Testing device and method for simulating grouting reinforcement of tunnel fault fracture zone

By using the rock box bearing frame, rock and soil filling box and stress loading system in the fault tunnel grouting simulation device to simulate grouting conditions at different depths and angles, the problem of deviation in grouting simulation results in the existing technology is solved and achieved More accurate tunnel stability analysis and determination of optimal grouting parameters.

CN118817482APending Publication Date: 2024-10-22SHIJIAZHUANG TIEDAO UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410955792.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

The existing fault tunnel grouting simulation device cannot accurately control the grouting pipe inclination angle, grouting range and engineering geological conditions, resulting in a large deviation between the simulation results and actual applications, and it is impossible to study the quantitative relationship between tunnel stability and various factors.

Method used

Provide a test device for simulating the grouting reinforcement of tunnel fault fracture zones, including a rock box load-bearing frame, a rock and soil filling box, a stress loading system, a universal grouting nozzle and a grouting system. The stress loading system simulates pressure at different depths. Record the inclination angle, grouting range and grouting volume of the universal grouting nozzle, and conduct multiple sets of comparative experiments to determine the optimal grouting parameters.

Benefits of technology

Through multi-directional loads and adjustable-angle universal grouting nozzles, the simulation results are more consistent with the real environment, and can determine the optimal grouting inclination and range, provide theoretical guidance for actual construction, and improve the stability and safety of grouting reinforcement. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118817482A_ABST
    Figure CN118817482A_ABST
Patent Text Reader

Abstract

The invention discloses a test device and method for simulating grouting reinforcement of a tunnel fault fracture zone. The test device comprises a rock box bearing frame; the rock-soil filling box is arranged in the rock box bearing frame; the stress loading system comprises a circumferential loading unit, a back loading unit and a loading control system; a mounting hole is formed in the front face of the rock-soil filling box, and the fixing ring is fixedly connected into the mounting hole; a discharge port of the universal grouting nozzle is provided with a grouting pipe, and the grouting pipe extends into the rock-soil filling box; and the grouting system comprises a grouting pump, and the discharging end of the grouting pump communicates with the universal grouting nozzle through a feeding pipe. By arranging the angle-adjustable universal grouting nozzle, the device can simulate grouting at different angles, so that the optimal grouting angle is found, and theoretical guidance is provided for actual construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tunnel engineering, in particular to a test device and method for simulating grouting reinforcement of a fault fracture zone in a tunnel. Background Art

[0002] Tunnel construction inevitably encounters fault fracture zones. Excavation disturbance near these zones can easily induce surrounding rock instability and water and mud inrush hazards, significantly increasing project difficulty and cost, extending construction time, and even causing casualties. Therefore, grouting reinforcement is often necessary when encountering fracture zones. Grouting fills voids, solidifies the surrounding soil, enhances the tunnel's overall stability, and reduces the risk of structural deformation and damage. Grouting increases soil density and strength, improving its bearing capacity and mitigating the effects of adverse geological conditions on the tunnel structure.

[0003] Existing fault tunnel grouting simulation devices are too simplistic in terms of tunnel depth, thickness, inclination, and grouting range. They are unable to precisely control these variables, nor can they simulate the inclination and grouting range during grouting. Consequently, they are unable to study the quantitative relationship between tunnel stability and these factors. The measured results deviate significantly from actual applications and are unrepresentative. Therefore, there is an urgent need to develop a test device that can comprehensively simulate the inclination of the grouting pipe, the grouting range, and engineering geological conditions. For these reasons, the present invention provides a test device and method for simulating grouting reinforcement in a tunnel fault fracture zone. Summary of the Invention

[0004] The purpose of the present invention is to provide a test device and method for simulating grouting reinforcement of a fault fracture zone in a tunnel, so as to solve the problems existing in the prior art.

[0005] To achieve the above-mentioned object, the present invention provides the following solution: The present invention provides a test device for simulating grouting reinforcement of a tunnel fault fracture zone, comprising:

[0006] Rock box bearing frame;

[0007] A rock-soil filling box, the rock-soil filling box being arranged in the rock-box bearing frame, with a gap being provided between an inner wall of the rock-box bearing frame and an outer wall of the rock-soil filling box;

[0008] A stress loading system, comprising a circumferential loading unit, a back loading unit, and a loading control system. The circumferential loading unit is disposed between the outer circumference of the geotechnical filling box and the inner circumference of the rock box supporting frame. The back loading unit is disposed between the outer back wall of the geotechnical filling box and the inner back wall of the rock box supporting frame.

