Different-frequency-band load balancing method and device, electronic equipment and storage medium
By determining the signal strength and communication load level of terminal equipment in the wireless communication network, setting the inter-frequency switching threshold, and triggering cell switching or reselection, the problem of uneven load in the D/F band is solved and the load balancing of the communication network is improved. and switching efficiency.
Patent Information
- Application Number
- CN202410315379.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-03-19
AI Technical Summary
In wireless communication networks, the cell load in the D/F frequency band is uneven and the handover reselection efficiency is low. The existing optimization strategy relies too much on expert experience, resulting in the inability to quickly achieve the balancing effect.
By determining the signal strength and communication load level of the first cell and the second cell related to the terminal equipment, setting the inter-frequency switching threshold according to the relationship between signal strength and load level, triggering the terminal equipment to perform cell switching or reselection to achieve load balanced.
It achieves efficient cell load balancing, reduces reliance on expert experience, and improves the efficiency and accuracy of handover and reselection.
Smart Images

Figure CN118804104A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the field of communication technology, and in particular to a method, device, electronic device and storage medium for cross-frequency band load balancing. Background Art
[0002] In wireless communication networks, F-band is an effective supplement to D-band signals, providing wider coverage and lower priority. The fourth generation mobile communication technology (4G) base station signal switching and reselection are mostly due to signal attenuation, load imbalance, improper mobility management, network congestion, and equipment failure. To solve these problems, it is necessary to comprehensively consider multiple factors, such as equipment performance, network topology, user distribution, etc., and formulate reasonable cell switching and reselection strategies to improve the continuity and quality of communication.
[0003] In the related technology, the configuration thresholds of cell switching and cell reselection adopt the unified specifications of the provincial company. However, due to the randomness of user distribution areas, the unified strategy cannot be applied to complex wireless environments, resulting in uneven loads in the cells corresponding to the D / F frequency bands. In addition, daily D / F switching and reselection parameter configurations rely too much on expert experience, but the skill levels of existing optimization personnel vary, which may lead to low efficiency of cell switching and reselection and failure to quickly achieve a balanced effect. Summary of the invention
[0004] The present disclosure proposes a method, device, electronic device, storage medium and computer program product for cross-frequency band load balancing, aiming to solve the technical problems in the related technologies at least to a certain extent.
[0005] The first aspect of the present disclosure proposes an inter-frequency band load balancing method, including: determining a first cell and a second cell related to a terminal device, wherein the first cell uses a first frequency band signal and the second cell uses a second frequency band signal; determining a first signal strength of the first frequency band signal, and a second signal strength of the second frequency band signal; determining a first communication load degree corresponding to the first cell, and a second communication load degree corresponding to the second cell; determining an inter-frequency switching threshold based on a size relationship between the first communication load degree and the second communication load degree, the first frequency band signal, and the second frequency band signal; triggering the terminal device to perform cell switching or cell reselection based on the size relationship, the inter-frequency switching threshold, the first signal strength, and the second signal strength.
[0006] The second aspect of the present disclosure proposes an inter-frequency band load balancing device, including: a first determination module, used to determine a first cell and a second cell related to a terminal device, wherein the first cell uses a first frequency band signal and the second cell uses a second frequency band signal; a second determination module, used to determine a first signal strength of the first frequency band signal, and a second signal strength of the second frequency band signal; a third determination module, used to determine a first communication load degree corresponding to the first cell, and a second communication load degree corresponding to the second cell; a fourth determination module, used to determine an inter-frequency switching threshold according to a size relationship between the first communication load degree and the second communication load degree, the first frequency band signal and the second frequency band signal; a trigger module, used to trigger the terminal device to perform cell switching or cell reselection according to the size relationship, the inter-frequency switching threshold, the first signal strength and the second signal strength.
[0007] The third aspect of the present disclosure proposes an electronic device, comprising: a processor; a memory for storing instructions executable by the processor; wherein the processor is configured to execute instructions to implement a method for load balancing in different frequency bands.
[0008] The fourth aspect of the present disclosure provides a computer-readable storage medium. When instructions in the computer-readable storage medium are executed by a processor of an electronic device, the electronic device can perform a cross-frequency band load balancing method.
[0009] The fifth aspect of the present disclosure provides a computer program product, including a computer program, characterized in that the computer program is executed by a processor using a cross-frequency band load balancing method.
[0010] The inter-frequency band load balancing method, device, electronic device, storage medium and computer program product proposed in this embodiment have at least the following beneficial effects: determining a first cell and a second cell related to a terminal device, wherein the first cell uses a first frequency band signal and the second cell uses a second frequency band signal, then determining a first signal strength of the first frequency band signal and a second signal strength of the second frequency band signal, then determining a first communication load degree corresponding to the first cell and a second communication load degree corresponding to the second cell, then determining an inter-frequency switching threshold according to the size relationship between the first communication load degree and the second communication load degree, the first frequency band signal and the second frequency band signal, then triggering the terminal device to perform cell switching or cell reselection according to the size relationship, the inter-frequency switching threshold, the first signal strength and the second signal strength, thereby efficiently and accurately determining the inter-frequency switching threshold corresponding to the balance, so that the cell load balancing can be achieved based on the inter-frequency switching threshold. Furthermore, the technical problem that the configuration of the inter-frequency switching and reselection threshold in the prior art is overly dependent on expert experience, inefficient and unable to quickly achieve a balancing effect is solved.
