Prestress hyperbolic paraboloid single-layer bolt sphere joint latticed shell and manufacturing method
By applying full-surface prestressing on the hyperbolic paraboloid single-layer bolted spherical node lattice shell, combined with high-strength steel and electric heating temperature control technology, the problems of low prestressing accuracy and complex construction in the existing technology are solved, and the structure has high stiffness, Low cost and easy construction results.
Patent Information
- Application Number
- CN202410901584.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-10-11
AI Technical Summary
During the construction process of the existing hyperbolic paraboloid single-layer bolt ball joint reticulated shell, there are problems such as low prestress formation accuracy, complex equipment, long construction time and high cost. Moreover, the bending stiffness of the bolt ball connection is small and it is difficult to meet the structural stiffness. Require.
Using full-surface prestressed technology, the steel pipe rods and bolt ball joints are assembled in the factory, and electric temperature-controlled insulation equipment is used on-site to expand or shorten the steel pipe rods due to thermal expansion to form prestress, combining high-strength steel and three-dimensional steel. One-way or four-way grid design improves structural rigidity and construction efficiency.
It achieves high stiffness, low cost, simple construction and beautiful appearance of the structure, high prestressing accuracy, small displacement, increased basic frequency, reduced aerodynamic influence, satisfies the full stress optimization principle, and reduces the amount of material and construction complexity.
Smart Images

Figure CN118756809A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a prestressed hyperbolic parabola single-layer bolt ball node lattice shell and a manufacturing method thereof, belonging to the technical field of building structures. Background Art
[0002] A single-layer hyperbolic paraboloid cable net used as a roof structure is connected to a steel or reinforced concrete ring beam at the perimeter. It has a hyperbolic paraboloid shape and is usually composed of two-way intersecting full-length prestressed cables, with fixed cable nodes set at the intersection. The cable net is a flexible space structure.
[0003] Cable nets have obvious advantages in terms of stress performance: (1) Highly efficient use of materials. The surrounding steel or reinforced concrete ring beam is located at the outer edge of the roof and is part of the supporting structure. It is easy to meet the requirements of high stiffness and strong compression and bending resistance. The cables in the cable net bear the load by tension. Under live load, the cables in the positive curvature direction play a load-bearing role, and the cables in the negative curvature direction play a stabilizing role. The direction of wind load is roughly opposite to that of live load. Under wind load, the cables in the negative curvature direction play a load-bearing role, and the cables in the positive curvature direction play a stabilizing role. From the perspective of component stress, there is a stability problem when the compression rod is loaded. The ultimate bearing capacity is equal to the cross-sectional bearing capacity multiplied by a stability coefficient less than 1.0, and the ultimate bearing capacity is less than the cross-sectional bearing capacity; the tension rod does not need to consider stability issues, and the ultimate bearing capacity is equal to the cross-sectional bearing capacity, making full use of material strength. (2) The cable net surface is tensile at every point, so there is no stability problem. The cable net is made of high-strength steel, so the cross-section is small and the appearance is light. The cable net is suitable for roofs of different spans.
[0004] The cable net also has shortcomings: (1) The prestress of the cable net is formed by tensioning construction. The tensioning construction process is cumbersome, and the equipment is special, diverse, and large in number. The main processes are cable laying and tensioning. Cable laying uses traction and hanging equipment, and tensioning uses jacks and cable force measurement and control equipment. The number of equipment is related to the construction period. Shortening the construction period means that more equipment is needed. (2) The prestress value is positively correlated with the span. It is difficult to form a large and medium span cable net in one tensioning. Multiple tensioning is required, and even multiple cables are required to be tensioned simultaneously each time. There are many influencing factors, and monitoring and supervision are complex. The accuracy of prestressing is not high, which is easy to leave hidden dangers. (3) Tensioning is a construction sub-item with high risks and high safety risks. (4) The construction time is long and the cost is high. (5) It is difficult for general construction units to undertake the cable net tensioning task, which is usually completed by subcontracting by professional units. On the other hand, in order to reduce the specifications of fixed cable nodes, the cable cross-sections in the same direction are often the same, or even the cable cross-sections in two directions are also the same, so that the cable net cannot select the cable cross-section according to the full stress optimization principle like other forms of spatial structures such as frames and lattice shells.
