Concrete pavement maintenance device for road and bridge engineering

By designing the driving component and transmission component, the height adjustment and angle adjustment of the concrete pavement spraying device are realized, which solves the problems of uneven spraying and high labor force, and improves the spraying efficiency and the convenience of damage treatment.

CN118756550AInactive Publication Date: 2024-10-11广东长大道路养护有限公司 +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410937525.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing concrete pavement water spray maintenance equipment cannot adjust the spraying height, resulting in uneven spraying, increasing the labor force of the staff and reducing the spraying efficiency, which is especially inconvenient when maintenance of concrete walls is required.

Method used

A concrete pavement maintenance device including a driving component, a water supply component and a crushing component is designed. The motor drives the pulley and belt to rotate, adjusts the height of the support plate, and achieves efficient spraying through the water pump and nozzle. At the same time, the transmission component and the crushing plate are used to control different Angle and damaged pavement are treated.

Benefits of technology

It achieves flexible adjustment of spraying height, improves spraying efficiency and uniformity, reduces staff labor, and facilitates the crushing treatment of damaged road surfaces.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118756550A_ABST
    Figure CN118756550A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of concrete pavement maintenance, and discloses a concrete pavement maintenance device for road and bridge engineering, which comprises a base, and further comprises a driving assembly, a water supply assembly and a crushing assembly which are respectively mounted at the top of the base. A motor is started to drive a first pulley to rotate, a belt drives a second pulley and a third pulley to rotate, at the moment, the second pulley drives a first threaded rod to rotate, the third pulley drives the second threaded rod to rotate, a supporting plate moves upwards along threads outside the first threaded rod and the third pulley, and a water pump is started; water in the water tank is pumped into the water pipe through the water pump, injected into the water storage box through the water pipe and sprayed out through the spray head installed outside the water storage box, so that the road surface is protected, in the process, the time wasted for workers to manually take the water pipe for spraying is shortened, and the spraying efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of concrete pavement maintenance, and in particular is a concrete pavement maintenance device for road and bridge engineering. Background Art

[0002] Roads and bridges are generally composed of several parts, such as roadbed, pavement, bridges, tunnel engineering and traffic engineering facilities. Pavement engineering is a layered structure that is paved with various road-building materials or mixed materials on the roadbed for vehicles to travel. Its function is to ensure that vehicles can run on the road in all weather conditions, stably, at high speed, comfortably, safely and economically.

[0003] After the concrete pavement is laid, it is often necessary to spray water for maintenance so that the concrete solidification effect can reach a good strength. During the spraying maintenance process, the concrete maintenance is carried out by manually dragging a rubber hose to spray water on it, which is time-consuming and laborious. When the width of the road surface is different, it is also necessary to manually walk back and forth to spray water on the concrete road surface, which will lead to uneven spraying and waste water resources. The height of the water spraying cannot be adjusted, which is very inconvenient when some concrete walls need to be sprayed for maintenance. In this process, the pulling force of the staff is increased and the efficiency of the water spraying is reduced. Therefore, a concrete pavement maintenance device for road and bridge engineering is proposed. Summary of the invention

[0004] In order to solve the problems raised in the above background technology, the present invention provides a concrete pavement maintenance device for road and bridge engineering, which solves the problem that the height of the water spraying equipment cannot be adjusted, improves the labor force of the staff and has low spraying efficiency.

[0005] To achieve the above-mentioned object, the present invention provides the following technical solutions: A concrete pavement maintenance device for road and bridge engineering, comprising a base, a driving assembly, a water supply assembly and a crushing assembly respectively installed on the top of the base, a spraying assembly arranged on the top of the crushing assembly, and a transmission assembly sleeved on the outside of the driving assembly; The driving assembly includes a motor mounted on the top of the base, a first pulley sleeved on the outside of the motor, a belt connected to the outside of the first pulley, a second pulley and a third pulley respectively arranged at both ends of the belt, a first threaded rod sleeved inside the second pulley, a second threaded rod sleeved inside the third pulley, and a fourth connecting rod mounted on the top of the base; The crushing assembly includes a box installed on the top of the base, a round rod arranged inside the box, a first connecting block sleeved on the outside of the round rod, a second connecting rod sleeved inside the bottom end of the first connecting block, a first crushing plate connected to the outside of the second connecting rod, a third connecting rod arranged inside the box, a second connecting block sleeved on the outside of the third connecting rod, and a second crushing plate installed on the outside of the third connecting rod; The transmission assembly includes a first bevel gear sleeved on the outside of the second threaded rod, a second bevel gear meshed with the outside of the first bevel gear, a first connecting rod sleeved on the inside of the second bevel gear, a third bevel gear sleeved on the outside of the first connecting rod, and a fourth bevel gear meshed with the outside of the third bevel gear; The spray assembly includes a support plate installed on the top of the box body, a water storage box arranged on the top surface of the support plate, a nozzle installed on the outside of the water storage box, an inclined plate arranged on the inner side of the water storage box, a convex block connected to the outside of the inclined plate, a round block installed on the top of the support plate, and a rotating rod installed on the top of the round block. The outer side of the inclined plate is connected to a long rod, and the outside of the long rod is installed with a long block.

