Production force value evaluation management method
Through the collection and analysis of daily production parameters of production equipment, situation diagrams and models are generated to evaluate orchard productivity, which solves the problem of inaccurate manual evaluation, realizes digital value evaluation and visual management of production equipment, and improves resource utilization efficiency and economy. benefit.
Patent Information
- Application Number
- CN202411280663.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing technology, orchard productivity assessment relies on manual experience, has low objectivity and accuracy, and is difficult to effectively reflect the economic value of the orchard, affecting planting decisions and the establishment of trading markets.
By collecting daily production parameters of production equipment, generating and analyzing production parameter change situation diagrams, building productivity performance models, evaluating the productivity stability of production equipment, and calculating productivity value based on the analysis of production equipment groups.
It provides a method for digital value assessment of production equipment productivity, generates visual data, helps management users conduct adaptive management, and improves the resource utilization efficiency and economic benefits of production equipment.
Smart Images

Figure CN118798690A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data analysis, and in particular to a productivity value assessment management method. Background Art
[0002] Productivity value assessment is an important method for quantitatively evaluating productivity. It converts productivity into specific value indicators by analyzing multiple factors such as production efficiency, cost-effectiveness, and reliability. It can be used in scenarios such as enterprise management and project evaluation to provide a scientific basis for decision-making and help improve resource utilization efficiency and economic benefits.
[0003] The invention patent with application number 202410623663.2 discloses an orchard productivity evaluation method, which is characterized by comprising: obtaining multivariate basic data of the target orchard; the multivariate basic data includes image data, meteorological data and price data; based on the image data and the meteorological data, determining the growth characteristic parameters, flower and fruit characteristic parameters and meteorological parameters of the target orchard; inputting the growth characteristic parameters, the flower and fruit characteristic parameters, the meteorological parameters and the price data as multiple standard evaluation factors into a multi-factor target evaluation matrix; calculating the comprehensive correlation based on the multi-factor target evaluation matrix to obtain the orchard productivity of the target orchard.
[0004] The application aims to solve the problem that "orchard productivity can reflect the economic value of an orchard. For growers, financial institutions, government departments and other personnel, whether to plant, whether to invest financial support during the planting process, and how to establish a stable fruit trading market all need to be judged based on orchard productivity. At present, orchard productivity is usually evaluated manually based on experience. The orchard productivity obtained by manual experience is not objective and scientific enough, has low accuracy, and poor reference value."
[0005] However, relative to production equipment, its productivity, production value and product demand, production efficiency of production equipment, and performance of production equipment are closely related; In order to ensure that production equipment can stably perform production tasks and meet product requirements, production equipment management users need to regularly conduct comprehensive evaluations of production equipment to adaptively maintain, repair, improve or replace newer production equipment; To this end, we proposed a productivity value assessment management method. Summary of the invention
[0006] In view of the above-mentioned shortcomings of the prior art, the present invention provides a productivity value assessment management method, which solves the technical problems raised in the above-mentioned background technology.
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: A productivity value assessment management method, comprising: Collect daily production parameters of a group of production equipment, generate a production parameter change situation diagram based on the daily production parameters of the production equipment, create a database, and use the database to store the production parameter change situation diagram of the production equipment; select a group of production equipment as the retrieval target, retrieve all production parameter change situation diagrams related to the target in the database, obtain the latest group of production parameters in each retrieved production parameter change situation diagram, and perform normalization on the production parameters; select a group of production equipment as the retrieval target, retrieve all production parameter change situation diagrams related to the target in the database, and evaluate the productivity of the production equipment based on the production parameters in the situation diagram; obtain the normalized production parameters, and construct a productivity performance model representing the production equipment corresponding to the production parameters based on the normalized production parameters; obtain the production equipment productivity evaluation results and the constructed productivity performance model, and analyze the productivity stability of the production equipment in combination with the production equipment productivity evaluation results and the constructed productivity performance model; obtain the productivity stability analysis results of each production equipment, and further analyze the productivity stability of the production equipment group based on the productivity stability analysis results of each production equipment.
