Distributed power supply dispatching method for intelligent dispatching of power grid

By building a distributed power scheduling model and using multi-objective improvement particle swarm optimization algorithm, the problem of insufficient accuracy and real-time in distributed power scheduling is solved, the accurate and real-time scheduling of distributed power scheduling is achieved, and the distribution network is improved. stability.

CN118889559APending Publication Date: 2024-11-01STATE GRID ANHUI ELECTRIC POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410946142.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The prior art lacks accuracy and real-timeness in distributed power scheduling, which affects the stability of the distribution network.

Method used

By determining the objective function and constraints of distributed power scheduling, a distributed power scheduling model is constructed, and a multi-objective improved particle swarm optimization algorithm (MI-PSO) is used to optimize and solve multi-objectives, and the distributed formula of each scheduling moment during the scheduling cycle is obtained. Power scheduling scheme.

Benefits of technology

It realizes accurate and real-time scheduling of distributed power supplies, and improves the operating stability and scheduling effect of the distribution network.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889559A_ABST
    Figure CN118889559A_ABST
Patent Text Reader

Abstract

The invention relates to automation of a power system, in particular to a distributed power supply dispatching method for intelligent dispatching of a power grid, which comprises the following steps of: determining a target function of distributed power supply dispatching and constraint conditions of the distributed power supply dispatching, and constructing a distributed power supply dispatching model according to the target function and the constraint conditions of the distributed power supply dispatching. Carrying out multi-objective optimization solution on the distributed power supply dispatching model to obtain a distributed power supply dispatching scheme corresponding to each dispatching moment in a dispatching period; according to the technical scheme provided by the invention, the defect that the distributed power supply cannot be accurately scheduled in real time in the prior art can be effectively overcome.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to power system automation, and in particular to a distributed power source dispatching method for intelligent power grid dispatching. Background Art

[0002] Distributed power sources usually use advanced control equipment, with advantages such as simple operation, convenient switching of units and high energy utilization. When a power grid fails, distributed power sources can, in some cases, be used as power sources within an island to achieve island operation. Distributed power sources with reasonable locations and capacities can meet the small load power demand in remote areas and improve the reliability of power supply for users.

[0003] With the increasing penetration rate of distributed power sources, the demand for distributed power generation scheduling is becoming increasingly strong from the perspective of power grid economy and stability. However, traditional power grid scheduling is based on fixed-capacity power generation equipment, while the scheduling of distributed power sources needs to consider the impact of capacity uncertainty changes. At present, common distributed power generation scheduling methods are to quantify the uncertainty of distributed power generation capacity as a probability function and scalable variables, or use trained models to adapt to the capacity fluctuations of distributed power sources. However, these methods still have a lot of room for improvement in the accuracy and real-time performance of distributed power generation scheduling, which has a certain degree of impact on the stability of distribution network operation. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] In view of the above-mentioned shortcomings of the prior art, the present invention provides a distributed power supply scheduling method for intelligent power grid scheduling, which can effectively overcome the defect of the prior art that the distributed power supply cannot be accurately and real-time scheduled.

[0006] (II) Technical solution

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0008] A distributed power dispatching method for intelligent power grid dispatching determines the objective function of distributed power dispatching and the constraints of distributed power dispatching, builds a distributed power dispatching model according to the objective function and the constraints of distributed power dispatching, and performs multi-objective optimization on the distributed power dispatching model to obtain a distributed power dispatching plan corresponding to each dispatching time in the dispatching cycle.

[0009] Preferably, the determining of the objective function of distributed power generation scheduling includes:

[0010] Function models of the economic benefits of the distribution network, the voltage quality of the distribution network, and the loss of the distribution network are constructed respectively, and the objective function of the distributed generation scheduling is determined according to the function models of the economic benefits of the distribution network, the voltage quality of the distribution network, and the loss of the distribution network.

