Method for judging transformer connection group based on external characteristics

By calculating the zero-sequence impedance and correlation coefficient method of the transformer, combined with the transformer type of adjacent users or station areas, the problem of remote verification of the transformer connection group in the prior art is solved, and fast and accurate judgment and maintenance are achieved.

CN118884086APending Publication Date: 2024-11-01国网福建省电力有限公司营销服务中心 +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411025083.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The prior art cannot quickly and accurately perform remote verification of the transformer coupling group without knowing it. Especially in modern excellent power supply service systems, there are difficulties in positioning and replacing old transformers.

Method used

By establishing the three-phase vector conversion relationship between the high-voltage side and the low-voltage side of the transformer, the zero-sequence impedance is calculated, and the Pearson correlation coefficient method and linear regression method are used to determine the connection group of the target transformer based on the transformer type of adjacent users or station areas. .

Benefits of technology

It realizes the rapid and accurate judgment of the transformer connection group without relying on nameplate information, simplifies the maintenance process, and improves the accuracy of results and engineering applicability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118884086A_ABST
    Figure CN118884086A_ABST
Patent Text Reader

Abstract

The invention relates to a method for judging the connection group of a transformer based on external characteristics, and the method specifically comprises the steps: building a three-phase vector conversion relation between a high-voltage side and a low-voltage side of the transformer according to an equivalent circuit of a 10kV transformer, and calculating the amplitude of each phase voltage after offset correction, a voltage included angle and a phase offset angle; according to the three-phase vector conversion relation of the high-voltage side and the low-voltage side of the transformer and the voltage amplitude and the voltage included angle of each phase after offset correction, zero-sequence voltage and current of the xy axis are calculated; calculating zero-sequence voltage, zero-sequence current and a voltage-current included angle of the transformer according to the xy-axis zero-sequence voltage and current, and further calculating zero-sequence impedance of the transformer; fitting all transformer zero-sequence impedance data obtained by calculation by using a linear regression method to obtain a zero-sequence impedance estimated value of the transformer; and comparing the zero-sequence impedance estimated value with a preset zero-sequence impedance threshold value, and judging the range of the connection group to which the transformer belongs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of power distribution and utilization, and in particular to a method for judging a transformer connection group based on external characteristics. Background Art

[0002] The connection group of the transformer is an important information of the transformer. Usually, the connection group of the transformer is predetermined by the manufacturer according to the design requirements and marked on the transformer nameplate. After the transformer is put into operation, the main methods for determining the connection group of the transformer are:

[0003] 1. Visual inspection: This is the simplest and most direct method of judgment, usually used for small transformers and open transformers. The connection group can be analyzed by observing the lead position and number of the transformer winding lead wires.

[0004] 2. Measurement method: Measuring instruments or tools are required, commonly used are multimeters and transformer ratio meters. These measuring instruments can measure the voltage ratio and phase relationship of the transformer windings to determine the connection group.

[0005] Due to the limitations of transformers with connection group Yyn0, in the modern excellent power supply service system, it is necessary to locate and replace such old transformers. However, the number of transformers is very large, and it is difficult to check each one on site. In the actual maintenance and use process, the system files may be wrong and need to be updated and confirmed. Nowadays, there is a lack of a convenient, fast and engineering practical method to quickly and accurately determine the connection group of the transformer.

[0006] In the prior art CN111308397B, a method for verifying the connection group status of a three-phase transformer is disclosed. The method takes the connection group displayed on the nameplate of the three-phase transformer as the starting point, uses the angle relationship between the voltage phasors on the high-voltage side and the low-voltage side of the three-phase transformer, compares the angle between the low-voltage side line voltage phasor and the high-voltage side line voltage phasor, performs an orthogonal decomposition of the low-voltage side line voltage phasor, and obtains the polarity corresponding to the connection group displayed on the nameplate of the three-phase transformer. The polarity is compared with the polarity measured by the test meter to verify the correctness of the connection group displayed on the nameplate of the three-phase transformer.

