Virtual coupling train speed convergence cooperative control method based on multi-agent system
Through the virtual coupling train speed convergence collaborative control method of the multi-agent system, the speed coordination complexity and external interference problems in traditional train marshalling are solved, real-time information sharing and speed synchronization between trains are realized, and the stability and stability of the marshalling operation are improved. Safety meets peak passenger flow demand.
Patent Information
- Application Number
- CN202411110251.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-08-13
AI Technical Summary
Traditional train marshalling collaborative control is complex in the speed coordination stage. External interference and model uncertainty affect control stability, making it difficult to meet peak passenger flow demand and improve operation quality.
A virtual coupled train speed convergence collaborative control method based on a multi-agent system is adopted. Through distributed observer design, adaptive control algorithm and collaborative control algorithm, real-time information sharing and speed synchronization between trains are achieved to ensure stable spacing and dynamic adjustment control. Strategies to cope with uncertainty and disruption.
It improves the efficiency and safety of train marshalling operations, enhances the robustness and adaptability of the system, ensures stable operation in complex environments, and improves the operational quality and safety of rail transit.
Smart Images

Figure CN118753345A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of computer science and control technology, and specifically is a virtual coupled train speed convergence collaborative control method based on a multi-agent system. Background Art
[0002] As the artery of urban transportation, rail transit faces the challenge of increasing passenger flow and capacity bottlenecks. The traditional mobile block system is almost saturated and it is difficult to cope with peak passenger flow by increasing the frequency of trains. New lines are limited by high costs and space resources. In this context, train marshaling technology has become the key to improving transportation capacity. This technology abandons physical coupling and relies on advanced train-to-train communication and automatic operation technology to achieve coordinated operation of trains, effectively shorten train intervals, and enhance line capacity. However, the coordinated control of train marshaling is still complex in the speed coordination stage, and fine regulation is required to ensure safety and efficiency. At the same time, external interference and model uncertainty have become factors that cannot be ignored in affecting control stability and performance. It is necessary to further develop more robust control strategies to fully release the potential of train marshaling technology, flexibly match passenger flow demand, and optimize the quality of urban rail transit operations. Summary of the invention
[0003] The object of the present invention is to provide a virtual coupled train speed convergence cooperative control method based on a multi-agent system to solve the problems raised in the above background technology.
[0004] In order to achieve the above object, the present invention provides the following technical solution: a virtual coupled train speed convergence collaborative control method based on a multi-agent system, the specific steps of the control method are as follows:
[0005] S1: System initialization and parameter setting: The initial state of the train includes position, speed, and dynamic parameters. Set R1 communication distance and R2 safety distance to ensure safe communication and driving;
[0006] S2: Distributed observer design: Design a distributed observer to estimate trajectories and interference in real time, and use neighboring vehicle status updates to ensure accurate and real-time information;
[0007] S3: Adaptive control algorithm construction: Use barrier Lyapunov to maintain spacing, design an adaptive control algorithm, and calculate input based on error, parameter and interference estimates;
[0008] S4: Implementation of cooperative control algorithm: The cooperative control algorithm promotes train speed synchronization, ensures stable spacing, and improves train operation efficiency and safety;
[0009] S5: Global stability analysis: The global Lyapunov proof is stable, the algorithm is effective and robust, and ensures the stability of the system under all conditions;
[0010] S6: Dynamic formation of train marshaling: Train i applies for communication when it is close to the last car R1 of the marshaling group. If the link is established, it will be incorporated, and the cycle will continue until all trains are incorporated;
[0011] S7: Marshalling operation and disbanding: distributed observation after marshaling, adaptive speed control distance; intermittent communication during disbanding, dynamic and flexible response.
[0012] Preferably, the system initialization and parameter setting in S1 refers to the fact that in the railway operation system, the initial state of each train is crucial, the specific position of the train, the initial running speed and the dynamic model parameters used to describe its motion characteristics ensure the safety and efficiency of the train operation. We set two key distance parameters: the maximum communication distance R1 and the minimum safety distance R2. R1 ensures that the trains can maintain effective communication, exchange driving information in real time, and prevent potential conflicts; while R2 acts as a safety barrier to ensure that the distance between trains is sufficient to brake in an emergency and avoid collisions.
