Sealing structure of pre-buried electrical steel guide pipe and construction method of sealing structure
By using heat shrink tubes and detection components in the fastening joints of electrical steel conduits, the problem of grout leakage and pipe blockage at the connection locations of electrical steel conduits during the floor slab pouring process was solved, achieving good sealing effects and construction efficiency.
Patent Information
- Application Number
- CN202410863524.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-29
- Publication Date
- 2024-10-11
AI Technical Summary
During the concrete pouring process of building floor slabs, grout leakage and pipe blockage are prone to occur at the connection locations of electrical steel conduits, making subsequent threading difficult.
It adopts a sealing structure including a fastening joint and a heat-shrinkable tube. The fastening joint is composed of a fastening sleeve and a fastening screw. The heat-shrinkable tube shrinks after heating to fit the outer periphery of the electrical steel conduit and the fastening sleeve, providing Sealing effect, and optional detection components and water-stop rubber rings can be used to further improve sealing.
It effectively reduces the penetration of concrete slurry into electrical steel conduits, improves the sealing effect, and quickly judges the sealing performance by testing components to ensure construction quality and efficiency.
Smart Images

Figure CN118763574A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building electrical construction, and in particular to a sealing structure of a pre-buried electrical steel conduit and a construction method thereof. Background Art
[0002] Before pouring concrete on the building floor, it is necessary to pre-bury various wires and cables in the floor. In the existing technology, ordinary metal wire pipes, PVC pipes, or JDG pipes (full name: galvanized electrical steel conduit) and other pipes are pre-buried in the building floor; then, the staff will put various wires and cables in the pipes to protect the cables from erosion and damage by the external environment, and to facilitate the subsequent extraction and replacement of wires and cables.
[0003] During the construction process, electrical steel conduits (JDG pipes) can save complex processes such as threading, cross-grounding, and pipeline anti-corrosion compared to ordinary metal wire pipes; it also solves the problems of poor fire resistance and difficulty in grounding of PVC pipes. Therefore, in the existing technology, electrical steel conduits (JDG pipes) are often used to lay wires and cables.
[0004] Reference Figure 1 In the prior art, the electrical steel conduit 1 is buried in the building floor 7, and the electrical steel conduit 1 is arranged between the upper steel mesh 8 and the lower steel mesh 9, and the electrical steel conduit 1 is wrapped by the concrete of the floor 7; at the same time, adjacent electrical steel conduits 1 are connected by fastening joints 2.
[0005] Reference Figure 1 and Figure 2 The fastening joint 2 includes a fastening sleeve 21 and a fastening screw 22 ; two fastening screws 22 are provided, and the two fastening screws 22 are arranged on both sides of the fastening sleeve 21 , and the fastening screws 22 are threadedly connected to the fastening sleeve 21 .
[0006] Reference Figure 2 , the staff inserts the two electrical steel conduits 1 to be connected into the fastening sleeves 21 respectively, and rotates the fastening screws 22; thereby making the electrical steel conduits 1 tightly abut against the fastening sleeves 21 to complete the fixed connection of the two electrical steel conduits 1.
[0007] However, during the subsequent pouring of concrete for the floor slab 7, cement mortar will penetrate into the electrical steel conduit 1 along the gap between the fastening sleeve 21 and the electrical steel conduit 1, thereby causing pipe blockage and causing certain difficulties for subsequent wire threading. Summary of the invention
[0008] In order to solve the problems of leakage and pipe blockage at the connection position of electrical steel conduits, the present application provides a sealing structure of a pre-buried electrical steel conduit and a construction method thereof.
[0009] The present application provides a sealing structure for a pre-buried electrical steel conduit and a construction method thereof, which adopts the following technical solutions: A sealing structure for a pre-buried electrical steel conduit, the sealing structure is used to connect two electrical steel conduits; it includes a fastening joint and a heat shrink tube; the fastening joint includes a fastening sleeve and a fastening screw; there are two fastening screws, the two fastening screws are arranged oppositely on both sides of the fastening sleeve, the fastening sleeve is provided with a mounting hole, and the fastening screw is threadedly connected to the side wall of the mounting hole; the ends of the two electrical steel conduits are respectively inserted into the two sides of the fastening sleeve, the fastening screws abut against the electrical steel conduit, and the fastening screws are used to force the electrical steel conduit to tightly abut against the inner side wall of the fastening sleeve; the heat shrink tube is sleeved on the fastening joint and the outer periphery of the electrical steel conduit, and a protective spacing is provided between the end of the heat shrink tube and the end of the fastening sleeve; after the heat shrink tube is heated, the heat shrink tube shrinks and fits the outer peripheral surface of the electrical steel conduit and the fastening sleeve.
[0010] By adopting the above technical solution, after the heat shrink tube is heated, the heat shrink tube shrinks and fits to the outer peripheral surface of the electrical steel conduit and the fastening sleeve; the heat shrink tube fits tightly to the electrical steel conduit and the fastening sleeve, and tightly wraps the gap between the electrical steel conduit and the fastening joint to provide a good sealing effect, reducing the occurrence of concrete slurry penetrating into the electrical steel conduit.
