Method and equipment for determining three-dimensional stratum soil body type distribution based on drilling data
By establishing a Cartesian coordinate system and grid division at the borehole location, combined with the generalized regression neural network and Markov chain algorithm, the probability distribution of soil types is determined, which solves the deficiencies in the study of spatial variability of soil types in the formation. It achieves accurate identification and simplified calculation of stratigraphic soil types, and is suitable for underground space development.
Patent Information
- Application Number
- CN202410736013.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2024-10-15
AI Technical Summary
The existing technology is insufficient in the study of spatial variability of soil types, especially the geological information that is far away from the borehole cannot be accurately estimated, and the geological borehole operation is deep and costly, and the number of boreholes in the site is relatively large. Too few, resulting in inaccurate reflection of stratigraphic soil conditions, and complicated modeling process, which is not conducive to on-site application.
By designing the drilling location, establishing a Cartesian coordinate system and grid division, obtaining drilling data, using generalized regression neural network and Markov chain algorithm, combined with vertical and horizontal probability vectors, to determine the probability distribution of soil types and simplify soil types. Soil type identification of volume units.
It achieves accurate identification of stratigraphic soil types, simplifies the calculation process, reduces human influence, improves the reliability and efficiency of soil layer distribution prediction, and is suitable for underground space development.
Smart Images

Figure CN118779745A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of geological type prediction, and in particular to a method and device for determining the distribution of three-dimensional stratum soil types based on drilling data, and a storage medium. Background Art
[0002] Due to long-term weathering, sedimentation and geological structure, strata are often distributed in layers and have obvious spatial variability. The spatial variability of strata poses certain difficulties for underground space development, oil exploration, mineral mining, etc. Therefore, the prediction and analysis of stratum soil types is an important engineering issue that people pay close attention to. In particular, the prediction and analysis of 3D stratum soil types has important engineering significance for revealing the distribution characteristics of underground space soil, and can provide comprehensive geological distribution information for the safe operation and maintenance analysis of tunnel engineering, foundation pit engineering and underground pipeline engineering. The spatial variability of strata mainly includes two aspects: the spatial uncertainty of soil parameters and the spatial variability of soil types.
[0003] At present, most of the research on the spatial variability of strata focuses on the spatial uncertainty of soil parameters, and there is less research on the spatial variability of strata soil types. Geological surveys mainly use borehole data based on standard penetration tests to obtain geological information. Although the borehole data can reflect the type of strata soil within a limited range around the borehole, the geological information at a distance from the borehole cannot be accurately estimated. In addition, geological drilling operations are deep and costly, so the number of boreholes in a site is often small. Usually, the geological drilling data within the site is not sufficient to accurately reflect the actual soil conditions of the entire site, and in the existing technology, the operation process of the stratum modeling method using borehole data is relatively complicated, which is not conducive to the on-site application of actual projects. Summary of the invention
[0004] The purpose of the present invention is to provide a method for determining the distribution of three-dimensional stratum soil types based on drilling data, a detection system, and a preparation system to solve one or more technical problems existing in the prior art and at least provide a beneficial choice or create conditions.
[0005] In order to solve the above problem, in some embodiments of the first aspect of the present invention, a method for determining the distribution of three-dimensional soil types based on drilling data is provided, comprising:
[0006] Design the drilling position on the current site, establish a Cartesian coordinate system, divide the current site into grids, obtain the soil units corresponding to the grid units, and use the center coordinates of the grid units as the soil coordinates of the soil units;
[0007] Drilling a hole at the drilling position to obtain drilling data, and determining drilling soil type information according to the drilling data;
[0008] Discretize the borehole positions at intervals along the depth direction, determine the soil units at the discrete borehole positions, and record them as first soil units, determine the first probability vector of the soil type of the first soil unit according to the borehole soil type information, and establish a corresponding relationship between the soil coordinates of the first soil unit and the first probability vector;
[0009] The soil unit at the non-drilling position is recorded as the second soil unit, and the horizontal probability vector of the soil type of the second soil unit is determined along the horizontal extension direction of the soil layer by using a generalized regression neural network algorithm according to the soil coordinates of the first soil unit and the first probability vector;
[0010] Using a Markov chain algorithm, according to the soil coordinates of the first soil unit and the first probability vector, a vertical probability vector of the soil type of the second soil unit is calculated along the depth extension direction of the soil layer;
[0011] The vertical probability vector and the horizontal probability vector are coupled to calculate a second probability vector of the soil type of the second soil unit, and the soil type corresponding to the maximum probability value is selected from the first probability vector and the second probability vector as the soil type of the current soil unit.
[0012] Furthermore, the process of obtaining the soil unit corresponding to the grid unit specifically includes:
[0013] Obtaining the size characteristics of the current site and all the drilling elevations, and designing the drilling positions according to the size characteristics;
[0014] According to all the drilling elevations, the maximum value of the drilling elevations is selected as the maximum value in the depth direction, the drilling elevation of zero is used as the origin of the depth coordinate axis, and a drilling position is selected from the drilling positions as the origin of the horizontal coordinate axis and the longitudinal coordinate axis to establish a Cartesian coordinate system;
[0015] The current site is meshed in the horizontal, vertical and depth directions according to the set side lengths to obtain soil units corresponding to the mesh units.