[0008] Furthermore, the daily production parameters of the production equipment group include: production efficiency of the production equipment, yield rate of the products produced by the production equipment, manual maintenance frequency of the production equipment, accumulated manual maintenance time of the production equipment, and accumulated daily operation time of the production equipment. The production parameter change situation diagram is generated based on various daily production parameters of each production equipment in various production equipment groups. The production parameter change situation diagram is a line diagram. The horizontal axis of the production parameter change situation diagram represents time in days, and the vertical axis represents the collection results of various production parameters. Among them, when the database stores the production parameter change situation diagram of the production equipment, the production parameter change situation diagram is differentiated and stored based on the production parameter type. When the production parameter change situation diagram executes the storage operation, the number of the parameter source equipment in the production parameter change situation diagram is simultaneously applied to mark it. After the marking is completed, the storage operation is executed.
[0009] Furthermore, when a group of production equipment is selected as the retrieval target, the corresponding marking information of each production parameter change situation diagram stored in the database is used as the retrieval logic basis, so that the corresponding marking information of all the production parameter change situation diagrams retrieved are consistent; When normalizing the production parameters, the following procedures apply: traverse the latest set of production parameters obtained from each set and each retrieved production parameter change situation diagram, capture the set of production parameters with the smallest value in each latest set of production parameters, use the captured production parameters as the common denominator, and perform simple integer ratio processing on each latest set of production parameters based on the common denominator; When capturing a set of production parameters with the smallest value in each latest set of production parameters, the unit of the production parameters is not considered.
[0010] Furthermore, the production equipment productivity evaluation logic is expressed as: ; Where: It is an indicator for evaluating the productivity of production equipment; The date set of the production parameter collection included in the horizontal axis of the production parameter change situation diagram; To improve the production efficiency of production equipment; The yield rate of products produced by production equipment; Accumulate daily operating time of production equipment; The frequency of manual maintenance of production equipment; Accumulated manual maintenance time for production equipment; in, Indicates the production capacity of the production equipment as shown by the latest set of parameters in the production parameter change situation diagram. Table pair The average, Indicates the production capacity of the production equipment corresponding to the parameters on the i-th day in the production parameter change situation diagram, and the production equipment productivity evaluation index The larger the value is, the better the productivity of the production equipment is. Conversely, the smaller the value is, the worse the productivity of the production equipment is. The productivity evaluation index of production equipment is ≥0, it means that the productivity of the production equipment is in a safe state.
[0011] Furthermore, when applying the normalized production parameters to construct the production equipment productivity performance model, it follows that: A set of axis grids is set so that the spacings between adjacent vertical and horizontal axes in the axis grid are equal. Five adjacent groups of grids in the axis grid are selected as the area for constructing the productivity performance model. The center coordinates of each grid are obtained. The z-axis values in the center coordinates of each grid are iterated based on the normalized production parameters. The center coordinates of the grids based on the iterated z-axis values are connected with the four groups of corner points of the corresponding grids to construct a tetrahedral pyramid model representing the latest group of production parameters in a set of production parameter change situation diagrams. The production equipment productivity evaluation operation and the productivity performance model building operation are continuously executed based on the operation of continuously selecting the production equipment as the call target and the updating of the parameters in the production parameter change situation diagram; the five adjacent groups of grids in the selected axis network correspond to the production efficiency of the production equipment, the yield rate of the products produced by the production equipment, the manual maintenance frequency of the production equipment, the manual maintenance time accumulation of the production equipment, and the daily operation time accumulation of the production equipment in the production parameters, and the length and width of the five adjacent groups of grids in the selected axis network are 1*5; Among them, the production equipment productivity evaluation results and the constructed productivity performance model are synchronously marked with the corresponding production equipment numbers, further fed back to the database, and stored in the database. The combination of five groups of four-sided pyramid models is recorded as the productivity performance model.
