By calculating the travel distance and reaching the sky rail section of the target sky train, combining the driving paths of other sky trains to predict the number of passes, and selecting the appropriate stay section, the negative impact of track ban on transportation efficiency caused by sky train failure is solved. Achieve more efficient transportation management.
Patent Information
- Application Number
- CN202411304123.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-19
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-09-19
AI Technical Summary
During busy sky-car transportation, the track ban caused by sky-car failure will cause traffic congestion and transportation efficiency, especially when the faulty track is a busy track section, the impact is greater.
By obtaining the fault information and current location of the target sky train, calculate its travel distance and reachable sky rail segments, and predict the number of passes based on the driving paths of other sky trains, select a sky rail segment with the smallest number of passes as the target stay The section allows the target sky car to stay in this section, reducing the impact on the passage of other sky car.
It effectively reduces the impact of the sky train failure on the passage of other sky trains, reduces the adverse impact of item distribution, and improves transportation efficiency and optimized configuration of system resources.
Smart Images

Figure CN118822226B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of transportation control technology, and in particular to an overhead crane traffic operation control method, device, storage medium and electronic device. Background Art
[0002] The OHT (Overhead Hoist Transport) track (also called "overhead track") is suspended from the ceiling of the workshop as a whole, which can provide support and travel direction guidance for the overhead transport vehicle (also called "overhead crane"). Overhead cranes move on overhead tracks to transport items, which can save space (no ground space is occupied in aerial transportation) and can transport items quickly and stably. Since overhead cranes all move on overhead tracks, if an overhead crane has an abnormality and stops directly during busy transportation, it is very easy to cause traffic congestion, resulting in reduced overall transportation efficiency.
[0003] The existing technology usually stops the crane on the current track section when an abnormality occurs (such as unstable running, sensor failure, insufficient power or unstable load, etc.), and sets the track section where it stops as a prohibited track. Other cranes try to avoid running on this track section. After the crane failure is resolved, the track ban is lifted. However, during the track ban period, it will still have a certain impact on the entire transportation control system, especially when the prohibited track happens to be a busy track section, the impact will be even greater.
[0004] For example, patent CN117557184A discloses a method for handling overhead crane operation failures, which regards the track section where the overhead crane stops or the track section to be repaired as the faulty track section. After the faulty track section appears, the operation path of the overhead crane in the system is replanned to avoid running on the faulty track section to maximize the use of the overhead crane. However, since the faulty track section is usually not selected autonomously, if the faulty track section belongs to a busy track section, it will still have a significant impact on the overall transportation of goods. Summary of the invention
[0005] The purpose of the present application is to provide a method, device, storage medium and electronic device for controlling overhead crane traffic operation to solve the above problems.
[0006] In a first aspect of the present application, a method for controlling overhead travelling vehicle traffic operation is provided, the method comprising:
[0007] Obtain the operating fault information and current position of the target overhead crane;
[0008] Determining a drivable distance of the target overhead travelling vehicle based on the fault information;
[0009] Calculate a set of reachable overhead rail segments of the target overhead travelling vehicle based on the drivable distance and the current position;
[0010] Predicting the number of times other overhead cranes pass through the reachable overhead rail segments in the reachable overhead rail segment set according to the travel paths of other overhead cranes;
[0011] Based on the number of passes, determining one of the reachable sky rail segments as a target stop segment;
[0012] The target overhead travelling crane is controlled to travel to the target stop section.
[0013] Optionally, the method further includes: determining an estimated recovery time of the target overhead travelling crane according to the fault information;
[0014] The predicting the number of times the other overhead cranes pass through the reachable overhead rail segments in the reachable overhead rail segment set according to the driving paths of the other overhead cranes includes: predicting the number of times the other overhead cranes pass through the reachable overhead rail segments before the estimated recovery time according to the driving paths of the other overhead cranes.
[0015] Optionally, before determining one of the reachable sky rail segments as the target stop segment based on the number of passes, the method further includes:
[0016] Calculating the deviation between the faulty driving path of the target overhead travelling vehicle to the reachable overhead travelling vehicle section and the original driving path to the destination;
[0017] The step of determining one of the reachable sky rail segments as the target stop segment based on the number of passes includes:
[0018] detecting a detour cost of an overhead traveling vehicle that needs to pass through the accessible overhead rail section when detouring the accessible overhead rail section;
[0019] Calculate the distribution impact of the accessible sky rail segment based on the number of passes, the deviation, and the detour cost;
[0020] Based on the delivery impact, one of the reachable sky rail segments is determined as the target stop segment, and the delivery impact is positively correlated with the number of passes, the deviation, and the detour cost.
[0021] Optionally, the calculating the distribution impact of the reachable sky rail segment based on the number of passes, the deviation, and the detour cost includes:
[0022] Calculate the single impact of each detour to reach the sky rail segment according to the deviation and the detour cost when each detour reaches the sky rail segment, and calculate the delivery impact based on the single impact;
[0023] The determining, based on the delivery impact, one of the reachable sky rail segments as the target stay segment includes: selecting the reachable sky rail segment with the smallest delivery impact as the target stay segment.
[0024] Optionally, determining one of the reachable overhead rail segments as the target stop segment based on the delivery impact includes: selecting one as the target stop segment from the reachable overhead rail segments whose delivery impact is less than a preset impact threshold, and when there is more than one reachable overhead rail segments less than the impact threshold, selecting the one with the shortest fault driving path as the target stop segment.
[0025] Optionally, determining one of the reachable sky rail segments as the target stop segment based on the number of passes includes: selecting the reachable sky rail segment with the smallest number of passes as the target stop segment.
[0026] Optionally, determining one of the reachable sky rail segments as the target stop segment based on the number of passes includes: determining one of the reachable turning sky rail segments as the target stop segment based on the number of passes, the reachable sky rail segments including a reachable straight sky rail segment and a reachable turning sky rail segment.