[0016] Furthermore, the process of obtaining the borehole soil type information specifically includes:
[0017] The type of the borehole soil is determined based on the soil sample obtained after drilling to obtain the drilling data, and the types of the borehole soil are statistically sorted to obtain the borehole soil type information.
[0018] Further, the process of determining the first probability vector specifically includes:
[0019] Discretizing the drilling positions along the depth direction at intervals of a set depth, and determining soil units at the discrete drilling positions according to the discrete drilling positions to determine the first soil unit;
[0020] According to the drilling data of the first soil unit, the soil type contained in the first soil unit is determined, and the drilling soil type information {S1, S2, S3, ..., S m} is set to 1, and the remaining soil types are set to 0 to form the first probability vector, where m is the total number of soil types.
[0021] Furthermore, the calculation process of the horizontal probability vector specifically includes:
[0022] Training a generalized regression neural network algorithm using the soil coordinates of the first soil unit and the first probability vector;
[0023] The acquired soil coordinates of the second soil unit, the number of drilling positions and the drilling positions are input into the trained generalized regression neural network algorithm to output the horizontal probability vector.
[0024] Furthermore, the calculation process of the vertical probability vector specifically includes:
[0025] According to the first probability vector, the current first soil unit to the next adjacent first soil unit is recorded as a soil conversion, wherein the soil conversion includes a first conversion frequency of the current soil type to other soil types and a second conversion frequency of the current soil type to the current soil type;
[0026] A soil transformation matrix is formed according to the first transformation frequency and the second transformation frequency, and the soil transformation matrix is normalized to obtain a transformation probability matrix.
[0027] Furthermore, the calculation process of the vertical probability vector further specifically includes:
[0028] Surveying the surface of the current site and determining the probability vector of the surface soil type of the second soil unit;
[0029] According to the conversion probability matrix, the probability vector of the type of the surface soil is used as an initial input to calculate the adjacent soil type probability vector of the second soil unit in the next adjacent layer;
[0030] The adjacent soil type probability vectors are used as input again until the soil type probability vectors of the remaining second soil units in the depth direction are obtained, and the vertical probability vector is formed together with the surface soil type probability vector.
[0031] Furthermore, the value of the set depth is the same as the value of the set side length.
[0032] In some embodiments of the second aspect of the present invention, an electronic device includes:
[0033] a memory storing a computer program;
[0034] A processor, wherein when executing the computer program, the processor implements the method for determining the distribution of three-dimensional stratum soil types based on drilling data according to the first aspect of the present invention.
[0035] In some embodiments of the third aspect of the present invention, a storage medium stores a computer program thereon, characterized in that when the computer program is executed by a processor, the method for determining the distribution of three-dimensional stratum soil types based on drilling data of the first aspect of the present invention is implemented.
[0036] The beneficial effects of the present invention are as follows: Cartesian coordinate system and unit grid division are established for the current site to obtain soil units, and the soil types in the current site are statistically analyzed through the obtained drilling data, and the drilling soil type information is determined to determine the soil type probability vector of the soil unit at the drilling position; the coupling method of the generalized regression neural network algorithm and the Markov chain algorithm is adopted, and the soil coordinates and soil type probability vector of the soil unit at the drilling position are used as input information to calculate and determine the soil type probability vector of the soil unit at the non-drilling position, and then determine the soil type at this position to determine the soil type of the stratum in the current site; the method is simple and practical, avoiding the problems of large human influence factors and complex calculations in the previous method. In practical applications, the advantages compared with the traditional method are mainly that there are few input variables, simple methods, strong reliability, and the ability to objectively reflect the distribution of stratum soil types, which can bring convenience to the identification of stratum soil types involved in underground space development and the corresponding engineering design. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a flow chart of a method for determining the distribution of three-dimensional stratum soil types based on drilling data according to an embodiment of the present invention.
[0038] Figure 2 This is an information diagram of geological survey drilling locations and drilling soil types shown in an embodiment of the present invention.
[0039] Figure 3 It is a three-dimensional soil type distribution diagram shown in an embodiment of the present invention.
[0040] Figure 4 It is a slice diagram of a three-dimensional soil layer profile shown in an embodiment of the present invention. DETAILED DESCRIPTION
[0041] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the present invention will be further described below in conjunction with the embodiments and drawings.
[0042] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present disclosure. Instead, they are merely examples of devices and methods consistent with some aspects of the present disclosure as detailed in the appended claims.
[0043] In an embodiment of the first aspect of the present invention, referring to Figure 1 A method for determining the distribution of three-dimensional soil types based on drilling data includes the following steps:
[0044] S100, designing a drilling position on the current site, establishing a Cartesian coordinate system, meshing the current site, obtaining soil units corresponding to the mesh units, and using the center coordinates of the mesh units as soil coordinates of the soil units.
[0045] In this embodiment, in the prior art, drilling is generally performed in a certain arrangement, such as 9X9 arrangement or a certain drilling spacing between the drilling positions. Then, according to the size characteristics of the current site, the drilling positions {D1, D2, D3, ..., D n}, n is the total number of drilling positions.