[0006] Preferably, the water supply assembly includes a water tank installed at the middle end of the top of the base, a water pump arranged inside the water tank, a water inlet installed outside the water tank, and a water pipe connected to the outside of the water tank.

[0007] Preferably, a handle is installed on the top of the base, and wheels are provided on the bottom of the base.

[0008] Preferably, a long groove is provided on the inner side of the water storage box, and the protrusion slides in the long groove.

[0009] Preferably, a fixing block is arranged outside the long rod.

[0010] Preferably, a fixing frame is installed outside the first connecting rod, and the fixing frames are respectively located at two ends of the first connecting rod.

[0011] Preferably, the interior of the water storage box is hollowed out, and the water pipe is connected to the interior of the water storage box.

[0012] Preferably, a rectangular groove is provided at the bottom of the box body, and the first crushing plate slides vertically in the rectangular groove.

[0013] Preferably, the fourth bevel gear is sleeved on the outside of the round rod.

[0014] Preferably, the inclined plate is in a semicircular arc shape and is made of an elastic material.

[0015] Compared with the prior art, the present invention has the following beneficial effects: The present invention starts the motor to drive the first pulley to rotate, and the belt drives the second pulley and the third pulley to rotate. At this time, the second pulley drives the first threaded rod to rotate, and the third pulley drives the second threaded rod to rotate, so that the support plate moves up along the threads outside the first threaded rod and the third pulley, and the water pump is started. The water inside the water tank is pumped into the water pipe through the water pump, and injected into the water storage box through the water pipe, and the water is sprayed out through the nozzle installed outside the water storage box, so as to protect the road surface. When it is necessary to spray at different angles, the long block is pushed to drive the long rod and the inclined plate to move, and the convex block is driven by the inclined plate to move along the long groove inside the water storage box, so that the round block rotates along the outside of the rotating rod, so as to adjust the overall angle of the water storage box, and spray and maintain the road surface in different directions. In this process, the time wasted by the staff to manually take the water pipe for spraying is reduced, and the efficiency of spraying is improved.

[0016] The present invention drives the first bevel gear to rotate through the second threaded rod when damage occurs on the road surface, drives the second bevel gear and the first connecting rod to rotate through the first bevel gear, and at the same time drives the third bevel gear meshing externally to rotate, drives the fourth bevel gear to rotate through the third bevel gear, drives the round rod to rotate through the fourth bevel gear, drives the first connecting block to rotate through the round rod, drives the second connecting rod sleeved internally to rotate through the first connecting block, and drives the first crushing plate installed externally to move up and down along the rectangular groove opened at the bottom of the box body by the second connecting rod, thereby crushing the damaged road surface, thereby facilitating subsequent processing by staff and reducing the labor of staff. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the structure of the spray assembly of the present invention; Figure 3 It is a schematic diagram of the cross-sectional structure of the present invention; Figure 4 It is a schematic diagram of the combined structure of the first threaded rod and the second threaded rod of the present invention; Figure 5 It is a schematic diagram of the structure of the transmission assembly of the present invention; Figure 6 It is a schematic diagram of the structure of the crushing component of the present invention.