[0007] In the prior art, the transformer connection group can only be verified based on the existing nameplate information and calculated data, but it is not possible to remotely verify the transformer connection group without knowing the transformer connection group. Summary of the invention

[0008] In order to solve the above problems existing in the prior art, the present invention proposes a method for determining the connection group of a transformer based on external characteristics.

[0009] The technical solution of the present invention is as follows:

[0010] The present invention proposes a method for determining a transformer connection group based on external characteristics, and the specific steps include:

[0011] According to the equivalent circuit of the 10kV transformer, the three-phase vector conversion relationship between the high-voltage side and the low-voltage side of the transformer is established, and the voltage amplitude and voltage angle of each phase after offset correction, as well as the phase offset angle, are calculated;

[0012] According to the three-phase vector conversion relationship between the high-voltage side and the low-voltage side of the transformer, as well as the voltage amplitude and voltage angle of each phase after offset correction, the zero-sequence voltage and current of the xy axis are calculated;

[0013] According to the zero-sequence voltage and current of the xy axis, the zero-sequence voltage, zero-sequence current and the voltage-current angle of the transformer are calculated, and then the zero-sequence impedance of the transformer is further calculated; then the linear regression method is used to fit all the calculated zero-sequence impedance data of the transformer to obtain the estimated value of the zero-sequence impedance of the transformer;

[0014] Compare the estimated value of zero-sequence impedance with the preset zero-sequence impedance threshold value to determine the range of the connection group to which the transformer belongs;

[0015] The transformer type of the adjacent user or substation is selected as a reference, and the line voltages of each high-voltage side of the target transformer are calculated according to different transformer types based on the actual data of the low-voltage side measurement values ​​of the target transformer collected;

[0016] The correlation coefficient between the high-voltage side line voltages of the target transformer is calculated based on the Pearson correlation coefficient method, and then the evaluation function of the target transformer is constructed according to the correlation coefficient between the high-voltage side line voltages. The connection group of the target transformer is determined by using the transformer type of the adjacent user or substation and the evaluation function value and zero-sequence impedance value of the target transformer.

[0017] As a preferred implementation, the calculation formula for the step of calculating the offset-corrected voltage amplitude and voltage angle, and the phase offset angle is specifically:

[0018]

[0019] β 1 =α 1 +θ a -θ b

[0020] β 2 =α 2 +θ b -θ c

[0021] β 3 =α 3 +θ c -θa

[0022] In the formula, E a ', E b ', E c ' is the voltage amplitude of each phase after offset correction, β 1 , β 2 , β 3 is the angle between the voltages after offset correction, θ a ,θ b ,θ c is the phase shift; I a ,I b ,I c is the current of each phase on the low voltage side of the transformer; U a , U b , U c is the phase voltage on the low voltage side of the transformer; 1 、ɑ 2 、ɑ 3 is the angle between the phase voltages on the low voltage side of the transformer; R t and X t is the impedance of the transformer.

[0023] As a preferred implementation, the calculation formula for calculating the zero-sequence voltage and current of the xy axis according to the three-phase vector conversion relationship between the high-voltage side and the low-voltage side of the transformer, and the voltage amplitude and voltage angle of each phase after offset correction is specifically as follows:

[0024] U nx =-E a ′sinσ ua +E b ′sinσ ub +E c ′sinσ uc

[0025] U ny =-E a ′cosσ ua +E b ′cosσ ub +E c ′cosσ uc

[0026] I 0x =I a sinσ ia +I b sinσ ib +I c sinσ ic

[0027] I 0y =I a cosσia +I b cosσ ib +I c cosσ ic

[0028] In the formula, σ ua , σ ub , σ uc is the voltage angle of each phase after offset correction, σ ia , σ ib , σ ic is the current angle of each phase after offset correction.