[0027] Optionally, controlling the target overhead travelling vehicle to travel to the target stop section includes:
[0028] generating a changed travel path for the target overhead crane to travel to the target stop section based on the travel path of the other overhead cranes;
[0029] Determine the travel time and travel speed of the target overhead rail on the changed travel path based on the overhead rail traffic information of each overhead rail segment in the changed travel path;
[0030] The target overhead traveling vehicle is controlled to travel to the target stop section based on the travel time and the travel speed.
[0031] Optionally, after controlling the target overhead travelling crane to travel to the target stop section, the method further includes:
[0032] broadcasting an occupation message that the target stop section is occupied to the other overhead cranes, so that the other overhead cranes update the driving path according to the occupation message;
[0033] Receiving a travel message from another overhead crane that it needs to travel the target stop segment;
[0034] Based on the travel message, the target overhead travelling vehicle is controlled to drive out of the target staying section before the other overhead travelling vehicles reach the target staying section, and the target staying section is searched again.
[0035] In a second aspect of the present application, a device for controlling the operation of an overhead travelling vehicle is provided, the device comprising:
[0036] A fault information acquisition module is used to obtain the operation fault information and current position of the target overhead travelling crane;
[0037] A reachable overhead rail segment determination module is used to determine the drivable distance of the target overhead crane based on the fault information; and calculate the reachable overhead rail segment set of the target overhead crane based on the drivable distance and the current position;
[0038] a target stop segment determination module, configured to predict the number of times other overhead cranes pass through the reachable overhead rail segments in the reachable overhead rail segment set according to the travel paths of other overhead cranes; and determine one of the reachable overhead rail segments as the target stop segment based on the number of times the other overhead cranes pass through the reachable overhead rail segments;
[0039] The travel control module is used to control the target overhead travelling vehicle to travel to the target stop section.
[0040] According to a third aspect of the present application, a computer-readable storage medium is provided, on which executable instructions are stored. When the executable instructions are executed by a processor, the processor executes a method as described in any one of the methods in the present application.
[0041] In a fourth aspect of the present application, an electronic device is provided, including:
[0042] one or more processors;
[0043] The memory is used to store one or more programs, and when the one or more programs are executed by the one or more processors, the one or more processors execute any one of the methods described in the present application.
[0044] The overhead crane traffic operation control method, device, storage medium and electronic device in the present application, when a target overhead crane fails, does not directly stop the target overhead crane in place to wait for relevant operators to handle it, but determines the drivable distance based on the fault information, and then determines the reachable overhead rail sections covered based on the drivable distance, calculates the number of times each reachable overhead rail section is passed by other overhead cranes, and selects one of the reachable overhead rail sections as the target stop section based on the number of passes, and then makes the target overhead crane stay in the target stop section. Compared with staying directly in place, the present application uses the number of passes to select a suitable stop section, which can minimize the impact on the passage of other overhead cranes and reduce the impact on the distribution of goods. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope of the present application.
[0046] Figure 1 A schematic diagram of a scene of a method for controlling overhead crane traffic operation in an embodiment;
[0047] Figure 2 A schematic diagram of a flow chart of a method for controlling overhead travelling crane traffic operation in one embodiment;
[0048] Figure 3 A schematic diagram of the division of the sky rail segments in one embodiment;
[0049] Figure 4 A schematic diagram of a process for determining one of the reachable sky rail segments as a target stop segment based on the number of passes in one embodiment;
[0050] Figure 5 It is a schematic diagram of a flow chart of controlling a target overhead travelling crane to travel to a target stop section in one embodiment;
[0051] Figure 6 A schematic diagram of a scene of a method for controlling overhead travelling crane traffic operation in another embodiment;
[0052] Figure 7 1 is a schematic diagram of the structure of a traffic operation control device for an overhead travelling crane in one embodiment;
[0053] Figure 8 FIG. 1 is a schematic diagram of the structure of an electronic device in an embodiment. DETAILED DESCRIPTION
[0054] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0055] All terms (including technical and scientific terms) used in this application have the meanings commonly understood by those skilled in the art, unless otherwise defined. It should be noted that the terms used here should be interpreted as having a meaning consistent with the context of this specification, and should not be interpreted in an idealized or overly rigid manner.
[0056] For example, the terms "first", "second", etc. used in this application may be used in this article to describe various elements, but these elements are not limited by these terms. These terms are only used to distinguish a first element from another element. For example, without departing from the scope of this application, a first state management container may be referred to as a second state management container, and similarly, a second state management container may be referred to as a first state management container. Both the first state management container and the second state management container are state management containers, but they are not the same state management container.
[0057] For another example, the terms “include”, “comprising”, etc. used in this application indicate the existence of features, steps, operations and / or components, but do not exclude the existence or addition of one or more other features, steps, operations or components.
[0058] The overhead crane traffic operation control method in this application can be applied to Figure 1 In the scenario shown. Figure 1 As shown, the overhead crane (including the target overhead crane 110 and other overhead cranes 120) travels on the overhead rail to transport goods. Among them, one overhead crane can travel in parallel on each overhead rail, and the overhead crane cannot overtake on the same overhead rail section. The system can control the direction of the overhead crane on the overhead rail, such as controlling the same section of the overhead rail to travel in only one direction, or can temporarily reverse. The overhead rail includes a turning overhead rail section 140 and a straight overhead rail section 130. When the overhead crane travels to the turning intersection in the straight overhead rail section, it can enter the turning overhead rail section according to the plan, and enter another straight overhead rail section to achieve the distribution of goods. Among them, the overhead crane is integrated with corresponding GPS modules, distance sensor modules, communication modules and other components, which can report its own position and status to the overhead crane transportation control system in real time, and receive instructions sent to it by the control system, such as the instruction can be driving path information, so that the overhead crane walks according to the received driving path. When the target overhead crane 110 fails and cannot stably complete the delivery of goods, or cannot stably travel to the destination, the control system can instruct the target overhead crane to determine an accessible overhead rail section as the target overhead rail section from one or more accessible overhead rail sections within its drivable distance range 150, so that the traffic of other overhead cranes is less affected, and then control the target overhead crane to travel to the target overhead rail section to wait for relevant staff to handle the fault. For example, relevant staff can remove it from the target overhead rail section for maintenance, or directly handle the fault in the target overhead rail section. After the target overhead crane arrives at the target overhead rail section, other overhead cranes can try to avoid traveling in the target overhead rail section when transporting goods.
