Communication method and device, equipment and storage medium

The terminal device sends uplink control information in the 5G mobile communication system to indicate the usage of time-frequency resources, and selects appropriate time-frequency resources for information transmission when resources overlap, solving the transmission delay problem caused by insufficient time-frequency resources in CG configuration. This realizes timely transmission of information and reduces the complexity of network equipment processing.

CN118945846APending Publication Date: 2024-11-12HUAWEI TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202310544143.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-12
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In 5G mobile communication system, when authorized uplink transmission is configured, if the network side burst scheduling and the scheduled resources overlap with the time-frequency resources used by the CG configuration, the time-frequency resources used by the CG configuration are not sufficient to carry the required transmission. information, which in turn leads to transmission delay.

Method used

By sending the first uplink control information, the terminal device indicates whether the time-frequency resource configured by the CG is used, avoiding resource waste, and selects to send information through the resource when the first time-frequency resource overlaps the time-frequency resource dispatched by the scheduling information; Or when resources are insufficient, unoverlapping information is sent through the second time-frequency resource to ensure that the delay of information transmission is reduced.

Benefits of technology

It effectively avoids transmission delay caused by resource overlap, ensures timely transmission of information, and reduces the processing complexity of network equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118945846A_ABST
    Figure CN118945846A_ABST
Patent Text Reader

Abstract

The invention provides a communication method and device, equipment and a storage medium. The method comprises: a terminal device sending first uplink control information, the first uplink control information being used for indicating whether K time-frequency resources in time-frequency resources configured by a CG are used, K being a positive integer; the time-frequency resource used in the K time-frequency resources is a first time-frequency resource, and the first time-frequency resource is overlapped with the time-frequency resource scheduled by the first scheduling information; and the terminal equipment sends uplink information through the first time-frequency resource, or sends the uplink information through a non-overlapped resource in the first time-frequency resource and a second time-frequency resource, and the second time-frequency resource is not overlapped with a time-frequency resource used in the time-frequency resources configured by the CG. Through the mode, when the first time-frequency resource is overlapped with the time-frequency resource scheduled by the first scheduling information, the information needing to be sent on the first time-frequency resource can still be sent, and transmission delay is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of communication technology, and in particular to a communication method, apparatus, device and storage medium. Background Art

[0002] In some communication systems, such as the fifth generation wireless system (5G), uplink transmission with configured grant (CG) is supported to meet the communication service with low latency and high reliability. CG is configured with multiple physical uplink shared channel (PUSCH) transmission opportunities, namely PUSCH occasions (PO). When the amount of uplink information to be transmitted is small, one or more POs configured by CG can be set to unused, and the PUSCH under the PO is unused PUSCH.

[0003] In this case, if burst scheduling is performed on the network side and the scheduled resources overlap with the used PO configured by the CG, the used PO configured by the CG will be insufficient to carry the information to be sent, thus causing transmission delays. Summary of the invention

[0004] The present application provides a communication method, apparatus, device and storage medium, in order to alleviate the problem that the PO used in the CG configuration is insufficient to carry the information to be sent due to resource overlap, thereby causing transmission delay.

[0005] In a first aspect, the present application provides a communication method that can be applied to a terminal device or a component in a terminal device, such as a chip or a chip system. An exemplary description is given below using the terminal device as the execution subject.

[0006] Exemplarily, the method includes: the terminal device sends first uplink control information, the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the CG are used, K is a positive integer; the time-frequency resources used among the K time-frequency resources are first time-frequency resources, and the first time-frequency resources overlap with the time-frequency resources scheduled by the first scheduling information; the terminal device sends uplink information through the first time-frequency resources.

[0007] In another design, exemplarily, the method includes: the terminal device sends first uplink control information, the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the CG are used, K is a positive integer; the time-frequency resources used among the K time-frequency resources are first time-frequency resources, and the first time-frequency resources overlap with the time-frequency resources scheduled by the first scheduling information; the terminal device sends uplink information through non-overlapping resources in the first time-frequency resources and second time-frequency resources, and the second time-frequency resources do not overlap with the time-frequency resources used in the time-frequency resources configured by the CG.

[0008] Through these two methods, when the first time-frequency resource overlaps with the time-frequency resource scheduled by the first scheduling information, the information required to be sent on the first time-frequency resource can still be sent, avoiding transmission delay.

[0009] The terminal device sends the first uplink control information to indicate whether the K time-frequency resources are used, indicating that it selects the time-frequency resources to be used based on the amount of uplink information to be sent in the CG configuration to avoid wasting resources. In this case, if the time-frequency resources (such as used PUSCH) used in the CG configuration are reduced due to overlap between resources, it is easy to cause a delay in the transmission of the uplink information carried in the CG configuration. Therefore, the terminal device performs uplink transmission through the first time-frequency resource, thereby avoiding the problem of a reduction in the time-frequency resources used in the CG configuration due to overlap between resources, thereby causing a delay in the transmission of the uplink information carried in the CG configuration; or, when the first time-frequency resource is reduced and cannot carry all uplink information due to overlap with the time-frequency resource scheduled by the first scheduling information, the terminal device uses the second time-frequency resource to carry part of the uplink information that cannot be carried due to overlap with the first time-frequency resource, which can effectively reduce the transmission delay of the uplink information.

[0010] In some embodiments, the second time-frequency resource may be scheduled by the second scheduling information. The terminal device receives the second scheduling information to determine the second time-frequency resource and performs uplink transmission through the second time-frequency resource, thereby realizing flexible scheduling of the time-frequency resource.

[0011] In some embodiments, in order to achieve fine-grained indication of time-frequency resources, the second scheduling information includes N elements, and the N elements are associated with N sub-resources in the second time-frequency resources, and the elements are used to schedule corresponding sub-resources.

[0012] Further, based on the above-mentioned fine-grained indication, the modulation and coding scheme (MCS) of the uplink information carried on the N sub-resources can be indicated. Optionally, the MCS of the uplink information carried on the N sub-resources is the same as the MCS of the uplink information carried on the first time-frequency resource.

[0013] In some embodiments, the second time-frequency resources include M time-frequency resources that are not used in the time-frequency resources configured by the CG, where M is a positive integer.

[0014] In some embodiments, in order to avoid that the second time-frequency resource is insufficient to carry the information carried by the overlapping resources in the first time-frequency resource, resulting in transmission delay, the terminal device can select the uplink transmission resource based on the resource size of the second time-frequency resource. The uplink information is sent through the non-overlapping resources in the first time-frequency resource and the second time-frequency resource, including: when the resource size of the second time-frequency resource is greater than or equal to the resource size of the overlapping resources in the first time-frequency resource, the uplink information is sent through the non-overlapping resources in the first time-frequency resource and the second time-frequency resource.

[0015] In some embodiments, it also includes: when the resource size of the second time-frequency resource is smaller than the resource size of the overlapping resource in the first time-frequency resource, sending the uplink information through the first time-frequency resource.

[0016] In some embodiments, the terminal device may send second uplink control information to request scheduling of the second time-frequency resources to achieve flexible scheduling of the second time-frequency resources.

[0017] As a first example of the second uplink control information, the second uplink control information is used to indicate that the second time-frequency resource includes M time-frequency resources that are not used in the time-frequency resources configured by the CG, where M is a positive integer. By directly indicating the resource size of the second time-frequency resource through the second uplink control information, the processing complexity of the network device can be reduced.

[0018] Optionally, in order to enable the network device to schedule M time-frequency resources, the time domain interval between the sending time of the second uplink control information and the time domain starting position of the M time-frequency resources should be greater than or equal to a threshold, and the threshold may be related to the duration of the network device scheduling the M time-frequency resources.

[0019] Optionally, the threshold value may be agreed upon by a protocol or preconfigured. Exemplarily, the terminal device may receive indication information, where the indication information is used to indicate the threshold value.

[0020] As a second example of the second uplink control information, the second uplink control information is used to indicate the resource size of the second time-frequency resource. By indicating the time-frequency resources not used in the CG configuration through the second uplink control information, the resource size of the second time-frequency resource is indirectly indicated, and the fields of the existing uplink control information can be reused.

[0021] Exemplarily, the difference between the number of unused time-frequency resources indicated by the first uplink control information and the number of unused time-frequency resources indicated by the second uplink control information is used to indicate the resource size of the second time-frequency resources.

[0022] On the second aspect, an embodiment of the present application provides a communication method that can be applied to a network device or a component in a network device, such as a chip or a chip system. The following is an exemplary description using the network device as the execution subject.