[0029] As a preferred implementation, the transformer type of the adjacent user or substation is selected as a reference, and the steps of calculating each high-voltage side line voltage of the target transformer according to different transformer types are specifically as follows:

[0030] When the transformer metering mode of the adjacent user or substation is high supply and low timing, the collected low-voltage side measurement value of the target transformer is converted into the high-voltage side voltage of the transformer based on the equivalent circuit. The specific calculation formula is as follows:

[0031] E L1 2 =E a ' 2 +E b ' 2 -2E a ′E b ′cosβ 1

[0032] E L2 2 =E b ' 2 +E c ' 2 -2E b ′E c ′cosβ 2

[0033] E L3 2 =E c ' 2 +E a ' 2 -2E c ′E a ′cosβ 3

[0034] In the formula, E L1 、E L2 、E L3 is the line voltage between phases A, B, and C on the high voltage side of the target transformer;

[0035] When the transformer metering mode of the adjacent user or substation is high supply high timing, phase B is used as the reference phase, based on the collected line voltage E L1 、E L3 and E L1 and E L3 The angle between them is calculated using the cosine theorem. L2 , the specific calculation formula is as follows:

[0036] E L2 2 =E′ L1 2 +E′ L3 2 -2E′ L1 E′ L3 cosδ 2

[0037] In the formula, E L1 、E L2 、E L3 is the line voltage between phases A, B, and C on the high-voltage side of the target transformer; δ 2 is the voltage angle between phase A and phase C.

[0038] As a preferred implementation, when the transformer load is balanced, the calculation formula for calculating the transformer zero-sequence voltage, zero-sequence current and zero-sequence voltage-current angle according to the xy-axis zero-sequence voltage and current is specifically:

[0039]

[0040] Where U n is the transformer zero-sequence voltage; I 0 is the transformer zero-sequence current; θ n Zero sequence

[0041] The angle between voltage and current,

[0042] As a preferred implementation, the calculation formula for the step of further calculating the transformer zero-sequence impedance is specifically:

[0043]

[0044] R n =Z n cosθ n

[0045] X n =Z n sinθ n

[0046] In the formula, Z nis the zero-sequence impedance of the transformer; R n is the zero-sequence resistance of the transformer; X n is the zero-sequence reactance of the transformer.

[0047] As a preferred implementation, the calculation formula for the step of calculating the correlation coefficient between the high-voltage side line voltages of the target transformer based on the Pearson correlation coefficient method is specifically:

[0048]

[0049] Where X and Y are any two of the three-phase line voltages on the high-voltage side of the target transformer;

[0050] As a preferred implementation, the calculation formula of the step of constructing the evaluation function of the target transformer according to the correlation coefficient between the high-voltage side line voltages is specifically:

[0051] Since there are 6 possible phases of the distribution transformer connection, there are 6 permutations and combinations when calculating the correlation coefficient. Therefore, the objective function of the correlation coefficient is defined as the sum of all correlation coefficients. The specific calculation formula is as follows:

[0052] F m (X,Y)=ρ(X A ,Y B )+ρ(X B ,Y C )+ρ(X C ,Y A )

[0053] An evaluation function is established as the judgment index of the target transformer, and the calculation formula is as follows:

[0054] T m (X,Y)=max[F 1 (X,Y),F 2 (X,Y),...,F 6 (X,Y)

[0055] Where X and Y are any two of the three-phase line voltages on the high-voltage side of the target transformer.

[0056] As a preferred implementation, the step of determining the connection group of the target transformer by using the transformer type of the adjacent user or substation and the evaluation function value and zero-sequence impedance value of the target transformer is specifically as follows:

[0057] When the transformer metering mode of the adjacent user or substation is high supply and high timing, the transformer becomes three-phase three-wire, then the evaluation function T m Set to T Y3 or T D3 :

[0058] When the transformer metering mode of the adjacent user or substation is high supply high timing, if T Y3 >T D3 And when the zero-sequence impedance is greater than the preset threshold, the distribution transformer connection group to be tested is Yyn0; if T Y3 <T D3 And when the zero-sequence impedance is less than the preset threshold, the tested pair becomes Dyn11;

[0059] When the transformer metering mode of adjacent users or substations is high supply and low timing, there are two connection groups of distribution transformers. The evaluation function T m Set to T YY or T YD or T DD or T DY :

[0060] When the transformer metering mode of the adjacent user or substation is high supply and low timing, if the zero-sequence impedance is greater than the threshold, and T YY or T YD maximum, the distribution transformer connection group to be tested is Yyn0; if the zero-sequence impedance is less than the threshold, and T DY or T DD The maximum value is Dyn11.