[0011] Optionally, both ends of the heat shrink tube are provided with notches, and the two notches are arranged opposite to each other; the width of the notches decreases from the two ends to the middle of the heat shrink tube; a protective spacing is provided between the notches and the fastening sleeve.
[0012] By adopting the above technical solution, the notch at the end of the heat shrink tube can facilitate the staff to sleeve the heat shrink tube on the outer circumference of the fastening sleeve.
[0013] Optionally, it also includes a detection component, which is arranged around the fastening sleeve and covers the connection gap between the fastening sleeve and the electrical steel conduit, and the detection component is bonded and fixed to the electrical steel conduit or the fastening sleeve; the heat shrink tube is sleeved on the outer periphery of the detection component, and a protective distance is provided between the end of the heat shrink tube and the detection component, and the heat shrink tube is a transparent tube; the heat shrink tube shrinks when heated, forcing the detection component to abut against the electrical steel conduit and the fastening sleeve; the detection component is used to detect the presence of moisture, and if there is a flow channel between the heat shrink tube and the electrical steel conduit, external water can contact the detection component along the flow channel.
[0014] By adopting the above technical solution, the staff can quickly judge the waterproof performance of the sealing structure by observing the color change of the detection component. If the detection component does not change color, it means that the sealing of the connection between the two electrical steel conduits is good; if the detection component changes color, it means that there is a channel for water flow between the heat shrink tube and the electrical steel conduit, and there is a problem with the sealing between the two electrical steel conduits. The construction personnel need to remove the heat shrink tube and re-construct.
[0015] Optionally, the detection component includes a water-permeable shell and a detection reagent; the detection reagent is arranged in the water-permeable shell, the water-permeable shell is used to be bonded and fixed to the outer peripheral wall of the electrical steel conduit or the fastening sleeve, and the water body passes through the water-permeable shell and contacts the detection reagent; the detection reagent changes color when it contacts the water body, and the detection reagent is used to detect the presence of water.
[0016] By adopting the above technical solution, the water body passes through the water-permeable shell and contacts the detection reagent; the detection reagent changes color when it contacts the water body, and the detection reagent is used to detect the presence of water.
[0017] Optionally, the fastening screw includes a nut member and a screw member, the nut member and the screw member are integrally formed, and the nut member is used to drive the screw member to be threadedly connected with the fastening sleeve; the screw member is provided with a neck portion on one side close to the nut member, and when the fastening sleeve is tightly abutted against the electrical steel conduit, the neck portion breaks to separate the nut member from the screw member.
[0018] By adopting the above technical solution, the fastening screws that can be twisted off can be used to allow construction workers to quickly determine when to stop tightening, thereby reducing misjudgment during the installation process and improving construction efficiency.
[0019] Optionally, the water-permeable shell covers the screw member.
[0020] By adopting the above technical solution, the raised portion covers the fracture surface of the screw member, so as to reduce the scratches of the heat shrink tube caused by the fracture surface of the screw member and improve the integrity of the heat shrink tube.
[0021] Optionally, it also includes a water-stop rubber ring, a first ring groove is provided in the middle of the fastening sleeve, the cross-section of the first ring groove is an arc-shaped cross-section, and the heat shrink tube is fitted with the side wall of the first ring groove; the water-stop rubber ring is arranged in the fastening sleeve, and the water-stop rubber ring is bonded and fixed to the side wall of the first ring groove, and the water-stop rubber ring is used to abut and fix with the electrical steel conduit.
[0022] By adopting the above technical solution, the water-stop rubber ring will expand after absorbing water, so as to further improve the sealing between the electrical steel conduit and the fastening sleeve, and further reduce the occurrence of slurry penetrating into the interior of the electrical steel conduit.
[0023] Optionally, along the length direction of the heat shrinkable tube, the inner circumferential wall of the heat shrinkable tube is provided with a plurality of second annular grooves at intervals.
[0024] By adopting the above technical solution, the plurality of second annular grooves divide the heat shrinkable tube into a plurality of relatively independent sealing units, thereby improving the sealing effect of the heat shrinkable tube on the electrical steel conduit and the fastening sleeve.
[0025] A construction method for a sealing structure of a pre-buried electrical steel conduit comprises the following steps: Preparation of electrical steel conduits: Bend and cut electrical steel conduits of different sizes according to the construction drawings; Connection of electrical steel conduits: Insert the ends of two electrical steel conduits into the fastening sleeves from both sides, and twist off the neck of the screw. The screw forces the fastening sleeve to abut against the electrical steel conduit tightly. Heat shrink tube heating treatment: Heat the outer periphery of the heat shrink tube, and the heat shrink tube shrinks and adheres tightly to the outer periphery of the electrical steel conduit and the fastening sleeve; after the heat shrink tube cools down for a while, press the heat shrink tube to improve the connection strength between the heat shrink tube and the electrical steel conduit and the fastening sleeve.