[0009] A fixing ring, wherein a mounting hole is provided on the front of the rock and soil filling box, and the fixing ring is fixedly connected in the mounting hole;

[0010] Universal grouting nozzles, wherein the universal grouting nozzles are provided in a plurality of groups, and the plurality of universal grouting nozzles are respectively mounted on the fixing rings, and a grouting pipe is mounted on the discharge port of the universal grouting nozzle, and the grouting pipe extends into the rock and soil filling box;

[0011] A grouting system, the grouting system comprising a grouting pump, the discharge end of the grouting pump being connected to the universal grouting nozzle via a feeding pipe;

[0012] The loading control system is used to control the circumferential loading unit and the rear loading unit to provide loading force.

[0013] According to the test device for grouting reinforcement of simulated tunnel fault fracture zone provided by the present invention, the circumferential loading unit includes a lateral reaction wall fixedly connected to the inner circumference of the rock box bearing frame, and a plurality of circumferential loading hydraulic cylinders are arranged in an array on the lateral reaction wall. The circumferential loading hydraulic cylinders are vertically arranged between the lateral reaction wall, and the output end of the circumferential loading hydraulic cylinder abuts against the outer circumference of the rock and soil filling box.

[0014] According to the test device for simulating grouting reinforcement of a tunnel fault fracture zone provided by the present invention, the back-loading unit includes a back-reaction wall fixedly connected to the inner wall of the inner surface of the rock box bearing frame, and a plurality of back-loading hydraulic cylinders are arranged in an array on the back-reaction wall. The back-loading hydraulic cylinders are vertically arranged between the back-reaction wall, and the output end of the back-loading hydraulic cylinder abuts against the back of the rock and soil filling box.

[0015] According to the test device for grouting reinforcement of simulated tunnel fault fracture zone provided by the present invention, the universal grouting nozzle includes an outer connecting sleeve and an inner connecting sleeve, the outer connecting sleeve is fixedly sleeved on the outer wall of the inner connecting sleeve, the outer wall of the outer connecting sleeve is fixedly connected with a connecting protrusion, one end of the inner connecting sleeve is rotatably connected to a spherical connecting head, the spherical connecting head is fixedly connected to a nozzle head, the end of the inner connecting sleeve is threadedly connected to a positioning nut, the positioning nut and the spherical connecting head are limitedly engaged, the connecting protrusion and the fixing ring are detachably connected, and the grouting pipe is fixedly connected to one end of the nozzle head.

[0016] According to the test device for simulating grouting reinforcement of a tunnel fault fracture zone provided by the present invention, a plurality of grooves are circumferentially opened on the inner circumference of the fixing ring, the grooves are adapted to the shape of the connecting protrusions, the connecting protrusions are inserted into the grooves, and the connecting protrusions are fixed in the grooves by connecting pieces.

[0017] According to the test device for simulating grouting reinforcement of a tunnel fault fracture zone provided by the present invention, the connecting piece includes a fixing bolt, a through hole is opened on the side wall of the groove, the fixing bolt is passed through the through hole, and the fixing bolt passes through the connecting protrusion and is fixedly threaded and connected with a fixing nut.

[0018] According to the test device for simulating grouting reinforcement of a tunnel fault fracture zone provided by the present invention, scale lines are provided on the outer surface of the spherical connector.

[0019] According to the test device for grouting reinforcement of a simulated tunnel fault fracture zone provided by the present invention, a plurality of grouting holes are opened on the side wall of the grouting pipe along the axial direction.

