Petroleum business data comprehensive management method based on business resource model

By adopting a data management method based on a business resource model, the problems of insufficient storage capacity and business resource integration in traditional petroleum data management have been solved. This has enabled efficient data management and information sharing on local servers, and improved the scalability and adaptability of the system.

CN118939628APending Publication Date: 2024-11-12BEIJING JURASSIC SOFTWARE CO LTD

Patent Information

Application Number
CN202410853836.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Traditional petroleum data management methods focus on data storage and retrieval, leading to local server storage limitations, making it impossible to store excessive amounts of data. Furthermore, the lack of integration of business resources results in poor data consistency, difficulties in information sharing and integration, and insufficient scalability and flexibility.

Method used

By adopting a business resource model-based approach, the system obtains preset partitions and historical data call records from the cloud server, calculates the data call sequence and probability, determines the data to be downloaded, and analyzes partition priority and data tags to rationally select data to download to the local server.

Benefits of technology

It enables more rational and flexible data management on local servers, improves data consistency and information sharing capabilities, enhances system scalability and adaptability, and meets the ever-changing business needs of the petroleum industry.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118939628A_ABST
    Figure CN118939628A_ABST
Patent Text Reader

Abstract

The invention provides a petroleum business data comprehensive management method based on a business resource model, and belongs to the technical field of petroleum data management. The petroleum business data comprehensive management method based on the business resource model comprises the following steps: acquiring a preset partition of a cloud server and a historical data calling record of the cloud server; on the basis of a business resource model, according to the historical calling record, calculating and determining downloading-emphasized data of each preset data category; analyzing and determining partition priority data according to a preset data label of the data in the preset partition and the download-side data; determining local server presentation data according to the partition priority data and a preset data downloading rule; by adopting the scheme, the data screening of the cloud server is realized, and the data needing to be presented in the local server is emphatically reflected, so that the staff can conveniently check the data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of petroleum data management, and in particular to a petroleum business data integrated management method based on a business resource model. Background Art

[0002] In terms of data management applications in the oil industry, traditional data management methods usually focus on data storage and retrieval; that is, based on the pre-set oil-related data stored in the cloud server, when the relevant data needs to be called, the search qualifiers of various aspects are determined, and then the corresponding data is retrieved from the cloud server based on the search qualifiers, and the retrieved data is downloaded to the local server for use; however, due to the storage limit problem of the local server, the local server cannot store excessive data, so the data downloaded from the cloud needs to be managed. Summary of the invention

[0003] In order to solve the above technical problems, the present application provides a comprehensive management method for petroleum business data based on a business resource model.

[0004] The present application provides a method for comprehensive management of petroleum business data based on a business resource model. The method comprises: Get the preset partitions of the cloud server and the historical data call records of the cloud server; Based on the business resource model, the download focus data of each preset data category is calculated and determined according to the historical call records; Determine the partition priority data according to the preset data tags of the data in the preset partition and the download focus data analysis; The local server presentation data is determined according to the partition priority data and preset data downloading rules.

[0005] Furthermore, it is characterized in that the download focus data of each preset data category is calculated and determined based on the business resource model and the historical call records, including: Determine the data call timing and data call probability according to the historical call records; Computational downloads focus on data, ; In the formula, To download focused data, Call timing for data, is the data recall probability, To preset the first weight, The second weight is preset.

[0006] Further, .

[0007] Furthermore, the method for calculating the data call probability includes: Calculate the data call probability, ; In the formula, is the data call probability; the historical call record includes the total record time of historical data calls, the total record time of historical data calls includes multiple preset sampling time periods, i takes a value of 1-n, indicating 1-n preset sampling time periods extracted from the total time of historical data calls; represents the data call sub-probability of the i-th preset sampling time period, Indicates the preset time weight corresponding to the data call sub-probability of the i-th preset sampling time period.

[0008] Furthermore, the method for calculating the data call sub-probability includes: Determine the call demand information and the number of times each category of data is called in each preset sampling time period according to the historical data call record; Calculating the data call sub-probability, ; In the formula, Call subprobabilities for the data, Indicates the number of times any category of data is called in the i-th preset sampling time period. Indicates the calling demand information in the i-th preset sampling time period The number of times the strongly associated composite data of the same category of data is called; Indicates the time length value of the i-th preset sampling time period, Represents the calling frequency and value of all category data in the i-th preset sampling time period.

