Building construction technology quality management big data management method and system

By building a knowledge graph model and developing a semantic parsing algorithm, we solve the problem of the inability of existing technology to analyze and predict construction quality management, realize data analysis and prediction, and improve the efficiency and accuracy of quality management.

CN118780679APending Publication Date: 2024-10-15CHINA RAILWAY CONSTR GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411005029.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing construction technology quality management method cannot realize the analysis and prediction of multiple quality data. The management method is independent and cannot be integrated, and it lacks big data management capabilities.

Method used

Use on-site surveys, expert interviews, text mining and other methods to analyze the key elements of quality management throughout the construction process, build a knowledge graph model, develop semantic analysis and big data intelligent algorithms, establish a data management model for construction quality, and improve the accuracy of the model through iterative optimization sex and efficiency.

Benefits of technology

It realizes data analysis and prediction of construction technical quality, improves the accuracy and efficiency of quality management, and provides full-process data support for quality management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780679A_ABST
    Figure CN118780679A_ABST
Patent Text Reader

Abstract

The invention discloses a building construction technology quality management big data management method and system, and belongs to the technical field of building construction management, and the method comprises the steps: employing one or more of a field investigation method, an expert interview method and a text mining method, and carrying out the analysis of a logic relation and business demands between quality management key elements in a whole construction process; extracting features and attributes of quality management key elements in the whole construction process and analyzing the features and attributes; on the basis of knowledge management theories and methods, domain knowledge is fused, and a logical relationship reasoning-oriented knowledge graph model is constructed. According to the method, a semantic analysis algorithm and a big data intelligent algorithm are developed, a model facing construction quality big data management business requirements is constructed, the model is iteratively optimized by using quality management big data, the accuracy and efficiency of the model are continuously improved, and a data analysis and prediction method is provided for quality management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction management, and in particular to a big data management method and system for building construction technology quality management. Background Art

[0002] The technical quality of construction is the quality of construction activities and their products, that is, through construction, the inherent characteristics of the project meet the needs of the construction unit and comply with the requirements of national laws, administrative regulations and technical standards and specifications. It includes the sum of the characteristics of the ability to meet all explicit and implicit needs and expectations in terms of safety, functional use, durability, environmental protection, etc. Construction quality is related to the practicality, reliability, durability and investment benefits of construction projects, and is related to the safety of people's lives and property;

[0003] The quality of construction technology often involves a variety of different projects and technologies, as well as a variety of business entities. In the actual data mining and analysis process, the requirements and specifications of quality management come from a wide range of sources, such as laws, regulations, and specifications for quality management, as well as expert knowledge. At the same time, the subject and object of quality management are different. For example, standards and specifications have requirements for the management procedures of the subject, and there are quality standards for management objects such as parts and components. The existing management methods are relatively independent and cannot achieve data analysis and prediction of many qualities. Based on this, a big data management method and system for construction technology quality management is proposed. Summary of the invention

[0004] The purpose of the present invention is to solve the problems existing in the prior art and to propose a big data management method and system for construction technology quality management.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] A construction technology quality management big data management method and system, including a management method, characterized in that the management method includes the following steps:

[0007] S1. Use one or more methods such as field research, expert interviews, and text mining to analyze the logical relationship and business needs between the key elements of quality management throughout the construction process;

[0008] S2. Extract the characteristics and attributes of key elements of quality management throughout the construction process and analyze them;

[0009] S3. Based on knowledge management theories and methods, domain knowledge is integrated to build a knowledge graph model for logical relationship reasoning;

[0010] S4. Develop semantic parsing algorithms and big data intelligent algorithms based on knowledge graph models;

[0011] S5. Build a model based on algorithms to meet the business needs of construction quality big data management;

[0012] S6. Use quality management big data to iteratively optimize the model, continuously improve the accuracy and efficiency of the model, and provide data analysis and prediction methods for quality management.

[0013] Preferably, the analysis of the key elements of the whole construction process quality management in S1 includes the following data:

[0014] The entity that makes up the structure, such as the parts and components of the assembled structure and their raw materials and auxiliary materials;

[0015] The people, materials, and machines (equipment) used to implement the construction process;

[0016] Management entities involved in the entire process of construction quality management, such as government regulatory departments, design units, supervision units, construction units, and construction units;

[0017] Specific parameters of specific construction processes in construction plans and technical documents during construction of building projects;

[0018] Data collection elements during on-site construction include, but are not limited to, temperature changes of concrete, deformation values ​​of foundation pits, model spacing of steel bars during construction, and other construction data.