[0018] In the figure: 1, base; 2, transmission assembly; 21, first bevel gear; 22, second bevel gear; 23, first connecting rod; 24, third bevel gear; 25, fourth bevel gear; 3, crushing assembly; 31, box; 32, round rod; 33, first connecting block; 34, first crushing plate; 36, second connecting rod; 37, second connecting block; 38, third connecting rod; 39, second crushing plate; 4, spray assembly; 41, support plate; 42, Long block; 43, long rod; 45, inclined plate; 46, convex block; 47, water storage box; 471, round block; 472, rotating rod; 48, nozzle; 5, driving assembly; 51, motor; 52, first pulley; 53, belt; 54, second pulley; 55, first threaded rod; 56, third pulley; 57, second threaded rod; 58, fourth connecting rod; 6, water supply assembly; 61, water tank; 62, water pump; 63, water inlet; 64, water pipe. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] like Figures 1 to 6 As shown, the present invention provides a concrete pavement maintenance device for road and bridge engineering, comprising a base 1, a driving assembly 5, a water supply assembly 6 and a crushing assembly 3 respectively mounted on the top of the base 1, a spraying assembly 4 arranged on the top of the crushing assembly 3, and a transmission assembly 2 sleeved on the outside of the driving assembly 5; The driving assembly 5 includes a motor 51 mounted on the top of the base 1, a first pulley 52 sleeved on the outside of the motor 51, a belt 53 connected to the outside of the first pulley 52, a second pulley 54 and a third pulley 56 respectively arranged at both ends of the belt 53, a first threaded rod 55 sleeved inside the second pulley 54, a second threaded rod 57 sleeved inside the third pulley 56, and a fourth connecting rod 58 mounted on the top of the base 1; The crushing assembly 3 includes a box body 31 installed on the top of the base 1, a round rod 32 arranged inside the box body 31, a first connecting block 33 sleeved on the outside of the round rod 32, a second connecting rod 36 sleeved inside the bottom end of the first connecting block 33, a first crushing plate 34 connected to the outside of the second connecting rod 36, a third connecting rod 38 arranged inside the box body 31, a second connecting block 37 sleeved on the outside of the third connecting rod 38, and a second crushing plate 39 installed on the outside of the third connecting rod 38; The transmission assembly 2 includes a first bevel gear 21 sleeved on the outside of the second threaded rod 57, a second bevel gear 22 meshed with the outside of the first bevel gear 21, a first connecting rod 23 sleeved on the inside of the second bevel gear 22, a third bevel gear 24 sleeved on the outside of the first connecting rod 23, and a fourth bevel gear 25 meshed with the outside of the third bevel gear 24; The spray assembly 4 includes a support plate 41 installed on the top of the box body 31, a water storage box 47 arranged on the top surface of the support plate 41, a nozzle 48 installed on the outside of the water storage box 47, an inclined plate 45 arranged on the inner side of the water storage box 47, a protrusion 46 connected to the outside of the inclined plate 45, a round block 471 installed on the top of the support plate 41, and a rotating rod 472 installed on the top of the round block 471. The outer side of the inclined plate 45 is connected to a long rod 43, and the outer side of the long rod 43 is installed with a long block 42. The outer side of the inclined plate 45 is connected to the long rod 43, and the outer side of the long rod 43 is installed with a long block 42.

[0021] The above scheme is adopted: by starting the motor 51, the first pulley 52 is driven to rotate, and the belt 53 installed on the outside of the first pulley 52 drives the second pulley 54 and the third pulley 56 installed at both ends of the first pulley 52 to rotate. At this time, the second pulley 54 drives the first threaded rod 55 to rotate, and the third pulley 56 drives the second threaded rod 57 to rotate, so that the support plate 41 moves up along the threads outside the first threaded rod 55 and the third pulley 56, thereby raising the height of the support plate 41, and the water storage box 47 is driven to adjust the height by moving the support plate 41 upward. At this time, the water pump 62 is started, and the water inside the water tank 61 is pumped into the water pipe 64 through the water pump 62, and injected into the water storage box 47 through the water pipe 64, and the water is sprayed out through the nozzle 48 installed on the outside of the water storage box 47, so as to protect the road surface. When it is necessary to spray at different angles, the long block 42 is pushed to drive the long rod 43 and the inclined plate 45 to move, and the convex block 46 is driven by the inclined plate 45 to move along the inside of the water storage box 47 The long groove on the side moves, so that the round block 471 rotates along the outside of the rotating rod 472, so as to adjust the overall angle of the water storage box 47, and spray and maintain the road surfaces in different directions. When the road surface is damaged, the first bevel gear 21 is driven to rotate by the second threaded rod 57, and the second bevel gear 22 and the first connecting rod 23 are driven to rotate through the first bevel gear 21. At the same time, the first connecting rod 23 drives the third bevel gear 24 meshing with the outside to rotate, and the fourth bevel gear 25 is driven to rotate through the third bevel gear 24, and the round rod 32 is driven to rotate by the fourth bevel gear 25, and the first connecting block 33 is driven to rotate through the round rod 32, and the second connecting rod 36 installed inside is driven to rotate by the first connecting block 33, and the second connecting rod 36 drives the first crushing plate 34 installed outside to move up and down along the rectangular groove opened at the bottom of the box body 31, so as to crush the damaged road surface. In this process, the spraying efficiency is improved and the labor of the staff is reduced.