[0059] In one embodiment, Figure 2 As shown, a vehicle traffic operation control method is provided, the method comprising:
[0060] Step 202: Obtain the operation fault information and current position of the target overhead travelling crane.
[0061] In this embodiment, the operation fault information indicates the sudden fault information when the target overhead crane is traveling on the overhead rail. When the fault information exists, the target overhead crane is not completely unable to travel, but may not be able to travel safely or stably to the set destination. The destination may be a delivery destination, or return to the set pending location after delivering the items. The current position is the real-time position on the overhead rail. Specifically, the operation fault information may be related mechanical faults such as transmission system faults, wheel faults, suspension system faults, etc.; it may also be electrical faults such as motor faults, circuit faults, controller faults, etc.; or related sensor device faults such as position sensors and speed sensors; it may also be other types of faults such as communication faults, energy faults (such as insufficient power), load faults (such as load imbalance), etc.
[0062] The electronic equipment can actively obtain the status information and position of each overhead crane in the overhead track during operation. The overhead crane (including the target overhead crane) operating on the OHT track can also actively report its position and status information in real time. When the target overhead crane fails, the electronic equipment can promptly know its current position and fault information to facilitate its processing.
[0063] Step 204: Determine the drivable distance of the target overhead travelling crane based on the fault information.
[0064] The drivable distance indicates the distance that the target overhead crane can safely travel, such as any value such as 10 meters, 20 meters, 50 meters, etc. The drivable distances corresponding to different fault information are not necessarily the same, and in the case of the same fault information, the drivable distances corresponding to the target overhead crane in the load operation state and the non-load operation state are not necessarily the same.
[0065] For example, when the fault information is an energy fault due to insufficient battery power, the control system can calculate the corresponding drivable distance based on the load of the items delivered by the overhead crane, or the target overhead crane itself can calculate its own drivable distance, and then report the drivable distance to the control system. When the fault information is a load imbalance fault, such as detecting that the delivered items are tilted or shake violently, and there is a risk of falling off, the corresponding drivable distance can be determined based on the current specific load conditions.
[0066] In one embodiment, a corresponding relationship table between different fault information and drivable distances may be set, and after receiving the corresponding fault information, the corresponding drivable distance may be obtained by looking up the table.
[0067] Step 206: Calculate a set of reachable overhead rail segments of the target overhead travelling vehicle based on the drivable distance and the current position.
[0068] The electronic device can pre-divide the overhead rail into various overhead rail segments. The track segment between two track change intersections can be used as a track segment, that is, the various overhead rail segments can be connected through the track change intersection, and the overhead car enters another overhead rail segment through the corresponding track change intersection. Figure 3 The straight section of the overhead rail shown in the figure has multiple track change intersections, and the part of the overhead rail between two adjacent track change intersections is divided into a track segment (including a1 track segment 130-1, a2 track segment 130-2, a3 track segment 130-3, a4 track segment 130-4, a5 track segment 130-5, a6 track segment 130-6, and a7 track segment 130-7). For the turning section overhead rail, its two ends are connected to the corresponding straight section overhead rail, and track change intersections are formed at both ends, so the turning section overhead rail also constitutes a track segment (including b1 track segment 140-1, b2 track segment 140-2, b3 track segment 140-3, b4 track segment 140-4, b5 track segment 140-5, and b6 track segment 140-6).
[0069] Furthermore, when the length of the track between two track change intersections is long, the track can be further divided into multiple track segments. Among them, a corresponding length threshold can be set, and the track exceeding the length threshold can be divided according to the length threshold to form multiple track segments. Specifically, by dividing the length of the track segment by the length threshold and rounding up or down, the rounded value is used as the number of divided track segments, and the track segment is divided into equal parts according to the number to form corresponding track segments, so that the lengths of the various track segments in the track segment are the same. For example, the length threshold set is 5 meters. When the length of one of the track segments is 12 meters, the length is divided by the length threshold and rounded up to get a value of 3, that is, the track segment is divided into 3 equal parts, forming 3 track segments with a length of 4 meters each.
[0070] The reachable overhead rail segment represents the overhead rail segment that can be safely reached by the target overhead car starting from the current position in the presence of a corresponding fault. Specifically, starting from the current position, various passable walking paths are generated so that the path length of the walking path does not exceed the drivable distance, and the overhead rail segments covered by the paths that do not exceed the drivable distance are all taken as reachable overhead rail segments. Optionally, a corresponding radius range can be formed with the current position as the center and the drivable distance as the radius, and the shortest path between the current position and each overhead rail segment covered within the radius is generated, and the overhead rail segment covered by the shortest path with a length less than the drivable distance is taken as a reachable overhead rail segment. Aggregate the various reachable overhead rail segments to form a reachable overhead rail segment set.
[0071] Step 208: predicting the number of times other overhead cranes pass through the reachable overhead rail segments in the reachable overhead rail segment set based on the travel paths of other overhead cranes.
[0072] In this embodiment, the electronic device pre-records the travel paths of each overhead crane on the overhead rail within a future period of time at the current moment. The travel path can be a pre-generated or real-time generated path, and can be adjusted according to actual conditions. When an adjustment is detected, the number of passes is predicted based on the adjusted path. Other overhead cranes refer to overhead cranes other than the target overhead crane.
[0073] Specifically, based on the driving paths of other currently running overhead cranes, it is detected whether the driving paths need to pass through any reachable overhead rail segment in the reachable overhead rail segment set, and the number of times each reachable overhead rail segment is passed by the overhead crane is counted. Among them, the same overhead crane can pass through the same reachable overhead rail segment multiple times.