[0012] Furthermore, the production equipment productivity stability analysis logic is expressed as: ; Where: It is the performance value of the productivity stability of production equipment; The update times of the production parameters in the production parameter change situation diagram; The productivity evaluation index of the production equipment obtained when the production parameters are updated for the j+1th time in the production parameter change situation diagram; The productivity evaluation index of the production equipment obtained when the production parameters are updated for the jth time in the production parameter change situation diagram; is the judgment function; Among them, the performance value of production equipment productivity stability The larger it is, the better the productivity stability of the production equipment is; conversely, the smaller it is, the worse the productivity stability of the production equipment is.
[0013] Furthermore, when determining the value, the judgment function obeys: It represents the z-axis value of the fixed point coordinate on the four-sided pyramid model p corresponding to the production parameter in the constructed productivity performance model when the production parameter is updated for the jth time in the production parameter change situation diagram; It represents the z-axis value of the fixed point coordinate on the four-sided pyramid model p corresponding to the production parameter in the constructed productivity performance model when the production parameter is updated for the j+1th time in the production parameter change situation diagram; When the four-sided pyramid model p corresponds to the production efficiency of the production equipment, the judgment function middle ≤0, judgment function =1, >0, judgment function =0; When the four-sided pyramid model p corresponds to the yield rate of the products produced by the production equipment, the judgment function middle ≤0, judgment function =1, >0, judgment function =0; When the four-sided pyramid model p corresponds to the daily operation time accumulation of production equipment, the judgment function middle ≤0, judgment function =1, >0, judgment function =0; When the four-sided pyramid model p corresponds to the manual maintenance frequency of production equipment, the judgment function middle >0, judgment function =1, ≤0, judgment function =0; When the four-sided pyramid model p corresponds to the accumulation of manual maintenance time of production equipment, the judgment function middle >0, judgment function =1, ≤0, judgment function =0.
[0014] Furthermore, the productivity stability analysis logic of the production equipment group is expressed as: ; Where: It is the productivity stability performance value of the production equipment group; is the total number of production equipment in the production equipment group; is the productivity stability performance value of the production equipment in group v; is the corresponding stability analysis weight of the production equipment in group v; in, , the productivity stability performance value of the production equipment group The larger it is, the better the productivity stability of the production equipment group is. Conversely, the smaller it is, the worse the productivity stability of the production equipment group is.
[0015] Furthermore, the value of the corresponding stability analysis weight of the production equipment is subject to: ; Where: The importance of the production equipment in group v compared to the overall product production process; The time it takes to process a group of products for the vth group of production equipment; The total time it takes to produce a set of products for a group of production equipment; The importance of the production equipment compared to the overall product production process is customized by the user of the production equipment group management end, and the sum of the importance of each production equipment in the production equipment group compared to the overall product production process is 1.
[0016] Furthermore, the productivity stability performance value of the production equipment group and the productivity stability performance value of the production equipment, the user of the production equipment group management end further sets a value assessment factor so that the value assessment factor is not less than zero, and obeys the setting logic that the higher the productivity stability performance value, the larger the value assessment factor value, and the lower the productivity stability performance value, the smaller the value assessment factor value, and the productivity stability performance value of the production equipment group or the productivity stability performance value of the production equipment is multiplied by the value assessment factor to obtain a set of numerical values, which is recorded as the productivity value of the production equipment group or the production equipment.
[0017] Compared with the known public technology, the technical solution provided by the present invention has the following beneficial effects: The present invention provides a productivity value assessment management method, which is applied to the scenario of production equipment in a production equipment group. During the execution of its steps, the method collects and analyzes the daily production parameters of the production equipment to conduct a digital value assessment on the productivity of the production equipment, and provides specific data references for users at the production equipment management end to facilitate adaptive management of the production equipment. When the method is executed, a situation diagram and a model are also generated and constructed, thereby realizing visual data reading conditions in the process of digital value assessment of the productivity of the production equipment, so as to facilitate more efficient management of the production equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0019] Figure 1 It is a flowchart of a productivity value assessment management method; Figure 2 This is an example diagram of a production parameter change situation diagram of the production equipment in the present invention; Figure 3 This is an example diagram of the productivity performance model of the production equipment in the present invention. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] The present invention will be further described below in conjunction with the embodiments.
