Electrical equipment management method and system based on Internet of Things

Through IoT technology, the energy consumption of electrical equipment on campus is monitored and managed in real time, and the problem of failure to detect energy consumption abnormalities in the existing technology is solved, precise and efficient management of electrical equipment is achieved, and energy use efficiency is optimized.

CN118967356AInactive Publication Date: 2024-11-15WUXI UNIV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410944334.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology cannot realize real-time monitoring of the energy consumption of electrical equipment on campus and timely discover potential energy consumption abnormalities, resulting in low management efficiency and waste of energy.

Method used

Through the Internet of Things-based electrical equipment management method, determine building types and set management time periods, obtain historical and real-time energy consumption data, calculate energy consumption thresholds and abnormal situations, and monitor and manage abnormal equipment in real time.

Benefits of technology

It realizes accurate and efficient management of electrical equipment with abnormal energy consumption, optimizes the use of electricity, improves the accuracy and efficiency of energy efficiency management, and reduces energy waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118967356A_ABST
    Figure CN118967356A_ABST
Patent Text Reader

Abstract

The invention discloses an electrical equipment management method and system based on the Internet of Things, and relates to the technical field of the Internet of Things. The method comprises the following steps: determining a main electrical equipment set corresponding to each building type in each management time period; acquiring a plurality of first historical energy consumption of each main electrical device in each management time period; based on each first historical energy consumption and each building type, obtaining an energy consumption threshold value corresponding to each main electrical equipment set in each management time period; acquiring first current average energy consumption of each main electrical equipment set in each management time period; when each first current average energy consumption is greater than each energy consumption threshold, determining abnormal electrical equipment from each main electrical equipment; and determining an abnormal power consumption condition corresponding to the abnormal electrical equipment, and managing the abnormal electrical equipment based on the abnormal power consumption condition. By implementing the technical scheme of the invention, the electrical equipment with abnormal energy consumption can be managed accurately and efficiently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of Internet of Things, and in particular to an electrical equipment management method and system based on the Internet of Things. Background Art

[0002] In modern campus management, energy consumption management of electrical equipment is crucial. With the continuous expansion of campus scale and the increase in the number of buildings, the energy consumption management of electrical equipment in various buildings on campus has become more and more complicated. Under the current technical background, the energy consumption management of electrical equipment on campus mainly relies on manual monitoring and regular testing. Although this approach can ensure the normal operation of equipment to a certain extent, it has obvious limitations. First, manual monitoring cannot achieve real-time monitoring of all equipment, and problems can often only be discovered when obvious faults or energy consumption anomalies occur. Secondly, although regular testing can prevent some problems, due to the lack of real-time data support, potential energy consumption anomalies cannot be discovered and handled in a timely manner.

[0003] Therefore, how to accurately and efficiently manage electrical equipment with abnormal energy consumption has become a technical problem that needs to be solved urgently. Summary of the invention

[0004] The present application provides an electrical equipment management method and system based on the Internet of Things, which can accurately and efficiently manage electrical equipment with abnormal energy consumption.

[0005] In the first aspect, the present application provides an electrical equipment management method based on the Internet of Things, the method comprising: determining the building type corresponding to each campus building on campus; setting multiple management time periods, and determining the main electrical equipment set corresponding to each of the building types in each of the management time periods; the main electrical equipment set includes at least one main electrical equipment; obtaining multiple first historical energy consumptions of each of the main electrical equipment in each of the management time periods; based on each of the first historical energy consumptions and each of the building types, obtaining the energy consumption threshold corresponding to each of the main electrical equipment sets in each of the management time periods; obtaining the first current average energy consumption of each of the main electrical equipment sets in each of the management time periods; when each of the first current average energy consumptions is greater than each of the energy consumption thresholds, determining abnormal electrical equipment from each of the main electrical equipment; determining the abnormal power usage corresponding to the abnormal electrical equipment, and managing the abnormal electrical equipment based on the abnormal power usage.

[0006] By adopting the above technical solution, by determining the building type corresponding to each campus building on campus, it is possible to classify and manage the electricity demand of different building types, thereby improving the accuracy and pertinence of energy efficiency management. By setting multiple management time periods and determining the main electrical equipment sets corresponding to each building type in each management time period, it is possible to monitor and manage the main electrical equipment in different time periods in a targeted manner, optimize the use of electric energy, and improve management efficiency. By obtaining multiple first historical energy consumptions of each main electrical equipment in each management time period, it is possible to understand the energy consumption patterns and laws of the main electrical equipment in different time periods, and provide data support for subsequent energy consumption analysis and management. By obtaining the energy consumption thresholds corresponding to each main electrical equipment set in each management time period based on each first historical energy consumption and each building type, it is possible to set reasonable energy consumption standards. By obtaining the first current average energy consumption of each main electrical equipment set in each management time period, it is possible to monitor the energy consumption of electrical equipment in real time and discover abnormal energy consumption in time. By determining abnormal electrical equipment from each main electrical equipment when each first current average energy consumption is greater than each energy consumption threshold, it is possible to quickly identify equipment with abnormal energy consumption. By determining the abnormal power consumption corresponding to the abnormal electrical equipment and managing the abnormal electrical equipment based on the abnormal power consumption, the electrical equipment with abnormal energy consumption can be managed accurately and efficiently.

[0007] Optionally, the energy consumption threshold corresponding to each of the main electrical equipment sets in each of the management time periods is obtained based on each of the first historical energy consumptions and each of the building types, specifically including: determining the electricity consumption coefficient corresponding to each of the building types; calculating the first historical average energy consumption corresponding to each of the main electrical equipment sets in each of the management time periods based on each of the first historical energy consumptions; calculating the historical electricity consumption standard deviation corresponding to each of the main electrical equipment sets in each of the management time periods based on each of the first historical average energy consumptions and each of the first historical energy consumptions; calculating the energy consumption threshold corresponding to each of the main electrical equipment sets in each of the management time periods based on each of the first historical average energy consumptions, each of the electricity consumption coefficients and each of the historical electricity consumption standard deviations.

[0008] By adopting the above technical solution, by determining the power consumption coefficient corresponding to each building type, the power consumption characteristics of different building types can be reflected, providing an accurate adjustment basis for the calculation of subsequent energy consumption thresholds. By calculating the first historical average energy consumption corresponding to each major electrical equipment set in each management time period based on each first historical energy consumption, the typical energy consumption level of the equipment in different time periods can be accurately reflected. By calculating the historical power consumption standard deviation corresponding to each major electrical equipment set in each management time period based on each first historical average energy consumption and each first historical energy consumption, the volatility and discreteness of energy consumption data can be quantified. The calculation of the historical power consumption standard deviation helps to set a dynamic energy consumption threshold, avoid false alarms caused by normal fluctuations, and effectively detect energy consumption anomalies. By calculating the energy consumption threshold corresponding to each major electrical equipment set in each management time period based on each first historical average energy consumption, each power consumption coefficient and each historical power consumption standard deviation, a scientific and reasonable energy consumption upper limit can be set, effectively preventing excessive energy consumption and improving the level of energy efficiency management.