[0022] like Figure 1 and Figure 3As shown, the water supply assembly 6 includes a water tank 61 installed at the middle end of the top of the base 1, a water pump 62 arranged inside the water tank 61, a water inlet 63 installed outside the water tank 61, and a water pipe 64 connected to the outside of the water tank 61; a handle is installed on the top of the base 1, and wheels are arranged at the bottom of the base 1.

[0023] The above solution is adopted: the handles and wheels installed on the outside of the base 1 are convenient for staff to use, and the flexibility of the equipment is improved. Water is conveniently injected into the water tank 61 through the water inlet 63 to avoid water shortage inside after long-term use.

[0024] like Figure 1 and Figure 2 As shown, a long groove is opened on the inner side of the water storage box 47, and the protrusion 46 slides in the long groove; a fixing block is arranged on the outside of the long rod 43; the inclined plate 45 is semicircular, and the inclined plate 45 is made of elastic material; the interior of the water storage box 47 is hollowed out, and the water pipe 64 is connected to the interior of the water storage box 47.

[0025] The above scheme is adopted: by pushing the long rod 43, the inclined plate 45 and the protrusion 46 are driven to move along the long groove opened on the inner side of the water storage box 47, so as to adjust the angle of the water storage box 47, and spray maintenance is performed on different road surfaces, thereby improving the efficiency of road maintenance and reducing the labor of the staff. The inclined plate 45 is made of elastic material to prevent the long rod 43 from breaking due to long-term pushing, and the long rod 43 is limited and fixed by the fixing block installed on the outside of the long rod 43.

[0026] like Figure 5 and Figure 6 As shown, a rectangular groove is provided at the bottom of the box body 31, and the first crushing plate 34 slides vertically in the rectangular groove; the fourth bevel gear 25 is sleeved on the outside of the round rod 32; a fixing frame is installed on the outside of the first connecting rod 23, and the fixing frame is respectively located at both ends of the first connecting rod 23.

[0027] The above solution is adopted: the first crushing plate 34 is vertically slid in the rectangular groove provided at the bottom of the box body 31, so that the first crushing plate 34 is in an up-and-down state, and the broken road surface is processed so that the staff can repair it in time.

[0028] The working principle and use process of the present invention: First, when it is necessary to maintain the concrete pavement, the equipment is pushed to the designated place through the handles provided on the top of the base 1 and the wheels at the bottom, the motor 51 is started, and the first pulley 52 is driven to rotate, and the belt 53 installed on the outside of the first pulley 52 drives the second pulley 54 and the third pulley 56 installed at both ends of the outside to rotate, at this time, the second pulley 54 drives the first threaded rod 55 to rotate, and the third pulley 56 drives the second threaded rod 57 to rotate, so that the support plate 41 moves up along the threads outside the first threaded rod 55 and the third pulley 56, thereby raising the height of the support plate 41, and the height of the water storage box 47 is adjusted by moving the support plate 41 upward, and the water pump 62 is started at this time, and the water inside the water tank 61 is pumped into the water pipe 64 through the water pump 62, and injected into the water storage box 47 through the water pipe 64, and the water is sprayed out through the nozzle 48 installed on the outside of the water storage box 47, so as to protect the road surface, and when it is necessary to spray at different angles, the long block 42 is pushed to drive the long rod 43 and the inclined plate 45 to move, and the inclined plate 45 drives the protrusion 46 to move along the long groove inside the water storage box 47, so that the round block 471 rotates along the outside of the rotating rod 472, thereby adjusting the overall angle of the water storage box 47 and spraying and maintaining the road surfaces in different directions. When the road surface is damaged, the first bevel gear 21 is driven to rotate by the second threaded rod 57, and the second bevel gear 22 and the first connecting rod 23 are driven to rotate through the first bevel gear 21. At the same time, the first connecting rod 23 drives the third bevel gear 24 meshing with the outside to rotate, and the fourth bevel gear 25 is driven to rotate through the third bevel gear 24, and the round rod 32 is driven to rotate by the fourth bevel gear 25, and the first connecting block 33 is driven to rotate through the round rod 32, and the second connecting rod 36 installed internally is driven to rotate by the first connecting block 33, and the second connecting rod 36 drives the first crushing plate 34 installed externally to move up and down along the rectangular groove opened at the bottom of the box body 31, so as to crush the damaged road surface, thereby facilitating the subsequent processing of the staff and reducing the labor of the staff.

