Fusion model-based pipe gallery structure settlement monitoring management method and system
Through the fusion model-based settlement monitoring and management method of pipeline corridor structure, the segmentation and overall settlement status of the pipeline corridor are predicted, and the problem of insufficient settlement monitoring in the existing technology is solved, and the safety and stability of the pipeline corridor are guaranteed.
Patent Information
- Application Number
- CN202411375531.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2024-11-01
AI Technical Summary
The existing pipeline settlement monitoring system cannot issue a warning in time when the settlement displacement distance exceeds the preset threshold, resulting in damage to the pipeline structure. Since the monitoring equipment is only set in some areas, it cannot ensure the overall safety and stability of the pipeline corridor.
Using the fusion model-based settlement monitoring and management method for pipe gallery structures, by dividing the pipeline gallery into multiple sub-segments, obtaining structural and environmental data regularly, using the settlement prediction model to predict whether there is settlement phenomenon in the sub-segments, and all the sub-segments are included in the same time period. The prediction results of sub-segmentation are comprehensively analyzed through the fusion model to generate management strategies for early warning and optimization of management.
Effectively warn of potential settlement risks, take measures in advance, improve the safety and stability of the pipeline corridor, and ensure the sustainability and efficiency of the pipeline corridor use.
Smart Images

Figure CN118886618A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of pipe gallery monitoring and management, and in particular to a pipe gallery structure settlement monitoring and management method and system based on a fusion model. Background Art
[0002] The full name of the pipe gallery is the comprehensive pipe gallery or the urban underground comprehensive pipe gallery, which is used to centrally lay and manage various municipal pipelines, such as electricity, communications, water supply, drainage, heat, gas, etc. This design places multiple pipelines in the same underground tunnel. During the use of the pipe gallery, settlement detection needs to be carried out regularly to ensure the stable use of the pipe gallery; The existing tunnel structure settlement monitoring system usually sets up monitoring equipment on the tunnel to monitor the settlement and displacement of the tunnel. When the settlement displacement distance exceeds the preset displacement distance threshold, a warning signal is sent to the relevant management personnel. This monitoring method has the following defects: 1. If only the settlement and displacement of the pipe gallery is monitored, when the settlement and displacement distance exceeds the preset displacement distance threshold, it will take some time for the management personnel to reach the settlement area of the pipe gallery for maintenance. During this period of time, the settlement of the pipe gallery may continue to intensify, resulting in damage to the pipelines inside the pipe gallery, causing greater economic losses; 2. Due to the continuity and integrity of the pipeline corridor, monitoring equipment is usually only set up in certain areas of the pipeline corridor for monitoring. If the entire pipeline corridor is in a settlement condition, but the settlement displacement distance monitored by the monitoring equipment in each area does not exceed the preset displacement distance threshold, there will still be a risk of structural damage to the pipeline corridor, and the safety and stability of the use of the pipeline corridor cannot be guaranteed. Summary of the invention
[0003] The purpose of the present invention is to provide a pipeline corridor structure settlement monitoring management method and system based on a fusion model, which predicts whether there is a settlement risk in the use of the pipeline corridor based on the settlement prediction model, so as to issue an early warning prompt before the settlement displacement distance of the pipeline corridor exceeds a preset displacement distance threshold, and analyzes the overall settlement condition of the pipeline corridor by combining the monitoring results of multiple areas of the pipeline corridor with the fusion model, further ensuring the safety and stability of the use of the pipeline corridor, so as to solve the shortcomings of the background technology.
[0004] In order to achieve the above object, the present invention provides the following technical solution: a pipeline corridor structure settlement monitoring and management method based on a fusion model, the management method comprising the following steps: The management system obtains the basic information of the corridor through the corridor platform, divides the corridor into multiple sub-segments based on the basic information, and obtains the structural data and environmental data of each sub-segment at regular intervals during the operation of the corridor; After substituting the structural data and environmental data into the settlement prediction model, the settlement prediction model predicts whether there is settlement in the sub-segment. If settlement is predicted in the sub-segment, an early warning signal is sent to the management personnel; If no settlement is predicted in the sub-segment, the prediction results of all sub-segments in the same time period are used to comprehensively analyze the overall settlement condition of the corridor through the fusion model, and the corresponding management strategy is generated based on the analysis results of the overall settlement condition of the corridor, and the management strategy is sent to the management personnel.