[0009] Furthermore, the 1-n preset sampling time periods extracted from the total time of the historical data call include: The preset sampling time period is a homogenization time period; The homogenization time period indicates that, in any two of the preset sampling time periods, at least one data feature of any data contained in one of the preset sampling time periods is the same as at least one data feature of any data contained in another of the preset sampling time periods; The data characteristics represent the attributes contained in the data; The data's own attributes are obtained according to a preset data attribute table in the cloud server.

[0010] Furthermore, the method for calculating the preset time weight includes: Determine the number of data features of the data to be analyzed corresponding to all the preset sampling time periods in each of the preset sampling time periods; calculating the preset time weight, ; In the formula, represents the i-th preset time weight, represents the number of data features of the data to be analyzed corresponding to the i-th preset sampling time period, Indicates the sum of the data features of the data to be analyzed corresponding to all preset sampling time periods.

[0011] Further, .

[0012] It should be understood that the contents described in the Summary of the Invention are not intended to limit the key or important features of the embodiments of the present application, nor are they intended to limit the scope of the present application. Other features of the present application will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The above and other features, advantages and aspects of the embodiments of the present application will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. In the accompanying drawings, the same or similar reference numerals represent the same or similar elements, wherein: Figure 1 A flow chart of a method for integrated management of petroleum business data based on a business resource model in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0014] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0015] In addition, the term "and / or" in this article is only a description of the association relationship between the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0016] Metadata management is to support the "collection, storage, management and use" of data throughout its life cycle, help organizations understand their own data, systems and processes, and help users evaluate data quality. It is indispensable to databases or applications. Currently, the most common metadata management methods are mainly based on traditional data model design, such as DAMA's metadata solution. These traditional methods or industry-wide methods usually focus on data storage and retrieval, and lack comprehensive consideration and integration of business resource applications. Lack of business resource integration: Traditional methods usually regard metadata as isolated data units and do not effectively combine metadata with business resources, resulting in metadata design that cannot fully reflect business needs and characteristics. Poor data consistency: Due to the lack of unified modeling of business resources, there may be duplication, redundancy or inconsistency between different metadata, which increases the difficulty of data management and maintenance. Difficulty in information sharing and integration: Due to the non-standard and non-uniform metadata design, information sharing and integration between different systems become difficult, affecting the overall informatization level of the oil industry. Insufficient scalability and flexibility: Traditional methods often use fixed data models, which are difficult to adapt to the ever-changing business needs of the oil industry and lack sufficient scalability and flexibility.

[0017] All data are descriptions of various aspects of the business, and oil data are descriptions of various aspects of the oil business. Business data = business object master data + business node + data content. Data is a description of the results obtained by a certain object subject engaging in a certain business activity. Among them, business nodes can be defined through business coordinates, sorting out business coordinate relationships, and obtained through effective combinations of business coordinates; specifically, the master data metadata is determined according to the object type, object area, object belonging (object relationship), object alias and other dimensions of the main business objects in the oil industry, and the unified description content of the object master data is constructed; Business node sorting includes, first, establishing a business coordinate system. In order to accurately indicate the location of various places on the earth, people assume a coordinate system for the surface of the earth, which is the latitude and longitude geographic coordinates. Similarly, in order to describe an accurate oil exploration and development business, we can build a business coordinate system based on dimensions such as business objects, business stages, work types, and professional types, and at the same time define the main coordinate scales of each dimension to form a business coordinate for the entire business; based on the business coordinate definition goals, define a business coordinate division method, formulate division principles, and establish a business coordinate system that conforms to the oil and gas exploration and development business. After some practical exploration, preliminary research on the division of four dimensions, namely business objects, business stages, professional types, and work types, can meet the needs of business architecture positioning; the division principles are as follows: the business coordinate dimensions are independent of each other and they will not affect each other; these dimensions can comprehensively describe any business of oil and gas exploration and development; each dimension has a definite business meaning and can have a unique mapping and comparison with actual business work.