[0029] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A concrete pavement maintenance device for road and bridge engineering, comprising a base (1), characterized in that: It also includes a driving assembly (5), a water supply assembly (6) and a crushing assembly (3) respectively mounted on the top of the base (1), a spraying assembly (4) arranged on the top of the crushing assembly (3), and a transmission assembly (2) sleeved on the outside of the driving assembly (5); The driving assembly (5) comprises a motor (51) mounted on the top of the base (1), a first pulley (52) sleeved on the outside of the motor (51), a belt (53) connected to the outside of the first pulley (52), a second pulley (54) and a third pulley (56) respectively arranged at two ends of the belt (53), a first threaded rod (55) sleeved on the inside of the second pulley (54), a second threaded rod (57) sleeved on the inside of the third pulley (56), and a fourth connecting rod (58) mounted on the top of the base (1); The crushing assembly (3) comprises a box (31) mounted on the top of the base (1), a round rod (32) arranged inside the box (31), a first connecting block (33) sleeved on the outside of the round rod (32), a second connecting rod (36) sleeved inside the bottom end of the first connecting block (33), a first crushing plate (34) connected to the outside of the second connecting rod (36), a third connecting rod (38) arranged inside the box (31), a second connecting block (37) sleeved on the outside of the third connecting rod (38), and a second crushing plate (39) mounted on the outside of the third connecting rod (38); The transmission assembly (2) comprises a first bevel gear (21) sleeved on the outside of the second threaded rod (57), a second bevel gear (22) meshed with the outside of the first bevel gear (21), a first connecting rod (23) sleeved on the inside of the second bevel gear (22), a third bevel gear (24) sleeved on the outside of the first connecting rod (23), and a fourth bevel gear (25) meshed with the outside of the third bevel gear (24); The spray assembly (4) comprises a support plate (41) mounted on the top of the box body (31), a water storage box (47) arranged on the top surface of the support plate (41), a spray head (48) mounted on the outside of the water storage box (47), an inclined plate (45) arranged on the inside of the water storage box (47), a convex block (46) connected to the outside of the inclined plate (45), a round block (471) mounted on the top of the support plate (41), and a rotating rod (472) mounted on the top of the round block (471); a long rod (43) is connected to the outside of the inclined plate (45), and a long block (42) is mounted on the outside of the long rod (43).

2. The concrete pavement maintenance device for road and bridge engineering according to claim 1 is characterized in that: The water supply assembly (6) comprises a water tank (61) mounted at the middle of the top of the base (1), a water pump (62) arranged inside the water tank (61), a water inlet (63) mounted outside the water tank (61), and a water pipe (64) connected to the outside of the water tank (61).

3. The concrete pavement maintenance device for road and bridge engineering according to claim 1 is characterized in that: A handle is installed on the top of the base (1), and wheels are arranged on the bottom of the base (1).

4. The concrete pavement maintenance device for road and bridge engineering according to claim 1 is characterized in that: A long groove is provided on the inner side of the water storage box (47), and the protrusion (46) slides in the long groove.

5. The concrete pavement maintenance device for road and bridge engineering according to claim 1 is characterized in that: A fixing block is arranged outside the long rod (43).

6. The concrete pavement maintenance device for road and bridge engineering according to claim 1 is characterized in that: A fixing frame is installed outside the first connecting rod (23), and the fixing frame is located at both ends of the first connecting rod (23).

7. The concrete pavement maintenance device for road and bridge engineering according to claim 2 is characterized in that: The interior of the water storage box (47) is hollowed out, and the water pipe (64) is connected to the interior of the water storage box (47).

8. The concrete pavement maintenance device for road and bridge engineering according to claim 1 is characterized in that: The bottom of the box body (31) is provided with a rectangular groove, and the first crushing plate (34) slides vertically in the rectangular groove.

9. The concrete pavement maintenance device for road and bridge engineering according to claim 1 is characterized in that: The fourth bevel gear (25) is sleeved on the outside of the round rod (32).

10. The concrete pavement maintenance device for road and bridge engineering according to claim 1, characterized in that: The inclined plate (45) is in a semicircular arc shape, and the inclined plate (45) is made of an elastic material.

Citation Information

Cited By

  • Self-propelled cement base watering maintenance device and use method

    CN120867179A