[0011] Preferably, the constructing of a function model for the economic benefits of the distribution network includes:

[0012] The function model F1(t) of the economic benefit of the distribution network is expressed as follows:

[0013]

[0014] in, P1 is the amount of electricity purchased by the user from the Internet at time t, t is the corresponding electricity purchase price, is the amount of electricity sold by users to the main grid at time t, is the corresponding electricity price, T is the dispatch period;

[0015] The constructing of a function model for the voltage quality of the distribution network includes:

[0016] The function model F2(t) of the distribution network voltage quality is expressed as follows:

[0017]

[0018] in, is the voltage over-limit deviation value of the kth branch at time t, is the maximum value of the voltage over-limit deviation of the kth branch within the dispatch period T, is the minimum value of the voltage over-limit deviation of the kth branch within the dispatch period T, K is the total number of distribution network branches, and λ is the voltage over-limit penalty factor;

[0019] The constructing of a function model for distribution network loss includes:

[0020] The function model F3(t) of distribution network loss is expressed as follows:

[0021]

[0022] in, is the active network loss of the kth branch at time t, is the reactive network loss of the kth branch at time t, T is the dispatching period, and K is the total number of distribution network branches.

[0023] Preferably, the objective function of distributed power generation scheduling is determined according to the function model of the economic benefits of the distribution network, the voltage quality of the distribution network, and the loss of the distribution network, including:

[0024] The objective function F(t) of distributed generation scheduling is determined according to the function model F1(t) of the economic benefit of the distribution network, the function model F2(t) of the voltage quality of the distribution network, and the function model F3(t) of the loss of the distribution network:

[0025]

[0026] Among them, ω1, ω2, and ω3 are weight coefficients of the function model F1(t) of the economic benefit of the distribution network, the function model F2(t) of the voltage quality of the distribution network, and the function model F3(t) of the loss of the distribution network, respectively, and ω1+ω2+ω3=1.

[0027] Preferably, the determining of the constraint conditions for the distributed power generation scheduling includes:

[0028] Determine that the voltage of each node in the dispatched distribution network is within a preset voltage range;

[0029] Determine that the transmission power on each branch of the dispatched distribution network is within a preset power range;

[0030] It is determined that the active output and reactive output of each distributed power source in the distribution network after scheduling are within the preset output range.

[0031] Preferably, the multi-objective optimization solution of the distributed power dispatching model is performed to obtain the distributed power dispatching scheme corresponding to each dispatching time in the dispatching cycle, including:

[0032] The multi-objective improved particle swarm optimization algorithm MI-PSO is used to solve the objective function F(t) to obtain the distributed power generation scheduling scheme corresponding to each scheduling time in the scheduling period that meets the constraints, including:

[0033] S1, algorithm parameter initialization;

[0034] S2, initialize the particle swarm according to the constraints, including the initial position of the particles, the initial velocity of the particles, the individual optimal initial position and the global optimal initial position;

[0035] S3, using the single-objective particle swarm algorithm SO-PSO to solve the function model F1(t) of the economic benefit of the distribution network, the function model F2(t) of the voltage quality of the distribution network, and the function model F3(t) of the loss of the distribution network in the objective function F(t) to obtain the ideal optimal position;

[0036] S4, update particle velocity;

[0037] S5, update particle position;

[0038] S6. Update the individual optimal position and the global optimal position according to the ideal optimal position;

[0039] S7. If the preset number of iterations is not reached, return to S4, otherwise the current global optimal position is used as the distributed power generation scheduling scheme corresponding to each scheduling time in the scheduling period that meets the constraint conditions.

[0040] Preferably, updating the particle velocity in S4 includes:

[0041] Update particle velocity using the following formula:

[0042] v i,j (t+1)=ω·v i,j (t)+ε1·r1·[pbest i,j -p i,j (t)]+ε2·r2·[gbest j -p i,j (t)];

[0043] Among them, v i,j (t) is the velocity of particle i in the jth dimension at time t, v i,j (t+1) is the velocity of particle i in the jth dimension at time t+1, and ω is the inertia weight;

[0044] ε1 is the first learning factor, r1 is the first random number, pbest i,j is the historical individual optimal position of particle i in the jth dimension, p i,j (t) is the position of particle i in the jth dimension at time t;

[0045] ε2 is the second learning factor, r2 is the second random number, gbest j is the historical global optimal position of the particle swarm in the jth dimension.