[0013] Preferably, the distributed observer in S2 is designed to enable each train to independently and in real time predict its reference running trajectory and external potential interference. This observer innovatively incorporates the real-time shared status information of adjacent trains and continuously updates its own status through data fusion and cross-validation.
[0014] Preferably, the specific steps of constructing the adaptive control algorithm in S3 are:
[0015] Step 1: Use barrier Lyapunov function to implement spacing hard constraint analysis and design barrier function: According to the safety requirements of train spacing (such as the minimum safety distance R2), design a barrier Lyapunov function V(z), where z is a state variable or error variable related to the train spacing. The function should satisfy that when the train spacing is close to or less than R2, the value of V(z) increases sharply, which is an indication of violation of the spacing constraint;
[0016] Embed constraints: Combine the barrier function V(z) with the train’s control objective to ensure that the hard spacing constraint is taken into account in the control strategy. Typically, this is done by adding a term related to V(z) to the control law to adjust the control input when approaching the spacing limit.
[0017] Step 2: Online estimation of uncertain parameters and disturbances
[0018] Establish parameter estimation model: Establish corresponding estimation model for uncertain parameters and external interference that affect train operation;
[0019] Design estimators: Use filtering techniques or observer design methods to design a suitable estimator for each parameter or disturbance to be estimated. These estimators accurately and in real time track the changes of parameters and disturbances.
[0020] Step 3: Design an adaptive control algorithm
[0021] Build control strategy: Based on the speed error, the estimated values of the uncertain parameters and the estimated values of the disturbance, design an adaptive control algorithm that can dynamically adjust the control input to compensate for the effects of uncertainty and disturbance on train operation and meet the spacing hard constraint;
[0022] Optimize control parameters: Tune the parameters in the control algorithm through optimization methods or model-based design methods to improve system performance and stability;
[0023] Verification and testing: Verify and test the designed adaptive control algorithm in a simulation environment to evaluate its performance under different working conditions, and adjust and optimize it according to the test results to ensure that the algorithm can run stably and reliably in actual applications.
[0024] Preferably, the collaborative control algorithm in S4 is implemented using an advanced collaborative control algorithm, so that the train system can make full use of the real-time information of adjacent trains to achieve accurate synchronization and rapid convergence of speed, ensuring that the distance between trains is always maintained within a preset safety range, and effectively reducing energy consumption and delays caused by speed fluctuations.
[0025] Preferably, the global stability analysis in S5 is to perform system stability analysis by selecting the global Lyapunov function V, and evaluate the stability of the system dynamic behavior by the changing trend of the function over time. Furthermore, based on the analysis result of the function, it is strictly proved that the designed control algorithm is not only effective under ideal conditions, but also exhibits strong robustness when facing complex working conditions such as parameter changes and external interference.
[0026] Preferably, the specific steps of dynamically forming the train formation in S6 are as follows:
[0027] Step 1: Detect distance and request communication
[0028] Detection distance: Train i continuously monitors the distance between itself and the last train in the current marshaling. The distance is obtained in real time through sensors or communication systems on the train;
[0029] Judgment condition: When train i detects that the distance between it and the train at the end of the formation is less than or equal to the preset threshold R1, train i is considered to be in a suitable position to join the formation;
[0030] Request communication: After the conditions are met, train i sends a request to the last train of the formation through wireless communication, requesting to establish a direct communication link in order to join the formation;
[0031] Step 2: Establish a communication link and join the group
[0032] Respond to the request: After receiving the request from train i, the train at the end of the marshaling group confirms its identity and the validity of the request;
[0033] Establishing a link: After confirmation, a stable communication link is established between the last train of the marshaling and train i. The link will be used for subsequent data exchange and transmission of control instructions;
[0034] Joining the marshaling: After the communication link is successfully established, train i officially joins the marshaling, and its running status will be uniformly managed and dispatched by the marshaling control system;
[0035] Step 3: Repeat the process until all trains are added
[0036] Continue monitoring: After train i joins the formation, the system continues to monitor the distance between other trains that have not joined the formation and the train at the end of the formation;
[0037] Repeated request and joining: Whenever a new train enters the R1 range and meets the conditions for joining the formation, the process of steps 1 and 2 is repeated, that is, requesting to establish a communication link and joining the formation after success;
[0038] Complete marshaling: This process will continue until all trains are successfully joined in sequence to form a complete train marshaling, and run efficiently and safely under unified control.
