Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

1683 results about "Topology information" patented technology

PCFarm resource scheduling method and system based on dynamic load prediction

The invention discloses a PCFarm resource scheduling method and system based on dynamic load prediction, and relates to the technical field of resource scheduling, and the method comprises the steps: constructing a feature extractor based on multi-modal feature fusion, mapping original data into a high-dimensional feature vector, and obtaining a dependency relationship between tasks; modeling a cluster topology, predicting a load propagation effect between nodes, constructing a spatio-temporal joint prediction framework, and fusing a time sequence and spatial topology information; proposing a multi-objective optimization function; training a scheduling strategy generator, and generating an optimal scheduling scheme based on the current cluster state; designing the elastic expansion and contraction of the prediction drive; constructing a migration cost model, and quantifying the influence of task migration on the performance; the overall load balance degree of the cluster is calculated through the global controller, and a coarse-grained migration instruction is generated. By arranging the load prediction module and the resource scheduling module, resource allocation is dynamically adjusted according to the real-time state and task requirements of the cluster, and a better resource scheduling effect is achieved.
Owner:SHENZHEN ZHIAO TECH CO LTD

Distributed fault self-healing method and system for active distribution network, and device and medium

The present disclosure relates to the technical field of power systems. Disclosed are a distributed fault self-healing method and system for an active distribution network, and a device and a medium. In the present disclosure, using a two-terminal waveform difference as a faulty section locating principle is applicable to an active distribution network, which contains various types of DGs and different DG permeabilities. The present disclosure has a relatively low requirement for data computation and storage regarding an STU, and topology identification and update can be automatically completed during operation by simply configuring basic static network topology information for the STU, thereby adapting to a change in the operation mode of the network. By means of the present disclosure, a rational fault recovery rule is set, and important load nodes can be recovered as much as possible while meeting a network power constraint. In a recovery solution, the presence of distributed generation is taken into consideration, and different processing methods are designed according to whether the distributed generation can operate in an island manner for a long period of time.
Owner:GUANGDONG POWER GRID CO LTD +1

Cable fault intelligent diagnosis and positioning method and system

The invention discloses an intelligent cable fault diagnosis and positioning method and system, and relates to the technical field of intelligent operation and maintenance of a power system. The method is used for accurately identifying and positioning high-resistance faults and external damage. According to the method, electric field, current, temperature and vibration signals are synchronously collected, a multi-source fusion enhanced signal flow is constructed, and multi-physical field features are extracted; based on a coupling mechanism of an electromagnetic-thermal field and a mechanical-electric field, generating a fault type label and a space coordinate; executing targeted impedance correction for different fault types, establishing a dynamic topology network, and inputting a time-space diagram neural network to output a preliminary positioning result; and multi-source verification is carried out by further fusing salinity dielectric, a harmonic thermal field, a vibration electric field and stress topological information, a high-confidence-coefficient fault positioning result is finally output, a closed-loop diagnosis mechanism is formed, and the fault recognition accuracy and the system adaptability under complex working conditions are improved.
Owner:GUANGDONG JINPAI CABLE CO LTD

Wide-narrow integrated ad hoc network method

The invention discloses a wide-narrow integrated ad hoc network method, and belongs to the technical field of network communication. The method comprises the following steps: a network node generates dynamic topology information based on a narrow-band communication module periodic broadcast state beacon; according to the link quality and the node load in the topological information, coordinating the resource allocation of broadband and narrowband channels by adopting a load-aware time slot allocation algorithm; data are classified according to service types, broadband data are modulated and transmitted by adopting orthogonal frequency division multiplexing, and narrowband control instructions are modulated and transmitted by adopting differential phase shift keying; when the link quality is deteriorated, the link is switched, and the transmitting power and the frequency band parameters are dynamically adjusted; and adaptive switching and data distribution of wide and narrow band communication modes are realized. According to the method, the problems of difficulty in topology maintenance and low bandwidth and narrowband resource allocation efficiency in a high-dynamic network scene are solved, the network adaptability, the anti-interference capability and the resource utilization rate are remarkably improved through a dynamic cooperative bandwidth and narrowband communication mode, and meanwhile, the protocol switching overhead and energy consumption are reduced.
Owner:CHINA ROAD & BRIDGE

Power grid topology real-time reconstruction method and system based on distributed task scheduling