[0046] Preferably, updating the particle position in S5 includes:

[0047] Update particle position using the following formula:

[0048] p i,j (t+1)=p i,j (t)+v i,j (t+1);

[0049] Among them, p i,j (t) is the position of particle i in the jth dimension at time t, p i,j (t+1) is the position of particle i in the jth dimension at time t+1, v i,j (t+1) is the velocity of particle i in the jth dimension at time t+1.

[0050] Preferably, after performing multi-objective optimization on the distributed power dispatching model to obtain the distributed power dispatching scheme corresponding to each dispatching time in the dispatching cycle, the method further comprises:

[0051] Execute the corresponding distributed power dispatching plan at each dispatching time in the dispatching cycle, and obtain the power output curve, load curve, distribution network loss curve and reactive power curve of the target distribution equipment in the target area;

[0052] For each dispatching moment, the corresponding total output value is determined according to the power output curve, the corresponding load demand is determined according to the load curve, the corresponding line loss is determined according to the distribution network loss curve, and the reactive power of the target distribution equipment is determined according to the reactive power curve;

[0053] The total output value, load demand, line loss and reactive power at the current dispatching time are input into the preset evaluation function, the evaluation value at the current dispatching time is calculated, and the distributed power generation dispatching plan at the next dispatching time is optimized and adjusted according to the evaluation value at the current dispatching time;

[0054] Among them, the evaluation function F e (t) is expressed by the following formula:

[0055] F e (t) = 1.5l t -[o t (1-w t )-p t ];

[0056] In the above formula, l t is the load demand at time t, o t is the total output at time t, w t is the line loss at time t, p t is the reactive power at time t.

[0057] Preferably, the optimizing and adjusting the distributed power generation scheduling scheme at the next scheduling moment according to the evaluation value at the current scheduling moment includes:

[0058] If the evaluation value at the current scheduling moment is greater than the upper limit of the preset evaluation range, the distributed power generation scheduling strategy outside the target area is determined according to the difference between the load demand and the total output value at the current scheduling moment, and the distributed power generation scheduling plan at the next scheduling moment is optimized and coordinated;

[0059] If the evaluation value at the current scheduling moment is less than the lower limit of the preset evaluation range, the distributed power generation scheduling plan for the next scheduling moment is optimized and adjusted according to the difference between the total output value at the current scheduling moment and the load demand.

[0060] (III) Beneficial effects

[0061] Compared with the prior art, the distributed power dispatching method for intelligent power grid dispatching provided by the present invention has the following beneficial effects:

[0062] 1) Determine the objective function of distributed power scheduling and the constraints of distributed power scheduling, build a distributed power scheduling model based on the objective function and constraints of distributed power scheduling, and use the multi-objective improved particle swarm optimization algorithm MI-PSO to perform multi-objective optimization on the distributed power scheduling model to obtain the distributed power scheduling plan corresponding to each scheduling time within the scheduling cycle, so that the distributed power scheduling plan corresponding to each scheduling time can be used for accurate and real-time scheduling;

[0063] 2) After obtaining the distributed power dispatching scheme corresponding to each dispatching moment in the dispatching cycle, the total output, load demand, line loss and reactive power at the current dispatching moment are input into the preset evaluation function, and the evaluation value of the current dispatching moment is calculated. According to the evaluation value of the current dispatching moment, the distributed power dispatching scheme for the next dispatching moment is optimized and adjusted, which can further improve the dispatching effect of distributed power and ensure the stability of distribution network operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0065] Figure 1 It is a schematic diagram of the process of the present invention;

[0066] Figure 2 It is a detailed schematic diagram of the present invention. DETAILED DESCRIPTION

[0067] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0068] A distributed power generation scheduling method for intelligent power grid scheduling, such as Figure 1 and Figure 2As shown in the figure, the objective function of distributed power generation scheduling and the constraints of distributed power generation scheduling are determined, a distributed power generation scheduling model is constructed according to the objective function and constraints of distributed power generation scheduling, and the distributed power generation scheduling model is solved by multi-objective optimization to obtain the distributed power generation scheduling scheme corresponding to each scheduling time in the scheduling cycle.