[0074] In one embodiment, the travel paths of other overhead cars in the future duration can be queried, and the number of passes of each accessible overhead rail segment can be determined based on the travel paths in the future duration, that is, the number of passes is the number of passes in the future duration. Specifically, within a time range, for each accessible overhead rail segment, it can be determined whether the travel paths of other overhead cars cover the number of times that the accessible overhead rail segment is covered. For the travel paths that cover the accessible overhead rail segment, the time when the corresponding other overhead cars travel to the accessible overhead rail segment is further predicted, and whether the time is within the future duration is detected. If so, it is determined that the overhead car will pass the accessible overhead rail segment in the future duration. Based on this, the number of passes of each accessible overhead rail segment in the future duration and the corresponding passing time each time it is passed can be counted. Among them, the future duration can be any suitable duration set in advance, or it can be a duration adaptively determined based on fault information. For example, the future duration can be uniformly set to any suitable duration such as 10 minutes, 30 minutes, 1 hour, etc.
[0075] Step 210: determine one of the reachable sky rail segments as the target stop segment based on the number of passes.
[0076] The target stop segment indicates the reachable overhead rail segment where the target overhead crane stops. The greater the number of passes of the target stop segment, the greater the impact of the target overhead crane on other overhead cranes when it stops at the target stop segment. It can be understood that in each reachable overhead rail segment, the smaller the corresponding number of passes, the greater the probability of being determined as the target stop segment.
[0077] In one embodiment, the reachable overhead rail section with the least number of passes is selected as the target stop section. By directly using the reachable overhead rail section with the least number of passes as the target stop section, when the target overhead rail travels to the target overhead rail section, the number of other overhead rails affected (such as overhead rails that need to pass through the target stop section) is minimized, thereby minimizing the impact on the travel of other overhead rails in the entire system, avoiding the need to make too many adjustments to the global overhead rail travel path, and reducing the amount of calculation for changing the travel path in the system. In addition, by directly using the reachable overhead rail section with the least number of passes as the target overhead rail section, the efficiency of determining the target overhead rail section can be improved. For example, when there is a reachable overhead rail section with a pass number of 0, the reachable overhead rail section can be selected as the corresponding target stop section.
[0078] In one embodiment, one of the reachable turning rail sections is determined as the target stop section based on the number of passes. The reachable rail sections include reachable straight rail sections and reachable turning rail sections. For the selection of the target stop section, it can be selected from the reachable turning rail sections. Since the straight rail section is usually the main road for the overhead crane to pass, the traffic volume of the overhead crane on the straight rail section is usually higher than the traffic volume of the turning section, and the speed of the overhead crane in the straight rail section can be higher than the speed in the turning rail section. Furthermore, when the overhead crane goes to the destination, it can usually have a variety of travel paths, and different turning rail sections can be selected from these paths, while the straight rail section usually does not change much.
[0079] By selecting a target stop segment in the reachable turning sky track segment, the selection range of the target stop segment can be narrowed and the efficiency of determining the target stop segment can be improved.
[0080] Step 212: Control the target overhead travelling crane to travel to the target stop section.
[0081] In this embodiment, after the target stop section is determined, a fault driving path for the target overhead travelling vehicle to travel from the current position to the target stop section may be planned, and the target overhead travelling vehicle may be controlled to travel to the target stop section according to the fault driving path.
[0082] Specifically, the travel speed of the target overhead travelling vehicle in the travel path of the fault may be controlled according to the fault information, so that the target overhead travelling vehicle can smoothly reach the target stop section according to the prescribed path.
[0083] After the target overhead crane arrives at the target stop section, when other overhead cranes need to pass through the target stop section according to a preset driving route, the driving route can be changed to bypass the target stop section; or when or before other overhead cranes arrive at the target stop section, the target overhead crane releases the target stop section, so that other overhead cranes can pass smoothly.
[0084] The overhead crane traffic operation control method in this application does not directly stop the target overhead crane in place to wait for relevant operators to handle it when a target overhead crane fails, but determines the drivable distance based on the fault information, and then determines the reachable overhead rail sections covered based on the drivable distance, calculates the number of times each reachable overhead rail section is passed by other overhead cranes, and selects one of the reachable overhead rail sections as the target stop section based on the number of passes, and then makes the target overhead crane stay in the target stop section. Compared with staying directly in place, this application uses the number of passes to select a suitable stop section, which can minimize the impact on the passage of other overhead cranes and reduce the impact on the distribution of goods.
[0085] For any of the above-mentioned faults, when the overhead crane is unable to continue to complete the current task, the present application intelligently plans a temporary stop position with the least impact on the overall transportation by detecting the fault type of the overhead crane in real time, evaluating its remaining driving capacity, analyzing the traffic conditions of the overhead rail, and comprehensively considering factors such as the number of passes, the matching degree of the driving path, and the track position (such as whether it is close to a turn), thereby achieving efficient handling of the overhead crane exception and optimal allocation of system resources.
[0086] In one embodiment, the method further includes: determining an estimated recovery time of the target overhead travelling vehicle based on the fault information; step 208 includes: predicting the number of times other overhead travelling vehicles pass through the reachable overhead travelling vehicle section before the estimated recovery time based on the travel paths of other overhead travelling vehicles.
[0087] In this embodiment, after step 202, the estimated recovery time can be further determined according to the fault information. The electronic device can set the estimated recovery time corresponding to different fault information, and determine the estimated recovery time based on the corresponding relationship, which can be the above-mentioned future time.
[0088] In one embodiment, after receiving the fault information, the electronic device may send the fault information to the corresponding maintenance personnel and receive the response time fed back by the maintenance personnel. Alternatively, the electronic device may actively query the operation tasks of multiple maintenance personnel in the system, and determine the maintenance personnel who respond to the fault information and the response time of the maintenance personnel based on the operation tasks and the fault information.
