Open caisson and construction method thereof
Through the multi-section wellbore construction method and the buoyancy control of mud in the guide groove, the problems of inclination, sudden sinking and environmental impact in caisson construction are solved, stable sinking and efficient construction of the wellbore are achieved, and construction safety and integrity are improved.
Patent Information
- Application Number
- CN202411075025.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-19
AI Technical Summary
There are problems such as inclination, sudden sinking, difficulty in sinking, bottom bulge, groundwater surge and surrounding environment in the construction of existing caissons, making it difficult to achieve uniform sinking and efficient construction.
Using a multi-section wellbore construction method connected in the height direction, the combined structure of guide groove and steel pipe piles is used to adjust the sinking speed by utilizing the mud buoyancy in the guide groove and the wellbore control device, and first form the caisson wall and then excavate the well. holes to reduce the difficulty of digging earth, and avoid bottom bulges and groundwater surges through continuous walls of cement soil.
The uniform sinking and high stability of the wellbore is achieved, which reduces the difficulty of earth excavation, improves construction safety and efficiency, reduces the impact on the surrounding environment, and improves the integrity and economicality of the caisson.
Smart Images

Figure CN118979512A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an caisson and a construction method of the caisson. Background Art
[0002] Caisson is a shaft-shaped hollow structure. In the prior art, it is a deep foundation type formed by digging soil in a prefabricated shaft, and gradually sinking into the ground to a predetermined design elevation by relying on the shaft's own weight or with the help of external force to overcome the friction resistance between the shaft wall and the underground soil. Caisson has the advantages of supporting and structural walls in one, strong integrity, high stability, small actual footprint, high internal space utilization, and huge bearing capacity. It is often used as the foundation of large buildings (structures), shaft-shaped underground spaces or retaining cofferdam structures. It is widely used in large-scale projects such as geotechnical, water conservancy, municipal engineering, bridges, new energy storage, such as foundations of wide waters or large-span bridges, sewage pumping stations, underground warehouses, underground gas storage stations, civil air defense shelters, shield starting shafts, etc.
[0003] The force-bearing components of the caisson are mainly composed of blade feet, well walls, inner partition walls, bottom plates, etc. When the caisson is sinking, it is necessary to dig soil in the shaft and rely on its own gravity or deadweight and external forces to overcome the friction resistance between the well wall and the underground soil and the resistance under the blade feet. During the sinking process of the caisson, the soil in the well is excavated. Digging and sinking are carried out simultaneously, which makes the caisson face the following difficulties in design and construction:
[0004] The caisson sinks at an angle due to uneven excavation and uneven strata; the caisson sinks suddenly due to complex strata and improper reaction force control during the sinking process; there are problems of upward uplift and groundwater surge at the bottom; when encountering harder strata, the caisson is difficult to sink or cannot sink at all; when sinking, the well wall has a significant dragging effect on the surrounding strata, which has a great impact on the surrounding environment; sinking and excavation are carried out simultaneously, which requires high precision management of the construction site.
[0005] Therefore, how to avoid the problems of caisson tilting, sudden sinking, difficulty in sinking, bottom bulge, groundwater surge, and great impact on the surrounding environment in the prior art has become a technical problem that technical personnel in this field need to solve urgently. Summary of the invention
[0006] In order to at least partially solve the above problems, the present application first proposes a construction method of a caisson, the caisson comprising N shaft sections connected together in a height direction, N being an integer ≥ 1, and the construction method comprising the following steps:
[0007] (1) Construction of guide wall;
[0008] (2) constructing a guide groove and forming a cement soil continuous wall on the lower side of the guide groove, wherein the top surface of the cement soil continuous wall is lower than the set elevation of the bottom surface of the foundation pit; the soil in the guide groove becomes mud;
[0009] (3) inserting a steel pipe pile into the guide groove, and inserting the lower end of the steel pipe pile into the cement soil continuous wall;
[0010] (4) constructing a connecting beam on the steel pipe pile, the space between the connecting beam and the ground forms a shaft construction space, and a shaft control device is installed on the connecting beam;
[0011] (5) Casting the first section of the wellbore in the wellbore construction space, with the wall of the first section of the wellbore wrapped around the steel pipe pile;
[0012] (6) After the concrete of the first section of the shaft reaches the designed strength, the first section of the shaft is sunk into the guide groove using the steel pipe pile as a guide rod, and the sinking speed of the first section of the shaft is adjusted using the shaft control device; during the sinking process of the first section of the shaft, the mud in the guide groove is pumped out;
[0013] (7) When N=1, the first section of the shaft is completed and forms the caisson wall;
[0014] When N≥2, repeat steps (5) and (6) until all shafts are sunk and adjacent shafts are connected up and down to form a shaft sinking wall.