[0061] The present invention has the following beneficial effects:

[0062] 1. The present invention uses the metering data of the electric energy meter to make basic calculations, infer the voltage and current on the high-voltage side of the target transformer after offset correction, and further calculates the zero-sequence impedance, providing basic data for the subsequent judgment of the transformer connection group.

[0063] 2. The present invention combines the types and data of transformers adjacent to the target transformer as measurement reference points to further infer the connection group of the target transformer, thereby ensuring the accuracy of the results.

[0064] 3. The calculation process of the present invention is simple and efficient, and has good engineering applicability. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] Figure 1 It is a schematic diagram of the process of the present invention;

[0066] Figure 2 It is a schematic diagram of the three-term vector conversion relationship between the high-voltage side and the low-voltage side of the transformer;

[0067] Figure 3 It is a schematic diagram of the relationship between voltage amplitude and phase deviation;

[0068] Figure 4 This is a schematic diagram of the three-phase equivalent circuit for high-supply and low-meter dedicated transformer users. DETAILED DESCRIPTION

[0069] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0070] It should be understood that the step numbers used in this document are only for convenience of description and are not intended to limit the order in which the steps are executed.

[0071] It should be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.

[0072] The terms “include” and “comprising” indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.

[0073] The term "and / or" means and includes any and all possible combinations of one or more of the associated listed items.

[0074] Embodiment 1:

[0075] See also Figure 1 , a method for determining transformer connection groups based on external characteristics, the specific steps include:

[0076] According to the equivalent circuit of the 10kV transformer, the three-phase vector conversion relationship between the high-voltage side and the low-voltage side of the transformer is established, and the voltage amplitude and voltage angle of each phase after offset correction, as well as the phase offset angle, are calculated;

[0077] According to the three-phase vector conversion relationship between the high-voltage side and the low-voltage side of the transformer, as well as the voltage amplitude and voltage angle of each phase after offset correction, the zero-sequence voltage and current of the xy axis are calculated;

[0078] According to the zero-sequence voltage and current of the xy axis, the zero-sequence voltage, zero-sequence current and the voltage-current angle of the transformer are calculated, and then the zero-sequence impedance of the transformer is further calculated; then the linear regression method is used to fit all the calculated zero-sequence impedance data of the transformer to obtain the estimated value of the zero-sequence impedance of the transformer;

[0079] Compare the estimated value of zero-sequence impedance with the preset zero-sequence impedance threshold value to determine the range of the connection group to which the transformer belongs;

[0080] The transformer type of the adjacent user or substation is selected as a reference, and the line voltages of each high-voltage side of the target transformer are calculated according to different transformer types based on the actual data of the low-voltage side measurement values ​​of the target transformer collected;

[0081] The correlation coefficient between the high-voltage side line voltages of the target transformer is calculated based on the Pearson correlation coefficient method, and then the evaluation function of the target transformer is constructed according to the correlation coefficient between the high-voltage side line voltages. The connection group of the target transformer is determined by using the transformer type of the adjacent user or substation and the evaluation function value and zero-sequence impedance value of the target transformer.

[0082] In this embodiment, by collecting the three-phase voltage and current data of the low-voltage side concentrator of a 10kV transformer, and combining the external characteristics of the transformer, the zero-sequence voltage and current of the transformer are derived by vector summation, and the zero-sequence impedance under the zero-sequence voltage and current is calculated, so that the zero-sequence impedance data is fitted based on the linear regression method to obtain the estimated value of the zero-sequence impedance of the transformer. Then, by comparing the estimated value of the zero-sequence impedance with the threshold, the preliminary range of the connection group of the transformer is determined, and then combined with the types and data of adjacent transformers, the accurate connection group of the target transformer is finally determined.