The invention discloses a power grid topology real-time reconstruction method and system based on distributed task scheduling, and relates to the technical field of power system intelligent scheduling, and the method comprises the steps: collecting power grid operation data in real time, detecting topology changes, and triggering a topology reconstruction task; according to a distributed data synchronization mechanism, updating and sharing power grid topology information and computing resource states in real time; and dynamically decomposing the topology reconstruction task through an adaptive task scheduler according to the power grid topology information and the computing resource state, and allocating the topology reconstruction task to distributed nodes for execution. According to the method, firstly, a solid foundation is provided for decision making by constructing a power grid topology model, and the feasibility and safety of a reconstruction scheme are ensured; and secondly, through distributed state estimation and data synchronization, the perception capability and the response speed of the system to the dynamic change of the network are greatly improved. And finally, through adaptive task scheduling and a multi-layer fault-tolerant mechanism, the execution efficiency, reliability and flexibility of the system are remarkably improved.
Owner:GUIZHOU POWER GRID CO LTD

Civil air defense construction concealed conduit leakage positioning method based on acoustic characteristics

The invention provides a civil air defense engineering concealed conduit leakage positioning method based on acoustic characteristics, and belongs to the technical field of civil air defense engineering. An acoustic signal acquisition network is constructed by deploying a high-sensitivity hydrophone array, and signals are preprocessed by using a time division multiple access technology and a pulse compression technology; and carrying out time-frequency analysis by applying wavelet transform to extract acoustic features. A time reversal mirror technology is introduced to identify direct propagation and multipath reflection signals, a fluid acoustic coupling propagation equation is constructed to analyze a leakage sound source mechanism, and pipe network topological information and a sound wave speed correction function are combined to compensate a measurement error. Wherein the deep learning pipe network acoustic propagation multi-modal model is fused with a pipeline structure encoder, an acoustic feature extractor and a position prediction decoder, and high-precision leakage positioning and degree evaluation in a complex environment are realized through a three-stage pre-training strategy; the technical problem that it is difficult to accurately locate the position of a leakage point in the complex pipe network environment of civil air defense engineering is solved.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Multi-mode large model interpretable diagnosis method and system for wind turbine generator

The invention discloses a multi-modal large model interpretable diagnosis method and system for a wind turbine generator, and relates to the technical field of wind turbine generator fault diagnosis, comprising the step of combining multi-modal data (vibration, time sequence, image and text) and topological information to realize fault diagnosis through cross-modal contrast learning and topological modeling. The method comprises the steps of multi-modal feature extraction, standardization and alignment, and feature fusion through topology embedding optimization and a cross-modal attention mechanism. In the fault diagnosis process, dynamic correction and path reliability evaluation are introduced by using a regular Agent and a topology consistent Agent, weighted fusion is performed on each modal feature and a topology structure, and finally an accurate fault type and a component positioning result are output. Through combination of knowledge retrieval and a multi-Agent decision model, the adaptability and precision of fault diagnosis are improved, especially in a complex environment, the fault mode of the wind turbine generator can be effectively identified, and the system reliability is improved.
Owner:BEIJING INST OF TECH

Game reinforcement learning-based reactive power dispatching method for electric vehicle participating in power distribution network

The invention discloses a game reinforcement learning-based reactive power dispatching method for an electric vehicle to participate in a power distribution network, and the method comprises the steps: collecting node voltage, line current, electric vehicle charging and discharging states and topological information, and constructing graph attention embedding; generating an initial reactive power regulation action in the multi-agent game reinforcement learning framework, and shaping and updating a strategy gradient through double rewards; the improved particle swarm is initialized according to the updating strategy gradient, and a self-adaptive inertia coefficient is set; iteratively searching according to the node voltage sensitivity, the line reactive margin and the expected convergence step number to obtain an optimized particle swarm; the particle speed is mapped to a main strategy network through online cooperative training, the inertia coefficient is synchronously adjusted, a cooperative optimization strategy is output, a reactive power dispatching instruction is generated, and the algorithm is updated in a closed-loop mode according to real-time feedback. According to the invention, rapid and cooperative reactive dynamic scheduling of an electric vehicle group is realized, and the voltage stability and the electric energy quality are remarkably improved.
Owner:HAINAN POWER GRID CO LTD ELECTRIC POWER RES INST

Power distribution network topology identification and state estimation method based on message passing neural network and online deep learning