[0026] Optionally, a construction method for a sealing structure of a pre-buried electrical steel conduit comprises the following steps: Paste the detection component: After the electrical steel conduit is fixedly connected with the fastening sleeve, the water-permeable shell of the detection component is bonded to the outer peripheral wall of the electrical steel conduit or the fastening sleeve, so that the detection component covers the outer periphery of the electrical steel conduit and the fastening sleeve; then, the heat shrink tube is sleeved on the electrical steel conduit, the fastening sleeve and the outer periphery of the detection component, and after the heat shrink tube shrinks due to heat, the heat shrink tube wraps the electrical steel conduit, the fastening sleeve and the detection component; Detect the waterproof performance of the sealing structure: Wrap absorbent cloth around the periphery of the heat shrinkable tube. The absorbent cloth covers the periphery of the heat shrinkable tube and the electrical steel conduit. The absorbent cloth covers the joint between the heat shrinkable tube and the electrical steel conduit. The waterproof performance of the sealing structure can be judged by observing the color change of the detection reagent.
[0027] In summary, the present application includes at least one of the following beneficial technical effects: 1. After the heat shrink tube is heated, it shrinks and fits on the outer circumference of the electrical steel conduit and the fastening sleeve; the heat shrink tube fits tightly with the electrical steel conduit and the fastening sleeve, and the gap between the electrical steel conduit and the fastening joint is tightly wrapped to provide a good sealing effect, and reduce the occurrence of concrete slurry penetrating into the electrical steel conduit; 2. The staff can quickly judge the waterproof performance of the sealing structure by observing the color change of the detection component. If the detection component does not change color, it means that the sealing of the connection between the two electrical steel conduits is good; if the detection component changes color, it means that there is a channel for water flow between the heat shrink tube and the electrical steel conduit, and there is a problem with the sealing between the two electrical steel conduits. The construction personnel need to remove the heat shrink tube and re-construct; 3. By using fastening screws that can be twisted off, construction workers can quickly determine when to stop tightening, thereby reducing misjudgment during the installation process and improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of an electrical steel conduit installation structure in the background technology.
[0029] Figure 2 It is a schematic diagram of an electrical steel conduit connection structure in the background technology.
[0030] Figure 3 It is a schematic diagram of the sealing structure of the electrical steel conduit in Example 1.
[0031] Figure 4 It is a cross-sectional view of the sealing structure of the electrical steel conduit in Example 1.
[0032] Figure 5 yes Figure 4 Enlarged view of point A in the middle.
[0033] Figure 6 It is a schematic diagram showing the first state of the sealing structure of the electrical steel conduit in Example 1.
[0034] Figure 7 It is a cross-sectional view showing the first state of the sealing structure of the electrical steel conduit in Example 1.
[0035] Figure 8 It is a cross-sectional view showing the second state of the sealing structure of the electrical steel conduit in Example 1.
[0036] Fig. 9 yes Figure 8 Enlarged view of point B in the middle.
[0037] Fig.10 Schematic diagram of the heat shrink tube structure in Example 1.
[0038] Fig.11 Schematic diagram of the heat shrink tube structure in Example 3.
[0039] Fig.12 It is a schematic diagram of the sealing structure of the electrical steel conduit in Example 4.
[0040] Fig.13It is a cross-sectional view of the sealing structure of the electrical steel conduit in Example 4.
[0041] Fig.14 yes Fig.13 Enlarged view of point C in the middle.
[0042] Fig.15 It is a cross-sectional view showing the structure of the detection component in Example 4.
[0043] Fig.16 It is a cross-sectional view of the sealing structure of the electrical steel conduit in Example 6.
[0044] Fig.17 yes Fig.16 Enlarged view of point D in the middle.
[0045] Explanation of the reference numerals in the accompanying drawings: 1. electrical steel conduit; 2. fastening joint; 21. fastening sleeve; 211. mounting hole; 212. first ring groove; 22. fastening screw; 221. nut piece; 2211. plug-in slot; 222. screw piece; 2221. neck; 3. heat shrink tube; 31. hot melt adhesive layer; 32. cross-linked polyolefin layer; 33. notch; 34. second ring groove; 4. detection component; 41. straight strip; 42. raised portion; 43. water-permeable shell; 431. water-permeable hole; 44. detection reagent; 45. adhesive layer; 46. release paper; 5. absorbent cloth; 6. water-stop rubber ring; 7. floor slab; 8. upper steel mesh; 9. lower steel mesh. DETAILED DESCRIPTION
[0046] The following is combined with Figure 3-17 This application is described in further detail.
[0047] The present application embodiment discloses a sealing structure of a pre-buried electrical steel conduit, which is used to connect two electrical steel conduits 1. Figure 3 The sealing structure of the embedded electrical steel conduit includes a fastening joint 2 and a heat shrink tube 3.
