Power dispatching optimization method and system based on digital twinning
Digital twin technology is used to identify power flow, build a power network, predict power demand and power supply, solve the problem of inaccurate load acquisition and power supply prediction in power dispatch optimization, and improve the accuracy and efficiency of power dispatch.
Patent Information
- Application Number
- CN202410850448.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-18
AI Technical Summary
The real-time load acquisition and power supply prediction in the existing power dispatch optimization technology are not accurate enough, resulting in poor accuracy, efficiency and reliability of power dispatch optimization.
Adopt a power dispatching method based on digital twins to determine the target power generation system, identify the power flow direction, build a power network, establish a load aggregator, conduct digital twin modeling, pre-build power consumption and power generation analysis channels, and predict power demand and supply. quantity, set the supply and demand deviation threshold, and perform power dispatch optimization.
It improves the accuracy and efficiency of power dispatching, ensures the reliability of results, and solves the problem of inaccurate real-time load acquisition and power supply prediction.
Smart Images

Figure CN118801355A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field related to smart grid management, and in particular to a power dispatch optimization method and system based on digital twins. Background Art
[0002] Power dispatch optimization is a series of optimization measures to achieve efficient operation and supply-demand balance of power systems. With the advancement of science and technology and the acceleration of urbanization, electricity demand continues to grow, and the scale and complexity of power systems have increased significantly, which has brought great challenges to power dispatch. Traditional power dispatch methods can no longer meet the needs of modern power systems. Traditional power dispatch cannot accurately obtain real-time load data in complex power systems of different sizes and types, and accurately predict electricity demand and power supply. As a result, it cannot efficiently and accurately optimize power dispatch and achieve reasonable allocation and dispatch of power resources.
[0003] Therefore, existing power dispatch optimization technologies have the problem that real-time load acquisition and power supply prediction are not accurate and efficient enough, which in turn leads to technical problems in the accuracy, efficiency and reliability of power dispatch optimization. Summary of the invention
[0004] Based on this, the embodiments of the present application provide a power dispatching optimization method and system based on digital twins, which solves the technical problems of the existing power dispatching optimization, namely, the real-time load acquisition and power supply prediction are not accurate and efficient enough, which in turn leads to poor accuracy, efficiency and reliability of power dispatching optimization, thereby achieving the technical effect of higher accuracy and efficiency of power dispatching optimization and better reliability of results.
[0005] A first aspect of an embodiment of the present application provides a power dispatch optimization method based on digital twins, the method comprising:
[0006] Determine a target power generation system, identify the power flow direction of the target power generation system, and construct a target power consumption network, wherein the target power consumption network includes a plurality of power consumption sub-networks;
[0007] Perform load identification on the multiple electronic networks, respectively establish load aggregators, and obtain multiple load aggregators, wherein the load aggregators are used to count the real-time loads of the sub-networks of the electronic networks;
[0008] Performing digital twin modeling on the target power generation system to obtain a power generation system twin model, wherein the power generation system twin model has multiple load interfaces corresponding to the multiple load aggregators;
[0009] Pre-build multiple customized power consumption analysis channels, deploy the multiple customized power consumption analysis channels on multiple load interfaces respectively, predict the real-time load of the sub-network output by the load aggregator, and obtain the power consumption demand of multiple sub-networks;
[0010] Pre-constructing a power generation analysis channel, deploying the power generation analysis channel in the power generation system twin model, predicting the power supply of the target power generation system, and obtaining power supply prediction information;
[0011] Setting a supply-demand deviation threshold, using the power generation system twin model, optimizing power dispatch based on power demand and power supply forecast information of multiple sub-networks, and obtaining an optimized power dispatch plan;
[0012] Power dispatch is implemented based on the optimized power dispatch plan.
[0013] A second aspect of an embodiment of the present application provides a system for power dispatch optimization based on digital twins, the system comprising:
[0014] A target power consumption network construction module, the target power consumption network construction module is used to determine a target power generation system, identify the power flow direction of the target power generation system, and construct a target power consumption network, wherein the target power consumption network includes a plurality of sub-power consumption networks;
[0015] A load aggregator establishment module, the load aggregator establishment module is used to identify the loads of the multiple electronic networks, respectively establish load aggregators, and obtain multiple load aggregators, the load aggregators are used to count the real-time loads of the sub-networks of the electronic networks;
[0016] A power generation system twin model construction module, wherein the power generation system twin model construction module is used to perform digital twin modeling on the target power generation system to obtain a power generation system twin model, wherein the power generation system twin model has multiple load interfaces corresponding to the multiple load aggregators;
[0017] A sub-network power demand acquisition module, which is used to pre-build multiple customized power analysis channels, deploy the multiple customized power analysis channels on multiple load interfaces respectively, predict the sub-network real-time load output by the load aggregator, and obtain multiple sub-network power demands;
[0018] A power supply prediction information acquisition module, which is used to pre-build a power generation analysis channel, deploy the power generation analysis channel in the power generation system twin model, predict the power supply of the target power generation system, and obtain power supply prediction information;
[0019] An optimized power dispatching scheme obtaining module, wherein the optimized power dispatching scheme obtaining module is used to set a supply-demand deviation threshold, utilize the power generation system twin model, perform power dispatch optimization based on power demand and power supply forecast information of multiple sub-networks, and obtain an optimized power dispatching scheme;
[0020] A power dispatching implementation module is used to implement power dispatching based on the optimized power dispatching plan.
