Cold region steep slope riparian buffer zone construction method based on non-point source pollution blocking
By setting up sewage areas and multi-layer plant plantings that combine willow piles and willow branch bundles on the banks of the steep slopes in cold areas, the problems of fragile ecological functions of the buffer zone and poor pollutant interception effect are solved, and pollutant purification capacity is significantly improved and improved The regional ecological environment.
Patent Information
- Application Number
- CN202411095130.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-05
AI Technical Summary
The ecological functions of the buffer zone of the river bank in the steep slopes in cold areas are fragile and the water body is self-purifying, which leads to serious pollution from the surface source. The existing technology focuses more on plant community construction and ignores the buffer band width and slope characteristics, which affects the pollutant interception effect.
Using the method of combining willow stakes and willow branch bundles, a sewage interception area is set up on the banks of the steep slopes and planting different types of plants, including willows, shrubs and herbs. Gravel and pumice are fixed through willow branch bundles and barbed wire to form a multi-layer retention area. To improve the ability to intercept pollutants.
The area source pollution purification capacity of the emergency steep slope buffer zone has been significantly improved, the vegetation coverage rate and pollutant interception rate have been significantly improved, the regional ecological environment has been improved, and it is widely applicable, and is suitable for governments and enterprises to implement.
Smart Images

Figure CN118895728A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of river ecological protection / environmental governance, and in particular to a method for constructing a steep riverbank buffer zone in cold regions based on non-point source pollution blocking. Background Art
[0002] At present, due to the large area and large number of agricultural planting and breeding, the application of fertilizers and pesticides, and the inadequate management and control of waste discharge, non-point source pollution is serious. my country's riverbank buffer zones generally have the characteristics of fragile ecological functions, high degree of fragmentation, and insufficient interception and purification functions. Especially in Northeast my country, the winter is long and cold, the aquatic vegetation species are single, the vegetation growth cycle is short, the water body's self-purification capacity is weak, and the buffer zone area is insufficient, leading to serious water environment problems. The riverbank buffer zone is a transition zone from terrestrial ecosystems to aquatic ecosystems. It plays an important role in purifying river water quality, consolidating banks and preventing floods, regulating river basin microclimate, and protecting biodiversity. It is one of the main measures to prevent and control non-point source pollution. It is also the last green barrier to intercept pollutants from entering rivers, lakes, etc. The buffer zone effectively blocks pollutants such as nitrogen and phosphorus from entering the water system through the filtration, infiltration, absorption, retention and sedimentation of water-soil-vegetation. It is an effective means of intercepting terrestrial non-point source pollutants and improving river water quality that is widely used at home and abroad. Affected by topographic conditions, longitude and latitude, altitude, social factors, etc., the interception and conversion efficiency of pollutants in riverbank buffers of different vegetation types varies significantly. The width and slope of riverbank buffers are also important factors affecting pollutant reduction. However, the current riverbank buffer construction technology focuses more on the construction of buffer plant communities, and less consideration is given to the width of buffers and the interception characteristics of buffers with different slopes, which seriously affects the pollutant interception effect of riverbank buffers. Summary of the invention
[0003] The purpose of the present invention is to solve the problems existing in the above-mentioned technologies and further provide a method for constructing a steep slope river bank buffer zone in cold regions based on non-point source pollution blocking.
[0004] The objective of the present invention is achieved through the following technical solutions:
[0005] A method for constructing a buffer zone on steep slope riverbanks in cold regions based on non-point source pollution blocking.
[0006] Step 1: Riverbank buffer zone preparation: In April every year, in the riverbank buffer zone with a steep slope of more than 50%, remove stones, weeds and loose soil from the base surface, level the slope, and trim it until the slope matrix is firm;
[0007] Step 2: Set up a willow pile interception area. At 0.5m to 1m from the top of the slope to the water surface, and at the bottom of the steep slope, wedge in living tree stumps of arbor willow. The length of the living tree stumps of arbor willow is 1.2m to 1.5m, the middle diameter is 4cm to 6cm, the wedging depth is 0.8m to 1.1m, the height of the above-ground part is 0.2m to 0.5m, and the density is 0.5m. The willow varieties are selected from one or a combination of Songjiang willow, Artemisia willow and Marsh willow. Fix a 0.3m to 0.5m high wire mesh between adjacent willow piles, and the aperture of the wire mesh is 6cm.
