Power grid safety emergency early warning method and device based on multi-source data fusion and medium

Through the multi-source data fusion method, combined with public opinion, grid operation and natural disaster data, grid risk assessment and emergency analysis are carried out, and the problems of high costs and limited accuracy in the existing technology are solved, achieving efficient and accurate grid emergency warnings. sex.

CN118941076APending Publication Date: 2024-11-12BEIJING NORTH STAR DIGITAL REMOTE SENSING TECH CO LTD +1
View PDF 0 Cites 6 Cited by

Patent Information

Application Number
CN202410959279.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing power grid emergency warning system relies on historical cases and sensor data, resulting in high monitoring costs and early warning accuracy affected by the environment and equipment stability. It lacks a unified data integration mechanism, making it difficult to achieve space-time tracking and dynamic adjustment of disasters, affecting early warning. Timeliness and accuracy.

Method used

Using a multi-source data fusion method, obtain public opinion data, power grid operation data and natural disaster data, judge the grid risks through semantic and emotional analysis, combine the power grid distribution information to conduct risk assessment and emergency analysis, formulate targeted emergency response plans, and use External and internal data source platforms obtain multiple aspects of data to ensure the accuracy and reliability of the data.

Benefits of technology

By integrating multi-source data, the accuracy and timeliness of grid risk assessment are improved, and a comprehensive perspective is provided to analyze grid safety conditions, reduce losses, improve the accuracy and efficiency of emergency responses, and ensure the rational allocation and utilization of resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941076A_ABST
    Figure CN118941076A_ABST
Patent Text Reader

Abstract

The invention relates to a power grid safety emergency early warning method and device based on multi-source data fusion and a medium. The method comprises the following steps: acquiring monitoring data and power grid distribution information of a target area; based on the public opinion data and a preset public opinion analysis rule, whether power grid risk early warning needs to be carried out on the target area is judged; if power grid risk early warning needs to be carried out on the target area, risk prediction is carried out on a power grid in the target area based on all disaster data, power grid operation data, power grid distribution information and a preset early warning analysis rule, and a first target power grid asset meeting a first set condition and a risk assessment result of the first target power grid asset are obtained; and based on the risk assessment result of each first target power grid asset, performing emergency analysis on each first target power grid asset to obtain a second target power grid asset meeting a second set condition and an emergency processing scheme of each second target power grid asset. According to the invention, the accuracy and timeliness of power grid safety early warning and emergency are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid security, and in particular to a power grid security emergency warning method, device and medium based on multi-source data fusion. Background Art

[0002] With the rapid development of the power industry and the increasing complexity of the power network structure, the construction of the power emergency warning and management system is particularly important. In the power system, timely warning and effective response to emergencies are of great significance to ensure the safe and stable operation of the power grid and reduce economic losses and social impacts. State Grid Corporation of China has made significant progress in the construction of emergency systems. By building a series of power transmission and transformation line monitoring and early warning operation and maintenance systems such as lightning warning, line fault monitoring, and panoramic intelligent monitoring of power transmission, the safety and reliability of power grid operation have been greatly improved.

[0003] However, despite the remarkable achievements in power emergency warning and management, there are still some problems and challenges. In terms of data acquisition, existing research mainly relies on historical cases and sensor equipment and facilities. Although this method can provide a certain degree of information support, it is often accompanied by high monitoring costs, and due to the instability of the environment and equipment, the accuracy of the warning will also be affected to a certain extent.

[0004] In terms of early warning systems, current research focuses on modeling the likelihood of disasters, but rarely involves further temporal and spatial tracking of disaster information. This limitation makes it difficult for the early warning system to grasp and dynamically adjust the development of disasters in real time, thus affecting the timeliness and accuracy of early warnings.

[0005] In terms of system construction, existing platforms are often highly targeted, with scattered data and a lack of a unified integration mechanism. This not only increases the difficulty and cost of system maintenance, but also limits the function and expansion of the system. Therefore, how to build an efficient, intelligent, and integrated power emergency warning system has become an urgent problem to be solved in the current power industry. Summary of the invention

[0006] The technical problem to be solved by the present invention is to provide a power grid security emergency warning method, device and medium based on multi-source data fusion, aiming to solve at least one of the above technical problems.

[0007] The technical solution of the present invention to solve the above technical problems is as follows:

[0008] In the first aspect, the present application provides a power grid security emergency warning method based on multi-source data fusion, which adopts the following technical solutions:

[0009] A power grid security emergency warning method based on multi-source data fusion, comprising:

[0010] Acquire monitoring data and power grid distribution information of a target area, wherein the monitoring data includes public opinion data, power grid operation data, and disaster data of at least one natural disaster;

[0011] Based on the public opinion data and preset public opinion analysis rules, determining whether it is necessary to issue a power grid risk warning for the target area;

[0012] If it is necessary to conduct a power grid risk warning for the target area, a risk assessment is conducted on the power grid in the target area based on the power grid operation data and the power grid distribution information, and / or based on all disaster data and the power grid distribution information, to obtain at least one first target power grid asset that meets a first set condition and a risk assessment result corresponding to each of the first target power grid assets, wherein the first set condition is used to assess whether information on the risk assessment result of the first target power grid asset meets the risk condition;

[0013] Based on the risk assessment results of each of the first target power grid assets, an emergency analysis is performed on each of the first target power grid assets in the target area to obtain second target power grid assets that meet second set conditions and emergency handling plans corresponding to each of the second target power grid assets, wherein the second set condition is to use the first target power grid assets that meet preset risk requirements as the conditions for the second target power grid assets.

[0014] The beneficial effects of the present invention are: by integrating data from multiple channels, including natural disaster data, public opinion data and power grid operation data, it is possible to more comprehensively understand the operation status and potential risks of the power grid, thereby providing more comprehensive and in-depth data support for disaster emergency response work. By integrating multi-source data, the method can provide a comprehensive perspective to observe and analyze the safety status of the power grid. As a new source of information, public opinion data provides a valuable reference for power grid risk assessment. By analyzing public opinion data through public opinion analysis rules, it is possible to accurately determine whether a power grid risk warning is needed, thereby improving the accuracy and timeliness of the warning.

[0015] After the warning is triggered, the method combines the power grid distribution information, all disaster data and power grid operation data to conduct a detailed assessment of the topography of the disaster area, so as to estimate whether there will be an impact on power grid assets such as power lines and towers, and predict in advance the first target power grid assets with failure risks and / or disaster impact risks, thereby achieving timely and accurate warnings.

[0016] By fully considering the characteristics of power grid data and the actual needs of emergency response, emergency analysis is performed based on the risk assessment results of each first target power grid asset, and the second target power grid assets that meet the preset risk level conditions are obtained, and specific emergency response plans are formulated for them. This targeted emergency response plan can more effectively deal with power grid risks, reduce losses, and improve the accuracy and timeliness of emergency response.

[0017] Based on the above technical solution, the present invention can also be improved as follows.

[0018] Furthermore, the disaster data is obtained through various preset external data source platforms, and the power grid operation data is obtained through various preset internal data source platforms;

[0019] The preset external data source platforms include emergency management agencies, national emergency warning information release platform, China Earthquake Networks Center and China Meteorological Administration Public Meteorological Service Center;

[0020] The preset internal data source platforms include State Grid Corporation's D5000 monitoring system, PMS monitoring system, SCADA monitoring system, and WANS monitoring system.