[0046] According to all the drilling elevations and drilling positions on the current site, a Cartesian coordinate system is established on the current site to form a three-dimensional site. Among them, the drilling elevation refers to the height of the bottom of the drilling hole, which is the height relative to the reference plane of the current site.
[0047] In the Cartesian coordinate system, the current site forming a three-dimensional site is gridded according to the set side length, and a plurality of grid units are divided to form soil units, which correspond to the grid units.
[0048] In the Cartesian coordinate system, the center coordinates of the grid unit are regarded as the soil coordinates (x, y, z) of the soil unit according to the center coordinates of the grid unit by the set side length. Among them, the coordinates of the drilling position designed on the surface of the current site can be D = (x, y, 0).
[0049] For example: grid division can be regarded as dividing the current site into cubic soil blocks with a side length of 0.5 meters, obtaining multiple grid units with a side length of 0.5 meters. The depth of the drilling hole is approximately 30 to 40 meters, then a drilling location includes 60 to 80 grid units, and the type of soil samples within the depth range of the drilling location corresponds to the soil type contained in each grid unit (soil unit).
[0050] S200, drilling at a drilling position, obtaining drilling data, and determining drilling soil type information according to the drilling data.
[0051] In this embodiment, an in-situ standard penetration test is performed on the drilling location to realize drilling at the drilling location, record and obtain soil samples of all drilling locations in the current site, and identify the specific soil type by visual observation or through a screening test. According to the particle size of the soil sample, the type of drilling soil at the drilling location in the depth direction is determined, thereby obtaining the drilling data of the drilling location.
[0052] Through the drilling data, the types of bored soil at all drilling locations in the current site are obtained, and the types of bored soil are sorted to obtain the type information of bored soil. The type information of bored soil is recorded as {S1, S2, S3, …, S m}, m is the total number of soil types.
[0053] S300, discretize the drilling positions at intervals along the depth direction, determine the soil units at the discrete drilling positions, and record them as the first soil units, determine the first probability vector of the soil type of the first soil unit according to the drilling soil type information, and establish a corresponding relationship between the soil coordinates of the first soil unit and the first probability vector.
[0054] In this embodiment, after the in-situ standard penetration test in S200, the type of the borehole soil contained in the depth direction of the borehole position can be determined.
[0055] Based on the drilling position, the intervals of the drilling position along the depth direction are discretized according to the set depth, and the soil unit where the discretized drilling position is located is confirmed. The soil unit where the discretized drilling position is located is recorded as the first soil unit. The first soil unit is the soil unit through the hole, so as to divide the soil types at different depths into corresponding soil units.
[0056] By comparing the borehole soil type information, a first probability vector of the soil type of the first soil unit is obtained, and based on the soil coordinates of the first soil unit and the corresponding first probability vector, a one-to-one correspondence between the two is established, thereby establishing a relationship between the soil type and the soil coordinates.
[0057] That is to say, the drilling position is divided into several drilling sections along the depth direction, and each drilling section will contain at least one soil type. By setting the depth, determine in which soil unit the drilling section is located, and obtain the corresponding soil coordinates. The soil unit where the drilling section is located is regarded as the first soil unit, and the drilling soil type contained in the drilling section is regarded as the soil type contained in the first soil unit. The first probability vector is obtained by the soil type contained in the first soil unit and the drilling soil type information. The first probability vector is corresponded to the corresponding soil coordinates, which is convenient for the training of the neural network and probability matrix in the subsequent steps.
[0058] For example: The drilling coordinates of the current drilling position are D p =(x p ,y p ,0), p∈n, the soil coordinates of the soil unit where the drilling hole is located are (x q ,y q , z q ), the drilling position pair is discretized according to the interval of the set depth, and the discretized drilling position can be (x p ,y p , z p1 )、(x p ,y p , z p2 )....(x p ,y p , z pl ), then determine the soil unit where the above-discrete drilling position is located.
[0059] S400, the soil unit at the non-drilling position is recorded as the second soil unit, and the horizontal probability vector of the soil type of the second soil unit is determined along the horizontal extension direction of the soil layer by using a generalized regression neural network algorithm according to the soil coordinates of the first soil unit and the first probability vector.
[0060] In this embodiment, the soil unit without a drilling location is recorded as the second soil unit.
[0061] The first probability vector and the soil coordinates of the first soil unit are used to train the generalized regression neural network algorithm. The soil coordinates of the second soil unit are used as input along the horizontal extension direction of the soil layer through the trained generalized regression neural network algorithm to output the horizontal probability vector P of the soil type of the second soil unit. h (x, y, z).
[0062] S500, using a Markov chain algorithm, according to the soil coordinates of the first soil unit and the first probability vector, calculate the vertical probability vector of the soil type of the second soil unit along the soil layer depth extension direction.
[0063] In this embodiment, the conversion probability matrix of the Markov chain algorithm is trained by the soil coordinates of the first soil unit and the first probability vector to form a conversion probability matrix of the soil type in the depth direction.
[0064] Using the conversion probability matrix, we start from the land type of the second soil unit located on the surface, and calculate the soil type probability vector of the second soil unit in the depth direction along the depth extension direction of the soil layer, so as to obtain the vertical probability vector of the soil type of the second soil unit.