[0009] Optionally, the calculating, based on each of the first historical average energy consumptions, each of the power consumption coefficients, and each of the historical power consumption standard deviations, the energy consumption threshold corresponding to each of the sets of main electrical equipment in each of the management time periods specifically includes: Each of the energy consumption thresholds is calculated by the following formula: Where x is the building type and the number of major electrical equipment sets, y is the number of management time periods, and s xy is the energy consumption threshold corresponding to the xth set of major electrical equipment in the yth management time period, is the first historical average energy consumption corresponding to the xth set of major electrical equipment in the yth management time period, k x is the electricity consumption coefficient corresponding to the x-th building type, σ xy It is the historical electricity consumption standard deviation corresponding to the x-th set of major electrical equipment in the y-th management time period.

[0010] Optionally, when the first current average energy consumption is greater than the energy consumption threshold, abnormal electrical equipment is determined from the main electrical equipment, specifically including: obtaining the first current energy consumption of each main electrical equipment in the set of main electrical equipment; based on the first historical average energy consumption, the power consumption coefficient and the historical power consumption standard deviation, obtaining the expected energy consumption range corresponding to each set of main electrical equipment in each management time period; when the first current energy consumption is greater than the upper limit value of the expected energy consumption range, or when the first current energy consumption is less than the lower limit value of the expected energy consumption range, determining that the main electrical equipment corresponding to the first current energy consumption is the abnormal electrical equipment.

[0011] By adopting the above technical solution, by obtaining the first current energy consumption of each main electrical device in the main electrical device set, the energy consumption of each device can be monitored in real time to ensure the real-time and accuracy of the data. Based on each first historical average energy consumption, each power consumption coefficient and each historical power consumption standard deviation, the expected energy consumption range corresponding to each main electrical device set in each management time period is obtained, so that a reasonable energy consumption range can be set, which can not only reflect the normal operating status of the equipment, but also effectively detect energy consumption anomalies. When each first current energy consumption is greater than the upper limit value of each expected energy consumption range, or when each first current energy consumption is less than the lower limit value of each expected energy consumption range, the main electrical equipment corresponding to the first current energy consumption is determined to be an abnormal electrical equipment, so that the equipment with abnormal energy consumption can be quickly identified and timely measures can be taken to deal with it.

[0012] Optionally, the expected energy consumption range is expressed by the following formula: Where x is the building type and the number of the main electrical equipment sets, y is the number of management time periods, E xy is the expected energy consumption range corresponding to the xth set of major electrical equipment in the yth management time period, is the first historical average energy consumption corresponding to the xth set of major electrical equipment in the yth management time period, k x is the electricity consumption coefficient corresponding to the x-th building type, σ xy It is the historical electricity consumption standard deviation corresponding to the x-th set of major electrical equipment in the y-th management time period.

[0013] Optionally, the abnormal power usage situation includes the abnormal amplitude and duration of energy consumption abnormality; determining the abnormal power usage situation corresponding to the abnormal electrical equipment specifically includes: determining the second current energy consumption corresponding to the abnormal electrical equipment, and determining multiple second historical energy consumptions of the abnormal electrical equipment in each management time period; based on each of the second historical energy consumptions, calculating the second historical average energy consumption corresponding to the abnormal electrical equipment in each of the management time periods; based on the second current energy consumption and the second historical average energy consumption, determining the abnormal amplitude of energy consumption; and determining the duration of the abnormality based on multiple time nodes corresponding to the second historical energy consumption and the second current energy consumption.

[0014] By adopting the above technical solution, by determining the second current energy consumption corresponding to the abnormal electrical equipment and determining multiple second historical energy consumptions of the abnormal electrical equipment in each management time period, the energy consumption of the equipment can be analyzed in detail and sufficient data support can be provided. By calculating the second historical average energy consumption corresponding to the abnormal electrical equipment in each management time period based on each second historical energy consumption, the typical energy consumption level of the equipment under normal operating conditions can be understood. By determining the energy consumption abnormality amplitude based on the second current energy consumption and the second historical average energy consumption, the severity of the energy consumption abnormality can be quantified. The calculation of the energy consumption abnormality amplitude can help identify the specific degree of energy consumption exceeding the standard of the equipment and provide a scientific basis for subsequent management measures. By determining the abnormal duration based on the time nodes corresponding to multiple second historical energy consumptions and the second current energy consumption, short-term fluctuations and long-term abnormalities can be distinguished. The determination of the abnormal duration helps to determine whether there is a persistent problem with the equipment, and helps managers take targeted measures to prevent long-term abnormal operation of the equipment and improve the reliability and safety of equipment operation.

[0015] Optionally, after setting multiple management time periods, the method also includes: determining a set of secondary electrical equipment corresponding to each of the building types in each of the management time periods; the set of secondary electrical equipment is an empty set or a non-empty set, and when the set of secondary electrical equipment is a non-empty set, the set of secondary electrical equipment includes at least one secondary electrical equipment; when the set of secondary electrical equipment is a non-empty set, obtaining the third historical average energy consumption of each of the sets of secondary electrical equipment in each of the management time periods, and obtaining the second current average energy consumption of each of the sets of secondary electrical equipment in each of the management time periods; when the second current average energy consumption is greater than the third historical average energy consumption, power consumption management is performed on all of the secondary electrical equipment in each of the sets of secondary electrical equipment.

[0016] By adopting the above technical solution, by determining the secondary electrical equipment set corresponding to each building type in each management time period, the energy consumption monitoring of all electrical equipment can be fully covered, ensuring the comprehensiveness and refinement of energy efficiency management. The determination of the secondary electrical equipment set not only manages the energy consumption of the main electrical equipment, but also pays attention to the energy consumption of the secondary electrical equipment in a timely manner. By determining whether the secondary electrical equipment set is an empty set or a non-empty set, when the secondary electrical equipment set is a non-empty set, the secondary electrical equipment set includes at least one secondary electrical equipment, so that the energy consumption of the equipment in different time periods and building types can be flexibly responded to, ensuring the flexibility and adaptability of management. For different time periods and different building types, the dynamic adjustment of the secondary electrical equipment set makes management more accurate and efficient. By obtaining the third historical average energy consumption of each secondary electrical equipment set in each management time period when the secondary electrical equipment set is a non-empty set, and obtaining the second current average energy consumption of each secondary electrical equipment set in each management time period, it is possible to compare and analyze historical data and real-time data, and timely discover abnormal energy consumption of secondary electrical equipment. When the second current average energy consumption is greater than the third historical average energy consumption, all the secondary electrical equipment in each set of secondary electrical equipment are managed for power consumption, so that measures can be taken in time to avoid energy waste and equipment damage caused by abnormal energy consumption of secondary electrical equipment. The combination of real-time energy consumption monitoring and historical data comparison makes energy consumption management more effective and timely, and improves the overall energy efficiency management level.