[0011] Additional aspects and advantages of the present disclosure will be given in part in the following description and in part will be obvious from the following description or learned through practice of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] The above and / or additional aspects and advantages of the present disclosure will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0013] Figure 1 is a flow chart of a method for load balancing in different frequency bands according to the first embodiment of the present disclosure;
[0014] Figure 2 is a flow chart of a method for load balancing in different frequency bands according to the second embodiment of the present disclosure;
[0015] Figure 3 is a flow chart of a method for load balancing in different frequency bands according to the third embodiment of the present disclosure;
[0016] Figure 4 is a block diagram of a load balancing device in different frequency bands according to the present disclosure;
[0017] Figure 5 A block diagram of an exemplary electronic device suitable for implementing embodiments of the present disclosure is shown. DETAILED DESCRIPTION
[0018] Embodiments of the present disclosure are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present disclosure, and are not to be construed as limitations of the present disclosure. On the contrary, the embodiments of the present disclosure include all changes, modifications, and equivalents that fall within the spirit and connotation of the appended claims.
[0019] It should be noted that the executor of the inter-band load balancing method of this embodiment can be an inter-band load balancing device, which can be implemented by software and / or hardware. The device can be configured in an electronic device, and the electronic device can include but is not limited to a terminal, a server, etc.
[0020] It should be noted that the process of obtaining, storing, using, and processing information in the disclosed technical solution complies with the relevant provisions of national laws and regulations and does not violate public order and good morals.
[0021] Figure 1 is a flow chart of a method for load balancing in different frequency bands according to the first embodiment of the present disclosure, such as Figure 1 As shown, the method includes:
[0022] S101: Determine a first cell and a second cell related to a terminal device, wherein the first cell uses a first frequency band signal and the second cell uses a second frequency band signal.
[0023] The first cell related to the terminal device may be a service cell of the terminal device or an adjacent cell of the service cell, and there is no limitation on this.
[0024] The second cell related to the terminal device may be a service cell of the terminal device or an adjacent cell of the service cell, and there is no limitation on this.
[0025] Among them, the first cell uses the first frequency band signal, the first frequency band signal can be, for example: F frequency band signal (1880-1920) HZ, the second cell uses the second frequency band signal, the second frequency band signal can be, for example: D frequency band signal (2570-2620), the D frequency band and the F frequency band mainly cover outdoor, among which the D frequency band mainly functions to absorb business traffic and has a higher priority; the F frequency band, as an effective supplement to the D frequency band signal, provides a wider coverage range and has a lower priority.
[0026] S102: Determine a first signal strength of a first frequency band signal and a second signal strength of a second frequency band signal.
[0027] The first signal strength of the first frequency band signal refers to the reference signal received power (RSRP) of the first frequency band signal, and the second signal strength of the second frequency band signal refers to the reference signal received power (RSRP) of the second frequency band signal.
[0028] In the disclosed embodiment, the first signal strength of the first frequency band signal and the second signal strength of the second frequency band signal are determined, which may be the measurement report data (Measurement Report Original, MRO) data of the first cell and the second cell, and the MRO data mainly comes from the terminal and the base station, as well as the measurement statistics calculated and generated in the process of wireless resource management. The original measurement data is directly reported to the Operation and Maintenance Center-Radio (OMC-R) for storage in the form of sample data, and finally an MRO file is generated, and each sampling point mainly includes the reference signal received power, reference signal received quality, time advance, base station received interference power, uplink packet loss rate, downlink packet loss rate, etc., and then RSRP is determined from the MRO data corresponding to the first cell as the first signal strength, and RSRP is determined from the MRO data corresponding to the second cell as the second signal strength.
[0029] S103: Determine a first communication load level corresponding to the first cell and a second communication load level corresponding to the second cell.
[0030] When the cell utilization rate, number of users, and flow rate exceed the defined relevant thresholds, it is considered that the communication load of the cell is high (high load).
[0031] In the disclosed embodiment, the total uplink and downlink traffic, the number of successful establishment of Evolved Radio Access Bearer (E-RAB), the number of radio resource control (RRC) with data transmission, the uplink utilization rate PUSCH, the downlink utilization rate PDSCH, the downlink utilization rate PDCCH, the uplink traffic (GB), the downlink traffic (GB), the standard, the bandwidth, etc. can be combined to determine the corresponding communication load degree of the cell, that is, the high load definition of different standards and bandwidths is shown in the following table:
[0032] Table 1: Standard = Frequency Division Duplex (FDD) FDD1800, and bandwidth = 20M The high load scenario is defined as follows:
[0033]
[0034] Table 2: Standard = FDD1800, and bandwidth = 15M scenario high load definition is as follows:
[0035]
[0036] Table 3: Standard = FDD900, and bandwidth = 10M scenario high load definition is as follows:
[0037]
[0038] Table 4: Standard = FDD900, and bandwidth = 5M scenario high load definition is as follows:
[0039]
[0040]
[0041] Table 5: Standard = TDD, and bandwidth = 20M scenario high load definition is as follows:
[0042]
[0043] Table 6: Standard = TDD, and bandwidth = 15M scenario high load definition is as follows:
[0044]
[0045] Table 7: The high load definition for the scenario with standard = TDD and bandwidth = 10M is as follows:
[0046]
[0047] In the embodiments of the present disclosure, the utilization rate, standard, bandwidth, number of users, flow rate and other data of the first cell and the second cell may be determined respectively, and then the aforementioned data may be combined to query from the above Tables 1 to 7 to obtain the communication load level corresponding to the cell. Then, the first communication load level of the first cell and the second communication load level of the second cell may be combined to trigger the execution of subsequent cross-frequency band load balancing methods. For details, please refer to the subsequent embodiments.
[0048] S104: Determine an inter-frequency switching threshold according to a magnitude relationship between the first communication load degree and the second communication load degree, the first frequency band signal, and the second frequency band signal.
[0049] Among them, the inter-frequency switching threshold can be used to assist in determining the cell switching threshold and cell reselection threshold of the terminal equipment, and there is no restriction on this.
