A photovoltaic shed construction method and operation and maintenance channel
By installing operation and maintenance channels on the photovoltaic roof, the maintenance difficulties and safety hazards of photovoltaic modules are solved, and convenient and safe maintenance operations are achieved.
Patent Information
- Application Number
- CN202411279600.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2044-09-12
AI Technical Summary
Due to the inclined installation and lack of footing, the photovoltaic modules on the photovoltaic roof are difficult to repair, easy to damage and safety hazards.
Install the operation and maintenance channel on the photovoltaic shed roof, and lay components such as purlins, M-shaped guide rails, central rails, and squeezing codes between the trusses to form a snap-fit operation and maintenance channel, and support seats, buckle plates and auxiliary components are set at both ends to allow maintenance personnel to walk and position.
It improves the convenience and safety of photovoltaic shed maintenance, reduces the risk of trampling and slipping on photovoltaic modules, and enhances the operating range and stability of maintenance personnel.
Smart Images

Figure CN118933278B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of photovoltaic shed construction, and in particular to a photovoltaic shed construction method and operation and maintenance channel. Background Art
[0002] Photovoltaic trellis is a trellis installed with photovoltaic panels; the photovoltaic panels installed on it can convert solar energy into electrical energy for use by the load.
[0003] At present, most factories are built with steel structures, and most of the factory roofs are capped with colored steel tiles. As the factory ages, the colored steel tile roofs are often accompanied by obvious damage and water leakage. However, if the colored steel tiles are replaced on a large scale, it is not only expensive, but also fails to solve the fundamental problem. For this reason, photovoltaic sheds are often built on the colored steel tile roofs. Photovoltaic sheds are not only conducive to the use of sunlight, converting light energy into electrical energy for factory use, but also can block the original colored steel tile roof and reduce water leakage.
[0004] During the use of photovoltaic sheds, it is often necessary to perform daily maintenance on the photovoltaic modules on the roof. However, since the photovoltaic modules are installed at an angle on the roof and there are few footholds on the photovoltaic shed, it is not only difficult to perform maintenance work, but also easy to step on the photovoltaic modules and damage them. What's more, maintenance personnel are prone to fall from the roof of the photovoltaic shed. Summary of the invention
[0005] In order to improve the convenience and safety of maintenance on photovoltaic sheds, the present application provides a photovoltaic shed construction method and operation and maintenance channel.
[0006] In the first aspect, the present application provides a photovoltaic shed construction method, which adopts the following technical solution:
[0007] A photovoltaic shed construction method includes the following construction steps:
[0008] S1: Fix the buried plate on the original concrete column of the building and install the steel column;
[0009] S2: The truss is welded on the ground, and the truss is hoisted to the building roof by a crane. The construction workers use aerial work vehicles and other methods to complete the welding of the truss frame;
[0010] S3: Lay a construction channel on the welded truss, lay a safety net and a stress dispersing material plate on the building roof, and the construction workers complete the welding of other truss parts on the roof under the condition of taking safety protection measures;
[0011] S4: After the truss is installed, the operation and maintenance channels arranged vertically and horizontally between the photovoltaic panel assembly arrays are installed;
[0012] S5: Photovoltaic panel assembly laying and wiring process: The construction workers use the operation and maintenance channel and the roof's stress-dispersing material panels to complete the process. The roof wiring uses the operation and maintenance channel as buried wiring.
[0013] By adopting the above technical scheme, in order to facilitate the assembly of the photovoltaic shed, a photovoltaic shed is installed above the original roof. To this end, the buried plate is first fixed on the original concrete column, and then the steel column is fixedly installed using the buried plate, followed by the installation of the truss, and then the operation and maintenance channel is arranged, and finally the photovoltaic panel assemblies are laid, thereby improving the convenience of shed installation. When the photovoltaic panel assemblies need to be inspected or replaced, the maintenance personnel can walk on the operation and maintenance channel on the photovoltaic shed, reduce stepping on the photovoltaic panel assemblies, and avoid slipping on the smooth surface of the photovoltaic panel assemblies, which is conducive to improving the convenience and safety of maintenance on the photovoltaic shed.
[0014] Optionally, the operation and maintenance channel in step S4 includes the following installation steps:
[0015] S4.1: Lay purlins between trusses and secure with bolts;
[0016] S4.2: Prepare M-type rails, lay them on the purlins, and fix them with self-tapping screws;
[0017] S4.3: Prepare the middle load, arrange and hang it on the top surface of the M-type guide rail, and fix it with self-tapping screws;
[0018] S4.4: Prepare the pressure weight and fix it to the top surface of the middle load with bolts;
[0019] S4.5: Snap the two ends of the operation and maintenance channel into the compression code.