[0008] Step 3, preparation of willow branch bundles, take a 1.2m long and 35cm wide high-density polyethylene mesh, fold the long side in half and sew it, and sew one short side to form a bag with one side open, fill the bag with gravel and pumice in a ratio of 1:3, and then sew the bag, the filling amount of gravel and pumice is 70% to 80% of the bag volume, take the young willow branches of the current year, the diameter of the young willow branches is 1cm and the length is 1m, and each bundle of 30 to 50 willow branches is wrapped around the periphery of the bag filled with gravel and pumice, and tied and fixed at the head and tail of the willow branches with wire;
[0009] Step 4: Place the willow bundles vertically between the willow piles and the bank slope (if the willow bundles, the willow piles and the bank are not completely in contact, place gravel and pumice bags underneath), connect the bundles at the same height head to tail, and the number of bundles should be flush with the normal water level;
[0010] Step 5: In the tree and shrub interception area, shrubs with a width of not less than 3m are planted next to the willow bundles. The planting varieties are one or a combination of Spiraea serrata, Pearlberry, Redwood and Salix marshlandii, 3-4 year old seedlings, with a plant spacing × row spacing of 1.5m × 1.5m. Next to the shrubs, 4-5 year old tree seedlings are planted. The tree varieties are one or a combination of poplar, Salix matsudana and Salix artemisiae, with a plant spacing × row spacing of 3m × 3m. The planting hole specifications are: 50cm × 50cm × 50cm;
[0011] Step 6: Herbaceous retention area: Plant a herbaceous retention area with a width of not less than 5m adjacent to the tree and shrub interception area. The planting varieties are one or any combination of bluegrass, red fescue and white clover. The seeds are 25g / m 2 Sow in spring.
[0012] The density in step 2 is the spacing between rows and plants.
[0013] The mesh size of the high-density polyethylene mesh in step 3 is 14 to 20 meshes.
[0014] In the step 3, the particle size of the gravel is 2-10 mm, and the particle size of the pumice is 10-20 mm.
[0015] The outstanding feature of the present invention is that willow stakes, willow branch bundles and plants are used in combination to repair and construct steep slope riverbank buffer zones in cold regions, which significantly improves the purification capacity of steep slope buffer zones for surface source pollution. In 2015, an experiment was conducted in the Ashi River bank zone (N45°40′9.83″, E126°54′4.16″~N45°40′30.13″, E126°53′45.04″) in Chenggaozi Town, Xiangfang District, Harbin City, Heilongjiang Province. The experimental length was 1 km. The continuous monitoring results in 2017 and 2018 showed that compared with the steep slopes without riverbank buffer zone construction (control), the vegetation coverage rate increased by 20-30%, the nitrogen interception rate increased by 12.4-13.8%, and the phosphorus interception rate increased by 13.0-13.5%. In addition, the present invention is simple to operate and has wide applicability. It can be afforded by governments, enterprises and institutions, and can significantly improve the regional ecological environment. It is of great significance to maintain regional ecological security and protect riverbank buffer zones. At the same time, it can provide a solid ecological guarantee for regional economic and social development. The present invention can be used for the restoration and construction of steep slope buffer zones in cold regions. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 Schematic diagram of modeling method for constructing steep slope riverbank buffer zones in cold regions based on non-point source pollution blocking. DETAILED DESCRIPTION
[0017] The present invention will be further described in detail below: This embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation method is given, but the protection scope of the present invention is not limited to the following embodiments.
[0018] Example 1
[0019] like Figure 1 As shown in the figure, the construction method of the steep slope riverbank buffer zone in cold regions based on non-point source pollution blocking is as follows:
[0020] Step 1: Riverbank buffer zone preparation: In April every year, in the riverbank buffer zone with steep slopes >50%, remove stones, weeds and loose soil on the base surface, level the slope, and trim it until the slope matrix is firm.