[0050] After determining the first communication load level corresponding to the first cell and the second communication load level corresponding to the second cell, the embodiment of the present disclosure can determine the inter-frequency switching threshold based on the size relationship between the first communication load level and the second communication load level, the first frequency band signal and the second frequency band signal.
[0051] Optionally, in some embodiments, the inter-frequency switching threshold is determined based on the size relationship between the first communication load degree and the second communication load degree, the first frequency band signal and the second frequency band signal. The total number of sampling points, the number of first carriers corresponding to the cell covered by the first frequency band signal and the number of second carriers corresponding to the cell covered by the second frequency band signal are determined, and then when the first communication load degree is higher than the second communication load degree, the first formula is used to process the total number of sampling points, the number of first carriers and the number of second carriers to obtain the first sampling point number required by the first frequency band signal; when the first communication load degree is lower than the second communication load degree, the second formula is used to process the total number of sampling points, the number of first carriers and the number of second carriers to determine the second sampling point number required by the second frequency band signal, and the inter-frequency switching threshold is determined based on the first sampling point number or the second sampling point number.
[0052] In the disclosed embodiment, in order to balance the D+F scenario, combined with MRO sampling, the high-frequency load points account for 40% of the sampling, and the low-frequency load points account for 60% of the sampling, the starting point of the D / F switching and the A5-related threshold are output to achieve cell load balancing.
[0053] That is, in the embodiment of the present disclosure, when the first communication load level of the first frequency band signal F is higher than the second communication load level, the first number of sampling points required for the frequency band F may be determined based on the first formula.
[0054] Optionally, in some embodiments, the first formula is:
[0055] The number of first sampling points=(40% / (60%*the number of second carriers+the number of first carriers*40%)*the total number of sampling points)*the number of first carriers.
[0056] That is, in the embodiment of the present disclosure, when the second communication load level of the second frequency band signal is higher than the first communication load level, the second number of sampling points required for the D frequency band may be determined based on the second formula.
[0057] Optionally, in some embodiments, the second formula is:
[0058] The number of first sampling points=(40% / (60%*the number of first carriers+the number of second carriers*40%)*the total number of sampling points)*the number of second carriers.
[0059] Optionally, in some embodiments, the inter-frequency switching threshold is determined based on the first number of sampling points or the second number of sampling points. It may be that when the first communication load level is higher than the second communication load level, when the signal strength value corresponding to the first frequency band signal is less than -100dBm, the number of sampling points corresponding to the signal strength value is accumulated to obtain the first number, and then a first difference between the first number of sampling points and the first number is determined; when the signal strength value corresponding to the second frequency band signal is less than -108dBm, the number of sampling points corresponding to the signal strength value is accumulated to obtain the second number; determine the second difference between the first difference and the second number; take -47dBm as the starting point, from the multiple signal strength values corresponding to the first frequency band signal, determine the signal strength value where the number of sampling points is greater than the second difference, and use the signal value where the number of sampling points is greater than the second difference as the inter-frequency switching threshold.
[0060] That is to say, in the embodiment of the present disclosure, in the F high load scenario, the inter-frequency switching threshold = selecting the first value of the RSRP interval corresponding to (the first sampling point number - the number of sampling points reserved for F (the sampling point of the F band is lower than -100dBm) - the number of sampling points for switching to F from the weak field of D (the sampling point of the D band is lower than -108dBm)) on the sampling points summarized in the F band starting from -47dBm.
[0061] Optionally, in some embodiments, the inter-frequency switching threshold is determined based on the first number of sampling points or the second number of sampling points. When the first communication load level is lower than the second communication load level, the signal strength value in which the number of sampling points is greater than the second number of sampling points is determined from multiple signal strength values corresponding to the second frequency band signal starting from -47dBm, and the signal value in which the number of sampling points is greater than the second number of sampling points is used as the inter-frequency switching threshold.
[0062] That is to say, in the embodiment of the present disclosure, in the D high load scenario, the inter-frequency switching threshold = the first value of the RSRP interval value corresponding to the sampling points summarized in the D frequency band starting from -47dBm that satisfies (is greater than) the second sampling point number.
[0063] S105: Triggering the terminal device to perform cell switching or cell reselection according to the size relationship, the inter-frequency switching threshold, the first signal strength and the second signal strength.
[0064] In the disclosed embodiment, after determining the inter-frequency switching threshold based on the size relationship between the first communication load degree and the second communication load degree, the first frequency band signal and the second frequency band signal, the terminal device can be triggered to perform cell switching or cell reselection based on the size relationship, the inter-frequency switching threshold, the first signal strength and the second signal strength, thereby achieving cell load balancing and improving cell communication effects.
[0065] In some embodiments, based on the size relationship, the inter-frequency switching threshold, the first signal strength and the second signal strength, the terminal device is triggered to perform cell switching or cell reselection. It can be that when the first communication load is higher than the second communication load and the first signal strength and the second signal strength meet the inter-frequency switching threshold, the terminal device's service cell is triggered to be switched from the first cell to the second cell or reselected. Alternatively, when the first communication load is lower than the second communication load and the first signal strength and the second signal strength meet the inter-frequency switching threshold, the terminal device's service cell is triggered to be switched from the second cell to the first cell or reselected.
[0066] In the embodiment of the present disclosure, by determining a first cell and a second cell related to a terminal device, wherein the first cell uses a first frequency band signal and the second cell uses a second frequency band signal, then determining a first signal strength of the first frequency band signal and a second signal strength of the second frequency band signal, then determining a first communication load degree corresponding to the first cell and a second communication load degree corresponding to the second cell, then determining an inter-frequency switching threshold based on a size relationship between the first communication load degree and the second communication load degree, the first frequency band signal and the second frequency band signal, then triggering the terminal device to perform cell switching or cell reselection based on the size relationship, the inter-frequency switching threshold, the first signal strength and the second signal strength, thereby being able to efficiently and accurately determine the inter-frequency switching threshold corresponding to achieving balance, thereby being able to achieve cell load balancing based on the inter-frequency switching threshold.