[0017] In a second aspect of the present application, an electrical equipment management system based on the Internet of Things is provided, the system comprising: a processing module and an acquisition module; the processing module is used to determine the building type corresponding to each campus building on campus; the processing module is also used to set multiple management time periods and determine the main electrical equipment sets corresponding to each of the building types in each of the management time periods; the main electrical equipment set includes at least one main electrical equipment; the acquisition module is used to obtain multiple first historical energy consumptions of each of the main electrical equipment in each of the management time periods; the processing module is also used to obtain the energy consumption threshold corresponding to each of the main electrical equipment sets in each of the management time periods based on each of the first historical energy consumptions and each of the building types; the acquisition module is also used to obtain the first current average energy consumption of each of the main electrical equipment sets in each of the management time periods; the processing module is also used to determine abnormal electrical equipment from each of the main electrical equipment when each of the first current average energy consumptions is greater than each of the energy consumption thresholds; the processing module is also used to determine the abnormal power usage corresponding to the abnormal electrical equipment, and manage the abnormal electrical equipment based on the abnormal power usage.

[0018] In the third aspect of the present application, an electronic device is provided, including a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes any method as described in the first aspect of the present application.

[0019] In a fourth aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program that can be loaded by a processor and execute the method as described in any one of the first aspects of the present application.

[0020] In summary, one or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: By determining the building type corresponding to each campus building on campus, it is possible to classify and manage the electricity demand of different building types, thereby improving the accuracy and pertinence of energy efficiency management. By setting multiple management time periods and determining the main electrical equipment sets corresponding to each building type in each management time period, it is possible to monitor and manage the main electrical equipment in different time periods in a targeted manner, optimize the use of electric energy, and improve management efficiency. By obtaining multiple first historical energy consumptions of each main electrical equipment in each management time period, it is possible to understand the energy consumption patterns and laws of the main electrical equipment in different time periods, and provide data support for subsequent energy consumption analysis and management. By obtaining the energy consumption thresholds corresponding to each main electrical equipment set in each management time period based on each first historical energy consumption and each building type, it is possible to set reasonable energy consumption standards. By obtaining the first current average energy consumption of each main electrical equipment set in each management time period, it is possible to monitor the energy consumption of electrical equipment in real time and discover abnormal energy consumption in time. By determining abnormal electrical equipment from each main electrical equipment when each first current average energy consumption is greater than each energy consumption threshold, it is possible to quickly identify equipment with abnormal energy consumption. By determining the abnormal power consumption corresponding to the abnormal electrical equipment and managing the abnormal electrical equipment based on the abnormal power consumption, the electrical equipment with abnormal energy consumption can be managed accurately and efficiently. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is one of the flow charts of an electrical equipment management method based on the Internet of Things provided in an embodiment of the present application; Figure 2 This is a second flow chart of an electrical equipment management method based on the Internet of Things provided in an embodiment of the present application; Figure 3 This is a schematic diagram of the structure of an electrical equipment management system based on the Internet of Things provided in an embodiment of the present application; Figure 4 It is a structural schematic diagram of an electronic device disclosed in an embodiment of the present application.

[0022] Explanation of the reference numerals: 1. Processing module; 2. Acquisition module; 400. Electronic device; 401. Processor; 402. Communication bus; 403. User interface; 404. Network interface; 405. Memory. DETAILED DESCRIPTION

[0023] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.

[0024] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.

[0025] In the description of the embodiments of the present application, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" can explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

[0026] This application provides an electrical equipment management method based on the Internet of Things, referring to Figure 1 , which shows one of the flow diagrams of an electrical equipment management method based on the Internet of Things provided in an embodiment of the present application. The method includes steps S1-S7, which are as follows: Step S1: Determine the building type corresponding to each campus building on campus.

[0027] When implementing step S1, it is first necessary to determine the building type corresponding to each campus building on campus. The purpose of this step is to achieve precise and targeted management of electrical equipment energy consumption, because there are significant differences in electricity demand and usage patterns among different building types. By clarifying the building type, it can lay the foundation for subsequent energy consumption monitoring and management, and ensure the effectiveness and scientificity of the management strategy.

[0028] Specifically, first classify all buildings on campus, which usually include teaching buildings, laboratories, dormitories, libraries, gymnasiums, canteens and office buildings. In the classification process, consider the main functions of each building, the frequency of use, the types of electrical equipment equipped and its energy consumption characteristics. For example, teaching buildings are usually equipped with a large number of lighting equipment and multimedia equipment, and energy consumption is concentrated during class time; laboratories are equipped with a large number of scientific research instruments, with high energy consumption and large fluctuations; dormitories mainly use air conditioners and lighting equipment, and energy consumption is mainly concentrated in the morning and evening time periods; libraries need to consider the continuous use of lighting and air conditioning; the energy consumption of gymnasiums is closely related to activity arrangements; canteens are mainly concentrated in the use of kitchen equipment; office buildings need to manage office equipment and lighting, etc.

[0029] In the classification process, the campus's building information management system (BIM) and equipment management system (EMS) can be used to obtain basic building information and equipment information. By analyzing this information, the functional positioning and main electricity consumption characteristics of each building can be clarified, and its building type can be determined. At the same time, the historical electricity consumption data can be combined to further verify and optimize the classification results through data mining technology.

[0030] Step S2: setting a plurality of management time periods, and determining a set of main electrical equipment corresponding to each building type in each management time period; the set of main electrical equipment includes at least one main electrical equipment.

[0031] In step S2, multiple management time periods are set, and the main electrical equipment sets corresponding to each building type in each management time period are determined. The purpose of this process is to monitor and manage the main electrical equipment in a targeted manner according to the electricity consumption characteristics and needs in different time periods, and further improve the accuracy and response speed of energy efficiency management.

[0032] Specifically, we first need to divide the time into multiple management time periods according to different time periods of the day, such as morning (6:00-9:00), daytime (9:00-18:00), evening (18:00-22:00) and night (22:00-6:00). The purpose of this division is to match the usage characteristics and electricity demand of various buildings in different time periods, so as to formulate a more reasonable energy consumption management strategy.

[0033] After dividing the time periods, it is necessary to determine the main electrical equipment sets corresponding to each building type in each management time period. The main electrical equipment set includes at least one main electrical equipment, which is the main source of energy consumption for each type of building in the corresponding time period. For example, in the morning time period of the teaching building, the main electrical equipment set may include lighting equipment and air-conditioning equipment; in the daytime time period of the laboratory, the main electrical equipment set may include scientific research instruments and ventilation equipment; in the evening time period of the dormitory, the main electrical equipment set may include lighting equipment and air-conditioning equipment.

[0034] The specific method of determining these main electrical equipment sets is to analyze the electricity consumption data of various buildings in different time periods and identify the equipment with large energy consumption. Historical energy consumption data and real-time monitoring data can be used to find equipment with significant energy consumption in each time period through data analysis and mining technology, and classify them into the main electrical equipment set. For example, the energy consumption proportion of each device in different time periods can be calculated through statistical analysis methods, and the equipment with the highest energy consumption proportion can be selected as the main electrical equipment.