[0020] A test method for simulating grouting reinforcement of a tunnel fault fracture zone comprises the following steps:

[0021] Step 1: Assemble the experimental device, determine the number and installation position of the universal grouting nozzles, determine the grouting angle of the universal grouting nozzles, and determine the loading stress value of the stress loading system;

[0022] Step 2: Apply a release agent to the inner surface of the geotechnical filling box in advance, fix the universal grouting nozzle on the fixing ring, adjust the angle of the universal grouting nozzle, and fill the geotechnical filling box with materials similar to the surrounding rock and the broken zone;

[0023] Step 3: The grouting pump injects the slurry into the universal grouting nozzle through the feeding pipe. The slurry enters the geotechnical filling box through the grouting pipe on the universal grouting nozzle. The circumferential loading unit and the back loading unit apply pressure to the geotechnical filling box in the circumferential direction and back direction respectively to simulate the pressure at different depths of the tunnel. The inclination angle of the universal grouting nozzle, grouting range, grouting volume and stress loading value are recorded in detail.

[0024] Step 4: After grouting is completed, the equipment is dismantled, the rock and soil grouting in the broken zone rock and soil filling box is demoulded, and the stability, tensile and compressive properties of the broken zone after grouting are tested;

[0025] Step 5: Change the number of universal grouting nozzles, the grouting angle, and the output stress value of the stress loading system, and repeat steps 2 to 4 to conduct multiple groups of comparative experiments;

[0026] Step six: Summarize the stability of the broken zone after grouting under different parameters and determine the optimal grouting inclination angle and grouting range parameters.

[0027] The present invention discloses the following technical effects:

[0028] When the present invention is working, first assemble the experimental device, determine the installation quantity and installation position of the universal grouting nozzle, determine the grouting angle of the universal grouting nozzle, and determine the loading stress value of the stress loading system; apply the release agent on the inner surface of the geotechnical filling box in advance, fix the universal grouting nozzle on the fixing ring, and fill the surrounding rock similar materials and the broken zone similar materials into the geotechnical filling box; the grouting pump injects the slurry into the universal grouting nozzle through the feeding pipe, and the slurry enters the geotechnical filling box through the grouting pipe on the universal grouting nozzle, and the circumferential loading unit and the back loading unit are respectively Apply pressure in the circumferential and back directions of the geotechnical filling box to simulate the pressure at different depths of the tunnel, and record in detail the inclination angle of the universal grouting nozzle, grouting range, grouting volume and stress loading value. After the grouting is completed, dismantle the equipment, demould the geotechnical grouting in the geotechnical filling box of the broken zone, and test the stability, tensile and compressive properties of the broken zone after grouting. Change the number of universal grouting nozzles, the grouting angle and the output stress value of the stress loading system to obtain the relevant values ​​repeatedly, summarize the stability of the broken zone after grouting under different parameters, and determine the optimal grouting inclination angle and grouting range parameters.

[0029] The present invention can provide a tunnel fault fracture zone deformation and destruction simulation device with loads applied in multiple directions through the setting of the stress loading system, so that the simulation results of the simulation device are more consistent with the real environment.

[0030] The present invention provides a universal grouting nozzle with adjustable angle, so that the device can simulate grouting at different angles, thereby finding the optimal grouting angle and providing theoretical guidance for actual construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0032] Figure 1 This is a schematic structural diagram of a test device for simulating grouting reinforcement of a tunnel fault fracture zone according to the present invention;

[0033] Figure 2 Schematic diagram of the matching relationship between the rock box bearing frame and the rock and soil filling box of the present invention;

[0034] Figure 3 This is a schematic structural diagram of the universal grouting nozzle of the present invention;

[0035] Figure 4 An exploded view of the universal grouting nozzle of the present invention;

[0036] Figure 5Schematic diagram of the matching relationship between the fixing ring and the universal grouting nozzle of the present invention;

[0037] Figure 6 It is a structural schematic diagram of the grouting pipe of the present invention.