[0023] Exemplarily, the method includes: a network device receives first uplink control information, the first uplink control information being used to indicate whether K time-frequency resources among the time-frequency resources configured by the configuration authorization CG are used, K being a positive integer; the time-frequency resources used among the K time-frequency resources are first time-frequency resources, and the first time-frequency resources overlap with the time-frequency resources scheduled by the first scheduling information; and uplink information is received through the first time-frequency resources.

[0024] In another design, a network device receives first uplink control information, where the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the authorized CG are used, where K is a positive integer; the time-frequency resources used among the K time-frequency resources are first time-frequency resources, and the first time-frequency resources overlap with the time-frequency resources scheduled by the first scheduling information; uplink information is received through non-overlapping resources among the first time-frequency resources and second time-frequency resources, and the second time-frequency resources do not overlap with the time-frequency resources used in the time-frequency resources configured by the CG.

[0025] In a possible implementation, the method further includes: the network device sending second scheduling information, where the second scheduling information is used to schedule the second time-frequency resource.

[0026] In a possible implementation, the second time-frequency resource includes N sub-resources, the second scheduling information includes N elements, the N elements correspond one-to-one to the N sub-resources, and the elements are used to schedule corresponding sub-resources.

[0027] In a possible implementation manner, the MCS of the uplink information carried on the N sub-resources is the same as the MCS of the uplink information carried on the first time-frequency resource.

[0028] In a possible implementation, uplink information is received through non-overlapping resources in the first time-frequency resources and the second time-frequency resources; the second time-frequency resources include M time-frequency resources that are not used in the time-frequency resources configured by the CG, where M is a positive integer.

[0029] In one possible implementation, uplink information is received through non-overlapping resources in the first time-frequency resources and the second time-frequency resources, including: when the resource size of the second time-frequency resources is greater than or equal to the resource size of the overlapping resources in the first time-frequency resources, the network device receives the uplink information through the non-overlapping resources in the first time-frequency resources and the second time-frequency resources.

[0030] In a possible implementation, the method further includes: when the resource size of the second time-frequency resource is smaller than the resource size of the overlapping resource in the first time-frequency resource, the network device receives the uplink information through the first time-frequency resource.

[0031] In a possible implementation manner, the method further includes: the network device receiving second uplink control information, where the second uplink control information is used to request scheduling of the second time-frequency resource.

[0032] In a possible implementation, the second uplink control information is used to indicate that the second time-frequency resources include M time-frequency resources that are not used in the time-frequency resources configured by the CG, where M is a positive integer.

[0033] In a possible implementation manner, a time domain interval between a sending time of the second uplink control information and a time domain starting position of the M time-frequency resources is greater than or equal to a threshold.

[0034] In a possible implementation manner, the further step includes: the network device sending indication information, where the indication information is used to indicate the threshold.

[0035] In a possible implementation manner, the second uplink control information is used to indicate a resource size of the second time-frequency resource.

[0036] In a possible implementation, the second uplink control information indicates unused time-frequency resources in the time-frequency resources configured by the CG; the difference between the number of unused time-frequency resources indicated by the first uplink control information and the number of unused time-frequency resources indicated by the second uplink control information is used to indicate the resource size of the second time-frequency resources.

[0037] The beneficial effects of the communication method provided by the second aspect and each possible implementation manner of the second aspect can be referred to the beneficial effects brought about by the first aspect and each possible implementation manner of the first aspect, and will not be repeated here.

[0038] On the third aspect, an embodiment of the present application provides a communication method that can be applied to a network device or a component in a network device, such as a chip or a chip system. The following is an exemplary description using the network device as the execution subject.

[0039] Exemplarily, the method includes: the network device receives first uplink control information, the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the CG are used, K is a positive integer; the network device sends third scheduling information, and the time-frequency resources scheduled by the third scheduling information do not overlap with the K time-frequency resources.

[0040] To avoid resource collision, the terminal device does not expect the time-frequency resources scheduled by the network device to overlap with the K time-frequency resources. Correspondingly, the time-frequency resources scheduled by the network device do not overlap with the K time-frequency resources, thereby avoiding the reduction of time-frequency resources (such as used PUSCH) used in the CG configuration due to overlap between resources, and further causing the problem of delay in the transmission of uplink information carried in the CG configuration.

[0041] In a fourth aspect, an embodiment of the present application provides a communication device, comprising: a transceiver module, used to send first uplink control information, the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the CG are used, K is a positive integer; the time-frequency resources used among the K time-frequency resources are first time-frequency resources, and the first time-frequency resources overlap with the time-frequency resources scheduled by the first scheduling information; a processing module, used to determine whether the overlapping resources among the first time-frequency resources are used for uplink transmission; the transceiver module is also used to send uplink information through the first time-frequency resources; or, the transceiver module is also used to send uplink information through non-overlapping resources among the first time-frequency resources and second time-frequency resources, and the second time-frequency resources do not overlap with the time-frequency resources used in the time-frequency resources configured by the CG.

[0042] In a possible implementation, the transceiver module is further used to receive second scheduling information, where the second scheduling information is used to schedule the second time-frequency resources.

[0043] In a possible implementation, the second time-frequency resource includes N sub-resources, the second scheduling information includes N elements, the N elements correspond one-to-one to the N sub-resources, and the elements are used to schedule the corresponding sub-resources.

[0044] In a possible implementation manner, the MCS of the uplink information carried on the N sub-resources is the same as the MCS of the uplink information carried on the first time-frequency resource.

[0045] In a possible implementation, uplink information is received through non-overlapping resources in the first time-frequency resources and the second time-frequency resources; the second time-frequency resources include M time-frequency resources that are not used in the time-frequency resources configured by the CG, where M is a positive integer.

[0046] In a possible implementation, the transceiver module is specifically used to: when the resource size of the second time-frequency resource is greater than or equal to the resource size of the overlapping resources in the first time-frequency resource, receive the uplink information through the non-overlapping resources in the first time-frequency resource and the second time-frequency resource.

[0047] In a possible implementation, the transceiver module is specifically configured to: when a resource size of the second time-frequency resource is smaller than a resource size of an overlapping resource in the first time-frequency resource, receive the uplink information through the first time-frequency resource.

[0048] In a possible implementation manner, the transceiver module is further used to: receive second uplink control information, where the second uplink control information is used to request scheduling of the second time-frequency resource.

[0049] In a possible implementation, the second uplink control information is used to indicate that the second time-frequency resources include M time-frequency resources that are not used in the time-frequency resources configured by the CG, where M is a positive integer.

[0050] In a possible implementation manner, a time domain interval between a sending time of the second uplink control information and a time domain starting position of the M time-frequency resources is greater than or equal to a threshold.

[0051] In a possible implementation manner, the transceiver module is further used to: send indication information, where the indication information is used to indicate the threshold.

[0052] In a possible implementation manner, the second uplink control information is used to indicate a resource size of the second time-frequency resource.

[0053] In a possible implementation, the second uplink control information indicates unused time-frequency resources in the time-frequency resources configured by the CG; the difference between the number of unused time-frequency resources indicated by the first uplink control information and the number of unused time-frequency resources indicated by the second uplink control information is used to indicate the resource size of the second time-frequency resources.

[0054] The beneficial effects of the communication device provided by the fourth aspect and each possible implementation manner of the fourth aspect can be referred to the beneficial effects brought about by the first aspect and each possible implementation manner of the first aspect, and will not be repeated here.

[0055] In a fifth aspect, an embodiment of the present application provides a communication device, comprising: a transceiver module, used to receive first uplink control information, the first uplink control information is used to indicate whether K time-frequency resources in the time-frequency resources configured by the CG are used, K is a positive integer; the time-frequency resources used in the K time-frequency resources are first time-frequency resources, and the first time-frequency resources overlap with the time-frequency resources scheduled by the first scheduling information; a processing module, used to determine whether the K time-frequency resources are used; the transceiver module is also used to receive uplink information through the first time-frequency resources; or, the transceiver module is also used to receive uplink information through non-overlapping resources in the first time-frequency resources and second time-frequency resources, and the second time-frequency resources do not overlap with the time-frequency resources used in the time-frequency resources configured by the CG.

[0056] In a possible implementation, the transceiver module is further used to: send second scheduling information, where the second scheduling information is used to schedule the second time-frequency resources.