[0089] The estimated recovery time is determined based on the response time. For example, if the operation and maintenance personnel provide feedback that the target overhead travelling crane is expected to be processed after 1 hour, the estimated recovery time can be set to 1 hour.
[0090] In one embodiment, the number of passes in the present application may be the number of passes within a time period from the current moment to the estimated recovery time. The accuracy of the calculation of the number of passes can be improved for the number of passes within this time period.
[0091] In one embodiment, before step 210, the method further includes: calculating the deviation between the faulty driving path of the target overhead travelling vehicle to the accessible overhead travelling vehicle section and the original driving path to the destination.
[0092] In this embodiment, before the fault information of the target overhead crane is obtained, the target overhead crane is in a state of traveling on the overhead rail, and has a corresponding destination and a travel path, and the travel path is the original travel path to the destination. The destination may be a place where the delivered items need to be delivered, or a place where the delivery is completed and the item is returned to the starting place or a waiting place for waiting for work.
[0093] For each accessible overhead rail segment, a driving path from the current position to the accessible overhead rail segment (i.e., the fault driving path) can be generated. For each fault driving path, the deviation between it and the original driving path can be compared. The deviation is used to reflect the length of the fault driving path relative to the non-overlapping path in the original driving path. The larger the length, the greater the difference between the fault driving path and the original driving path, that is, the higher the deviation. The higher the deviation, the more it deviates from the original driving path, and the larger the path that the target overhead crane needs to change.
[0094] In one embodiment, Figure 4 As shown, step 210 includes:
[0095] Step 402 , detecting the detour cost of the overhead travelling vehicle that needs to pass through the accessible overhead travelling segment when detouring the accessible overhead travelling segment.
[0096] For example, at the current moment, the other overhead train that needs to pass through the accessible overhead rail section is overhead train A. If it follows the established driving path, the predicted time to pass through the accessible overhead rail section to its destination is the first time length A. Assuming that the accessible overhead rail section is occupied, overhead train A needs to modify its driving path to bypass the accessible overhead rail section and travel to the destination of overhead train A. The predicted time required is the second time length A, and the excess time is the second time length A-first time length A. The detour cost is used to reflect the size of the excess time length A. The larger the excess time length, the higher the detour cost.
[0097] Furthermore, when overhead crane A travels along its modified route, it will also affect the passage of other overhead cranes, that is, the time taken by other overhead cranes B directly affected by overhead crane A to reach the corresponding destination may also increase. The detour cost further reflects the increased time B of other overhead cranes B directly affected by overhead crane A, that is, the greater the increased time B and / or the greater the increased time A, the higher the corresponding detour cost.
[0098] It is understandable that the detour costs corresponding to different overhead cranes when they detour to reach the overhead rail section may not be the same.
[0099] Step 404, the distribution impact of the accessible sky rail segment is calculated based on the number of passes, the deviation, and the detour cost.
[0100] The distribution impact is used to reflect the distribution impact of the reachable sky rail segment on the entire system when it is used as the target stop segment. The higher the distribution impact, the greater the distribution impact on the entire system. The distribution impact is positively correlated with the number of passes, the deviation, and the detour cost. That is, the more passes, the greater the deviation, and / or the higher the detour cost, the greater the distribution impact.
[0101] In one embodiment, the electronic device pre-sets a calculation model between the delivery impact and the number of passes, the deviation, and the detour cost. Based on the calculation model, the corresponding delivery impact can be calculated.
[0102] Specifically, step 404 includes: calculating the single impact degree of each detour to reach the sky rail segment according to the deviation degree and the detour cost when each detour to reach the sky rail segment, and calculating the delivery impact degree based on the single impact degree.
[0103] For example, for a certain accessible overhead rail segment, when another overhead car needs to pass through the accessible overhead rail segment according to the original driving route, but assuming that the accessible overhead rail segment is occupied, the overhead car needs to bypass the accessible overhead rail segment to the corresponding destination, and the single impact m of bypassing the accessible overhead rail segment can be calculated. The single impact of each passage is superimposed or weighted summed to obtain the distribution impact of the corresponding accessible overhead rail segment. Among them, when performing weighted summation, the weight of the single impact can be set according to the corresponding deviation and / or detour cost. The higher the deviation and / or the greater the detour cost, the higher the corresponding weight; when directly superimposing the single impact, the single impact can be determined according to the deviation and / or detour cost corresponding to bypassing the accessible overhead rail segment.
[0104] In one embodiment, the formula Calculate the distribution impact M of the reachable sky rail segment. Let the deviation corresponding to the reachable sky rail segment be X; the corresponding number of passes be N, where the detour cost Y corresponding to the i-th pass of the reachable sky rail segment is Y i , then a corresponding overall weight x can be determined based on the deviation, and a corresponding reference value Z will be formed each time the accessible sky track section is passed, that is, the reference value corresponding to the i-th pass through the accessible sky track section is Z i , the corresponding detour cost Y i Form the corresponding single weight y i Understandably, i With Y i Positive correlation; Z i With z i Positive correlation, zi Indicates based on Z i The determined benchmark weight, for example, can be directly set to y i =Y i ;z i =Z i The reference value or reference weight may be set to 1 by default. Furthermore, the reference value or reference weight is related to the priority of the delivery task of the overhead travelling vehicle passing through the overhead travelling vehicle section. The higher the priority, the larger the corresponding reference value or reference weight.
[0105] Preferably, the single impact degree formed by the i-th pass through the reachable sky rail segment is , delivery impact .
[0106] Step 406: determine one of the reachable sky rail segments as the target stop segment based on the delivery impact.
[0107] In this embodiment, with respect to the calculated delivery impact of each reachable overhead rail segment, an reachable overhead rail segment with a smaller delivery impact can be selected as the target stop segment, so that when the target overhead crane is traveling and occupying the target stop segment, it has less impact on the delivery of overhead cranes in the entire system.
[0108] Specifically, the reachable sky rail segment with the smallest delivery impact can be selected as the target stop segment. When there are multiple minimum delivery impacts, the reachable sky rail segment with the shortest fault driving path can be selected as the target stop segment.