[0022] Embodiment 1: A productivity value assessment management method of this embodiment, such as Figure 1 As shown, including: Collect daily production parameters of the production equipment group, generate a production parameter change situation diagram based on the daily production parameters of the production equipment, create a database, and use the database to store the production parameter change situation diagram of the production equipment; Select a group of production equipment as the target to be retrieved, retrieve all production parameter change situation diagrams related to the target from the database, obtain the latest group of production parameters from each retrieved production parameter change situation diagram, and perform normalization processing on the production parameters; Select a group of production equipment as the target to be retrieved, retrieve all production parameter change situation diagrams related to the target from the database, and evaluate the productivity of the production equipment based on the production parameters in the situation diagram; obtain the normalized production parameters, and construct a productivity performance model representing the production equipment corresponding to the production parameters based on the normalized production parameters; The production equipment productivity evaluation logic is expressed as: ; Where: It is an indicator for evaluating the productivity of production equipment; The date set of the production parameter collection included in the horizontal axis of the production parameter change situation diagram; To improve the production efficiency of production equipment; The yield rate of products produced by production equipment; Accumulate daily operating time of production equipment; The frequency of manual maintenance of production equipment; Accumulated manual maintenance time for production equipment; in, Indicates the production capacity of the production equipment as shown by the latest set of parameters in the production parameter change situation diagram. Table pair The average, Indicates the production capacity of the production equipment corresponding to the parameters on the i-th day in the production parameter change situation diagram, and the production equipment productivity evaluation index The larger the value is, the better the productivity of the production equipment is. Conversely, the smaller the value is, the worse the productivity of the production equipment is. The productivity evaluation index of production equipment is ≥0, it means that the productivity of production equipment is in a safe state; When applying the normalized production parameters to construct a production equipment productivity performance model, the following applies: A set of axis grids is set so that the spacings between adjacent vertical and horizontal axes in the axis grid are equal. Five adjacent groups of grids in the axis grid are selected as the area for constructing the productivity performance model. The center coordinates of each grid are obtained. The z-axis values in the center coordinates of each grid are iterated based on the normalized production parameters. The center coordinates of the grids based on the iterated z-axis values are connected with the four groups of corner points of the corresponding grids to construct a tetrahedral pyramid model representing the latest group of production parameters in a set of production parameter change situation diagrams. The productivity evaluation operation of production equipment and the construction operation of productivity performance model are based on the operation of continuously selecting production equipment as the call target and the continuous update of parameters in the production parameter change situation diagram; the five adjacent groups of grids in the selected axis network correspond to the production efficiency of production equipment, the yield rate of products produced by production equipment, the manual maintenance frequency of production equipment, the manual maintenance time accumulation of production equipment, and the daily operation time accumulation of production equipment in the production parameters, and the length and width of the five adjacent groups of grids in the selected axis network are 1*5; Among them, the productivity evaluation results of production equipment and the constructed productivity performance model are synchronously marked with the corresponding production equipment numbers, further fed back to the database, and stored in the database. The combination of five sets of four-sided pyramid models is recorded as the productivity performance model; Obtain the productivity evaluation results of production equipment and the constructed productivity performance model, and analyze the productivity stability of production equipment in combination with the productivity evaluation results of production equipment and the constructed productivity performance model; The logic of production equipment productivity stability analysis is expressed as: ; Where: It is the performance value of the productivity stability of production equipment; The update times of the production parameters in the production parameter change situation diagram; The productivity evaluation index of the production equipment obtained when the production parameters are updated for the j+1th time in the production parameter change situation diagram; The productivity evaluation index of the production equipment obtained when the production parameters are updated for the jth time in the production parameter change situation diagram; is the judgment function; Among them, the performance value of production equipment productivity stability The larger the value is, the better the productivity stability of the production equipment is; conversely, the smaller the value is, the worse the productivity stability of the production equipment is. Obtaining the productivity stability analysis results of each production equipment, and further analyzing the productivity stability of the production equipment