[0005] The single-layer steel ball node lattice shell used as the roof is mostly spherical and cylindrical in shape. The rods are steel pipes, and the steel balls are welded hollow balls and bolt balls. All steel pipe and steel ball nodes are made in the factory. If bolt balls are used, the parts to be made include cover plates, cone heads, sleeves, bolts and pins, and the steel pipes and parts are assembled. After all components are made, they are transported to the construction site for installation. The installation usually adopts the hoisting method: first assemble at low altitude on the ground, the assembly body includes the support ball, then hoist to the actual position (hoisting may require auxiliary stiffening beams), connect with the steel embedded parts to form a structure, and complete the installation. The high-altitude bulk method can also be used to assemble at the actual position. In order to speed up the progress, it is generally pushed up from the low-position support to the top of the lattice shell circle by circle or layer by layer. Since the components are made in the factory using CNC equipment and the dimensions are accurate, the installation accuracy of the single-layer steel ball node lattice shell is high. If bolt balls are used, the connection is achieved by screwing bolts, without welding, and it can be completed by general construction units, and it is very fast.
[0006] Hyperbolic paraboloid single-layer steel ball node lattice shell generally adopts three-way or four-way cross grid. The internal force of the rod is mainly axial force, and the bending moment is small. In the Von Misses stress, the axial stress accounts for a very large proportion, and the bending stress accounts for a very small proportion. However, despite the difficulty and long construction period of welded hollow balls, welded hollow balls are still used in actual projects, and bolt balls are rarely used. Because although the bolt ball is solid and belongs to a rigid body, the end of the steel pipe rod is connected to the bolt ball by bolts. If the sleeve effect is not considered, the bending stiffness of the bolt is small, usually only about 1 / 8 of the rod, and the bending stiffness of the bolt can be almost ignored. In this way, the bolt ball connection is a hinge. Compared with the rigidly connected welded hollow ball, the hinged bolt ball makes the structure present obvious geometric nonlinear characteristics, with large displacement, and it is difficult to meet the use requirements.
[0007] In order to use hinged bolt balls in hyperbolic paraboloid single-layer steel ball node lattice shells, measures must be taken to reduce displacement. One way to increase the stiffness of hinged structures without changing the appearance is to apply prestress. The methods for applying prestress to hinged space grid structures are: (1) artificially lengthening or shortening the length of the rods, and establishing prestress through the assembly error of the rods. (2) Raising or lowering the elevation of some supports, and establishing prestress by raising and lowering the supports. (3) Adding cables and establishing prestress by tensioning the cables. According to the positional relationship between the cables and the spatial structure, the cables are divided into external cables and internal cables. Prestress also plays a role in adjusting the internal force distribution, reducing the peak internal force of the rods, reducing the cross-section of the rods, reducing the amount of steel used and saving construction costs. Therefore, the above-mentioned methods of applying prestress have difficult construction requirements, cumbersome operations and high costs. Summary of the invention
[0008] In view of the deficiencies in the prior art, the present invention proposes a prestressed hyperbolic parabola single-layer bolt ball node lattice shell and a manufacturing method thereof. The lattice shell not only has greater rigidity, higher fundamental frequency, and less aerodynamic influence, but also has low cost, is easy to construct, and has a beautiful appearance.
[0009] The technical solution of the present invention is a prestressed hyperbolic parabola single-layer bolt ball node lattice shell, comprising steel tube rods and bolt ball nodes, wherein the steel tube rods are connected through bolt ball nodes to form a single-layer lattice shell with a hyperbolic parabola shape, and full-surface prestress is applied to the single-layer lattice shell.
[0010] Furthermore, the grids of the single-layer lattice shell have three directions or four directions.