[0020] By adopting the above technical solution, the purlins are conducive to providing support for the operation and maintenance channel and the photovoltaic panel assembly, and the operation and maintenance channel is installed in a snap-fit form, which is conducive to improving the convenience and stability of the photovoltaic panel assembly.
[0021] In a second aspect, the present application provides an operation and maintenance channel, including the operation and maintenance channel in the above-mentioned step S4, wherein support seats are provided at both ends of the operation and maintenance channel, a buckle plate is provided on the inner side of the support seat, and an auxiliary component is provided inside the support seat.
[0022] By adopting the above technical solution, the buckle plate is used to buckle into the pressure code, so that the operation and maintenance channel is fixed on the top surface of the photovoltaic shed, and the auxiliary components are used to change and extend the channel of the operation and maintenance channel, thereby further improving the maintenance range of the maintenance personnel.
[0023] Optionally, the auxiliary component includes two groups of extension channels, and accommodating grooves are symmetrically opened on both sides of the support seat. The two groups of extension channels are respectively rotated in the accommodating grooves on both sides, and the number of extension channels in each group is two. The support seat is provided with a positioning piece for positioning the two extension channels.
[0024] By adopting the above technical solution, when it is necessary to change and extend the walking channel of the operation and maintenance channel, the extension channels are first swung out of the accommodating grooves respectively, and then the two extension channels are positioned at the same time by the positioning parts. At this time, the two extension channels are respectively perpendicular to the operation and maintenance channels, and the maintenance personnel can walk on the extension channels to increase the maintenance range of the photovoltaic panel components.
[0025] Optionally, the positioning member is a limiting rod, a top surface of which is provided with a sliding groove, both ends of which slide in the sliding groove, a side wall of the support seat is provided with an embedding groove, the embedding groove is connected to the accommodating groove, and the limiting rod is plugged into the embedding groove.
[0026] By adopting the above technical solution, when it is necessary to limit the two extension channels at a vertical position with respect to the operation and maintenance channel at the same time, the limit rod is first taken out from the embedded groove, and the two ends of the limit rod are simultaneously slid in the slide groove. Under the limiting action of the limit rod and the accommodating groove, the two extension channels are positioned at the current position, which is beneficial to improve the stability of the positioning of the extension channels.
[0027] Optionally, adjustment grooves are provided at both ends of the limit rod, and an insertion rod is slidably arranged in the adjustment groove. The extension channel is provided with a plurality of slots based on the groove wall of the sliding groove. The plurality of slots are evenly distributed along the length direction of the extension channel. One end of the insertion rod is respectively plugged into the slot, and the limit rod is provided with an elastic member for cooperating to drive the insertion rod to move.
[0028] By adopting the above technical solution, under the action of the elastic member, the rod is inserted into the slot. When the position of the limit rod needs to be adjusted, the rod is slid out of the slot, and then the position of the limit rod is adjusted. The limit rod is also used to provide maintenance personnel with an optional foothold, which is beneficial to improve the scope of maintenance of photovoltaic modules and the convenience of maintenance.
[0029] Optionally, the elastic member is a spring, the side wall ring of the insertion rod is provided with a pressure ring, the spring is sleeved on the side wall of the insertion rod, one end of the spring is connected to the pressure ring, and the other end of the spring is connected to the groove wall of the adjustment groove.
[0030] By adopting the above technical solution, when the insertion rod is detached from the slot, the insertion rod presses against the spring through the pressure ring. When the insertion rod is released, the spring releases the elastic force and drives the insertion rod to be inserted into the slot through the pressure ring, which is beneficial to improve the stability of the insertion rod in the slot.
[0031] Optionally, a vertical groove is provided on the bottom surface of the extension channel, a wedge-shaped pad is slidably arranged in the vertical groove, and the extension channel is provided with a lifting member for driving the wedge-shaped pad to rise and fall.
[0032] By adopting the above technical solution, when the extension channel swings in the accommodating groove, the wedge-shaped pad slides in through the wedge-shaped surface and presses against the groove wall of the accommodating groove, and the extension channel is fixed in the accommodating groove through the wedge-shaped pad. When the operation and maintenance channel is swung out, the wedge-shaped pad is driven down by the lifting member. At this time, the wedge-shaped pad presses against the surface of the photovoltaic module, thereby providing support for the extension channel, which is beneficial to avoid the extension channel from being stepped on and deformed.