group based on the productivity stability analysis results of each production equipment; The productivity stability analysis logic of the production equipment group is expressed as: ; Where: It is the productivity stability performance value of the production equipment group; is the total number of production equipment in the production equipment group; is the productivity stability performance value of the production equipment in group v; is the corresponding stability analysis weight of the production equipment in group v; in, , the productivity stability performance value of the production equipment group The larger the value is, the better the productivity stability of the production equipment group is; conversely, the smaller the value is, the worse the productivity stability of the production equipment group is. The value of the corresponding stability analysis weight of the production equipment follows: ; Where: The importance of the production equipment in group v compared to the overall product production process; The time it takes to process a group of products for the vth group of production equipment; The total time it takes to produce a set of products for a group of production equipment; The importance of the production equipment compared to the overall production process of the product is customized by the user of the production equipment group management end, and the sum of the importance of each production equipment in the production equipment group compared to the overall production process of the product is 1; The productivity stability performance value of the production equipment group and the productivity stability performance value of the production equipment. The user of the production equipment group management end further sets the value assessment factor so that the value assessment factor is not less than zero, and obeys the setting logic that the higher the productivity stability performance value, the larger the value assessment factor value, and the lower the productivity stability performance value, the smaller the value assessment factor value. The productivity stability performance value of the production equipment group or the productivity stability performance value of the production equipment is multiplied by the value assessment factor to obtain a set of values, which is recorded as the productivity value of the production equipment group or the production equipment.
[0023] In this embodiment, the method in the above embodiment brings digital value assessment of productivity to production equipment, provides auxiliary management effect for production equipment management end users, and realizes visual data reading conditions in the process of digital value assessment of production equipment productivity by generating and constructing situation diagrams and models, so that production equipment management end users can more quickly monitor the productivity change status of production equipment; See also Figure 2 As shown, based on Figure 2 Further, an example is presented of a production parameter change situation diagram generated based on the production efficiency of the production equipment, the yield rate of the products produced by the production equipment, the manual maintenance frequency of the production equipment, the accumulated manual maintenance time of the production equipment, and the accumulated daily operation time of the production equipment; Based on Figure 3, the production equipment productivity performance model is further demonstrated.
[0024] Embodiment 2: In terms of specific implementation, based on Embodiment 1, this embodiment refers to Figure 1 The productivity value assessment management method in Example 1 is further described in detail: The daily production parameters of the production equipment group include: production efficiency of the production equipment, yield rate of the products produced by the production equipment, manual maintenance frequency of the production equipment, accumulated manual maintenance time of the production equipment, and accumulated daily operation time of the production equipment. The production parameter change situation diagram is generated based on various daily production parameters of each production equipment in various production equipment groups. The production parameter change situation diagram is a line diagram. The horizontal axis of the production parameter change situation diagram represents time in days, and the vertical axis represents the collection results of various production parameters. Among them, when the database stores the production parameter change situation diagram of the production equipment, the production parameter change situation diagram is differentiated and stored based on the production parameter type. When the production parameter change situation diagram is stored, the number of the parameter source equipment in the production parameter change situation diagram is synchronously applied to mark it. After the marking is completed, the storage operation is performed; When a group of production equipment is selected as the retrieval target, the corresponding marking information of each production parameter change situation diagram stored in the database is used as the retrieval logic basis, so that the corresponding marking information of all the production parameter change situation diagrams retrieved are consistent; When normalizing the production parameters, the following procedures apply: traverse the latest set of production parameters obtained from each set and each retrieved production parameter change situation diagram, capture the set of production parameters with the smallest value in each latest set of production parameters, use the captured production parameters as the common denominator, and perform simple integer ratio processing on each latest set of production parameters based on the common denominator; When capturing a set of production parameters with the smallest value in each latest set of production parameters, the unit of the production parameters is not considered.