[0019] Preferably, the knowledge graph in S3 is established based on the classification and interrelationships of different key elements of actual engineering construction;

[0020] Each of the key elements, i.e., each vertex, has its own attributes, spatial and temporal positions, and rights and responsibilities.

[0021] Preferably, when analyzing different big data management businesses based on the knowledge graph, data mining can be performed from three paths: rule-based, case-based, and deep learning in actual model building;

[0022] The rule-based approach mainly analyzes data on practices that are clearly defined in laws, regulations, specifications, and standards, and understands the correlation between the causes of quality defects and accidents within the framework of the rules;

[0023] The case-based approach: using existing quality defects, quality accidents and their causes in accident cases, through text mining and other technologies, and clustering methods, reveal the causes of different types of accidents;

[0024] Deep learning: Based on neural network methods, it analyzes multi-source data, explores the causes of quality defects and accidents, and predicts quality risks in the construction process.

[0025] A big data management system for building construction technology quality management, the management system comprises an element parsing and mining unit, a data extraction and analysis unit, a data fusion component model unit and a model iteration optimization unit.

[0026] Compared with the prior art, the present invention has the following beneficial effects:

[0027] The present invention develops semantic parsing algorithms and big data intelligent algorithms to construct a model for the business needs of construction quality big data management, uses quality management big data to iteratively optimize the model, continuously improves the accuracy and efficiency of the model, and provides data analysis and prediction methods for quality management. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 A flowchart of a big data management method for building construction technology quality management proposed by the present invention;

[0029] Figure 2 A schematic diagram of a process framework of a big data management method for building construction technology quality management proposed by the present invention;

[0030] Figure 3 A schematic diagram of a big data management method for building construction technology quality management and a knowledge graph of the whole process construction quality management in the system proposed by the present invention;

[0031] Figure 4 A schematic diagram of the process of transforming the knowledge graph data layer into the model layer in a big data management method for building construction technology quality management proposed by the present invention;

[0032] Figure 5 A path is established for a big data management method for construction technology quality management and a mining model of a knowledge graph in the system proposed in the present invention. DETAILED DESCRIPTION

[0033] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0034] Example, see Figure 1-5 A big data management method and system for building construction technology quality management, including a management method, the management method includes the following steps:

[0035] refer to Figure 1, based on the classification and mutual relationship of different key elements of actual engineering construction, a knowledge map of construction quality management throughout the entire process is constructed;

[0036] The arrows in the knowledge graph indicate the existence of business relationships, spatiotemporal relationships, rights and responsibilities relationships, etc. between the two. They are also the bridges for the mutual flow of attribute data of each vertex, such as business flows between entities, and subordinate or constituent relationships between structures, materials, and parts.

[0037] Use one or more methods such as field research, expert interviews, and text mining to analyze the logical relationship and business needs between the key elements of quality management throughout the construction process;

[0038] The analysis of key elements of quality management throughout the construction process includes the following data:

[0039] The entity that makes up the structure, such as the parts and components of the assembled structure and their raw materials and auxiliary materials;

[0040] The people, materials, and machines (equipment) used to implement the construction process;

[0041] Management entities involved in the entire process of construction quality management, such as government regulatory departments, design units, supervision units, construction units, and construction units;

[0042] Specific parameters of specific construction processes in construction plans and technical documents during construction of building projects;

[0043] Data collection elements during on-site construction include, but are not limited to, temperature changes of concrete, deformation values ​​of foundation pits, model spacing of steel bars during construction, and other construction data.

[0044] Extract and analyze the characteristics and attributes of key elements of quality management throughout the construction process;

[0045] Based on knowledge management theories and methods, domain knowledge is integrated to build a knowledge graph model for logical relationship reasoning;

[0046] The establishment of the knowledge graph is based on the classification and interrelationship of different key elements of actual engineering construction;

[0047] Each key element, that is, each vertex, has its own attributes, spatial and temporal position, and rights and responsibilities.