The invention discloses a power distribution network topology identification and state estimation method based on a message passing neural network and online deep learning, and the method comprises the steps: training a neural network through historical measurement data, building a power distribution network topology identification model, combining the obtained topology information with corresponding power grid measurement data, and constructing a graph data set; taking the obtained graph data set as a training set to train a message passing neural network to obtain a power distribution network state estimation model; and finally, inputting the real-time measurement data into a state estimation model of the topology identification model to obtain a real-time state estimation result under the section. According to the method, the power distribution network topology can be accurately identified under limited measurement data, accurate state estimation is provided for a power distribution system, and technical support is provided for subsequent safety assessment and optimized operation.
Owner:HOHAI UNIV

Fault node positioning method and device, electronic equipment and nonvolatile storage medium

The invention discloses a fault node positioning method and device, electronic equipment and a nonvolatile storage medium. The method comprises the steps that network topology information is acquired, a system topological graph is generated according to the network topology information, the network topology information comprises information of all nodes in a network and relation information between the nodes, and the nodes comprise equipment nodes and cloud application nodes; acquiring monitoring index data; according to the system topological graph and the monitoring index data, a causal graph is generated, and the causal graph is used for representing influence relations among nodes in the network; and under the condition that abnormal nodes exist in the network, determining a root cause atlas according to the causal graph, and positioning fault nodes according to the root cause atlas. The technical problems of difficulty in fault node positioning and high operation and maintenance difficulty caused by the fact that an existing manual positioning mode is not suitable for increasingly complex networks are solved.
Owner:CHINA TELECOM CORP LTD

Intelligent optimization method and system for self-healing control of power grid

The invention relates to the technical field of power grid self-healing control, and discloses a power grid self-healing control intelligent optimization method and system, and the method comprises the steps: obtaining the topological structure information of a power grid, dividing n power grid toughness evaluation regions according to the topological structure information of the power grid, calculating a hierarchical toughness evaluation index, and forming a comprehensive toughness evaluation index according to the hierarchical toughness evaluation index; a self-healing control intelligent optimization model is constructed based on the comprehensive toughness evaluation indexes, a self-healing control optimal solution is obtained by solving the self-healing control intelligent optimization model, the self-healing control optimal solution is dynamically calibrated, and a self-healing control strategy is generated; according to the method, the topological structure, the historical fault data and the real-time operation state of the power grid are comprehensively considered, a layered evaluation and dynamic calibration combined mode is adopted, the intelligent level and adaptability of self-healing control of the intelligent micro-grid are improved, the toughness and recovery capacity of the micro-grid for coping with complex faults are enhanced, and safe, reliable and efficient operation of the power grid is guaranteed.
Owner:HUNAN XILAIKE ENERGY STORAGE TECH CO LTD

Bioactive peptide function prediction method based on multi-view multi-modal representation learning

ActiveCN119108018Aimprove performanceComprehensively reflect the physical structure characteristicsBiostatisticsSequence analysisTopology informationMulti-label classification
The invention discloses a bioactive peptide function prediction method based on multi-view multi-modal representation learning. The method comprises the following steps: extracting polypeptide amino acid sequence information by using a multi-scale expansion convolution CNN and a bidirectional LSTM; extracting structure and functional characteristics of polypeptide molecules by using an ESM-2 model; the molecular fingerprint information is processed through a convolutional CNN and a Mamba structure; topological information of the polypeptide molecular graph is extracted through a traditional convolutional CNN, and node features are processed through a graph convolutional neural network. All the multi-view features are finally fused into aggregated feature representation through feature fusion, and then multi-label classification is carried out through a full connection layer and by applying a sigmoid function. The extracted features are finally subjected to feature splicing and fusion to form a comprehensive polypeptide molecule feature representation so as to predict various biological activity features of the polypeptide. The multi-view and multi-modal feature integration method not only enhances the prediction ability of the model, but also improves the flexibility and accuracy of processing complex biological data.
Owner:YUNNAN UNIV

Large language model low-voltage distribution network topology sensing method based on cloud edge fusion