[0018] In order to make the division, the top-level design of the oil and gas industry is analyzed to extract the dimensions of business division. Then, each dimension is refined according to the division principle. In the business object dimension, a business work must depend on a business object, which can be a work organization unit or work object in the oil business, such as a trap, an exploration well, a basin, and a mining right area. In the business stage dimension, the business is divided into different work stages according to the timeline sequence of oil exploration and development. This is only a division of large stages, such as exploration, oil and gas pre-exploration, development and construction, trial production, and abandonment. In the work type dimension, different work natures and functions at different time nodes are defined, such as operations, research, management, and operations. In the professional type dimension, different technical methods and different types of work are considered, corresponding to specific petroleum geology and engineering majors, such as geophysical exploration, drilling, logging, analytical testing, and structural geology.

[0019] Business coordinate relationship: In a theoretical coordinate system, the scales of each dimension intersect to accurately determine the position of a point. However, in the petroleum business coordinate system, some business points may be beyond the scope of current exploration and development technology, or may not exist. For example, there is no correlation between the business object "enclosure" and the "production abandonment" in the business stage. Therefore, the business coordinate relationship of the petroleum business coordinate system needs to be manually defined to associate two by two, and finally obtain the intersection relationship of four dimensions. Based on the scale of the business coordinate dimension, analyze whether there is a business association relationship between the scales of different dimensions, and define the business coordinate relationship between the two by dimensionality reduction.

[0020] Generate business nodes; based on the above business coordinate system and the theory of business coordinate relationship, when we clarify the core scales of business objects, business stages, work types, and professional types involved in oilfield exploration and development, combined with the sorting of business coordinate relationships, we can obtain the core business work nodes of oil and gas exploration and development through business combination.

[0021] The present application provides a comprehensive management method for petroleum business data based on a business resource model, which can reasonably and flexibly select downloaded cloud data according to the needs of local servers and data calls.

[0022] refer to Figure 1 ,The specific steps of a comprehensive management method for petroleum business data based on ,business resource model are as follows.

[0023] Step S110: Obtain the preset partition of the cloud server and the historical data call record of the cloud server.

[0024] It can be understood that the preset partitions here are data areas randomly divided in advance in the cloud server, each preset partition contains data of multiple data categories, and there may be a correlation between data of different data categories in each preset partition; the historical data call record refers to the call information of all historical data with respect to the data usage of the cloud server.

[0025] Step S120: Based on the business resource model, the download focus data of each preset data category is calculated and determined according to the historical call records.

[0026] In the embodiment of the present application, the calculation and determination of the download focus data of each preset data category based on the business resource model and the historical call records includes determining the data call sequence and the data call probability according to the historical call records; Computational downloads focus on data, ; In the formula, To download focused data, Call timing for data, is the data recall probability, To preset the first weight, is the preset second weight; wherein, .

[0027] It can be understood that here, with respect to the emphasis on data downloading, analysis is conducted from two perspectives: the data call sequence and the call probability of use. The data emphasis is calculated by assigning different weights. Among them, the data call sequence refers to the order of calling different categories of data for a certain project, any data call cycle, or an oil data inspection process. In an embodiment of the present application, the cloud data is the periodic accumulated data of a certain oil project, and the data call demand is the call demand for data within the oil project. For example, for the data call cycle, there are three periodic inspections for the periodic inspection of oil production in a certain place. The order of A data is 1, 1, 2; the order of B data is 2, 2, 3; the order of C data is 3, 3, 1; then the order of A data is 1, 67%, 2, 33%; the data call order value of A data can be determined according to the preset data order value comparison table, and the value is not less than 0 and not greater than 1.

[0028] After obtaining the data call sequence and the data call probability, the download focus data of each category of data can be calculated based on the above formula. The download focus data here is essentially a numerical value. By comparing the final numerical values, the priority of the final various categories of data can be determined; the preset first weight and the preset second weight here can be set by yourself, or determined empirically through historical data; specifically, in this embodiment, take is 0.25, take is 0.75; generally speaking, the preset second weight is not less than the preset first weight, that is, the corresponding weight of the data call probability is higher than the corresponding weight of the data call timing.

[0029] Furthermore, the method for calculating the data call probability includes calculating the data call probability, ; In the formula, is the data call probability; the historical call record includes the total record time of historical data calls, the total record time of historical data calls includes multiple preset sampling time periods, i takes a value of 1-n, indicating 1-n preset sampling time periods extracted from the total time of historical data calls; represents the data call sub-probability of the i-th preset sampling time period, Indicates the preset time weight corresponding to the data call sub-probability of the i-th preset sampling time period.