[0065] S600, coupling the vertical probability vector and the horizontal probability vector, calculating a second probability vector of the soil type of the second soil unit, and selecting the soil type corresponding to the maximum probability value from the first probability vector and the second probability vector as the soil type of the current soil unit.
[0066] In this embodiment, the soil type probability vector of the second soil unit in the horizontal direction is obtained by S400, that is, the horizontal probability vector P h (x, y, z), and obtain the soil type probability vector of the second soil unit in the depth direction through S500, that is, the vertical probability vector For the horizontal probability vector P h (x, y, z) and the vertical probability vector A coupling calculation is performed to obtain a probability vector of the soil type of the soil unit where the non-drilling position is located, that is, a second probability vector.
[0067] The maximum probability value is selected from the first probability vector, and the soil type corresponding to the maximum probability value is determined, which is used as the soil type of the current first soil unit, thereby determining the soil type of the drilled soil unit. Similarly, the same selection operation is performed on the second probability vector to determine the soil type of the non-drilled soil unit.
[0068] After the soil types of the first soil unit and the second soil unit are determined, the distribution of soil types in the stratum at the current location can be determined.
[0069] It can be seen from the above embodiments that a coordinate system is established for the current site to form a three-dimensional site to divide soil units; based on the drilling data obtained from the standard penetration test, the soil types obtained from the drilling of the current site are statistically analyzed and a soil type probability vector is established; a method of coupling a generalized regression neural network algorithm with a Markov chain algorithm is used to calculate and determine the probability vector of the stratum soil type at a non-drilling position, and then the soil type at the position is determined, thereby determining the three-dimensional stratum distribution of the current site, providing geological soil layer information for underground space development, avoiding the problems of large human influence factors and complex calculations in previous methods, reducing input variables, and improving the reliability of soil layer distribution prediction.
[0070] In an embodiment of the first aspect of the present invention, in S100, the process of acquiring the soil unit corresponding to the grid unit specifically includes:
[0071] S110, obtaining the dimension characteristics of the current site and all drilling elevations, and designing the drilling positions based on the dimension characteristics.
[0072] S120, through all the drilling elevations, select the maximum value of the drilling elevation as the maximum value in the depth direction of the current site, take the depth where the drilling elevation is zero as the origin of the depth coordinate axis, select one of the drilling positions from the drilling positions as the origin of the horizontal coordinate axis and the longitudinal coordinate axis, and construct a Cartesian coordinate system.
[0073] S130, dividing the current site into grids in the horizontal, vertical and depth directions according to the set side lengths to form grid units, where the grid units correspond to the soil units.
[0074] In this embodiment, the scope of the current site is clarified, the size characteristics of the current site are obtained, and the drilling positions {D1, D2, D3, ..., D n}, n is the total number of drilling positions.
[0075] The maximum and minimum values of the elevations of all the boreholes in the current site are obtained as the maximum and minimum values of the depth direction of the current site, and the depth position where the borehole elevation is zero is used as the origin of the depth coordinate axis z axis of the current site. Through the borehole positions designed in S130, a borehole position is selected as the origin of the horizontal coordinate axis x axis and the longitudinal coordinate axis y axis, so as to construct a Cartesian coordinate system on the current site to form a three-dimensional site.
[0076] In the Cartesian coordinate system, according to the set side length, the current site forming a three-dimensional site is gridded in the horizontal x, vertical y and depth z directions to divide into multiple grid units, and the grid units are regarded as soil units, which correspond to the grid units.
[0077] In the Cartesian coordinate system, the center coordinates of the grid unit are determined by the set side length, and the center coordinates of the grid unit are regarded as the soil coordinates (x, y, z) of the soil unit.
[0078] The coordinates of the drilling position designed on the ground surface in the current site may be D=(x, y, 0).
[0079] It can be seen from the above embodiments that by establishing a Cartesian coordinate system on the current site, the current site is digitized, and the current site is decomposed and divided into a number of soil units, the complexity of determining the soil type distribution problem of the entire site is simplified, and the accuracy and efficiency of the prediction are improved.
[0080] In an embodiment of the first aspect of the present invention, in S200, the process of determining the type information of the bored soil body through the drilling data specifically includes:
[0081] S210, determining the type of the borehole soil through the soil sample after drilling, thereby obtaining drilling data, and based on the drilling data, counting the types of the borehole soil and sorting them to form borehole soil type information.
[0082] In this embodiment, by conducting an in-situ standard penetration test at the drilling location, soil samples of all drilling locations in the current site are obtained, and the specific soil type is identified by visual observation or through a screening test, the type of drilling soil at the drilling location in the depth direction is determined based on the particle size of the soil sample, thereby obtaining the drilling data of the drilling location in the depth direction.
[0083] The types of borehole soil at the drilling position in the depth direction are counted and sorted to form the borehole soil type information {S1, S2, S3, ..., S m}, m is the total number of soil types, and S represents the soil type.
[0084] In an embodiment of the first aspect of the present invention, in S300, the process of determining the first probability vector of the first soil unit specifically includes:
[0085] S310, discretizing the intervals of the drilling positions along the depth direction according to the set depth, and determining the soil units at the discrete drilling positions through the discrete drilling positions, that is, determining the first soil unit,
[0086] S320, determining the soil type contained in the first soil unit through the drilling data of the first soil unit, and performing a calculation on the drilling soil type information {S1, S2, S3, . . . , S m} is set to 1, and the remaining soil types are set to 0 to obtain the first probability vector.