The invention discloses a large language model low-voltage power distribution network topology perception method based on cloud edge fusion, and relates to the technical field of power systems, and the method comprises the steps: collecting the data of a low-voltage power distribution network through an edge device, and analyzing a topological structure through a cloud model; standardizing the power distribution network data based on a large language model, and verifying topological information; and establishing an n-shaped model to realize direct-current and alternating-current power distribution network differential modeling, and based on the standardized power distribution network data, automatically generating a standard power distribution network model and generating power distribution network topology output. According to the method, low-voltage power distribution network data is collected through edge equipment, a topological structure is analyzed through a cloud model, multi-data source input is supported, topological information is verified, standardized processing and data quality control are achieved, direct-current and alternating-current power distribution network differential modeling is achieved by establishing an n-shaped model, and the modeling efficiency is improved. The calculation efficiency and precision of the model are improved, the application efficiency of topological data is improved through automatic output, and the multi-scene requirement is met.
Owner:GUIZHOU POWER GRID CO LTD

Online prediction method and device for node voltage of time-varying topology DC power distribution network

The invention discloses an online prediction method and device for node voltage of a time-varying topology direct-current power distribution network, and the method comprises the steps: building a simulation model based on the historical operation data of the direct-current power distribution network in combination with the real topology of a power grid, and generating a time sequence training data set containing voltage, power and line states through dynamic topology simulation; based on the training data set, constructing a dynamic space-time diagram neural network fused with topology dynamic change, and learning a voltage time sequence evolution rule in combination with a time sequence module; node power data and topology information are collected in real time by using a dynamic space-time diagram neural network, network topology input is dynamically updated, and a future short-time domain voltage predicted value is output; and for a power grid topology change scene, graph connection parameters associated with change nodes are updated, rapid fine adjustment of the model is realized, and stable prediction is carried out. According to the method, network topology information can be dynamically input under the condition that the topology of the direct-current power distribution network is changed, and rapid and stable prediction of the node voltage of the direct-current power distribution network under the time-varying topology is achieved.
Owner:ZHEJIANG UNIV

Routing reconstruction method for distributed model training in hybrid photoelectric network

The invention discloses a distributed model training-oriented routing reconstruction method in a hybrid photoelectric network, and belongs to the field of network communication optimization. The method comprises the following steps: constructing a collaborative routing model based on a current network flow state and topological information, and introducing an adaptive weight mechanism to dynamically adjust the priority of optical channels and electric packet forwarding, thereby realizing efficient collaborative utilization of multi-layer forwarding resources. According to the method, path reconstruction can be rapidly completed according to task characteristics and a network dynamic state, so that the system resource utilization rate is improved, and the maximum task completion time delay is reduced. Compared with a traditional fixed routing and semi-dynamic routing method, the method has the advantages that the average completion time delay and the maximum time delay are improved by more than 45% in the large-flow environment generated by large-scale model training, and the method has good expandability and real-time performance and is particularly suitable for burst flow intensive intelligent computing cluster scenes.
Owner:ZHEJIANG LAB

Power grid anomaly detection and diagnosis method based on artificial intelligence and topological data analysis

The invention discloses a power grid anomaly detection and diagnosis method based on artificial intelligence and topological data analysis. The method comprises the steps of S1, forming power operation data; s2, constructing a topological network model of the power grid based on the physical structure of the power grid; s3, using a first generator to generate abnormal data in the simulation power grid based on the power operation data; s4, optimization abnormal data generation is carried out; s5, embedding the power operation data and topological structure features of the power grid into the anomaly detection model through a graph convolutional network; s6, power grid anomaly detection parameters are dynamically adjusted through the adaptive learning model, so that the anomaly detection model is continuously optimized along with the change of the power grid operation condition; and S7, based on the topological information and abnormal data generated by the generative adversarial network, combining topological data analysis, and positioning a fault node or an abnormal line in the power grid. According to the invention, the accuracy of fault prediction and positioning is improved.
Owner:GUANGDONG UNIV OF SCI & TECH

Distribution network recording fault accurate positioning method based on big data analysis

The invention discloses a distribution network recording fault accurate positioning method based on big data analysis, and relates to the technical field of power distribution network fault positioning, and the method comprises the steps: deploying a fault indicator; setting a trigger threshold value, and triggering high-precision transient recording to generate recording data when the current or the electric field suddenly changes; carrying out time alignment on the recording data and synchronously acquired current intensity, electric field intensity, cable temperature and environment data, extracting transient characteristics and environment characteristics after wavelet transform denoising, and combining the transient characteristics with the environment characteristics to generate a comprehensive characteristic matrix; binding the comprehensive characteristic matrix and the line topology information, and uploading the information to a monitoring center through encryption communication; formulating a dynamic threshold association rule, and judging a fault type; the monitoring center matches the current transient waveform with a historical database and calculates a fault signal propagation time difference; and calculating a fault distance by combining line topology information, and fusing the fault signal propagation time difference and the fault distance to obtain a fault coordinate.
Owner:GUANGDONG SENXU GENERAL EQUIP TECH CO LTD

