Construction engineering cost evaluation management system
By using a combination of image acquisition, processing and machine learning model technology in the construction project cost evaluation management system to automatically identify and enter building material bill data, it solves the problems of inconvenient and error data entry in the existing system and achieves high efficiency and reliability. cost assessment.
Patent Information
- Application Number
- CN202410828540.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing construction project cost assessment management system has human errors during data entry and is inconvenient for automatic entry, which affects the reliability and practicality of cost assessment.
The building material bill image acquisition module, image processing module, feature extraction module and data entry model training module are used to automatically identify and enter bill data through camera collection, preprocessing and machine learning models to achieve automated cost assessment.
Reduce human errors, improve data accuracy and reliability of cost assessment, improve work efficiency, reduce labor costs, and enhance the practicality of the system.
Smart Images

Figure CN118780875A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of construction project cost assessment management, and more specifically, to a construction project cost assessment management system. Background Art
[0002] Construction project cost assessment involves many aspects, the following are some of the main aspects:
[0003] Bill of Quantities: includes the preparation of a list of the quantities of materials, labor, machinery and equipment required for the construction project, as well as the quantification and pricing of each quantity.
[0004] Material prices: Evaluate the prices of construction materials, including the purchase prices of various raw materials such as cement, steel bars, bricks, tiles, sand and stone, and adjust prices based on market conditions and supply and demand.
[0005] Labor costs: Evaluate the labor costs required during the construction process, including construction workers’ wages, benefits, working hours, etc., as well as possible overtime pay, transportation subsidies, etc.
[0006] Machinery and equipment costs: Assess the rental or purchase costs of machinery and equipment required during the construction process, including the use of cranes, excavators, concrete mixers and other equipment.
[0007] Construction management costs: An assessment of the wages, office expenses, travel expenses, etc. of construction management personnel, including the costs of construction site management personnel, supervisors, safety officers, etc.
[0008] Taking all the above aspects into consideration, cost assessment of construction projects is carried out to ensure the quality, safety and economy of the projects, as well as the profits and sustainable development of construction companies.
[0009] The document with the prior art publication number CN116681479A provides a construction project cost assessment management system, which is used to determine the adjustment method of the per capita labor time cost in the current project cost and the per capita labor time cost in each project stage in the current project cost, and to determine the comprehensive adjustment coefficient K to adjust the current project cost. The present invention performs dynamic cost management on the project cost to avoid the problem of over-budget.
[0010] Although the above-mentioned prior art solution can achieve the relevant beneficial effects through the structure of the prior art, it still has the following defects: when the device is used, since it is necessary to conduct cost assessment according to the data amount on the documents such as materials during the construction of the construction project, the device is not convenient for automatically entering the data on the documents, resulting in human errors and data entry errors, affecting the reliability of the cost assessment, and having poor practicality.
[0011] In view of this, we propose a construction project cost assessment management system. Summary of the invention
[0012] 1. Technical problems to be solved
[0013] The purpose of this application is to provide a construction project cost assessment management system, which solves the technical problems raised in the above-mentioned background technology and achieves the technical effect of facilitating automatic entry of data on documents.
[0014] 2. Technical solution
[0015] The embodiment of the present application provides a construction project cost assessment management system, including: a construction material bill image acquisition module, a construction material bill image processing module, a construction material bill image feature extraction module, a construction material bill data entry model training module, and a cost assessment management system module.
[0016] Building material bill image acquisition module: the building material bill image acquisition module uses a camera to acquire images of purchase bills of building materials;
[0017] Building material bill image processing module: the building material bill image processing module pre-processes the collected image to improve the subsequent recognition accuracy;
[0018] Building material bill image feature extraction module: The building material bill image feature extraction module extracts relevant information data features of building materials from the text data recognized by OCR;
[0019] Building material bill data entry model training module: The building material bill data entry model training module uses historical building material bill data to train a machine learning model, and the model can learn to identify key information in the bill;
[0020] Cost assessment management system module: The cost assessment management system module automatically assesses the construction project cost based on the input building material data and other relevant information.