[0057] In a possible implementation, the second time-frequency resource includes N sub-resources, and the second scheduling information includes N elements, the N elements correspond one-to-one to the N sub-resources, and the elements are used to schedule the corresponding sub-resources.

[0058] In a possible implementation manner, the MCS of the uplink information carried on the N sub-resources is the same as the MCS of the uplink information carried on the first time-frequency resource.

[0059] In a possible implementation, uplink information is received through non-overlapping resources in the first time-frequency resources and the second time-frequency resources; the second time-frequency resources include M time-frequency resources that are not used in the time-frequency resources configured by the CG, where M is a positive integer.

[0060] In a possible implementation, the transceiver module is specifically used to: when the resource size of the second time-frequency resources is greater than or equal to the resource size of the overlapping resources in the first time-frequency resources, receive the uplink information through the non-overlapping resources in the first time-frequency resources and the second time-frequency resources.

[0061] In a possible implementation, the transceiver module is further configured to: when the resource size of the second time-frequency resource is smaller than the resource size of the overlapping resource in the first time-frequency resource, receive the uplink information through the first time-frequency resource.

[0062] In a possible implementation manner, the transceiver module is further used to: receive second uplink control information, where the second uplink control information is used to request scheduling of second time-frequency resources.

[0063] In a possible implementation, the second uplink control information is used to indicate that the second time-frequency resources include M time-frequency resources that are not used in the time-frequency resources configured by the CG, where M is a positive integer.

[0064] In a possible implementation manner, a time domain interval between a sending moment of the second uplink control information and a time domain starting position of the M time-frequency resources is greater than or equal to a threshold.

[0065] In a possible implementation manner, the transceiver module is further used to: send indication information, where the indication information is used to indicate the threshold.

[0066] In a possible implementation manner, the second uplink control information is used to indicate a resource size of the second time-frequency resource.

[0067] In one possible implementation, the second uplink control information indicates unused time-frequency resources in the time-frequency resources configured by the CG; the difference between the number of unused time-frequency resources indicated by the first uplink control information and the number of unused time-frequency resources indicated by the second uplink control information is used to indicate the resource size of the second time-frequency resources.

[0068] The beneficial effects of the communication device provided by the fifth aspect and each possible implementation manner of the fifth aspect can be referred to the beneficial effects brought about by the first aspect and each possible implementation manner of the first aspect, and will not be repeated here.

[0069] In the sixth aspect, an embodiment of the present application provides a communication device, including: a transceiver module for receiving first uplink control information, the first uplink control information being used to indicate whether K time-frequency resources among the time-frequency resources configured by the CG are used, K being a positive integer; a processing module for determining the time-frequency resources scheduled by third scheduling information; the transceiver module is also used to send third scheduling information, and the time-frequency resources scheduled by the third scheduling information do not overlap with the K time-frequency resources.

[0070] The beneficial effects of the communication device provided by the fifth aspect and each possible implementation manner of the fifth aspect can be referred to the beneficial effects brought about by the third aspect and each possible implementation manner of the third aspect, which will not be repeated here.

[0071] In the seventh aspect, an embodiment of the present application provides a communication device, comprising: a processor and a memory, the memory being used to store a computer program, the processor being used to call and run the computer program stored in the memory, and executing the method in the first aspect, the second aspect, the third aspect or each possible implementation method.

[0072] In an eighth aspect, an embodiment of the present application provides a communication device, comprising: a processor, configured to execute a method as in the first aspect, the second aspect, the third aspect, or any possible implementation manner.

[0073] In a ninth aspect, an embodiment of the present application provides a computer-readable storage medium for storing computer program instructions, wherein the computer program enables a computer to execute a method as in the first aspect, the second aspect, the third aspect, or any possible implementation manner.

[0074] In a tenth aspect, an embodiment of the present application provides a computer program product, comprising computer program instructions, which enable a computer to execute a method as in the first aspect, the second aspect, the third aspect, or any possible implementation manner.

[0075] In the twelfth aspect, an embodiment of the present application provides a communication system, including a device as in the fourth aspect or each possible implementation of the fourth aspect, and a device in the fifth aspect, the sixth aspect or each possible implementation. BRIEF DESCRIPTION OF THE DRAWINGS

[0076] Figure 1 It is a schematic diagram of the architecture of the communication system used in the embodiment of the present application;

[0077] Figure 2A schematic diagram of a method for indicating unused time-frequency resources provided by the present application;

[0078] Figure 3 A schematic diagram of a method for indicating time-frequency resources provided in this application;

[0079] Figure 4 A schematic flow chart of a communication method provided in an embodiment of the present application;

[0080] Figure 5 A schematic flow chart of a communication method provided in an embodiment of the present application;

[0081] Figure 6 A schematic flow chart of a communication method provided in an embodiment of the present application;

[0082] Figure 7 is a schematic block diagram of a communication device provided in an embodiment of the present application;

[0083] Figure 8 It is another schematic block diagram of the communication device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0084] The technical solution in this application will be described below in conjunction with the accompanying drawings.

[0085] Figure 1 1 is a schematic diagram of the architecture of the communication system 100 used in the embodiment of the present application. Figure 1 As shown, the communication system 100 includes network equipment and terminal equipment, such as Figure 1 The network device 110, terminal devices 121 and 122 shown in . The network device 110 and each terminal device 121 and 122 can communicate through the wireless air interface respectively. Among them, the terminal device (such as 121) sends signaling and / or data to the network device 110 for uplink transmission, and the network device 110 sends signaling and / or data to the terminal device (such as 121) for downlink transmission. Of course, signaling and / or data can also be transmitted between the terminal device (such as 121) and the terminal device (such as 122), and this application does not limit this.

[0086] It should be understood that Figure 1 It is only an example that one network device and two terminal devices are shown. However, this should not constitute any limitation to the present application. The communication system 100 may also include more network devices, and may also include more or fewer terminal devices. The present application embodiment does not limit this.

[0087] The network device can be a wireless access device that a terminal uses to access a communication system wirelessly. The wireless access device can be a base station, an evolved NodeB (eNodeB), a transmission reception point (TRP), a next generation NodeB (gNB) in a fifth generation (5G) mobile communication system, a next generation base station in a sixth generation (6G) mobile communication system, a base station in a future mobile communication system, or an access node in a WiFi system, etc.; it can also be a module or unit that completes part of the functions of a base station, for example, a centralized unit (CU) or a distributed unit (DU). The CU here completes the functions of the radio resource control protocol and the packet data convergence layer protocol (PDCP) of the base station, and can also complete the function of the service data adaptation protocol (SDAP); the DU completes the functions of the radio link control layer and the medium access control (MAC) layer of the base station, and can also complete the functions of part of the physical layer or all of the physical layer. For the specific description of the above-mentioned protocol layers, please refer to the relevant technical specifications of the 3rd Generation Partnership Project (3GPP). The wireless access network equipment can be a macro base station, a micro base station or an indoor station, a relay node or a donor node, etc. The embodiments of the present application do not limit the specific technology and specific equipment form adopted by the wireless access network equipment.

[0088] The terminal device is a device with wireless transceiver function, which can send signals to the base station or receive signals from the base station. The terminal can also be called user equipment (UE), mobile station, mobile terminal, etc. The terminal device can be widely used in various scenarios, such as extended reality, industrial control, automatic driving, telemedicine, smart grid, smart furniture, smart office, smart wear, smart transportation, smart city, device-to-device (D2D), vehicle to everything (V2X) communication, machine-type communication (MTC), Internet of Things (IOT), etc. The terminal device can be a mobile phone, a tablet computer, a computer with wireless transceiver function, a wearable device, a vehicle, an airplane, a ship, a robot, a mechanical arm, a smart home device, etc. The embodiments of the present application do not limit the specific technology and specific device form adopted by the terminal.

[0089] The network equipment and terminal equipment can be fixed or movable. The network equipment and terminal equipment can be deployed on land, including indoors or outdoors, handheld or vehicle-mounted; they can also be deployed on the water surface; they can also be deployed on airplanes, balloons, and artificial satellites. The embodiments of the present application do not limit the application scenarios of base stations and terminals.

[0090] Network devices and terminal devices, terminal devices and devices in the network, and network devices can communicate through authorized spectrum, unlicensed spectrum, or both; can communicate through spectrum below 6 gigahertz (GHz), spectrum above 6 GHz, or spectrum below 6 GHz and spectrum above 6 GHz at the same time. The embodiments of the present application do not limit the spectrum resources used for wireless communication.