[0033] Optionally, the lifting member is a screw rod, the screw rod is threadedly connected in the extension channel, one end of the screw rod extends in the vertical groove, and one end of the screw rod is rotatably connected to the wedge-shaped pad.
[0034] By adopting the above technical solution, when the screw is rotated, the screw is threadedly connected to the extension channel and drives the lifting member to move up and down, which is beneficial to improving the lifting stability of the wedge-shaped pad.
[0035] Optionally, at least two reinforcing ribs are provided on the inner side of the operation and maintenance channel.
[0036] By adopting the above technical solution, under the action of the reinforcing ribs, it is helpful to increase the overall strength of the operation and maintenance channel and to prevent deformation caused by maintenance personnel stepping on it.
[0037] In summary, this application includes the following beneficial technical effects:
[0038] To facilitate the assembly of the photovoltaic shed, a photovoltaic shed is installed on top of the original roof. To this end, the buried plate is first fixed on the original concrete column, and then the steel column is fixed with the buried plate, followed by the installation of the truss, and then the operation and maintenance channel is arranged, and finally the photovoltaic panel assemblies are laid, thereby improving the convenience of installation on the shed. When the photovoltaic panel assemblies need to be inspected or replaced, the maintenance personnel can walk on the operation and maintenance channel on the photovoltaic shed, reducing the trampling on the photovoltaic panel assemblies and avoiding slipping on the smooth surface of the photovoltaic panel assemblies, which is conducive to improving the convenience and safety of maintenance on the photovoltaic shed. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 These are the construction steps for the photovoltaic shed in this application;
[0040] Figure 2This is the operation and maintenance channel installation step for this application;
[0041] Figure 3 It is the installation node diagram of the operation and maintenance channel of this application;
[0042] Figure 4 It is a schematic diagram of the overall structure of the operation and maintenance channel of this application;
[0043] Figure 5 It is a structural schematic diagram of the limit rod of the present application;
[0044] Figure 6 yes Figure 4 Magnified view of part A.
[0045] Explanation of the reference numerals: 1. purlin; 2. M-shaped guide rail; 3. middle load; 4. pressure code; 5. photovoltaic module; 6. operation and maintenance channel; 7. support seat; 8. buckle plate; 9. extension channel; 10. accommodating groove; 11. limiting rod; 12. slide groove; 13. embedded groove; 14. adjustment groove; 15. insertion rod; 16. slot; 17. spring; 18. pressure ring; 19. vertical groove; 20. wedge-shaped pad; 21. screw. DETAILED DESCRIPTION
[0046] The following is combined with Figure 1-6 This application is described in further detail.
[0047] Example:
[0048] First, see Figure 1 A photovoltaic shed construction method includes the following construction steps:
[0049] S1: Fix the embedded plate on the concrete column of the original roof building, and then use the embedded plate to fix and install the steel column;
[0050] S2: The trusses are welded one by one on the ground, and the welded trusses are hoisted to the roof of the building by a crane. The construction workers use aerial work vehicles and other methods to complete the welding of the truss frame;
[0051] S3: Lay a construction channel on the welded truss, lay a safety net and a stress dispersing material plate on the building roof, and the construction workers complete the welding of other truss parts on the roof under the condition of taking safety protection measures;
[0052] S4: After the truss is installed, the photovoltaic panel assemblies are arranged in a rectangular array, and an operation and maintenance channel 6 is installed between the photovoltaic panel assembly arrays;
[0053] S5: Photovoltaic panel assembly laying and wiring process: The construction workers use the operation and maintenance channel 6 and the roof's stress dispersion material to complete the process, and the roof wiring uses the operation and maintenance channel 6 as buried wiring.
[0054] The new photovoltaic shed is constructed on the basis of retaining the original building roof, which can ensure that the building is not damaged to the greatest extent, and improve the efficiency and convenience of photovoltaic shed installation. The operation and maintenance channel 6 is used by construction personnel when repairing photovoltaic modules 5, which reduces the direct stepping of construction personnel on photovoltaic modules 5, avoids sliding from the surface of photovoltaic modules 5, and improves the safety of photovoltaic module 5 repair.