[0109] In one embodiment, one of the reachable sky rail segments whose delivery impact is less than a preset impact threshold is selected as a target stop segment. When there are more than one reachable sky rail segments less than the impact threshold, the one with the shortest fault driving path is selected as the target stop segment.
[0110] Among them, the corresponding impact threshold is pre-set, and the impact threshold is used to measure the critical value of whether the target stop segment has too great an impact on the entire system. When it exceeds the impact threshold, it means that the relative impact is large. If it is less than the impact threshold, it means that the impact on the system is small. At this time, when a segment smaller than any of the reachable sky rail segments is selected as the target stop segment, the impact on the system is small.
[0111] By comparing the size of each distribution impact with the impact threshold, when each distribution impact is greater than the impact threshold, the reachable overhead rail segment with the smallest distribution impact is selected as the target stop segment. When there are multiple distribution impacts less than the distribution impact threshold, the one with the shortest fault driving path is selected from the corresponding multiple reachable overhead rail segments as the target stop segment. In this way, the target overhead crane can travel a shorter distance while ensuring that the impact on the system is small, thereby improving the safety of the target overhead crane reaching the target stop segment.
[0112] In one embodiment, only the delivery influence of each reachable turning rail segment can be calculated, and the target stop segment can be selected from the reachable turning rail segments according to the delivery influence of each reachable turning rail segment. If the delivery influence of each turning rail segment exceeds the corresponding influence threshold, the delivery influence of the reachable straight rail segment is calculated, and the target stop segment is confirmed from the delivery influence of all reachable rail segments. If there is a reachable turning rail segment whose delivery influence is less than the influence threshold, the reachable turning rail segment with the shortest fault driving path is selected from these rail segments as the target stop segment.
[0113] In one embodiment, Figure 5 As shown, step 212 includes:
[0114] Step 502: generating a modified driving path for a target overhead crane to travel to a target stop section based on the driving paths of other overhead cranes.
[0115] In this embodiment, the changed driving path is the fault driving path of the target overhead traveling vehicle from the current position to the target stop section. When generating the changed driving path, the driving paths of other overhead traveling vehicles are further considered so that the generated changed driving path is optimal. There are multiple solutions for the path from the current position of the target overhead traveling vehicle to the target stop position. By considering the driving paths of other overhead traveling vehicles, the corresponding congested overhead traveling vehicle section can be avoided as much as possible, so that the optimal path can be generated within the drivable distance range as the changed driving path.
[0116] Furthermore, in the process of generating the changed driving path, the original driving path of the target overhead crane is further considered, so that the deviation between the changed driving path and the original driving path is small, avoiding excessive changes in the driving path and affecting the passage of other overhead cranes.
[0117] Step 504: Determine the travel time and travel speed of the target overhead rail on the changed travel path based on the overhead rail traffic information of each overhead rail segment in the changed travel path.
[0118] Step 506: Control the target overhead traveling vehicle to travel to the target stop section based on the travel time and the travel speed.
[0119] In the process of traveling along the changed driving path, the traffic conditions of other overhead cranes on each overhead rail segment are further considered, and the driving time and speed of the target overhead rail on the changed driving path are controlled based on the traffic conditions, so that the target overhead rail segment reaches the target stop segment at a predetermined speed.
[0120] Furthermore, when there are other overhead cranes that need to pass through the target stop section, the passing time of other overhead cranes in the target stop section can be further considered, and the travel speed and travel time of the target overhead crane can be controlled based on the passing time. For example, without considering the passing time of other overhead cranes in the target stop section, the time calculated for the target overhead crane to reach the target stop section is time A. At this time, if there is a time difference between one or more passing times B and time A that is less than a preset time threshold, the travel speed of the target overhead crane can be further reduced, so that after other overhead cranes pass through the target stop section, the target overhead crane is controlled to travel to the target stop section, and the corresponding target overhead crane does not need to change its travel path, so as to avoid affecting other overhead cranes.
[0121] In one embodiment, after step 212, the process further includes: broadcasting an occupation message that the target stop segment is occupied to other overhead cranes, so that the other overhead cranes update their travel paths according to the occupation message; receiving a travel message that other overhead cranes need to travel to the target stop segment; and controlling the target overhead crane to leave the target stop segment before other overhead cranes arrive at the target stop segment based on the travel message, and searching for the target stop segment again.
[0122] In this embodiment, when the target overhead travelling vehicle has reached the target stop section, a message that the target stop section is occupied may be broadcasted, so that other overhead travelling vehicles that need to pass through the target stop section try to avoid the target stop section and change their travel paths.
[0123] Furthermore, the broadcasted message further includes the occupancy time of the target stop section, so that other overhead cranes that need to pass the target stop section within the occupancy time change their travel paths.
[0124] When other overhead cranes insist on traveling the target stop segment, a travel message that the target overhead crane needs to pass the target stop segment may be sent to the target overhead crane, and the travel message further includes the travel path information of the other overhead cranes and the estimated time of passing the target stop segment.
[0125] Based on the travel information, the target overhead travelling vehicle selects a suitable time to drive out of the target stop section before other overhead travelling vehicles reach the target stop section, releases the occupation of the target stop section, and enables other overhead travelling vehicles to pass smoothly. After other overhead travelling vehicles pass the target stop section, the target overhead travelling vehicle may be controlled to re-enter the target stop section, or a new target stop section may be re-selected according to the above steps or embodiments.
[0126] Specifically, when the target overhead crane is driving out of the target stop section, it can be combined with the driving paths of the other overhead cranes so that the position where the target overhead crane stops after driving out of the target stop section will not interfere with the driving paths of the other overhead cranes. Figure 6 As shown, the target overhead crane 110 is currently on the target stop segment, and other overhead cranes 120 travel along the dashed line travel path in the figure and need to pass through the target stop segment. Based on the dashed line travel path, the target overhead crane can choose to stop at any suitable stop point that is not in the travel path and is located near the target stop segment, so that the target overhead crane travels from the target stop segment to the target stop point. Figure 6 The candidate stay point 160-1 or the candidate stay point 160-2 is selected as the target stay point. Further, the congestion condition of each candidate stay point can also be considered, and the candidate stay point with the least congestion condition is selected as the target stay point.