[0021] The beneficial effect of adopting the above further scheme is that by combining the external data source platform and the internal data source platform, data including natural disasters, emergencies, power grid operation and other aspects can be obtained. These data not only come from diverse sources, but also cover all aspects of power grid operation and various risks that may be faced, providing comprehensive data support for power grid security early warning. The external data source platform is usually operated by government agencies or authoritative agencies, and the data it provides has high accuracy and reliability. The internal data source platform is the power grid company's own monitoring system, which can reflect the operating status of the power grid in real time and accurately. This internal and external data acquisition method can ensure the accuracy and reliability of the data and improve the accuracy and credibility of the early warning.

[0022] Further, judging whether it is necessary to issue a power grid risk warning to the target area based on the public opinion data and preset public opinion analysis rules includes:

[0023] Performing semantic analysis on the public opinion data based on a preset semantic analysis algorithm to obtain first power grid related information of the target area, where the first power grid related information represents the degree of power grid failure in the target area;

[0024] Performing sentiment analysis on the public opinion data based on a preset sentiment analysis algorithm to obtain second power grid related information of the target area, where the second power grid related information represents the public's sentiment attitude towards the power grid situation in the target area;

[0025] Determine the public opinion level of the target area based on the first power grid related information and the second power grid related information;

[0026] If the public opinion level of the target area is not less than the preset public opinion level, it is determined that an early warning needs to be issued for the target area;

[0027] If the public opinion level of the target area is lower than the preset public opinion level, it is determined that there is no need to issue an early warning for the target area.

[0028] The beneficial effect of adopting the above further scheme is that by collecting and analyzing public opinion data in real time, the method can timely discover the public's concerns and feedback on the power grid situation. Combining semantic analysis and sentiment analysis algorithms, the degree of power grid failure and the public's emotional attitude can be accurately identified, so as to more accurately judge whether it is necessary to initiate power grid risk warning. It can significantly improve the timeliness and accuracy of warnings and reduce potential risks caused by information lag or misjudgment.

[0029] Further, based on the power grid operation data and the power grid distribution information, and / or based on all disaster data and the power grid distribution information, a risk assessment is performed on the power grid in the target area to obtain a first target power grid asset that meets a first set condition and a risk assessment result of the first target power grid asset, including:

[0030] Based on the power grid operation data, the power grid distribution information and the preset power grid abnormal data analysis rules, determine a third target power grid asset having power grid abnormal data in the target area, fault information corresponding to the third target power grid asset and the first geographic information;

[0031] Determining a first risk level of the third target power grid based on fault information corresponding to the third target power grid asset;

[0032] Taking the third target power grid asset as the first target power grid asset, and taking the fault information, first geographic information and first risk level corresponding to the third target power grid asset as the risk assessment result of the first target power grid asset;

[0033] and / or,

[0034] Performing spatial analysis on the target area based on all the disaster data and power grid distribution information to determine fourth target power grid assets affected by each natural disaster, risk levels corresponding to the fourth target power grid assets, and second geographic information;

[0035] The fourth target power grid asset is used as the first target power grid asset, and the second geographic information and the second risk level corresponding to the fourth target power grid asset are used as the risk assessment result of the first target power grid asset.

[0036] The beneficial effects of adopting the above further scheme are:

[0037] By analyzing the grid operation data in real time and combining it with the grid distribution information, the system can accurately identify the grid assets with abnormal data in the target area, such as line anomalies. For the identified abnormal grid assets, the system can further analyze their fault information, including fault type, fault occurrence time, fault impact range, etc. Based on the fault information, the system can calculate the first risk level of the third target grid asset and provide a quantitative risk assessment result.

[0038] By performing spatial analysis on the target area through all disaster data and grid distribution information, it is possible to predict and identify grid assets that may be affected by various natural disasters, such as towers and other grid assets without grid operation data. The risk level of each affected grid asset is analyzed through spatial analysis technology, that is, the second risk level. This quantitative risk assessment facilitates the formulation of different response strategies according to the risk level, optimizes resource allocation, and ensures that risk losses are minimized with limited resources.

[0039] Further, the spatial analysis of the target area based on all the disaster data and power grid distribution information includes:

[0040] For disaster data corresponding to any natural disaster, data cleaning and preprocessing are performed on the disaster data to obtain target disaster data;

[0041] For any disaster data corresponding to a natural disaster, the target disaster data is input into a geological disaster risk model corresponding to the disaster type for disaster prediction, and at least one natural disaster corresponding risk area and disaster level in the target area are obtained. The preset geological disaster risk model is trained based on the historical disaster data and early warning indicators corresponding to the disaster type;

[0042] Based on the risk areas, disaster levels, the power grid distribution information, the preset geographic information system and the preset power grid risk analysis rules corresponding to all natural disasters, at least one fourth target power grid asset in the target area and the risk level and second geographic information corresponding to each of the fourth target power grid assets are determined.

[0043] The beneficial effect of adopting the above further scheme is that through the risk areas, disaster levels and power grid distribution information corresponding to all natural disasters, combined with the preset geographic information system and power grid risk analysis rules, the power grid assets that may be affected in the target area (i.e., the fourth target power grid assets) can be accurately determined and the corresponding risk levels can be assigned to them. Different disaster data are input into the corresponding geological disaster risk models for prediction, making the prediction of each natural disaster more accurate and reliable.

[0044] Further, based on the risk assessment results of each of the first target power grid assets, performing emergency analysis on each of the first target power grid assets in the target area to obtain second target power grid assets that meet the second set condition includes:

[0045] For any of the first target power grid assets, judging whether the risk level of the first target power grid asset meets a preset risk level threshold based on the risk level of the first target power grid asset;

[0046] For any of the first target grid assets, if the risk level of the first target grid asset meets a preset risk level threshold, determining whether the preset geographical location is met based on the geographic information of the first target grid asset;

[0047] If the geographic information of the first target power grid asset meets the preset geographic location, the first target power grid asset is determined to be the second target power grid asset.

[0048] The beneficial effect of adopting the above further solution is that by first screening out assets with higher risk levels based on the evaluation results, those grid assets that are most likely to have problems or accidents can be accurately identified, so that emergency resources and measures can be more accurately invested in these key grid assets.

[0049] Further screening combined with the geographic information of power grid assets can quickly locate power grid assets in geographically important or sensitive areas. When dealing with emergencies, it can respond more quickly, improve the efficiency of emergency response, and ensure that limited emergency resources are reasonably allocated and utilized.

[0050] Further, obtaining the emergency response plan corresponding to each second target power grid asset includes:

[0051] Based on the importance of each of the second target grid assets to the security of the target area, determining a first priority value of each of the second target grid assets in the target area, wherein for each of the second target grid assets, the first priority value represents the importance of the second target grid asset to grid security in the target area;

[0052] Determine, based on the degree of influence of each of the second target power grid assets on the security of the target area, a second priority value of each of the second target power grid assets in the target area, wherein, for each of the second target power grid assets, the second priority value represents the scope of influence of the second target power grid asset on power grid security in the target area;

[0053] Determine, based on the urgency of the respective regions where the respective second target grid assets are located, a third priority value for each of the second target grid assets in the target region, wherein for each of the second target grid assets, the third priority value represents the urgency of the second target grid asset to grid security in the target region;

[0054] Based on the public opinion level of the target area, determining a fourth priority value of each of the second target power grid assets in the target area, wherein for each of the second target power grid assets, the fourth priority value represents the degree of influence of the second target power grid asset when performing emergency processing on the power grid;

[0055] For any of the second target grid assets, determining a response priority of the second target grid asset based on the first priority value, the second priority value, the third priority value, and the fourth priority value of the second target grid asset;

[0056] For any of the second target grid assets, determining an optimal path for the second target grid asset based on the location information of the second target grid asset and a preset path optimization algorithm;

[0057] Based on the response priority and optimal path of each of the second target power grid assets, an emergency treatment plan corresponding to each of the second target power grid assets is generated.