[0030] It can be understood that the data call probability is determined based on the historical data call records; by calculating the number and time of data calls in multiple preset sampling time periods, the probability of the data in each preset sampling time period can be determined, and combined with the preset time weight, the data call probability value based on the overall historical data can be calculated to characterize the data call situation.

[0031] Furthermore, the 1-n preset sampling time periods extracted from the total time of the historical data call include: the preset sampling time periods are homogeneous time periods; the homogeneous time periods represent that in any two of the preset sampling time periods, at least one data feature of any data contained in one of the preset sampling time periods is the same as at least one data feature of any data contained in another of the preset sampling time periods; the data features represent the data's own attributes; the data's own attributes are obtained according to a preset data attribute table in the cloud server.

[0032] It is understandable that the preset sampling time period needs to be explained here; in the actual data calling process, for example, data A and B need to be called, but the local server can only present one data, then the priority of data A and B needs to be screened; among them, the data calling probability value is one of the factors that can characterize the data priority; and the calculation of the data calling probability value needs to be analyzed based on multiple historical data, so as to calculate the data calling probability value that fits the actual situation; and the preset sampling time period screened here needs to meet the data characteristics of containing at least one data A or data B; for example, data A is data called on Wednesday, then one of the preset sampling time periods needs to include the historical calling data of the previous Wednesday, etc.; through the above analysis, it can be known that the weight of the data probability value calculated by the preset sampling time period containing more data features should be greater, and by calculating the ratio of a single preset sampling time period to the sum of all preset sampling time periods, the preset time weight corresponding to each preset sampling time period can be determined.

[0033] Furthermore, the method for calculating the preset time weight includes determining the number of data features of the data to be analyzed corresponding to all the preset sampling time periods in each of the preset sampling time periods; calculating the preset time weight, ; In the formula, represents the i-th preset time weight, represents the number of data features of the data to be analyzed corresponding to the i-th preset sampling time period, represents the sum of the data features of the data to be analyzed corresponding to all preset sampling time periods; where, .

[0034] Furthermore, the method for calculating the data call sub-probability includes determining the call demand information and the number of times each category of data is called in each preset sampling time period according to the historical data call record; calculating the data call sub-probability, ; In the formula, Call subprobabilities for the data, Indicates the number of times any category of data is called in the i-th preset sampling time period. Indicates the call demand information in the i-th preset sampling time period The number of times the strongly associated composite data of the same category of data is called; Indicates the time length value of the i-th preset sampling time period, Represents the calling frequency and value of all category data in the i-th preset sampling time period.

[0035] It can be understood that for each preset sampling time period, each category of data has its corresponding call count data; however, in this embodiment, when accumulating the number of calls of data, it is for single category data, such as oil collection volume per unit time and oil collection rate per unit time. Composite data will be accumulated in the statistical call count; therefore, it is necessary to subtract the number of calls of load data strongly associated with the data from the number of calls of any category of data; the composite data here is data containing at least two categories of data or calculated from at least two categories of data; strongly associated data is obtained based on a preset data association table, which contains the association relationship between data, such as strongly associated data, weakly associated data, and unassociated data.

[0036] Specifically, in time period A, there are three data including oil collection volume, oil collection volume per unit time and oil collection rate per unit time. Therefore, when counting the times, the single category of data of oil collection volume is accumulated twice, once for the oil collection volume and once for the oil collection volume per unit time. However, in fact, the oil collection volume per unit time is a composite data, which is calculated by dividing the oil collection volume by the time. Therefore, the actual number of calls for the oil collection volume is 2-1=1.

[0037] Step S130: Determine partition priority data according to the preset data tags of the data in the preset partition and the download focus data analysis.

[0038] In this embodiment, the partition priority data is determined based on a preset priority determination rule; the preset priority determination rule includes representing the first priority data of the partition with the highest download emphasis data value of each category of data contained in the preset partition; based on the preset data label of the data in the preset partition, determining the remaining preset number of category data in each preset partition that are strongly associated with the highest download emphasis data value as the second priority data; after sorting the first priority data, sorting the second priority data.