[0021] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0022] The present application determines a target power generation system, identifies the power flow direction of the target power generation system, and constructs a target power consumption network, wherein the target power consumption network includes multiple electronic consumption networks, performs load identification on the multiple electronic consumption networks, establishes load aggregators respectively, and obtains multiple load aggregators, wherein the load aggregators are used to count the real-time loads of the sub-networks of the electronic consumption networks, performs digital twin modeling on the target power generation system, and obtains a power generation system twin model, wherein the power generation system twin model has multiple load interfaces corresponding to the multiple load aggregators, pre-constructs multiple customized power consumption analysis channels, and deploys the multiple customized power consumption analysis channels on multiple load interfaces respectively, and pre-constructs the real-time loads of the sub-networks output by the load aggregators. The power demand of multiple sub-networks is measured, and the power generation analysis channel is pre-built. The power generation analysis channel is deployed in the twin model of the power generation system, the power supply of the target power generation system is predicted, the power supply prediction information is obtained, and a supply and demand deviation threshold is set. The twin model of the power generation system is used to perform power dispatch optimization based on the power demand of multiple sub-networks and the power supply prediction information, and an optimized power dispatch plan is obtained. Power dispatch is implemented based on the optimized power dispatch plan, which solves the technical problem that the real-time load acquisition and power supply prediction of the existing power dispatch optimization are not accurate and efficient, which leads to poor accuracy, efficiency and reliability of power dispatch optimization, thereby achieving the technical effect of higher accuracy and efficiency of power dispatch optimization and better reliability of results. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0024] Figure 1 A schematic diagram of a flow chart of a power dispatching method based on digital twins provided in an embodiment of the present application;
[0025] Figure 2 A schematic diagram of a flow chart for establishing a load aggregator in a power dispatching method based on digital twins provided in an embodiment of the present application;
[0026] Figure 3 A schematic diagram of the system structure of power dispatch optimization based on digital twins provided in an embodiment of the present application;
[0027] Explanation of the accompanying drawings: target power consumption network construction module 10, load aggregator establishment module 20, power generation system twin model construction module 30, sub-network power demand acquisition module 40, power supply forecast information acquisition module 50, optimized power dispatching plan acquisition module 60, power dispatching implementation module 70. DETAILED DESCRIPTION
[0028] The embodiment of the present application provides a power dispatch optimization method based on digital twins, which solves the technical problem that the real-time load acquisition and power supply prediction of the existing power dispatch optimization are not accurate and efficient enough, which in turn leads to poor accuracy, efficiency and reliability of power dispatch optimization.
[0029] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only some embodiments of the present application, not all embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0030] It should be noted that the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or modules that are not explicitly listed or inherent to these processes, methods, products or devices.
[0031] Embodiment 1
[0032] like Figure 1 As shown, an embodiment of the present application provides a method for optimizing power dispatching based on digital twins, the method comprising:
[0033] Determine a target power generation system, identify the power flow direction of the target power generation system, and construct a target power consumption network, wherein the target power consumption network includes a plurality of power consumption sub-networks;
[0034] Preferably, the target power generation system is first determined, and the power flow direction of the target power generation system is identified, and a target power consumption network including multiple electronic networks is constructed, wherein the target power generation system refers to a power generation system that meets the power demand and has a reliable supply, for example, a traditional coal, gas, nuclear power generation system or a renewable energy power generation system such as solar photovoltaic, wind, and hydropower. The power flow direction refers to the process of transmitting the power generated by the target power generation system to each electronic network through a transmission line network, involving multiple transmission lines and substations. Electronic networks refer to user groups of different types of electric energy, for example, industrial areas, commercial areas, residential areas, etc. have independent power consumption requirements and load characteristics. The target power consumption network refers to an overall power supply system composed of the multiple electronic networks connected, each electronic network is connected through a power transmission line. During normal operation, each electronic network is relatively independent. During power dispatching, each electronic network interacts with each other to provide real-time load or power consumption information of the electronic network to realize power supply and distribution.
[0035] Perform load identification on the multiple electronic networks, respectively establish load aggregators, and obtain multiple load aggregators, wherein the load aggregators are used to count the real-time loads of the sub-networks of the electronic networks;
[0036] Preferably, load identification is performed on multiple electronic networks, and load aggregators are established for each of them to obtain multiple load aggregators for counting the real-time load of sub-networks of the electronic networks. Load identification refers to using appropriate methods and techniques to identify and collect load data of the multiple electronic networks, for example, using sensor equipment to monitor the current, voltage and other parameters of the electronic networks in real time to obtain load information. Load aggregator refers to a device that aggregates sub-network load data established for each electronic network. For example, the load aggregator is a computer device or cloud platform responsible for receiving, counting and processing real-time load data of each electronic network, for example, summing up the load of each individual user in the electronic network or the load average value within a specific time period, etc., in order to predict future power supply demand and power resource allocation.