[0067] Figure 2 is a flow chart of a method for load balancing in different frequency bands according to the second embodiment of the present disclosure, such as Figure 2 As shown, the method includes:
[0068] S201: Determine a first cell and a second cell related to a terminal device, wherein the first cell uses a first frequency band signal and the second cell uses a second frequency band signal.
[0069] S202: Determine a first signal strength of a first frequency band signal and a second signal strength of a second frequency band signal.
[0070] S203: Determine a first communication load level corresponding to the first cell and a second communication load level corresponding to the second cell.
[0071] S204: Determine an inter-frequency switching threshold according to the magnitude relationship between the first communication load degree and the second communication load degree, the first frequency band signal, and the second frequency band signal.
[0072] The specific description of S201 - S204 can be found in the above embodiment, which will not be repeated here.
[0073] S205: If the first communication load level is higher than the second communication load level, and the first signal strength is greater than the inter-frequency switching threshold, and the second signal strength is less than the first threshold, triggering the terminal device's service cell to be switched from the first cell to the second cell.
[0074] In the disclosed embodiment, when the first communication load level is higher than the second communication load level, due to the high load of F, some sampling points of F need to be switched to D, so the starting measurement and decision threshold of F need to be adjusted to make it easier for F to switch to D, and the switching sampling interval is mainly concentrated between the time when F starts to measure and when D is higher than -105dBm, to ensure that the quality of users switched to D is better, and the sampling of <-105dBm is reserved for F. Because the load of D is relatively small, the switching event of D needs to be postponed to ensure that the sampling points of D higher than -108dBm are not switched to F (better quality area), and the sampling points higher than -108dBm are reserved for D, and the area lower than -108dBm is switched to F (deep coverage area).
[0075] The first threshold may be, for example, -105 dBm, which is not limited.
[0076] Therefore, when the first communication load level is higher than the second communication load level, the corresponding thresholds involved in switching from the first cell to the second cell can be determined: the A1 threshold of F is set to Q+6dB, the starting A2 threshold of F is Q+3dB, the A5 switching threshold 1 is RSRP at QdB, and the A5 switching threshold 2 is set to -105dBm, and the threshold below -105dBm is reserved for F.
[0077] That is to say, in the embodiment of the present disclosure, when the first signal strength is greater than the inter-frequency switching threshold and the second signal strength is less than -105dBm, it can trigger the service cell of the terminal device to be switched from the first cell to the second cell.
[0078] S206: If the first communication load level is higher than the second communication load level, and the first signal strength is greater than the second threshold, and the second signal strength is less than the third threshold, triggering switching of the service cell of the terminal device from the second cell to the first cell.
[0079] The second threshold may be, for example, -108 dBm, and the third threshold may be, for example, -124 dBm, which are not limited.
[0080] Therefore, when the first communication load level is higher than the second communication load level, the corresponding thresholds involved in determining the switching of the second cell to the first cell are: A1 is set to -102dBm, A2 is set to -105dBm, A5 1 threshold is set to -108dBm, and the sampling points above -108 in the existing network are reserved for D, and A5 switching threshold 2 is set to the standard minimum value of -124dbm.
[0081] That is to say, in the embodiment of the present disclosure, when the first signal strength is greater than -108dBm and the second signal strength is less than -124dbm, it can trigger the service cell of the terminal device to be switched from the second cell to the first cell.
[0082] S207: If the first communication load level is lower than the second communication load level, and the first signal strength is greater than the first threshold, and the second signal strength is less than the inter-frequency switching threshold, triggering the terminal device to switch its service cell from the first cell to the second cell.
[0083] In the disclosed embodiment, since the load of F is relatively low, the existing sampling points of F are retained and not switched to D (all the sampling of F is retained for itself), so the switching threshold of A5 1 of F is set according to the minimum switching event of the provincial specification. Since the load of D is relatively high, in order to ensure the balance of D / F, some sampling points of D need to be switched to F, so the starting and decision thresholds of D need to be adjusted to make it easier for D to switch to F.
[0084] The first threshold may be, for example, -110 dBm, which is not limited.
[0085] Therefore, when the first communication load level is lower than the second communication load level, the corresponding thresholds involved in switching from the first cell to the second cell can be determined: A1 of D is set to Q+6db, A2 is set to Q+3db, A5 1 switching threshold Q, and A5 switching threshold 2 is set to the standard minimum value -124dbm.
[0086] That is to say, in the embodiment of the present disclosure, when the first communication load level is lower than the second communication load level, and the first signal strength is greater than -110dBm, and the second signal strength is less than the inter-frequency switching threshold Q, the service cell of the terminal device is triggered to switch from the first cell to the second cell.
[0087] S208: If the first communication load level is lower than the second communication load level, and the first signal strength is greater than the inter-frequency switching threshold, and the second signal strength is less than the third threshold, triggering the terminal device's service cell to be switched from the second cell to the first cell.
[0088] The third threshold may be, for example, -124 dbm, which is not limited.
[0089] Therefore, when the first communication load level is lower than the second communication load level, the corresponding thresholds involved in switching from the second cell to the first cell can be determined: A1 of D is set to Q+6db, A2 is set to Q+3db, A5 1 switching threshold Q, A5 switching threshold 2 is set to the standard minimum value -124dbm.