[0083] As a preferred implementation of this embodiment, the calculation formula for the step of calculating the offset-corrected voltage amplitude and voltage angle, and the phase offset angle is specifically:

[0084]

[0085] β 1 =α 1 +θ a -θ b

[0086] β 2 =α 2 +θ b -θ c

[0087] β 3 =α 3 +θ c -θ a

[0088] In the formula, E a ', E b ', E c ' is the voltage amplitude of each phase after offset correction, β 1 , β 2 , β 3 is the angle between the voltages after offset correction, θ a ,θ b ,θ c is the phase shift; Ia ,I b ,I c is the current of each phase on the low voltage side of the transformer; U a , U b , U c is the phase voltage on the low voltage side of the transformer; 1 、ɑ 2 、ɑ 3 is the angle between the phase voltages on the low voltage side of the transformer; R t and X t is the impedance of the transformer.

[0089] In this embodiment, the three-term vector conversion relationship between the high-voltage side and the low-voltage side of the transformer is as follows: Figure 2 As shown, the transformer impedance R t , X t The relationship between the voltage amplitude and phase deviation caused by Figure 3 shown.

[0090] As a preferred implementation of this embodiment, the calculation formula for calculating the zero-sequence voltage and current of the xy axis according to the three-phase vector conversion relationship between the high-voltage side and the low-voltage side of the transformer, and the voltage amplitude and voltage angle of each phase after offset correction is specifically as follows:

[0091] U nx =-E a ′sinσ ua +E b ′sinσ ub +E c ′sinσ uc

[0092] U ny =-E a ′cosσ ua +E b ′cosσ ub +E c ′cosσ uc

[0093] I 0x =I a sinσ ia +I b sinσ ib +I c sinσ ic

[0094] I 0y =I a cosσ ia +I b cosσ ib +I c cosσic

[0095] In the formula, σ ua , σ ub , σ uc is the voltage angle of each phase after offset correction, σ ia , σ ib , σ ic is the current angle of each phase after offset correction.

[0096] In this embodiment, the voltage amplitude obtained in the above steps and the three-term vector conversion relationship between the high-voltage side and the low-voltage side of the transformer are used for further calculation.

[0097] As a preferred implementation of this embodiment, the transformer type of the adjacent user or substation is selected as a reference, and the steps of calculating each high-voltage side line voltage of the target transformer according to different transformer types are specifically as follows:

[0098] When the transformer metering mode of the adjacent user or substation is high supply and low timing, the collected low-voltage side measurement value of the target transformer is converted into the high-voltage side voltage of the transformer based on the equivalent circuit. The specific calculation formula is as follows:

[0099] E L1 2 =E a ' 2 +E b ' 2 -2E a ′E b ′cosβ 1

[0100] E L2 2 =E b ' 2 +E c ' 2 -2E b ′E c ′cosβ 2

[0101] E L3 2 =E c ' 2 +E a ' 2 -2E c ′E a ′cosβ 3

[0102] In the formula, E L1 、E L2 、E L3is the line voltage between phases A, B, and C on the high voltage side of the target transformer;

[0103] In this embodiment, the three phases of the high voltage line are usually relatively balanced, and it can be assumed that E a 、E b 、E c The angle between them is 120°. According to the cosine theorem, we have:

[0104] E L1 2 =E a 2 +E b 2 +E a E b

[0105] E L2 2 =E b 2 +E c 2 +E b E c

[0106] E L3 2 =E c 2 +E a 2 +E c E a

[0107] When the transformer metering mode of the adjacent user or substation is high supply high timing, phase B is used as the reference phase, based on the collected line voltage E L1 、E L3 and E L1 and E L3 The angle between them is calculated using the cosine theorem. L2 , the specific calculation formula is as follows:

[0108] E L2 2 =E′ L1 2 +E′ L3 2 -2E′ L1 E′ L3 cosδ 2

[0109] In the formula, E L1 、E L2 、E L3 is the line voltage between phases A, B, and C on the high-voltage side of the target transformer; δ 2 is the voltage angle between phase A and phase C.

[0110] In this embodiment, when the transformer metering mode of the adjacent user or substation is high supply and low timing, the three-phase equivalent circuit of the high supply and low timing dedicated transformer user is as follows: Figure 4 shown.