[0058] The beneficial effect of adopting the above further scheme is that by comprehensively considering the importance, impact, urgency of the region where the second target grid asset is located and the public opinion level of the target region, a clear response priority is assigned to each grid asset. This is convenient for giving priority to those grid assets that are most critical to the stability of the grid system, user electricity demand and social impact when resources are limited, ensuring the efficiency and pertinence of emergency response.

[0059] Using location information and a preset path optimization algorithm, the optimal path is determined for each second target grid asset. This helps shorten emergency response time, improve repair efficiency, and reduce the duration and scope of power outages caused by faults.

[0060] Based on the determination of response priorities and optimal routes, emergency resources, such as repair personnel, equipment, and materials, can be more reasonably allocated, thus avoiding waste and over-concentration of resources and improving resource utilization and the overall effect of emergency response.

[0061] Furthermore, if an early warning is required for the target area, the method further includes:

[0062] Based on the public opinion time series and the public opinion data, determining the target time periods corresponding to the natural disasters in the target area, wherein the target time periods are the early warning period, the emergency period or the post-disaster period;

[0063] The warning period represents the period when the disaster occurs in the target area, the emergency zone represents the period when the target power grid in the target area is emergency-handled, and the post-disaster period represents the period when the target power grid in the target area is restored after the disaster.

[0064] The beneficial effect of adopting the above further scheme is that the early warning period of natural disasters can be predicted more accurately through the public opinion time series and public opinion data. During the early warning period, relevant departments can make emergency preparations in advance, such as preparing emergency supplies, deploying rescue personnel, and formulating emergency plans, so as to effectively respond to the upcoming disasters. According to the prediction of the early warning period, resource allocation can be optimized in a more targeted manner. Through the clear early warning period and emergency period, relevant departments and personnel can have a clearer understanding of the stages and trends of disaster development, so as to carry out emergency response work more efficiently.

[0065] In the second aspect, the present application provides a power grid security emergency warning processing device based on multi-source data fusion, which adopts the following technical solution:

[0066] A power grid security emergency warning device based on multi-distance data fusion, comprising:

[0067] A data acquisition module, used to acquire monitoring data and power grid distribution information of a target area, wherein the monitoring data includes public opinion data, power grid operation data, and disaster data of at least one natural disaster;

[0068] A public opinion analysis module, used to determine whether it is necessary to issue a power grid risk warning to the target area based on the public opinion data and preset public opinion analysis rules;

[0069] An early warning analysis module is used for, if a power grid risk early warning is required for the target area, to conduct a risk assessment on the power grid in the target area based on the power grid operation data and the power grid distribution information, and / or based on all disaster data and the power grid distribution information, to obtain at least one first target power grid asset that meets a first set condition and a risk assessment result corresponding to each of the first target power grid assets, wherein the first set condition is a condition that a power grid asset with a failure risk and / or a disaster impact risk is used as a first target power grid asset in the target area;

[0070] An emergency processing module is used to perform emergency analysis on each first target power grid asset in the target area based on the risk assessment results of each first target power grid asset, and obtain second target power grid assets that meet second set conditions and emergency processing plans corresponding to each second target power grid asset, wherein the second set condition is to use the first target power grid asset that meets the preset risk requirements as the condition for the second target power grid asset.

[0071] In a third aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution:

[0072] A computer-readable storage medium stores a computer program that can be loaded by a processor and execute the power grid security emergency warning method based on multi-source data fusion as described in any one of the first aspects.

[0073] Additional aspects and advantages of the present application will be partially given in the following description, which will become apparent from the following description, or will be understood through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0074] Figure 1 A schematic diagram of a power grid security emergency warning system based on multi-source data fusion provided by an embodiment of the present invention;

[0075] Figure 2 A schematic diagram of building multiple databases provided by an embodiment of the present invention;

[0076] Figure 3 A schematic flow chart of a power grid security emergency warning method based on multi-source data fusion is provided as an embodiment of the present invention.

[0077] Figure 4 A structural block diagram of a power grid security emergency warning device based on multi-source data fusion provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0078] The present application is further described in detail below in conjunction with the accompanying drawings.

[0079] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0080] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.

[0081] An embodiment of the present application provides a power grid security early warning method based on multi-source data fusion, and the power grid security early warning method based on multi-source data fusion is applied to a power grid security early warning system with multi-source data fusion.

[0082] like Figure 1 As shown, the power grid security emergency warning system based on multi-source data fusion includes a multi-source data platform, a database, a data layer, a service application layer, an operation support layer, a business layer and a client.

[0083] Among them, the multi-source data platforms include China Emergency Information Network, China Forest and Grassland Fire Prevention Network, Central Meteorological Observatory, Hydrological Information Forecast Center of the Ministry of Water Resources, China Earthquake Networks Center, China Weather Network and through national emergency broadcasting.

[0084] The database includes internal information database and external information database, such as Figure 2 As shown, the internal information database stores basic power grid data, online monitoring data and emergency resource data. The external information database stores natural disaster data and early warning indicator data.

[0085] Among them, the basic data of the power grid include remote sensing image data, topographic data, power grid asset data and power grid operation data; online monitoring data include image monitoring data, video monitoring data, pole tower inclination data, conductor vibration data; emergency resource data include emergency material data, emergency equipment data, emergency personnel data and emergency system data; natural disaster data include daily meteorological data, news report data, emergency event data and emergency linkage data; early warning indicator data include geological and historical disaster information, earthquake early warning indicators, lightning early warning indicators, forest fire early warning indicators and ice cover early warning indicators.

[0086] The above data extracts key information from multi-source data platforms such as power grid monitoring equipment, sensors, Internet crawlers, and other cooperative companies. The system will screen and format the collected data, normalize and standardize the data, so that data from different sources and dimensions can be compared and analyzed on the same scale. This can eliminate outliers and noise data and improve data quality. After the data is fused and integrated, a unified data set is formed. This data set not only contains the real-time operation data of the power grid, but also integrates multi-dimensional information such as historical data, equipment status information, and environmental parameters.

[0087] The data layer includes data cache module, data reading and writing module, cache expiration control module, data synchronization module, etc.

[0088] The operation service layer supports multiple technical languages, including DirectX, DevExpress, Spring Boot, Java and other technical languages ​​to ensure the stable operation and scalability of the system.

[0089] The business layer implements the specific business logic of power grid security early warning based on the API provided by the service application layer, including basic data service API, emergency service API and early warning service API.

[0090] The client includes a command screen, desktop office and mobile applications, which are used to display warning information, perform emergency operations, etc.

[0091] An embodiment of the present application provides a power grid safety early warning method based on multi-source data fusion that can be executed by an electronic device, which can be a server or a mobile terminal device, wherein the server can be an independent physical server, a server cluster or a distributed system composed of multiple physical servers, or a cloud server that provides cloud computing services; the mobile terminal device can be a laptop computer, a desktop computer, etc., but is not limited to this.

[0092] The following is a further detailed description of the embodiments of the present application in conjunction with the accompanying drawings. Figure 1 As shown, a power grid security emergency warning method based on multi-source data fusion includes:

[0093] Step S1, acquiring monitoring data and power grid distribution information of a target area, wherein the monitoring data includes disaster data of at least one natural disaster, public opinion data, and power grid operation data; wherein the public opinion data represents public opinion information related to the power grid in the target area, and the power grid operation data represents real-time monitoring data corresponding to each power grid in the target area;

[0094] In the implementation manner of the present application, disaster data is obtained through web crawlers on various preset external data source platforms, and disaster data is obtained through various sensors set up by the system; power grid operation data is obtained through various preset internal data source platforms; public opinion data is collected through social media, news websites, Internet charity platforms and other channels, and these data can reflect the public's concern and attitude towards the operation of the power grid in the target area.