[0011] Furthermore, the steel tube rod is made of high-strength steel.
[0012] At the same time, the present invention also provides a method for manufacturing the above-mentioned prestressed hyperbolic parabola single-layer bolt ball node lattice shell, comprising the following steps:
[0013] Step 1: First, all steel pipe members and bolt ball nodes are processed in the factory according to the single-layer lattice shell at natural temperature;
[0014] Step 2: Using the high-altitude bulk method, assemble the steel pipe members and the bolt ball nodes at the actual position to form a single-layer lattice shell with a hyperbolic paraboloid shape;
[0015] Step 3: The top and bottom surfaces of the single-layer grid shell are fully covered with electric temperature-controlled insulation blankets and then heated to make the single-layer grid shell expand and stretch to the shape at natural temperature; at this time, the ends of the steel pipe rods around the single-layer grid shell are fixedly connected with the support bolts on the steel or reinforced concrete ring beam;
[0016] Step 4: remove the electric temperature control insulation blanket to allow the single-layer grid shell to cool to a natural temperature, so that prestress can be formed on the single-layer grid shell.
[0017] Further, when processing the steel tube rod of the single-layer lattice shell, the length of the steel tube rod after heating is assumed to be L0, the area is A, the linear expansion coefficient is α, the material elastic modulus is E, the natural temperature is assumed to be T, the temperature rise is t, the heating constant temperature is T+t, the elongation of the steel tube rod is δ=αL0t, the shortening of the steel tube rod after cooling is δ, the cutting length of the steel tube rod is L0-αL0t, and the prestress F=αEAL0t established in the steel tube rod; similarly, assuming that the temperature of one end of the steel tube rod around the single-layer lattice shell is T+t, and the temperature of the other end is T, the shortening of the steel tube rod around the cooling is δ=αL0t / 2, the cutting length of the steel tube rod is L0-αL0t / 2, and the prestress established in the surrounding steel tube rod is F=αEAL0t / 2.
[0018] Due to the adoption of the above technical solution, the advantages of the present invention are:
[0019] (1) Compared with the cable net, the present invention adopts a three-dimensional grid or even a four-dimensional grid, and the in-plane and out-of-plane stiffness of the structure is higher. The rods of the lattice shell are high-strength steel pipes, and the wall thickness is selected according to the needs. For steel pipes and cables with the same cross-sectional area, the moment of inertia of the steel pipe is larger. The steel pipe rods have good rigidity and good structural conformal effect. During the prestressing process and the use stage, the displacement of the structure, the change of the angle between the rods, etc. are very small, and the shape is closer to the design state. Like the cable net, the patent of the present invention has greater rigidity, higher fundamental frequency, and less aerodynamic influence.
[0020] (2) Some of the steel pipe rods of the present invention are subjected to tension during the prestressing stage and to compression under load, which partially offset each other, and the offset portion is equivalent to reducing the internal force of the rod. The specifications of the rods connected to the same node can be different, and the steel pipes can be selected according to the full stress optimization principle. The rods with small internal forces use small-sized steel pipes, and the rods with large internal forces use large-sized steel pipes, thereby saving materials.
[0021] (3) The principle of forming prestress is easy to understand, and the construction method is simple, the quality is easy to control, and the structural cost is low. The prestress is formed by the principle of thermal expansion and contraction, and the mechanical concept is clear. The temperature is raised by electric heating temperature control insulation, and the auxiliary construction materials used are daily necessities and are cheap. The heat transfer of steel is fast, the temperature difference control is simple, and the prestress value is highly accurate. Similar to the effect of shortening the rod to form prestress, the prestress is constant once formed. Similar to the cable net, since the linear expansion coefficients of steel and concrete are basically the same, after cooling to the natural temperature, the single-layer hyperbolic parabola bolt ball node lattice shell expands and contracts simultaneously with the steel or reinforced concrete ring beam, and the ambient temperature has little effect on the prestress.