[0055] For details, see Figure 2 and Figure 3 In step S4, the operation and maintenance channel 6 further includes the following installation steps:
[0056] S4.1: Lay purlins 1 evenly between the trusses and fix the two ends of purlins 1 to the trusses with bolts;
[0057] S4.2: prepare a plurality of M-shaped guide rails 2, and arrange the plurality of M-shaped guide rails 2 evenly on the purlin 1, and fix both ends of the M-shaped guide rails 2 to the top surface of the purlin 1 with self-tapping screws;
[0058] S4.3: prepare a plurality of middle loaders 3, the number of which is set to be made of aluminum alloy, and the plurality of middle loaders 3 are evenly hung on the top surface of the M-shaped guide rail 2, and the two ends of the middle loaders 3 are fixed to the two sides of the M-shaped guide rail 2 with self-tapping screws respectively;
[0059] S4.4: prepare a pressure code 4, the number of which is provided with a plurality, the pressure code 4 including an edge pressure code 4 and a middle pressure code 4, the edge pressure code 4 is used to press the edge of the photovoltaic shed, the middle pressure code 4 is used to press the adjacent photovoltaic modules 5, and the pressure code 4 is fixed to the top surface of the middle support 3 by bolts;
[0060] S4.5: Buckle the two ends of the operation and maintenance channel 6 onto the symmetrical sides of the pressure code 4.
[0061] The photovoltaic modules 5 are supported by the M-shaped guide rails 2, the middle support 3 and the pressure codes 4. While supporting the photovoltaic modules 5, the operation and maintenance channel 6 is fastened to the top surfaces of two adjacent photovoltaic modules 5 so that the photovoltaic shed can be inspected and maintained through the operation and maintenance channel 6.
[0062] Second, see Figure 4 An operation and maintenance channel includes the operation and maintenance channel 6 in step S4, wherein both ends of the operation and maintenance channel 6 are fixedly connected with support seats 7, and opposite sides of the two support seats 7 are fixedly connected with buckle plates 8.
[0063] When the operation and maintenance channel 6 needs to be installed, the buckle plate 8 is buckled between the pressure code 4 and the photovoltaic module 5, and then the bolts corresponding to the pressure code 4 are tightened. At this time, the operation and maintenance channel 6 is fixed to the top surface of the photovoltaic shed.
[0064] See also Figure 4 and Figure 5In order to increase the walking range of maintenance personnel on the operation and maintenance channel 6 and increase the foothold, an auxiliary component is installed in the support seat 7, and the auxiliary component includes an extension channel 9, and the number of the extension channels 9 is set in two groups, and the number of each group of extension channels 9 is set in two. The two sides of the support seat 7 are symmetrically provided with accommodating grooves 10, and the number of the accommodating grooves 10 corresponds to the extension channels 9. Each extension channel 9 is hinged in each accommodating groove 10, and the hinged end of the extension channel 9 is the end close to the two extension channels 9 in each group.
[0065] At the same time, the support seat 7 is also equipped with a positioning member, which is used to simultaneously position and fix the positions of the two extension channels 9. The positioning member is a limiting rod 11, and the top surfaces of the two extension channels 9 are provided with a slide groove 12, and the two ends of the limiting rod 11 slide in the slide groove 12 respectively. The side wall of the support seat 7 is also provided with an embedding groove 13, which is located between the two accommodating grooves 10, and the two ends of the embedding groove 13 are respectively connected to the accommodating groove 10. The limiting rod 11 is plugged into the embedding groove 13.
[0066] When the extension channel 9 needs to be unfolded, the two extension channels 9 are first swung out of the accommodating groove 10, and the extension channels 9 are perpendicular to the support seat 7. Then the limiting rod 11 is taken out of the embedding groove 13, and the limiting rod 11 slides in the sliding groove 12. Under the limiting effect of the limiting rod 11, the two extension channels 9 are positioned and fixed at the current position.
[0067] See also Figure 5 In order to fix the limit rod 11, the limit rod 11 has adjustment grooves 14 at both ends, and the adjustment grooves 14 are slidably connected with the insertion rods 15. The extension channel 9 has slots 16 on the groove wall based on the slide groove 12. The number of the slots 16 is multiple, and the multiple slots 16 are respectively distributed in a linear array along the length direction of the extension channel 9. One end of the insertion rod 15 extends outside the rod end of the limit rod 11, and one end of the insertion rod 15 is respectively plugged into the slots 16.