[0095] The disaster data includes, but is not limited to, one of earthquake disaster data, lightning disaster data, icing disaster data, gale disaster data, landslide disaster data and fire disaster data.

[0096] Among them, the preset external data source platforms include emergency management agencies, national emergency warning information release platform, China Earthquake Networks Center and China Meteorological Administration Public Meteorological Service Center, which can provide real-time or recent natural disaster information such as earthquakes, floods, typhoons, etc.

[0097] The preset internal data source platforms include State Grid Corporation's D5000 monitoring system, PMS monitoring system, SCADA monitoring system, and WANS monitoring system, which can provide real-time operating status, operating parameters and other data of power grid equipment.

[0098] The power grid distribution information is a data set of detailed attributes such as the geographical location, connection relationship, and capacity of each power grid asset in the target area. The power grid distribution information is obtained through the Geographic Information System (GIS), which contains detailed information such as the geographical location, connection relationship, and capacity of power grid equipment. Through the GIS system, the distribution of the power grid can be intuitively displayed, which is convenient for emergency response and fault location.

[0099] Step S2, based on the public opinion data and preset public opinion analysis rules, determining whether it is necessary to issue a power grid risk warning for the target area;

[0100] In the implementation mode of the present application, the public opinion analysis rules are based on the public opinion performance in historical power grid accidents or risk events combined with expert experience, laws and regulations, policies and industry standards, and analyze the relationship between the correlation and sensitivity between public opinion and power grid risks.

[0101] Specifically, step S2 includes the following sub-steps:

[0102] Step S21, performing semantic analysis on the public opinion data based on a preset semantic analysis algorithm to obtain first power grid related information of the target area, where the first power grid related information represents the degree of power grid failure in the target area;

[0103] Step S22, performing sentiment analysis on the public opinion data based on a preset sentiment analysis algorithm to obtain second power grid related information of the target area, where the second power grid related information represents the public's sentiment attitude towards the power grid situation in the target area;

[0104] Step S23, determining the public opinion level of the target area based on the first power grid related information and the second power grid related information;

[0105] Step S24: if the public opinion level of the target area is not less than the preset public opinion level, it is determined that an early warning needs to be issued for the target area;

[0106] Step S25: If the public opinion level of the target area is lower than the preset public opinion level, it is determined that there is no need to issue an early warning for the target area.

[0107] In the above implementation, first, the public opinion data is preprocessed, and then the preprocessed public opinion data is semantically analyzed, and the first power grid related information such as keywords, phrases or sentences related to power grid failures mentioned in the public opinion input data are identified through a semantic analysis algorithm. Power grid failures include but are not limited to power outages, line damage, tower tilt, etc.

[0108] Afterwards, sentiment analysis is performed on the preprocessed public opinion data, and the second power grid related information of the emotional inclination expressed in the text is identified through the sentiment analysis algorithm. The second power grid related information may include positive, negative or neutral related sentences, and the proportion of positive and negative emotions is counted through positive, negative or neutral related sentences, or specific emotional keywords are identified.

[0109] Afterwards, the first power grid related information and the second power grid related information are evaluated according to the preset public opinion level evaluation criteria to determine the public opinion level of the target area, and whether to initiate an early warning is determined according to the public opinion level. The evaluation criteria may include factors such as the severity of the power grid failure and the tendency of public emotional attitudes.

[0110] Due to the fast fermentation of network events, the public's concerns and feedback on the power grid situation can be discovered in a timely manner by collecting and analyzing public opinion data in real time. Combining semantic analysis and sentiment analysis algorithms, the degree of power grid failure and the public's emotional attitude can be accurately identified, so as to more accurately determine whether it is necessary to initiate a power grid risk warning. It can significantly improve the timeliness and accuracy of warnings and reduce potential risks caused by information lag or misjudgment.

[0111] Step S3, if it is necessary to conduct a power grid risk warning for the target area, then based on the power grid operation data and the power grid distribution information, and / or based on all disaster data and the power grid distribution information, a risk assessment is conducted on the power grid in the target area to obtain at least one first target power grid asset that meets a first set condition and a risk assessment result corresponding to each of the first target power grid assets, wherein the first set condition is used to assess whether the information of the risk assessment result of the first target power grid asset meets the risk condition; in the embodiment of the present application, the risk condition is the existence of a fault risk and / or a disaster impact risk.

[0112] In the implementation manner of the present application, the grid assets include transmission lines, AC and DC substation equipment, communication lines, poles and towers, etc. According to the type of grid assets, the grid assets can be divided into grid assets that can monitor grid operation data and grid assets that cannot monitor grid operation data.

[0113] When the grid operation data of the power grid itself is abnormal, the abnormal data will be displayed. Emergency management personnel can click on specific towers through the grid monitoring interface to view the operation monitoring status of each transmission line, substation equipment, etc.

[0114] For environmental disasters, based on the collected disaster data, we study the natural disasters that may be induced by the combined effects of multiple factors such as earthquakes, extreme precipitation, climate change, and land use change. Through spatial analysis, we determine the power grid assets that will be affected around the disaster site, and issue early warning alerts based on early warning rules.

[0115] It should be noted that the setting of early warning rules mainly includes: threshold setting, setting risk thresholds for various natural disasters based on historical data and expert opinions. When the disaster data of the disaster risk factor exceeds the set threshold, the early warning is triggered. And according to the risk assessment results of the first target power grid asset in the target area, the early warning is divided into different risk levels, such as yellow warning, orange warning and red warning, so that corresponding response measures can be taken.

[0116] The following is a detailed description of step S3. Step S3 includes:

[0117] Step S31, based on the power grid operation data, the power grid distribution information and the preset power grid abnormal data analysis rule, determining a third target power grid asset having power grid abnormal data in the target area, fault information corresponding to the third target power grid asset and first geographic information;

[0118] Through data analysis and comparison, the third target power grid assets with abnormal power grid data in the target area are identified. At the same time, the fault information (such as fault type, fault time, etc.) and the first geographic information (such as latitude and longitude coordinates, belonging area, etc.) corresponding to these assets are determined.

[0119] Step S32, based on the fault information corresponding to the third target power grid asset, determine the first risk level of the third target power grid, wherein the first risk level is divided based on factors such as the severity and impact scope of the third power grid asset fault.

[0120] Step S33, taking the third target power grid asset as the first target power grid asset, and taking the fault information, first geographic information and first risk level corresponding to the third target power grid asset as the risk assessment result of the first target power grid asset;

[0121] and / or,

[0122] Step S34, performing spatial analysis on the target area based on all the disaster data and power grid distribution information, determining the fourth target power grid assets affected by each natural disaster, the risk level corresponding to the fourth target power grid assets and the second geographic information, wherein the second risk level is divided according to factors such as disaster type and disaster intensity.

[0123] Step S35: taking the fourth target power grid asset as the first target power grid asset, and taking the second geographic information and the second risk level corresponding to the fourth target power grid asset as the risk assessment result of the first target power grid asset.

[0124] In the implementation manner of the present application, the power grid operation data includes but is not limited to tower monitoring data, conductor temperature monitoring data, etc., and the preset power grid abnormal data analysis rules represent the analysis rules corresponding to different types of power grid operation data.