[0021] Step 2: Set up a willow pile sewage interception area. Extend 0.5m to 1m from the top of the slope to the water surface and wedge living willow stumps toward the bottom of the steep slope. The length of the living willow stumps is 1.2m to 1.5m, the middle diameter is 4cm to 6cm, the wedging depth is 0.8m to 1.1m, the height of the above-ground part is 0.2m to 0.5m, and the density is 0.5m. The willow variety can be selected from one or any combination of Songjiang willow, Artemisia willow and Swamp willow. Fix a 0.3m to 0.5m high wire mesh between adjacent willow piles, and the aperture of the wire mesh is 6cm.
[0022] Step 3. Preparation of willow branch bundles: take a 1.2m long and 35cm wide high-density polyethylene mesh, fold the long side in half and sew it, and sew one short side to form a bag with one side open, fill the bag with gravel and pumice in a ratio of 1:3 (1:3 ratio is weight ratio or volume ratio, gravel is 1, pumice is 3), then sew the bag, the filling amount of gravel and pumice is 70% to 80% of the bag volume, take young willow branches of the current year, the diameter of the willow branches is 1cm, and the length is 1m, and 30 to 50 willow branches are wrapped in a bundle around the periphery of the bag filled with gravel and pumice, and tied and fixed at the head and tail of the willow branches with wire.
[0023] Step 4: Place the willow branch bundles vertically between the willow piles and the vertical surface of the slope. The willow branch bundles at the same height should be connected end to end, and the number of willow branch bundles should be flush with the normal water level.
[0024] Step 5. In the tree and shrub interception area, shrubs with a width of not less than 3m are planted next to the willow branch bundles. The planting varieties are one or a combination of Spiraea willowii, Pearl Bush, Red Amaranthus and Salix marsh, 3-4 year old seedlings, and the plant spacing × row spacing is 1.5m×1.5m. Next to the shrubs, 4-5 year old seedlings of trees are planted. The tree varieties are one or a combination of several of Poplar, Salix matsudana and Salix artemisia, with a plant spacing × row spacing of 3m×3m, and the planting hole specifications are: 50cm×50cm×50cm.
[0025] Step 6: Herbaceous retention area: Plant a herbaceous retention area with a width of not less than 5m adjacent to the tree and shrub interception area. The planting varieties are one or any combination of bluegrass, red fescue and white clover. The seeds are 25g / m 2 Sow in spring.
[0026] Example 2
[0027] like Figure 1 As shown in the figure, the construction method of the steep slope riverbank buffer zone in cold regions based on non-point source pollution blocking is as follows:
[0028] Step 1: Riverbank buffer zone preparation: In April every year, in the riverbank buffer zone with steep slopes >50%, remove stones, weeds and loose soil on the base surface, level the slope appropriately, and trim the slope until the substrate is firm.
[0029] Step 2: Set up a willow stake interception area. Extend 0.7m from the top of the slope to the water surface and wedge living willow stumps (1.2m long, 5cm in middle diameter) into the bottom of the steep slope. The wedging depth is 0.9m, the height of the above-ground part is 0.3m, and the density (spacing between rows and plants) is 0.5m. Fix a 0.3m high wire mesh (6cm in aperture) between adjacent willow stakes.
[0030] Step 3. Prepare bundles of willow branches. Fold a 1.2m×35cm high-density polyethylene mesh (15 mesh), sew the long side in half and sew the short side on one side, fill it with gravel (4mm particle size) and pumice (12mm particle size) in a ratio of 1:3 and sew it together. Take the tender branches of Artemisia willow (1cm in diameter, 1m in length) of the current year, wrap 35 branches in a bundle outside the gravel and pumice bag, and fix them at the head and tail with wire.
[0031] Step 4: Place the willow branch bundles vertically between the willow piles and the vertical surface of the slope (if the willow branch bundles, willow piles and the slope are not in complete contact when placing the willow branch bundles, place gravel or pumice bags underneath), and the willow branch bundles at the same height are connected head to tail, and the number of willow branch bundles should be level with the normal water level.
[0032] Step 5. In the tree and shrub interception area, shrubs with a width of not less than 3m are planted next to the willow branch bundles. The planting varieties are Spiraea willowii, Red Rhododendron and / or Salix marsh, 3-4 year old seedlings, with a plant spacing × row spacing of 1.5m×1.5m. Next to the shrubs, 4-5 year old seedlings of Salix matsudana and / or Salix argyi are planted, with a plant spacing × row spacing of 3m×3m, and the planting hole specifications are: 50cm×50cm×50cm.