[0037] Further, such as Figure 2 As shown, load identification is performed on the plurality of electronic networks, and load aggregators are established respectively to obtain a plurality of load aggregators, and the method includes:
[0038] Locking a first electronic network among the plurality of electronic networks;
[0039] Based on the power distribution structure and power consumption characteristics of the first electronic network, partitioning the first electronic network to obtain a plurality of first network partitions;
[0040] Deploying smart meters on the power transmission buses of the plurality of first network partitions respectively, collecting power consumption information of the plurality of first network partitions, and obtaining power consumption data of the plurality of first partitions;
[0041] Connecting the plurality of first partition power consumption data to a preset calculation module to obtain a first load aggregator;
[0042] The first load aggregator is added to the plurality of load aggregators.
[0043] Preferably, a first electronic network is locked in the multiple electronic networks, and the first electronic network is partitioned according to the distribution structure and power consumption characteristics of the first electronic network to obtain multiple first network partitions, wherein the first electronic network refers to an electronic network selected from the multiple electronic networks, and this selection can be arbitrary or based on specific standards, for example, the first electronic network is selected according to the size and purpose of the electronic network, the distribution structure of the first electronic network refers to the layout and connection of equipment and components used for transmitting and distributing electricity, including transformers, switchboards, distribution lines and the connection method between them, the power consumption characteristics of the first electronic network refer to the characteristics of the power load in the electronic network, including load type and fluctuation, power consumption mode, power demand and working hours, etc., which together describe the change law and characteristics of the load in the electronic network, and the first power network partition refers to a plurality of power network partitions divided according to the distribution structure and power consumption characteristics of the first electronic network, such as residential areas or commercial areas, respectively in the multiple first networks Smart meters are arranged on the power transmission bus of the partitions to collect power consumption information of multiple first network partitions to obtain multiple first partition power consumption data, and the multiple first partition power consumption data are connected to the preset calculation module to obtain a first load aggregator. Specifically, smart meters are arranged on the power transmission bus of multiple first network partitions to collect power consumption information of each network partition. For example, the power consumption data of each load device or each household in the partition is collected to obtain multiple first network partition power consumption data, which are then input into the preset calculation module as input data to analyze and process the power consumption data to obtain the first load aggregator, wherein the preset calculation module refers to a mathematical calculation module pre-established based on load calculation rules, which is used to calculate and process the input power consumption data. The first load aggregator is used to monitor and analyze the power consumption of the multiple first network partitions as a whole, for example, to display the load status, load volatility or power demand of the entire partition, and finally, multiple first load aggregators are added to the multiple load aggregators to monitor the power demand of the entire target power network and the real-time load of the sub-network.
[0044] Performing digital twin modeling on the target power generation system to obtain a power generation system twin model, wherein the power generation system twin model has multiple load interfaces corresponding to the multiple load aggregators;
[0045] Preferably, digital twin modeling is performed based on the target power generation system to obtain a twin model of the power generation system with multiple load interfaces corresponding to the load aggregators. Specifically, mathematical modeling and computer simulation technology are used to simulate the actual power generation system into a digital model, and the characteristics and behaviors of the power generation system can be accurately reflected. The twin digital model includes power generation equipment, transmission lines, substations, load equipment and multiple load interfaces, wherein the multiple load interfaces are equivalent to multiple load aggregators in the actual power generation system, which are arranged at the nodes where the twin digital model is connected to the load equipment, and are used to receive accurate load data in real time, thereby dynamically reflecting the electricity demand and status of the load equipment, and realizing the simulation and analysis of the mutual influence between the power generation system and the load equipment, which is conducive to more stable, efficient and reliable allocation and scheduling of power resources.
[0046] Pre-build multiple customized power consumption analysis channels, deploy the multiple customized power consumption analysis channels on multiple load interfaces respectively, predict the real-time load of the sub-network output by the load aggregator, and obtain the power consumption demand of multiple sub-networks;
[0047] Preferably, multiple customized power consumption analysis channels are pre-constructed and deployed correspondingly on the multiple load interfaces, and the real-time loads of the sub-networks output by the load aggregator are predicted to obtain the power consumption demands of the multiple sub-networks, wherein the multiple customized power consumption analysis channels refer to power consumption analysis channels designed according to specific power consumption goals and demands, and each analysis channel is deployed at the load interface, receives the real-time load data of the sub-network from the first load aggregator, and performs analysis and prediction, so as to predict the power consumption demands of each sub-network, including the precise power consumption, the power change trend of the load, the load peak period or the periodic change law of the load, etc., and finally, power scheduling can be performed in real time according to the predicted power consumption demands of the multiple sub-networks.