[0005] In a preferred embodiment, substituting the structural data and the environmental data into the settlement prediction model comprises the following steps: Regularly obtain the structural data and environmental data of each sub-segment. The structural data includes the load variation index and the cumulative loss index, and the environmental data includes the foundation settlement and vibration amplitude. After the load variation index, cumulative loss index, foundation settlement and vibration amplitude are normalized, they are substituted into the settlement prediction model for comprehensive calculation to obtain the settlement prediction coefficient.
[0006] In a preferred embodiment, the settlement prediction model predicts whether there is settlement in a subsegment, including the following steps: The settlement prediction model compares the calculated settlement prediction coefficient with the preset coefficient threshold, and the coefficient threshold is used to predict whether settlement will occur in the current sub-segment; If the settlement prediction coefficient is greater than or equal to the coefficient threshold, it is predicted that the current sub-segment will not settle and there is no settlement phenomenon. If the settlement prediction coefficient is less than the coefficient threshold, it is predicted that the current sub-segment will settle and there is settlement phenomenon.
[0007] In a preferred embodiment, the prediction results of all sub-segments in the same time period are used to comprehensively analyze the overall settlement of the pipeline corridor through a fusion model, including the following steps: The settlement prediction coefficients of all sub-segments in the same time period are used to comprehensively analyze the overall settlement of the corridor through the fusion model. The model expression is: , where is the overall sedimentation index, It represents the settlement prediction coefficient of each sub-segment of the corridor. Indicates the number of corridor sub-sections. is the regression coefficient of each sub-segment, and the regression coefficient is greater than 0; The obtained overall settlement index is compared with the preset index threshold. The index threshold is used to analyze whether there is a settlement problem in the entire corridor. If the overall settlement index is greater than or equal to the index threshold, it is analyzed that there is no settlement problem in the entire corridor. If the overall settlement index is less than the index threshold, it is analyzed that there is a settlement problem in the entire corridor.
[0008] In a preferred embodiment, generating a corresponding management strategy based on the overall settlement analysis results of the utility corridor includes the following steps: According to the analysis results of the overall settlement status of the pipeline corridor, all the pipeline corridors in the management area are divided into a settlement set and a normal set. If the analysis shows that there is no settlement problem in the pipeline corridor as a whole, the pipeline corridor will be classified into the normal set. If the analysis shows that there is a settlement problem in the pipeline corridor as a whole, the pipeline corridor will be classified into the settlement set. In addition, after all the pipeline corridors in the settlement set are sorted from small to large according to the overall settlement index, the settlement set will be sent to the administrator.
[0009] In a preferred embodiment, the calculation logic of the load variation index is: obtaining pressure values in real time through pressure sensors arranged at various monitoring points on the outer surface of the sub-segment, establishing a data set of pressure values obtained from multiple monitoring points, calculating the average pressure and pressure standard deviation of the data set, and obtaining the load variation index by dividing the pressure standard deviation by the average pressure; The calculation expression of the cumulative loss index is: , where is at the stress level The number of cycles experienced, is at the stress level The fatigue life of the lower pipe gallery material and the stress level are obtained by subtracting the minimum stress from the maximum stress in the cyclic load.
[0010] In a preferred embodiment, the calculation expression of the foundation settlement is: , where is the load on the foundation, is the width of the foundation, is the Poisson's ratio of soil, is the elastic modulus of soil, is the current buried depth of the tunnel, It is the foundation burial depth of the pipe gallery; The calculation expression of the vibration amplitude is: , where For the moment The vibration amplitude at Indicates the cumulative monitoring time period.
[0011] The pipeline corridor structure settlement monitoring and management system based on the fusion model includes sub-segment division module, settlement prediction module and pipeline corridor management module; Sub-segment division module: obtain the basic information of the corridor through the corridor platform, and divide the corridor into multiple sub-segments based on the basic information; Settlement prediction module: During the operation of the tunnel, the structural data and environmental data of each sub-segment are obtained regularly. After the structural data and environmental data are substituted into the settlement prediction model, the settlement prediction model predicts whether there is settlement in the sub-segment. If settlement is predicted in the sub-segment, an early warning signal is sent to the management personnel; Pipeline corridor management module: If no settlement is predicted in a sub-segment, the prediction results of all sub-segments in the same time period are used to comprehensively analyze the overall settlement status of the pipeline corridor through a fusion model, and a corresponding management strategy is generated based on the analysis results of the overall settlement status of the pipeline corridor, and the management strategy is sent to the management personnel.