[0038] Among them, 1. Rock box bearing frame; 2. Geotechnical filling box; 3. Fixing ring; 4. Universal grouting nozzle; 5. Grouting pump; 6. Lateral reaction wall; 7. Circumferential loading hydraulic cylinder; 8. Back reaction wall; 9. External connecting sleeve; 10. Internal connecting sleeve; 11. Connecting bump; 12. Spherical connector; 13. Nozzle head; 14. Positioning nut; 15. Fixing bolt; 16. Grouting hole; 17. Grouting pipe. DETAILED DESCRIPTION

[0039] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0040] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0041] Reference Figure 1-6 The present invention provides a test device for simulating grouting reinforcement of a tunnel fault fracture zone, comprising:

[0042] Rock box bearing frame 1;

[0043] The geosoil filling box 2 is arranged in the rock box bearing frame 1, and a gap is provided between the inner wall of the rock box bearing frame 1 and the outer wall of the geosoil filling box 2; the rock box bearing frame 1 is welded with steel plates with relatively high rigidity, and the geosoil filling box 2 is surrounded by a first side plate, a second side plate, a third side plate, a fourth side plate, a bottom plate, and a front plate. The first side plate and the third side plate are arranged opposite to each other, and the second side plate and the fourth side plate are arranged opposite to each other. A tunnel face is provided on the front plate for filling similar rock and soil in the crushing zone;

[0044] Stress loading system, the stress loading system includes a circumferential loading unit, a back loading unit and a loading control system. The circumferential loading unit is arranged between the outer circumference of the geotechnical filling box 2 and the inner circumference of the rock box supporting frame 1. The back loading unit is arranged between the outer back wall of the geotechnical filling box 2 and the inner back wall of the rock box supporting frame 1.

[0045] A fixing ring 3 is provided on the front of the geotechnical filling box 2, and the fixing ring 3 is fixedly connected in the fixing hole;

[0046] Universal grouting nozzles 4, which are provided in several groups, are respectively mounted on the fixing ring 3, and a grouting pipe 17 is mounted on the discharge port of the universal grouting nozzle 4, and the grouting pipe 17 extends into the rock and soil filling box 2;

[0047] The grouting system includes a grouting pump 5, the discharge end of the grouting pump 5 is connected to the universal grouting nozzle 4 through a feeding pipe;

[0048] Among them, the loading control system is used to control the circumferential loading unit and the back loading unit to provide loading force.

[0049] When the present invention is working, first assemble the experimental device, determine the number and installation position of the universal grouting nozzle 4, determine the grouting angle of the universal grouting nozzle 4, and determine the loading stress value of the stress loading system; apply a release agent in advance on the inner surface of the geotechnical filling box 2, fix the universal grouting nozzle 4 on the fixing ring 3, and fill the surrounding rock similar materials and the broken zone similar materials into the geotechnical filling box 2; the grouting pump 5 injects the slurry into the universal grouting nozzle 4 through the feeding pipe, and the slurry enters the geotechnical filling box 2 through the grouting pipe 17 on the universal grouting nozzle 4, and the circumferential loading unit and the back loading unit are connected. The unit applies pressure in the circumferential and back directions of the geotechnical filling box 2 respectively to simulate the pressure at different depths of the tunnel, and records in detail the inclination angle of the universal grouting nozzle 4, grouting range, grouting amount and stress loading value; after the grouting is completed, the equipment is dismantled, the geotechnical grouting in the geotechnical filling box 2 of the broken zone is demolded, and the stability, tensile and compressive properties of the broken zone after grouting are tested; the number of universal grouting nozzles 4, the grouting angle and the output stress value of the stress loading system are changed to obtain the relevant values ​​repeatedly, summarize the stability of the broken zone after grouting under different parameters, and determine the optimal grouting inclination angle and grouting range parameters.

[0050] The present invention can provide a tunnel fault fracture zone deformation and destruction simulation device with loads applied in multiple directions through the setting of the stress loading system, so that the simulation results of the simulation device are more consistent with the real environment.

[0051] By setting the fixing ring 3 , the grouting conditions of different numbers of universal grouting nozzles 4 can be flexibly simulated, thereby providing the best setting number of universal grouting nozzles 4 for the actual construction process.

[0052] The present invention provides a universal grouting nozzle 4 with adjustable angle, so that the device can simulate grouting at different angles, thereby finding the optimal grouting angle and providing theoretical guidance for actual construction.

[0053] A further optimized solution is that the circumferential loading unit includes a lateral reaction wall 6 fixedly connected to the inner circumference of the rock box supporting frame 1, and a plurality of circumferential loading hydraulic cylinders 7 are arranged in an array on the lateral reaction wall 6. The circumferential loading hydraulic cylinders 7 are vertically arranged between the lateral reaction wall 6, and the output end of the circumferential loading hydraulic cylinder 7 is in contact with the outer circumference of the rock and soil filling box 2.