[0035] Step S3: Acquire a plurality of first historical energy consumptions of each major electrical device in each management time period.

[0036] In step S3, multiple first historical energy consumptions of each major electrical device in each management time period are obtained. The purpose of this step is to provide a reliable data basis for subsequent energy consumption threshold calculation and anomaly detection by collecting and analyzing historical energy consumption data. Understanding historical energy consumption patterns helps to set reasonable energy consumption standards, optimize energy consumption management strategies, and thus improve the overall energy efficiency management level.

[0037] Specifically, it is necessary to first collect energy consumption data of each major electrical device in different management time periods from IoT sensors and energy consumption metering devices. The historical energy consumption data of each device should cover as long a time period as possible, such as weeks or months, to ensure the representativeness and reliability of the data. These data will reflect the energy consumption changes and usage patterns of each major electrical device in different time periods.

[0038] The data collection process begins at the equipment installation and configuration stage. Energy consumption sensors need to be installed on each major electrical device to ensure that the sensors can accurately record the real-time energy consumption data of the equipment. Through the IoT network, the energy consumption data collected by these sensors will be transmitted to the central data processing platform and stored by time period. In order to ensure the accuracy and consistency of the data, the collected energy consumption data needs to be preprocessed, including data cleaning, removal of outliers and noise data, etc.

[0039] After acquiring and organizing historical energy consumption data, it is necessary to analyze these data in detail. Through statistical analysis, key indicators such as the average energy consumption, maximum energy consumption, minimum energy consumption, and standard deviation of major electrical equipment in each management period can be calculated. These statistical indicators will be used for subsequent energy consumption threshold calculations, laying the foundation for accurate energy consumption management.

[0040] Step S4: Based on each first historical energy consumption and each building type, obtain the energy consumption threshold corresponding to each set of main electrical equipment in each management time period.

[0041] In step S4, based on each first historical energy consumption and each building type, the energy consumption threshold corresponding to each set of main electrical equipment in each management time period is obtained. The purpose of this step is to calculate a reasonable energy consumption threshold through historical energy consumption data and building type characteristics, so that in actual applications, the energy consumption of electrical equipment can be accurately monitored and managed, abnormalities can be discovered in time, and energy efficiency can be optimized and the safety of equipment operation can be guaranteed.

[0042] In one possible implementation, refer to Figure 2 , which shows the second flow chart of an electrical equipment management method based on the Internet of Things provided in an embodiment of the present application. Step S4 specifically includes steps S41-S44: Step S41: Determine the electricity consumption coefficient corresponding to each building type.

[0043] Specifically, the value range of the power consumption coefficient is 1 to 3. In more detail, after the classification of each building type is completed, the historical energy consumption data of each building type needs to be collected. This data can be obtained from IoT sensors and energy consumption metering systems, covering energy consumption information in different time periods. By analyzing these data, the power consumption characteristics of each building type can be identified, such as peak hours, off-peak hours, average energy consumption, and energy consumption fluctuations.

[0044] Based on the analysis of historical energy consumption data, it is necessary to calculate the electricity consumption coefficient of each building type. The electricity consumption coefficient reflects the energy consumption level of a certain building type under specific conditions, relative to the energy consumption characteristics of other building types. The specific calculation method can adopt the weighted average method or other statistical analysis methods, taking into account the energy consumption characteristics and fluctuations in each time period. For example, for a teaching building, its average energy consumption on working days and non-working days and in different time periods can be calculated, and a comprehensive electricity consumption coefficient can be obtained through weighted average.

[0045] The process of determining the power consumption coefficient is not just a simple numerical calculation, but also needs to be adjusted and optimized in combination with the actual usage and functional characteristics of the building. For example, if a laboratory conducts high energy consumption experiments during a specific period of time, it can be specially considered in the power consumption coefficient to avoid setting the energy consumption threshold too low and causing frequent false alarms.

[0046] Step S42: Based on each first historical energy consumption, calculate the first historical average energy consumption corresponding to each set of major electrical equipment in each management time period.

[0047] Specifically, the first historical average energy consumption is calculated by summing up the first historical energy consumptions in the management time period and dividing the sum by the number of main electrical devices in the main electrical device set.

[0048] By calculating the historical average energy consumption, we can get the typical energy consumption level of each major electrical equipment group in different time periods. These average values ​​can reflect the energy consumption pattern of the equipment under normal operating conditions and are an important reference for setting energy consumption thresholds.

[0049] Step S43: Based on each first historical average energy consumption and each first historical energy consumption, calculate the historical power consumption standard deviation corresponding to each set of major electrical equipment in each management time period.

[0050] In step S43, based on each first historical average energy consumption and each first historical energy consumption, the historical power consumption standard deviation corresponding to each major electrical equipment set in each management time period is calculated. The purpose of this step is to quantify the volatility and discreteness of the energy consumption of each major electrical equipment set in different management time periods by calculating the historical power consumption standard deviation, so as to provide a more accurate basis for setting a reasonable energy consumption threshold.

[0051] First, starting from the first historical energy consumption data obtained in step S3 and the first historical average energy consumption calculated in step S42, for each set of major electrical equipment in each management time period, the historical electricity consumption standard deviation is calculated. The standard deviation can reflect the discrete degree of energy consumption data, that is, the volatility of energy consumption, which is crucial for setting dynamic energy consumption thresholds.

[0052] The specific calculation method is as follows: Assume that within a certain management period, the historical energy consumption data of a certain set of major electrical equipment is p 1xy , p 2xy , ..., p Nxy , its historical average energy consumption is Then, the standard deviation of historical electricity consumption σ xy It can be calculated by the following formula: Among them, σ xyis the historical electricity consumption standard deviation of the xth main electrical equipment set in the yth management time period, and N is the total number of main electrical equipment in the main electrical equipment set during the management time period.

[0053] By calculating the standard deviation of historical electricity consumption of a collection of major electrical equipment during each management period, the volatility of equipment energy consumption can be quantified. The effect of this is that when setting energy consumption thresholds, not only the average energy consumption level of the equipment is considered, but also the volatility of energy consumption can be taken into account, so that a more reasonable and scientific energy consumption threshold can be set. For example, if the energy consumption standard deviation of a certain device is large, it means that its energy consumption is highly volatile. When setting the threshold, the allowable range can be appropriately increased to reduce false alarms; conversely, the energy consumption of equipment with a small standard deviation is relatively stable, and a stricter threshold range can be set.

[0054] Step S44: based on each first historical average energy consumption, each power consumption coefficient and each historical power consumption standard deviation, calculate the energy consumption threshold corresponding to each set of major electrical equipment in each management time period.