[0091] In the embodiments of the present application, the functions of the network device may also be performed by a module (such as a chip) in the network device, or by a control subsystem including the network device function. The control subsystem including the network device function here may be a control center in the above-mentioned application scenarios such as smart grid, industrial control, smart transportation, and smart city. The functions of the terminal device may also be performed by a module (such as a chip or a modem) in the terminal device, or by a device including the terminal device function.

[0092] In this application, the network device sends a downlink signal or downlink information to the terminal device, and the downlink information is carried on the downlink channel; the terminal device sends an uplink signal or uplink information to the network device, and the uplink information is carried on the uplink channel. For the sake of consistency, the following is uniformly referred to as downlink information and uplink information. In order to communicate with the network device, the terminal device needs to establish a wireless connection with the cell controlled by the network device. The cell that has established a wireless connection with the terminal device is called the service cell of the terminal.

[0093] See also Figure 1 , the terminal device can implement uplink transmission based on CG. A CG configuration is performed once through radio resource control (RRC) signaling and / or physical downlink control channel (PDCCH), and the terminal device can periodically implement uplink transmission based on the CG.

[0094] CG configuration can include the following two types:

[0095] Type 1: configure the transmission parameters of CG and activate CG resources through RRC signaling. Transmission parameters include, for example, the Configured Scheduling Radio Network Temporary identifier (CS-RNTI), CG cycle, CG time domain resources, CG frequency domain resources, MCS, etc.

[0096] Type 2, configures some transmission parameters of CG through RRC signaling, such as CS-RMTI, CG period, etc., and indicates other transmission parameters through DCI, such as CG time domain resources, CG frequency domain resources, MCS, etc., and DCI activates CG resources at the same time.

[0097] Among them, the time domain resources of CG can be indicated by the time domain resource allocation (TDRA) field in the signaling; the frequency domain resources of CG can be indicated by the frequency domain resource allocation (FDRA) field in the signaling.

[0098] Based on the above CG configuration, there is a PO in each CG period, and the time-frequency resources configured in a CG period are the PUSCH under the PO. In some business scenarios, when the amount of uplink information sent in different CG periods is not fixed, if the time-frequency resources (such as PUSCH) configured by the CG are large, it will cause resource waste, and if the time-frequency resources (such as PUSCH) configured by the CG are small, it will increase the transmission delay.

[0099] For example, in an extended reality (XR) scenario, if the packet size of the periodically arriving XR service data is randomly distributed, there is a PO in each CG cycle, which results in the above-mentioned resource waste or increased transmission delay. Among them, XR scenarios can specifically include: virtual reality (VR) scenarios, augmented reality (AR) scenarios, and mixed reality (MR) scenarios. Of course, this application is not limited to this, and this application can be applied to any

[0100] A scenario where the amount of uplink information that arrives periodically during uplink transmission is not fixed.

[0101] Based on this, consider configuring multiple POs in a CG period, and the resource size of the PUSCH under each PO can be the same or different, and this application does not limit this. The terminal device can determine the PUSCH used in the CG configuration based on the amount of uplink information, and indicate the unused PUSCH through uplink control information (UCI). The network device can reallocate the unused PUSCH based on the indication of the terminal device to avoid resource waste.

[0102] See also Figure 2 As shown, the terminal device can send UCI on PUSCH 1 to indicate that PUSCH 5 and 6 are unused PUSCHs, and the terminal device can send UCI on PUSCH 2 to indicate that PUSCH 6 and 7 are unused PUSCHs.

[0103] It should be noted that the UCI carried by each PUSCH can indicate whether the PUSCH within a certain range is used. For example, the UCI carried by a PUSCH can indicate whether the n PUSCHs after the PUSCH are used, where n is a positive integer, such as n equals 5. For example, the UCI carried by PUSCH 1 can indicate whether PUSCH 2 to PUSCH 6 are used; for another example, the UCI carried by a PUSCH can indicate whether the PUSCH within a period of time after the PUSCH is used, and the period of time can be determined by the interval (offset) and duration (duration) from the PUSCH.

[0104] In the CG configuration, there are one or more POs that are set to be unused. For example, one or more PUSCHs are indicated as unused PUSCHs through UCI, indicating that the terminal device selects the PUSCH to be used based on the amount of uplink information to be sent in the CG configuration to avoid wasting resources. In this case, if there is an overlap between the PUSCH scheduled by the network device and the PUSCH used by the CG configuration, the terminal device reduces the PUSCH in the CG configuration in response to the scheduling, which is likely to cause a delay in the transmission of the uplink information. Figure 3 As shown, the UCI sent by the terminal device on PUSCH 2 indicates that PUSCH 5 and PUSCH 6 are unused PUSCHs, and the terminal device receives scheduling information from the network device before PUSCH 3. The PUSCH indicated by the scheduling information overlaps with PUSCH 3 in the CG configuration. In response to the scheduling, the terminal device sends uplink information on the PUSCH indicated by the scheduling information, which will result in insufficient PUSCH used in the CG configuration, resulting in delayed transmission of the uplink information to be transmitted in the CG configuration.

[0105] In response to the above problems, the embodiments of the present application hope to optimize the situation where resource overlap occurs in the CG configuration, resulting in insufficient usable time-frequency resources (such as PUSCH) of the CG configuration, so as to avoid transmission delays.

[0106] The UCI indicating whether the PUSCH is used may be called unused transmission occasion (UTO)-UCI. Of course, the present application does not limit this name, and its essence is still UCI, and UTO-UCI is only an exemplary name given to highlight its role.

[0107] The above UCI (or UTO-UCI) has a certain effective time, which can be a period of time from the time when the UCI is sent to the time domain end position of the last PUSCH that the UCI can indicate whether to use. Figure 3 As shown, assuming that the UCI can indicate whether the subsequent 4 PUSCHs are used, the time domain start position of PUSCH 2 to the time domain end position of PUSCH 6 is the effective time of the UCI. There is an overlap between the PUSCH scheduled by the above network device and the PUSCH used in the CG configuration, which can be defined as an overlap between the PUSCH scheduled by the network device and the PUSCH used in the CG configuration within the effective time of the UCI.

[0108] The side transmission method provided in the embodiment of the present application will be described in detail below with reference to the accompanying drawings.

[0109] It should be understood that the following is only for the convenience of understanding and explanation, and the method provided in the embodiment of the present application is described in detail by taking the interaction between the terminal device and the network device as an example. Figure 1 The terminal device 121 or 122 in the embodiment, the network device may be the above Figure 1 The network device 110 in.

[0110] However, it should be understood that this should not constitute any limitation on the execution subject of the method provided in the present application. As long as it is possible to run a program that records the code of the method provided in the embodiment of the present application, according to the method provided in the embodiment of the present application, it can be used as the execution subject of the method provided in the embodiment of the present application. For example, the terminal device shown in the following embodiment can also be replaced by a component in the terminal device, such as a chip, a chip system, or other functional modules that can call and execute programs. The network device can also be replaced by a component in the network device, such as a chip, a chip system, or other functional modules that can call and execute programs.

[0111] Figure 4 1 is a schematic flow chart of a communication method 200 provided in an embodiment of the present application. Figure 4 As shown, the method 200 may include the following steps S210 and S220. Each step in the method 200 is described in detail below.

[0112] S210, the terminal device sends first uplink control information to the network device, where the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the CG are used, where K is a positive integer; accordingly, the network device receives the first uplink control information sent by the terminal device.

[0113] S220, the terminal device sends uplink information to the network device through the first time-frequency resource; correspondingly, the network device receives the uplink information sent by the terminal device through the first time-frequency resource.

[0114] Among them, the time-frequency resources configured by CG can be the PUSCH under the PO configured by the above-mentioned CG. The time-frequency resources configured by CG can correspond to PO. The embodiment of the present application does not limit the number of time-frequency resources configured by CG. For example, the time-frequency resources configured by CG can be one or more, where multiple includes two or more. It should be noted that the time-frequency resources configured by CG can belong to the same CG period, but the present application does not limit this, that is, the time-frequency resources configured by CG can all belong to different CG periods, or some of the time-frequency resources configured by CG can belong to different CG periods.

[0115] The first uplink control information may be, for example, UCI, such as the above-mentioned UTO-UCI.

[0116] The K time-frequency resources may be time-frequency resources that the first uplink control information can indicate whether to use. Figure 3 As shown, the UCI carried on PUSCH 2 can indicate whether PUSCH 3 to PUSCH 6 are used, so the K time-frequency resources include the four time-frequency resources of PUSCH 3 to PUSCH 6.