[0048] Furthermore, multiple customized power consumption analysis channels are constructed, and the method includes:
[0049] Interact with multiple electronic networks respectively to obtain multiple sets of historical electricity consumption data;
[0050] Setting a channel training data volume, and obtaining a data extraction volume based on the channel training data volume and the number of electronic networks;
[0051] randomly extracting historical electricity consumption data from multiple groups of historical electricity consumption data according to the data extraction amount to obtain a random electricity consumption data set;
[0052] A plurality of customized electricity consumption analysis channels are constructed based on the random electricity consumption data set and a plurality of sets of historical electricity consumption data.
[0053] Preferably, the multiple electronic networks are interacted with respectively to obtain multiple groups of historical electricity consumption data, the historical electricity consumption data including the specific electricity consumption of multiple electronic networks in the past period of time, and the channel training data volume is set. Based on the channel training data volume and the number of electronic networks, the data extraction volume is obtained, wherein the channel training data volume refers to the amount of sample data set for training the electricity consumption analysis channel, which needs to be determined according to actual needs and the number of electronic networks, and the data extraction volume refers to the amount of sample data extracted from the historical electricity consumption data of each electronic network, which should be appropriately balanced and allocated according to the channel training data volume and the number of electronic networks, and the multiple groups of historical electricity consumption data are divided according to the data extraction volume. Randomly extract historical electricity consumption data to obtain a random electricity consumption data set, and then build multiple customized electricity consumption analysis channels based on the random electricity consumption data set and multiple groups of historical electricity consumption data. For example, if the amount of channel training data is large and the number of electronic networks is small, more sample data should be extracted from the historical electricity consumption data to fully train the electricity consumption analysis channel and improve the accuracy of electricity demand forecasting. Conversely, if the amount of channel training data is small and the number of electronic networks is large, it is necessary to extract less sample data from the historical electricity consumption data of each electronic network to ensure that each electronic network has sufficient data to support channel training, thereby training accurate and effective electricity consumption analysis channels and providing more accurate electricity demand forecasting.
[0054] Furthermore, a plurality of customized power consumption analysis channels are constructed based on the random power consumption data set and a plurality of sets of historical power consumption data, and the method includes:
[0055] Setting a channel input window and a prediction window, and formatting a random power consumption data set based on the channel input window and the prediction window to obtain a channel training data set;
[0056] The channel training data set includes multiple pairs of channel training data, each pair of channel training data includes channel input data and supervised prediction data;
[0057] Based on a convolutional neural network, supervised training is performed using the multiple pairs of channel training data to obtain a benchmark power consumption analysis channel;
[0058] Eliminate random electricity consumption data sets from multiple sets of historical electricity consumption data to obtain multiple sets of remaining electricity consumption data;
[0059] Transfer learning is performed based on the multiple remaining electricity consumption data and the benchmark electricity consumption analysis channels to obtain multiple customized electricity consumption analysis channels.
[0060] Preferably, a channel input window and a prediction window are set, and then the random power consumption data set is formatted based on the channel input window and the prediction window to obtain a channel training data set, wherein the channel training data set includes multiple pairs of channel training data, and each pair of channel training data includes channel input data and supervised prediction data, wherein the channel input window refers to a window of historical power consumption data used to train the power consumption analysis channel, usually including historical power consumption data within a period of time as input data for training the power consumption analysis channel, and the prediction window refers to a window used to predict power consumption data within a period of time in the future based on the input window, and the channel training data set refers to a data set with multiple pairs of channel training data obtained after formatting the random power consumption data set, and each pair of channel training data includes channel input data and corresponding supervised prediction data, wherein the channel input data includes historical power consumption data. According to the characteristic representation, the supervised prediction data is used for the prediction target of the applied power analysis channel, which is used for the training of the supervised channel and needs to correspond to the channel input data. Based on the convolutional neural network, the multiple pairs of channel training data are used for supervised training to obtain the benchmark power analysis channel, and then the random power data sets are eliminated from the multiple groups of historical power data to obtain multiple remaining power data, wherein the multiple remaining power data refer to the valid power data remaining after excluding certain factors in the historical power data from the analysis scope. Subsequently, transfer learning can be performed separately according to the remaining power data and the data of the benchmark power analysis channel, and the transfer learning refers to using the trained benchmark power analysis channel as the initial model, migrating its parameters and structure to the remaining power data sets and fine-tuning it, retaining some or all of the model parameters for optimization, and finally training to obtain the multiple customized power analysis channels.
[0061] Preferably, convolutional neural network (CNN) is a commonly used deep learning model, which is suitable for processing data with spatial structure. In the electricity consumption analysis scenario, channel input data is used as input and supervised prediction data is used as labels. A convolutional neural network model is designed and built for electricity demand prediction. The convolutional neural network model usually includes convolutional layers, pooling layers, fully connected layers, etc. The historical electricity consumption data is preprocessed, and the training data set and the verification data set are divided. The convolutional neural network model is supervised and trained, and the model parameters are optimized through multiple iterations so that it can accurately predict the electricity demand of multiple electronic networks.