[0068] At the same time, in order to improve the stability of the insertion rod 15 inserted into the slot 16, the limit rod 11 is installed with an elastic member, which is a spring 17. The side wall fixing ring of the insertion rod 15 is provided with a pressing ring 18, and the pressing ring 18 slides in the adjustment groove 14. One end of the spring 17 is fixedly connected to the pressing ring 18, and the other end of the spring 17 is fixedly connected to the groove wall of the adjustment groove 14.
[0069] When the limit rod 11 needs to be moved, the rod 15 is first moved away from the slot 16, and the rod 15 is pressed against the spring 17 through the pressure ring 18, and the position of the limit rod 11 can be adjusted. When the rod 15 is released, the spring 17 releases its elastic force and drives the rod 15 to be inserted into the slot 16 through the pressure ring 18.
[0070] It should be noted that in addition to positioning and fixing the two extension channels 9, the limit rod 11 is also used to provide a foothold for maintenance personnel, and the position of the foothold is adjusted by adjusting the position of the limit rod 11, thereby improving the convenience of adjusting the maintenance range.
[0071] See also Figure 6 In order to prevent the extension channel 9 from bending and deforming when construction workers step on the extension channel 9, a vertical groove 19 is opened on the bottom surface of the extension channel 9 away from the hinge, and a wedge-shaped pad 20 is slidably installed in the vertical groove 19, and the bottom end of the wedge-shaped pad 20 extends outside the vertical groove 19.
[0072] See also Figure 6 In order to facilitate the movement of the wedge-shaped pad 20, a lifting member is installed in the extension channel 9, and the lifting member is a screw 21. The screw 21 is threadedly connected to the extension channel 9, and the bottom end of the screw 21 extends into the vertical groove 19, and the bottom end of the screw 21 is rotatably connected to the top surface of the wedge-shaped pad 20.
[0073] When the extension channel 9 is swung out, the extension channel 9 is perpendicular to the inspection channel, and the screw rod 21 is rotated in the reverse direction, and the screw rod 21 drives the wedge-shaped pad 20 to descend. At this time, the wedge-shaped pad 20 is supported on the top surface of the photovoltaic module 5. When the screw rod 21 is rotated in the forward direction, the screw rod 21 drives the wedge-shaped pad 20 to rise, and when the wedge-shaped pad 20 is completely raised, the bottom end of the wedge-shaped pad 20 is placed outside the bottom of the extension channel 9. When the extension channel 9 is reset and swung in the receiving groove 10, the wedge surface of the wedge-shaped pad 20 is pressed against the receiving groove 10, and the wedge-shaped pad 20 is inserted into the receiving groove 10 with an interference fit, so that the extension channel 9 is fixed in the receiving groove 10.
[0074] It is worth mentioning that the inner side of the operation and maintenance channel 6 is fixedly connected with reinforcing ribs, and the number of reinforcing ribs is set to at least two. Under the action of the reinforcing ribs, the overall strength of the operation and maintenance channel 6 is improved.
[0075] The working principle of an operation and maintenance channel:
[0076] When the photovoltaic module 5 needs to be repaired, walk on the photovoltaic shed through the operation and maintenance channel 6 to walk to the location of the photovoltaic module 5 that needs to be repaired. When it is necessary to increase the foothold and widen the maintenance range, first swing the extension channel 9 out of the accommodating groove 10 to make the two extension channels 9 perpendicular to the operation and maintenance channel 6, and then slide the limit rod 11 out of the embedded groove 13. Under the restriction of the limit rod 11 and the groove wall of the accommodating groove 10, the two extension channels 9 are fixed at the current position. In addition, in the process of swinging out the extension channel 9, the screw 21 is tightened forward, and the screw 21 drives the wedge-shaped pad 20 to descend, so that the wedge-shaped pad 20 abuts against the top surface of the photovoltaic module 5, thereby supporting the extension channel 9. At this time, the maintenance personnel can stand on the top surface of the extension channel 9 or the limit rod 11, and then repair the photovoltaic module 5.
[0077] When the position of the foothold needs to be changed, the insertion rod 15 is pulled away from the slot 16, and the insertion rod 15 compresses the spring 17 through the pressure ring 18. At this time, the insertion rod 15 is separated from the slot 16, and the position of the limit rod 11 can be slidably adjusted. When the limit rod 11 slides to the desired position, the card insertion rod 15 is released, the spring 17 releases the elastic force, and drives the insertion rod 15 to be inserted into the slot 16 through the pressure ring 18. At this time, the limit rod 11 is fixed at the current position, so that the position of the foothold can be changed by adjusting the position of the limit rod 11.