[0012] In the above technical solution, the technical effects and advantages provided by the present invention are: 1. The present invention divides the pipe corridor into multiple sub-segments. During the operation of the pipe corridor, the structural data and environmental data of each sub-segment are obtained regularly. After the structural data and environmental data are substituted into the settlement prediction model, the settlement prediction model predicts whether there is settlement in the sub-segment. If the settlement is predicted in the sub-segment, an early warning signal is sent to the management personnel. If the settlement is not predicted in the sub-segment, the prediction results of all sub-segments in the same time period are comprehensively analyzed through a fusion model to analyze the overall settlement of the pipe corridor, and a corresponding management strategy is generated based on the analysis results of the overall settlement of the pipe corridor. The management system predicts whether there is a settlement risk in the use of the pipe corridor based on the settlement prediction model, so as to issue an early warning prompt before the settlement displacement distance of the pipe corridor exceeds the preset displacement distance threshold, and analyzes the overall settlement of the pipe corridor through the fusion model combined with the monitoring results of multiple areas of the pipe corridor, so as to further ensure the safety and stability of the use of the pipe corridor.
[0013] 2. The present invention comprehensively analyzes the overall settlement condition of the corridor through the fusion model of the settlement prediction coefficients of all sub-segments in the same time period. In this way, even if it is predicted that there is no settlement problem in each sub-segment, when the settlement prediction coefficients of all sub-segments are developing in a deteriorating trend, the corridor as a whole will develop towards a settlement trend (this is because the sub-segments are interrelated. If the corridor as a whole develops towards a settlement trend, it is likely to accelerate the overall settlement speed of the corridor in a short time, so prediction is needed), which can facilitate the administrator to understand the overall settlement condition of the corridor, so that management can be made in advance and the management efficiency of the corridor can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0015] Figure 1 The figure is a flow chart of the method of the present invention. DETAILED DESCRIPTION
[0016] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0017] Example 1: Please refer to Figure 1 As shown, the pipeline corridor structure settlement monitoring and management method based on the fusion model described in this embodiment includes the following steps: The management system obtains the basic information of the corridor through the corridor platform and divides the corridor into multiple sub-segments based on the basic information. During the operation of the corridor, the structural data and environmental data of each sub-segment are obtained at regular intervals. After substituting the structural data and environmental data into the settlement prediction model, the settlement prediction model predicts whether there is settlement in the sub-segment. If settlement is predicted in the sub-segment, an early warning signal is sent to the management personnel. If settlement is not predicted in the sub-segment, the prediction results of all sub-segments in the same time period are comprehensively analyzed through a fusion model to determine the overall settlement status of the corridor, and corresponding management strategies are generated based on the analysis results of the overall settlement status of the corridor, and the management strategies are sent to the management personnel.
[0018] This application divides the pipe corridor into multiple sub-segments. During the operation of the pipe corridor, the structural data and environmental data of each sub-segment are obtained regularly. After the structural data and environmental data are substituted into the settlement prediction model, the settlement prediction model predicts whether there is settlement in the sub-segment. If the settlement is predicted in the sub-segment, an early warning signal is sent to the management personnel. If the settlement is not predicted in the sub-segment, the prediction results of all sub-segments in the same time period are comprehensively analyzed through a fusion model to analyze the overall settlement status of the pipe corridor, and a corresponding management strategy is generated based on the analysis results of the overall settlement status of the pipe corridor. The management system predicts whether there is a settlement risk in the use of the pipe corridor based on the settlement prediction model, so as to issue an early warning prompt before the settlement displacement distance of the pipe corridor exceeds the preset displacement distance threshold, and analyzes the overall settlement status of the pipe corridor through the fusion model combined with the monitoring results of multiple areas of the pipe corridor, so as to further ensure the safety and stability of the use of the pipe corridor.
[0019] Embodiment 2: The management system obtains basic information of the pipe gallery through the pipe gallery platform, and divides the pipe gallery into multiple sub-segments according to the basic information, including the following steps: Obtain various basic data from the corridor platform, including geographic information system (GIS) data, pipeline type, location, length, height, intersection and other information in the corridor, clean the acquired data, delete duplicate or incomplete information, ensure data accuracy and consistency, integrate data from different sources, and form a comprehensive corridor basic information database; The tunnel is divided into sub-segments according to its length. Each sub-segment forms an independent management unit. The detailed information of each sub-segment is recorded in the system, including the segment number, boundary coordinates, pipeline types included, length, important intersections, etc. The basic information and segment information are updated in real time according to the actual changes in the tunnel (such as new pipelines, maintenance updates, etc.).