[0055] In a possible implementation, step S44 specifically includes the following steps: Each energy consumption threshold is calculated using the following formula: Where x is the number of building types and main electrical equipment sets, y is the number of management time periods, and s xy is the energy consumption threshold corresponding to the xth set of major electrical equipment in the yth management time period, is the first historical average energy consumption of the xth major electrical equipment set in the yth management time period, k x is the electricity consumption coefficient corresponding to the x-th building type, σ xy It is the historical electricity consumption standard deviation corresponding to the xth set of major electrical equipment in the yth management time period.

[0056] Specifically, through this formula, the energy consumption threshold of each major electrical equipment set in different management time periods can be set. x The introduction of is to adjust the energy consumption characteristics of different building types so that the energy consumption threshold can accurately reflect the actual energy consumption demand and fluctuation range of the equipment. xy The introduction of is to take into account the volatility of energy consumption and ensure that the set threshold can effectively detect anomalies without frequent false alarms due to normal fluctuations.

[0057] Step S5: Obtain the first current average energy consumption of each set of major electrical equipment in each management time period.

[0058] In step S5, the first current average energy consumption of each major electrical equipment set in each management time period is obtained. The purpose of this step is to monitor the energy consumption of electrical equipment in real time, ensure rapid response to energy consumption anomalies, take timely measures, thereby optimizing energy efficiency management and ensuring safe operation of equipment.

[0059] Specifically, first, energy consumption sensors need to be installed on each major electrical device. These sensors can collect energy consumption data of the device in real time. The frequency of data collection should be high enough to ensure that the energy consumption changes of the device can be accurately reflected. The data collected by the sensor is transmitted to the central data processing platform through the Internet of Things network.

[0060] On the central data processing platform, the collected energy consumption data is processed and analyzed in real time. Specifically, the real-time energy consumption data needs to be classified according to the pre-set management time period. For example, the energy consumption data of the lighting equipment in the teaching building in the morning, daytime, evening and night are classified separately. These data will be used to calculate the first current average energy consumption in the current time period.

[0061] Step S6: When each first current average energy consumption is greater than each energy consumption threshold, abnormal electrical devices are determined from each main electrical device.

[0062] In step S6, when each first current average energy consumption is greater than each energy consumption threshold, abnormal electrical equipment is determined from each major electrical equipment. The purpose of this step is to timely identify and handle electrical equipment with abnormal energy consumption, thereby preventing energy waste and potential equipment failures, and improving energy efficiency management and equipment operation safety.

[0063] In a possible implementation, step S6 specifically includes the following steps: Get the first current energy consumption of each major electrical device in the major electrical device collection.

[0064] Specifically, first, through the previous step S5, the first current average energy consumption of each set of major electrical equipment in each management time period has been obtained. On this basis, it is necessary to further refine the current energy consumption of each major electrical equipment so as to accurately identify the specific equipment with abnormal energy consumption.

[0065] Specifically, during each management period, energy consumption sensors installed on each major electrical device are used to collect energy consumption data of these devices in real time. The sensors transmit real-time energy consumption data to the central data processing platform through the Internet of Things network. In order to ensure the accuracy and timeliness of the data, the data collection frequency should be high enough to capture subtle changes in the energy consumption of the equipment.

[0066] By obtaining the first current energy consumption of each major electrical device, energy consumption monitoring can be refined and specific abnormal devices can be identified, so that accurate energy consumption management can be achieved and energy consumption anomalies can be discovered and handled in a timely manner. For example, if the energy consumption of the lighting equipment in a certain teaching building is abnormally high during the morning period, by collecting the energy consumption data of each lighting device in real time, it is possible to accurately identify which lamp or lamps have an abnormality, so that measures can be taken quickly to deal with it.

[0067] Based on each first historical average energy consumption, each power consumption coefficient and each historical power consumption standard deviation, the expected energy consumption range corresponding to each set of major electrical equipment in each management time period is obtained.

[0068] The expected energy consumption range is expressed by the following formula: Where x is the number of building types and main electrical equipment sets, y is the number of management time periods, and E xy is the expected energy consumption range of the xth set of major electrical equipment in the yth management time period, is the first historical average energy consumption of the xth major electrical equipment set in the yth management time period, k x is the electricity consumption coefficient corresponding to the x-th building type, σ xy It is the historical electricity consumption standard deviation corresponding to the xth set of major electrical equipment in the yth management time period.

[0069] When each first current energy consumption is greater than the upper limit value of each expected energy consumption range, or when each first current energy consumption is less than the lower limit value of each expected energy consumption range, it is determined that the main electrical equipment corresponding to the first current energy consumption is an abnormal electrical equipment.

[0070] Specifically, by setting a reasonable expected energy consumption range, the energy consumption of each major electrical equipment set can be monitored in real time. Once the current energy consumption of a device exceeds the upper and lower limits of the expected energy consumption range, it indicates that the device has abnormal energy consumption and needs to be checked and handled in time.

[0071] In this way, not only can the accuracy and response speed of energy consumption management be improved, but also energy consumption anomalies and equipment failures can be effectively prevented, thereby ensuring the safe operation of the equipment. For example, if the energy consumption of scientific research instruments in the laboratory is abnormal, it may indicate equipment failure or improper operation. By setting and monitoring the expected energy consumption range, these anomalies can be identified and handled in a timely manner to prevent further damage to the equipment or cause safety accidents.

[0072] Step S7: Determine the abnormal power usage corresponding to the abnormal electrical equipment, and manage the abnormal electrical equipment based on the abnormal power usage.

[0073] Specifically, abnormal power consumption includes abnormal energy consumption amplitude and abnormal duration. In step S7, the abnormal power consumption corresponding to the abnormal electrical equipment is determined, and the abnormal electrical equipment is managed based on the abnormal power consumption. The purpose of this step is to deeply analyze the specific causes of abnormal energy consumption and take targeted management measures to optimize energy efficiency management and improve the safety and reliability of equipment operation.

[0074] In a possible implementation, step S7 specifically includes the following steps: Determine a second current energy consumption corresponding to the abnormal electrical equipment, and determine a plurality of second historical energy consumptions of the abnormal electrical equipment in each management time period; Based on each second historical energy consumption, calculating the second historical average energy consumption corresponding to the abnormal electrical equipment in each management time period; Determine the energy consumption abnormality range based on the second current energy consumption and the second historical average energy consumption; Based on the time nodes corresponding to the plurality of second historical energy consumptions and the second current energy consumption, respectively, the abnormality duration is determined.

[0075] Specifically, first, based on the steps of the above embodiment, it has been determined which major electrical devices have abnormal energy consumption. Next, it is necessary to further analyze the specific power consumption of these abnormal devices, including the abnormal energy consumption amplitude and abnormal duration, so as to take effective management measures. In order to achieve this goal, it is first necessary to determine the second current energy consumption P of each abnormal electrical device. i 当前 , and collect multiple second historical average energy consumption of these devices in each management time period By comparing the current energy consumption with the historical energy consumption, the energy consumption abnormality range can be obtained. The calculation formula for the energy consumption abnormality range is as follows:

[0076] Next, based on the time nodes of multiple data points of the second historical energy consumption and the second current energy consumption, determine the duration of the abnormality. If the energy consumption of the equipment exceeds the expected range for multiple consecutive time periods, it means that the equipment has a continuous abnormality. In this way, short-term fluctuations and long-term abnormalities can be distinguished, and problems can be identified and handled more accurately. For example, if the energy consumption of a laboratory device is higher than the normal level for several consecutive hours, it is likely that there is a continuous equipment failure or operation problem.