[0022] The use of bolt-ball nodes not only meets the requirement of "Technical Code for Cable Structures" (JGJ 257) that the nodes should not slide during use, but also brings into play the advantages of bolt assembly: mature processing and installation technology, high assembly efficiency, reliable quality and low cost.
[0023] (4) The shape of the present invention is similar to that of a cable net, and the nodes are also small and compact, and the appearance is also simple. The number of rods connected to the same bolt ball node is small, and the angle between them is large. Since the bolt ball diameter is controlled by the angle between the rods, the bolt ball diameter is not large, generally less than 150mm. Calculated based on the general 3m grid length, the bolt ball diameter is about 1 / 20 of the grid length. The node is small and simple, and the appearance is beautiful.
[0024] (5) The cables of the cable net can only bear tension. The mechanical analysis adopts the finite element unit simulation of tension but not compression, which leads to slow calculation convergence or even no convergence and poor calculation reliability. The force transmission unit of the present invention is a steel pipe with a large outer diameter that can withstand tension and pressure. The finite element unit adopts a rod unit with fast convergence, reliable calculation and high precision. Commonly used commercial software such as ANSYS can meet the modeling and calculation of mechanical analysis. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a three-dimensional diagram of the overall structure of the present invention;
[0026] Figure 2 It is a plan view of the overall structure of the present invention;
[0027] Figure 3 It is a front elevation view of the overall structure of the present invention;
[0028] Figure 4 The side elevation of the overall structure of the present invention Figure 1 ;
[0029] Figure 5 The side elevation of the overall structure of the present invention Figure 2 ;
[0030] Figure 6 It is a three-dimensional diagram of the present invention during production.
[0031] Explanation of reference numerals: 1-single-layer lattice shell; 2-steel or reinforced concrete ring beam; 3-electric temperature-controlled insulation blanket; 11-steel pipe rod; 12-bolt ball node. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is further described in detail below with reference to the accompanying drawings and embodiments.
[0033] A schematic diagram of a prestressed hyperbolic parabola single-layer bolt ball node lattice shell of the present invention is shown in Figures 1 to 5 As shown, it includes a steel tube member 11 and a bolt ball node 12, the steel tube member 11 is connected by the bolt ball node 12 to form a single-layer lattice shell 1 with a hyperbolic paraboloid shape, and a full-surface prestress is applied to the single-layer lattice shell 1. The grid of the single-layer lattice shell 1 has three directions or four directions. The steel tube member 11 is made of high-strength steel, such as Q355, Q420 or other high-strength steel.
[0034] See also Figure 6 The present invention also provides a method for manufacturing the above-mentioned prestressed hyperbolic parabola single-layer bolt ball node lattice shell, comprising the following steps:
[0035] Step 1: First, all steel pipe members 11 and bolt ball nodes 12 are processed in the factory according to the single-layer lattice shell 1 at natural temperature;
[0036] Step 2: Using the high-altitude bulk method, assemble the steel pipe rods 11 and the bolt ball nodes 12 at the actual position to form a single-layer lattice shell 1 with a hyperbolic paraboloid shape;
[0037] Step 3: The top and bottom surfaces of the single-layer lattice shell 1 are fully covered with an electric temperature-controlled insulation blanket 3 and then heated to make the single-layer lattice shell 1 expand and elongate to the shape at natural temperature; at this time, the ends of the steel pipe rods 11 around the single-layer lattice shell 1 are fixedly connected with the support bolts on the steel or reinforced concrete ring beam 2;
[0038] Step 4, remove the electric temperature control insulation blanket 3, cool the single-layer lattice shell 1 to the natural temperature, shorten the steel pipe rod 11 by cooling, and generate prestress, so that prestress can be formed on the single-layer lattice shell 1.