[0069] ① Determine the objective function of distributed generation scheduling, including:

[0070] Function models of the economic benefits of the distribution network, the voltage quality of the distribution network, and the loss of the distribution network are constructed respectively, and the objective function of the distributed generation scheduling is determined according to the function models of the economic benefits of the distribution network, the voltage quality of the distribution network, and the loss of the distribution network.

[0071] 1) Construct a functional model for the economic benefits of the distribution network, including:

[0072] The function model F1(t) of the economic benefit of the distribution network is expressed as follows:

[0073]

[0074] in, P1 is the amount of electricity purchased by the user from the Internet at time t, t is the corresponding electricity purchase price, is the amount of electricity sold by users to the main grid at time t, is the corresponding electricity price, T is the dispatch period;

[0075] Construct a function model about the voltage quality of the distribution network, including:

[0076] The function model F2(t) of the distribution network voltage quality is expressed as follows:

[0077]

[0078] in, is the voltage over-limit deviation value of the kth branch at time t, is the maximum value of the voltage over-limit deviation of the kth branch within the dispatch period T, is the minimum value of the voltage over-limit deviation of the kth branch within the dispatch period T, K is the total number of distribution network branches, and λ is the voltage over-limit penalty factor;

[0079] Construct a function model for distribution network losses, including:

[0080] The function model F3(t) of distribution network loss is expressed as follows:

[0081]

[0082] in, is the active network loss of the kth branch at time t, is the reactive network loss of the kth branch at time t, T is the dispatching period, and K is the total number of distribution network branches.

[0083] 2) Determine the objective function of distributed generation scheduling based on the function model of distribution network economic benefits, distribution network voltage quality, and distribution network loss, including:

[0084] The objective function F(t) of distributed generation scheduling is determined according to the function model F1(t) of the economic benefit of the distribution network, the function model F2(t) of the voltage quality of the distribution network, and the function model F3(t) of the loss of the distribution network:

[0085]

[0086] Among them, ω1, ω2, and ω3 are weight coefficients of the function model F1(t) of the economic benefit of the distribution network, the function model F2(t) of the voltage quality of the distribution network, and the function model F3(t) of the loss of the distribution network, respectively, and ω1+ω2+ω3=1.

[0087] ② Determine the constraints for distributed generation scheduling, including:

[0088] Determine that the voltage of each node in the dispatched distribution network is within a preset voltage range;

[0089] Determine that the transmission power on each branch of the dispatched distribution network is within a preset power range;

[0090] It is determined that the active output and reactive output of each distributed power source in the distribution network after scheduling are within the preset output range.

[0091] ③ Perform multi-objective optimization on the distributed power dispatch model to obtain the distributed power dispatch scheme corresponding to each dispatch time in the dispatch cycle, including:

[0092] The multi-objective improved particle swarm optimization algorithm MI-PSO is used to solve the objective function F(t) to obtain the distributed power generation scheduling scheme corresponding to each scheduling time in the scheduling period that meets the constraints, including:

[0093] S1, algorithm parameter initialization;

[0094] S2, initialize the particle swarm according to the constraints, including the initial position of the particles, the initial velocity of the particles, the individual optimal initial position and the global optimal initial position;

[0095] S3, using the single-objective particle swarm algorithm SO-PSO to solve the function model F1(t) of the economic benefit of the distribution network, the function model F2(t) of the voltage quality of the distribution network, and the function model F3(t) of the loss of the distribution network in the objective function F(t) to obtain the ideal optimal position;

[0096] S4, update particle velocity;

[0097] S5, update particle position;

[0098] S6. Update the individual optimal position and the global optimal position according to the ideal optimal position;

[0099] S7. If the preset number of iterations is not reached, return to S4, otherwise the current global optimal position is used as the distributed power generation scheduling scheme corresponding to each scheduling time in the scheduling period that meets the constraint conditions.