[0090] That is to say, in the embodiment of the present disclosure, when the first communication load level is lower than the second communication load level, and the first signal strength is greater than the inter-frequency switching threshold Q, and the second signal strength is less than -124dbm, it triggers the terminal device's service cell to be switched from the second cell to the first cell.
[0091] In the embodiment of the present disclosure, by determining a first cell and a second cell related to a terminal device, wherein the first cell uses a first frequency band signal and the second cell uses a second frequency band signal, then determining a first signal strength of the first frequency band signal and a second signal strength of the second frequency band signal, then determining a first communication load degree corresponding to the first cell and a second communication load degree corresponding to the second cell, and then determining an inter-frequency switching threshold based on a size relationship between the first communication load degree and the second communication load degree, the first frequency band signal and the second frequency band signal, and then, when the first communication load degree is higher than the second communication load degree, and the first signal strength is greater than the inter-frequency switching threshold, and the second signal strength is less than the first threshold, then triggering the terminal device's service cell to be switched from the first cell to the second cell, and at the first communication load degree, the service cell of the terminal device is switched from the first cell to the second cell. When the first communication load level is higher than the second communication load level, and the first signal strength is greater than the second threshold, and the second signal strength is less than the third threshold, the service cell of the terminal device is triggered to be switched from the second cell to the first cell. Then, when the first communication load level is lower than the second communication load level, and the first signal strength is greater than the first threshold, and the second signal strength is less than the inter-frequency switching threshold, the service cell of the terminal device is triggered to be switched from the first cell to the second cell. Then, when the first communication load level is lower than the second communication load level, and the first signal strength is greater than the inter-frequency switching threshold, and the second signal strength is less than the third threshold, the service cell of the terminal device is triggered to be switched from the second cell to the first cell. Thus, the cell switching timing can be accurately determined based on the inter-frequency switching threshold, thereby timely triggering the cell switching and achieving load balancing.
[0092] Figure 3 is a flow chart of a method for load balancing in different frequency bands according to the third embodiment of the present disclosure, such as Figure 3 As shown, the method includes:
[0093] S301: Determine a first cell and a second cell related to a terminal device, wherein the first cell uses a first frequency band signal and the second cell uses a second frequency band signal.
[0094] S302: Determine a first signal strength of a first frequency band signal and a second signal strength of a second frequency band signal.
[0095] S303: Determine a first communication load level corresponding to the first cell and a second communication load level corresponding to the second cell.
[0096] S304: Determine an inter-frequency switching threshold according to the magnitude relationship between the first communication load degree and the second communication load degree, the first frequency band signal, and the second frequency band signal.
[0097] The specific description of S301 - S304 can be found in the above embodiment, which will not be repeated here.
[0098] S305: If the first communication load level is higher than the second communication load level, and the second signal strength is greater than the first threshold, triggering reselection of the service cell of the terminal device from the first cell to the second cell.
[0099] The first threshold may be, for example, -105 dBm, which is not limited.
[0100] Therefore, in the embodiment of the present disclosure, when the first communication load level is higher than the second communication load level and the second signal strength is greater than -105dBm, it may be triggered to reselect the service cell of the terminal device from the first cell to the second cell.
[0101] S306: If the first communication load level is higher than the second communication load level, and a third difference between the first signal strength and the second signal strength is greater than a difference threshold, triggering reselection of the service cell of the terminal device from the second cell to the first cell.
[0102] The difference threshold may be, for example, 10 dBm, which is not limited.
[0103] That is to say, in the embodiment of the present disclosure, when the first communication load level is higher than the second communication load level and the third difference between the first signal strength and the second signal strength is greater than 10 10dBm, the service cell of the terminal device is triggered to be reselected from the second cell to the first cell.
[0104] S307: If the first communication load level is lower than the second communication load level, and the second signal strength is greater than the inter-frequency switching threshold, triggering reselection of the service cell of the terminal device from the first cell to the second cell.
[0105] That is to say, in the embodiment of the present disclosure, when the first communication load level is lower than the second communication load level and the second signal strength is greater than the inter-frequency switching threshold, it may trigger the reselection of the service cell of the terminal device from the first cell to the second cell.
[0106] S308: If the first communication load level is lower than the second communication load level, and a third difference between the first signal strength and the second signal strength is greater than a difference threshold, triggering reselection of the service cell of the terminal device from the second cell to the first cell.
[0107] The difference threshold may be, for example, 10 dBm, which is not limited.
[0108] That is to say, in the embodiment of the present disclosure, when the second communication load level is higher than the first communication load level and the fourth difference between the second signal strength and the first signal strength is greater than 10 10dBm, the service cell of the terminal device is triggered to be reselected from the first cell to the second cell.
[0109] In the embodiment of the present disclosure, a first cell and a second cell related to a terminal device are determined, wherein the first cell uses a first frequency band signal and the second cell uses a second frequency band signal, and then a first signal strength of the first frequency band signal and a second signal strength of the second frequency band signal are determined, and then a first communication load degree corresponding to the first cell and a second communication load degree corresponding to the second cell are determined, and then an inter-frequency switching threshold is determined according to a size relationship between the first communication load degree and the second communication load degree, the first frequency band signal and the second frequency band signal, and then when the first communication load degree is higher than the second communication load degree, and the second signal strength is greater than the first threshold value, triggering reselection of the service cell of the terminal device from the first cell to the second cell, and when the first communication load degree is higher than the second communication load degree, and the second signal strength is greater than the first threshold value, the terminal device is triggered to reselect its service cell from the first cell to the second cell, and when the first communication load degree is higher than the second communication load degree ... When the first communication load level is higher than the second communication load level and the third difference between the first signal strength and the second signal strength is greater than the difference threshold, it triggers the terminal device to reselect its service cell from the second cell to the first cell. When the first communication load level is lower than the second communication load level and the second signal strength is greater than the inter-frequency switching threshold, it triggers the terminal device to reselect its service cell from the first cell to the second cell. When the first communication load level is lower than the second communication load level and the third difference between the first signal strength and the second signal strength is greater than the difference threshold, it triggers the terminal device to reselect its service cell from the second cell to the first cell. Thus, the cell reselection timing can be accurately determined based on the inter-frequency switching threshold, thereby timely triggering the cell reselection, achieving load balancing, and further optimizing the network performance and stability.