[0048] Develop semantic parsing algorithms and big data intelligent algorithms based on knowledge graph models;

[0049] Build a model based on algorithms to meet the business needs of construction quality big data management;

[0050] Use quality management big data to iteratively optimize the model, continuously improve the accuracy and efficiency of the model, and provide data analysis and prediction methods for quality management.

[0051] refer to Figure 5 ; It shows the connection between various subjects in engineering construction practice, and focuses on the simple logic of the data layer of the whole process construction quality management. In order to realize the mining and reuse of quality management knowledge, it is necessary to transform the quality management data layer into the model layer. The figure below shows the transformation process from the knowledge graph data layer to the model layer.

[0052] When analyzing different big data management businesses based on knowledge graphs, data mining can be done through three paths: rule-based, case-based, and deep learning in actual model building.

[0053] Based on the rule path: mainly conduct data analysis on practices that are clearly stipulated in laws, regulations, specifications, and standards, and grasp the correlation between the causes of quality defects and accidents within the rule framework;

[0054] Based on case path: using existing quality defects, quality accidents and their causes in accident cases, through text mining and other technologies, and clustering methods, reveal the causes of accidents of different types;

[0055] Deep learning path: Based on the neural network method, multi-modal data is analyzed to explore the causes of quality defects and accidents, and to predict the quality risks of the construction process.

[0056] The management system includes an element parsing and mining unit, a data extraction and analysis unit, a data fusion component model unit and a model iteration and optimization unit.

[0057] refer to Figure 3 , which shows the connection between various subjects in engineering construction practice, focusing on the simple logic of the whole process construction quality management data layer. In order to realize the mining and reuse of quality management knowledge, it is necessary to transform the quality management data layer into the model layer. The following figure shows the transformation process from the knowledge graph data layer to the model layer. Figure 4 shown.

[0058] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A big data management method for construction technology quality management, including a management method, characterized in that: The management method comprises the following steps: S1. Use one or more methods such as field research, expert interviews, and text mining to analyze the logical relationship and business needs between the key elements of quality management throughout the construction process; S2. Extract the characteristics and attributes of key elements of quality management throughout the construction process and analyze them; S3. Based on knowledge management theories and methods, domain knowledge is integrated to build a knowledge graph model for logical relationship reasoning; S4. Develop semantic parsing algorithms and big data intelligent algorithms based on knowledge graph models; S5. Build a model based on algorithms to meet the business needs of construction quality big data management; S6. Use quality management big data to iteratively optimize the model, continuously improve the accuracy and efficiency of the model, and provide data analysis and prediction methods for quality management.

2. A method for managing big data of construction technology quality management according to claim 1, characterized in that: The analysis of the key elements of quality management of the entire construction process in S1 includes the following data: The entity that makes up the structure, such as the parts and components of the assembled structure and their raw materials and auxiliary materials; The people, materials, and machines (equipment) used to implement the construction process; Management entities involved in the entire process of construction quality management, such as government regulatory departments, design units, supervision units, construction units, and construction units; Specific parameters of specific construction processes in construction plans and technical documents during construction of building projects; Data collection elements during on-site construction include, but are not limited to, temperature changes of concrete, deformation values ​​of foundation pits, model spacing of steel bars during construction, and other construction data.

3. A method for managing big data of construction technology quality management according to claim 1, characterized in that: The knowledge graph in S3 is established based on the classification and interrelationship of different key elements of actual engineering construction; Each of the key elements, i.e., each vertex, has its own attributes, spatial and temporal positions, and rights and responsibilities.

4. A method for managing big data of construction technology quality management according to claim 1, characterized in that: When analyzing different big data management businesses based on the knowledge graph, data mining can be carried out from three paths: rule-based, case-based, and deep learning in actual model building; The rule-based path mainly analyzes data on practices that are clearly defined in laws, regulations, specifications, and standards, and understands the correlation between the causes of quality defects and accidents within the framework of the rules; The case-based path: using existing quality defects, quality accidents and their causes in accident cases, through text mining and other technologies, and clustering methods, reveal the causes of different accident types; Deep learning path: Based on the neural network method, analyze multi-source data, explore the causes of quality defects and accidents, and predict the quality risks of the construction process.

5. A big data management system for construction technology quality management according to claims 1-4, characterized in that: The management system includes an element parsing and mining unit, a data extraction and analysis unit, a data fusion component model unit and a model iteration optimization unit.