[0039] Preferably, the specific steps of group operation and disbanding in S7 are as follows:
[0040] Step 1: Speed synchronization and spacing control after formation
[0041] Deployment of distributed observers: After the train formation is formed, distributed observers are deployed on each train. These observers can collect status information of neighboring trains in real time and estimate the train's reference trajectory and external interference based on this information;
[0042] Applying adaptive control algorithms: Based on the information provided by the distributed observers, the adaptive control algorithm on each train will calculate the appropriate control input to achieve synchronous convergence of train speed and stable control of spacing;
[0043] Step 2: Continuous monitoring and adjustment
[0044] Real-time feedback and adjustment: During the train marshaling process, the distributed observer and adaptive control algorithm will continue to work, provide real-time feedback on the train's operating status, and adjust the control strategy as needed;
[0045] Abnormal handling: If any abnormal situation is detected, the system will immediately trigger the corresponding emergency handling mechanism to ensure the safe and stable operation of the train formation;
[0046] Step 3: Disbanding the group and releasing the communication link
[0047] Disbanding decision: When the operation ends or other situations occur that require the disbanding of the group, the system will make a disbanding decision based on the preset disbanding conditions or the operator's instructions;
[0048] Release the communication link: After the disbanding decision is made, the system will release the communication link between trains through a specific communication protocol, which is the key to ensure that the train formation can be disbanded safely and orderly;
[0049] Independent operation: After the communication link is released, each train will resume independent operation and continue to move forward according to its own operation plan and control strategy.
[0050] Preferably, 1.
[0051] The beneficial effects of the present invention are as follows:
[0052] The present invention cleverly solves the communication problem through the distributed observer in the train marshaling system, collects the status of adjacent trains in real time, and dynamically compensates data to ensure accurate grasp of the marshaling status. The adaptive control algorithm is based on the barrier Lyapunov function, solidifies the spacing requirements into hard constraints, and combines nonlinear control theory to deal with parameter uncertainty and stabilize marshaling operation. The collaborative control algorithm is like a lubricant, which promotes seamless cooperation between trains, synchronous speed convergence, and safe and stable spacing. This system exhibits excellent robustness and adaptability, operates stably in complex environments, and provides solid guarantees for safe and efficient rail transit. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 It is a schematic diagram of the overall process of the present invention;
[0054] Figure 2 The train marshaling operation model diagram of the present invention;
[0055] Figure 3 This is a block diagram of the collaborative control algorithm of the present invention;
[0056] Figure 4 It is a diagram of the dynamic formation process of the train formation of the present invention;
[0057] Figure 5 It is a diagram of the disbanding process of the train formation of the present invention;
[0058] Figure 6 It is a schematic diagram of the train marshaling speed convergence process of the present invention. DETAILED DESCRIPTION
[0059] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0060] like Figures 1 to 6 As shown, an embodiment of the present invention provides a virtual coupled train speed convergence collaborative control method based on a multi-agent system, and the specific steps of the control method are as follows:
[0061] S1: System initialization and parameter setting: The initial state of the train includes position, speed, and dynamic parameters. Set R1 communication distance and R2 safety distance to ensure safe communication and driving;
[0062] S2: Distributed observer design: Design a distributed observer to estimate trajectories and interference in real time, and use neighboring vehicle status updates to ensure accurate and real-time information;
[0063] S3: Adaptive control algorithm construction: Use barrier Lyapunov to maintain spacing, design an adaptive control algorithm, and calculate input based on error, parameter and interference estimates;
[0064] S4: Implementation of cooperative control algorithm: The cooperative control algorithm promotes train speed synchronization, ensures stable spacing, and improves train operation efficiency and safety;
[0065] S5: Global stability analysis: The global Lyapunov proof is stable, the algorithm is effective and robust, and ensures the stability of the system under all conditions;
[0066] S6: Dynamic formation of train marshaling: Train i applies for communication when it is close to the last car R1 of the marshaling group. If the link is established, it will be incorporated, and the cycle will continue until all trains are incorporated;
[0067] S7: Marshalling operation and disbanding: distributed observation after marshaling, adaptive speed control distance; intermittent communication during disbanding, dynamic and flexible response.