[0048] Reference Figure 3 The fastening joint 2 includes a fastening sleeve 21 and a fastening screw 22. Two fastening screws 22 are provided, and the two fastening screws 22 are arranged oppositely on both sides of the fastening sleeve 21. The fastening sleeve 21 is provided with a mounting hole 211, and the fastening screws 22 are threadedly connected with the side wall of the mounting hole 211. The inner diameter of the fastening sleeve 21 matches the outer diameter of the electrical steel conduit 1, and the ends of the two electrical steel conduits 1 are respectively inserted into the two sides of the fastening sleeve 21; then, the staff tightens the fastening screws 22, and the fastening screws 22 abut against the electrical steel conduit 1, and forces the electrical steel conduit 1 to abut tightly against the inner wall of the fastening sleeve 21.
[0049] Reference Figure 3 and Figure 4A first annular groove 212 is provided in the middle of the fastening sleeve 21. The cross section of the first annular groove 212 is an arc-shaped cross section, and the end side wall of the electrical steel conduit 1 is abutted and fixed with the outer side wall of the first annular groove 212. When the electrical steel conduit 1 is inserted into the fastening sleeve 21, the taper design of the first annular groove 212 allows the electrical steel conduit 1 to be accurately positioned; at the same time, the end side wall of the electrical steel conduit 1 is abutted and fixed with the outer side wall of the first annular groove 212, and at the same time, the good sealing performance and waterproof performance between the electrical steel conduit 1 and the fastening sleeve 21 are ensured, and the cleaning of the concrete slurry penetrating along the gap between the electrical steel conduit 1 and the fastening sleeve 21 is reduced, and the problems of leakage and pipe blockage at the connection position of the electrical steel conduit 1 are reduced.
[0050] Reference Figure 4 and Figure 5 The fastening screw 22 includes a nut 221 and a screw 222, and the nut 221 and the screw 222 are integrally formed. An insertion groove 2211 is provided at one end of the nut 221 away from the screw 222, and a staff member can insert a special tool into the insertion groove 2211 and rotate the nut 221; the insertion groove 2211 can be in the shape of a cross groove, etc. When the nut 221 rotates, the nut 221 is used to drive the screw 222 to be threadedly connected with the fastening sleeve 21.
[0051] Reference Figure 4 and Figure 5 The screw member 222 is provided with a neck portion 2221 on one side close to the nut member 221. When the fastening sleeve 21 is in close contact with the electrical steel conduit 1, the neck portion 2221 breaks, so that the nut member 221 is separated from the screw member 222. That is, the neck portion 2221 of the screw member 222 will break after a certain torque is applied, so as to ensure that the electrical steel conduit 1 will not be damaged due to over-tightening after the fastening screw 22 reaches a certain tightening force, so as to reduce the size of the gap between the electrical steel conduit 1 and the fastening sleeve 21; at the same time, it can also ensure that the connection between the electrical steel conduit 1 and the fastening sleeve 21 reaches the expected tightening degree.
[0052] That is, by using the fastening screws 22 that can be twisted off, construction workers can quickly determine when to stop tightening, thereby reducing misjudgment during the installation process and improving construction efficiency.
[0053] Reference Figure 5 and Figure 6 , after the neck 2221 of the screw member 222 is broken. The screw member 222 will partially protrude from the fastening sleeve 21 to ensure the connection strength between the screw member 222 and the fastening sleeve 21. At the same time, there may be burrs or sharp parts on the fracture surface of the screw member 222; the staff should use tools such as files and clamps to grind the fracture surface of the screw member 222 to reduce the influence of the screw member 222 on the heat shrink tube 3.
[0054] Reference Figure 6 and Figure 7 The heat shrink tube 3 is sleeved on the fastening joint 2 and the outer periphery of the electrical steel conduit 1, and a protective spacing is provided between the end of the heat shrink tube 3 and the end of the fastening sleeve 21. In this embodiment, the end of the heat shrink tube 3 exceeds the end of the fastening sleeve 21 by 3-5 cm.
[0055] Reference Figure 8 and Fig. 9 , then, the staff uses a high-temperature spray gun or other heating device to heat the heat shrink tube 3. After the heat shrink tube 3 is heated, it shrinks and fits on the outer peripheral surface of the electrical steel conduit 1 and the fastening sleeve 21. After the heat shrink tube 3 cools down slightly, the staff presses the heat shrink tube 3 again by hand, especially the end of the heat shrink tube 3, so that the heat shrink tube 3 fits tightly with the electrical steel conduit 1 and the fastening sleeve 21, and tightly wraps the gap between the electrical steel conduit 1 and the fastening joint to provide a good sealing effect and reduce the penetration of concrete slurry into the electrical steel conduit 1. In order to solve the problem that during the subsequent pouring of concrete for the floor slab 7, cement mortar will penetrate into the electrical steel conduit 1 along the gap between the fastening sleeve 21 and the electrical steel conduit 1, thereby causing the electrical steel conduit 1 to be blocked, so as to facilitate the staff to thread the wires in the electrical steel conduit 1 later.