[0033] Step 6: Plant herb retention area with a width of not less than 5m next to the tree and shrub interception area. The planting variety is red fescue. The red fescue seeds are 25g m 2 Sow in spring.
[0034] The rest is the same as Example 1.
[0035] Example 3
[0036] like Figure 1 As shown in the figure, the construction method of the steep slope riverbank buffer zone in cold regions based on non-point source pollution blocking is as follows:
[0037] Step 1: Riverbank buffer zone preparation: In April every year, in the riverbank buffer zone with steep slopes >50%, remove stones, weeds and loose soil on the base surface, level the slope appropriately, and trim the slope until the substrate is firm.
[0038] Step 2: Set up a willow pile sewage interception area. Extend 0.5m from the top of the slope to the water surface and wedge living Songjiang willow stumps (length 1.3m, middle diameter 4cm) at the bottom of the steep slope. The wedging depth is 0.8m, the height of the above-ground part is 0.5m, and the density (plant spacing) is 0.5m. Fix a 0.5m high wire mesh (aperture 6cm) between adjacent willow piles.
[0039] Step 3, prepare willow branch bundles. Fold the long side of a 1.2m×35cm high-density polyethylene mesh (18 mesh) in half and sew together the short side on one side. Fill it with gravel (7mm in diameter) and pumice (16mm in diameter) in a ratio of 1:3, and then sew together the tender branches of the current year's willow (1cm in diameter, 1m in length). Wrap 40 willow branches in a bundle outside a gravel and pumice bag and fix them at the head and tail of the willow branches with wire.
[0040] Step 4: Place the willow branch bundles vertically between the willow piles and the vertical surface of the slope (if the willow branch bundles, willow piles and the slope are not in complete contact when placing the willow branch bundles, place gravel or pumice bags underneath), and the willow branch bundles at the same height are connected head to tail, and the number of willow branch bundles should be level with the normal water level.
[0041] Step 5. In the tree and shrub interception area, shrubs with a width of not less than 3m are planted next to the willow bundles. The planting varieties are pearl bush and / or red yew, 3-4 year old seedlings, and the plant spacing × row spacing is 1.5m×1.5m. 4-5 year old poplar seedlings are planted next to the shrubs, with a plant spacing × row spacing of 3m×3m, and the planting hole specifications are: 50cm×50cm×50cm.
[0042] Step 6: Herbaceous retention area: Plant a herbaceous retention area with a width of not less than 5m next to the tree and shrub interception area. Plant varieties are bluegrass and / or white clover. Seeds are 25g / m 2 Sow in spring.
[0043] The rest is the same as Example 1.
[0044] Example 4
[0045] like Figure 1 As shown in the figure, the construction method of the steep slope riverbank buffer zone in cold regions based on non-point source pollution blocking is as follows:
[0046] Step 1: Riverbank buffer zone preparation: In April every year, in the riverbank buffer zone with steep slopes >50%, remove stones, weeds and loose soil on the base surface, level the slope appropriately, and trim the slope until the substrate is firm.
[0047] Step 2: Set up a willow stake interception area. Extend 1m from the top of the slope to the water surface and wedge living willow stumps (1.4m long, 6cm in middle diameter) at the bottom of the steep slope. The wedging depth is 1.1m, the height of the above-ground part is 0.3m, and the density (spacing between rows and plants) is 0.5m. Fix a 0.4m high wire mesh (aperture 6cm) between adjacent willow stakes.
[0048] Step 3. Prepare bundles of willow branches. Fold a 1.2m×35cm high-density polyethylene mesh (20 mesh), sew the long side in half and sew the short side on one side, fill it with gravel (particle size 10mm) and pumice (particle size 20mm) in a 1:3 ratio and sew it together. Take the tender branches of Songjiang willow (1cm in diameter, 1m in length) of the current year, wrap 50 branches in a bundle outside the gravel and pumice bag, and fix the willow branches at the head and tail with wire.
[0049] Step 4: Place the willow branch bundles vertically between the willow stakes and the vertical surface of the slope (if the willow branch bundles, willow stakes and the slope are not in complete contact, place bags filled with gravel and pumice underneath). The willow branch bundles at the same height are connected head to tail, and the number of willow branch bundles should be level with the normal water level.