[0054] A further optimized solution is that the back loading unit includes a back reaction wall 8 fixedly connected to the inner wall of the rock box supporting frame 1, and a plurality of back loading hydraulic cylinders are arranged in an array on the back reaction wall 8. The back loading hydraulic cylinders are vertically arranged between the back reaction wall 8, and the output end of the back loading hydraulic cylinders is in contact with the back of the rock and soil filling box 2.

[0055] The circumferential loading unit and the back loading unit together form a loading reaction device, which simulates the tunnel depth by adjusting the loading magnitude. The loading control system is a load control system, which controls the output loading force of the circumferential loading hydraulic cylinder 7 and the back loading hydraulic cylinder.

[0056] Further optimization scheme, the universal grouting nozzle 4 includes an outer connecting sleeve 9 and an inner connecting sleeve 10, the outer connecting sleeve 9 is fixedly sleeved on the outer wall of the inner connecting sleeve 10, the outer wall of the outer connecting sleeve 9 is fixedly connected with a connecting protrusion 11, one end of the inner connecting sleeve 10 is rotatably connected to a spherical connector 12, the spherical connector 12 is fixedly connected to a nozzle head 13, the end of the inner connecting sleeve 10 is threadedly connected to a positioning nut 14, the positioning nut 14 and the spherical connector 12 are limited in position, the connecting protrusion 11 and the fixing ring 3 are detachably connected, and the grouting pipe 17 is fixedly connected to one end of the nozzle head 13. A spherical groove is provided at the end of the inner connecting sleeve 10, and notches are symmetrically opened on the inner connecting sleeve 10. The diameter of the inner connecting sleeve 10 is smaller than the diameter of the spherical connector 12. After the positioning nut 14 is loosened, the inner connecting sleeve 10 and the spherical connector 12 can rotate relatively. After the positioning nut 14 is connected to the inner connecting sleeve 10, the friction between the inner connecting sleeve 10 and the spherical connector 12 is increased by the squeezing of the positioning nut 14, thereby realizing the positioning of the spherical connector 12.

[0057] As a further optimization solution, a plurality of grooves are opened circumferentially on the inner circumference of the fixing ring 3 , the grooves are adapted to the shape of the connecting protrusions 11 , the connecting protrusions 11 are inserted into the grooves, and the connecting protrusions 11 are fixed in the grooves by connecting pieces.

[0058] A further optimized solution is that the connecting piece includes a fixing bolt 15. A through hole is formed in the side wall of the groove, and the fixing bolt 15 is formed in the through hole. The fixing bolt 15 passes through the connecting protrusion 11 and is fixedly threaded with a fixing nut. The connecting protrusion 11 is inserted into the groove, and then the fixing bolt 15 is inserted into the through hole. The connecting protrusion 11 is formed with a connecting hole, and the connecting hole and the through hole are coaxial. In this way, the connecting bolt can pass through the through hole and the connecting hole to fix the connecting protrusion 11 to the groove, and then fix it with the fixing nut and the connecting bolt, thereby completing the fixation of the universal grouting nozzle 4.

[0059] As a further optimization, scale lines are provided on the outer surface of the spherical connector 12. These scale lines are located along the longitude and latitude lines of the spherical connector 12 and pass through the center of the sphere. This allows for a visual display of the inclination angle of the universal grouting nozzle 4. By adjusting the mounting position of the rotatable universal grouting nozzle 4, the central angle of the circle during grouting reinforcement can be simulated to explore the grouting range.

[0060] According to a further optimized solution, a plurality of grouting holes 16 are provided on the side wall of the grouting pipe 17 along the axial direction.