Cross-domain workflow scheduling system for dynamic resource arrangement

The invention discloses a cross-domain workflow scheduling system for dynamic resource arrangement, and the system comprises a resource abstraction subsystem which is used for collecting all resource platform information and network topology information, and constructing a resource directory and all adaptation layers; the task granularity division subsystem is used for receiving a target task, determining task characteristics of the target task, the cost of each task and an initial dependency graph, determining a target granularity according to the cost of each task, and optimizing the initial dependency graph to obtain a target dependency graph; the workflow arrangement subsystem is used for determining an initial execution plan according to the target dependency graph and the resource directory, determining a corresponding adaptation layer after each target execution platform receives target data, and submitting a corresponding subtask to each target execution platform; and the data preheating management subsystem is used for determining the transmission priority of the cross-platform sub-tasks and sending the target data to each target execution platform in combination with the network topology information, so that the effect of uniformly managing different platform resources is realized, and the stability of the cross-domain tasks is improved.
Owner:国家超级计算天津中心

TSN scheduling optimization method and device based on flow sensing autonomous learning, equipment and medium

The invention discloses a TSN scheduling optimization method and device based on flow sensing autonomous learning, equipment and a medium. The method comprises the following steps: deploying a lightweight flow detection module in a switch or a router, and after a controller receives a data request, automatically identifying a newly arrived unknown service flow by using the lightweight flow detection module, and judging whether the newly arrived unknown service flow is a periodic TT flow or an unpredictable burst flow; the controller performs classification management on the identified service flow types, collects topological information and flow requirements of the whole network and issues the topological information and the flow requirements to the terminal nodes through a network management interface; the controller constructs an intelligent queue scheduling task based on the collected network topology information and traffic demand and converts the task into a Markov decision process MDP, network resources, queue states and priorities are used as a state space, a scheduling strategy is used as an action space, a reward function is designed in combination with throughput and delay indexes, and an intelligent queue scheduling task is obtained. Driving a dynamic environment through real-time data and training a DRL model; an enhanced queue scheduling mechanism Pro-CQF is adopted, different priority labels are configured according to classified flow types, and then mixed flow scheduling is carried out; the controller periodically collects time delay, packet loss rate and end-to-end transmission delay indexes and feeds back the indexes to the DRL model, and a scheduling strategy is updated online. According to the method, the traffic sensing and scheduling efficiency is greatly improved in a network environment in which multiple service flows coexist and end-side equipment functions are different, and the reliability and the expandability of the TSN in industrial Internet of Things, edge computing and other high-real-time application scenes are remarkably enhanced.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Distribution network line dynamic optimization method based on multi-fault mode analysis

The invention provides a distribution network line dynamic optimization method based on multi-fault mode analysis, and relates to the technical field of distribution network management. Comprising the following steps: acquiring electrical parameters and real-time monitoring data of each fault section in a distribution network line, and acquiring a topological structure, a load demand and historical fault data of the distribution network line; carrying out load distribution optimization on the distribution network lines by adopting a dynamic load optimization algorithm according to the topological structure and the load demand of the distribution network lines in combination with the electrical parameters and the historical fault data, and adjusting the load distribution of each distribution network line based on optimization; and when a distribution network fault occurs, positioning a fault point and implementing a repair measure by combining the topological information of the distribution network and the electrical parameters of the fault section. According to the invention, by constructing the multi-fault mode analysis model, the fault occurrence position of the distribution network is detected in real time, and the fault point is quickly positioned; and in combination with an optimized repair strategy, the fault recovery time is effectively shortened, and the distribution network recovery efficiency is improved.
Owner:STATE GRID QINGHAI ELECTRIC POWER CO HAINAN POWER SUPPLY CO