[0068] The system initialization and parameter setting in S1 refers to the fact that in the railway operation system, the initial state of each train is crucial, including the specific position of the train, the initial running speed, and the dynamic model parameters used to describe its motion characteristics. To ensure the safety and efficiency of train operation, we set two key distance parameters: the maximum communication distance R1 and the minimum safety distance R2. R1 ensures that the trains can maintain effective communication, so as to exchange driving information in real time and prevent potential conflicts; while R2 acts as a safety barrier to ensure that the distance between trains is sufficient to brake in an emergency and avoid collisions. This setting ensures that the trains operate within a safe and efficient communication range.
[0069] The distributed observer in S2 is designed to enable each train to independently and in real time predict its reference running trajectory and external potential interference. This observer innovatively incorporates the real-time shared status information of adjacent trains and continuously updates its own status through data fusion and cross-validation.
[0070] The state update equation of the observer is:
[0071]
[0072] Where μ is a designed positive number, is the estimated state value of the i-th train, a ij is the adjacency matrix element of the communication topology.
[0073] This significantly improves the accuracy and timeliness of the estimation. This process ensures the intelligence and safety of train operation control and promotes the smooth operation of the overall transportation system.
[0074] The specific steps of constructing the adaptive control algorithm in S3 are as follows:
[0075] Step 1: Use barrier Lyapunov function to implement spacing hard constraint analysis and design barrier function: According to the safety requirements of train spacing (such as the minimum safety distance R2), design a barrier Lyapunov function V(z), where z is a state variable or error variable related to the train spacing. The function should satisfy that when the train spacing is close to or less than R2, the value of V(z) increases sharply as an indication of violation of the spacing constraint.
[0076] Embed constraints: Combine the barrier function V(z) with the train’s control objective to ensure that the hard spacing constraint is taken into account in the control strategy. Typically, this is done by adding a term related to V(z) to the control law to adjust the control input when approaching the spacing limit.
[0077] Step 2: Online estimation of uncertain parameters and disturbances
[0078] Establish parameter estimation models: Establish corresponding estimation models for uncertain parameters (such as unknown parameters in the model) and external interference (such as environmental factors) that affect train operation; these models should be able to update the estimated values of the parameters based on the real-time status and operation data of the train.
[0079] Design estimators: Use filtering techniques (such as Kalman filters, particle filters, etc.) or observer design methods to design a suitable estimator for each parameter or disturbance to be estimated. These estimators should be able to accurately and in real time track the changes of parameters and disturbances;
[0080] Step 3: Design an adaptive control algorithm
[0081] Constructing a control strategy: Based on the speed error (i.e., the difference between the actual train speed and the desired speed), the estimated values of the uncertain parameters, and the estimated values of the disturbances, an adaptive control algorithm is designed. The algorithm should be able to dynamically adjust the control input (such as traction or braking force) to compensate for the effects of uncertainty and disturbances on train operation and meet the spacing hard constraint;
[0082] Optimize control parameters: Tune the parameters in the control algorithm through optimization methods (such as genetic algorithms, particle swarm optimization, etc.) or model-based design methods (such as LQR, MPC, etc.) to improve the performance and stability of the system;
[0083] Verification and testing: Verify and test the designed adaptive control algorithm in a simulation environment to evaluate its performance under different working conditions, and adjust and optimize it according to the test results to ensure that the algorithm can run stably and reliably in actual applications.
[0084] The control input is:
[0085]
[0086] in, is the estimated value of the uncertain parameter, e i is the speed error K i , is the control gain and is the estimated value of the disturbance.