[0021] As an optional solution to the technical solution of the present application document, the building material bill image acquisition module uses a camera to capture images of purchase bills of building materials, and automatically collects building material bill data from various sources (such as suppliers, procurement departments, construction sites, etc.). The data may include material name, specifications, quantity, unit price, supplier information, invoice number, etc.
[0022] As an optional solution of the technical solution of the present application document, the building material bill image processing module pre-processes the collected image to improve the subsequent recognition accuracy, including image enhancement and image binarization. The image enhancement: the bill image may cause unclear information due to insufficient lighting, low contrast and other reasons. Through the image enhancement technology of histogram equalization, the contrast and brightness of the image can be improved, making the text, numbers and other information on the bill clearer and more recognizable;
[0023] The image binarization: converting the image into a binary image (i.e., only two colors, black and white) can simplify subsequent processing steps and improve recognition accuracy. Based on the threshold segmentation technology, a suitable threshold is set to divide the pixels in the image into foreground (such as text, numbers) and background.
[0024] As an optional solution of the technical solution of the present application document, the building material bill image feature extraction module extracts relevant information data features of building materials from the text data recognized by OCR, including text, numbers and structured information, and the text features: through the natural language processing (NLP) method: used to parse and understand text data, extract keywords and phrases, including material names: such as the names of building materials such as steel bars, cement, bricks, etc., brands or manufacturers: providing brand or manufacturer information of materials, etc.;
[0025] The digital features: through the regular expression method: used to match and extract text in a specific format, such as numbers, dates, etc., quantity: the number or number of pieces of building materials, price: the unit price or total price of the material, date: such as production date, purchase date or expiration date, size and weight: such as length, width, height, weight, etc.;
[0026] The structured information: tables and lists: table or list data extracted from the bill, such as price lists, material details, etc.
[0027] As an optional solution to the technical solution of the present application document, the building material bill data entry model training module uses historical building material bill data to train a recurrent neural network machine learning model. The model can learn to identify key information in the bill, such as material type, specification, price, etc., and automatically classify and enter data, and automatically enter the data processed by the machine learning model into the construction project cost assessment system.
[0028] As an optional solution to the technical solution of this application document, the cost assessment management system module automatically assesses the construction project cost based on the input construction material data and other relevant information (such as engineering design, construction progress, etc.), and the assessment results can provide decision support for project management, such as budget allocation, cost control, etc.
[0029] 3. Beneficial effects
[0030] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
[0031] 1. Since the present application adopts technical means such as the building material bill image acquisition module, it effectively solves the technical problems in the prior art, and further realizes that when it is necessary to conduct cost assessment based on the data amount on the material documents, through the automatic processing and verification of the machine learning model, human errors and data entry errors are reduced, data accuracy and the reliability of cost assessment are improved, and the automatic entry of building material bill data and the automation of cost assessment are realized, which greatly improves work efficiency and reduces labor costs, and improves the practicality of the device.
[0032] 2. This application sets up a flattening collection mechanism. After placing the document on the placement plate, the electric push rod is used to drive the transparent pressure plate to move downward, thereby flattening the document, facilitating image collection and ensuring the accuracy of image data.
[0033] 3. This application sets up a material transfer mechanism, which realizes that when the flattening and collecting mechanism is retracted, it will drive the push plate to move back and forth, thereby pushing the bills with captured images into the bill box, completing the automatic collection of bills and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 The overall structure of the construction project cost assessment management system disclosed in a preferred embodiment of the present application is a schematic diagram of the cost assessment process of material bill data entry for construction projects;
[0035] Figure 2 This is a schematic diagram of the overall structure of a construction project cost assessment management system disclosed in a preferred embodiment of the present application;
[0036] Figure 3 This is a schematic diagram of the workbench and ticket box structure of a construction project cost assessment management system disclosed in a preferred embodiment of the present application;
[0037] Figure 4 This is a schematic diagram of the flattening and collecting mechanism structure of a construction project cost assessment management system disclosed in a preferred embodiment of the present application;
[0038] Figure 5 A schematic diagram of the structure of a material transfer mechanism of a construction engineering cost assessment management system disclosed in a preferred embodiment of the present application;
[0039] Explanation of the numbers in the figure: 1. workbench; 2. bill box; 3. placement plate; 4. flattening and collecting mechanism; 5. material shifting mechanism; 101. rotating frame; 102. display screen; 103. worm gear; 104. worm; 105. fixing groove; 201. fixing block; 401. electric push rod; 402. movable frame; 403. transparent pressure plate; 404. spring; 405. ratchet; 406. tension spring; 501. reciprocating screw; 502. ratchet; 503. rack; 504. gear; 505. shift rod; 506. push plate. DETAILED DESCRIPTION
[0040] The present application is further described in detail below in conjunction with the accompanying drawings.