[0020] During the operation of the tunnel, the structural data and environmental data of each sub-segment are obtained regularly. After the structural data and environmental data are substituted into the settlement prediction model, the settlement prediction model predicts whether there is settlement in the sub-segment. If settlement is predicted in the sub-segment, an early warning signal is sent to the management personnel, including the following steps: Regularly obtain the structural data and environmental data of each sub-segment. The structural data includes the load variation index and the cumulative loss index, and the environmental data includes the foundation settlement and vibration amplitude. After normalizing the load variation index, cumulative loss index, foundation settlement and vibration amplitude, they are substituted into the settlement prediction model for comprehensive calculation to obtain the settlement prediction coefficient. The model is expressed as: , where is the settlement prediction coefficient, is the foundation settlement, is the load variation index, is the cumulative loss index, is the vibration amplitude, , , are the proportional coefficients of foundation settlement, load variation index and cumulative loss index, respectively, and , , Both are greater than 0.
[0021] The smaller the settlement prediction coefficient, the more likely the current sub-segment will experience settlement. The settlement prediction model will compare the calculated settlement prediction coefficient with the preset coefficient threshold. The coefficient threshold is used to predict whether the current sub-segment will experience settlement. If the settlement prediction coefficient is greater than or equal to the coefficient threshold, it is predicted that the current sub-segment will not experience settlement and there will be no settlement phenomenon. If the settlement prediction coefficient is less than the coefficient threshold, it is predicted that the current sub-segment will experience settlement and there will be settlement phenomenon.
[0022] The calculation logic of the load variation index is: obtain the pressure value in real time through the pressure sensor set at each monitoring point on the outer surface of the sub-segment, establish a data set of the pressure values obtained from multiple monitoring points, and calculate the average pressure and pressure standard deviation of the data set. The expression is: , where is the average pressure, is the pressure standard deviation, For the The pressure at each monitoring point, is the number of monitoring points. The load variation index is obtained by dividing the pressure standard deviation by the average pressure. The larger the load variation index, the greater the load difference between the monitoring points on the outer surface of the sub-segment, which may indicate that the following anomalies on the corridor may cause settlement problems: Structural inhomogeneity; Uneven materials: If the quality of the component materials of the tunnel is inconsistent, the strength of some parts may not be sufficient to withstand the design load, resulting in uneven settlement.
[0023] Construction quality issues: Irregular operations, workmanship defects or cutting corners during the construction process may lead to uneven structures.
[0024] Foundation design or construction issues; Uneven settlement of foundations: Differences in foundation soil properties may result in different bearing capacities of different foundations, causing uneven settlement.
[0025] Inconsistent foundation depth or form: If the foundation depth, form or reinforcement measures are inconsistent, it may cause local overload and lead to settlement.
[0026] The pipe gallery has insufficient carrying capacity; Overload operation: The equipment or facilities carried by the tunnel exceed the design expectations, resulting in insufficient local bearing capacity and causing settlement.
[0027] Local concentrated load: Certain areas are subject to concentrated loads due to equipment, storage, etc., which exceed the design bearing capacity of the area.
[0028] changes in geological conditions; Changes in foundation soil quality: Factors such as rising or falling groundwater levels, soil loss or expansion, earthquakes, etc. cause changes in foundation soil quality, affecting foundation stability.
[0029] Neighboring construction: Neighboring construction projects may disturb the foundation under the tunnel, causing uneven settlement of the foundation.
[0030] corrosion and aging; Material corrosion: Pipeline materials exposed to humid or chemically corrosive environments for a long time may corrode and weaken the structural strength.
[0031] Aging issues: Over time, materials and structures may degrade due to fatigue or natural aging and become unable to effectively carry the loads.
[0032] design or construction defects; Unreasonable design: factors such as load distribution and geological conditions were not fully considered during the design, resulting in insufficient actual bearing capacity.
[0033] Inadequate monitoring: Lack of regular inspections and maintenance, failure to detect and address potential settlement problems in a timely manner.
[0034] External influences; Dynamic loads: Dynamic loads such as those caused by vehicle vibration or the operation of mechanical equipment may cause local overload of the tunnel.
[0035] Environmental factors: such as the impact of extreme weather, groundwater erosion, etc. on foundations or structures.