[0087] In this embodiment, based on the drilling position, the intervals of the drilling position along the depth direction are discretized according to the set depth, and the discrete drilling position is determined by the set depth, that is, the drilling coordinates of the discretized drilling position are determined. The soil unit where the drilling position is located, that is, the first soil unit, is determined by the discrete drilling position.
[0088] Through S310, the drilling positions with drilling data are segmented and classified into corresponding soil units, so as to segment and classify soil types at different depths into corresponding soil units to form a first soil unit.
[0089] According to S200, the drilling data at the drilling position is known. After the interval discretization in S310, the discrete drilling position also has drilling data, and the drilling data is the drilling data of the first soil unit corresponding to the discrete drilling position.
[0090] The soil type contained in the first unit is determined by comparing the drilling data of the first soil unit with the drilling soil type information. m}, set the soil types contained in the first unit to 1 and the remaining soil types to 0, thereby obtaining the first probability vector.
[0091] For example: assuming that the drilled soil type information in the current site is {S1, S2, S3}, through the drilling data of a certain soil unit, it is known that the soil types of the soil unit include S1 and S2, and do not include soil type S3.
[0092] The soil type probability vector of the soil unit is recorded as [1, 1, 0], and the corresponding soil coordinates of the soil unit are (x q ,y q , z q ).
[0093] It should be noted that the value of the set depth is the same as the value of the set side length. That is, the set side length of the grid division can be 0.3 meters, and the set depth of the discrete interval can be 0.3 meters.
[0094] In an embodiment of the first aspect of the present invention, in S400, the calculation process of the horizontal probability vector specifically includes:
[0095] S410: Training a generalized regression neural network algorithm according to the first probability vector and the soil coordinates of the first soil unit.
[0096] S420, obtaining the soil coordinates of the second soil unit, the number of drilling positions and the drilling positions, and inputting the obtained parameters into the trained generalized regression neural network algorithm to obtain a horizontal probability vector.
[0097] In this embodiment, the generalized regression neural network algorithm includes an input layer, a hidden layer, and an output layer. The input layer contains three neurons, which correspond to the horizontal coordinate x, the vertical coordinate y, and the depth coordinate z in the soil coordinates (x, y, z) of the second soil unit. The number of neurons in the hidden layer is the same as the number of borehole positions, and the corresponding borehole positions are the same as the depth coordinates of the soil unit to be calculated. The output layer is a neuron, which is represented by the horizontal probability vector P of the second soil unit. h (x, y, z).
[0098] The value of the smoothing system in the generalized regression neural network algorithm is 0.5 times the average value of the drilling spacing of the designed drilling positions in S100.
[0099] That is, the generalized regression neural network algorithm trained by S410 is set with parameters according to the number of drilling positions, the drilling spacing of the drilling positions, and the drilling positions, and the soil coordinates of the second soil unit are input, and the horizontal probability vector P of the second soil unit is obtained along the horizontal extension direction of the soil layer. h (x, y, z).
[0100] In an embodiment of the first aspect of the present invention, in S500, the calculation process of the vertical probability vector specifically includes:
[0101] S510, through the first probability vector, drilling the current first soil unit to the next adjacent first soil unit is recorded as a soil conversion, and the soil conversion includes a second conversion frequency from the current soil type to its own soil type and a first conversion frequency from the current soil type to other soil types.
[0102] In this embodiment, it can be known from S200 to S300 that the first soil unit is arranged along the depth direction. The soil type in the first soil unit can be known through the first probability vector.
[0103] Through the first probability vector of the first soil unit, the current first soil unit to the next adjacent first soil unit is recorded as a soil conversion. The soil conversion records the change from the current soil type S i Switching to other soil types S j The first conversion frequency, and the current soil type S i Switch to current soil type S i The second conversion frequency itself.
[0104] S520: Establish a soil transformation matrix by using the first transformation frequency and the second transformation frequency, normalize the soil transformation matrix, and establish a transformation probability matrix.
[0105] In this embodiment, the first conversion frequency and the second conversion frequency are used to establish the excavated body conversion matrix T.
[0106]
[0107] Where m is the total number of soil types, S represents the soil type, T ij Represented as the current soil type S i Switching to other soil types S j The first conversion frequency.
[0108] The conversion frequency of each row in the soil conversion matrix T is accumulated to obtain the row sum of the frequency, and the conversion frequency of the row is divided by the row sum of the frequency of the row to normalize the soil conversion matrix and establish the conversion probability matrix P v .
[0109]
[0110] in, Indicates that from the current soil type S i Switching to other soil types S j The conversion probability.
[0111] Through S510 and S520, the conversion frequency of the soil type at the drilling position in the depth direction is determined to form a soil conversion matrix T of the soil type, and the conversion probability matrix P is calculated through the soil conversion matrix T. v The transition probability matrix P of the Markov chain algorithm is trained by the soil coordinates of the first soil unit and the first probability vector. v , in order to form the conversion probability matrix of soil types in the depth direction.