[0110] Figure 4 is a block diagram of a load balancing device for different frequency bands according to the present disclosure, such as Figure 4 As shown, the inter-frequency band load balancing device 40 includes:
[0111] A first determination module 401 is used to determine a first cell and a second cell related to a terminal device, wherein the first cell uses a first frequency band signal and the second cell uses a second frequency band signal;
[0112] A second determination module 402, configured to determine a first signal strength of a first frequency band signal and a second signal strength of a second frequency band signal;
[0113] A third determination module 403, configured to determine a first communication load level corresponding to the first cell and a second communication load level corresponding to the second cell;
[0114] The fourth determination module 404 is used to determine the inter-frequency switching threshold according to the magnitude relationship between the first communication load degree and the second communication load degree, the first frequency band signal and the second frequency band signal;
[0115] The trigger module 405 is used to trigger the terminal device to perform cell switching or cell reselection according to the size relationship, the inter-frequency switching threshold, the first signal strength and the second signal strength.
[0116] In some embodiments of the present disclosure, the fourth determining module 404 is further configured to:
[0117] Determine the total number of sampling points, the number of first carriers corresponding to the cells covered by the first frequency band signal, and the number of second carriers corresponding to the cells covered by the second frequency band signal;
[0118] If the first communication load level is higher than the second communication load level, the first formula is used to process the total number of sampling points, the first number of carriers, and the second number of carriers to obtain the first number of sampling points required by the first frequency band signal;
[0119] If the first communication load level is lower than the second communication load level, the second formula is used to process the total number of sampling points, the first number of carriers and the second number of carriers to determine the second number of sampling points required by the second frequency band signal;
[0120] An inter-frequency switching threshold is determined according to the first sampling point quantity or the second sampling point quantity.
[0121] In some embodiments of the present disclosure, the fourth determining module 404 is further configured to:
[0122] If the first communication load level is higher than the second communication load level, when the signal strength value corresponding to the first frequency band signal is less than -100 dBm, the number of sampling points corresponding to the signal strength value is accumulated to obtain a first number;
[0123] determining a first difference between the first number of sampling points and the first number;
[0124] When the signal strength value corresponding to the second frequency band signal is less than -108 dBm, the number of sampling points corresponding to the signal strength value is accumulated to obtain a second number;
[0125] determining a second difference between the first difference and the second amount;
[0126] Taking -47dBm as the starting point, a signal strength value whose number of sampling points is greater than the second difference is determined from multiple signal strength values corresponding to the first frequency band signal, and the signal value whose number of sampling points is greater than the second difference is used as the inter-frequency switching threshold.
[0127] In some embodiments of the present disclosure, the fourth determining module 404 is further configured to:
[0128] If the first communication load level is lower than the second communication load level, the signal strength value whose number of sampling points is greater than the second sampling point number is determined from the multiple signal strength values corresponding to the second frequency band signal with -47dBm as the starting point, and the signal value whose number of sampling points is greater than the second sampling point number is used as the inter-frequency switching threshold.
[0129] In some embodiments of the present disclosure, the first formula is:
[0130] The number of first sampling points=(40% / (60%*the number of second carriers+the number of first carriers*40%)*the total number of sampling points)*the number of first carriers.
[0131] In some embodiments of the present disclosure, the second formula is:
[0132] The number of first sampling points=(40% / (60%*the number of first carriers+the number of second carriers*40%)*the total number of sampling points)*the number of second carriers.
[0133] In some embodiments of the present disclosure, the trigger module 405 is further configured to:
[0134] If the first communication load level is higher than the second communication load level, and the first signal strength is greater than the inter-frequency switching threshold, and the second signal strength is less than the first threshold, triggering the switching of the service cell of the terminal device from the first cell to the second cell;
[0135] If the first communication load level is higher than the second communication load level, and the first signal strength is greater than the second threshold, and the second signal strength is less than the third threshold, triggering switching of the serving cell of the terminal device from the second cell to the first cell;
[0136] If the first communication load level is lower than the second communication load level, and the first signal strength is greater than the first threshold, and the second signal strength is less than the inter-frequency switching threshold, triggering switching of the service cell of the terminal device from the first cell to the second cell;
[0137] If the first communication load level is lower than the second communication load level, and the first signal strength is greater than the inter-frequency switching threshold, and the second signal strength is less than the third threshold, it triggers the terminal device's service cell to be switched from the second cell to the first cell.
[0138] In some embodiments of the present disclosure, the trigger module 405 is further configured to:
[0139] If the first communication load level is higher than the second communication load level and the second signal strength is greater than the first threshold, triggering reselection of the serving cell of the terminal device from the first cell to the second cell;
[0140] If the first communication load level is higher than the second communication load level, and a third difference between the first signal strength and the second signal strength is greater than a difference threshold, triggering reselection of a serving cell of the terminal device from the second cell to the first cell;
[0141] If the first communication load level is lower than the second communication load level, and the second signal strength is greater than the inter-frequency switching threshold, triggering reselection of the service cell of the terminal device from the first cell to the second cell;
[0142] If the first communication load level is lower than the second communication load level and a third difference between the first signal strength and the second signal strength is greater than a difference threshold, reselection of the service cell of the terminal device from the second cell to the first cell is triggered.