[0036] The calculation expression of the cumulative loss index is: , where is at the stress level The number of cycles experienced, is at the stress level The fatigue life of the lower pipe gallery material and the stress level are obtained by subtracting the minimum stress from the maximum stress in the cyclic load. The larger the cumulative loss index, the more serious the damage to the surface pipe gallery. The following anomalies may occur, which may lead to settlement problems: Material fatigue and fracture; Fatigue cracks: Under repeated loads, fatigue cracks may occur in the pipe gallery material. Over time, these cracks will expand and weaken the structure's bearing capacity.
[0037] Fracture: Accumulated fatigue damage may lead to material fracture, especially at connection points, supports or areas of stress concentration. This can significantly reduce the overall stability of the structure.
[0038] Structural deformation; Buckling deformation: Due to overloading or local load concentration, structural members may buckle, resulting in structural instability and settlement.
[0039] Increased deflection: Structural components may deflect (bend) under long-term loads, increasing the risk of settlement.
[0040] Connection failure; Loose or sheared bolts: Bolts in a connection may loosen or shear due to fatigue, corrosion or overloading, causing the connection to fail.
[0041] Weld cracking: Welded areas may crack due to fatigue or thermal stress, affecting the integrity of the structure.
[0042] corrosion; Corrosion of steel structures: Steel structures exposed to humid or corrosive environments may corrode, resulting in weakening of the cross-section and reduced load-bearing capacity.
[0043] Concrete Corrosion: Concrete structures can be damaged by chemical attack (e.g. chloride attack, acidic environments), with corrosion of internal reinforcement further weakening the structure.
[0044] foundation settlement; Uneven settlement: Due to factors such as changes in the properties of the foundation soil, changes in the groundwater level, or nearby construction, the foundation may undergo uneven settlement, resulting in additional stress and deformation of the corridor structure.
[0045] Weak foundation: The foundation strength is insufficient or the bearing capacity is reduced, which cannot support the load of the corridor structure, resulting in settlement or tilting.
[0046] Environmental and external influences; Temperature changes: Extreme temperature changes may cause thermal expansion or contraction of materials, generate thermal stress, and accelerate the accumulation of fatigue damage.
[0047] Natural disasters: Natural disasters such as earthquakes and floods can produce extreme loads on the tunnel structure, causing increased damage.
[0048] design and construction issues; Design flaws: Failure to adequately consider long-term load effects, environmental factors or material properties during design, resulting in insufficient structural bearing capacity.
[0049] Construction quality issues: Defects during construction, such as uneven concrete pouring and improper reinforcement configuration, can cause initial damage to the structure that accumulates over time.
[0050] The calculation expression of foundation settlement is: , where is the load on the foundation, is the width of the foundation, is the Poisson's ratio of soil, is the elastic modulus of soil, is the current buried depth of the tunnel, The depth of the tunnel foundation. The greater the foundation settlement, the more serious the foundation settlement in the sub-section area. The following problems may cause tunnel structure damage and settlement: Uneven settlement; Differential settlement: Uneven settlement of foundations in different areas will lead to different sinking speeds among different parts of the corridor structure. This difference will cause tensile, compressive or shear stress in the structure, causing deformation, cracking or even rupture of the corridor.
[0051] Tilt and deformation: Uneven settlement may cause overall or partial tilt of the corridor, and deformation of the connections between pipelines and other facilities, affecting their function and safety.
[0052] Insufficient bearing capacity of foundation; Foundation instability: Insufficient bearing capacity of the foundation soil will lead to overall instability of the foundation, making it unable to effectively support the pipeline corridor structure, resulting in increased settlement.
[0053] Liquefaction of foundation soil: Under dynamic loads such as earthquakes, foundation materials such as saturated sand may liquefy, causing a sudden decrease in the bearing capacity of the foundation, resulting in settlement or tilting.
[0054] Changes in foundation soil properties; Changes in groundwater levels: The rise or fall of groundwater levels may cause the softening or shrinkage of foundation soil, thereby causing foundation settlement. For example, a drop in groundwater levels may cause shrinkage settlement of the soil, while a rise in groundwater levels may cause compression settlement of soft soil.
[0055] Soil erosion: Soil erosion caused by water flow, groundwater infiltration or other external factors may cause the foundation soil to be lost or loosened, reducing the bearing capacity of the foundation.
[0056] Increased external loads; Overload: Buildings and facilities in or near the pipeline corridor area exceed the original design load, increasing the bearing pressure of the foundation and causing foundation settlement.