[0062] Pre-constructing a power generation analysis channel, deploying the power generation analysis channel in the power generation system twin model, predicting the power supply of the target power generation system, and obtaining power supply prediction information;
[0063] Preferably, a power generation analysis channel is pre-constructed and deployed in the twin model of the power generation system, wherein the power generation analysis channel refers to a channel model for analyzing the power generation situation in the power generation system and is used to predict the power generation to optimize power dispatch. It uses the historical power generation data of the power generation system through training modeling, can simulate and monitor the state of the actual power generation system, accurately predict the power supply of the target power generation system, and obtain power supply prediction information. The power supply prediction information refers to the prediction information of the power supply situation of the power generation system in the future, such as specific power supply prediction, power generation change trend of the power generation system in different time periods, prediction of power generation peak and valley load, etc.
[0064] Setting a supply-demand deviation threshold, using the power generation system twin model, optimizing power dispatch based on power demand and power supply forecast information of multiple sub-networks, and obtaining an optimized power dispatch plan;
[0065] Preferably, a supply and demand deviation threshold is set, and the power generation system twin model is utilized to perform power dispatch optimization based on the power demand and power supply forecast information of multiple power consumption networks, wherein the supply and demand deviation threshold refers to a value set according to the requirements of the power system to measure the difference between the actual power supply and the power demand. When the supply and demand deviation exceeds the supply and demand deviation threshold, power dispatch optimization is performed based on the power demand and power supply forecast information of multiple power consumption networks, including real-time power consumption data obtained by smart meters and load aggregators, power consumption data predicted by power consumption analysis channels, power supply information predicted by power generation analysis channels, etc. An optimized power dispatch plan is generated based on the results of power dispatch optimization, including coordinating the load distribution of different power consumption networks so that they meet the requirements of the supply and demand deviation threshold to ensure the stability and reliability of the power supply system.
[0066] Furthermore, the power generation system twin model is used to optimize power dispatch based on power demand and power supply forecast information of multiple sub-networks to obtain an optimized power dispatch plan, and the method includes:
[0067] Initialize the power generation system twin model using the current operating status of the target power generation system and the target power consumption network;
[0068] The power demand and power supply forecast information of the multiple sub-networks are driven and operated once in the twin model of the power generation system to obtain power supply and consumption analysis results;
[0069] Resetting the power generation system twin model based on the power supply and consumption analysis result, performing secondary drive operation, and updating the power supply and consumption analysis result;
[0070] By analogy, an optimized power dispatching plan is determined based on the power supply and consumption analysis results.
[0071] Preferably, the current operating status of the target power generation system and the target power consumption network is used to initialize the power generation system twin model, and the optimized power dispatching plan is determined by multiple driving operations and updating the power consumption analysis results. Specifically, the operating status of the target power generation system and the target power consumption network is converted into the initial state of the digital twin model, and then the power demand and power supply forecast information of multiple power consumption networks are input into the model, and the first driving operation is performed, and the power supply and consumption analysis results are calculated, including supply and demand deviation, power generation and load conditions, etc., and then the model is reset and the second driving operation is performed to calculate the updated power supply and consumption analysis results, and the above steps are repeated for multiple iterative optimization to obtain multiple power supply and consumption analysis results, and the optimized power dispatching plan is determined from the multiple power supply and consumption analysis results.
[0072] Furthermore, an optimized power dispatching scheme is determined according to the power supply and utilization analysis result, and the method includes:
[0073] After obtaining the power supply and consumption analysis results, the power supply and consumption analysis results determine the power consumption network that meets the supply and demand deviation threshold, and then lock the sub-network;
[0074] For an electronic network that does not meet the supply and demand deviation threshold, identifying the sub-network supply and demand relationship, and distributing electricity according to the sub-network supply and demand relationship;
[0075] Resetting the twin model of the power generation system based on the power distribution result, driving it again, and updating the power supply and consumption analysis result;
[0076] The power supply and consumption analysis results are judged according to the supply and demand deviation threshold, and when all power consumption networks are locked, the optimized power dispatch plan is output.
[0077] Preferably, after obtaining the shared electricity analysis results, the electronic networks that meet the supply and demand deviation threshold are determined and sub-network locking is performed, wherein the sub-network locking refers to separating the electronic networks that meet the supply and demand deviation threshold from the entire target power network to ensure its power supply stability. For the electronic networks that do not meet the supply and demand deviation threshold, the sub-network supply and demand relationship is identified, and power is distributed according to the sub-network supply and demand relationship. For example, the power demand of each electronic network is determined, the power supply demand of electronic networks with different uses and priorities is considered, and the power distribution method of the transmission line is adjusted. Then, the twin model of the power generation system is reset based on the power distribution result, and then the driving operation is performed again to update the power supply and consumption analysis results, and the power supply and consumption analysis results are judged according to the supply and demand deviation threshold until all electronic networks in the target power network are locked, which means that all electronic networks meet the supply and demand deviation threshold. At this time, an optimized power scheduling plan is obtained and output.