[0143] In this embodiment, by determining the first cell and the second cell related to the terminal device, wherein the first cell uses the first frequency band signal and the second cell uses the second frequency band signal, then determining the first signal strength of the first frequency band signal and the second signal strength of the second frequency band signal, then determining the first communication load degree corresponding to the first cell and the second communication load degree corresponding to the second cell, and then determining the inter-frequency switching threshold based on the size relationship between the first communication load degree and the second communication load degree, the first frequency band signal and the second frequency band signal, and then triggering the terminal device to perform cell switching or cell reselection based on the size relationship, the inter-frequency switching threshold, the first signal strength and the second signal strength, thereby efficiently and accurately determining the inter-frequency switching threshold corresponding to the balance, thereby achieving cell load balancing based on the inter-frequency switching threshold.
[0144] According to an embodiment of the present disclosure, the present disclosure also provides an electronic device, a computer-readable storage medium, and a computer program product.
[0145] Figure 5 A block diagram of an exemplary electronic device suitable for implementing embodiments of the present disclosure is shown.
[0146] Figure 5 The electronic device 12 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.
[0147] like Figure 5 As shown, the electronic device 12 is in the form of a general purpose computing device. The components of the electronic device 12 may include, but are not limited to: one or more processors or processing units 16, a memory 28, and a bus 18 that connects various system components (including the memory 28 and the processing unit 16).
[0148] The bus 18 represents one or more of several types of bus structures, including a memory bus or memory controller, a peripheral bus, a graphics acceleration port, a processor or a local bus using any of a variety of bus structures. For example, these architectures include but are not limited to Industry Standard Architecture (ISA) bus, Micro Channel Architecture (MAC) bus, Enhanced ISA bus, Video Electronics Standards Association (VESA) local bus and Peripheral Component Interconnection (PCI) bus.
[0149] The electronic device 12 typically includes a variety of computer system readable media. These media can be any available media that can be accessed by the electronic device 12, including volatile and non-volatile media, removable and non-removable media.
[0150] The memory 28 may include computer system readable media in the form of volatile memory, such as random access memory (RAM) 30 and / or cache memory 32. The electronic device 12 may further include other removable / non-removable, volatile / non-volatile computer system storage media. By way of example only, the storage system 34 may be used to read and write non-removable, non-volatile magnetic media ( Figure 5 Not shown, often called a "hard drive").
[0151] although Figure 5 Not shown in the figure, a disk drive for reading and writing a removable non-volatile disk (e.g., a "floppy disk"), and an optical disk drive for reading and writing a removable non-volatile optical disk (e.g., a compact disc read only memory (hereinafter referred to as: CD-ROM), a digital versatile disc read only memory (hereinafter referred to as: DVD-ROM) or other optical media) may be provided. In these cases, each drive may be connected to the bus 18 via one or more data medium interfaces. The memory 28 may include at least one program product having a set (e.g., at least one) of program modules that are configured to perform the functions of the various embodiments of the present disclosure.
[0152] A program / utility 40 having a set (at least one) of program modules 42 may be stored, for example, in the memory 28, such program modules 42 including but not limited to an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment. The program modules 42 generally perform the functions and / or methods of the embodiments described in the present disclosure.
[0153] The electronic device 12 may also communicate with one or more external devices 14 (e.g., keyboard, pointing device, display 24, etc.), may also communicate with one or more devices that enable the human body to interact with the electronic device 12, and / or communicate with any device that enables the electronic device 12 to communicate with one or more other computing devices (e.g., network card, modem, etc.). Such communication may be performed through an input / output (I / O) interface 22. In addition, the electronic device 12 may also communicate with one or more networks (e.g., a local area network (LAN), a wide area network (WAN), and / or a public network, such as the Internet) through a network adapter 20. As shown, the network adapter 20 communicates with other modules of the electronic device 12 through a bus 18. It should be understood that, although not shown in the figure, other hardware and / or software modules may be used in conjunction with the electronic device 12, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.
[0154] The processing unit 16 executes various functional applications and parameter information determination by running the program stored in the memory 28, such as implementing the business data storage method mentioned in the above embodiment, or implementing the business data acquisition method mentioned in the above embodiment.
[0155] It should be noted that, in the description of the present disclosure, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of the present disclosure, unless otherwise specified, the meaning of "plurality" is two or more.
[0156] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present disclosure includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by those skilled in the art to which the embodiments of the present disclosure belong.
[0157] It should be understood that the various parts of the present disclosure can be implemented in hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented in software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented in hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0158] A person of ordinary skill in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0159] In addition, each functional unit in each embodiment of the present disclosure may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0160] The storage medium mentioned above can be a read-only memory, a magnetic disk or an optical disk, etc.
[0161] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present disclosure. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0162] Although the embodiments of the present disclosure have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present disclosure. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present disclosure.
Claims
1. A method for load balancing in different frequency bands, characterized in that: The method comprises: Determine a first cell and a second cell related to the terminal device, wherein the first cell uses a first frequency band signal and the second cell uses a second frequency band signal; Determine a first signal strength of the first frequency band signal and a second signal strength of the second frequency band signal; determining a first communication load level corresponding to the first cell and a second communication load level corresponding to the second cell; Determining an inter-frequency switching threshold according to a magnitude relationship between the first communication load degree and the second communication load degree, the first frequency band signal, and the second frequency band signal; According to the size relationship, the inter-frequency switching threshold, the first signal strength and the second signal strength, the terminal device is triggered to perform cell switching or cell reselection.