[0117] Based on the definition of the aforementioned effective time, the starting time of the effective time of the above-mentioned first uplink control information may be the sending time of the first uplink control information, and the ending time of the effective time of the first uplink control information may be the time domain end position of the K time-frequency resources.

[0118] For ease of description, in the embodiment of the present application, the time-frequency resource used in the K time-frequency resources is taken as the first time-frequency resource. Figure 3 As shown, the first time-frequency resource may include PUSCH 3 and PUSCH 4. The first time-frequency resource overlaps with the time-frequency resource scheduled by the first scheduling information, such as PUSCH 3 partially overlaps with the PUSCH scheduled by the first scheduling information. The first scheduling information may be scheduling information sent by the network device based on a burst transmission demand. Optionally, the first scheduling information may be information for dynamically scheduling PUSCH or semi-persistently scheduling PUSCH.

[0119] The first time-frequency resource overlaps with the time-frequency resource scheduled by the first scheduling information, which may be a partial overlap between the first time-frequency resource and the time-frequency resource scheduled by the first scheduling information, or a complete overlap between the first time-frequency resource and the time-frequency resource scheduled by the first scheduling information. This application does not limit this.

[0120] The first scheduling information may be downlink control information (DCI). The triggering time of the first scheduling information may be within the effective time or before the effective time, which is not limited in the present application.

[0121] Generally speaking, the terminal device sends the first uplink control information to indicate whether K time-frequency resources are used, indicating that it has selected the time-frequency resources to be used based on the amount of uplink information to be sent in the CG configuration to avoid waste of resources. In this case, if the time-frequency resources used in the CG configuration (such as usedPUSCH) are reduced due to overlap between resources, it is easy to cause delays in the transmission of the uplink information carried in the CG configuration.

[0122] In order to avoid delay in sending uplink information carried in the CG configuration, the terminal device can perform uplink transmission through the first time-frequency resource, that is, send uplink information through the first time-frequency resource. Instead of responding to the scheduling of the first scheduling information. This avoids the overlap between resources, resulting in a reduction in the time-frequency resources used in the CG configuration, thereby causing the problem of delay in the transmission of uplink information carried in the CG configuration.

[0123] Of course, the embodiments of the present application do not exclude the terminal device from responding to the first scheduling information. The terminal device can decide by itself whether to perform uplink transmission through the time-frequency resources scheduled by the first scheduling information, or to perform uplink transmission through the first time-frequency resources. Exemplarily, the terminal device can determine whether to perform uplink transmission through the first time-frequency resources or the time-frequency resources scheduled by the first scheduling information according to the importance of the uplink information carried on the CG configuration; or the terminal device can determine whether to perform uplink transmission through the first time-frequency resources or the time-frequency resources scheduled by the first scheduling information according to whether it is expected to re-encode the uplink information on the first time-frequency resources.

[0124] Figure 5 Schematic flow chart of a communication method 300 provided in an embodiment of the present application. Figure 5 As shown, the method 300 may include the following S310 and S320. Each step in the method 300 is described in detail below.

[0125] S310, the terminal device sends first uplink control information to the network device, where K is a positive integer; correspondingly, the network device receives the first uplink control information sent by the terminal device.

[0126] S320, the terminal device sends uplink information through non-overlapping resources in the first time-frequency resources and the second time-frequency resources, and the second time-frequency resources do not overlap with the time-frequency resources used in the time-frequency resources configured by the CG; correspondingly, the network device receives the uplink information received by the terminal device through non-overlapping resources in the first time-frequency resources and the second time-frequency resources.

[0127] The above S310 and Figure 4 S210 in is the same step, and the first uplink control information, the time-frequency resources configured by the CG, the K time-frequency resources, and the first time-frequency resources are all in Figure 4 The description is made in the embodiment shown and will not be repeated for the sake of brevity.

[0128] Figure 5 The embodiment shown is similar to the above Figure 4The difference between the illustrated embodiments is that, in order to avoid resource collision, the terminal device sends uplink information using non-overlapping resources in the first time-frequency resources and the second time-frequency resources. It should be noted that the uplink information may be the uplink information that needs to be carried by the first time-frequency resources in the CG configuration. When the first time-frequency resources are reduced and cannot carry all uplink information due to overlap with the time-frequency resources scheduled by the first scheduling information, the terminal device uses the second time-frequency resources to carry part of the uplink information that cannot be carried due to overlap with the first time-frequency resources, which can effectively reduce the transmission delay of the uplink information.

[0129] It can be understood that if the first time-frequency resource completely overlaps with the time-frequency resource scheduled by the first scheduling information, the terminal device can send uplink information in the second time-frequency resource, and the uplink information is the information that the first time-frequency resource needs to carry.

[0130] Optionally, for one overlapping time-frequency resource in the first time-frequency resources, even if part of the resources in the one time-frequency resource overlap with the time-frequency resources scheduled by the first scheduling information, the one time-frequency resource is deemed to be an overlapping time-frequency resource. In other words, the non-overlapping time-frequency resources in the first time-frequency resources are time-frequency resources that have neither complete overlap nor partial overlap with the time-frequency resources scheduled by the first scheduling information.

[0131] Combination Figure 3 As shown, PUSCH 3 in the first time-frequency resource partially overlaps with the PUSCH scheduled by the first scheduling information. In this case, the terminal device can continue uplink transmission on PUSCH 4 that does not overlap in the first time-frequency resource, and send the information carried in the original PUSCH 3 in the uplink information through the second time-frequency resource.

[0132] Optionally, the terminal device may perform uplink transmission using the time-frequency resources scheduled by the first scheduling information.

[0133] Among them, the second time-frequency resources may include M time-frequency resources not used in the CG configured time-frequency resources, where M is a positive integer; or the second time-frequency resources may include time-frequency resources that do not belong to the CG configuration; or the second time-frequency resources may include M time-frequency resources not used in the CG configured time-frequency resources and time-frequency resources that do not belong to the CG configuration.

[0134] The second time-frequency resource may be scheduled by the network device. Exemplarily, the network device may send second scheduling information to the terminal device, where the second scheduling information is used to schedule the second time-frequency resource, and correspondingly, the terminal device receives the second scheduling information sent by the network device. Optionally, the second scheduling information may be DCI.

[0135] In order to reduce the implementation complexity of the terminal device, it is considered that the MCS configured for the second time-frequency resource is the same as the MCS configured for the first time-frequency resource, that is, the MCS of the uplink information carried on the second time-frequency resource is the same as the MCS of the uplink information carried on the first time-frequency resource. In this case, the terminal device does not need to re-encode the carried uplink information when transmitting uplink through the second time-frequency resource, thereby reducing the implementation complexity of the terminal device.

[0136] Generally speaking, the MCS of the scheduled time-frequency resources can be uniformly configured through the second scheduling information. In some implementations, the second scheduling information can also realize dynamic scheduling or semi-continuous scheduling of the third time-frequency resources in addition to the second time-frequency resources, wherein the third time-frequency resources may include one or more PUSCHs, and the second scheduling information uniformly configures the MCS of the second time-frequency resources and the third time-frequency resources, which will not ensure that the MCS of the uplink information carried on the second time-frequency resources is the same as the MCS of the uplink information carried on the first time-frequency resources. In this regard, this embodiment considers fine-grained MCS configuration of the scheduled time-frequency resources through the second scheduling information to ensure that the MCS of the uplink information carried on the second time-frequency resources is the same as the MCS of the uplink information carried on the first time-frequency resources.

[0137] Exemplarily, the second scheduling information includes L elements, each of the L elements is used to schedule the corresponding time-frequency resources (such as PUSCH), and then MCS is configured for the corresponding time-frequency resources. For example, the second time-frequency resources may include N sub-resources, each sub-resource may be, for example, a PUSCH, N elements of the L elements correspond one-to-one to the N sub-resources, and each of the N elements is used to schedule the corresponding sub-resource and MCS is configured for the corresponding sub-resource. Wherein, L and N are both positive integers, and L is greater than or equal to N. Each element of the L elements except the N elements can be used to schedule the corresponding sub-resource in the above-mentioned third time-frequency resource, and MCS is configured for the corresponding sub-resource.

[0138] Optionally, the N elements may be the last N elements of the L elements, or the first N elements of the L elements, or the N elements may be elements at any position of the L elements, which is not limited in the present application.