[0025] In this embodiment, through the above settings, further method execution logic support and limitation are provided for the method in the embodiment, ensuring that the execution process logic basis of the method in Example 1 is more complete.
[0026] Example 3: In terms of specific implementation, based on Example 1, this example further specifically illustrates a productivity value assessment management method in Example 1 with reference to FIG. 1 : When determining the value, the judgment function obeys: It represents the z-axis value of the fixed point coordinate on the four-sided pyramid model p corresponding to the production parameter in the constructed productivity performance model when the production parameter is updated for the jth time in the production parameter change situation diagram; It represents the z-axis value of the fixed point coordinate on the four-sided pyramid model p corresponding to the production parameter in the constructed productivity performance model when the production parameter is updated for the j+1th time in the production parameter change situation diagram; When the four-sided pyramid model p corresponds to the production efficiency of the production equipment, the judgment function middle ≤0, judgment function =1, >0, judgment function =0; When the four-sided pyramid model p corresponds to the yield rate of the products produced by the production equipment, the judgment function middle ≤0, judgment function =1, >0, judgment function =0; When the four-sided pyramid model p corresponds to the daily operation time accumulation of production equipment, the judgment function middle ≤0, judgment function =1, >0, judgment function =0; When the four-sided pyramid model p corresponds to the manual maintenance frequency of production equipment, the judgment function middle >0, judgment function =1, ≤0, judgment function =0; When the four-sided pyramid model p corresponds to the accumulation of manual maintenance time of production equipment, the judgment function middle >0, judgment function =1, ≤0, judgment function =0.
[0027] Through the above settings, the determination function of the production equipment productivity stability analysis logic application in Example 1 is further limited by the specific value logic, ensuring that the determination function participates in the calculation with a specific value in the production equipment productivity stability analysis logic, ensuring that the production equipment productivity stability performance value Stable output.
[0028] In summary, the method in the above embodiment is applied to the scenario of production equipment in a production equipment group. During the execution of its steps, the method collects and analyzes the daily production parameters of the production equipment to conduct a digital value assessment on the productivity of the production equipment, and provides specific data references for users at the production equipment management end to facilitate adaptive management of the production equipment. When the method is executed, a situation diagram and model are also generated and constructed, thereby realizing visual data reading conditions in the process of digital value assessment of the productivity of the production equipment, so as to facilitate more efficient management of the production equipment.
[0029] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A productivity value assessment management method, characterized in that: include: Collect daily production parameters of the production equipment group, generate a production parameter change situation diagram based on the daily production parameters of the production equipment, create a database, and use the database to store the production parameter change situation diagram of the production equipment; Select a group of production equipment as the target to be retrieved, retrieve all production parameter change situation diagrams related to the target from the database, obtain the latest group of production parameters from each retrieved production parameter change situation diagram, and perform normalization processing on the production parameters; Select a group of production equipment as the target to be retrieved, retrieve all production parameter change situation diagrams related to the target from the database, and evaluate the productivity of the production equipment based on the production parameters in the situation diagram; obtain the normalized production parameters, and construct a productivity performance model representing the production equipment corresponding to the production parameters based on the normalized production parameters; Obtain the productivity evaluation results of production equipment and the constructed productivity performance model, and analyze the productivity stability of production equipment in combination with the productivity evaluation results of production equipment and the constructed productivity performance model; Obtaining the productivity stability analysis results of each production equipment, and further analyzing the productivity stability of the production equipment group based on the productivity stability analysis results of each production equipment; The production equipment productivity evaluation logic is expressed as: ; Where: It is an indicator for evaluating the productivity of production equipment; The date set of the production parameter collection included in the horizontal axis of the production parameter change situation diagram; To improve the production efficiency of production equipment; The yield rate of products produced by production equipment; Accumulate daily operating time of production equipment; The frequency of manual maintenance of production equipment; It is the accumulation of manual maintenance time for production equipment.