[0127] When other overhead cranes leave the target stop segment, the target overhead crane determines whether to enter the target stop segment based on the latest travel paths of each overhead crane in the system, or to use the overhead rail segment where the target stop point is located as a new target stop segment, or to recalculate a new target stop segment. The specific method for determining the target stop segment can refer to the process described in the above embodiments, which will not be repeated here.
[0128] In one embodiment, Figure 7 As shown, a overhead crane traffic operation control device is provided, the device comprising:
[0129] The fault information acquisition module 702 is used to acquire the operation fault information and current position of the target overhead travelling crane.
[0130] The reachable overhead rail segment determination module 704 is used to determine the drivable distance of the target overhead crane based on the fault information; and calculate the reachable overhead rail segment set of the target overhead crane based on the drivable distance and the current position.
[0131] The target stop segment determination module 706 is used to predict the number of times other overhead cranes pass through the reachable overhead rail segments in the reachable overhead rail segment set according to the travel paths of other overhead cranes; and determine one of the reachable overhead rail segments as the target stop segment based on the number of passes.
[0132] The travel control module 708 is used to control the target overhead travelling vehicle to the target stop section.
[0133] In one embodiment, the fault information acquisition module 702 is further used to determine the estimated recovery time of the target overhead travelling vehicle according to the fault information;
[0134] The target stop segment determination module 706 is further used to predict the number of times other overhead cranes pass through the reachable overhead rail segment before the estimated recovery time according to the travel paths of other overhead cranes.
[0135] In one embodiment, the target stop segment determination module 706 is also used to calculate the deviation between the faulty driving path of the target overhead crane to the accessible overhead rail segment and the original driving path to the destination; detect the detour cost of the overhead crane that needs to pass through the accessible overhead rail segment when bypassing the accessible overhead rail segment; calculate the distribution influence of the accessible overhead rail segment based on the number of passes, the deviation, and the detour cost; determine one of the accessible overhead rail segments as the target stop segment based on the distribution influence, and the distribution influence is positively correlated with the number of passes, the deviation, and the detour cost.
[0136] In one embodiment, the target stop segment determination module 706 is further used to calculate the single impact of each detour to reach the sky rail segment according to the deviation degree and the detour cost when each detour to reach the sky rail segment, and calculate the delivery impact based on the single impact.
[0137] In one embodiment, the target stop segment determination module 706 is further configured to select an accessible sky rail segment with the smallest delivery impact as the target stop segment.
[0138] In one embodiment, the target stop segment determination module 706 is further used to select one as a target stop segment from the reachable sky rail segments whose delivery impact is less than a preset impact threshold. When there are more than one reachable sky rail segments less than the impact threshold, the one with the shortest fault driving path is selected as the target stop segment.
[0139] In one embodiment, the target stay segment determination module 706 is further configured to select an accessible sky rail segment with the minimum number of passes as the target stay segment.
[0140] In one embodiment, the target stop segment determination module 706 is further configured to determine one of the reachable turning sky rail segments as the target stop segment based on the number of passes, and the reachable sky rail segments include reachable straight sky rail segments and reachable turning sky rail segments.
[0141] In one embodiment, the travel control module 708 is also used to generate a changed travel path for the target overhead crane to travel to the target stop section based on the travel paths of other overhead cranes; determine the travel time and travel speed of the target overhead crane on the changed travel path based on the overhead crane traffic information of each overhead crane section in the changed travel path; and control the target overhead crane to travel to the target stop section based on the travel time and travel speed.
[0142] In one embodiment, the travel control module 708 is also used to broadcast an occupancy message that the target stop segment is occupied to other overhead cranes, so that other overhead cranes update their travel routes according to the occupancy message; receive travel messages from other overhead cranes that they need to travel to the target stop segment; and control the target overhead crane to leave the target stop segment before other overhead cranes reach the target stop segment based on the travel message.
[0143] The target stay segment determination module 706 is further configured to search for the target stay segment again.
[0144] In one embodiment, a computer-readable storage medium is provided, on which executable instructions are stored. When the instructions are executed by a processor, the processor executes the steps in the above-mentioned method embodiments.
[0145] In one embodiment, an electronic device is also provided, comprising one or more processors; a memory, wherein one or more programs are stored in the memory, wherein when the one or more programs are executed by the one or more processors, the one or more processors execute the steps in the above-mentioned method embodiments. The electronic device may be a device in which the above-mentioned transportation control system is deployed, such as a background server that controls the operation of an overhead crane or sends a travel path to the overhead crane to communicate with the overhead crane.
[0146] In one embodiment, Figure 8 As shown, it shows a schematic diagram of the structure of an electronic device for implementing an embodiment of the present application. The electronic device 800 includes a central processing unit (CPU) 801, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 802 or a program loaded from a storage part 808 to a random access memory (RAM) 803. In the RAM 803, various programs and data required for the operation of the electronic device 800 are also stored. The CPU 801, the ROM 802, and the RAM 803 are connected to each other via a bus 804. An input / output (I / O) interface 805 is also connected to the bus 804.
[0147] The following components are connected to the I / O interface 805: an input section 806 including a keyboard, a mouse, etc.; an output section 807 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 808 including a hard disk, etc.; and a communication section 809 including a network interface card such as a LAN card, a modem, etc. The communication section 809 performs communication processing via a network such as the Internet. A drive 810 is also connected to the I / O interface 805 as needed. A removable medium 811, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 810 as needed, so that a computer program read therefrom is installed into the storage section 808 as needed.
[0148] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, including a computer-readable medium carrying instructions, in such an embodiment, the instructions can be downloaded and installed from a network through a communication part 809, and / or installed from a removable medium 811. When the instructions are executed by a central processing unit (CPU) 801, the various method steps described in the present application are executed.