[0139] Optionally, the L elements may be elements in the field for dynamically scheduling time-frequency resources (PUSCH-TimeDomainResourceAllocation-r16).

[0140] Optionally, the second scheduling information may include the first scheduling information. For example, the first scheduling information may include LN elements in the L elements except the N elements, and the time-frequency resources scheduled by at least some of the LN elements overlap with the first time-frequency resources.

[0141] Optionally, the network device may actively schedule the second time-frequency resources, or the network device may schedule the second time-frequency resources in response to a request from the terminal device.

[0142] Exemplarily, the terminal device may send second uplink control information to the network device, where the second uplink control information is used to request scheduling of second time-frequency resources.

[0143] As a first example, the second uplink control information may indicate that the second time-frequency resources include M time-frequency resources that are not used in the time-frequency resources configured by the above-mentioned CG, where M is a positive integer. It should be understood that the M time-frequency resources may be indicated by the above-mentioned first uplink control information or may be indicated by other uplink control information, and the present application does not limit this. Other uplink control information may be carried by the time-frequency resources before or after the time-frequency resources carrying the first uplink control information, and similar to the first uplink control information, other uplink control information is used to indicate whether one or more time-frequency resources in the time-frequency resources configured by the CG are used, the difference being that each uplink control information indicates whether the time-frequency resources within its own indication capability are used.

[0144] It should be understood that the second time-frequency resources scheduled by the network device include M time-frequency resources that are not used in the time-frequency resources configured by the CG, which means that the network device schedules the M time-frequency resources that have been indicated as unused in the CG configuration as time-frequency resources to be used.

[0145] For example, combined with Figure 3 As shown, the first uplink control information carried on PUSCH 2 indicates that PUSCH 5 and PUSCH 6 are not used, and the second uplink control information carried on PUSCH 3 indicates that PUSCH 5 and PUSCH 7 are not used, which means that PUSCH 6 is implicitly indicated to be used. Then the network device uses PUSCH 6 as the second time-frequency resource, that is, PUSCH 6 is scheduled from not in use to in use.

[0146] As a second example, the second uplink control information may indicate the resource size of the second time-frequency resource. Optionally, the second uplink control information may directly indicate the resource size of the second time-frequency resource, or the second uplink control information may indirectly indicate the resource size of the second time-frequency resource in the following manner.

[0147] The second uplink control information may indicate the unused time-frequency resources in the time-frequency resources configured by the CG. Generally speaking, the second uplink control information is sent later than the first uplink control information. The second uplink control information may be carried by the time-frequency resources after the time-frequency resources carrying the first uplink control information. Figure 3 As shown, the first uplink control information occupies PUSCH 2, and the second uplink control information may occupy non-overlapping resources in PUSCH 3, or the second uplink control information may occupy PUSCH 4. The difference between the number of unused time-frequency resources indicated by the first uplink control information and the number of unused time-frequency resources indicated by the second uplink control information may be used to indicate the resource size of the second time-frequency resources. For example, the first uplink control information indicates that PUSCH 5 and PUSCH 6 are not used, and the second uplink control information indicates that PUSCH 6 is not used, and the difference between the two is 1, indicating that the second uplink control information indirectly indicates that the resource size of the second time-frequency resources is one PUSCH.

[0148] In the second example above, the second time-frequency resources scheduled by the network device based on the second uplink control information may include or exclude time-frequency resources not used in the CG configuration (such as the M time-frequency resources mentioned above), and this application does not limit this. The second time-frequency resources include the M time-frequency resources not used in the CG configuration. Please refer to the description in the first example above, and will not be repeated for the sake of brevity.

[0149] Regardless of the first example or the second example above, when the second time-frequency resources scheduled by the network device include M time-frequency resources that are not used in the CG configuration, the network device implements the scheduling of the M time-frequency resources in response to the second uplink control information, that is, the M time-frequency resources are scheduled from being not used by the terminal device to being used. In order for the network device to be able to schedule the M time-frequency resources, the time domain interval between the sending time of the second uplink control information and the time domain starting position of the M time-frequency resources should be greater than or equal to a threshold, and the threshold may be related to the duration of the network device scheduling the M time-frequency resources.

[0150] Optionally, the threshold may be defined by a protocol or indicated by a network device. For example, the network device may send indication information to the terminal device to indicate the threshold, and correspondingly, the terminal device receives the threshold sent by the network device. Optionally, the indication information may be carried in RRC signaling.

[0151] In the first example mentioned above, the resource size of the second time-frequency resources is directly indicated by the second uplink control information, which can reduce the processing complexity of the network device; in the second example mentioned above, the time-frequency resources not used in the CG configuration are indicated by the second uplink control information, so as to achieve indirect indication of the resource size of the second time-frequency resources, and the existing UCI field can be reused.

[0152] Optionally, the second uplink control information may be UCI or carried on UCI.

[0153] In some embodiments, in order to avoid transmission delay caused by the second time-frequency resource being insufficient to carry the information carried by the overlapping resources in the first time-frequency resource, the terminal device may select the uplink transmission resource based on the resource size of the second time-frequency resource. Exemplarily, the terminal device may send uplink information through the non-overlapping resources in the first time-frequency resource and the second time-frequency resource when the resource size of the second time-frequency resource is greater than or equal to the resource size of the overlapping resources in the first time-frequency resource; or, the terminal device may send uplink information through the first time-frequency resource when the resource size of the second time-frequency resource is less than the resource size of the overlapping resources in the first time-frequency resource.

[0154] Figure 6 FIG. 4 is a schematic flow chart of a communication method 400 provided in an embodiment of the present application. Figure 6 As shown, the method 400 may include the following S410 and S420. Each step in the method 400 is described in detail below.

[0155] S410, the terminal device sends first uplink control information to the network device; correspondingly, the network device receives the first uplink control information sent by the terminal device.

[0156] S420, the network device sends third scheduling information to the terminal device, and the time-frequency resources scheduled by the third scheduling information do not overlap with the K time-frequency resources.

[0157] The above S410 and Figure 4 S210 in is the same step, and the first uplink control information, the time-frequency resources configured by the CG, the K time-frequency resources, and the first time-frequency resources are all in Figure 4 The description is made in the embodiment shown and will not be repeated for the sake of brevity.

[0158] Figure 6 The embodiment shown is similar to the above Figure 4 The difference between the illustrated embodiments is that, in order to avoid resource collision, the terminal device does not expect the time-frequency resources scheduled by the network device to overlap with the K time-frequency resources, thereby avoiding the overlap between resources which leads to a reduction in the time-frequency resources used in the CG configuration (such as used PUSCH), and further causes the problem of delay in the transmission of the uplink information carried in the CG configuration.

[0159] Among them, the time-frequency resources scheduled by the third scheduling information do not overlap with the K time-frequency resources, which means that there is no complete overlap or partial overlap between the time-frequency resources scheduled by the third scheduling information and any time-frequency resource among the K time-frequency resources.

[0160] In an embodiment, when the terminal device predicts unused time-frequency resources in the time-frequency resources configured by the CG, it is not necessary to reserve resource margin to cope with the overlap caused by burst scheduling of network devices, so as to avoid waste of resources.

[0161] Figure 7 : is a schematic block diagram of a communication device provided in an embodiment of the present application. The communication device 500 may be a terminal device or a network device, or may be a device in a terminal device or a network device, or may be a device that can be used in conjunction with a terminal device or a network device. In one possible implementation, the communication device 500 may include a module or unit that corresponds to the method / operation / step / action performed by the terminal device or the network device in the above method embodiment. The unit may be a hardware circuit, or may be software, or may be a combination of a hardware circuit and software. In one possible implementation, as Figure 7 As shown, the device 500 may include: a transceiver module 510 and a processing module 520 .

[0162] Optionally, the communication device 500 may correspond to the terminal device in the above method embodiment.

[0163] For example, when the communication device 500 is used to perform Figure 4 In the embodiment shown, the transceiver module 510 is used to send first uplink control information, where the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the CG are used, where K is a positive integer; the time-frequency resources used among the K time-frequency resources are first time-frequency resources, and the first time-frequency resources overlap with the time-frequency resources scheduled by the first scheduling information; the processing module 520 is used to determine whether the overlapping resources among the first time-frequency resources are used for uplink transmission; the transceiver module 510 is also used to send uplink information through the first time-frequency resources.