[0087] Speed error calculation:
[0088] The velocity error is defined as:
[0089]
[0090] Among them, v i is the current train speed, is the reference trajectory speed,
[0091] Parameter estimates:
[0092] By estimating the parameters of the train's dynamic model, the control input is updated:
[0093]
[0094] The advantages of constructing an adaptive control algorithm are: ensuring hard constraints on spacing through barrier Lyapunov functions to improve operational safety; online estimation of uncertain parameters and interference to enhance system robustness; dynamic adjustment of control strategies to optimize control parameters to improve operational efficiency and stability; simulation verification to ensure algorithm reliability and provide intelligent, flexible and safe control solutions for train marshaling systems.
[0095] Among them, the collaborative control algorithm in S4 adopts an advanced collaborative control algorithm. The train system can make full use of the real-time information of adjacent trains to achieve accurate synchronization and rapid convergence of speed, ensuring that the distance between trains is always maintained within the preset safety range, and effectively reducing energy consumption and delays caused by speed fluctuations. This significantly improves the overall operating efficiency of train formations and the safety of passengers, bringing revolutionary optimization and upgrades to modern rail transit systems.
[0096] The collaborative control algorithm helps optimize train formation: precise synchronization of speed, rapid convergence, ensuring safe spacing, reducing energy consumption and delays. This algorithm makes full use of the real-time information of adjacent trains to improve the efficiency and safety of train formation, bringing passengers a smoother and more punctual travel experience, while reducing operating costs and promoting the intelligent and green development of rail transit systems.
[0097] Among them, the global stability analysis in S5 is to select the global Lyapunov function V to perform system stability analysis, and evaluate the stability of the system dynamic behavior through the change trend of the function over time. Further, based on the analysis results of the function, it is strictly proved that the designed control algorithm is not only effective under ideal conditions, but also exhibits strong robustness when facing complex working conditions such as parameter changes and external interference. This ensures that the entire train marshaling system can maintain a stable, efficient and safe operating state under various operating conditions.
[0098] Global Lyapunov analysis ensures the stability of the train marshaling system: the V function is used to evaluate the system dynamics and strictly prove the effectiveness and robustness of the control algorithm. Under complex working conditions, such as parameter changes and external interference, the system can still maintain stable operation, improve the overall operation safety and reliability, optimize the passenger experience, and provide a solid guarantee for the safe and efficient operation of rail transit.
[0099] The specific steps of the dynamic formation of train formation in S6 are as follows:
[0100] Step 1: Detect distance and request communication
[0101] Detection distance: Train i continuously monitors the distance between itself and the last train in the current marshaling. The distance is obtained in real time through sensors or communication systems on the train;
[0102] Judgment condition: When train i detects that the distance between it and the train at the end of the formation is less than or equal to the preset threshold R1, train i is considered to be in a suitable position to join the formation;
[0103] Request communication: After the conditions are met, train i sends a request to the last train of the formation through wireless communication, requesting to establish a direct communication link in order to join the formation;
[0104] Step 2: Establish a communication link and join the group
[0105] Respond to the request: After receiving the request from train i, the train at the end of the marshaling group confirms its identity and the validity of the request;
[0106] Establishing a link: After confirmation, a stable communication link is established between the last train of the marshaling and train i. The link will be used for subsequent data exchange and transmission of control instructions;
[0107] Joining the marshaling: After the communication link is successfully established, train i officially joins the marshaling, and its running status will be uniformly managed and dispatched by the marshaling control system;
[0108] Step 3: Repeat the process until all trains are added
[0109] Continue monitoring: After train i joins the formation, the system continues to monitor the distance between other trains that have not joined the formation and the train at the end of the formation;
[0110] Repeated request and joining: Whenever a new train enters the R1 range and meets the conditions for joining the formation, the process of steps 1 and 2 is repeated, that is, requesting to establish a communication link and joining the formation after success;
[0111] Complete marshaling: This process will continue until all trains are successfully joined in sequence to form a complete train marshaling, and run efficiently and safely under unified control.