[0112] S530, observing the ground surface of the current site, determining the soil type on the ground surface at the non-drilling position, and obtaining a probability vector of the ground surface soil type of a second soil unit on the ground surface.
[0113] In this embodiment, a drilling position is set on the current site. After grid division, a part of the soil units are located on the surface of the current site, and another part of the soil units are located deep in the stratum of the current site.
[0114] The soil unit corresponding to the drilling position is the first soil unit, which is located at the surface of the current site or at the depth of the stratum of the current site. Similarly, the soil unit without a drilling position is the second soil unit, which is located at the surface of the current site or at the depth of the stratum of the current site.
[0115] The second soil unit located on the surface is observed to obtain the soil type of the second soil unit on the surface. According to the method in S300, the soil type information of the borehole is compared to obtain the corresponding surface soil type probability vector.
[0116] S540, using the conversion probability matrix and taking the surface soil type probability vector as an initial input, to obtain an adjacent soil type probability vector of the second soil unit of the next adjacent layer.
[0117] In this embodiment, the vertical probability vector Starting from the surface, use the transition probability matrix P vMultiplying by the surface soil type probability vector, along the depth extension direction of the stratum, the soil type probability vector of the second soil unit adjacent to the second soil unit on the surface and located in the next layer under the surface is obtained, that is, the adjacent soil type probability vector is obtained.
[0118] S550, taking the adjacent soil type probability vector as input, and so on, the soil type probability vectors of the remaining second soil units in the depth direction are calculated, and the soil type probability vectors and the surface soil type probability vectors are combined into a vertical probability vector.
[0119] In this embodiment, the transition probability matrix P is used v , along the depth extension direction of the stratum, start calculating from the surface soil type probability vector, output the soil type probability vector of the second soil unit in the adjacent next layer, and use the obtained soil type probability vector as input again, and so on, the soil type probability vector of the second soil unit in the entire depth direction can be obtained.
[0120] Integrate the soil type probability vectors at the surface and deep in the stratum of the second soil unit to form the vertical probability vector of the soil type of the second soil unit
[0121] In an embodiment of the first aspect of the present invention, in S600, the coupling calculation process specifically includes:
[0122] For the horizontal probability vector p of the second soil unit obtained in S400 h (x, y, z) and the vertical probability vector obtained in S500 A coupling calculation is performed to obtain a second probability vector.
[0123]
[0124] Where ⊙ represents ph(x, y, z) and element-wise multiplication of the components of ; is the cumulative sum of the elements in the above calculation results. Vertical probability vector k is the transition probability matrix P in S500 v The k-th row vector of .
[0125] Through the specific embodiments of S100 to S600, the present invention establishes a coordinate system for the current site to form a three-dimensional site to divide soil units; based on the drilling data obtained from the standard penetration test, the soil types obtained by drilling in the current site are statistically analyzed and a soil type probability vector is established, and a method of coupling a generalized regression neural network algorithm with a Markov chain algorithm is used to calculate and determine the probability vector of the stratum soil type at a non-drilling position, and then determine the soil type at the position, thereby determining the three-dimensional stratum distribution of the current site, providing geological soil layer information for underground space development, avoiding the problems of large human influence factors and complex calculations in previous methods, reducing input variables, and improving the reliability of soil layer distribution prediction.
[0126] Reference Figures 2 to 4 In one embodiment of the first aspect of the present invention, a current site with a length of 64 meters, a width of 30 meters, and a drilling depth of 40 meters is taken as an example. The corresponding three-dimensional stratum distribution determination method process is as follows:
[0127] According to the current site size characteristics, 9 drilling positions are designed, 40 meters is taken as the maximum depth of the current site, the depth of the drilling elevation is zero as the origin of the depth coordinate axis, and the drilling position D1 is taken as the origin of the horizontal coordinate axis and the vertical coordinate axis to construct a Cartesian coordinate system. The width of the set side length of 0.3 meters is used to grid the horizontal x, vertical y and depth z of the current site, and multiple grid units are divided to form soil units, which correspond to grid units.
[0128] According to the center coordinates of the grid unit, the center coordinates of the grid unit are regarded as the soil coordinates (x, y, z) of the soil unit.
[0129] Through the in-situ standard penetration test, the types of borehole soil in the depth direction of the drilling position are determined, and the types of borehole soil are: clay, silt and sand, so as to obtain the drilling data of the drilling position. The types of borehole soil are sorted to obtain the information of the types of borehole soil, and the sorting is recorded as {S1, S2, S3}.
[0130] Based on the drilling position, the intervals of the drilling position along the depth direction are discretized according to the depth of 0.3 meters, the soil unit where the discretized drilling position is located is confirmed, and the soil unit where the discretized drilling position is located is recorded as the first soil unit.
[0131] Based on the drilled soil type information {S1, S2, S3}, a first probability vector of the soil type of the first soil unit is obtained, and based on the soil coordinates of the first soil unit and the corresponding first probability vector, a one-to-one correspondence between the two is established.
[0132] For example, if the soil type at the drilling location is clay, the first probability vector of the first soil unit is recorded as [1, 0, 0]; if the soil type at the drilling location is sand, the first probability vector of the first soil unit is recorded as [0, 0, 1].