[0100] Specifically, the particle velocity is updated in S4, including:

[0101] Update particle velocity using the following formula:

[0102] v i,j (t+1)=ω·v i,j (t)+ε1·r1·[pbest i,j -p i,j (t)]+ε2·r2·[gbest j -p i,j (t)];

[0103] Among them, v i,j (t) is the velocity of particle i in the jth dimension at time t, v i,j (t+1) is the velocity of particle i in the jth dimension at time t+1, and ω is the inertia weight;

[0104] ε1 is the first learning factor, r1 is the first random number, pbest i,j is the historical individual optimal position of particle i in the jth dimension, p i,j (t) is the position of particle i in the jth dimension at time t;

[0105] ε2 is the second learning factor, r2 is the second random number, gbest j is the historical global optimal position of the particle swarm in the jth dimension.

[0106] Specifically, updating the particle position in S5 includes:

[0107] Update particle position using the following formula:

[0108] p i,j (t+1)=p i,j(t)+v i,j (t+1);

[0109] Among them, p i,j (t) is the position of particle i in the jth dimension at time t, p i,j (t+1) is the position of particle i in the jth dimension at time t+1, v i,j (t+1) is the velocity of particle i in the jth dimension at time t+1.

[0110] The above technical scheme determines the objective function of distributed power scheduling and the constraints of distributed power scheduling, builds a distributed power scheduling model based on the objective function and constraints of distributed power scheduling, and uses the multi-objective improved particle swarm optimization algorithm MI-PSO to perform multi-objective optimization solution on the distributed power scheduling model, and obtains the distributed power scheduling plan corresponding to each scheduling time in the scheduling cycle, so that the distributed power scheduling plan corresponding to each scheduling time can be used for accurate and real-time scheduling.

[0111] ④ After solving the distributed power dispatch model through multi-objective optimization, the distributed power dispatch scheme corresponding to each dispatch time in the dispatch cycle is obtained, including:

[0112] Execute the corresponding distributed power dispatching plan at each dispatching time in the dispatching cycle, and obtain the power output curve, load curve, distribution network loss curve and reactive power curve of the target distribution equipment in the target area;

[0113] For each dispatching moment, the corresponding total output value is determined according to the power output curve, the corresponding load demand is determined according to the load curve, the corresponding line loss is determined according to the distribution network loss curve, and the reactive power of the target distribution equipment is determined according to the reactive power curve;

[0114] The total output value, load demand, line loss and reactive power at the current dispatching time are input into the preset evaluation function, the evaluation value at the current dispatching time is calculated, and the distributed power generation dispatching plan at the next dispatching time is optimized and adjusted according to the evaluation value at the current dispatching time;

[0115] Among them, the evaluation function F e (t) is expressed by the following formula:

[0116] F e (t) = 1.5l t -[o t (1-w t )-p t ];

[0117] In the above formula, l t is the load demand at time t, o t is the total output at time t, wt is the line loss at time t, p t is the reactive power at time t.

[0118] Specifically, the distributed power generation scheduling scheme at the next scheduling moment is optimized and adjusted according to the evaluation value at the current scheduling moment, including:

[0119] If the evaluation value at the current scheduling moment is greater than the upper limit of the preset evaluation range, the distributed power generation scheduling strategy outside the target area is determined according to the difference between the load demand and the total output value at the current scheduling moment, and the distributed power generation scheduling plan at the next scheduling moment is optimized and coordinated;

[0120] If the evaluation value at the current scheduling moment is less than the lower limit of the preset evaluation range, the distributed power generation scheduling plan for the next scheduling moment is optimized and adjusted according to the difference between the total output value at the current scheduling moment and the load demand.