[0112] The advantages of the dynamic train formation process are significant: through real-time distance monitoring and wireless communication, trains can autonomously request to join the formation, ensuring that the formation process is efficient and flexible; stable communication links are established to ensure the smooth transmission of data and control instructions; repeated processes ensure that all trains join in an orderly manner to form a complete formation, thereby improving overall operating efficiency and safety, and providing passengers with a more stable and comfortable travel experience.
[0113] The specific steps of marshaling operation and disbanding in S7 are as follows:
[0114] Step 1: Speed synchronization and spacing control after formation
[0115] Deployment of distributed observers: After the train formation is formed, distributed observers are deployed on each train. These observers can collect the status information of neighboring trains (such as position, speed, acceleration, etc.) in real time and estimate the reference trajectory and external interference of the train based on this information;
[0116] Application of adaptive control algorithm: Based on the information provided by the distributed observer, the adaptive control algorithm on each train will calculate the appropriate control input (such as traction or braking force) to achieve synchronous convergence of train speed and stable control of spacing; the algorithm can dynamically adjust control parameters to cope with various uncertainties and interferences, ensuring the stability and safety of the overall operation of the train formation.
[0117] Step 2: Continuous monitoring and adjustment
[0118] Real-time feedback and adjustment: During the train marshaling operation, the distributed observer and adaptive control algorithm will continue to work, provide real-time feedback on the train's operating status, and adjust the control strategy as needed; this helps ensure that the train maintains optimal performance in a complex and changing operating environment.
[0119] Abnormal handling: If any abnormal situation is detected (such as train failure, communication interruption, etc.), the system will immediately trigger the corresponding emergency handling mechanism to ensure the safe and stable operation of the train formation;
[0120] Step 3: Disbanding the group and releasing the communication link
[0121] Disbanding decision: When the operation ends or other situations occur that require the disbanding of the group, the system will make a disbanding decision based on the preset disbanding conditions or the operator's instructions;
[0122] Release the communication link: After the disbanding decision is made, the system will release the communication link between trains through a specific communication protocol, which is the key to ensure that the train formation can be disbanded safely and orderly;
[0123] Independent operation: After the communication link is released, each train will resume independent operation and continue to move forward according to its own operation plan and control strategy.
[0124] Optimizing the marshaling operation and disbanding processes brings multiple benefits: Distributed observation and adaptive control ensure stable and efficient train marshaling; real-time monitoring and flexible adjustment to cope with complex environments; exception handling mechanisms ensure safety; the disbanding process is orderly and communication links are immediately released, which promotes the rapid resumption of independent operation of trains, improves overall operational efficiency and flexibility, and ensures passenger safety and smooth travel.
[0125] Figure 2 The operational model of train formation is presented, in which each train is regarded as an intelligent agent, and adjacent trains can obtain each other's status information (such as speed and position) through inter-train communication links.
[0126] Figure 3 The block diagram of the cooperative control algorithm is shown. By receiving the status information of neighboring trains, the control input is calculated to ensure the synchronous convergence of train speeds and the stability of train spacing.
[0127] Figure 4 The dynamic formation process of train formation is shown. Assuming that train i does not belong to the formation and its distance to the last train of the formation is within the range (R2, R1-γ), train i requests to establish a communication link with the last train of the formation, and joins the formation after success. This process is repeated until all trains have joined the formation.
[0128] Figure 5 The disbanding process of the train formation is shown. If the distance between train i and the train ahead exceeds the maximum communication distance R1 or communication is lost, and the communication link cannot be reestablished within the specified time, train i and its subsequent trains exit the formation.
[0129] Figure 6 The schematic diagram of the train marshaling speed convergence process is shown. Through inter-train communication, the trains in the marshaling obtain the status information of the train in front and synchronize the speed through the cooperative control algorithm while maintaining the preset train spacing.