[0077] By analyzing abnormal power consumption, the specific cause of equipment abnormality can be determined. This step involves not only simple data comparison, but also a comprehensive analysis based on the equipment's usage environment, operation records, and maintenance history. For example, abnormal energy consumption of equipment may be caused by internal failures (such as component aging), improper use (such as overload operation), or changes in the external environment (such as temperature fluctuations). By comparing and analyzing historical data with current data, it can help locate the root cause of the problem so that targeted measures can be taken.

[0078] Based on the above analysis results, taking corresponding management measures is the key. Carrying out a detailed inspection of the electrical equipment determined to be abnormal, finding out the cause of the failure and repairing or replacing it is the first step. Secondly, the operating parameters or usage time of the equipment can be optimized to avoid excessive use or unreasonable usage patterns. For example, adjusting the operation strategy of the air-conditioning equipment in the teaching building can reduce energy consumption while ensuring comfort. If the abnormal energy consumption is caused by changes in the external environment, the operating status of the equipment can be improved by adjusting the environmental conditions (such as temperature, humidity, etc.). In addition, equipment operators can also be trained to ensure that they use the equipment correctly and avoid abnormal energy consumption due to improper operation.

[0079] In a possible implementation, after step S1, the method further includes the following steps: Determine the secondary electrical equipment set corresponding to each building type in each management time period; the secondary electrical equipment set is an empty set or a non-empty set. When the secondary electrical equipment set is a non-empty set, the secondary electrical equipment set includes at least one secondary electrical equipment.

[0080] In this step, the secondary electrical equipment set corresponding to each building type in each management time period is determined; the secondary electrical equipment set is an empty set or a non-empty set. When the secondary electrical equipment set is a non-empty set, the secondary electrical equipment set includes at least one secondary electrical equipment. The purpose of this step is to comprehensively monitor the energy consumption of all electrical equipment on campus, not only focusing on the main electrical equipment, but also managing the secondary electrical equipment, so as to achieve more comprehensive energy efficiency management and optimization.

[0081] Specifically, first, based on the various building types and management time periods determined in the previous step, further equipment classification is performed. The main electrical equipment set has been determined as the key equipment with large energy consumption in each time period, and the secondary electrical equipment set includes those equipment that consume relatively less energy in the corresponding time period but still need to be monitored. For example, in a teaching building, the main electrical equipment may include lighting equipment and air conditioners, while the secondary electrical equipment may include projectors and electric fans.

[0082] The method for determining the minor electrical equipment set is similar to that for determining the major electrical equipment set. First, the historical energy consumption data of all electrical equipment needs to be collected from IoT sensors and energy consumption metering systems. By analyzing this data, it is possible to identify devices that consume relatively little energy in various time periods. Based on the energy consumption data, these devices are classified into the minor electrical equipment set.

[0083] Next, based on the historical energy consumption data of minor electrical equipment in each time period, calculate its historical average energy consumption and standard deviation. These statistics can help set reasonable management strategies and energy consumption thresholds. Although the energy consumption of minor electrical equipment is small, its management is equally important. For example, if the energy consumption of some minor electrical equipment increases abnormally, it may reflect equipment failure or improper use, which needs to be handled in time.

[0084] By monitoring the minor electrical equipment set, more comprehensive energy efficiency management can be achieved. The minor electrical equipment set is an empty set or a non-empty set. When the minor electrical equipment set is a non-empty set, the minor electrical equipment set includes at least one minor electrical equipment. This means that in some cases, if there is no significant minor electrical equipment in a certain period of time, the minor electrical equipment set can be empty. For example, in certain specific time periods, if the minor electrical equipment in the teaching building does not have significant energy consumption, it can be temporarily not monitored.

[0085] By incorporating minor electrical equipment into the energy efficiency management system, we can fully understand the energy consumption of various electrical equipment on campus and avoid missing potential energy consumption problems. The effect of this is that we can further optimize the overall energy consumption management strategy based on the management of major electrical equipment. For example, by monitoring the energy consumption of minor electrical equipment, we can identify the energy consumption of equipment during non-peak hours, adjust and optimize the equipment use strategy in a timely manner, and avoid unnecessary energy waste.

[0086] In addition, the management of minor electrical equipment can also improve the reliability and safety of equipment operation. Although the energy consumption of minor electrical equipment is relatively small, it may still cause equipment failure and abnormal energy consumption if it is not managed. For example, if the projector in the teaching building is in standby mode for a long time, it will consume unnecessary electricity. Through monitoring and management, unused equipment can be turned off in time to reduce energy consumption.

[0087] When the secondary electrical device set is a non-empty set, the third historical average energy consumption of each secondary electrical device set in each management time period is obtained, and the second current average energy consumption of each secondary electrical device set in each management time period is obtained.

[0088] Specifically, when the secondary electrical equipment set is a non-empty set, the third historical average energy consumption of each secondary electrical equipment set in each management time period is obtained, and the second current average energy consumption of each secondary electrical equipment set in each management time period is obtained. The purpose of this step is to fully understand the energy consumption of the secondary electrical equipment, and to identify and manage the energy consumption anomalies of the secondary electrical equipment by comparing historical data with current data, thereby optimizing the overall energy efficiency management.

[0089] When each second current average energy consumption is greater than each third historical average energy consumption, power consumption management is performed on all secondary electrical devices in each secondary electrical device set.

[0090] Specifically, after calculating the second current average energy consumption of each set of secondary electrical equipment in each management time period, it is compared with the corresponding third historical average energy consumption. If it is found that the current average energy consumption is greater than the historical average energy consumption, it indicates that the set of secondary electrical equipment in this time period has abnormal energy consumption. This abnormality may be caused by increased frequency of equipment use, equipment failure or other external factors. In order to prevent further abnormal energy consumption and ensure the normal operation of the equipment, these secondary electrical equipment need to be managed.

[0091] Specific electricity management measures may include the following aspects: Equipment inspection and maintenance: Conduct detailed inspections of minor electrical equipment with abnormal energy consumption to identify the cause of increased energy consumption and perform necessary maintenance and repairs. For example, if certain projectors have abnormally high energy consumption during non-working hours, it may be because the equipment was not shut down in time. Inspections can identify and resolve this problem.

[0092] Optimize operation strategy: Adjust the operation strategy of minor electrical equipment according to the equipment usage and energy consumption characteristics. For example, you can set a timer switch to turn off unused equipment during non-essential time periods to reduce energy consumption.