[0041] Reference Figure 1 A construction engineering cost assessment management system, comprising: a building material bill image acquisition module, a building material bill image processing module, a building material bill image feature extraction module, a building material bill data entry model training module, and a cost assessment management system module.
[0042] Building material bill image acquisition module: The building material bill image acquisition module uses a camera to collect images of purchase bills of building materials;
[0043] Building material bill image processing module: The building material bill image processing module pre-processes the collected images to improve the subsequent recognition accuracy;
[0044] Building material bill image feature extraction module: The building material bill image feature extraction module extracts relevant information data features of building materials from the text data recognized by OCR;
[0045] Building material bill data entry model training module: The building material bill data entry model training module uses historical building material bill data to train a machine learning model, which can learn to identify key information in the bill;
[0046] Cost assessment management system module: The cost assessment management system module automatically assesses the cost of construction projects based on the input building material data and other relevant information.
[0047] The building material invoice image acquisition module uses a camera to capture images of building material purchase invoices, and automatically collects building material invoice data from various sources such as suppliers, procurement departments, construction sites, etc. The data can include material name, specifications, quantity, unit price, supplier information, invoice number, etc.
[0048] The building material bill image processing module pre-processes the collected images to improve the subsequent recognition accuracy, including image enhancement and image binarization. Image enhancement: The bill image may be unclear due to insufficient lighting, low contrast and other reasons. The image enhancement technology of histogram equalization can improve the contrast and brightness of the image, making the text, numbers and other information on the bill clearer and more recognizable;
[0049] Image binarization: Converting an image into a binary image, that is, only two colors, black and white, can simplify subsequent processing steps and improve recognition accuracy. Based on threshold segmentation technology, a suitable threshold is set to divide the pixels in the image into foreground such as text, numbers and background.
[0050] The building material bill image feature extraction module extracts relevant information data features of building materials from the text data recognized by OCR, including text, numbers and structured information. Text features: through natural language processing (NLP) methods: used to parse and understand text data, extract keywords and phrases, including material names: such as the names of building materials such as steel bars, cement, bricks, etc. Brand or manufacturer: provides brand or manufacturer information of materials, etc.
[0051] Digital features: Regular expression method: used to match and extract text in a specific format, such as numbers, dates, etc. Quantity: the number or number of pieces of building materials, Price: the unit price or total price of the material, Date: such as production date, purchase date or expiration date, Size and weight: such as length, width, height, weight, etc.;
[0052] Structured information: Tables and lists: Tabular or list data extracted from the bill, such as price lists, material details, etc.
[0053] The construction material bill data entry model training module uses historical construction material bill data to train the recurrent neural network machine learning model. The model can learn to identify key information in the bill, such as material type, specifications, price, etc., and automatically classify and enter data, and automatically enter the data processed by the machine learning model into the construction project cost assessment system.
[0054] The cost assessment management system module automatically assesses the construction project cost based on the input building material data and other relevant information such as engineering design and construction progress. The assessment results can provide decision support for project management, such as budget allocation and cost control.
[0055] Reference Figure 2 A construction engineering cost assessment management system includes a workbench 1, a ticket box 2, a placement board 3, a flattening collection mechanism 4, and a material shifting mechanism 5.
[0056] A bill box 2 is placed on the workbench 1 , a placing plate 3 is connected to the workbench 1 , a flattening and collecting mechanism 4 is fixedly connected to the workbench 1 , and a material shifting mechanism 5 is rotatably connected to the workbench 1 .