[0130] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0131] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A virtual coupled train speed convergence cooperative control method based on a multi-agent system, characterized by: The specific steps of the control method are as follows: S1: System initialization and parameter setting: The initial state of the train includes position, speed, and dynamic parameters. Set R1 communication distance and R2 safety distance to ensure safe communication and driving; S2: Distributed observer design: Design a distributed observer to estimate trajectories and interference in real time, and use neighboring vehicle status updates to ensure accurate and real-time information; S3: Adaptive control algorithm construction: Use barrier Lyapunov to maintain spacing, design an adaptive control algorithm, and calculate input based on error, parameter and interference estimates; S4: Implementation of cooperative control algorithm: The cooperative control algorithm promotes train speed synchronization, ensures stable spacing, and improves train operation efficiency and safety; S5: Global stability analysis: The global Lyapunov proof is stable, the algorithm is effective and robust, and ensures the stability of the system under all conditions; S6: Dynamic formation of train marshaling: Train i applies for communication when it is close to the last car R1 of the marshaling group. If the link is established, it will be incorporated, and the cycle will continue until all trains are incorporated; S7: Marshalling operation and disbanding: distributed observation after marshaling, adaptive speed control distance; intermittent communication during disbanding, dynamic and flexible response.
2. According to claim 1, a virtual coupled train speed convergence cooperative control method based on a multi-agent system is characterized by: The system initialization and parameter setting in S1 refers to the initial state of each train, the specific position of the train, the initial running speed and the dynamic model parameters used to describe its motion characteristics, to ensure the safety and efficiency of train operation, and set two key distance parameters: the maximum communication distance R1 and the minimum safety distance R2. R1 ensures that the trains can maintain effective communication, exchange driving information in real time, and prevent potential conflicts; while R2 acts as a safety barrier to ensure that the distance between trains is sufficient to brake in an emergency and avoid collisions.
3. The method for virtual coupled train speed convergence cooperative control based on a multi-agent system according to claim 1, characterized in that: The distributed observer in S2 is designed to enable each train to independently and in real time predict its reference running trajectory and external potential interference. This observer innovatively incorporates the real-time shared status information of adjacent trains and continuously updates its own status through data fusion and cross-validation.
4. The method for virtual coupled train speed convergence cooperative control based on a multi-agent system according to claim 1, characterized in that: The specific steps of constructing the adaptive control algorithm in S3 are as follows: Step 1: Use barrier Lyapunov function to implement spacing hard constraint analysis and design barrier function: According to the safety requirements of train spacing, design a barrier Lyapunov function V(z); Embed constraints: The barrier function V(z) is combined with the control objective of the train to ensure that the hard spacing constraint is taken into account in the control strategy. This is achieved by adding a term related to V(z) in the control law to adjust the control input when approaching the spacing limit. Step 2: Online estimation of uncertain parameters and disturbances Establish parameter estimation model: Establish corresponding estimation model for uncertain parameters and external interference that affect train operation; Design estimator: Using filtering technology and observer design methods, a suitable estimator is designed for each parameter or disturbance to be estimated. The estimator accurately and in real time tracks the changes of parameters and disturbances. Step 3: Design an adaptive control algorithm Build control strategy: Based on the speed error, the estimated values of the uncertain parameters and the estimated values of the disturbance, design an adaptive control algorithm that can dynamically adjust the control input to compensate for the effects of uncertainty and disturbance on train operation and meet the spacing hard constraint; Optimize control parameters: Tune the parameters in the control algorithm through optimization methods and model-based design methods to improve system performance and stability; Verification and testing: Verify and test the designed adaptive control algorithm in a simulation environment to evaluate its performance under different working conditions, and adjust and optimize it according to the test results to ensure that the algorithm can run stably and reliably in actual applications.
5. The method for virtual coupled train speed convergence cooperative control based on a multi-agent system according to claim 1, characterized in that: The collaborative control algorithm in S4 is implemented using an advanced collaborative control algorithm. The train system can make full use of the real-time information of adjacent trains to achieve accurate synchronization and rapid convergence of speed, ensuring that the distance between trains is always maintained within a preset safety range, and effectively reducing energy consumption and delays caused by speed fluctuations.