[0133] Through the generalized regression neural network algorithm, based on the central coordinates of the first soil unit and the corresponding first probability vector, the probability vector of the soil type at the non-drilling position is calculated along the horizontal extension direction of the soil layer, that is, the horizontal probability vector P of the second soil unit. h (x, y, z).
[0134] The generalized regression neural network algorithm includes an input layer, a hidden layer and an output layer. The input layer contains three neurons, which are the center coordinates x, y, and z of the soil unit at the non-drilling position; the hidden layer contains the same number of neurons as the number of drilling positions. In this embodiment, there are a total of 9 drilling data, so the hidden layer contains 9 neurons, and the corresponding drilling positions are the same as the depth coordinates of the soil unit to be calculated; the output layer is a neuron, which represents the horizontal probability vector P h (x, y, z). The smoothing coefficient in the generalized regression neural network algorithm is 0.5 times the average value of the drilling spacing between the drilling positions.
[0135] Through the soil coordinates of the first soil unit and the first probability vector, the current first soil unit to the next adjacent first soil unit is recorded as a soil conversion, and the frequency of conversion from sand to sand, silt, and clay is recorded, as shown in the first row of the soil conversion matrix T. The frequency of conversion from silt to sand, silt, and clay is recorded, as shown in the second row of the soil conversion matrix T. The frequency of conversion from clay to sand, silt, and clay is recorded, as shown in the third row of the soil conversion matrix T, so as to establish the soil conversion matrix T.
[0136]
[0137] The conversion frequency of each row in the soil conversion matrix T is accumulated to obtain the row sum of the frequency, and the conversion frequency of the row is divided by the row sum of the frequency of the row to normalize the soil conversion matrix to obtain the conversion probability matrix P v .
[0138]
[0139] Observe the surface of the current site, learn the soil type on the surface at the non-drilling position, and obtain the probability vector of the surface soil type at the non-drilling position. Use the conversion probability matrix to calculate the soil type probability vector in the depth direction of the non-drilling position, and combine it with the surface soil type probability vector to form a vertical probability vector.
[0140] For the horizontal probability vector P h (x, y, z) and the vertical probability vector A coupling calculation is performed to obtain the probability vector of the soil type of the soil unit where the non-drilling position is located, that is, the second probability vector, and the probability vectors of the soil type of all soil units in the entire current site are determined, that is, the first probability vector and the second probability vector. The soil type corresponding to the maximum probability in these probability vectors represents the soil type of these soil units.
[0141] like Figure 4 As shown, in this embodiment, the three-dimensional stratum soil type calculation result diagram of the current site is determined based on the site drilling data. It can be seen that this embodiment can objectively reflect the soil type of the three-dimensional stratum of the current site. This method is simple and practical, avoiding the problems of large human influence factors and complex calculations in previous methods. In practical applications, the advantages of the present invention over traditional methods are mainly that there are fewer input variables, simple methods, strong reliability, and the ability to objectively reflect the distribution of stratum soil types, which can bring convenience to the identification of stratum soil types involved in underground space development and corresponding engineering design.
[0142] According to an embodiment of a second aspect of the present invention, a computer device is provided.
[0143] The computer device includes a processor, a memory and a database connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. When the computer program is executed by the processor, the method for determining the distribution of three-dimensional soil types based on drilling data of the first aspect is implemented.
[0144] The memory and the processor components are electrically connected to each other directly or indirectly to achieve data transmission or interaction. For example, these components can be electrically connected to each other through one or more communication buses or signal lines. The processor includes at least one software function module that can be stored in the memory in the form of software or firmware or solidified in the operating system (OS) of the server. The processor is used to execute the executable module stored in the memory.
[0145] The memory may be a random access memory (RAM), a read only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable read-only memory (EEPROM), etc. The memory is used to store programs and voice data, and the processor executes the program after receiving the execution instruction.
[0146] The processor may be an integrated circuit chip with signal processing capabilities. The above-mentioned processor may be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it may also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present invention may be implemented or executed. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.
[0147] The processor couples various input / output devices to the processor and the memory. In some embodiments, the processor and the memory can be implemented in a single chip. In some other examples, they can be implemented by separate chips respectively.
[0148] The peripheral interface couples various input / output devices to the processor and the memory. In some embodiments, the peripheral interface, the processor and the memory can be implemented in a single chip. In some other examples, they can be implemented by separate chips respectively.
[0149] According to an embodiment of the third aspect of the present invention, a computer storage medium is further provided, wherein a computer program is stored in the computer storage medium, and the computer storage medium may be a magnetic random access memory, a read-only memory, a programmable read-only memory, an erasable programmable read-only memory, an electrically erasable programmable read-only memory, a flash memory, a magnetic surface memory, an optical disk, or a read-only optical disk, etc.; or may be various devices including one or any combination of the above memories, such as a mobile phone, a computer, a tablet device, a personal digital assistant, etc. When the computer program is executed by a processor, the method for determining the distribution of three-dimensional stratum soil types based on drilling data of the first aspect is implemented.
[0150] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0151] In this document, the terms "comprises," "comprising," or any other variations thereof, are intended to cover a non-exclusive inclusion of elements other than those listed and may also include additional elements not expressly listed.