[0125] For example, Table 1 is the analysis rules corresponding to the pole tower monitoring data in the power grid operation data, so as to analyze the third target power grid asset with abnormal pole tower data in the target area.

[0126] Table 1:

[0127]

[0128] By analyzing the grid operation data in real time and combining it with the grid distribution information, the system can accurately identify the grid assets with abnormal data in the target area, such as line anomalies, etc. For the abnormal grid assets identified, the system can further analyze their fault information to calculate the first risk level of the third target grid asset and provide quantitative risk assessment results.

[0129] By performing spatial analysis on the target area through all disaster data and grid distribution information, it is possible to predict and identify grid assets that may be affected by various natural disasters, such as towers and other grid assets without grid operation data. The risk level of each affected grid asset is analyzed through spatial analysis technology, that is, the second risk level. This quantitative risk assessment facilitates the formulation of different response strategies according to the risk level, optimizes resource allocation, and ensures that risk losses are minimized with limited resources.

[0130] Furthermore, the spatial analysis of the target area based on all the disaster data and power grid distribution information includes:

[0131] For disaster data corresponding to any natural disaster, the disaster data is cleaned and preprocessed to remove duplicate, erroneous or invalid data to obtain target disaster data, thereby ensuring the accuracy and reliability of the data;

[0132] For any disaster data corresponding to a natural disaster, the target disaster data is input into a geological disaster risk model corresponding to the disaster type for disaster prediction, and at least one natural disaster corresponding risk area and disaster level in the target area are obtained. The preset geological disaster risk model is trained based on the historical disaster data and early warning indicators corresponding to the disaster type;

[0133] Based on the risk areas, disaster levels, the power grid distribution information, the preset geographic information system and the preset power grid risk analysis rules corresponding to all natural disasters, at least one fourth target power grid asset in the target area and the risk level and second geographic information corresponding to each of the fourth target power grid assets are determined.

[0134] In the above implementation, when the natural disaster is a fire, the geological disaster risk model is a forest fire spread model based on the forest fire spread model and constructed in combination with the principle of meta-cellular automata;

[0135] When the natural disaster is a landslide, the geological disaster risk model is the Bishop model.

[0136] In the above implementation, the grid risk analysis rules characterize the corresponding relationship between the disaster level, impact degree, distance between grid assets and disaster risk areas, and types of grid assets and grid risk levels corresponding to different natural disasters.

[0137] As an example, when the natural disaster is a gale disaster, firstly, based on the target area of ​​the gale disaster and the geographical location of the power grid assets, it is determined whether there is an overlapping area with the target area within the preset area of ​​the power grid assets. If there is an overlapping area, the power grid assets corresponding to the overlapping area are determined as the fourth target power grid assets; then, based on the wind speed in the overlapping area and the set gale emergency warning rules, the risk level of each second target power grid asset in the overlapping area is determined. The gale emergency warning rule is that the second target power grid asset meets the preset wind speed range within the preset time.

[0138] For example, if within 30 minutes, the 10-minute average ambient wind speed collected by the automatic meteorological station within a 10km radius around the power grid asset is less than 17.2m / s, and there is no obvious impact on the power grid asset, then the power grid asset will not be used as the second power grid target asset and the wind power level will be zero.

[0139] If within 30 minutes, the 10-minute average ambient wind speed collected by the automatic meteorological station within 10 km around the power grid asset reaches 17.2 m / s to 24.4 m / s (level 8 to 9 gale), then the power grid asset is the second power grid target asset, and the risk level of the second power grid target asset is the yellow warning for gale.

[0140] If within 30 minutes, the 10-minute average ambient wind speed collected by the automatic meteorological station within 10 km around the power grid asset reaches 24.5 m / s to 28.4 m / s (level 10, strong winds), then the power grid asset will be the second power grid target asset, and the risk level of the second power grid target asset will be an orange warning for strong winds.

[0141] If within 30 minutes, the 10-minute average ambient wind speed collected by the automatic meteorological station within 10 km around the power grid asset reaches 28.5 m / s (level 11, storm), then the power grid asset will be the second power grid target asset, and the risk level of the second power grid target asset will be a red warning for strong winds.

[0142] As another example, when the natural disaster is a lightning disaster, according to the lightning positioning system data, a lightning strike event occurred within 1 km around a power grid asset above 220 kV within nearly 30 minutes. The power grid asset is the second target power grid asset, and the risk level of the second power grid target asset is an orange warning for lightning strikes.

[0143] According to the data from the lightning location system, a lightning strike occurred within 1 km around a power grid asset above 500 kV within nearly 30 minutes. This power grid asset is the second target power grid asset, and the second power grid target asset is in a red warning for lightning strikes at the risk level.

[0144] In one embodiment, if an early warning is required for the target area, the method further includes:

[0145] Based on the public opinion time series and the public opinion data, determining the target time periods corresponding to the natural disasters in the target area, wherein the target time periods are the early warning period, the emergency period or the post-disaster period;

[0146] The warning period represents the period when the disaster occurs in the target area, the emergency zone represents the period when the target power grid in the target area is emergency-handled, and the post-disaster period represents the period when the target power grid in the target area is restored after the disaster.

[0147] In the above implementation, time series technology is used to organize the time series of public opinion data, identify key time points and trends in public opinion data, and ensure the time series of public opinion data for subsequent analysis. Through semantic analysis technology, the types of natural disasters involved in public opinion data, such as rainstorms, typhoons, earthquakes, etc., are identified, and then the identified natural disaster types are classified and sorted, so as to subsequently determine their respective target time periods, and establish corresponding labels or indexes for each natural disaster type. According to the characteristics and historical data of each natural disaster type, the warning period, emergency period and post-disaster period of each disaster are determined.

[0148] Step S4, based on the risk assessment results of each of the first target power grid assets, perform emergency analysis on each of the first target power grid assets in the target area to obtain second target power grid assets that meet second set conditions and emergency handling plans corresponding to each of the second target power grid assets, wherein the second set condition is to use the first target power grid assets that meet the preset risk requirements as the conditions for the second target power grid assets.

[0149] In the implementation manner of the present application, step S4 specifically includes:

[0150] For any of the first target power grid assets, whether the risk level of the first target power grid asset meets the preset risk level threshold is determined based on the risk level of the first target power grid asset. The risk level threshold is set according to the actual situation. For example, for risks that may lead to particularly serious or serious power safety accidents, it can be defined as a first-level risk and used as the risk level threshold.

[0151] For any of the first target power grid assets, if the risk level of the first target power grid asset meets the preset risk level threshold, it is determined whether the preset geographical location is met based on the geographic information of the first target power grid asset. The preset geographical location may be a specific area, terrain conditions, climate conditions, etc.

[0152] For any of the first target power grid assets, if the geographic information of the first target power grid asset meets a preset geographic location, the first target power grid asset is determined to be a second target power grid asset.

[0153] After determining at least one second target power grid asset that needs emergency processing, the system generates an emergency processing plan corresponding to each second target power grid asset based on the geographic information of each second target power grid asset.