[0078] In summary, walking on the photovoltaic shed through the operation and maintenance channel 6 improves the convenience of overhauling the photovoltaic components 5. It reduces stepping on the photovoltaic components 5, avoids slipping from the photovoltaic shed, and improves the safety of overhauling the photovoltaic shed.
[0079] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A photovoltaic shed construction method, characterized in that: The construction steps include: S1: Fix the buried plate on the original concrete column of the building and install the steel column; S2: Complete the welding of the truss on the ground, use the crane to lift the truss to the building roof, and the construction workers use the aerial work vehicle to complete the welding of the truss frame; S3: Lay a construction channel on the welded truss, lay a safety net and a stress dispersing material plate on the building roof, and the construction workers complete the welding of other truss parts on the roof under the condition of taking safety protection measures; S4: After the truss is installed, the operation and maintenance channels (6) arranged vertically and horizontally between the photovoltaic panel assembly arrays are installed; S5: photovoltaic panel assembly laying and wiring process: the construction personnel use the maintenance channel (6) and the roof's stress dispersing material plate to complete the process, and the roof wiring uses the maintenance channel (6) as buried wires; The operation and maintenance channel (6) in step S4 includes the following installation steps: S4.1: Lay purlins (1) between trusses and secure with bolts; S4.2: Prepare M-shaped rails (2), lay them on the purlins (1), and fix them with self-tapping screws; S4.3: Prepare the middle load (3), arrange and hang it on the top surface of the M-shaped guide rail (2), and fix it with self-tapping screws; S4.4: Prepare a pressure weight (4), and fix the pressure weight (4) to the top surface of the middle load (3) by means of bolts; S4.5: buckle the two ends of the operation and maintenance channel (6) into the compression code (4); Support seats (7) are arranged at both ends of the operation and maintenance channel (6), a buckle plate (8) is arranged on the inner side of the support seat (7), and an auxiliary component is arranged inside the support seat (7); The auxiliary component comprises two groups of extension channels (9), and accommodating grooves (10) are symmetrically provided on both sides of the support seat (7). The two groups of extension channels (9) are respectively rotated in the accommodating grooves (10) on both sides, and the number of extension channels (9) in each group is two. The support seat (7) is provided with a positioning member for positioning the two extension channels (9); The positioning member is a limiting rod (11), the top surface of the limiting rod (11) is provided with a slide groove (12), both ends of the limiting rod (11) slide in the slide groove (12), the side wall of the supporting seat (7) is provided with an embedding groove (13), the embedding groove (13) is connected with the accommodating groove (10), and the limiting rod (11) is plugged into the embedding groove (13).
2. A photovoltaic shed construction method according to claim 1, characterized in that: Adjustment grooves (14) are provided at both ends of the limit rod (11), and an insertion rod (15) is slidably arranged in the adjustment groove (14). The extension channel (9) is provided with a plurality of slots (16) based on the slot wall of the slide groove (12). The plurality of slots (16) are evenly distributed along the length direction of the extension channel (9), and one end of the insertion rod (15) is respectively plugged into the slot (16). The limit rod (11) is provided with an elastic member for cooperating to drive the insertion rod (15) to move.
3. A photovoltaic shed construction method according to claim 2, characterized in that: The elastic member is a spring (17), and a pressure ring (18) is provided around the side wall of the insertion rod (15). The spring (17) is sleeved on the side wall of the insertion rod (15), one end of the spring (17) is connected to the pressure ring (18), and the other end of the spring (17) is connected to the groove wall of the adjustment groove (14).
4. A photovoltaic shed construction method according to claim 1, characterized in that: The bottom surface of the extension channel (9) is provided with a vertical groove (19), a wedge-shaped pad (20) is slidably arranged in the vertical groove (19), and the extension channel (9) is provided with a lifting member for driving the wedge-shaped pad (20) to rise and fall.
5. A photovoltaic shed construction method according to claim 4, characterized in that: The lifting member is a screw rod (21), the screw rod (21) is threadedly connected to the extension channel (9), one end of the screw rod (21) extends into the vertical groove (19), and one end of the screw rod (21) is rotatably connected to the wedge-shaped pad (20).
6. A photovoltaic shed construction method according to claim 1, characterized in that: At least two reinforcing ribs are arranged on the inner side of the operation and maintenance channel (6).
Citation Information
Patent Citations
Solar cell panel installation structure with operation and maintenance channel
CN216766573U
Photovoltaic truss connecting structural member and truss type photovoltaic support convenient to adjust
CN220173150U