[0078] The method for implementing power dispatch based on the optimized power dispatch scheme includes:
[0079] Conduct real-time dispatch monitoring of power dispatch and obtain power dispatch results;
[0080] Based on the power dispatch results, analyzing the power dispatch adaptability, wherein the power dispatch adaptability includes the supply and demand matching degree of each electronic network;
[0081] Based on the power dispatch adaptability, subsequent power dispatch is fine-tuned and optimized.
[0082] Preferably, real-time dispatch monitoring is performed on power dispatch to obtain power dispatch results, and then the power dispatch adaptability is analyzed based on the dispatch results, wherein the power dispatch adaptability includes the supply and demand matching of each electronic network, that is, the matching degree between the power supply and the load demand. The supply and demand matching can be evaluated by comparing the gap between the actual power supply and the load demand. Based on the power dispatch adaptability, further fine-tuning and optimization of subsequent power dispatch is performed for the electronic networks that do not meet the supply and demand matching, so as to ensure the adaptability of the power system and reasonably allocate power resources.
[0083] In summary, the embodiments of the present application have at least the following technical effects:
[0084] The embodiment of the present application determines a target power generation system, identifies the power flow direction of the target power generation system, and constructs a target power consumption network, wherein the target power consumption network includes multiple electronic consumption networks, performs load identification on the multiple electronic consumption networks, and establishes load aggregators respectively to obtain multiple load aggregators, wherein the load aggregators are used to count the real-time loads of the sub-networks of the electronic consumption networks, performs digital twin modeling on the target power generation system, and obtains a power generation system twin model, wherein the power generation system twin model has multiple load interfaces corresponding to the multiple load aggregators, pre-constructs multiple customized power consumption analysis channels, and deploys the multiple customized power consumption analysis channels on multiple load interfaces respectively, and performs real-time load analysis on the sub-networks output by the load aggregators. The power demand of multiple sub-networks is predicted, and the power generation analysis channel is pre-built. The power generation analysis channel is deployed in the twin model of the power generation system, the power supply of the target power generation system is predicted, the power supply prediction information is obtained, and a supply and demand deviation threshold is set. The twin model of the power generation system is used to optimize power dispatch based on the power demand of multiple sub-networks and the power supply prediction information, and an optimized power dispatch plan is obtained. Power dispatch is implemented based on the optimized power dispatch plan, which solves the technical problem that the real-time load acquisition and power supply prediction of the existing power dispatch optimization are not accurate and efficient, which leads to poor accuracy, efficiency and reliability of power dispatch optimization, thereby achieving the technical effect of higher accuracy and efficiency of power dispatch optimization and better reliability of results.
[0085] Embodiment 2
[0086] Based on the same inventive concept as the power dispatch optimization method based on digital twin in the aforementioned embodiment, Figure 3 As shown, the present application provides a power dispatch optimization system based on digital twins. The system and method embodiments in the embodiments of the present application are based on the same inventive concept, wherein the system includes:
[0087] A target power consumption network construction module 10, the target power consumption network construction module 10 is used to determine a target power generation system, identify the power flow direction of the target power generation system, and construct a target power consumption network, wherein the target power consumption network includes a plurality of electronic power consumption networks;
[0088] A load aggregator establishment module 20, the load aggregator establishment module 20 is used to identify the loads of the multiple electronic networks, respectively establish load aggregators, and obtain multiple load aggregators, the load aggregators are used to count the real-time loads of the sub-networks of the electronic networks;
[0089] A power generation system twin model construction module 30, wherein the power generation system twin model construction module 30 is used to perform digital twin modeling on the target power generation system to obtain a power generation system twin model, wherein the power generation system twin model has multiple load interfaces corresponding to the multiple load aggregators;
[0090] A sub-network power demand acquisition module 40, which is used to pre-build multiple customized power analysis channels, deploy the multiple customized power analysis channels on multiple load interfaces respectively, predict the sub-network real-time load output by the load aggregator, and obtain multiple sub-network power demands;
[0091] A power supply prediction information acquisition module 50, which is used to pre-build a power generation analysis channel, deploy the power generation analysis channel in the power generation system twin model, predict the power supply of the target power generation system, and obtain power supply prediction information;
[0092] An optimized power dispatching scheme obtaining module 60, wherein the optimized power dispatching scheme obtaining module 60 is used to set a supply-demand deviation threshold, utilize the power generation system twin model, perform power dispatch optimization based on power demand and power supply forecast information of multiple sub-networks, and obtain an optimized power dispatching scheme;
[0093] The power dispatching implementation module 70 is used to implement power dispatching based on the optimized power dispatching scheme.
[0094] Furthermore, the load aggregator establishing module 20 is also used to execute the following method:
[0095] Locking a first electronic network among the plurality of electronic networks;
[0096] Based on the power distribution structure and power consumption characteristics of the first electronic network, partitioning the first electronic network to obtain a plurality of first network partitions;
[0097] Deploying smart meters on the power transmission buses of the plurality of first network partitions respectively, collecting power consumption information of the plurality of first network partitions, and obtaining power consumption data of the plurality of first partitions;
[0098] Connecting the plurality of first partition power consumption data to a preset calculation module to obtain a first load aggregator;
[0099] The first load aggregator is added to the plurality of load aggregators.