[0061] A test method for simulating grouting reinforcement of a tunnel fault fracture zone comprises the following steps:

[0062] Step 1: Install the geotechnical filling box 2 in the rock box bearing frame 1, install a circumferential loading unit on the outer circumference of the geotechnical filling box 2, and install a back loading unit on the back of the geotechnical filling box 2. Both the circumferential loading unit and the back loading unit are connected to the loading control system. Install the fixing ring 3 in the mounting hole opened on the front of the geotechnical filling box 2, calculate and determine the number and installation position of the universal grouting nozzles 4, determine the grouting angle of the universal grouting nozzles 4, and determine the loading stress value of the stress loading system;

[0063] Step 2: Apply a release agent to the inner surface of the geotechnical filling box 2 in advance, prepare the universal grouting nozzle 4 according to the calculated number, insert the connecting protrusion 11 on the universal grouting nozzle 4 into the groove on the fixing ring 3, fix the protrusion and the fixing ring 3 with the fixing bolt 15, adjust the angle of the universal grouting nozzle 4, and fill the surrounding rock-like material and the broken zone-like material into the geotechnical filling box 2;

[0064] Step 3: The grouting pump 5 injects the slurry into the universal grouting nozzle 4 through the feeding pipe. The slurry enters the geotechnical filling box 2 through the grouting pipe 17 on the universal grouting nozzle 4. The circumferential loading unit and the back loading unit apply pressure to the geotechnical filling box 2 in the circumferential direction and back direction respectively to simulate the pressure at different depths of the tunnel. The inclination angle of the universal grouting nozzle 4, the grouting range, the grouting amount and the stress loading value are recorded in detail.

[0065] Step 4: After the grouting is completed, the equipment is dismantled, the rock and soil grouting in the broken zone rock and soil filling box 2 is demoulded, and the stability, tensile and compressive properties of the broken zone after grouting are tested;

[0066] Step 5: changing the number of universal grouting nozzles 4, the grouting angle, and the output stress value of the stress loading system, and repeating steps 2 to 4 to conduct multiple sets of comparative experiments;

[0067] Step six: Summarize the stability of the broken zone after grouting under different parameters and determine the optimal grouting inclination angle and grouting range parameters.

[0068] In the description of the present invention, it should be understood that the terms "longitudinal", "transverse", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0069] The embodiments described above are merely descriptions of preferred embodiments of the present invention and are not intended to limit the scope of the present invention. Without departing from the spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by persons skilled in the art should fall within the scope of protection defined by the claims of the present invention.

Claims

1. A test device for simulating grouting reinforcement of a tunnel fault zone, characterized in that: include: Rock box bearing frame (1); A rock-soil filling box (2), wherein the rock-soil filling box (2) is arranged in the rock-box bearing frame (1), and a gap is arranged between the inner wall of the rock-box bearing frame (1) and the outer wall of the rock-soil filling box (2); A stress loading system, the stress loading system comprising a circumferential loading unit, a back loading unit and a loading control system, the circumferential loading unit being arranged between the outer circumference of the rock filling box (2) and the inner circumference of the rock box bearing frame (1), and the back loading unit being arranged between the back outer wall of the rock filling box (2) and the back inner wall of the rock box bearing frame (1); A fixing ring (3), wherein a mounting hole is provided on the front of the rock filling box (2), and the fixing ring (3) is fixedly connected in the mounting hole; Universal grouting nozzles (4), the universal grouting nozzles (4) being provided in a plurality of groups, the plurality of universal grouting nozzles (4) being respectively mounted on the fixing ring (3), the discharge ports of the universal grouting nozzles (4) being mounted with grouting pipes (17), the grouting pipes (17) extending into the rock and soil filling box (2); A grouting system, the grouting system comprising a grouting pump (5), the discharge end of the grouting pump (5) being connected to the universal grouting nozzle (4) via a feeding pipe; Wherein, the loading control system is used to control the circumferential loading unit and the back loading unit to provide loading force.

2. The test device for simulating grouting reinforcement of a fault fracture zone in a tunnel according to claim 1, characterized in that: The circumferential loading unit comprises a lateral reaction wall (6) fixedly connected to the inner circumference of the rock box supporting frame (1), a plurality of circumferential loading hydraulic cylinders (7) are arranged in an array on the lateral reaction wall (6), the circumferential loading hydraulic cylinders (7) are vertically arranged between the lateral reaction wall (6), and the output end of the circumferential loading hydraulic cylinder (7) abuts against the outer circumference of the rock filling box (2).