[0154] Specifically, the process of generating the emergency response plan corresponding to each second target power grid asset includes the following sub-steps:

[0155] Step S41, determining a first priority value of each second target grid asset in the target area based on the importance of each second target grid asset to the security of the target area, wherein for each second target grid asset, the first priority value represents the importance of the second target grid asset to grid security in the target area;

[0156] Step S42, determining a second priority value of each second target grid asset in the target area based on the degree of influence of each second target grid asset on the security of the target area, wherein for each second target grid asset, the second priority value represents the scope of influence of the second target grid asset on grid security in the target area;

[0157] Step S43, based on the urgency of the respective regions where the respective second target grid assets are located, determining the third priority value of each second target grid asset in the target region, wherein for each second target grid asset, the third priority value represents the urgency of the second target grid asset to grid security in the target region, and the urgency of the region is based on government regulations;

[0158] Step S44, based on the public opinion level of the target area, determining the fourth priority value of each second target power grid asset in the target area, for each second target power grid asset, the fourth priority value represents the impact degree, social impact and historical data of the second target power grid asset when handling an emergency on the power grid;

[0159] Step S45, for any of the second target power grid assets, determining a response priority of the second target power grid asset based on the first priority value, the second priority value, the third priority value, and the fourth priority value of the second target power grid asset;

[0160] Step S46, for any of the second target power grid assets, determining the optimal path of the second target power grid asset based on the location information of the second target power grid asset and a preset path optimization algorithm;

[0161] Step S47: generating an emergency treatment plan corresponding to each of the second target power grid assets based on the response priority and optimal path of each of the second target power grid assets.

[0162] In the implementation mode of the present application, the system is pre-set with information such as the importance, impact, and urgency of each region of all power grid assets.

[0163] Among them, the importance of power grid assets is evaluated based on the role they play in the power grid system, such as whether they are key nodes, whether they affect power supply over a large area, etc.

[0164] The impact of grid assets is assessed based on the possible consequences of grid asset failure, such as power outage area, economic losses, social impact, etc.

[0165] The level of urgency of the area where the grid assets are located is assessed based on the risk situation of the area where the grid assets are located, such as whether it is prone to natural disasters and whether there are other important facilities.

[0166] In the implementation mode of the present application, the preset path optimization algorithm is the Dijkstra algorithm, which is a classic algorithm for solving the single-source shortest path problem in a weighted graph. In the emergency response scenario, the weight of the road can be set according to the actual situation, such as based on factors such as the length of the road, traffic flow, road conditions (such as whether it is congested, whether there is construction, etc.), the impact of disasters (such as disaster type, disaster level, etc.), and road types (such as highways, ordinary roads, country roads, etc.).

[0167] Use Geographic Information System (GIS) and path optimization algorithm to analyze the path from the second target asset to the emergency response center, obtain the optimal path from the emergency response center to the target location of the second target asset, and calculate the total weight of the path (such as total distance or estimated arrival time), which facilitates the route selection of emergency response and improves response efficiency.

[0168] After obtaining the optimal path, the system will pass the emergency response plan corresponding to each second target grid asset to the emergency response team and guide them to follow the path to the target location for emergency treatment. The system will continuously update the damage status and related data of the grid assets to reflect the changes in the actual situation. According to the scope of disaster impact, the road network information affected by the disaster will be excluded, and dynamic path planning will be carried out. According to the latest data, the system can dynamically adjust the emergency response strategy, including correcting the target location, recommending the path, re-evaluating the risk and resource allocation, etc.

[0169] It should be noted that in addition to the importance and degree of damage of the power grid assets, the urgency of the affected area and the level of public opinion in the target area, the response priority of the second target power grid assets can also be determined based on other conditions such as the availability of emergency resources, the effectiveness and cost of emergency measures, social public opinion and government requirements, but is not limited to these.

[0170] For example, based on the government requirements of each of the second target grid assets, determining a fifth priority value of each of the second target grid assets in the target area;

[0171] determining a sixth priority value for each of the second target grid assets in the target area based on the contingency cost of each of the second target grid assets;

[0172] For any of the second target grid assets, a response priority of the second target grid asset is determined based on the first priority value, the second priority value, the third priority value, the fourth priority value, the fifth priority value and the sixth priority value of the second target grid asset.

[0173] By determining the response priority and the optimal route, emergency resources, such as repair personnel, equipment, and materials, can be allocated more reasonably, avoiding waste and over-concentration of resources, and improving resource utilization and the overall effectiveness of emergency response.

[0174] This method constructs a comprehensive and efficient power grid security emergency warning method by integrating multiple technologies such as web crawlers, semantic sentiment analysis, cellular automata, Bishop model, optimal path algorithm, remote sensing technology, geographic information and positioning. Using web crawler technology, it is possible to capture power grid-related information on the Internet in real time, including fault reports, weather warnings, equipment status, etc., so as to achieve real-time monitoring of the power grid security status. This real-time performance is crucial to power grid security and can ensure that potential safety hazards are discovered at the first time.

[0175] Through semantic sentiment analysis technology, we can deeply explore and analyze the sentiment tendencies and key information in text data, so as to more accurately judge the safety status of the power grid. It helps to discover the public's concerns and doubts about the safety of the power grid in advance, and provide a strong reference for emergency decision-making. This patent also combines theories such as cellular automata and Bishop's model to simulate the dynamic evolution of the power grid under the influence of complex factors such as natural disasters and equipment failures, so as to more accurately predict the changes in the safety status of the power grid. By simulating the operation status of the power grid in different scenarios, it can provide more comprehensive and in-depth analysis support for emergency decision-making.

[0176] At the same time, this patent also uses remote sensing technology, geographic information and positioning technology to accurately evaluate the topography, equipment distribution, fault location, etc. of the power grid. This helps to quickly locate the fault point, formulate the best emergency path and rescue plan, and improve the efficiency and accuracy of emergency response.

[0177] Figure 4 A structural block diagram of a power grid security emergency warning device 200 based on multi-source data fusion provided by an embodiment of the present invention.

[0178] like Figure 4 As shown, a power grid security emergency warning device 200 based on multi-source data fusion mainly includes:

[0179] The data acquisition module 201 is used to acquire monitoring data and power grid distribution information of the target area, wherein the monitoring data includes public opinion data, power grid operation data and disaster data of at least one natural disaster;

[0180] The public opinion analysis module 202 is used to determine whether it is necessary to issue a power grid risk warning to the target area based on the public opinion data and preset public opinion analysis rules;

[0181] The early warning analysis module 203 is used to, if a power grid risk early warning is required for the target area, conduct a risk assessment on the power grid in the target area based on the power grid operation data and the power grid distribution information, and / or based on all disaster data and the power grid distribution information, to obtain at least one first target power grid asset that meets a first set condition and a risk assessment result corresponding to each of the first target power grid assets, wherein the first set condition is used to assess whether information on the risk assessment result of the first target power grid asset meets the risk condition;

[0182] The emergency processing module 204 is used to perform emergency analysis on each first target power grid asset in the target area based on the risk assessment results of each first target power grid asset, and obtain second target power grid assets that meet second set conditions and emergency processing plans corresponding to each second target power grid asset. The second set condition is to use the first target power grid asset that meets the preset risk requirements as the condition for the second target power grid asset.

[0183] Optionally, the disaster data is obtained through various preset external data source platforms, and the power grid operation data is obtained through various preset internal data source platforms;

[0184] The preset external data source platforms include emergency management agencies, national emergency warning information release platform, China Earthquake Networks Center and China Meteorological Administration Public Meteorological Service Center;

[0185] The preset internal data source platforms include State Grid Corporation's D5000 monitoring system, PMS monitoring system, SCADA monitoring system, and WANS monitoring system.