[0164] For example, when the communication device 500 is used to perform Figure 5 In the embodiment shown, the transceiver module 510 is used to send first uplink control information, where the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the CG are used, where K is a positive integer; the time-frequency resources used among the K time-frequency resources are first time-frequency resources, and the first time-frequency resources overlap with the time-frequency resources scheduled by the first scheduling information; the processing module 520 is used to determine whether the overlapping resources among the first time-frequency resources are used for uplink transmission; the transceiver module 510 is also used to send uplink information through non-overlapping resources among the first time-frequency resources and second time-frequency resources, and the second time-frequency resources do not overlap with the time-frequency resources used among the time-frequency resources configured by the CG.

[0165] It should be understood that the specific process executed by each module has been described in detail in the above method embodiment, and for the sake of brevity, it will not be repeated here.

[0166] Optionally, the communication device 500 may correspond to the network device in the above method embodiment.

[0167] For example, when the communication device 500 is used to perform Figure 4 In the method in the embodiment shown, the transceiver module 510 is used to receive first uplink control information, the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the CG are used, K is a positive integer; the time-frequency resources used among the K time-frequency resources are the first time-frequency resources, and the first time-frequency resources overlap with the time-frequency resources scheduled by the first scheduling information; the processing module 520 is used to determine whether the K time-frequency resources are used; the transceiver module 510 is also used to receive uplink information through the first time-frequency resources.

[0168] For example, when the communication device 500 is used to perform Figure 5 In the method in the embodiment shown, the transceiver module 510 is used to receive first uplink control information, the first uplink control information is used to indicate whether K time-frequency resources in the time-frequency resources configured by the CG are used, K is a positive integer; the time-frequency resources used in the K time-frequency resources are first time-frequency resources, and the first time-frequency resources overlap with the time-frequency resources scheduled by the first scheduling information; the processing module 520 is used to determine whether the K time-frequency resources are used; the transceiver module 510 is also used to receive uplink information through non-overlapping resources in the first time-frequency resources and second time-frequency resources, and the second time-frequency resources do not overlap with the time-frequency resources used in the time-frequency resources configured by the CG.

[0169] For example, when the communication device 500 is used to perform Figure 5 In the method in the embodiment shown, the transceiver module 510 is used to receive first uplink control information, where the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the CG are used, where K is a positive integer; the processing module 520 is used to determine the time-frequency resources scheduled by the third scheduling information; the transceiver module 510 is also used to send third scheduling information, where the time-frequency resources scheduled by the third scheduling information do not overlap with the K time-frequency resources.

[0170] It should be understood that the specific process executed by each module has been described in detail in the above method embodiment, and for the sake of brevity, it will not be repeated here.

[0171] The transceiver module 510 in the communication device 500 may be implemented by a transceiver, for example, corresponding to Figure 8 The transceiver 620 in the communication device 600 shown in FIG. 5 , the processing module 520 in the communication device 500 may be implemented by at least one processor, for example, corresponding to Figure 8 The processor 610 in the communication device 600 shown in FIG.

[0172] When the communication device 500 is a chip or a chip system configured in a communication device (such as a terminal device or a network device), the transceiver module 510 in the communication device 500 can be implemented through an input / output interface, circuit, etc., and the processing module 520 in the communication device 500 can be implemented through a processor, microprocessor or integrated circuit integrated on the chip or chip system.

[0173] Figure 8 is another schematic block diagram of a communication device provided in an embodiment of the present application. Figure 8 As shown, the communication device 600 may include: a processor 610. The processor 610 may be used to execute the method executed by the terminal device or the network device in the above method embodiment.

[0174] In some possible implementations, the communication device 600 may include a transceiver 620. The transceiver 620 may communicate with the processor 610 through an internal connection path. The processor 610 may control the transceiver 620 to send and / or receive signals.

[0175] In some possible implementations, the communication device 600 may include a memory 630. The memory 630 may communicate with the processor 610 through an internal connection path. The memory 630 and the processor 610 may be integrated together or separately arranged. The memory 630 may also be a memory outside the device. The memory 630 is used to store instructions, and the processor 610 is used to execute the instructions stored in the memory 630 to execute the method in the above method embodiment.

[0176] It should be understood that the communication device 600 may correspond to the terminal device or network device in the above method embodiment, and may be used to execute the various steps and / or processes executed by the terminal device or network device in the above method embodiment. Optionally, the memory 630 may include a read-only memory and a random access memory, and provide instructions and data to the processor. A portion of the memory may also include a non-volatile random access memory. The memory 630 may be a separate device or may be integrated in the processor 610. The processor 610 may be used to execute instructions stored in the memory 630, and when the processor 610 executes instructions stored in the memory, the processor 610 is used to execute the various steps and / or processes of the above method embodiment corresponding to the terminal device or network device.

[0177] Optionally, the communication device 600 is the terminal device in the previous embodiment.

[0178] Optionally, the communication device 600 is the network device in the previous embodiment.

[0179] Among them, the transceiver 620 may include a transmitter and a receiver. The transceiver 620 may further include an antenna, and the number of antennas may be one or more. The processor 610 and the memory 630 and the transceiver 620 may be devices integrated on different chips. For example, the processor 610 and the memory 630 may be integrated in a baseband chip, and the transceiver 620 may be integrated in a radio frequency chip. The processor 610 and the memory 630 and the transceiver 620 may also be devices integrated on the same chip. This application does not limit this.

[0180] Optionally, the communication device 600 is a component configured in a terminal device, such as a chip, a chip system, etc.

[0181] Optionally, the communication device 600 is a component configured in a network device, such as a chip, a chip system, etc.

[0182] The transceiver 620 may also be a communication interface, such as an input / output interface, a circuit, etc. The transceiver 620, the processor 610, and the memory 630 may be integrated into the same chip, such as a baseband chip.

[0183] The present application also provides a processing device, including at least one processor, wherein the at least one processor runs a computer program or a logic circuit so that the processing device executes the method executed by the terminal device or the network device in the above method embodiment. The above processing device may also include a memory, which is used to store the above computer program.

[0184] The embodiment of the present application also provides a processing device, including a processor and an input / output interface. The input / output interface is coupled to the processor. The input / output interface is used to input and / or output information. The information includes at least one of an instruction and data. The processor is used to execute a computer program so that the processing device executes the method executed by the terminal device or the network device in the above method embodiment.

[0185] The present application also provides a processing device, including a processor and a memory. The memory is used to store a computer program, and the processor is used to call and run the computer program from the memory, so that the processing device executes the method executed by the terminal device or network device in the above method embodiment.

[0186] It should be understood that the above-mentioned processing device can be one or more chips. For example, the processing device can be a field programmable gate array (FPGA), an application specific integrated circuit (ASIC), a system on chip (SoC), a central processor unit (CPU), a network processor (NP), a digital signal processor (DSP), a microcontroller unit (MCU), a programmable logic device (PLD) or other integrated chips.

[0187] In the implementation process, each step of the above method can be completed by an integrated logic circuit of hardware in a processor or an instruction in the form of software. The steps of the method disclosed in conjunction with the embodiment of the present application can be directly embodied as a hardware processor for execution, or a combination of hardware and software modules in a processor for execution. The software module can be located in a storage medium mature in the art such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in a memory, and the processor reads the information in the memory and completes the steps of the above method in conjunction with its hardware. To avoid repetition, it is not described in detail here.

[0188] The processor in the embodiment of the present application can be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method embodiment can be completed by the integrated logic circuit of the hardware in the processor or the instruction in the form of software. The above processor can be a general-purpose processor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The disclosed methods, steps and logic block diagrams in the embodiments of the present application can be implemented or executed. The general-purpose processor can be a microprocessor or the processor can also be any conventional processor, etc. The steps of the method disclosed in the embodiment of the present application can be directly embodied as a hardware decoding processor to perform, or the hardware and software modules in the decoding processor are combined and performed. The software module can be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in a memory, and the processor reads the information in the memory and completes the steps of the above method in combination with its hardware.

[0189] It can be understood that the memory in the embodiments of the present application can be a volatile memory or a non-volatile memory, or can include both volatile and non-volatile memories. Among them, the non-volatile memory can be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory can be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of RAM are available, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDR SDRAM), enhanced SDRAM (ESDRAM), synchronous link DRAM (SLDRAM), and direct RAM (DR RAM). It should be noted that the memory of the systems and methods described herein is intended to include, but is not limited to, these and any other suitable types of memory.