[0056] Reference Fig.11 The heat shrinkable tube 3 can be one of the heat shrinkable tubes 3 such as thermoplastic polyolefin heat shrinkable tube 3 and polytetrafluoroethylene heat shrinkable tube 3. In the present embodiment, the heat shrinkable tube 3 is preferably a viscous heat shrinkable tube 3; the inner layer of the heat shrinkable tube 3 is provided with a hot melt adhesive layer 31, and the outer layer is a cross-linked polyolefin layer 32, and the hot melt adhesive layer 31 and the cross-linked polyolefin layer 32 are bonded and fixed. The hot melt adhesive layer 31 is made of hot melt adhesive, and the cross-linked polyolefin layer 32 is made of high-quality, soft cross-linked polyolefin material. After the heat shrinkable tube 3 is heated and shrunk, the hot melt adhesive of the inner layer will melt and adhere to the surface of the electrical steel conduit 1 and the fastening sleeve 21, forming a good sealing effect.
[0057] Example 2 This embodiment 2 discloses a construction method for the sealing structure of the pre-buried electrical steel conduit in embodiment 1. Specifically, it includes the following steps: Preparation of electrical steel conduits 1: Bend and cut electrical steel conduits 1 of different sizes according to the construction drawings.
[0058] The staff can use a toothless saw or a hacksaw to cut the electrical steel conduit 1, and perform a frustration treatment on the pipe mouth to ensure that the pipe mouth is smooth and burr-free. For the electrical steel conduit 1 that needs to be bent, a pipe bender is used to bend the electrical steel conduit 1, and the bending radius of the electrical steel conduit 1 is greater than 6 times the outer diameter of the pipe.
[0059] Connection of the electrical steel conduit 1: Insert the ends of the two electrical steel conduits 1 into the fastening sleeve 21 from both sides, and twist off the neck 2221 of the screw member 222 , so that the screw member 222 forces the fastening sleeve 21 to tightly abut against the electrical steel conduit 1 .
[0060] Install the heat shrink tube 3: use a file to trim the surface of the broken part of the screw member 222 to ensure that the broken surface of the screw member 222 is smooth; install the heat shrink tube 3 on the electrical steel conduit 1, and move the heat shrink tube 3 to the outer wall of the fastening sleeve 21, and the end of the heat shrink tube 3 exceeds the end of the fastening sleeve 21 by 3-5 cm.
[0061] Heating treatment of the heat shrink tube 3: The outer periphery of the heat shrink tube 3 is heated, and the heat shrink tube 3 shrinks due to the heat and adheres closely to the outer periphery of the electrical steel conduit 1 and the fastening sleeve 21; after the heat shrink tube 3 cools down for a while, the heat shrink tube 3 is pressed to improve the connection sealing between the heat shrink tube 3 and the electrical steel conduit 1 and the fastening sleeve 21.
[0062] Example 3 The difference between this embodiment 3 and embodiment 1 is that: Reference Fig.10 The heat shrink tube 3 has notches 33 at both ends, and the two notches 33 are arranged opposite to each other; the width of the notches 33 decreases from the two ends to the middle of the heat shrink tube 3; a protective spacing is provided between the notch 33 and the fastening sleeve 21. In this embodiment, the distance between the bottom of the notch 33 and the heat shrink tube 3 is 3-5 cm.
[0063] Arc-shaped notches 33 are provided at both ends of the heat shrink tube 3. On one hand, the screw part will partially protrude from the outer peripheral wall of the fastening sleeve 21. Through the notches 33 at the ends of the heat shrink tube 3, it is convenient for the staff to sleeve the heat shrink tube 3 on the outer periphery of the fastening sleeve 21. On the other hand, the notches 33 at the ends of the heat shrink tube 3 reserve deformation space for the shrinkage deformation of the heat shrink tube 3, thereby improving the sealing degree between the ends of the heat shrink tube 3 and the electrical steel conduit 1, and improving the sealing of the connection between adjacent electrical steel conduits 1.
[0064] Example 4 The difference between this embodiment 4 and embodiment 1 is that: The sealing performance between the heat shrink tube 3 and the electrical steel conduit 1 is related to the heating time and temperature of the heat shrink tube 3; if the heat source is suitable, the heat shrink tube 3 is fully recovered and closely fits the electrical steel conduit 1, thereby improving the sealing performance of the connection between adjacent electrical steel conduits 1. However, if the operator does not operate properly, the heat shrink tube 3 is not fully heated and shrunk; thus, there is a gap between the heat shrink tube 3 and the electrical steel conduit 1 for the slurry to penetrate, thereby affecting the sealing performance of the connection between the electrical steel conduit 1. Therefore, this embodiment further improves the sealing structure of the electrical steel conduit 1.
[0065] Reference Fig.11The sealing structure of the pre-buried electrical steel conduit further includes a detection component 4, which is used to detect the sealing between the heat shrink tube 3 and the electrical steel conduit 1.