[0186] Optionally, the public opinion analysis module 202 is specifically used for:

[0187] Performing semantic analysis on the public opinion data based on a preset semantic analysis algorithm to obtain first power grid related information of the target area, where the first power grid related information represents the degree of power grid failure in the target area;

[0188] Performing sentiment analysis on the public opinion data based on a preset sentiment analysis algorithm to obtain second power grid related information of the target area, where the second power grid related information represents the public's sentiment attitude towards the power grid situation in the target area;

[0189] Determine the public opinion level of the target area based on the first power grid related information and the second power grid related information;

[0190] If the public opinion level of the target area is not less than the preset public opinion level, it is determined that an early warning needs to be issued for the target area;

[0191] If the public opinion level of the target area is lower than the preset public opinion level, it is determined that there is no need to issue an early warning for the target area.

[0192] Optionally, the early warning analysis module 203 includes:

[0193] A power grid anomaly monitoring submodule, configured to determine, based on the power grid operation data, the power grid distribution information and a preset power grid anomaly data analysis rule, a third target power grid asset having power grid anomaly data in the target area, fault information corresponding to the third target power grid asset and first geographic information;

[0194] A first determination submodule, configured to determine a first risk level of the third target power grid based on fault information corresponding to the third target power grid asset;

[0195] A second determination submodule is used to take the third target power grid asset as the first target power grid asset, and take the fault information, first geographic information and first risk level corresponding to the third target power grid asset as the risk assessment result of the first target power grid asset;

[0196] A spatial analysis submodule, configured to perform spatial analysis on the target area based on all the disaster data and power grid distribution information, and determine fourth target power grid assets affected by each natural disaster, risk levels corresponding to the fourth target power grid assets, and second geographic information;

[0197] The third determination submodule is used to take the fourth target power grid asset as the first target power grid asset, and take the second geographic information and the second risk level corresponding to the fourth target power grid asset as the risk assessment result of the first target power grid asset.

[0198] Optionally, the spatial analysis submodule is specifically used to:

[0199] For disaster data corresponding to any natural disaster, data cleaning and preprocessing are performed on the disaster data to obtain target disaster data;

[0200] For any disaster data corresponding to a natural disaster, the target disaster data is input into a geological disaster risk model corresponding to the disaster type for disaster prediction, and at least one natural disaster corresponding risk area and disaster level in the target area are obtained. The preset geological disaster risk model is trained based on the historical disaster data and early warning indicators corresponding to the disaster type;

[0201] Based on the risk areas, disaster levels, the power grid distribution information, the preset geographic information system and the preset power grid risk analysis rules corresponding to all natural disasters, at least one fourth target power grid asset in the target area and the risk level and second geographic information corresponding to each of the fourth target power grid assets are determined.

[0202] Optionally, the emergency processing module includes a first emergency analysis submodule, and the first emergency analysis submodule is specifically used to:

[0203] For any of the first target power grid assets, judging whether the risk level of the first target power grid asset meets a preset risk level threshold based on the risk level of the first target power grid asset;

[0204] For any of the first target grid assets, if the risk level of the first target grid asset meets a preset risk level threshold, determining whether the preset geographical location is met based on the geographic information of the first target grid asset;

[0205] If the geographic information of the first target power grid asset meets the preset geographic location, the first target power grid asset is determined to be the second target power grid asset.

[0206] Optionally, the emergency processing module includes a second emergency analysis submodule, and the second emergency analysis submodule is specifically used to:

[0207] The second emergency analysis submodule is specifically used for:

[0208] Based on the importance of each of the second target grid assets to the security of the target area, determining a first priority value of each of the second target grid assets in the target area, wherein for each of the second target grid assets, the first priority value represents the importance of the second target grid asset to grid security in the target area;

[0209] Determine, based on the degree of influence of each of the second target power grid assets on the security of the target area, a second priority value of each of the second target power grid assets in the target area, wherein, for each of the second target power grid assets, the second priority value represents the scope of influence of the second target power grid asset on power grid security in the target area;

[0210] Determine, based on the urgency of the respective regions where the respective second target grid assets are located, a third priority value for each of the second target grid assets in the target region, wherein for each of the second target grid assets, the third priority value represents the urgency of the second target grid asset to grid security in the target region;

[0211] Based on the public opinion level of the target area, determining a fourth priority value of each of the second target power grid assets in the target area, wherein for each of the second target power grid assets, the fourth priority value represents the degree of influence of the second target power grid asset when performing emergency processing on the power grid;

[0212] For any of the second target grid assets, determining a response priority of the second target grid asset based on the first priority value, the second priority value, the third priority value, and the fourth priority value of the second target grid asset;

[0213] For any of the second target grid assets, determining an optimal path for the second target grid asset based on the location information of the second target grid asset and a preset path optimization algorithm;

[0214] Based on the response priority and optimal path of each of the second target grid assets, an emergency treatment plan corresponding to each of the second target grid assets is generated. Optionally, the grid security emergency warning device based on multi-source data fusion also includes a warning period analysis module, which is specifically used to:

[0215] Based on the public opinion time series and the public opinion data, determining the target time periods corresponding to the natural disasters in the target area, wherein the target time periods are the early warning period, the emergency period or the post-disaster period;

[0216] The warning period represents the period when the disaster occurs in the target area, the emergency zone represents the period when the target power grid in the target area is emergency-handled, and the post-disaster period represents the period when the target power grid in the target area is restored after the disaster.

[0217] In one example, the module in any of the above devices can be one or more integrated circuits configured to implement the above methods, such as: one or more application specific integrated circuits (ASICs), or, one or more digital signal processors (DSPs), or, one or more field programmable gate arrays (FPGAs), or a combination of at least two of these integrated circuit forms.

[0218] Those of ordinary skill in the art will appreciate that the modules and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0219] The computer-readable storage medium provided in the embodiment of the present application is introduced below. The computer-readable storage medium described below and the power grid security emergency warning method based on multi-source data fusion described above can be referenced to each other.

[0220] The present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned power grid security emergency warning method based on multi-source data fusion are implemented.

[0221] The computer-readable storage medium may include: a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.

[0222] The terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not expressly listed, or also includes elements inherent to such process, method, article, or apparatus.

[0223] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of application involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the aforementioned application concept. For example, the above features are replaced with (but not limited to) technical features with similar functions applied in the present application.

Claims

1. A power grid security emergency warning method based on multi-source data fusion, It is characterized in that include: Acquire monitoring data and power grid distribution information of a target area, wherein the monitoring data includes public opinion data, power grid operation data, and disaster data of at least one natural disaster; Based on the public opinion data and preset public opinion analysis rules, determining whether it is necessary to issue a power grid risk warning for the target area; If it is necessary to conduct a power grid risk warning for the target area, a risk assessment is conducted on the power grid in the target area based on the power grid operation data and the power grid distribution information, and / or based on all disaster data and the power grid distribution information, to obtain at least one first target power grid asset that meets a first set condition and a risk assessment result corresponding to each of the first target power grid assets, wherein the first set condition is used to assess whether information on the risk assessment result of the first target power grid asset meets the risk condition; Based on the risk assessment results of each of the first target power grid assets, an emergency analysis is performed on each of the first target power grid assets in the target area to obtain second target power grid assets that meet second set conditions and emergency handling plans corresponding to each of the second target power grid assets, wherein the second set condition is to use the first target power grid assets that meet preset risk requirements as the conditions for the second target power grid assets.

2. According to claim 1, a power grid security emergency warning method based on multi-source data fusion, It is characterized in that The disaster data is obtained through various preset external data source platforms, and the power grid operation data is obtained through various preset internal data source platforms; The preset external data source platforms include emergency management agencies, national emergency warning information release platform, China Earthquake Networks Center and China Meteorological Administration Public Meteorological Service Center; The preset internal data source platforms include State Grid Corporation's D5000 monitoring system, PMS monitoring system, SCADA monitoring system, and WANS monitoring system.