[0015] (8) Excavating earth in the wall of the caisson to form a well hole for the caisson;
[0016] (9) Construction of underground structures in well boreholes;
[0017] (10) After the underground structure is constructed to zero, the steel pipe piles are removed and the holes left by the removal of the steel pipe piles are filled.
[0018] When constructing the guide groove, equipment such as a double-wheel milling machine or a chain-type troughing machine (TRD) is used. The guide groove and the cement soil continuous wall can be completed continuously using the same equipment or different equipment. The cement soil continuous wall can also be constructed using equipment other than a double-wheel milling machine or a chain-type troughing machine, such as a double-axis or three-axis mixing pile driver and a rotary jet pile driver. The top surface of the cement soil continuous wall is preferably set at an elevation of 0.5-2 meters lower than the bottom surface of the foundation pit. In the present application, the foundation pit is the well hole formed in the caisson when excavating earth.
[0019] In the present application, when the wellbore includes at least two wellbores connected together in the vertical direction, each wellbore is sequentially referred to as the first wellbore section, the second wellbore section, ..., the Nth wellbore section from bottom to top. When the caisson includes only one wellbore section, the wellbore section is referred to as the first wellbore section.
[0020] The steel pipe pile is preferably inserted into the cement soil continuous wall to a depth of 5-10 meters so that the steel pipe pile can generate sufficient friction in the cement soil continuous wall to ensure that it will not sink under the action of the friction of the wellbore when the wellbore sinks, thereby ensuring the stability of the steel pipe pile.
[0021] In order to facilitate the removal of the bottom form of the shaft, it is preferred that the bottom form adopts a block assembly structure, and a bottom form hole for the steel pipe pile to pass through is provided on the bottom form. The connecting beam can be a steel concrete structure or a steel structure, and both structural forms can be constructed by on-site production or prefabrication.
[0022] In order to improve the stability of the wellbore when it sinks, a number of steel pipe piles are arranged around the guide groove, and the steel pipe piles are evenly spaced along the circumference of the caisson; in the thickness direction of the wellbore, the steel pipe piles are located in the middle part of the wellbore.
[0023] When sinking each shaft, the following methods can be used: Method A, when one shaft section completely enters the guide groove, the next shaft section is cast, and when the next shaft section sinks, the shaft in the guide groove is pushed to continue sinking until all shafts have completed the sinking and reached the set position; Method B, when each shaft section sinks, it sinks to its set position at one time. The two methods can be used separately or simultaneously. When the above two methods are used at the same time, the shaft at the bottom can be sunk to its set position at one time, and the shaft at the top can be sunk using Method A.
[0024] In the caisson construction method of the present application, the buoyancy of the mud in the guide groove and the control of the sinking speed of the wellbore by the wellbore control device are utilized to make the sinking of the wellbore safe and uniform. Since the construction of the caisson wall is completed first and the wellbore is excavated later, the problem of wellbore tilting caused by different soil qualities of the underground soil is avoided. At the same time, the safety problems caused by the collapse of the lower part of the wellbore are also avoided, thereby ensuring the safety of surrounding buildings. Since the wellbore is excavated after the wellbore is sunk on the ground, large-scale construction machinery can be fully used for earth excavation, which minimizes the difficulty of earth excavation, not only improves the safety of the operation, but also improves the construction efficiency and saves construction costs. Specifically, this construction method has the following advantages:
[0025] 1. The reinforced concrete shaft and steel pipe piles form a composite structure. During the excavation process, the composite structure has high rigidity and strength, and small deformation during the excavation process. After the construction reaches zero, the steel pipe piles can be pulled out and reused, which is economical and environmentally friendly.