[0066] Reference Fig.11 , the detection component 4 is arranged around the fastening sleeve 21, and the detection component 4 covers the connection gap between the fastening sleeve 21 and the electrical steel conduit 1, and the detection component 4 is bonded and fixed to the electrical steel conduit 1 or the fastening sleeve 21. The heat shrink tube 3 is sleeved on the outer periphery of the detection component 4, and a protective spacing is provided between the end of the heat shrink tube 3 and the detection component 4. In this embodiment, the end of the heat shrink tube 3 exceeds the outside of the detection component 4 by 3-5 cm to ensure the connection length of the heat shrink tube 3 and the electrical steel conduit 1.
[0067] Reference Figure 12 to Figure 14 , the detection component 4 includes a flexible straight strip portion 41 and a raised portion 42, the raised portion 42 is arranged in the middle area of the straight strip portion 41, and the straight strip portion 41 and the raised portion 42 are named based on the shape of the detection component 4, and the straight strip portion 41 and the raised portion 42 are two parts of a whole. The raised portion 42 covers the fracture surface of the screw member 222 to reduce the scratches on the heat shrink tube 3 by the fracture surface of the screw member 222, thereby improving the integrity of the heat shrink tube 3. At the same time, the straight strip portion 41 covers the connection area between the electrical steel conduit 1 and the fastening sleeve 21; that is, half of the straight strip portion 41 covers the electrical steel conduit 1, and the other half of the straight strip portion 41 covers the fastening sleeve 21, so that the straight strip portion 41 is arranged on the water infiltration path. The heat shrink tube 3 shrinks due to heat, forcing the detection component 4 to abut against the electrical steel conduit 1 and the fastening sleeve 21.
[0068] In this embodiment, the detection component 4 can react in contact with water, and the color of the detection component 4 will change after contacting the water.
[0069] Reference Fig.13 and Fig.14 , the staff can wrap the absorbent cloth 5 around the outer periphery of the heat shrink tube 3, the absorbent cloth 5 includes the outer periphery of the heat shrink tube 3 and the electrical steel conduit 1, and the absorbent cloth 5 covers the joint between the heat shrink tube 3 and the electrical steel conduit 1. If there is a flow channel between the heat shrink tube 3 and the electrical steel conduit 1, the external water can contact the detection component 4 along the flow channel, thereby detecting whether there is water between the heat shrink tube 3 and the electrical steel conduit 1. At the same time, the heat shrink tube 3 is a transparent tube, so that the staff can observe the color change of the detection component 4.
[0070] That is, the staff can quickly judge the waterproof performance of the sealing structure by observing the color change of the detection component 4. If the detection component 4 does not change color, it means that the sealing of the connection between the two electrical steel conduits 1 is good; if the detection component 4 changes color, it means that there is a channel for water flow between the heat shrink tube 3 and the electrical steel conduit 1, and there is a problem with the sealing between the two electrical steel conduits 1. The construction staff needs to remove the heat shrink tube 3 and re-construct. = Thus, by setting the detection component 4, the construction quality and construction efficiency are improved.
[0071] Reference Fig.15 , the detection component 4 includes a water-permeable shell 43 and a detection reagent 44; the detection reagent 44 is arranged in the water-permeable shell 43, the water-permeable shell 43 is used to be bonded and fixed with the outer peripheral wall of the electrical steel conduit 1 or the fastening sleeve 21, and the water body passes through the water-permeable shell 43 and contacts the detection reagent 44; the detection reagent 44 changes color when in contact with the water body, and the detection reagent 44 is used to detect the presence of water. The transparent shell can be made of water-permeable fabrics such as non-woven fabrics, composite paper, wax paper, and breathable cotton paper; in this embodiment, the transparent shell is made of non-woven fabrics, and a plurality of water-permeable holes 431 can be opened on the transparent shell. The detection reagent 44 uses chemical reagents that change color with the water body, such as anhydrous copper sulfate crystals, ferric chloride powder and other materials; anhydrous copper sulfate reacts with water to turn blue, and ferric chloride reacts with water to form brown ferric chloride hexahydrate. In this embodiment, the detection reagent 44 is preferably anhydrous copper sulfate crystals, so that the staff can carry and observe.
[0072] It is worth noting that the transparent shell can be partially bonded to the electrical steel conduit 1 and the fastening sleeve 21 to preliminarily fix the position of the detection component 4, so that the staff can put on the heat shrink tube 3. The transparent shell can be fixed to the electrical steel conduit 1 and the fastening sleeve 21 by point bonding to increase the probability of contact between the water body and the transparent shell.
[0073] In order to facilitate the staff to bond the detection component 4, the detection component 4 also includes an adhesive layer 45 and a release paper 46. The adhesive layer 45 is arranged on one side of the transparent shell, and the release paper 46 is arranged on the side of the adhesive layer 45 away from the bonding component. Under normal circumstances, the release paper 46 is bonded and fixed to the adhesive layer 45; when the staff bonds the detection component 4, the release paper 46 is separated from the adhesive layer 45, so that the adhesive layer 45 is bonded to the electrical steel conduit 1 or the fastening sleeve 21.