[0111] As a preferred implementation of this embodiment, when the transformer load is balanced, the calculation formula for calculating the transformer zero-sequence voltage, zero-sequence current and zero-sequence voltage-current angle according to the xy-axis zero-sequence voltage and current is specifically:

[0112]

[0113] Where U n is the transformer zero-sequence voltage; I 0 is the transformer zero-sequence current; θ n Zero sequence

[0114] The angle between voltage and current,

[0115] As a preferred implementation of this embodiment, the calculation formula for the step of further calculating the zero-sequence impedance of the transformer is specifically:

[0116]

[0117] R n =Z n cosθ n

[0118] X n =Z n sinθ n

[0119] In the formula, Z n is the zero-sequence impedance of the transformer; R n is the zero-sequence resistance of the transformer; X n is the zero-sequence reactance of the transformer.

[0120] As a preferred implementation of this embodiment, the calculation formula of the step of calculating the correlation coefficient between the high-voltage side line voltages of the target transformer based on the Pearson correlation coefficient method is specifically:

[0121]

[0122] Where X and Y are any two of the three-phase line voltages on the high-voltage side of the target transformer;

[0123] As a preferred implementation of this embodiment, the calculation formula of the step of constructing the evaluation function of the target transformer according to the correlation coefficient between the high-voltage side line voltages is specifically:

[0124] Since there are 6 possible phases of the distribution transformer connection, there are 6 permutations and combinations when calculating the correlation coefficient. Therefore, the objective function of the correlation coefficient is defined as the sum of all correlation coefficients. The specific calculation formula is as follows:

[0125] F m (X,Y)=ρ(X A ,Y B )+ρ(X B ,Y C )+ρ(X C ,Y A )

[0126] An evaluation function is established as the judgment index of the target transformer, and the calculation formula is as follows:

[0127] T m (X,Y)=max[F 1 (X,Y),F 2 (X,Y),...,F 6 (X,Y)]

[0128] Where X and Y are any two of the three-phase line voltages on the high-voltage side of the target transformer.

[0129] In this embodiment, based on the measured and derived line voltage data, the evaluation function F is the sum of the correlation coefficients of the line voltage data of each phase. According to different permutations and combinations, the evaluation function is calculated, and the distribution transformer connection group can be judged as follows:

[0130] Since there are 6 possible phases of distribution transformer wiring (ABC, BCA, CAB, ACB, BAC, CBA), there are 6 permutations and combinations when calculating the correlation coefficient. Therefore, it is necessary to calculate the maximum value of the 6 permutations and combinations. The correlation coefficient objective function is defined as:

[0131] F m (X,Y)=ρ(X A ,Y B )+ρ(X B ,Y C )+ρ(X C ,Y A )

[0132] The connection group of the distribution transformer to be tested is unknown. There are two cases: Yyn0 and Dyn11. The measured voltage on the high-voltage side can be the phase voltage or the line voltage.

[0133] If the metering method of the adjacent distribution transformer used as a reference is high supply and high timing, the distribution transformer is three-phase three-wire, and the voltage value can be directly derived, then the evaluation function T m Can be set to T Y3 or T D3; If the adjacent distribution transformer is high supply and low timing, there are also two connection groups, then the evaluation function T m Can be set to T YY or T YD or T DD or T DY Then the evaluation function T m The functional form is as follows:

[0134] T m (X,Y)=max[F 1 (X,Y),F 2 (X,Y),...,F 6 (X,Y)].

[0135] As a preferred implementation of this embodiment, the step of determining the connection group of the target transformer by using the transformer type of the adjacent user or substation and the evaluation function value and zero-sequence impedance value of the target transformer is specifically as follows:

[0136] When the transformer metering mode of the adjacent user or substation is high supply and high timing, the transformer becomes three-phase three-wire, then the evaluation function T m Set to T Y3 or T D3 :

[0137] When the transformer metering mode of the adjacent user or substation is high supply high timing, if T Y3 >T D3 And when the zero-sequence impedance is greater than the preset threshold, the distribution transformer connection group to be tested is Yyn0; if T Y3 <T D3 And when the zero-sequence impedance is less than the preset threshold, the tested pair becomes Dyn11;

[0138] When the transformer metering mode of adjacent users or substations is high supply and low timing, there are two connection groups of distribution transformers. The evaluation function T m Set to T YY or T YD or T DD or T DY :

[0139] When the transformer metering mode of the adjacent user or substation is high supply and low timing, if the zero-sequence impedance is greater than the threshold, and T YY or T YD maximum, the distribution transformer connection group to be tested is Yyn0; if the zero-sequence impedance is less than the threshold, and T DY or T DD The maximum value is Dyn11.