[0190] According to the method provided in the embodiment of the present application, the present application also provides a computer program product, which includes: a computer program or a set of instructions, when the computer program or a set of instructions is run on a computer, the computer executes the method executed by the terminal device or network device in the above method embodiment.

[0191] According to the method provided in the embodiment of the present application, the present application also provides a computer-readable storage medium, which stores a program. When the program runs on a computer, the computer executes the method executed by the terminal device or network device in the above method embodiment.

[0192] According to the method provided in the embodiment of the present application, the present application also provides a communication system, which may include the aforementioned terminal device or network device.

[0193] The terms "component", "module", "system", etc. used in this specification are used to represent computer-related entities, hardware, firmware, a combination of hardware and software, software, or software in execution. For example, a component can be, but is not limited to, a process running on a processor, a processor, an object, an executable file, an execution thread, a program and / or a computer. By way of illustration, both applications running on a computing device and a computing device can be components. One or more components may reside in a process and / or an execution thread, and a component may be located on a computer and / or distributed between two or more computers. In addition, these components may be executed from various computer-readable media having various data structures stored thereon. Components may, for example, communicate through local and / or remote processes according to signals having one or more data packets (e.g., data from two components interacting with another component between a local system, a distributed system and / or a network, such as the Internet interacting with other systems through signals).

[0194] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0195] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0196] In several embodiments provided in the present application, the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0197] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0198] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0199] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the part of the technical solution of the present application that contributes essentially or the part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as USB flash drives, mobile hard drives, ROM, RAM, magnetic disks, or optical disks.

[0200] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A communication method, characterized in that: include: Sending first uplink control information, where the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the configuration authorization CG are used, where K is a positive integer; The time-frequency resource used in the K time-frequency resources is a first time-frequency resource, and the first time-frequency resource overlaps with the time-frequency resource scheduled by the first scheduling information; Sending uplink information through the first time-frequency resource; or, Uplink information is sent through non-overlapping resources in the first time-frequency resources and the second time-frequency resources, and the second time-frequency resources do not overlap with the time-frequency resources used in the time-frequency resources configured by the CG.

2. The method according to claim 1, characterized in that The uplink information is sent through the non-overlapping resources in the first time-frequency resources and the second time-frequency resources, and the method further includes: Receive second scheduling information, where the second scheduling information is used to schedule the second time-frequency resources.

3. The method according to claim 2, characterized in that The second time-frequency resources include N sub-resources, and the second scheduling information includes N elements, the N elements correspond one-to-one to the N sub-resources, and the elements are used to schedule corresponding sub-resources.

4. The method according to claim 3, characterized in that The modulation and coding strategy MCS of the uplink information carried on the N sub-resources is the same as the MCS of the uplink information carried on the first time-frequency resource.

5. The method according to any one of claims 1 to 4, characterized in that: The uplink information is sent through non-overlapping resources in the first time-frequency resources and the second time-frequency resources, and the second time-frequency resources include M time-frequency resources that are not used in the time-frequency resources configured by the CG, where M is a positive integer.

6. The method according to any one of claims 1 to 5, characterized in that: The sending of the uplink information by using the non-overlapping resources in the first time-frequency resources and the second time-frequency resources includes: When the resource size of the second time-frequency resources is greater than or equal to the resource size of the overlapping resources in the first time-frequency resources, the uplink information is sent through the non-overlapping resources in the first time-frequency resources and the second time-frequency resources.

7. The method according to claim 6, characterized in that Also includes: When the resource size of the second time-frequency resource is smaller than the resource size of the overlapping resource in the first time-frequency resource, the uplink information is sent through the first time-frequency resource.

8. The method according to any one of claims 1 to 7, characterized in that: Also includes: Send second uplink control information, where the second uplink control information is used to request scheduling of the second time-frequency resource.

9. The method according to claim 8, characterized in that The second uplink control information is used to indicate that the second time-frequency resources include M time-frequency resources that are not used in the time-frequency resources configured by the CG, where M is a positive integer.

10. The method according to claim 9, characterized in that A time domain interval between a sending time of the second uplink control information and a time domain starting position of the M time-frequency resources is greater than or equal to a threshold.

11. The method according to claim 10, characterized in that Also includes: Indication information is received, where the indication information is used to indicate the threshold.

12. The method according to claim 8, characterized in that The second uplink control information is used to indicate a resource size of the second time-frequency resource.

13. The method according to claim 12, characterized in that The second uplink control information indicates unused time-frequency resources in the time-frequency resources configured by the CG; The difference between the number of unused time-frequency resources indicated by the first uplink control information and the number of unused time-frequency resources indicated by the second uplink control information is used to indicate the resource size of the second time-frequency resources.

14. A communication method, characterized in that: include: Receive first uplink control information, where the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the configuration authorization CG are used, where K is a positive integer; The time-frequency resource used in the K time-frequency resources is a first time-frequency resource, and the first time-frequency resource overlaps with the time-frequency resource scheduled by the first scheduling information; receiving uplink information through the first time-frequency resource; or, Uplink information is received through non-overlapping resources in the first time-frequency resources and the second time-frequency resources, and the second time-frequency resources do not overlap with the time-frequency resources used in the time-frequency resources configured by the CG.

15. The method according to claim 14, characterized in that Also includes: Send second scheduling information, where the second scheduling information is used to schedule the second time-frequency resources.

16. The method according to claim 15, characterized in that The second time-frequency resources include N sub-resources, and the second scheduling information includes N elements, the N elements correspond one-to-one to the N sub-resources, and the elements are used to schedule corresponding sub-resources.

17. The method according to claim 16, characterized in that The MCS of the uplink information carried on the N sub-resources is the same as the MCS of the uplink information carried on the first time-frequency resource.

18. The method according to any one of claims 14 to 17, characterized in that Receiving uplink information through non-overlapping resources in the first time-frequency resources and the second time-frequency resources; The second time-frequency resources include M time-frequency resources that are not used in the time-frequency resources configured by the CG, where M is a positive integer.

19. The method according to any one of claims 14 to 18, characterized in that The receiving uplink information through the non-overlapping resources in the first time-frequency resources and the second time-frequency resources includes: When the resource size of the second time-frequency resources is greater than or equal to the resource size of the overlapping resources in the first time-frequency resources, the uplink information is received through the non-overlapping resources in the first time-frequency resources and the second time-frequency resources.

20. The method according to claim 19, characterized in that Also includes: When the resource size of the second time-frequency resource is smaller than the resource size of the overlapping resource in the first time-frequency resource, the uplink information is received through the first time-frequency resource.

21. The method according to any one of claims 14 to 20, characterized in that Also includes: Second uplink control information is received, where the second uplink control information is used to request scheduling of the second time-frequency resource.

22. The method according to claim 21, characterized in that The second uplink control information is used to indicate that the second time-frequency resources include M time-frequency resources that are not used in the time-frequency resources configured by the CG, where M is a positive integer.

23. The method according to claim 22, characterized in that A time domain interval between a sending time of the second uplink control information and a time domain starting position of the M time-frequency resources is greater than or equal to a threshold.

24. The method according to claim 23, characterized in that Also includes: Send indication information, where the indication information is used to indicate the threshold.

25. The method according to claim 21, characterized in that The second uplink control information is used to indicate a resource size of the second time-frequency resource.

26. The method according to claim 25, characterized in that The second uplink control information indicates unused time-frequency resources in the time-frequency resources configured by the CG; The difference between the number of unused time-frequency resources indicated by the first uplink control information and the number of unused time-frequency resources indicated by the second uplink control information is used to indicate the resource size of the second time-frequency resources.

27. A communication method, characterized in that: include: Receive first uplink control information, where the first uplink control information is used to indicate whether K time-frequency resources among the time-frequency resources configured by the CG are used, where K is a positive integer; Send third scheduling information, where the time-frequency resources scheduled by the third scheduling information do not overlap with the K time-frequency resources.

28. A communication device, characterized in that: The method comprises a module for executing the method according to any one of claims 1 to 13, or comprises a module for executing the method according to any one of claims 14 to 27.

29. A communication device, characterized in that: include: A processor for executing the method according to any one of claims 1 to 27.

30. A computer-readable storage medium, characterized in that: Used to store computer program instructions, the computer program causing a computer to execute the method according to any one of claims 1 to 27.

31. A computer program product, characterized in that The method comprises computer program instructions which cause a computer to execute the method according to any one of claims 1 to 27.

Citation Information

Cited By

  • Communication method and apparatus

    WO2026166361A1