[0074] Example 5 This embodiment 5 discloses a construction method for the sealing structure of the pre-buried electrical steel conduit in embodiment 4. Specifically, it also includes the following steps: Pasting the detection component 4: After the electrical steel conduit 1 is fixedly connected to the fastening sleeve 21; the water-permeable shell of the detection component 4 is adhered to the outer peripheral wall of the electrical steel conduit 1 or the fastening sleeve 21, so that the detection component 4 covers the outer periphery of the electrical steel conduit 1 and the fastening sleeve 21; then, the heat shrink tube 3 is sleeved on the outer periphery of the electrical steel conduit 1, the fastening sleeve 21 and the detection component 4, and after the heat shrink tube 3 shrinks due to heat, the heat shrink tube 3 wraps the electrical steel conduit 1, the fastening sleeve 21 and the detection component 4; Detect the waterproof performance of the sealing structure: Wrap the absorbent cloth 5 around the periphery of the heat shrinkable tube 3, the absorbent cloth 5 includes the periphery of the heat shrinkable tube 3 and the electrical steel conduit 1, and the absorbent cloth 5 covers the joint between the heat shrinkable tube 3 and the electrical steel conduit 1. The waterproof performance of the sealing structure is judged by observing the color change of the detection reagent 44.
[0075] Example 6 The difference between this embodiment 6 and embodiment 4 is that: Reference Fig.16 and Fig.17 The sealing structure of the embedded electrical steel conduit further includes a waterproof rubber ring 6, which is disposed in the fastening sleeve 21 and is bonded and fixed to the groove side wall of the first annular groove 212. The waterproof rubber ring 6 is used to abut and fix with the electrical steel conduit 1. The waterproof rubber ring 6 will expand after absorbing water, so as to further improve the sealing between the electrical steel conduit 1 and the fastening sleeve 21, and further reduce the occurrence of slurry penetrating into the interior of the electrical steel conduit 1.
[0076] Meanwhile, in this embodiment, along the length direction of the heat shrink tube 3, the inner peripheral wall of the heat shrink tube 3 is provided with a plurality of second annular grooves 34 at intervals. On the one hand, the second annular grooves 34 reserve deformation space for the recovery deformation of the heat shrink tube 3, which is beneficial to the recovery deformation of the heat shrink tube 3. On the other hand, the plurality of second annular grooves 34 divide the heat shrink tube 3 into a plurality of relatively independent sealing units, thereby improving the sealing effect of the heat shrink tube 3 on the electrical steel conduit 1 and the fastening sleeve 21.
[0077] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A sealing structure for a pre-buried electrical steel conduit, the sealing structure being used to connect two electrical steel conduits (1); characterized in that: The invention comprises a fastening joint (2) and a heat shrink tube (3); the fastening joint (2) comprises a fastening sleeve (21) and a fastening screw (22); two fastening screws (22) are provided, and the two fastening screws (22) are arranged on both sides of the fastening sleeve (21) opposite to each other; the fastening sleeve (21) is provided with a mounting hole (211), and the fastening screw (22) is threadedly connected to the side wall of the mounting hole (211); the ends of the two electrical steel conduits (1) are respectively plugged into the two sides of the fastening sleeve (21), and the fastening screws (22) are connected to the side wall of the mounting hole (211). The screw (22) is in contact with the electrical steel conduit (1), and the fastening screw (22) is used to force the electrical steel conduit (1) to tightly abut against the inner wall of the fastening sleeve (21); the heat shrink tube (3) is sleeved on the outer periphery of the fastening joint (2) and the electrical steel conduit (1), and a protective spacing is provided between the end of the heat shrink tube (3) and the end of the fastening sleeve (21); after the heat shrink tube (3) is heated, the heat shrink tube (3) shrinks and fits the outer periphery of the electrical steel conduit (1) and the fastening sleeve (21).
2. The sealing structure of the embedded electrical steel conduit according to claim 1 is characterized in that: Notches (33) are provided at both ends of the heat shrink tube (3), and the two notches (33) are arranged opposite to each other; the width of the notches (33) decreases from the two ends to the middle of the heat shrink tube (3); and a protective spacing is provided between the notches (33) and the fastening sleeve (21).
3. The sealing structure of the embedded electrical steel conduit according to claim 1 is characterized in that: The invention also comprises a detection component (4), wherein the detection component (4) is arranged around the fastening sleeve (21), and the detection component (4) covers the connection gap between the fastening sleeve (21) and the electrical steel conduit (1), and the detection component (4) is bonded and fixed to the electrical steel conduit (1) or the fastening sleeve (21); the heat shrinkable tube (3) is sleeved on the outer periphery of the detection component (4), and a protective spacing is provided between the end of the heat shrinkable tube (3) and the detection component (4), and the heat shrinkable tube (3) is a transparent tube; the heat shrinkable tube (3) shrinks when heated, forcing the detection component (4) to abut against the electrical steel conduit (1) and the fastening sleeve (21); the detection component (4) is used to detect the presence of water, and if a flow channel exists between the heat shrinkable tube (3) and the electrical steel conduit (1), external water can contact the detection component (4) along the flow channel.