[0140] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A method for determining transformer connection groups based on external characteristics, characterized in that: The specific steps include: According to the equivalent circuit of the 10kV transformer, the three-phase vector conversion relationship between the high-voltage side and the low-voltage side of the transformer is established, and the voltage amplitude and voltage angle of each phase after offset correction, as well as the phase offset angle, are calculated; According to the three-phase vector conversion relationship between the high-voltage side and the low-voltage side of the transformer, as well as the voltage amplitude and voltage angle of each phase after offset correction, the zero-sequence voltage and current of the xy axis are calculated; According to the zero-sequence voltage and current of the xy axis, the zero-sequence voltage, zero-sequence current and the voltage-current angle of the transformer are calculated, and then the zero-sequence impedance of the transformer is further calculated; then the linear regression method is used to fit all the calculated zero-sequence impedance data of the transformer to obtain the estimated value of the zero-sequence impedance of the transformer; Compare the estimated value of zero-sequence impedance with the preset zero-sequence impedance threshold value to determine the range of the connection group to which the transformer belongs; The transformer type of the adjacent user or substation is selected as a reference, and the line voltages of each high-voltage side of the target transformer are calculated according to different transformer types based on the actual data of the low-voltage side measurement values ​​of the target transformer collected; The correlation coefficient between the high-voltage side line voltages of the target transformer is calculated based on the Pearson correlation coefficient method, and then the evaluation function of the target transformer is constructed according to the correlation coefficient between the high-voltage side line voltages. The connection group of the target transformer is determined by using the transformer type of the adjacent user or substation and the evaluation function value and zero-sequence impedance value of the target transformer.

2. A method for determining transformer connection groups based on external characteristics according to claim 1, characterized in that: The calculation formula for calculating the offset-corrected voltage amplitude and voltage angle, as well as the phase offset angle step is specifically: β1=α1+θ a -θ b β2=α2+θ b -θ c β3=α3+θ c -θ a In the formula, E a ', E b ', E c ' is the voltage amplitude of each phase after offset correction, β1, β2, β3 are the angles between the voltages after offset correction, θ a ,θ b ,θ c is the phase shift; I a ,I b ,I c is the current of each phase on the low voltage side of the transformer; U a , U b , U c is the phase voltage on the low voltage side of the transformer; ɑ1, ɑ2, ɑ3 are the angles between the phase voltages on the low voltage side of the transformer; R t and X t is the impedance of the transformer.

3. A method for determining transformer connection groups based on external characteristics according to claim 2, characterized in that: The calculation formula for calculating the zero-sequence voltage and current of the xy axis according to the three-phase vector conversion relationship between the high-voltage side and the low-voltage side of the transformer, and the voltage amplitude and voltage angle of each phase after offset correction is specifically as follows: The nx =-E′ a sinσ ua +E′ b sinσ ub +E′ c sinσ uc U ny =-And′ a cosσ ua +E′ b cosσ ub +E′ c cosσ uc I 0x =I a sinσ ia +I b sinσ ib +I c sinσ ic I 0y =I a cosσ ia +I b cosσ ib +I c cosσ ic In the formula, σ ua , σ ub , σ uc is the voltage angle of each phase after offset correction, σ ia , σ ib , σ ic is the current angle of each phase after offset correction.