[0057] Reference Figure 3 A rotating frame 101 is rotatably connected to one side of the workbench 1, a display screen 102 is installed on the rotating frame 101, a worm gear 103 is connected to one end of the rotating frame 101 connected to the workbench 1, a worm 104 is meshingly driven on one side of the worm gear 103, the worm 104 is rotatably connected to the workbench 1, and a fixing groove 105 is provided on the workbench 1. The fixing groove 105 makes it easy to take the ticket box 2.
[0058] Reference Figure 3 A fixing block 201 is fixedly connected to the ticket box 2 , and the fixing block 201 is movably plugged into the fixing slot 105 .
[0059] Reference Figure 4 The flattening collection mechanism 4 includes an electric push rod 401, which is connected and fixedly arranged with the workbench 1, and the other end of the electric push rod 401 is connected and fixedly arranged with a movable frame 402, on which a camera is installed, and a transparent pressing plate 403 is slidably arranged on the movable frame 402, and a spring 404 is connected between the transparent pressing plate 403 and the movable frame 402, and a plurality of ratchets 405 are rotatably connected at one end of the movable frame 402, and a tension spring 406 is connected between the ratchets 405 and the movable frame 402. The tension spring 406 realizes the one-way transmission of the ratchets 405.
[0060] Reference Figure 5 The material-dispensing mechanism 5 includes a reciprocating screw rod 501, which is rotatably connected to the workbench 1, a ratchet wheel 502 is connected to one end of the reciprocating screw rod 501, and the ratchet wheel 502 is meshed with the ratchet 405 for transmission. A rack 503 is slidably provided on the reciprocating screw rod 501, and a gear 504 is meshed with the rack 503 for transmission. The gear 504 is rotatably connected to the workbench 1, a lever 505 is connected to the gear 504, and a push plate 506 is slidably provided on the other end of the lever 505, and the push plate 506 is slidably provided on the workbench 1. The push plate 506 realizes automatic pushing down of the bill.
[0061] The implementation principle of a construction project cost assessment management system in the embodiment of the present application is as follows: when it is necessary to conduct a construction project cost assessment, first, the worm 104 is rotated so that the worm 104 drives the rotating frame 101 connected to the worm wheel 103 to rotate, so that the display screen 102 is rotated to the front side for easy use, and then the bill to be entered is placed on the placement plate 3, and then the electric push rod 401 is used to drive the movable frame 402 to move down. At this time, the transparent pressing plate 403 on the movable frame 402 will press on the bill under the action of the spring 404, so that the bill is flattened, and then the camera is used to capture the image of the purchase bill of the building materials, and automatically collect the building material bill data from various sources such as suppliers, procurement departments, construction sites, etc. The data can include material name, specification, quantity, unit price, supplier information, invoice number, etc.;
[0062] The collected images are preprocessed through the building material bill image processing module to improve the subsequent recognition accuracy, including image enhancement and image binarization. Image enhancement: The bill image may be unclear due to insufficient lighting, low contrast and other reasons. The image enhancement technology of histogram equalization can improve the contrast and brightness of the image, making the text, numbers and other information on the bill clearer and more legible;
[0063] Image Binarization: Converting an image into a binary image, that is, only two colors, black and white, can simplify subsequent processing steps and improve recognition accuracy. Based on threshold segmentation technology, pixels in the image are divided into foreground (such as text, numbers) and background by setting a suitable threshold.
[0064] Then the building material bill image feature extraction module extracts relevant information data features of building materials from the text data recognized by OCR, including text, numbers and structured information. Text features: through natural language processing (NLP) methods: used to parse and understand text data, extract keywords and phrases, including material names: such as the names of building materials such as steel bars, cement, bricks, etc. Brand or manufacturer: providing brand or manufacturer information of materials, etc.;
[0065] Digital features: Regular expression method: used to match and extract text in a specific format, such as numbers, dates, etc. Quantity: the number or number of pieces of building materials, Price: the unit price or total price of the material, Date: such as production date, purchase date or expiration date, Size and weight: such as length, width, height, weight, etc.;
[0066] Structured information: Tables and lists: Table or list data extracted from bills, such as price lists, material details, etc.