4. The sealing structure of the embedded electrical steel conduit according to claim 3 is characterized in that: The detection component (4) comprises a water-permeable shell (43) and a detection reagent (44); the detection reagent (44) is arranged in the water-permeable shell (43); the water-permeable shell (43) is used to be bonded and fixed to the outer peripheral wall of the electrical steel conduit (1) or the fastening sleeve (21); water passes through the water-permeable shell (43) and contacts the detection reagent (44); the detection reagent (44) changes color when in contact with the water; the detection reagent (44) is used to detect the presence of water.
5. The sealing structure of the embedded electrical steel conduit according to claim 4 is characterized in that: The fastening screw (22) comprises a nut member (221) and a screw member (222); the nut member (221) and the screw member (222) are integrally formed; the nut member (221) is used to drive the screw member (222) to be threadedly connected with the fastening sleeve (21); a neck portion (2221) is provided on a side of the screw member (222) close to the nut member (221); when the fastening sleeve (21) is in tight contact with the electrical steel conduit (1), the neck portion (2221) breaks, so that the nut member (221) and the screw member (222) are separated.
6. The sealing structure of the embedded electrical steel conduit according to claim 5 is characterized in that: The water-permeable housing (43) is covered with the screw member (222).
7. The sealing structure of the embedded electrical steel conduit according to claim 1 is characterized in that: It also includes a waterproof rubber ring (6), a first annular groove (212) is provided in the middle of the fastening sleeve (21), the cross section of the first annular groove (212) is an arc-shaped cross section, and the heat shrink tube (3) is in contact with the side wall of the first annular groove (212); the waterproof rubber ring (6) is arranged in the fastening sleeve (21), and the waterproof rubber ring (6) is bonded and fixed to the side wall of the first annular groove (212), and the waterproof rubber ring (6) is used to abut and fix with the electrical steel conduit (1).
8. The sealing structure of the embedded electrical steel conduit according to claim 1 is characterized in that: Along the length direction of the heat shrink tube (3), a plurality of second annular grooves (34) are provided at intervals on the inner peripheral wall of the heat shrink tube (3).
9. A construction method for the sealing structure of the embedded electrical steel conduit according to any one of claims 1 to 8, characterized in that: The following steps are involved: Preparation of electrical steel conduits (1): bending and cutting electrical steel conduits (1) of different sizes according to the construction drawings; Connection of the electrical steel conduit (1): inserting the ends of the two electrical steel conduits (1) into the fastening sleeve (21) from both sides, and twisting off the neck (2221) of the screw member (222), so that the screw member (222) forces the fastening sleeve (21) to tightly abut against the electrical steel conduit (1); Installing the heat shrink tube (3): using a file to trim the surface of the fractured portion of the screw member (222) to ensure that the fractured surface of the screw member (222) is smooth; installing the heat shrink tube (3) on the electrical steel conduit (1), and moving the heat shrink tube (3) to the outer peripheral wall of the fastening sleeve (21), with the end of the heat shrink tube (3) protruding 3-5 cm from the end of the fastening sleeve (21); Heat shrink tube (3) heating treatment: the outer periphery of the heat shrink tube (3) is heated, the heat shrink tube (3) shrinks due to the heat and adheres closely to the outer periphery of the electrical steel conduit (1) and the fastening sleeve (21); after the heat shrink tube (3) cools down for a while, the heat shrink tube (3) is pressed to improve the connection sealing between the heat shrink tube (3) and the electrical steel conduit (1) and the fastening sleeve (21).
10. The construction method of the sealing structure of the pre-buried electrical steel conduit according to claim 9 is characterized in that: The following steps are also included: Adhere the detection component (4): after the electrical steel conduit (1) and the fastening sleeve (21) are fixedly connected; adhere the water-permeable outer shell of the detection component (4) to the outer peripheral wall of the electrical steel conduit (1) or the fastening sleeve (21), so that the detection component (4) covers the outer periphery of the electrical steel conduit (1) and the fastening sleeve (21); then, sleeve the heat shrink tube (3) on the outer periphery of the electrical steel conduit (1), the fastening sleeve (21) and the detection component (4); after the heat shrink tube (3) shrinks due to heat, the heat shrink tube (3) wraps around the electrical steel conduit (1), the fastening sleeve (21) and the detection component (4); Testing the waterproof performance of the sealing structure: wrapping a water-absorbing cloth (5) around the outer periphery of the heat shrink tube (3), the water-absorbing cloth (5) including the outer periphery of the heat shrink tube (3) and the electrical steel conduit (1), the water-absorbing cloth (5) covering the joint between the heat shrink tube (3) and the electrical steel conduit (1), and judging the waterproof performance of the sealing structure by observing the color change of the detection reagent (44).