[0100] Furthermore, the sub-network power demand obtaining module 40 is also used to execute the following method:
[0101] Interact with multiple electronic networks respectively to obtain multiple sets of historical electricity consumption data;
[0102] Setting a channel training data volume, and obtaining a data extraction volume based on the channel training data volume and the number of electronic networks;
[0103] randomly extracting historical electricity consumption data from multiple groups of historical electricity consumption data according to the data extraction amount to obtain a random electricity consumption data set;
[0104] A plurality of customized electricity consumption analysis channels are constructed based on the random electricity consumption data set and a plurality of sets of historical electricity consumption data.
[0105] Furthermore, the sub-network power demand obtaining module 40 is also used to execute the following method:
[0106] Setting a channel input window and a prediction window, and formatting a random power consumption data set based on the channel input window and the prediction window to obtain a channel training data set;
[0107] The channel training data set includes multiple pairs of channel training data, each pair of channel training data includes channel input data and supervised prediction data;
[0108] Based on a convolutional neural network, supervised training is performed using the multiple pairs of channel training data to obtain a benchmark power consumption analysis channel;
[0109] Eliminate random electricity consumption data sets from multiple sets of historical electricity consumption data to obtain multiple sets of remaining electricity consumption data;
[0110] Transfer learning is performed based on the multiple remaining electricity consumption data and the benchmark electricity consumption analysis channels to obtain multiple customized electricity consumption analysis channels.
[0111] Furthermore, the optimized power dispatching scheme obtaining module 60 is also used to execute the following method:
[0112] Initialize the power generation system twin model using the current operating status of the target power generation system and the target power consumption network;
[0113] The power demand and power supply forecast information of the multiple sub-networks are driven and operated once in the twin model of the power generation system to obtain power supply and consumption analysis results;
[0114] Resetting the power generation system twin model based on the power supply and consumption analysis result, performing secondary drive operation, and updating the power supply and consumption analysis result;
[0115] By analogy, an optimized power dispatching plan is determined based on the power supply and consumption analysis results.
[0116] Furthermore, the optimized power dispatching scheme obtaining module 60 is also used to execute the following method:
[0117] After obtaining the power supply and consumption analysis results, the power supply and consumption analysis results determine the power consumption network that meets the supply and demand deviation threshold, and then lock the sub-network;
[0118] For an electronic network that does not meet the supply and demand deviation threshold, identifying the sub-network supply and demand relationship, and distributing electricity according to the sub-network supply and demand relationship;
[0119] Resetting the twin model of the power generation system based on the power distribution result, driving it again, and updating the power supply and consumption analysis result;
[0120] The power supply and consumption analysis results are judged according to the supply and demand deviation threshold, and when all power consumption networks are locked, the optimized power dispatch plan is output.
[0121] Furthermore, the power dispatch implementation module 70 is also used to execute the following method:
[0122] Conduct real-time dispatch monitoring of power dispatch and obtain power dispatch results;
[0123] Based on the power dispatch results, analyzing the power dispatch adaptability, wherein the power dispatch adaptability includes the supply and demand matching degree of each electronic network;
[0124] Based on the power dispatch adaptability, subsequent power dispatch is fine-tuned and optimized.
[0125] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. Other embodiments are within the scope of the attached claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0126] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
[0127] This specification and drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.
Claims
1. The power dispatch optimization method based on digital twin is characterized by: The method comprises: Determine a target power generation system, identify the power flow direction of the target power generation system, and construct a target power consumption network, wherein the target power consumption network includes a plurality of power consumption sub-networks; Perform load identification on the multiple electronic networks, respectively establish load aggregators, and obtain multiple load aggregators, wherein the load aggregators are used to count the real-time loads of the sub-networks of the electronic networks; Performing digital twin modeling on the target power generation system to obtain a power generation system twin model, wherein the power generation system twin model has multiple load interfaces corresponding to the multiple load aggregators; Pre-build multiple customized power consumption analysis channels, deploy the multiple customized power consumption analysis channels on multiple load interfaces respectively, predict the real-time load of the sub-network output by the load aggregator, and obtain the power consumption demand of multiple sub-networks; Pre-constructing a power generation analysis channel, deploying the power generation analysis channel in the power generation system twin model, predicting the power supply of the target power generation system, and obtaining power supply prediction information; Setting a supply-demand deviation threshold, using the power generation system twin model, optimizing power dispatch based on power demand and power supply forecast information of multiple sub-networks, and obtaining an optimized power dispatch plan; Power dispatch is implemented based on the optimized power dispatch plan.
2. The method according to claim 1, characterized in that: Load identification is performed on the plurality of electronic networks, and load aggregators are established respectively to obtain a plurality of load aggregators, including: Locking a first electronic network among the plurality of electronic networks; Based on the power distribution structure and power consumption characteristics of the first electronic network, partitioning the first electronic network to obtain a plurality of first network partitions; Deploying smart meters on the power transmission buses of the plurality of first network partitions respectively, collecting power consumption information of the plurality of first network partitions, and obtaining power consumption data of the plurality of first partitions; Connecting the plurality of first partition power consumption data to a preset calculation module to obtain a first load aggregator; The first load aggregator is added to the plurality of load aggregators.