Fabricated building management method and system based on BIM and cloud service

The fabricated building management method based on the BIM and the cloud service is characterized by comprising the following steps: step 1, constructing a heterogeneous data management model based on the cloud service; step 2, realizing multi-party collaborative fabricated building management based on the data management model; step 3, performing intelligent production and distribution optimization of the fabricated components based on the BIM; step 4, cross-platform lightweight model rendering and interaction based on the BIM, wherein the step 4 comprises the following steps: 4.1, constructing a heterogeneous BIM geometrical relationship model; 4.2, carrying out adaptive streaming transmission; 4.3, multiplexing and rendering the heterogeneous grids; 4.4, on the basis of vision field-first progressive rendering, an overall solution of multi-granularity grid simplification, self-adaptive rendering, vision field-first progressive rendering and multi-terminal response type interaction is provided, geometric topology information and semantic attribute information of the BIM model are brought into full play, the data scale is simplified to the maximum extent, and the rendering efficiency is optimized.
Owner:CHONGQING GUIDANCE TECH CO LTD

Time-sensitive network flow routing and scheduling method based on centralized control

ActiveCN119544805ARealize dynamic managementGuaranteed transmission reliabilityTransmissionPathPingGlobal topology
The invention belongs to the technical field of network transmission, and particularly relates to a time-sensitive network flow routing and scheduling method based on centralized control. Comprising the steps that CNC constructs network topology and generates global topology information; the CUC collects demand information of each to-be-transmitted traffic from each source node and divides traffic priorities according to the demand information; the CNC generates an optimal transmission path for each flow according to the global topological information; the CNC distributes a transmission time slot for each flow and dynamically adjusts the transmission time slot; carrying out synchronous distribution on the optimal transmission path and the transmission time slot, optimizing the transmission time slot and controlling the jitter of the transmission time slot; a scheduling table is generated according to the final distribution result of the paths and the time slots, and the CNC distributes the scheduling table to each network device; when the network state is changed, the scheduling table is dynamically adjusted to realize real-time routing and scheduling of the flow; according to the invention, the dynamic management of the flow priority is realized, the utilization rate of network resources is enhanced, and the service quality and high availability of transmission are ensured.
Owner:CHONGQING UNIV OF POSTS & TELECOMM

Satellite network traffic spatio-temporal characteristic prediction method based on multiple convolutional neural networks

The invention relates to a satellite network traffic spatio-temporal characteristic prediction method based on multiple convolutional neural networks, comprising the following steps: step 1, preprocessing input data including satellite network traffic data and satellite network topology information; 2, extracting spatial features, and processing a spatial dependency relationship of satellite network traffic through a GCN module; 3, time features are extracted, global features and local features of the satellite network traffic in the time dimension are extracted through a double-branch Transform encoder structure, the global branch processes long-term dependence through causal convolution and a global attention mechanism, and the local branch processes short-time mutation through dynamic convolution and a local attention mechanism; and 4, fusing the spatio-temporal features and output prediction, fusing the spatial features and the time features, and outputting a prediction result of the satellite network traffic through a linear layer. The accuracy and robustness of satellite network traffic prediction can be improved.
Owner:SHANGHAI LINGHENG INFORMATION TECH CO LTD +2

Vulnerability management based on network infrastructure security context

Provided herein are techniques to facilitate vulnerability management for one or more endpoint devices of a network based on network infrastructure security context. In one example, a computer-implemented method may include determining a base vulnerability score for a particular vulnerability that is detected for an endpoint device of an enterprise network; determining topology information for the endpoint device within the enterprise network; translating the particular vulnerability to triggering information; performing a comparison between the security policies for the one or more network security mechanisms of network security infrastructure and the triggering information to determine whether the endpoint device is protected from the particular vulnerability being triggered for the endpoint device; and generating an updated vulnerability score for the particular vulnerability by adjusting the base vulnerability score based on whether the endpoint device is protected from the particular vulnerability being triggered for the endpoint device.
Owner:CISCO TECHNOLOGY INC

Distribution agent ad hoc network method and system based on dynamic node cooperation

The invention provides a distribution agent ad hoc network method and system based on dynamic node collaboration, and the method comprises the steps: firstly obtaining a network state data set of all distribution nodes in a target network region, including real-time communication load, link stability and resource occupation characteristics, generating dynamic collaboration topology information based on the network state data set; comprising a node cooperation relation topological graph and a communication path weight table, a distribution agent strategy set is generated according to dynamic cooperation topological information, path optimization processing is carried out on a target distribution task according to an initial path distribution strategy, a dynamic load adjustment rule and a path switching trigger condition, and an optimized distribution path set is obtained; and deploying to the corresponding distribution node to execute dynamic cooperative distribution, and updating the network state data set according to the distribution real-time feedback data, so that the distribution efficiency and reliability can be improved.
Owner:THE FIFTH RES INST OF TELECOMM SCI & TECH CO LTD