[0093] Energy-saving measures: Use more energy-saving equipment or technical means to reduce the energy consumption of minor electrical equipment. For example, replace traditional lighting equipment with energy-saving lamps, or use intelligent power management systems.

[0094] By managing the power consumption of all the secondary electrical equipment in the secondary electrical equipment set, we can effectively prevent abnormal energy consumption and energy waste, and ensure the efficient operation and safe use of the equipment. For example, by optimizing the use strategy of projectors and electric fans in the teaching building, we can significantly reduce energy consumption during non-working hours and achieve the effect of energy saving and emission reduction.

[0095] Reference Figure 3, which shows a structural schematic diagram of an electrical equipment management system based on the Internet of Things provided by an embodiment of the present application, the system includes: a processing module 1 and an acquisition module 2; the processing module 1 is used to determine the building type corresponding to each campus building on campus; the processing module 1 is also used to set multiple management time periods and determine the main electrical equipment sets corresponding to each building type in each management time period; the main electrical equipment set includes at least one main electrical equipment; the acquisition module 2 is used to obtain multiple first historical energy consumptions of each main electrical equipment in each management time period; the processing module 1 is also used to obtain the energy consumption threshold corresponding to each main electrical equipment set in each management time period based on each first historical energy consumption and each building type; the acquisition module 2 is also used to obtain the first current average energy consumption of each main electrical equipment set in each management time period; the processing module 1 is also used to determine abnormal electrical equipment from each main electrical equipment when each first current average energy consumption is greater than each energy consumption threshold; the processing module 1 is also used to determine the abnormal power usage corresponding to the abnormal electrical equipment, and manage the abnormal electrical equipment based on the abnormal power usage.

[0096] In a possible implementation, processing module 1 is also used to determine the electricity consumption coefficient corresponding to each building type; processing module 1 is also used to calculate the first historical average energy consumption corresponding to each major electrical equipment set in each management time period based on each first historical energy consumption; processing module 1 is also used to calculate the historical electricity consumption standard deviation corresponding to each major electrical equipment set in each management time period based on each first historical average energy consumption and each first historical energy consumption; processing module 1 is also used to calculate the energy consumption threshold corresponding to each major electrical equipment set in each management time period based on each first historical average energy consumption, each electricity consumption coefficient and each historical electricity consumption standard deviation.

[0097] In a possible implementation manner, the processing module 1 is further configured to calculate each energy consumption threshold value by using the following formula: Where x is the number of building types and main electrical equipment sets, y is the number of management time periods, and s xy is the energy consumption threshold corresponding to the xth set of major electrical equipment in the yth management time period, is the first historical average energy consumption of the xth major electrical equipment set in the yth management time period, k x is the electricity consumption coefficient corresponding to the x-th building type, σ xy It is the historical electricity consumption standard deviation corresponding to the xth set of major electrical equipment in the yth management time period.

[0098] In a possible implementation, the acquisition module 2 is also used to obtain the first current energy consumption of each main electrical equipment in the main electrical equipment set; the processing module 1 is also used to obtain the expected energy consumption range corresponding to each main electrical equipment set in each management time period based on each first historical average energy consumption, each power consumption coefficient and each historical power consumption standard deviation; the processing module 1 is also used to determine that the main electrical equipment corresponding to the first current energy consumption is an abnormal electrical equipment when each first current energy consumption is greater than the upper limit value of each expected energy consumption range, or when each first current energy consumption is less than the lower limit value of each expected energy consumption range.

[0099] In a possible implementation, the processing module 1 is also used to determine the second current energy consumption corresponding to the abnormal electrical equipment, and determine multiple second historical energy consumptions of the abnormal electrical equipment in each management time period; the processing module 1 is also used to calculate the second historical average energy consumption corresponding to the abnormal electrical equipment in each management time period based on each second historical energy consumption; the processing module 1 is also used to determine the magnitude of the energy consumption anomaly based on the second current energy consumption and the second historical average energy consumption; the processing module 1 is also used to determine the duration of the anomaly based on the time nodes corresponding to multiple second historical energy consumptions and the second current energy consumption.

[0100] In one possible implementation, the processing module 1 is also used to determine the set of secondary electrical equipment corresponding to each building type in each management time period; the set of secondary electrical equipment is an empty set or a non-empty set, and when the set of secondary electrical equipment is a non-empty set, the set of secondary electrical equipment includes at least one secondary electrical equipment; the acquisition module 2 is also used to obtain the third historical average energy consumption of each set of secondary electrical equipment in each management time period when the set of secondary electrical equipment is a non-empty set, and obtain the second current average energy consumption of each set of secondary electrical equipment in each management time period; the processing module 1 is also used to manage the power consumption of all secondary electrical equipment in each set of secondary electrical equipment when each second current average energy consumption is greater than each third historical average energy consumption.

[0101] It should be noted that: when the device provided in the above embodiment realizes its function, only the division of the above functional modules is used as an example. In actual application, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.

[0102] The present application also discloses an electronic device. Figure 4 , Figure 4The electronic device 400 may include: at least one processor 401 , at least one network interface 404 , a user interface 403 , a memory 405 , and at least one communication bus 402 .

[0103] The communication bus 402 is used to realize the connection and communication between these components.

[0104] The user interface 403 may include a display screen (Display) and a camera (Camera), and the optional user interface 403 may also include a standard wired interface and a wireless interface.

[0105] The network interface 404 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).

[0106] Among them, the processor 401 may include one or more processing cores. The processor 401 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 405, and calling data stored in the memory 405. Optionally, the processor 401 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 401 can integrate one or more combinations of a central processing unit (Central Processing Unit, CPU), a graphics processor (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application programs; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 401, and it can be implemented by a single chip.

[0107] Among them, the memory 405 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read-Only Memory). Optionally, the memory 405 includes a non-transitory computer-readable storage medium. The memory 405 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 405 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 405 may optionally be at least one storage device located away from the aforementioned processor 401. Refer to Figure 4 , the memory 405 as a computer-readable storage medium may include an operating system, a network communication module, a user interface module and an application program.

[0108] exist Figure 4 In the electronic device 400 shown, the user interface 403 is mainly used to provide an input interface for the user and obtain the data input by the user; and the processor 401 can be used to call an application stored in the memory 405, and when executed by one or more processors 401, the electronic device 400 executes one or more methods in the above-mentioned embodiments. It should be noted that for the aforementioned method embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should know that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.

[0109] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0110] In the several embodiments provided in this application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0111] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0112] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0113] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.

[0114] The above are only exemplary embodiments of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, those skilled in the art will easily think of other embodiments of the present disclosure.

[0115] This application is intended to cover any variation, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the art not described in the present disclosure. The description and examples are to be regarded as exemplary only, and the scope and spirit of the present disclosure are defined by the claims.