[0057] Dynamic loads: Dynamic loads such as vehicle vibration and mechanical equipment operation will repeatedly impact the foundation, causing the foundation soil to gradually settle.
[0058] construction defects; Improper foundation treatment: If the foundation is not properly reinforced before construction, such as if necessary compaction, grouting and other measures are not taken, it may cause foundation settlement.
[0059] Defects in foundation design or construction: Improper foundation form or size design, cutting corners during construction, and unqualified materials will reduce the bearing capacity of the foundation and increase the risk of foundation settlement.
[0060] Failure of foundation reinforcement measures; Aging of foundation reinforcement materials: The reinforcement materials used, such as pile foundations, soil nails, anchor rods, etc., may age, corrode or be damaged over time, resulting in a weakening of the foundation reinforcement effect.
[0061] Inadequate drainage measures: Inadequate design or construction of groundwater drainage systems may lead to saturation or softening of foundation soils, increasing the risk of settlement.
[0062] The calculation expression of vibration amplitude is: , where For the moment The vibration amplitude at Indicates the cumulative monitoring time period. When the foundation settlement increases, if it is accompanied by an increase in cumulative vibration (for example, when there is construction in the surrounding area or there is heavy traffic in the surrounding area), the speed of increase of the foundation settlement will be aggravated.
[0063] If no settlement is predicted for a sub-segment, the prediction results of all sub-segments in the same time period are integrated into a fusion model to comprehensively analyze the overall settlement of the corridor, including the following steps: The settlement prediction coefficients of all sub-segments in the same time period are used to comprehensively analyze the overall settlement of the corridor through the fusion model. The model expression is: , where is the overall sedimentation index, It represents the settlement prediction coefficient of each sub-segment of the corridor. Indicates the number of corridor sub-sections. is the regression coefficient of each sub-segment, and the regression coefficient is greater than 0; The larger the overall settlement index is, the better the overall condition of the corridor is, that is, the less likely it is to have a settlement problem. The obtained overall settlement index is compared with the preset index threshold. The index threshold is used to analyze whether there is a settlement problem in the corridor as a whole. If the overall settlement index is greater than or equal to the index threshold, it is analyzed that there is no settlement problem in the corridor as a whole. If the overall settlement index is less than the index threshold, it is analyzed that there is a settlement problem in the corridor as a whole.
[0064] When the present invention is used, the logical factors of the overall settlement index are composed of: taking the influence of the settlement prediction coefficients of each sub-segment on the overall settlement of the corridor as an example, the first is the index, that is, the factor that causes the change of the overall settlement condition of the corridor (the present invention refers to the influence of the settlement prediction coefficients of each sub-segment on the overall settlement of the corridor); the second is the weight of these indicators, that is, the proportion of each sub-segment settlement prediction coefficient when it is generated; the third is the operation equation, that is, what kind of mathematical operation process is used to obtain the result, and the overall settlement index is obtained by calculating the indicators with their respective weights through the operation equation.
[0065] The settlement prediction coefficients of the sub-segments obtained from the samples were converted and processed into data language recognized by computer software; secondly, these evaluation factors were analyzed by fusion model using SPSS software to screen out factors and their weights that have important correlation with the results; thirdly, the evaluation factors and weights were brought into the fusion model equation for calculation to obtain the results, which are as follows: First, ensure the integrity of the main effect data, handle missing values and outliers, and convert the data into a format that SPSS software can recognize. Usually, the data is stored in .csv, .xlsx and other formats, and then imported into SPSS. Open SPSS software, import the processed data file, and transform the variables as needed. For example, for continuous variables, standardize or normalize them. Select the "Analyze" menu, and then select the "Binary Logistic" option under "Regression". In the dialog box, add the dependent variable (outcome) and the independent variable (main effect data) to the corresponding boxes. SPSS will convert the variables according to the selected variables. Fit the fusion model. In the output results, you will see the model's index, standard error, p-value and other information. Check the index and p-value in the output results to determine which variables are significantly correlated with the results. Usually, a p-value less than 0.05 is considered significant. While fitting the model, use variable selection methods, such as stepwise regression, to help screen the most relevant factors. According to the index of the fusion model, the size of the index reflects the degree of influence of each factor on the result, and the positive and negative signs of the index indicate the direction of the influence. After obtaining the significant factors and their indexes, the fusion model equation is obtained, which is used to calculate the probability of each sample and then predict the results.