[0149] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.
[0150] In addition, those skilled in the art will appreciate that, although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present application and form different embodiments. For example, all of the above embodiments may be used in any combination. The information disclosed in this background technology section is intended only to deepen the understanding of the overall background technology of the present application and should not be regarded as an admission or in any form to imply that the information constitutes prior art known to those skilled in the art.
Claims
1. A method for controlling overhead crane traffic operation, It is characterized in that The method comprises: Obtain the operating fault information and current position of the target overhead crane; Determining a drivable distance of the target overhead travelling vehicle based on the fault information; Calculate a set of reachable overhead rail segments of the target overhead travelling vehicle based on the drivable distance and the current position; Predicting the number of times other overhead cranes pass through the reachable overhead rail segments in the reachable overhead rail segment set according to the travel paths of other overhead cranes; Calculating the deviation between the faulty driving path of the target overhead travelling vehicle to the reachable overhead travelling vehicle section and the original driving path to the destination; Determining one of the reachable sky rail segments as a target stop segment based on the number of passes, including: detecting a detour cost of an overhead vehicle that needs to pass through the reachable sky rail segment when detouring the reachable sky rail segment, calculating a distribution influence of the reachable sky rail segment based on the number of passes, the deviation, and the detour cost, and determining one of the reachable sky rail segments as a target stop segment based on the distribution influence, wherein the distribution influence is positively correlated with the number of passes, the deviation, and the detour cost; Controlling the target overhead travelling crane to travel to the target stop section; The method of determining one of the reachable overhead rail segments as the target stop segment based on the delivery impact includes any one of the following two methods: a) selecting the reachable overhead rail segment with the smallest delivery impact as the target stop segment; b) selecting one of the reachable overhead rail segments with a delivery impact less than a preset impact threshold as the target stop segment, and when there is more than one reachable overhead rail segment less than the impact threshold, selecting the one with the shortest fault driving path as the target stop segment.
2. The method according to claim 1, It is characterized in that The method further includes: determining an estimated recovery time of the target overhead travelling vehicle according to the fault information; The predicting the number of times the other overhead cranes pass through the reachable overhead rail segments in the reachable overhead rail segment set according to the driving paths of the other overhead cranes includes: predicting the number of times the other overhead cranes pass through the reachable overhead rail segments before the estimated recovery time according to the driving paths of the other overhead cranes.
3. The method according to claim 1, It is characterized in that The calculating the distribution impact of the reachable sky rail segment based on the number of passes, the deviation, and the detour cost includes: The single impact degree of each detour to reach the sky rail segment is calculated according to the deviation degree and the detour cost when each detour can reach the sky rail segment, and the delivery impact degree is calculated based on the single impact degree.
4. The method according to claim 1, It is characterized in that The step of controlling the target overhead travelling vehicle to travel to the target stop section comprises: generating a changed travel path for the target overhead crane to travel to the target stop section based on the travel path of the other overhead cranes; Determine the travel time and travel speed of the target overhead rail on the changed travel path based on the overhead rail traffic information of each overhead rail segment in the changed travel path; The target overhead traveling vehicle is controlled to travel to the target stop section based on the travel time and the travel speed.
5. The method according to any one of claims 1 to 4, It is characterized in that After controlling the target overhead travelling crane to travel to the target stop section, the method further includes: broadcasting an occupation message that the target stop section is occupied to the other overhead cranes, so that the other overhead cranes update the driving path according to the occupation message; Receiving a travel message from another overhead crane that it needs to travel the target stop segment; Based on the travel message, the target overhead travelling vehicle is controlled to drive out of the target staying section before the other overhead travelling vehicles reach the target staying section, and the target staying section is searched again.
6. A crane traffic operation control device, It is characterized in that The device comprises: A fault information acquisition module is used to obtain the operation fault information and current position of the target overhead travelling crane; A reachable overhead rail segment determination module is used to determine the drivable distance of the target overhead crane based on the fault information; and calculate the reachable overhead rail segment set of the target overhead crane based on the drivable distance and the current position; a target stop segment determination module, for predicting the number of times other overhead cranes pass through the reachable overhead rail segments in the reachable overhead rail segment set according to the driving paths of other overhead cranes; calculating the deviation between the fault driving path of the target overhead crane to the reachable overhead rail segment and the original driving path to the destination, detecting the detour cost of the overhead crane that needs to pass through the reachable overhead rail segment when bypassing the reachable overhead rail segment, calculating the distribution influence of the reachable overhead rail segment based on the number of passes, the deviation, and the detour cost, and determining one of the reachable overhead rail segments as the target stop segment based on the distribution influence, wherein the distribution influence is positively correlated with the number of passes, the deviation, and the detour cost; The target stop segment determination module is further used to determine the target stop segment according to any one of the following two methods: a) selecting the reachable skyway segment with the smallest delivery impact as the target stop segment; b) selecting one of the reachable skyway segments with a delivery impact less than a preset impact threshold as the target stop segment, and when there is more than one reachable skyway segment less than the impact threshold, selecting the one with the shortest fault driving path as the target stop segment; The travel control module is used to control the target overhead travelling vehicle to travel to the target stop section.
7. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores executable instructions, and when the executable instructions are executed by a processor, the processor is caused to perform the method according to any one of claims 1 to 5.
8. An electronic device, It is characterized in that include: one or more processors; A memory for storing one or more programs, which, when executed by the one or more processors, causes the one or more processors to perform the method according to any one of claims 1 to 5.
Citation Information
Patent Citations
Crown block operation fault processing method and system, electronic equipment and medium
CN117557184A
Monitoring method and device based on electroplating production line
CN107703903A
Wireless communication charging and discharging method and system based on V2G technology
CN116198381A
Obstacle driving track prediction method and device, electronic equipment and storage medium
CN116803813A
Speed control system and method for wafer carrying system
CN117735414A