3. According to claim 1, a power grid security emergency warning method based on multi-source data fusion, It is characterized in that The determining whether it is necessary to issue a power grid risk warning to the target area based on the public opinion data and the preset public opinion analysis rules includes: Performing semantic analysis on the public opinion data based on a preset semantic analysis algorithm to obtain first power grid related information of the target area, where the first power grid related information represents the degree of power grid failure in the target area; Performing sentiment analysis on the public opinion data based on a preset sentiment analysis algorithm to obtain second power grid related information of the target area, where the second power grid related information represents the public's sentiment attitude towards the power grid situation in the target area; Determine the public opinion level of the target area based on the first power grid related information and the second power grid related information; If the public opinion level of the target area is not less than the preset public opinion level, it is determined that an early warning needs to be issued for the target area; If the public opinion level of the target area is lower than the preset public opinion level, it is determined that there is no need to issue an early warning for the target area.

4. According to claim 1, a power grid security emergency warning method based on multi-source data fusion, It is characterized in that The risk assessment of the power grid in the target area based on the power grid operation data and the power grid distribution information, and / or based on all disaster data and the power grid distribution information, to obtain a first target power grid asset that meets a first set condition and a risk assessment result of the first target power grid asset, includes: Based on the power grid operation data, the power grid distribution information and the preset power grid abnormal data analysis rules, determine a third target power grid asset having power grid abnormal data in the target area, fault information corresponding to the third target power grid asset and the first geographic information; Determining a first risk level of the third target power grid based on fault information corresponding to the third target power grid asset; Taking the third target power grid asset as the first target power grid asset, and taking the fault information, first geographic information and first risk level corresponding to the third target power grid asset as the risk assessment result of the first target power grid asset; and / or, Performing spatial analysis on the target area based on all the disaster data and power grid distribution information to determine fourth target power grid assets affected by each natural disaster, risk levels corresponding to the fourth target power grid assets, and second geographic information; The fourth target power grid asset is used as the first target power grid asset, and the second geographic information and the second risk level corresponding to the fourth target power grid asset are used as the risk assessment result of the first target power grid asset.

5. A power grid security emergency warning method based on multi-source data fusion according to claim 4, It is characterized in that The spatial analysis of the target area based on all the disaster data and power grid distribution information includes: For disaster data corresponding to any natural disaster, data cleaning and preprocessing are performed on the disaster data to obtain target disaster data; For any disaster data corresponding to a natural disaster, the target disaster data is input into a geological disaster risk model corresponding to the disaster type for disaster prediction, and at least one natural disaster corresponding risk area and disaster level in the target area are obtained. The preset geological disaster risk model is trained based on the historical disaster data and early warning indicators corresponding to the disaster type; Based on the risk areas, disaster levels, the power grid distribution information, the preset geographic information system and the preset power grid risk analysis rules corresponding to all natural disasters, at least one fourth target power grid asset in the target area, the risk level corresponding to each of the fourth target power grid assets and the second geographic information are determined.

6. A power grid security emergency warning method based on multi-source data fusion according to claim 4, It is characterized in that The step of performing emergency analysis on each first target grid asset in the target area based on the risk assessment result of each first target grid asset to obtain a second target grid asset that meets a second set condition includes: For any of the first target power grid assets, judging whether the risk level of the first target power grid asset meets a preset risk level threshold based on the risk level of the first target power grid asset; For any of the first target grid assets, if the risk level of the first target grid asset meets a preset risk level threshold, determining whether the preset geographical location is met based on the geographic information of the first target grid asset; If the geographic information of the first target power grid asset meets the preset geographic location, the first target power grid asset is determined to be the second target power grid asset.

7. A power grid security emergency warning method based on multi-source data fusion according to claim 3 or 6, It is characterized in that The obtaining of the emergency response plan corresponding to each of the second target power grid assets includes: Based on the importance of each of the second target grid assets to the security of the target area, determining a first priority value of each of the second target grid assets in the target area, wherein for each of the second target grid assets, the first priority value represents the importance of the second target grid asset to grid security in the target area; Determine, based on the degree of influence of each of the second target power grid assets on the security of the target area, a second priority value of each of the second target power grid assets in the target area, wherein, for each of the second target power grid assets, the second priority value represents the scope of influence of the second target power grid asset on power grid security in the target area; Determine, based on the urgency of the respective regions where the respective second target grid assets are located, a third priority value for each of the second target grid assets in the target region, wherein for each of the second target grid assets, the third priority value represents the urgency of the second target grid asset to grid security in the target region; Based on the public opinion level of the target area, determining a fourth priority value of each of the second target power grid assets in the target area, wherein for each of the second target power grid assets, the fourth priority value represents the degree of influence of the second target power grid asset when performing emergency processing on the power grid; For any of the second target grid assets, determining a response priority of the second target grid asset based on the first priority value, the second priority value, the third priority value, and the fourth priority value of the second target grid asset; For any of the second target grid assets, determining an optimal path for the second target grid asset based on the location information of the second target grid asset and a preset path optimization algorithm; Based on the response priority and optimal path of each of the second target power grid assets, an emergency treatment plan corresponding to each of the second target power grid assets is generated.

8. A power grid security emergency warning method based on multi-source data fusion according to claim 3, It is characterized in that If an early warning is required for the target area, the method further includes: Based on the public opinion time series and the public opinion data, determining the target time periods corresponding to the natural disasters in the target area, wherein the target time periods are the early warning period, the emergency period or the post-disaster period; The warning period represents the period when the disaster occurs in the target area, the emergency zone represents the period when the target power grid in the target area is emergency-handled, and the post-disaster period represents the period when the target power grid in the target area is restored after the disaster.

9. A power grid security emergency warning processing device based on multi-source data fusion, It is characterized in that include: A data acquisition module, used to acquire monitoring data and power grid distribution information of a target area, wherein the monitoring data includes public opinion data, power grid operation data, and disaster data of at least one natural disaster; A public opinion analysis module, used to determine whether it is necessary to issue a power grid risk warning to the target area based on the public opinion data and preset public opinion analysis rules; An early warning analysis module is used for, if a power grid risk early warning is required for the target area, to conduct a risk assessment on the power grid in the target area based on the power grid operation data and the power grid distribution information, and / or based on all disaster data and the power grid distribution information, to obtain at least one first target power grid asset that meets a first set condition and a risk assessment result corresponding to each of the first target power grid assets, wherein the first set condition is a condition that a power grid asset with a failure risk and / or a disaster impact risk is used as a first target power grid asset in the target area; An emergency processing module is used to perform emergency analysis on each first target power grid asset in the target area based on the risk assessment results of each first target power grid asset, and obtain second target power grid assets that meet second set conditions and emergency processing plans corresponding to each second target power grid asset, wherein the second set condition is to use the first target power grid asset that meets the preset risk requirements as the condition for the second target power grid asset.

10. A computer-readable storage medium, It is characterized in that The method comprises a computer program or an instruction, which, when executed on a computer, causes the computer to execute the method according to any one of claims 1 to 8.

Citation Information

Cited By

  • Method and device for evaluating extreme natural weather emergency mechanism

    CN119558686A

  • Method, device, equipment and medium for evaluating toughness of power system under extreme disasters

    CN119989945A

  • Method, device, equipment, and medium for evaluating the resilience of a power system under extreme disasters

    CN119989945B

  • Disaster risk assessment early warning method and system based on multi-source heterogeneous data

    CN120708363A

  • Power grid safety emergency early warning method and system based on multi-source data fusion

    CN121117738A