[0066] The present application uses a fusion model to comprehensively analyze the overall settlement condition of the corridor through the settlement prediction coefficients of all sub-segments in the same time period. In this way, even if it is predicted that there is no settlement problem in each sub-segment, when the settlement prediction coefficients of all sub-segments are developing in a deteriorating trend, the corridor as a whole will develop in the direction of settlement (this is because the sub-segments are interrelated. If the corridor as a whole develops in the direction of settlement, it is likely to accelerate the overall settlement speed of the corridor in a short period of time, so prediction is needed), which makes it easier for administrators to understand the overall settlement condition of the corridor, so that management can be made in advance and the management efficiency of the corridor can be improved.
[0067] According to the analysis results of the overall settlement of the tunnel, a corresponding management strategy is generated and sent to the management personnel, including the following steps: According to the analysis results of the overall settlement status of the corridor, all the corridors in the management area are divided into a settlement set and a normal set. If the analysis shows that there is no settlement problem in the corridor as a whole, the corridor will be classified into the normal set. If the analysis shows that there is a settlement problem in the corridor as a whole, the corridor will be classified into the settlement set. In addition, after all the corridors in the settlement set are sorted from small to large according to the overall settlement index, the settlement set will be sent to the administrator. The higher the ranking of the corridor in the settlement set, the more serious the overall settlement problem of the corridor is, and the more it needs to be managed in advance to ensure the safety and stability of the corridor operation.
[0068] Embodiment 3: The pipe gallery structure settlement monitoring and management system based on the fusion model described in this embodiment includes a sub-segment division module, a settlement prediction module, and a pipe gallery management module; Sub-segmentation module: obtains the basic information of the corridor through the corridor platform, divides the corridor into multiple sub-segments based on the basic information, and sends the sub-segmentation results to the settlement prediction module and the corridor management module; Settlement prediction module: During the operation of the tunnel, the structural data and environmental data of each sub-segment are obtained regularly. After the structural data and environmental data are substituted into the settlement prediction model, the settlement prediction model predicts whether there is settlement in the sub-segment. If settlement is predicted in the sub-segment, an early warning signal is sent to the management personnel, and the prediction result of the settlement phenomenon of the sub-segment is sent to the tunnel management module; Pipeline corridor management module: If no settlement is predicted in a sub-segment, the prediction results of all sub-segments in the same time period are used to comprehensively analyze the overall settlement status of the pipeline corridor through a fusion model, and a corresponding management strategy is generated based on the analysis results of the overall settlement status of the pipeline corridor, and the management strategy is sent to the management personnel.
[0069] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.
[0070] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0071] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A pipeline corridor structure settlement monitoring and management method based on a fusion model is characterized by: The management method comprises the following steps: The management system obtains the basic information of the corridor through the corridor platform, divides the corridor into multiple sub-segments based on the basic information, and obtains the structural data and environmental data of each sub-segment at regular intervals during the operation of the corridor; After substituting the structural data and environmental data into the settlement prediction model, the settlement prediction model predicts whether there is settlement in the sub-segment. If settlement is predicted in the sub-segment, an early warning signal is sent to the management personnel; If no settlement is predicted in the sub-segment, the prediction results of all sub-segments in the same time period are used to comprehensively analyze the overall settlement condition of the corridor through the fusion model, and the corresponding management strategy is generated based on the analysis results of the overall settlement condition of the corridor, and the management strategy is sent to the management personnel.
2. According to the fusion model-based pipeline corridor structure settlement monitoring and management method according to claim 1, it is characterized by: Substituting structural data and environmental data into the settlement prediction model includes the following steps: Regularly obtain the structural data and environmental data of each sub-segment. The structural data includes the load variation index and the cumulative loss index, and the environmental data includes the foundation settlement and vibration amplitude. After the load variation index, cumulative loss index, foundation settlement and vibration amplitude are normalized, they are substituted into the settlement prediction model for comprehensive calculation to obtain the settlement prediction coefficient.
3. The pipeline corridor structure settlement monitoring and management method based on the fusion model according to claim 2 is characterized by: The settlement prediction model predicts whether there is settlement in the sub-segment, including the following steps: The settlement prediction model compares the calculated settlement prediction coefficient with the preset coefficient threshold, and the coefficient threshold is used to predict whether settlement will occur in the current sub-segment; If the settlement prediction coefficient is greater than or equal to the coefficient threshold, it is predicted that the current sub-segment will not settle and there is no settlement phenomenon. If the settlement prediction coefficient is less than the coefficient threshold, it is predicted that the current sub-segment will settle and there is settlement phenomenon.