[0050] Step 5. In the tree and shrub interception area, shrubs with a width of not less than 3m are planted next to the willow branch bundles. The planting varieties are Spiraea willowii, 3-4 year old seedlings, and the plant spacing × row spacing is 1.5m×1.5m. Next to the shrubs, 4-5 year old Salix matsudana seedlings are planted, with a plant spacing × row spacing of 3m×3m. The planting hole specifications are: 50cm×50cm×50cm.
[0051] Step 6: Herbaceous retention area: Plant a herbaceous retention area with a width of not less than 5m next to the tree and shrub interception area. The planting variety is white clover. The white clover seeds are 25g / m 2 Sow in spring.
[0052] The rest is the same as Example 1.
[0053] The above are only preferred specific embodiments of the present invention, which are all different implementations based on the overall concept of the present invention, and the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A method for constructing a buffer zone on steep slope riverbanks in cold regions based on non-point source pollution blocking, characterized in that: Step 1: Riverbank buffer zone preparation: In April every year, in the riverbank buffer zone with a steep slope of more than 50%, remove stones, weeds and loose soil from the base surface, level the slope, and trim it until the slope matrix is firm; Step 2: Set up a willow pile interception area. At 0.5m to 1m from the top of the slope to the water surface, and at the bottom of the steep slope, wedge in living tree stumps of arbor willow. The length of the living tree stumps of arbor willow is 1.2m to 1.5m, the middle diameter is 4cm to 6cm, the wedging depth is 0.8m to 1.1m, the height of the above-ground part is 0.2m to 0.5m, and the density is 0.5m. The willow varieties are selected from one or a combination of Songjiang willow, Artemisia willow and Marsh willow. Fix a 0.3m to 0.5m high wire mesh between adjacent willow piles, and the aperture of the wire mesh is 6cm. Step 3, preparation of willow branch bundles, take a 1.2m long and 35cm wide high-density polyethylene mesh, fold the long side in half and sew it, and sew one short side to form a bag with one side open, fill the bag with gravel and pumice in a ratio of 1:3, and then sew the bag, the filling amount of gravel and pumice is 70% to 80% of the bag volume, take the young willow branches of the current year, the diameter of the young willow branches is 1cm and the length is 1m, and each bundle of 30 to 50 willow branches is wrapped around the periphery of the bag filled with gravel and pumice, and tied and fixed at the head and tail of the willow branches with wire; Step 4: Place the willow branch bundles vertically between the willow piles and the bank slope, with the bundles of willow branches at the same height connected end to end, and the number of bundles of willow branches aligned with the normal water level; Step 5: In the tree and shrub interception area, shrubs with a width of not less than 3m are planted next to the willow bundles. The planting varieties are one or a combination of Spiraea serrata, Pearlberry, Redwood and Salix marshlandii, 3-4 year old seedlings, with a plant spacing × row spacing of 1.5m × 1.5m. Next to the shrubs, 4-5 year old tree seedlings are planted. The tree varieties are one or a combination of poplar, Salix matsudana and Salix artemisiae, with a plant spacing × row spacing of 3m × 3m. The planting hole specifications are: 50cm × 50cm × 50cm; Step 6: Herbaceous retention area: Plant a herbaceous retention area with a width of not less than 5m adjacent to the tree and shrub interception area. The planting varieties are one or any combination of bluegrass, red fescue and white clover. The seeds are 25g / m 2 Sow in spring.
2. The method for constructing a buffer zone on a steep riverbank in cold regions based on non-point source pollution blocking according to claim 1 is characterized in that: The density in step 2 is the spacing between rows and plants.
3. The method for constructing a buffer zone on a steep slope river bank in cold regions based on non-point source pollution blocking according to claim 1 is characterized in that: In step 3, the mesh size of the high-density polyethylene mesh is 14 to 20 meshes.
4. The method for constructing a buffer zone on a steep slope river bank in cold regions based on non-point source pollution blocking according to claim 1 is characterized in that: In step 3, the particle size of the gravel is 2 to 10 mm, and the particle size of the pumice is 10 to 20 mm.
Citation Information
Cited By
Method for overwintering survival of willow shrubs in grassland, river and lake buffer zones in cold and arid regions
CN122271162A