Transient wave recording fault intelligent judgment method combining waveform matching and cloud edge cooperation

The invention provides a transient recording fault intelligent judgment method combining waveform matching and cloud edge cooperation, and relates to the technical field of fault diagnosis. Comprising the following steps: collecting global topological information and fault judgment reference parameters of a master station synchronous power system, and outputting initial transient recording data; carrying out preprocessing and feature extraction on the initial transient recording data, realizing edge side layered fault detection by adopting an improved waveform matching algorithm, and outputting multi-layer fault information; constructing a global fault judgment model, updating the global fault judgment model through the hierarchical model, and optimizing the fault judgment model; multi-level fault information is input into the optimized fault judgment model for accurate fault judgment, and graded response measures are taken for real-time judgment results with different confidence degrees; according to the invention, through deep fusion and system-level optimization of multiple technical streams, a transient recording fault intelligent judgment system integrating real-time performance and accuracy is created.
Owner:ZHUHAI GANXING AUTOMATION EQUIP CO LTD

Compound target interaction prediction method and system

The invention relates to the technical field of pharmacology and artificial intelligence, and provides a compound-target interaction prediction method and system, and the method comprises the steps: constructing a knowledge graph containing compounds, target entries and disease entities, and the correlation of the compounds, the target entries and the disease entities; inputting the knowledge graph into a multi-modal feature extraction model, and extracting topological information and internal semantic information in the knowledge graph; wherein the multi-modal feature extraction model comprises an ICD2Vec layer, a graph Transformer, a gene ontology embedding layer and an attention mechanism-based graph neural network, and the ICD2Vec layer, the graph Transformer, the gene ontology embedding layer and the attention mechanism-based graph neural network are respectively used for extracting disease semantic features, compound semantic features, protein target semantic features and topological features of a knowledge graph; performing knowledge fusion on the extracted semantic features and topological features of the knowledge graph through a feature fusion module, and obtaining a compound-target prediction probability matrix through a knowledge graph embedding method; and according to the compound-target prediction probability, performing descending sorting on the input compound-target interaction, and outputting a target recommendation list.
Owner:SUN YAT SEN UNIV

Multi-branch power distribution network double-end traveling wave fault positioning method and system

The invention relates to a multi-branch power distribution network double-end traveling wave fault positioning method and system, and the method comprises the steps: deploying a plurality of measurement points based on the head and tail ends of a radial power distribution network and branch terminals, collecting topological information, and calculating the linear mode wave velocity; using the three-phase voltage data after the fault to extract traveling wave line mode and zero mode components through modulus decoupling; a line mode component with the strongest global mutation is selected as a reference, and a wave head time sequence table is generated through wavelet decomposition and mutation detection; and correcting the zero-mode wave velocity by combining the topology, the time sequence table and the line-mode wave velocity, and determining a fault interval and outputting a fault position after compensation and correction by using the line-mode and zero-mode wave head time difference. According to the invention, through a wave head time sequence analysis and time difference compensation mechanism based on cooperation of multiple measuring points, positioning errors caused by clock asynchronization and parameter disturbance are effectively overcome, accurate distance measurement which is not influenced by clock errors is realized, and the distance measurement precision is significantly improved; and meanwhile, the point distribution requirement is simplified, accurate judgment and positioning of a fault interval can be realized only by a branch single measuring point, and high economy and deployment flexibility are both achieved.
Owner:WUHAN INST OF TECH

Power distribution network fault recovery method and device, storage medium and computer equipment

The invention provides a power distribution network fault recovery method and device, a storage medium and computer equipment. The method comprises the steps of obtaining operation state data of a power distribution network; determining a fault detection result according to the operation state data in combination with a neural network algorithm and digital twinborn simulation; based on the fault detection result, after a fault area is determined, an isolation measure corresponding to the fault area is applied; and based on the topological information of the power distribution network, calculating a load transfer path, and according to the load transfer path, carrying out load transfer by adopting a flexible interconnection system and a household energy management system so as to recover power supply of a fault area. Therefore, cooperative scheduling of the power distribution network level flexible interconnection system and the user side household energy system is realized, the self-healing capability and the operation efficiency of the power distribution network are effectively improved, and the technical effects of rapid fault isolation and power supply recovery are achieved.
Owner:FOSHAN POWER SUPPLY BUREAU GUANGDONG POWER GRID