3. The test device for simulating grouting reinforcement of a fault fracture zone in a tunnel according to claim 1, characterized in that: The back-loading unit comprises a back-reaction wall (8) fixedly connected to the inner wall of the inner surface of the rock box supporting frame (1), a plurality of back-loading hydraulic cylinders are arranged in an array on the back-reaction wall (8), the back-loading hydraulic cylinders are vertically arranged between the back-reaction wall (8), and the output end of the back-loading hydraulic cylinder abuts against the back side of the rock filling box (2).

4. The test device for simulating grouting reinforcement of a fault fracture zone in a tunnel according to claim 1, characterized in that: The universal grouting nozzle (4) comprises an outer connecting sleeve (9) and an inner connecting sleeve (10), wherein the outer connecting sleeve (9) is fixedly sleeved on the outer wall of the inner connecting sleeve (10), the outer wall of the outer connecting sleeve (9) is fixedly connected with a connecting protrusion (11), one end of the inner connecting sleeve (10) is rotatably connected with a spherical connecting head (12), the spherical connecting head (12) is fixedly connected with a nozzle head (13), the end of the inner connecting sleeve (10) is threadedly connected with a positioning nut (14), the positioning nut (14) and the spherical connecting head (12) are limitedly matched, the connecting protrusion (11) and the fixing ring (3) are detachably connected, and the grouting pipe (17) is fixedly connected to one end of the nozzle head (13).

5. The test device for simulating grouting reinforcement of a fault fracture zone in a tunnel according to claim 4, characterized in that: A plurality of grooves are circumferentially formed on the inner circumferential surface of the fixing ring (3), the grooves being adapted to the shape of the connecting protrusions (11), the connecting protrusions (11) being inserted into the grooves, and the connecting protrusions (11) being fixed in the grooves via connecting pieces.

6. The test device for simulating grouting reinforcement of a fault fracture zone in a tunnel according to claim 5, characterized in that: The connecting member comprises a fixing bolt (15), a through hole is formed on the side wall of the groove, the fixing bolt (15) is passed through the through hole, and the fixing bolt (15) passes through the connecting protrusion (11) and is fixedly threadedly connected to a fixing nut.

7. The test device for simulating grouting reinforcement of a fault fracture zone in a tunnel according to claim 4, characterized in that: The outer surface of the spherical connector (12) is provided with scale lines.

8. The test device for simulating grouting reinforcement of a fault fracture zone in a tunnel according to claim 1, characterized in that: The side wall of the grouting pipe (17) is provided with a plurality of grouting holes (16) along the axial direction.

9. A test method for simulating grouting reinforcement of a tunnel fault fracture zone, based on the test device for simulating grouting reinforcement of a tunnel fault fracture zone according to any one of claims 1 to 8, characterized in that: The steps include: Step 1, assembling the experimental device, determining the number and installation position of the universal grouting nozzle (4), determining the grouting angle of the universal grouting nozzle (4), and determining the loading stress value of the stress loading system; Step 2: Apply a release agent to the inner surface of the rock filling box (2) in advance, fix the universal grouting nozzle (4) on the fixing ring (3), adjust the angle of the universal grouting nozzle (4), and fill the surrounding rock-like material and the broken zone-like material into the rock filling box (2); Step three, the grouting pump (5) injects the slurry into the universal grouting nozzle (4) through the feeding pipe, and the slurry enters the geotechnical filling box (2) through the grouting pipe (17) on the universal grouting nozzle (4). The circumferential loading unit and the back loading unit apply pressure to the geotechnical filling box (2) in the circumferential direction and back direction respectively to simulate the pressure at different depths of the tunnel, and the inclination angle of the universal grouting nozzle (4), the grouting range, the grouting amount and the stress loading value are recorded in detail; Step 4: After the grouting is completed, the equipment is dismantled, the rock and soil in the broken zone rock and soil filling box (2) is demoulded, and the stability, tensile and compressive properties of the broken zone after grouting are tested; Step 5, changing the number of universal grouting nozzles (4), the grouting angle, and the output stress value of the stress loading system, and repeating steps 2 to 4 to conduct multiple groups of comparative experiments; Step six, summarize the stability of the broken zone after grouting under different parameters, and determine the optimal grouting inclination angle and grouting range parameters.

Citation Information

Cited By

  • Horizontal rotary jet grouting test device and use method thereof

    CN119985190A