[0121] The above technical scheme, after obtaining the distributed power generation scheduling plan corresponding to each scheduling moment within the scheduling cycle, inputs the total output, load demand, line loss and reactive power at the current scheduling moment into a preset evaluation function, calculates the evaluation value of the current scheduling moment, and optimizes and adjusts the distributed power generation scheduling plan for the next scheduling moment according to the evaluation value of the current scheduling moment, which can further improve the scheduling effect of distributed power sources and ensure the stability of distribution network operation.

[0122] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A distributed power generation dispatching method for intelligent power grid dispatching, Features: Determine the objective function of distributed power scheduling and the constraints of distributed power scheduling, build a distributed power scheduling model based on the objective function and constraints of distributed power scheduling, and perform multi-objective optimization on the distributed power scheduling model to obtain the distributed power scheduling plan corresponding to each scheduling time within the scheduling cycle.

2. The distributed power dispatching method for intelligent power grid dispatching according to claim 1, Features: The objective function of determining the distributed power generation scheduling includes: Function models of the economic benefits of the distribution network, the voltage quality of the distribution network, and the loss of the distribution network are constructed respectively, and the objective function of the distributed generation scheduling is determined according to the function models of the economic benefits of the distribution network, the voltage quality of the distribution network, and the loss of the distribution network.

3. The distributed power generation dispatching method for intelligent power grid dispatching according to claim 2, Features: The construction of a function model for the economic benefits of the distribution network includes: Functional model of economic benefits of distribution network F 1 (t) is expressed by the following formula: in, is the amount of electricity purchased from the Internet by the user at time t, is the corresponding electricity purchase price, is the amount of electricity sold by users to the main grid at time t, is the corresponding electricity price, T is the dispatch period; The constructing of a function model for the voltage quality of the distribution network includes: Functional model of voltage quality of distribution network F 2 (t) is expressed by the following formula: in, is the voltage over-limit deviation value of the kth branch at time t, is the maximum value of the voltage over-limit deviation of the kth branch within the dispatch period T, is the minimum value of the voltage over-limit deviation of the kth branch within the dispatch period T, K is the total number of distribution network branches, and λ is the voltage over-limit penalty factor; The constructing of a function model for distribution network loss includes: Functional model of distribution network loss F 3 (t) is expressed by the following formula: in, is the active network loss of the kth branch at time t, is the reactive network loss of the kth branch at time t, T is the dispatching period, and K is the total number of distribution network branches.

4. The distributed power generation dispatching method for intelligent power grid dispatching according to claim 3, Features: The objective function of distributed power generation scheduling is determined according to the function model of the economic benefits of the distribution network, the voltage quality of the distribution network, and the loss of the distribution network, including: According to the function model F of the economic benefits of the distribution network 1 (t), Function model F of distribution network voltage quality 2 (t), distribution network loss function model F 3 (t) Determine the objective function F(t) of distributed generation scheduling: Among them, ω 1 ,ω 2 ,ω 3 They are the function models of the economic benefits of the distribution network F 1 (t), Function model F of distribution network voltage quality 2 (t), distribution network loss function model F 3 (t) is the weight coefficient, and ω 1 +ω 2 +ω 3 =1.

5. The distributed power dispatching method for intelligent power grid dispatching according to claim 1, Features: The constraint conditions for determining the distributed power generation scheduling include: Determine that the voltage of each node in the dispatched distribution network is within a preset voltage range; Determine that the transmission power on each branch of the dispatched distribution network is within a preset power range; It is determined that the active output and reactive output of each distributed power source in the distribution network after scheduling are within the preset output range.