2. A productivity value assessment management method according to claim 1, characterized in that: The daily production parameters of the production equipment group include: production efficiency of the production equipment, yield rate of the products produced by the production equipment, manual maintenance frequency of the production equipment, accumulated manual maintenance time of the production equipment, and accumulated daily operation time of the production equipment. The production parameter change situation diagram is generated based on various daily production parameters of each production equipment in various production equipment groups. The production parameter change situation diagram is a line diagram. The horizontal axis of the production parameter change situation diagram represents time in days, and the vertical axis represents the collection results of various production parameters. Among them, when the database stores the production parameter change situation diagram of the production equipment, the production parameter change situation diagram is differentiated and stored based on the production parameter type. When the production parameter change situation diagram executes the storage operation, the number of the parameter source equipment in the production parameter change situation diagram is simultaneously applied to mark it. After the marking is completed, the storage operation is executed.
3. A productivity value assessment management method according to claim 1, characterized in that: When a group of production equipment is selected as the retrieval target, the corresponding marking information of each production parameter change situation diagram stored in the database is used as the retrieval logic basis, so that the corresponding marking information of all the production parameter change situation diagrams retrieved are consistent; When normalizing the production parameters, the following procedures apply: traverse the latest set of production parameters obtained from each set and each retrieved production parameter change situation diagram, capture the set of production parameters with the smallest value in each latest set of production parameters, use the captured production parameters as the common denominator, and perform simple integer ratio processing on each latest set of production parameters based on the common denominator; When capturing a set of production parameters with the smallest value in each latest set of production parameters, the unit of the production parameters is not considered.
4. A productivity value assessment management method according to claim 1, characterized in that: Indicates the production capacity of the production equipment as shown in the latest set of parameters in the production parameter change situation diagram. Table pair The average, Indicates the production capacity of the production equipment and the productivity evaluation index of the production equipment on the i-th day in the production parameter change situation diagram The larger the value is, the better the productivity of the production equipment is. Conversely, the smaller the value is, the worse the productivity of the production equipment is. The productivity evaluation index of production equipment is ≥0, it means that the productivity of the production equipment is in a safe state.
5. A productivity value assessment management method according to claim 1, characterized in that: When applying the normalized production parameters to construct a production equipment productivity performance model, the following applies: A set of axis grids is set so that the spacings between adjacent vertical and horizontal axes in the axis grid are equal. Five adjacent groups of grids in the axis grid are selected as the area for constructing the productivity performance model. The center coordinates of each grid are obtained. The z-axis values in the center coordinates of each grid are iterated based on the normalized production parameters. The center coordinates of the grids based on the iterated z-axis values are connected with the four groups of corner points of the corresponding grids to construct a tetrahedral pyramid model representing the latest group of production parameters in a set of production parameter change situation diagrams. The production equipment productivity evaluation operation and the productivity performance model building operation are continuously executed based on the operation of continuously selecting the production equipment as the call target and the updating of the parameters in the production parameter change situation diagram; the five adjacent groups of grids in the selected axis network correspond to the production efficiency of the production equipment, the yield rate of the products produced by the production equipment, the manual maintenance frequency of the production equipment, the manual maintenance time accumulation of the production equipment, and the daily operation time accumulation of the production equipment in the production parameters, and the length and width of the five adjacent groups of grids in the selected axis network are 1*5; Among them, the production equipment productivity evaluation results and the constructed productivity performance model are synchronously marked with the corresponding production equipment numbers, further fed back to the database, and stored in the database. The combination of five groups of four-sided pyramid models is recorded as the productivity performance model.