[0039] Specifically, in partitions A, B, and C, the data with the highest download focus in A is a, 80%, in B is b, 75%, and in C is c, 60%; then the first priority order is a, b, c; then based on the preset data labels, the data d in A is strongly associated with a, the data e in B is strongly associated with b, and the data f in C is strongly associated with c; then the second priority order is d, e, f.

[0040] Step S140: Determine the local server presentation data according to the partition priority data and preset data downloading rules.

[0041] In this embodiment, the preset data download rule includes taking the data upper limit value of the data presented in the local server as a threshold, screening the partition priority data according to the threshold, and selecting an appropriate number of data download values ​​for presentation by the local server.

[0042] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity of description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the embodiments of the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required by the present application.

[0043] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the described device can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0044] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the aforementioned disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in this application (but not limited to) by each other to form a technical solution.

Claims

1. A comprehensive management method for petroleum business data based on a business resource model, characterized in that: include: Get the preset partitions of the cloud server and the historical data call records of the cloud server; Based on the business resource model, the download focus data of each preset data category is calculated and determined according to the historical call records; Determine the partition priority data according to the preset data tags of the data in the preset partition and the download focus data analysis; The local server presentation data is determined according to the partition priority data and preset data downloading rules.

2. The petroleum business data integrated management method based on the business resource model according to claim 1 is characterized in that: The download focus data of each preset data category is calculated and determined based on the business resource model and the historical call records, including: Determine the data call timing and data call probability according to the historical call records; Computational downloads focus on data, ; In the formula, To download focused data, Call timing for data, is the data recall probability, To preset the first weight, The second weight is preset.

3. The petroleum business data integrated management method based on the business resource model according to claim 2 is characterized in that: 。 4. The petroleum business data integrated management method based on the business resource model according to claim 2 is characterized in that: The method for calculating the data call probability includes: Calculate the data call probability, ; In the formula, is the data call probability; the historical call record includes the total record time of historical data calls, the total record time of historical data calls includes multiple preset sampling time periods, i takes a value of 1-n, indicating 1-n preset sampling time periods extracted from the total time of historical data calls; represents the data call sub-probability of the i-th preset sampling time period, Indicates the preset time weight corresponding to the data call sub-probability of the i-th preset sampling time period.

5. The petroleum business data integrated management method based on the business resource model according to claim 4 is characterized in that: The method for calculating the data call sub-probability includes: Determine the call demand information and the number of times each category of data is called in each preset sampling time period according to the historical data call record; Calculating the data call sub-probability, ; In the formula, Call subprobabilities for the data, Indicates the number of times any category of data is called in the i-th preset sampling time period. Indicates the call demand information in the i-th preset sampling time period The number of times the strongly associated composite data of the same category of data is called; Indicates the time length value of the i-th preset sampling time period, Represents the calling frequency and value of all category data in the i-th preset sampling time period.

6. The petroleum business data integrated management method based on the business resource model according to claim 4 is characterized in that: The 1-n preset sampling time periods extracted from the total time of the historical data call include: The preset sampling time period is a homogenization time period; The homogenization time period indicates that, in any two of the preset sampling time periods, at least one data feature of any data contained in one of the preset sampling time periods is the same as at least one data feature of any data contained in another of the preset sampling time periods; The data characteristics represent the attributes contained in the data; The data's own attributes are obtained according to a preset data attribute table in the cloud server.

7. The method according to claim 6, characterized in that The method for calculating the preset time weight includes: Determine the number of data features of the data to be analyzed corresponding to all the preset sampling time periods in each of the preset sampling time periods; calculating the preset time weight, ; In the formula, represents the i-th preset time weight, represents the number of data features of the data to be analyzed corresponding to the i-th preset sampling time period, Indicates the sum of the data features of the data to be analyzed corresponding to all preset sampling time periods.

8. The method according to claim 7, characterized in that 。

Citation Information

Patent Citations

  • Hotspot data identification method and device

    CN101788995A

  • Download method for mobile terminal, mobile terminal and proxy download server

    CN102651861A

  • Resource management method and system based on cloud management

    CN115190181A

  • Efficient storage and retrieval for wearable-device data

    US20170090814A1

  • Method and apparatus for transmitting and displaying information between a remote network and a local computer

    US5913040A

Cited By

  • Petroleum business data design method and system

    CN119961253A

  • Train data classified storage method

    CN120849681A