6. The virtual coupled train speed convergence cooperative control method based on a multi-agent system according to claim 1, characterized in that: The global stability analysis in S5 is to perform system stability analysis by selecting the global Lyapunov function V, and evaluate the stability of the system dynamic behavior by the changing trend of this function over time. Furthermore, based on the analysis results of this function, it is strictly proved that the designed control algorithm is not only effective under ideal conditions, but also exhibits strong robustness when facing complex working conditions such as parameter changes and external interference.
7. The method for virtual coupled train speed convergence cooperative control based on a multi-agent system according to claim 1, characterized in that: The specific steps of the dynamic formation of train formation in S6 are as follows: Step 1: Detect distance and request communication Detection distance: Train i continuously monitors the distance between itself and the last train in the current marshaling. The distance is obtained in real time through sensors or communication systems on the train; Judgment condition: When train i detects that the distance between it and the train at the end of the formation is less than or equal to the preset threshold R1, train i is considered to be in a suitable position to join the formation; Request communication: After the conditions are met, train i sends a request to the last train of the formation through wireless communication, requesting to establish a direct communication link in order to join the formation; Step 2: Establish a communication link and join the group Respond to the request: After receiving the request from train i, the train at the end of the marshaling group confirms its identity and the validity of the request; Establishing a link: After confirmation, a stable communication link is established between the last train of the marshaling and train i. The link will be used for subsequent data exchange and transmission of control instructions; Joining the marshaling: After the communication link is successfully established, train i officially joins the marshaling, and its running status will be uniformly managed and dispatched by the marshaling control system; Step 3: Repeat the process until all trains are added Continue monitoring: After train i joins the formation, the system continues to monitor the distance between other trains that have not joined the formation and the train at the end of the formation; Repeated request and joining: Whenever a new train enters the R1 range and meets the conditions for joining the formation, the process of steps 1 and 2 is repeated, that is, requesting to establish a communication link and joining the formation after success; Complete marshaling: This process will continue until all trains are successfully joined in sequence to form a complete train marshaling, and run efficiently and safely under unified control.
8. The method for virtual coupled train speed convergence cooperative control based on a multi-agent system according to claim 1, characterized in that: The specific steps of marshaling operation and disbanding in S7 are as follows: Step 1: Speed synchronization and spacing control after formation Deployment of distributed observers: After the train formation is formed, distributed observers are deployed on each train. These observers can collect status information of neighboring trains in real time and estimate the train's reference trajectory and external interference based on this information; Applying adaptive control algorithms: Based on the information provided by the distributed observers, the adaptive control algorithm on each train will calculate the appropriate control input to achieve synchronous convergence of train speed and stable control of spacing; Step 2: Continuous monitoring and adjustment Real-time feedback and adjustment: During the train marshaling process, the distributed observer and adaptive control algorithm will continue to work, provide real-time feedback on the train's operating status, and adjust the control strategy as needed; Abnormal handling: If any abnormal situation is detected, the system will immediately trigger the corresponding emergency handling mechanism to ensure the safe and stable operation of the train formation; Step 3: Disbanding the group and releasing the communication link Disbanding decision: When the operation ends or other situations occur that require the disbanding of the group, the system will make a disbanding decision based on the preset disbanding conditions or the operator's instructions; Release the communication link: After the disbanding decision is made, the system will release the communication link between trains through a specific communication protocol, which is the key to ensure that the train formation can be disbanded safely and orderly; Independent operation: After the communication link is released, each train will resume independent operation and continue to move forward according to its own operation plan and control strategy.
Citation Information
Patent Citations
Multi-train cooperative control method and device
CN112084636A
Virtual formation-oriented train operation control method
CN113525461A
Intelligent port comprehensive management system
CN114861956A
Heavy-load train system optimization coordination fault-tolerant control method based on fault compensation
CN115712245A
Train cooperative control method based on virtual marshalling
CN117962967A
Cited By
Multi-train cooperative cruise control method and system considering communication distance
CN119568238A
High-speed train cooperative control method based on distributed sampling observer
CN119668103A
Vehicle safety control algorithm based on model-free non-zero sum game
CN119758709A
Cooperative operation control method for high-speed train group containing malicious agent
CN119858582A
High-speed train group control method based on tracking and communication distance constraints
CN120440094A