3. The method according to claim 1, characterized in that Build multiple custom power usage analysis channels, including: Interact with multiple electronic networks respectively to obtain multiple sets of historical electricity consumption data; Setting a channel training data volume, and obtaining a data extraction volume based on the channel training data volume and the number of electronic networks; randomly extracting historical electricity consumption data from multiple groups of historical electricity consumption data according to the data extraction amount to obtain a random electricity consumption data set; A plurality of customized electricity consumption analysis channels are constructed based on the random electricity consumption data set and a plurality of sets of historical electricity consumption data.
4. The method according to claim 3, characterized in that Based on the random power consumption data set and multiple sets of historical power consumption data, multiple customized power consumption analysis channels are constructed, including: Setting a channel input window and a prediction window, and formatting a random power consumption data set based on the channel input window and the prediction window to obtain a channel training data set; The channel training data set includes multiple pairs of channel training data, each pair of channel training data includes channel input data and supervised prediction data; Based on a convolutional neural network, supervised training is performed using the multiple pairs of channel training data to obtain a benchmark power consumption analysis channel; Eliminate random electricity consumption data sets from multiple sets of historical electricity consumption data to obtain multiple sets of remaining electricity consumption data; Transfer learning is performed based on the multiple remaining electricity consumption data and the benchmark electricity consumption analysis channels to obtain multiple customized electricity consumption analysis channels.
5. The method according to claim 1, characterized in that: The power generation system twin model is used to optimize power dispatch based on the power demand and power supply forecast information of multiple sub-networks to obtain an optimized power dispatch solution, including: Initialize the power generation system twin model using the current operating status of the target power generation system and the target power consumption network; The power demand and power supply forecast information of the multiple sub-networks are driven and operated once in the twin model of the power generation system to obtain power supply and consumption analysis results; Resetting the power generation system twin model based on the power supply and consumption analysis result, performing secondary drive operation, and updating the power supply and consumption analysis result; By analogy, an optimized power dispatching plan is determined based on the power supply and consumption analysis results.
6. The method according to claim 5, characterized in that Determining an optimized power dispatching plan based on the power supply and consumption analysis results includes: After obtaining the power supply and consumption analysis results, the power supply and consumption analysis results determine the power consumption network that meets the supply and demand deviation threshold, and then lock the sub-network; For an electronic network that does not meet the supply and demand deviation threshold, identifying the sub-network supply and demand relationship, and distributing electricity according to the sub-network supply and demand relationship; Resetting the twin model of the power generation system based on the power distribution result, driving it again, and updating the power supply and consumption analysis result; The power supply and consumption analysis results are judged according to the supply and demand deviation threshold, and when all power consumption networks are locked, the optimized power dispatch plan is output.
7. The method according to claim 1, characterized in that The method further comprises: Conduct real-time dispatch monitoring of power dispatch and obtain power dispatch results; Based on the power dispatch results, analyzing the power dispatch adaptability, wherein the power dispatch adaptability includes the supply and demand matching degree of each electronic network; Based on the power dispatch adaptability, subsequent power dispatch is fine-tuned and optimized.
8. The power dispatch optimization system based on digital twin is characterized by: The system comprises: A target power consumption network construction module, the target power consumption network construction module is used to determine a target power generation system, identify the power flow direction of the target power generation system, and construct a target power consumption network, wherein the target power consumption network includes a plurality of sub-power consumption networks; A load aggregator establishment module, the load aggregator establishment module is used to identify the loads of the multiple electronic networks, respectively establish load aggregators, and obtain multiple load aggregators, the load aggregators are used to count the real-time loads of the sub-networks of the electronic networks; A power generation system twin model construction module, wherein the power generation system twin model construction module is used to perform digital twin modeling on the target power generation system to obtain a power generation system twin model, wherein the power generation system twin model has multiple load interfaces corresponding to the multiple load aggregators; A sub-network power demand acquisition module, which is used to pre-build multiple customized power analysis channels, deploy the multiple customized power analysis channels on multiple load interfaces respectively, predict the sub-network real-time load output by the load aggregator, and obtain multiple sub-network power demands; A power supply prediction information acquisition module, which is used to pre-build a power generation analysis channel, deploy the power generation analysis channel in the power generation system twin model, predict the power supply of the target power generation system, and obtain power supply prediction information; An optimized power dispatching scheme obtaining module, wherein the optimized power dispatching scheme obtaining module is used to set a supply-demand deviation threshold, utilize the power generation system twin model, perform power dispatch optimization based on power demand and power supply forecast information of multiple sub-networks, and obtain an optimized power dispatching scheme; A power dispatching implementation module is used to implement power dispatching based on the optimized power dispatching plan.
Citation Information
Cited By
Electric power big data analysis method and system based on cloud computing
CN119047797A
Offshore wind power dispatching optimization method and system based on multi-source data fusion
CN120181521A