[0067] The model training module for building material bill data entry uses historical building material bill data to train the machine learning model of the recurrent neural network. The model can learn to identify key information in the bill, such as material type, specification, price, etc., and automatically classify and enter data. The data processed by the machine learning model is automatically entered into the construction project cost assessment system.
[0068] The cost assessment management system module automatically assesses the construction project cost based on the input building material data and other relevant information such as engineering design and construction progress. The assessment results can provide decision support for project management, such as budget allocation and cost control.
[0069] After the input is completed, the movable frame 402 is reset, and the ratchet 405 drives the ratchet 502 to rotate, so that the reciprocating screw 501 drives the rack 503 to move, so that the rack 503 drives the lever 505 connected to the gear 504 to swing, thereby driving the push plate 506 to move and push the bill into the bill box 2.
Claims
1. A construction project cost assessment management system, comprising: a construction material bill image acquisition module, a construction material bill image processing module, a construction material bill image feature extraction module, a construction material bill data entry model training module, and a cost assessment management system module, characterized in that: Building material bill image acquisition module: the building material bill image acquisition module uses a camera to acquire images of purchase bills of building materials; Building material bill image processing module: the building material bill image processing module pre-processes the collected image to improve the subsequent recognition accuracy; Building material bill image feature extraction module: The building material bill image feature extraction module extracts relevant information data features of building materials from the text data recognized by OCR; Building material bill data entry model training module: The building material bill data entry model training module uses historical building material bill data to train a machine learning model, and the model can learn to identify key information in the bill; Cost assessment management system module: The cost assessment management system module automatically assesses the construction project cost based on the input building material data and other relevant information.
2. The construction project cost assessment management system according to claim 1, characterized in that: The building material invoice image acquisition module uses a camera to capture images of building material purchase invoices and automatically collects building material invoice data from various sources (such as suppliers, purchasing departments, construction sites, etc.). The data may include material name, specification, quantity, unit price, supplier information, invoice number, etc.
3. The construction project cost assessment management system according to claim 1, characterized in that: The building material bill image processing module pre-processes the collected image to improve the subsequent recognition accuracy, including image enhancement and image binarization. The image enhancement: the bill image may have unclear information due to insufficient lighting, low contrast, etc. The image enhancement technology of histogram equalization can improve the contrast and brightness of the image, making the text, numbers and other information on the bill clearer and more recognizable; The image binarization: converting the image into a binary image (i.e., only two colors, black and white) can simplify subsequent processing steps and improve recognition accuracy. Based on the threshold segmentation technology, a suitable threshold is set to divide the pixels in the image into foreground (such as text, numbers) and background.
4. The construction project cost assessment management system according to claim 1, characterized in that: The building material bill image feature extraction module extracts relevant information data features of building materials from the text data recognized by OCR, including text, numbers and structured information. The text features are used to parse and understand text data through natural language processing (NLP) methods, extract keywords and phrases, including material names: such as the names of building materials such as steel bars, cement, bricks, etc., brands or manufacturers: provide brand or manufacturer information of materials, etc.; The digital features: through the regular expression method: used to match and extract text in a specific format, such as numbers, dates, etc., quantity: the number or number of pieces of building materials, price: the unit price or total price of the material, date: such as production date, purchase date or expiration date, size and weight: such as length, width, height, weight, etc.; The structured information: tables and lists: table or list data extracted from the bill, such as price lists, material details, etc.
5. The construction project cost assessment management system according to claim 1, characterized in that: The construction material bill data entry model training module uses historical construction material bill data to train a recurrent neural network machine learning model. The model can learn to identify key information in the bill, such as material type, specification, price, etc., and automatically classify and enter data, and automatically enter the data processed by the machine learning model into the construction project cost assessment system.
6. The construction project cost assessment management system according to claim 1, characterized in that: The cost assessment management system module automatically assesses the construction project cost based on the input building material data and other relevant information (such as engineering design, construction progress, etc.). The assessment results can provide decision support for project management, such as budget allocation, cost control, etc.
Citation Information
Patent Citations
Construction engineering cost evaluation management system
CN116681479A