[0026] 2. The cement-soil continuous wall on the lower side serves as a water-stop curtain to avoid the problem of the bottom bulging upward and the sudden surge of groundwater. When precipitation measures are adopted in the caisson, the impact on the surrounding environment is relatively small.
[0027] 3. The connection of the connecting beam increases the overall stability of the steel pipe pile; the steel pipe pile also serves as a guide rod, which can control the sinking of the wellbore with high precision. The wellbore control device controls the sinking speed of the wellbore to avoid sudden sinking of the wellbore, thus avoiding the sudden sinking problem existing in the prior art.
[0028] 4. It has changed the traditional caisson construction method of digging and sinking the soil. The original soil is fully mixed by double-wheel milling, TRD or multi-axis mixing pile driver, which greatly reduces the caisson's sinking resistance and completely separates the caisson's side wall from the surrounding soil. The geological conditions are relatively uniform, which solves the problems of sinking in hard strata, sudden sinking of caissons and easy deviation of sinking, and greatly reduces the impact of caisson sinking on the surrounding environment.
[0029] Since the soil in the guide trough is stirred into mud, it can protect the guide trough wall and avoid the collapse of the trough wall. It can also provide buoyancy for the wellbore to ensure the uniform sinking of the wellbore.
[0030] 5. The shaft is cast-in-place on the ground, with reliable construction quality, good integrity, impermeability and durability.
[0031] Furthermore, in order to smoothly mix the earth in the guide groove into mud, when constructing the guide groove, slurry is sprayed into the underground soil at the same time to mix the underground soil into mud.
[0032] Specifically, the slurry is stirred by the following components in mass percentage: 70-90% water, 5-29% bentonite, and 1-5% binder. The binder can be carboxymethyl cellulose (CMC) or polyacrylamide (PAM) or other similar binders. In a specific embodiment, it is necessary to conduct tests according to the different soil types in the construction area to determine the appropriate ratio. The density of the slurry is preferably 1.05-1.15 g / ml.
[0033] Furthermore, in order to increase the pile end resistance of the steel pipe pile in the cement soil continuous wall and improve the compressive capacity of the steel pipe pile, the bottom of the steel pipe pile is closed.
[0034] Furthermore, in order to smoothly sink the wellbore, a pipe insertion hole is reserved in the axial direction on each wellbore, and the pipe insertion holes on adjacent wellbores are connected in the axial direction. When the wellbore is difficult to sink, the water jet tube is inserted into the pipe insertion hole, and water is sprayed through the water jet tube to the bottom of the first section of the wellbore to punch and cut the mud below the first section of the wellbore. When using the water jet tube to spray water downward, it is necessary to spray evenly along the circumference of the wellbore to avoid excessive or insufficient local spraying, which will cause the wellbore to tilt. When the wellbore tilts, it is necessary to adjust the spray amount of each water jet tube in time to correct the wellbore.
[0035] Furthermore, in order to reduce the friction between the wellbore and the steel pipe pile, an isolation membrane is provided on the outer wall of the steel pipe pile. The isolation membrane can be made of geotextile, plastic film or other materials, or isolation paint is applied on the outer wall of the steel pipe pile, and the paint film formed by the isolation paint forms the isolation membrane.
[0036] Specifically, the wellbore control device includes a hoisting mechanism and a pressing mechanism, wherein the hoisting mechanism is used to bear the weight of the wellbore, and the pressing mechanism is used to push the wellbore downward. Further, the hoisting mechanism is fixedly installed on the ground or fixedly installed on the connecting beam, and the pressing mechanism adopts a jack, which is arranged between the connecting beam and the wellbore to be sunk. The hoisting mechanism can specifically adopt a winch or a lifting machine. When the hoisting mechanism is installed on the ground, a pulley needs to be installed on the connecting beam to facilitate the arrangement of the hoisting rope of the hoisting mechanism. The jack can specifically adopt a mechanical jack or a hydraulic jack.
[0037] Alternatively, the wellbore control device includes a piston cylinder, the cylinder of the piston cylinder is fixed on the connecting beam, and the piston rod of the piston cylinder extends downward and is detachably connected to the wellbore. The piston cylinder has the dual ability of lifting and pressing down, which can improve the construction efficiency. The piston cylinder diameter can be an electric piston cylinder or a hydraulic piston cylinder for unified control.