2. The method according to claim 1, characterized in that The determining the inter-frequency switching threshold according to the magnitude relationship between the first communication load degree and the second communication load degree, the first frequency band signal and the second frequency band signal includes: Determine the total number of sampling points, the number of first carriers corresponding to the cells covered by the first frequency band signal, and the number of second carriers corresponding to the cells covered by the second frequency band signal; If the first communication load level is higher than the second communication load level, processing the total number of sampling points, the first number of carriers, and the second number of carriers using a first formula to obtain a first number of sampling points required by the first frequency band signal; If the first communication load level is lower than the second communication load level, processing the total number of sampling points, the first number of carriers, and the second number of carriers using a second formula to determine the second number of sampling points required by the second frequency band signal; The inter-frequency switching threshold is determined according to the first number of sampling points or the second number of sampling points.
3. The method according to claim 2, characterized in that The determining the inter-frequency switching threshold according to the first number of sampling points or the second number of sampling points includes: If the first communication load level is higher than the second communication load level, when the signal strength value corresponding to the first frequency band signal is less than -100 dBm, the number of sampling points corresponding to the signal strength value is accumulated to obtain a first number; determining a first difference between the first number of sampling points and the first number; When the signal strength value corresponding to the second frequency band signal is less than -108 dBm, accumulating the number of sampling points corresponding to the signal strength value to obtain a second number; determining a second difference between the first difference and the second amount; From a plurality of signal strength values corresponding to the first frequency band signal starting from -47 dBm, a signal strength value having a number of sampling points greater than the second difference is determined, and the signal value having a number of sampling points greater than the second difference is used as the inter-frequency switching threshold.
4. The method according to claim 3, characterized in that The determining the inter-frequency switching threshold according to the first number of sampling points or the second number of sampling points includes: If the first communication load level is lower than the second communication load level, determine the signal strength value whose number of sampling points is greater than the second sampling point number from the multiple signal strength values corresponding to the second frequency band signal starting from -47dBm, and use the signal value whose number of sampling points is greater than the second sampling point number as the inter-frequency switching threshold.
5. The method according to claim 2, characterized in that The first formula is: The number of first sampling points=(40% / (60%*the number of second carriers+the number of first carriers*40%)*the total number of sampling points)*the number of first carriers.
6. The method according to claim 2, characterized in that The second formula is: The number of first sampling points=(40% / (60%*the number of first carriers+the number of second carriers*40%)*the total number of sampling points)*the number of second carriers.
7. The method according to any one of claims 1 to 6, characterized in that: The triggering the terminal device to perform cell switching according to the size relationship, the inter-frequency switching threshold, the first signal strength, and the second signal strength includes: If the first communication load level is higher than the second communication load level, and the first signal strength is greater than the inter-frequency switching threshold, and the second signal strength is less than the first threshold, triggering switching of the serving cell of the terminal device from the first cell to the second cell; If the first communication load level is higher than the second communication load level, and the first signal strength is greater than a second threshold, and the second signal strength is less than a third threshold, triggering switching of the serving cell of the terminal device from the second cell to the first cell; If the first communication load level is lower than the second communication load level, and the first signal strength is greater than a first threshold, and the second signal strength is less than the inter-frequency switching threshold, triggering switching of the serving cell of the terminal device from the first cell to the second cell; If the first communication load level is lower than the second communication load level, and the first signal strength is greater than the inter-frequency switching threshold, and the second signal strength is less than a third threshold, it triggers switching of the service cell of the terminal device from the second cell to the first cell.
8. The method according to any one of claims 1 to 6, characterized in that: Triggering the terminal device to perform cell reselection according to the size relationship, the inter-frequency switching threshold, the first signal strength, and the second signal strength, includes: If the first communication load level is higher than the second communication load level, and the second signal strength is greater than a first threshold, triggering reselection of the serving cell of the terminal device from the first cell to the second cell; If the first communication load level is higher than the second communication load level, and a third difference between the first signal strength and the second signal strength is greater than a difference threshold, triggering reselection of the serving cell of the terminal device from the second cell to the first cell; If the first communication load level is lower than the second communication load level, and the second signal strength is greater than the inter-frequency switching threshold, triggering reselection of the serving cell of the terminal device from the first cell to the second cell; If the first communication load level is lower than the second communication load level and a third difference between the first signal strength and the second signal strength is greater than the difference threshold, reselection of the service cell of the terminal device from the second cell to the first cell is triggered.
9. A load balancing device for different frequency bands, characterized in that: The device comprises: A first determination module, configured to determine a first cell and a second cell related to a terminal device, wherein the first cell uses a first frequency band signal and the second cell uses a second frequency band signal; A second determination module, configured to determine a first signal strength of the first frequency band signal and a second signal strength of the second frequency band signal; A third determination module, configured to determine a first communication load level corresponding to the first cell and a second communication load level corresponding to the second cell; A fourth determination module, configured to determine an inter-frequency switching threshold according to a magnitude relationship between the first communication load degree and the second communication load degree, the first frequency band signal, and the second frequency band signal; A trigger module is used to trigger the terminal device to perform cell switching or cell reselection according to the size relationship, the inter-frequency switching threshold, the first signal strength and the second signal strength.
10. An electronic device, characterized in that: include: processor; a memory for storing instructions executable by the processor; The processor is configured to execute the instructions to implement the method according to any one of claims 1 to 8.
11. A computer-readable storage medium, when instructions in the computer-readable storage medium are executed by a processor of an electronic device, the electronic device is enabled to execute the method according to any one of claims 1 to 8.
12. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 8 is implemented.
Citation Information
Patent Citations
Method, device and system for realizing load balancing
CN101801030A
Load equalizing method and device
CN105554818A
Method and device for determining pilot frequency load balancing threshold, equipment and medium
CN110876167A
Frequency converter, radio receiver
US20080233906A1
Terminal camping load balancing method and apparatus, electronic device, and storage medium
WO2023078042A1