[0152] The preferred embodiments of the present invention are described in detail above, but the invention is not limited to the embodiments. Those skilled in the art may make various equivalent modifications or substitutions without violating the spirit of the invention. These equivalent modifications or substitutions are all included in the scope defined by the claims of this application.
Claims
1. A method for determining the distribution of three-dimensional soil types based on drilling data, characterized in that: include: Design the drilling position on the current site, establish a Cartesian coordinate system, divide the current site into grids, obtain the soil units corresponding to the grid units, and use the center coordinates of the grid units as the soil coordinates of the soil units; Drilling a hole at the drilling position to obtain drilling data, and determining drilling soil type information according to the drilling data; Discretize the borehole positions at intervals along the depth direction, determine the soil units at the discrete borehole positions, and record them as first soil units, determine the first probability vector of the soil type of the first soil unit according to the borehole soil type information, and establish a corresponding relationship between the soil coordinates of the first soil unit and the first probability vector; The soil unit at the non-drilling position is recorded as the second soil unit, and the horizontal probability vector of the soil type of the second soil unit is determined along the horizontal extension direction of the soil layer by using a generalized regression neural network algorithm according to the soil coordinates of the first soil unit and the first probability vector; Using a Markov chain algorithm, according to the soil coordinates of the first soil unit and the first probability vector, a vertical probability vector of the soil type of the second soil unit is calculated along the depth extension direction of the soil layer; The vertical probability vector and the horizontal probability vector are coupled to calculate a second probability vector of the soil type of the second soil unit, and the soil type corresponding to the maximum probability value is selected from the first probability vector and the second probability vector as the soil type of the current soil unit.
2. The method for determining the distribution of three-dimensional soil types based on drilling data according to claim 1, characterized in that: The process of obtaining the soil unit corresponding to the grid unit specifically includes: Obtaining the size characteristics of the current site and all the drilling elevations, and designing the drilling positions according to the size characteristics; According to all the drilling elevations, the maximum value of the drilling elevations is selected as the maximum value in the depth direction, the drilling elevation of zero is used as the origin of the depth coordinate axis, and a drilling position is selected from the drilling positions as the origin of the horizontal coordinate axis and the longitudinal coordinate axis to establish a Cartesian coordinate system; The current site is meshed in the horizontal, vertical and depth directions according to the set side lengths to obtain soil units corresponding to the mesh units.
3. The method for determining the distribution of three-dimensional soil types based on drilling data according to claim 1, characterized in that: The process of obtaining the borehole soil type information specifically includes: The type of the borehole soil is determined based on the soil sample obtained after drilling to obtain the drilling data, and the types of the borehole soil are statistically sorted to obtain the borehole soil type information.
4. The method for determining the distribution of three-dimensional soil types based on drilling data according to claim 2, characterized in that: The process of determining the first probability vector specifically includes: Discretizing the drilling positions along the depth direction at intervals of a set depth, and determining soil units at the discrete drilling positions according to the discrete drilling positions to determine the first soil unit; According to the drilling data of the first soil unit, the soil type contained in the first soil unit is determined, and the drilling soil type information {S1, S2, S3, ..., S m } is set to 1, and the remaining soil types are set to 0 to form the first probability vector, where m is the total number of soil types.
5. The method for determining the distribution of three-dimensional soil types based on drilling data according to claim 1, characterized in that: The calculation process of the horizontal probability vector specifically includes: Training a generalized regression neural network algorithm using the soil coordinates of the first soil unit and the first probability vector; The acquired soil coordinates of the second soil unit, the number of drilling positions and the drilling positions are input into the trained generalized regression neural network algorithm to output the horizontal probability vector.
6. The method for determining the distribution of three-dimensional soil types based on drilling data according to claim 1, characterized in that: The calculation process of the vertical probability vector specifically includes: According to the first probability vector, the current first soil unit to the next adjacent first soil unit is recorded as a soil conversion, wherein the soil conversion includes a first conversion frequency of the current soil type to other soil types and a second conversion frequency of the current soil type to the current soil type; A soil transformation matrix is formed according to the first transformation frequency and the second transformation frequency, and the soil transformation matrix is normalized to obtain a transformation probability matrix.
7. The method for determining the distribution of three-dimensional soil types based on drilling data according to claim 6, characterized in that: The calculation process of the vertical probability vector further specifically includes: Surveying the surface of the current site and determining the probability vector of the surface soil type of the second soil unit; According to the conversion probability matrix, the probability vector of the surface soil type is used as an initial input to calculate the adjacent soil type probability vector of the second soil unit in the next adjacent layer; The adjacent soil type probability vectors are used as input again until the soil type probability vectors of the remaining second soil units in the depth direction are obtained, and the vertical probability vector is formed together with the surface soil type probability vector.
8. The method for determining the distribution of three-dimensional soil types based on drilling data according to claim 4, characterized in that: The value of the set depth is the same as the value of the set side length.
9. A computer device, characterized in that: include: a memory storing a computer program; A processor, wherein when executing the computer program, the processor implements the method for determining the distribution of three-dimensional stratum soil types based on drilling data as described in any one of claims 1 to 8.
10. A storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method for determining the distribution of three-dimensional stratum soil types based on drilling data as described in any one of claims 1 to 8 is implemented.