6. The distributed power source dispatching method for intelligent power grid dispatching according to claim 1, Features: The multi-objective optimization solution of the distributed power dispatching model is performed to obtain the distributed power dispatching scheme corresponding to each dispatching time in the dispatching cycle, including: The multi-objective improved particle swarm optimization algorithm MI-PSO is used to solve the objective function F(t) to obtain the distributed power generation scheduling scheme corresponding to each scheduling time in the scheduling period that meets the constraints, including: S1, algorithm parameter initialization; S2, initialize the particle swarm according to the constraints, including the initial position of the particles, the initial velocity of the particles, the individual optimal initial position and the global optimal initial position; S3. Use single objective particle swarm algorithm SO-PSO to calculate the function model F of the economic benefit of distribution network in the objective function F(t) 1 (t), Function model F of distribution network voltage quality 2 (t), distribution network loss function model F 3 (t) Solve the single objective and obtain the ideal optimal position; S4, update particle velocity; S5, update particle position; S6. Update the individual optimal position and the global optimal position according to the ideal optimal position; S7. If the preset number of iterations is not reached, return to S4, otherwise the current global optimal position is used as the distributed power generation scheduling scheme corresponding to each scheduling time in the scheduling period that meets the constraint conditions.

7. The distributed power source dispatching method for intelligent power grid dispatching according to claim 6, Features: Update particle velocity in S4, including: Update particle velocity using the following formula: v i,j (t+1)=ω·v i,j (t)+ε 1 ·r 1 ·[pbest i,j -p i,j (t)]+ε 2 ·r 2 ·[gbest j -p i,j (t)]; Among them, v i,j (t) is the velocity of particle i in the jth dimension at time t, v i,j (t+1) is the velocity of particle i in the jth dimension at time t+1, and ω is the inertia weight; ε 1 is the first learning factor, r 1 is the first random number, pbest i,j is the historical individual optimal position of particle i in the jth dimension, p i,j (t) is the position of particle i in the jth dimension at time t; ε 2 is the second learning factor, r 2 is the second random number, gbest j is the historical global optimal position of the particle swarm in the jth dimension.

8. The distributed power source dispatching method for intelligent power grid dispatching according to claim 7, Features: In S5, the particle position is updated, including: Update particle position using the following formula: p i,j (t+1)=p i,j (t)+v i,j (t+1); Among them, p i,j (t) is the position of particle i in the jth dimension at time t, p i,j (t+1) is the position of particle i in the jth dimension at time t+1, v i,j (t+1) is the velocity of particle i in the jth dimension at time t+1.

9. The distributed power source dispatching method for intelligent power grid dispatching according to claim 1, Features: After performing multi-objective optimization on the distributed power dispatching model to obtain the distributed power dispatching scheme corresponding to each dispatching time in the dispatching cycle, the method includes: Execute the corresponding distributed power dispatching plan at each dispatching time in the dispatching cycle, and obtain the power output curve, load curve, distribution network loss curve and reactive power curve of the target distribution equipment in the target area; For each dispatching moment, the corresponding total output value is determined according to the power output curve, the corresponding load demand is determined according to the load curve, the corresponding line loss is determined according to the distribution network loss curve, and the reactive power of the target distribution equipment is determined according to the reactive power curve; The total output value, load demand, line loss and reactive power at the current dispatching time are input into the preset evaluation function, the evaluation value at the current dispatching time is calculated, and the distributed power generation dispatching plan at the next dispatching time is optimized and adjusted according to the evaluation value at the current dispatching time; Among them, the evaluation function F e (t) is expressed by the following formula: F e (t)=1.5l t -[o t (1-w t )-p t ]; In the above formula, l t is the load demand at time t, o t is the total output at time t, w t is the line loss at time t, p t is the reactive power at time t.

10. The distributed power dispatching method for intelligent power grid dispatching according to claim 9, Features: The step of optimizing and adjusting the distributed power generation scheduling scheme at the next scheduling moment according to the evaluation value at the current scheduling moment includes: If the evaluation value at the current scheduling moment is greater than the upper limit of the preset evaluation range, the distributed power generation scheduling strategy outside the target area is determined according to the difference between the load demand and the total output value at the current scheduling moment, and the distributed power generation scheduling plan at the next scheduling moment is optimized and coordinated; If the evaluation value at the current scheduling moment is less than the lower limit of the preset evaluation range, the distributed power generation scheduling plan for the next scheduling moment is optimized and adjusted according to the difference between the total output value at the current scheduling moment and the load demand.