[0039] When processing the steel tube rod 11 of the single-layer lattice shell 1, the length of the steel tube rod 11 after heating is L0, the area is A, the linear expansion coefficient is α, the material elastic modulus is E, the natural temperature is T, the temperature rise is t, the heating constant temperature is T+t, the elongation of the steel tube rod 11 is δ=αL0t, the shortening of the steel tube rod 11 after cooling is δ, the cutting length of the steel tube rod 11 is L0-αL0t, and the prestress F=αEAL0t established in the steel tube rod 11; similarly, assuming that the temperature of one end of the steel tube rod 11 around the single-layer lattice shell 1 is T+t, and the temperature of the other end is T, the shortening of the steel tube rod 11 around the cooling is δ=αL0t / 2, the cutting length of the steel tube rod 11 is L0-αL0t / 2, and the prestress established in the steel tube rod 11 around the cooling is F=αEAL0t / 2.
[0040] Applying full-surface prestress to a single-layer hyperbolic paraboloid bolt ball node lattice shell can significantly increase the structural stiffness. The steel tube rod 11 is made of high-strength steel, and the steel tube rod 11 easily meets the strength requirements, but the single-layer lattice shell 1 has a gentle curved surface, large displacement, and poor stiffness, and it is difficult to meet the stiffness requirements of the normal use limit state. Therefore, applying prestress to the single-layer lattice shell 1 plays a stress stiffening role, improves the structural stiffness, reduces the displacement, makes the structure meet the stiffness requirements, and reduces the aerodynamic effect. Its principle is basically the same as that of the cable net. The prestress of the cable net is small or not tensioned, the cable net stiffness is small, the displacement is large, the basic frequency is small, and the aerodynamic effect is large; within the elastic range of the material, the greater the prestress, the higher the cable net stiffness, the smaller the displacement, the larger the basic frequency, and the smaller the aerodynamic effect.
[0041] The following two embodiments compare the difference between displacement and fundamental frequency before and after prestressing. The steel tube member 11 is used for structural model calculation. The single-layer lattice shell 1 is composed of a steel tube member 11 and a bolt ball node 12. Since the actual length of the steel tube member 11 is about 95% of the theoretical length, the linear expansion coefficients of the steel tube member 11 and the bolt ball node 12 are not much different, and the error caused by simplification is less than 5%, which is within the engineering allowable range. The displacement calculation takes into account geometric nonlinearity and stress stiffening, and the fundamental frequency calculation takes into account stress stiffening.
[0042] Example 1
[0043] The plane projection is a cross-shaped 4-rod structure. The plane projection length of the 4 rods is 3m. The 4 fixed hinge supports on the outside are raised and lowered at intervals of 0.05m. The cross-sectional area of the rod is 8.89cm 2 , material elastic modulus 195GPa, linear expansion coefficient 1.15×10 -5 / ℃, a concentrated force of 3kN is applied to the central node to simulate live load. The displacement of the central node of the original structure is 36.8mm, which is 1 / 163 of the span of 6m. The method of the present invention is used to increase the temperature by 25℃ to form prestress, and the displacement of the central node is 0. A concentrated force of 3kN is applied to the central node of the prestressed structure, and the displacement of the central node is reduced to 21.9mm, which is 1 / 274 of the span. Prestress reduces the displacement by 40.5%. A concentrated force of 3kN in the opposite direction is applied to the central node to simulate wind load, and the results are similar.
[0044] The basic frequency of the original structure is 7.63Hz, and the basic frequency is 10.89Hz after prestressing is established. The prestressing increases the basic frequency by 38.8%.
[0045] Example 2
[0046] Peripheral fixed hinge constraint, projection is a square plane 18m×18m, and the diagonal point is raised 4m. The single-layer hyperbolic paraboloid bolt ball node lattice shell. The four perimeter lines are divided into 5 equal parts, and the grid plane is projected in three directions, two of which are parallel to the diagonal lines, and the third is parallel to one of the side lines. The curvatures of the two directions of the plane projection parallel to the diagonal are positive and negative respectively, and the curvature of the third direction is 0. The cross-sectional area of the rod is 10.62cm 2 , material elastic modulus 195GPa, linear expansion coefficient 1.15×10 -5 / ℃. A concentrated force of 3kN is applied to the central node, and the displacement of the central node of the original structure is 40.6mm, which is 1 / 443 of the span of 18m. The method of the present invention is used to increase the temperature by 50℃ to form prestress, and the displacement of the central node is almost 0. A concentrated force of 3kN is applied to the central node of the prestressed structure, and the displacement of the central node is reduced to 9.2mm, which is 1 / 1957 of the span. Prestress reduces the displacement by 77.3%. A concentrated force of 3kN is applied to the central node in the opposite direction, and the result is similar.