Claims

1. An electrical equipment management method based on the Internet of Things, characterized in that: The method comprises: Determine the building type corresponding to each campus building on campus; Setting a plurality of management time periods, and determining a set of main electrical equipment corresponding to each of the building types in each of the management time periods; the set of main electrical equipment includes at least one main electrical equipment; Acquire a plurality of first historical energy consumptions of each of the main electrical equipment in each of the management time periods; Based on each of the first historical energy consumptions and each of the building types, obtaining an energy consumption threshold corresponding to each of the main electrical equipment sets in each of the management time periods; Acquire the first current average energy consumption of each of the main electrical equipment sets in each of the management time periods; When each of the first current average energy consumptions is greater than each of the energy consumption thresholds, determining abnormal electrical devices from each of the main electrical devices; Abnormal power usage corresponding to the abnormal electrical equipment is determined, and the abnormal electrical equipment is managed based on the abnormal power usage.

2. The method according to claim 1, characterized in that The obtaining, based on each of the first historical energy consumptions and each of the building types, energy consumption thresholds corresponding to each of the main electrical equipment sets in each of the management time periods specifically includes: determining an electricity consumption coefficient corresponding to each of the building types; Based on each of the first historical energy consumptions, calculating the first historical average energy consumption corresponding to each of the main electrical equipment sets in each of the management time periods; Calculating the historical power consumption standard deviation corresponding to each of the main electrical equipment sets in each of the management time periods based on each of the first historical average energy consumptions and each of the first historical energy consumptions; The energy consumption threshold corresponding to each of the sets of major electrical equipment in each of the management time periods is calculated based on each of the first historical average energy consumptions, each of the power consumption coefficients, and each of the historical power consumption standard deviations.

3. The method according to claim 2, characterized in that The calculating, based on each of the first historical average energy consumptions, each of the power consumption coefficients, and each of the historical power consumption standard deviations, the energy consumption threshold corresponding to each of the main electrical equipment sets in each of the management time periods specifically includes: Each of the energy consumption thresholds is calculated by the following formula: Where x is the building type and the number of major electrical equipment sets, y is the number of management time periods, and s xy is the energy consumption threshold corresponding to the xth set of major electrical equipment in the yth management time period, is the first historical average energy consumption corresponding to the xth set of major electrical equipment in the yth management time period, k x is the electricity consumption coefficient corresponding to the x-th building type, σ xy It is the historical electricity consumption standard deviation corresponding to the x-th set of major electrical equipment in the y-th management time period.

4. The method according to claim 2, characterized in that: When each of the first current average energy consumptions is greater than each of the energy consumption thresholds, determining abnormal electrical equipment from each of the main electrical equipment specifically includes: Acquire a first current energy consumption of each of the main electrical devices in the set of main electrical devices; Based on each of the first historical average energy consumptions, each of the power consumption coefficients, and each of the historical power consumption standard deviations, obtaining an expected energy consumption range corresponding to each of the main electrical equipment sets in each of the management time periods; When each of the first current energy consumptions is greater than the upper limit value of each of the expected energy consumption ranges, or when each of the first current energy consumptions is less than the lower limit value of each of the expected energy consumption ranges, it is determined that the main electrical equipment corresponding to the first current energy consumption is the abnormal electrical equipment.

5. The method according to claim 4, characterized in that The expected energy consumption range is expressed by the following formula: Where x is the building type and the number of the main electrical equipment sets, y is the number of management time periods, E xy is the expected energy consumption range corresponding to the xth set of major electrical equipment in the yth management time period, is the first historical average energy consumption corresponding to the xth set of major electrical equipment in the yth management time period, k x is the electricity consumption coefficient corresponding to the x-th building type, σ xy It is the historical electricity consumption standard deviation corresponding to the x-th set of major electrical equipment in the y-th management time period.

6. The method according to claim 1, characterized in that The abnormal power consumption includes the abnormal energy consumption amplitude and abnormal duration; the determining the abnormal power consumption corresponding to the abnormal electrical equipment specifically includes: Determine a second current energy consumption corresponding to the abnormal electrical device, and determine a plurality of second historical energy consumptions of the abnormal electrical device in each of the management time periods; Based on each of the second historical energy consumptions, calculating the second historical average energy consumption of the abnormal electrical equipment corresponding to each of the management time periods; Determining the energy consumption abnormality magnitude based on the second current energy consumption and the second historical average energy consumption; The abnormal duration is determined based on a plurality of time nodes corresponding to the second historical energy consumption and the second current energy consumption.

7. The method according to claim 1, characterized in that After setting the plurality of management time periods, the method further includes: Determine a set of secondary electrical equipment corresponding to each of the building types in each of the management time periods; the set of secondary electrical equipment is an empty set or a non-empty set, and when the set of secondary electrical equipment is a non-empty set, the set of secondary electrical equipment includes at least one secondary electrical equipment; When the secondary electrical equipment set is a non-empty set, obtaining the third historical average energy consumption of each of the secondary electrical equipment sets in each of the management time periods, and obtaining the second current average energy consumption of each of the secondary electrical equipment sets in each of the management time periods; When each of the second current average energy consumptions is greater than each of the third historical average energy consumptions, power consumption management is performed on all of the secondary electrical devices in each of the secondary electrical device sets.

8. An electrical equipment management system based on the Internet of Things, characterized in that: The system comprises: a processing module and an acquisition module; The processing module is used to determine the building type corresponding to each campus building on campus; The processing module is further used to set a plurality of management time periods, and determine a set of main electrical equipment corresponding to each of the building types in each of the management time periods; the set of main electrical equipment includes at least one main electrical equipment; The acquisition module is used to acquire a plurality of first historical energy consumptions of each of the main electrical equipment in each of the management time periods; The processing module is further used to obtain the energy consumption threshold corresponding to each of the main electrical equipment sets in each of the management time periods based on each of the first historical energy consumptions and each of the building types; The acquisition module is further used to acquire the first current average energy consumption of each of the main electrical equipment sets in each of the management time periods; The processing module is further configured to determine abnormal electrical equipment from each of the main electrical equipment when each of the first current average energy consumptions is greater than each of the energy consumption thresholds; The processing module is further used to determine the abnormal power usage corresponding to the abnormal electrical equipment, and manage the abnormal electrical equipment based on the abnormal power usage.

9. An electronic device, characterized in that: The electronic device (400) comprises a processor (401), a memory (405), a user interface (403) and a network interface (404), wherein the memory (405) is used to store instructions, the user interface (403) and the network interface (404) are used to communicate with other devices, and the processor (401) is used to execute the instructions stored in the memory (405) so that the electronic device (400) executes the method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores instructions, and when the instructions are executed, the method according to any one of claims 1 to 7 is executed.

Citation Information

Patent Citations

  • Campus building energy consumption management method, campus energy consumption management system, equipment and readable storage medium

    CN112393765A

  • Public building energy consumption abnormity determination method and device, equipment and medium

    CN115130572A

  • Building energy consumption prediction method based on artificial intelligence

    CN118211721A

  • Electric power consumption management system and method

    US20140371933A1