4. The method for determining transformer connection groups based on external characteristics according to claim 2, characterized in that: The steps of selecting the transformer type of the adjacent user or substation as a reference, and calculating the line voltage of each high-voltage side of the target transformer according to the actual data of the low-voltage side measurement value collected for the target transformer according to different transformer types are specifically as follows: When the transformer metering mode of the adjacent user or substation is high supply and low timing, the collected low-voltage side measurement value of the target transformer is converted into the high-voltage side voltage of the transformer based on the equivalent circuit. The specific calculation formula is as follows: In the formula, E L1 、E L2 、E L3 is the line voltage between phases A, B, and C on the high voltage side of the target transformer; When the transformer metering mode of the adjacent user or substation is high supply high timing, phase B is used as the reference phase, based on the collected line voltage E L1 、E L3 and E L1 and E L3 The angle between them is calculated using the cosine theorem. L2 , the specific calculation formula is as follows: In the formula, E L1 、E L2 、E L3 is the line voltage between phases A, B, and C on the high-voltage side of the target transformer; δ2 is the voltage angle between phase A and phase C.

5. The method for determining transformer connection groups based on external characteristics according to claim 3, characterized in that: When the transformer load is balanced, the calculation formula for calculating the transformer zero-sequence voltage, zero-sequence current and zero-sequence voltage-current angle according to the xy-axis zero-sequence voltage and current is specifically: Where U n is the transformer zero-sequence voltage; I0 is the transformer zero-sequence current; θ n is the angle between zero-sequence voltage and current.

6. The method for determining transformer connection groups based on external characteristics according to claim 4, characterized in that: The calculation formula for further calculating the transformer zero-sequence impedance step is specifically: R n =Z n cosθ n X n =Z n sinθ n In the formula, Z n is the zero-sequence impedance of the transformer; R n is the zero-sequence resistance of the transformer; X n is the zero-sequence reactance of the transformer.

7. The method for determining transformer connection groups based on external characteristics according to claim 1, characterized in that: The calculation formula of the step of calculating the correlation coefficient between the high-voltage side line voltages of the target transformer based on the Pearson correlation coefficient method is specifically: Where X and Y are any two of the three-phase line voltages on the high-voltage side of the target transformer.

8. The method for determining transformer connection groups based on external characteristics according to claim 1, characterized in that: The calculation formula of the step of constructing the evaluation function of the target transformer according to the correlation coefficient between the high-voltage side line voltages is specifically: Since there are 6 possible phases of the distribution transformer connection, there are 6 permutations and combinations when calculating the correlation coefficient. Therefore, the objective function of the correlation coefficient is defined as the sum of all correlation coefficients. The specific calculation formula is as follows: F m (X,Y)=ρ(X A ,Y B )+ρ(X B ,Y C )+ρ(X C ,Y A ) An evaluation function is established as the judgment index of the target transformer, and the calculation formula is as follows: T m (X,Y)=max[F1(X,Y),F2(X,Y),...,F6(x,Y)] Where X and Y are any two of the three-phase line voltages on the high-voltage side of the target transformer.

9. The method for determining transformer connection groups based on external characteristics according to claim 1, characterized in that: The step of determining the connection group of the target transformer by using the transformer type of the adjacent user or substation and the evaluation function value and zero-sequence impedance value of the target transformer is specifically as follows: When the transformer metering mode of the adjacent user or substation is high supply and high timing, the transformer becomes three-phase three-wire, then the evaluation function T m Set to T Y3 or T D3 : When the transformer metering mode of the adjacent user or substation is high supply high timing, if T Y3 >T D3 And when the zero-sequence impedance is greater than the preset threshold, the distribution transformer connection group to be tested is Yyn0; if T Y3 <T D3 And when the zero-sequence impedance is less than the preset threshold, the tested pair becomes Dyn11; When the transformer metering mode of adjacent users or substations is high supply and low timing, there are two connection groups of distribution transformers. The evaluation function T m Set to T YY or T YD or T DD or T DY : When the transformer metering mode of the adjacent user or substation is high supply and low timing, if the zero-sequence impedance is greater than the threshold, and T YY or T YD maximum, the distribution transformer connection group to be tested is Yyn0; if the zero-sequence impedance is less than the threshold, and T DY or T DD The maximum value is Dyn11.

Citation Information

Cited By

  • Online monitoring and early warning method for abnormal state of power distribution area

    CN120490675A