4. The pipeline corridor structure settlement monitoring and management method based on the fusion model according to claim 3 is characterized by: The prediction results of all sub-segments in the same time period are integrated into a model to comprehensively analyze the overall settlement of the corridor, including the following steps: The settlement prediction coefficients of all sub-segments in the same time period are used to comprehensively analyze the overall settlement of the corridor through the fusion model. The model expression is: , where is the overall sedimentation index, It represents the settlement prediction coefficient of each sub-segment of the corridor. Indicates the number of corridor sub-sections. is the regression coefficient of each sub-segment, and the regression coefficient is greater than 0; The obtained overall settlement index is compared with the preset index threshold. The index threshold is used to analyze whether there is a settlement problem in the entire corridor. If the overall settlement index is greater than or equal to the index threshold, it is analyzed that there is no settlement problem in the entire corridor. If the overall settlement index is less than the index threshold, it is analyzed that there is a settlement problem in the entire corridor.
5. The pipeline corridor structure settlement monitoring and management method based on the fusion model according to claim 4 is characterized in that: Generating corresponding management strategies based on the overall settlement analysis results of the corridor includes the following steps: According to the analysis results of the overall settlement status of the pipeline corridor, all the pipeline corridors in the management area are divided into a settlement set and a normal set. If the analysis shows that there is no settlement problem in the pipeline corridor as a whole, the pipeline corridor will be classified into the normal set. If the analysis shows that there is a settlement problem in the pipeline corridor as a whole, the pipeline corridor will be classified into the settlement set. In addition, after all the pipeline corridors in the settlement set are sorted from small to large according to the overall settlement index, the settlement set will be sent to the administrator.
6. The pipeline corridor structure settlement monitoring and management method based on the fusion model according to claim 5 is characterized by: The calculation logic of the load variation index is as follows: the pressure value is obtained in real time by the pressure sensor set at each monitoring point on the outer surface of the sub-segment, the pressure values obtained at multiple monitoring points are used to establish a data set, the average pressure and the pressure standard deviation of the data set are calculated, and the load variation index is obtained by dividing the pressure standard deviation by the average pressure; The calculation expression of the cumulative loss index is: , where is at the stress level The number of cycles experienced, is at the stress level The fatigue life of the lower pipe gallery material and the stress level are obtained by subtracting the minimum stress from the maximum stress in the cyclic load.
7. The pipeline corridor structure settlement monitoring and management method based on the fusion model according to claim 6 is characterized by: The calculation expression of the foundation settlement is: , where is the load on the foundation, is the width of the foundation, is the Poisson's ratio of soil, is the elastic modulus of soil, is the current buried depth of the tunnel, It is the foundation burial depth of the pipe gallery; The calculation expression of the vibration amplitude is: , where For the moment The vibration amplitude at Indicates the cumulative monitoring time period.
8. A pipeline corridor structure settlement monitoring and management system based on a fusion model, used to implement the management method according to any one of claims 1 to 7, characterized in that: It includes sub-segment division module, settlement prediction module and pipe gallery management module; Sub-segment division module: obtain the basic information of the corridor through the corridor platform, and divide the corridor into multiple sub-segments based on the basic information; Settlement prediction module: During the operation of the tunnel, the structural data and environmental data of each sub-segment are obtained regularly. After the structural data and environmental data are substituted into the settlement prediction model, the settlement prediction model predicts whether there is settlement in the sub-segment. If settlement is predicted in the sub-segment, an early warning signal is sent to the management personnel; Pipeline corridor management module: If no settlement is predicted in a sub-segment, the prediction results of all sub-segments in the same time period are used to comprehensively analyze the overall settlement status of the pipeline corridor through a fusion model, and a corresponding management strategy is generated based on the analysis results of the overall settlement status of the pipeline corridor, and the management strategy is sent to the management personnel.
Citation Information
Patent Citations
Multiple sensor and ground SAR integrated deep foundation pit construction monitoring and early warning technology
CN107829452A
Safety perception early warning method and system for underground pipe gallery
CN113139731A
Underground pipe gallery water inflow monitoring and early warning system and method
CN114252128A
Comprehensive pipe gallery monitoring method and application
CN115623438A
Shield proximity structure safety prediction control method and system based on intelligent algorithm
CN117988869A
Cited By
Foundation monitoring regulation and control method and system based on adaptive adjustment
CN119990623A