6. A productivity value assessment management method according to claim 1, characterized in that: The production equipment productivity stability analysis logic is expressed as: ; Where: It is the performance value of the productivity stability of production equipment; The update times of the production parameters in the production parameter change situation diagram; The productivity evaluation index of the production equipment obtained when the production parameters are updated for the j+1th time in the production parameter change situation diagram; The productivity evaluation index of the production equipment obtained when the production parameters are updated for the jth time in the production parameter change situation diagram; is the judgment function; Among them, the performance value of production equipment productivity stability The larger the value is, the better the productivity stability of the production equipment is; conversely, the smaller the value is, the worse the productivity stability of the production equipment is. When determining the value, the judgment function obeys: It represents the z-axis value of the fixed point coordinate on the four-sided pyramid model p corresponding to the production parameter in the constructed productivity performance model when the production parameter is updated for the jth time in the production parameter change situation diagram; It represents the z-axis value of the fixed point coordinate on the four-sided pyramid model p corresponding to the production parameter in the constructed productivity performance model when the production parameter is updated for the j+1th time in the production parameter change situation diagram; When the four-sided pyramid model p corresponds to the production efficiency of the production equipment, the judgment function middle ≤0, judgment function =1, >0, judgment function =0; When the four-sided pyramid model p corresponds to the yield rate of the products produced by the production equipment, the judgment function middle ≤0, judgment function =1, >0, judgment function =0; When the four-sided pyramid model p corresponds to the daily operation time accumulation of production equipment, the judgment function middle ≤0, judgment function =1, >0, judgment function =0; When the four-sided pyramid model p corresponds to the manual maintenance frequency of production equipment, the judgment function middle >0, judgment function =1, ≤0, judgment function =0; When the four-sided pyramid model p corresponds to the accumulation of manual maintenance time of production equipment, the judgment function middle >0, judgment function =1, ≤0, judgment function =0.
7. A productivity value assessment management method according to claim 1, characterized in that: The productivity stability analysis logic of the production equipment group is expressed as: ; Where: It is the productivity stability performance value of the production equipment group; is the total number of production equipment in the production equipment group; is the productivity stability performance value of the production equipment in group v; is the corresponding stability analysis weight of the production equipment in group v; in, , the productivity stability performance value of the production equipment group The larger it is, the better the productivity stability of the production equipment group is. Conversely, the smaller it is, the worse the productivity stability of the production equipment group is.
8. A productivity value assessment management method according to claim 7, characterized in that: The value of the corresponding stability analysis weight of the production equipment is subject to: ; Where: The importance of the production equipment in group v compared to the overall product production process; The time it takes for the vth group of production equipment to process a group of products; The total time it takes to produce a set of products for a group of production equipment; The importance of the production equipment compared to the overall product production process is customized by the user of the production equipment group management end, and the sum of the importance of each production equipment in the production equipment group compared to the overall product production process is 1.
9. A productivity value assessment management method according to claim 1, characterized in that: The productivity stability performance value of the production equipment group and the productivity stability performance value of the production equipment. The user of the production equipment group management end further sets the value assessment factor so that the value assessment factor is not less than zero, and obeys the setting logic that the higher the productivity stability performance value, the larger the value assessment factor value, and the lower the productivity stability performance value, the smaller the value assessment factor value. The productivity stability performance value of the production equipment group or the productivity stability performance value of the production equipment is multiplied by the value assessment factor to obtain a set of values, which is recorded as the productivity value of the production equipment group or the production equipment.
Citation Information
Patent Citations
Receipt acquisition terminal of intelligent glove production line based on cloud platform
CN113341897A
Industrial robot comprehensive performance analysis method and system based on digital twinning
CN116117811A
Digital factory equipment inspection evaluation method and system based on big data, and medium
CN116502925A
Equipment maintenance state determination method and system, electronic equipment and readable storage medium
CN116882961A
Liquid crystal display screen production line operation management system based on Internet of Things
CN117132064A