[0047] The basic frequency of the original structure is 0.79Hz, and the basic frequency is 9.52Hz after prestressing is established. The prestressing increases the basic frequency by 1105.1%.
[0048] It can be seen from the above embodiments that the present invention uses the principle of thermal expansion and contraction to form full-surface prestress on the structure, so that the displacement of the structure is reduced, the fundamental frequency is greatly improved, and the rigidity of the structure is large and the aerodynamic effect is small. The prestressing method of the present invention is also applicable to a hyperbolic paraboloid single-layer welded hollow spherical node lattice shell and a prestressed hyperbolic paraboloid cable net.
Claims
1. A prestressed hyperbolic parabola single-layer bolt ball node lattice shell, comprising a steel tube member (11) and a bolt ball node (12), characterized in that: The steel tube rods (11) are connected via bolt ball nodes (12) to form a single-layer lattice shell (1) with a hyperbolic paraboloid shape, and full-surface prestress is applied to the single-layer lattice shell (1).
2. The prestressed hyperbolic parabola single-layer bolted ball node lattice shell according to claim 1 is characterized in that: The grids of the single-layer lattice shell (1) have three directions or four directions.
3. The method for manufacturing a prestressed hyperbolic parabola single-layer bolted ball node lattice shell according to claim 1, characterized in that: The steel tube rod (11) is made of high-strength steel.
4. A method for manufacturing a prestressed hyperbolic parabola single-layer bolted ball node lattice shell according to any one of claims 1 to 3, characterized in that The following steps are involved: Step 1: First, all steel tube rods (11) and bolt ball nodes (12) are processed in a factory according to the single-layer lattice shell (1) at natural temperature; Step 2: using a high-altitude bulk method, assembling the steel tube rods (11) and the bolt ball nodes (12) at the actual position to form a single-layer lattice shell (1) with a hyperbolic paraboloid shape; Step three, the top and bottom surfaces of the single-layer lattice shell (1) are fully covered with an electric temperature-controlled insulation blanket (3) and then heated to increase the temperature, so that the single-layer lattice shell (1) expands and stretches to the shape at natural temperature; at this time, the ends of the steel pipe rods (11) around the single-layer lattice shell (1) are fixedly connected with the support bolts on the steel or reinforced concrete ring beam (2); Step 4: Remove the electric temperature control insulation blanket (3) to allow the single-layer lattice shell (1) to cool to a natural temperature, thereby forming prestress on the single-layer lattice shell (1).
5. The method for manufacturing a prestressed hyperbolic parabola single-layer bolted ball node lattice shell according to claim 4, characterized in that: When processing a steel tube member (11) of a single-layer lattice shell (1), the length of the steel tube member (11) after heating is assumed to be L0, the area is A, the linear expansion coefficient is α, the material elastic modulus is E, the natural temperature is assumed to be T, the temperature rise is assumed to be t, the heating constant temperature is assumed to be T+t, the elongation of the steel tube member (11) is δ=αL0t, the shortening of the steel tube member (11) after cooling is δ, and the blanking length of the steel tube member (11) is assumed to be L0-αL0t. The prestress F established in the steel tube rod (11) is αEAL0t; similarly, assuming that the temperature of one end of the steel tube rod (11) around the single-layer lattice shell (1) is T+t and the temperature of the other end is T, the shortening amount of the steel tube rod (11) around the cooling is δ=αL0t / 2, then the cutting length of the steel tube rod (11) is L0-αL0t / 2, and the prestress established in the steel tube rod (11) around the cooling is F=αEAL0t / 2.