[0038] Secondly, the present application also provides a caisson, which is constructed using any of the construction methods described above. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 It is a construction flow chart of the present invention.
[0040] Figure 2 The utility model relates to a circular caisson made by adopting the construction method in the present application.
[0041] Figure 3 yes Figure 1 Enlarged view of part A.
[0042] Figure 4 It is a schematic diagram of the structure of a wellbore control device as a piston cylinder.
[0043] Figure 5 It is a schematic diagram of the wellbore structure.
[0044] Figure 6 It is a structural diagram of the bottom mold.
[0045] Figure 7 The utility model relates to a rectangular caisson made by adopting the construction method in the present application. DETAILED DESCRIPTION
[0046] The following is a detailed description of the construction method of the caisson in this application. Please refer to Figure 1 and Figure 2, Figure 1 The mark 100 in the figure represents the ground. Figure 2 In the embodiment, the circular caisson is divided into six shafts along the height direction, and the six shafts are sequentially called the first shaft 21, the second shaft 22, the third shaft 23, the fourth shaft 24, the fifth shaft 25 and the sixth shaft 26 from bottom to top. It can be understood that in other embodiments, according to the height and construction requirements of different caissons, the caisson can also be divided into other numbers of shafts along the height direction, or the entire caisson can be constructed as one shaft.
[0047] The following Figure 2 The construction method of the circular caisson shown in the figure is described, and the construction method specifically includes the following steps:
[0048] (1) Please refer to Figure 1 (a) A guide wall 11 is constructed in the sinking area of the caisson, and the guide wall includes an inner guide wall and an outer guide wall which are sleeved together.
[0049] (2) Please refer to Figure 1 (b), construct the guide groove 13 downward along the area between the inner guide wall and the outer guide wall, and form a cement soil continuous wall 31 on the lower side of the guide groove, and the top surface of the cement soil continuous wall 31 is 1 meter lower than the set elevation of the bottom surface of the foundation pit. It can be understood that in other embodiments, the top surface of the cement soil continuous wall 31 can also be 0.2 meters, 0.5 meters, 1.5 meters, 2 meters or other distances between 0.2-2 meters lower than the set elevation of the bottom surface of the foundation pit.
[0050] When constructing the guide groove, slurry is sprayed into the guide groove at the same time to stir the earth in the guide groove into mud. In this embodiment, a double-wheel groove milling machine is specifically used to construct the guide groove. It can be understood that in other embodiments, a chain groove machine (TRD) and other equipment can also be used to construct the guide groove. The cement soil continuous wall 31 is used as a water-stop curtain to avoid the problem of the bottom of the caisson bulging upward and the sudden surge of groundwater due to the external pressure of the caisson. When precipitation measures are adopted in the caisson, the groundwater outside the caisson has less impact on the surrounding environment due to the barrier effect of the cement soil continuous wall.
[0051] The slurry is formed by stirring the following raw materials in mass percentage, 85% clean water, 12% bentonite and 3% adhesive. The density of the mud is controlled between 1.06-1.08g / ml. It is understood that in other embodiments, the composition of the slurry can also be 70% clean water, 25% bentonite and 5% adhesive, or 90% clean water, 6% bentonite and 4% adhesive, or 83% clean water, 16% bentonite and 1% adhesive, or 90% clean water, 5% bentonite and 5% adhesive. The density of the mud can also be 1.05-1.06g / ml, 1.08-1.11g / ml or 1.12-1.15g / ml. It is specifically carried out according to factors such as the convenience of construction. In the present embodiment, the adhesive specifically adopts carboxymethyl cellulose (CMC), and it is understood that in other embodiments, polyacrylamide (PAM) or similar adhesives can also be used.
[0052] (3) Insert the steel pipe pile 14 into the guide groove 13, and insert the lower end of the steel pipe pile 14 into the cement soil continuous wall. The depth of the steel pipe pile inserted into the cement soil continuous wall is 5 meters. In this embodiment, in order to increase the pile end resistance of the steel pipe pile, the bottom of the steel pipe pile is closed. It can be understood that in other embodiments, the depth of the steel pipe pile inserted into the cement soil continuous wall can also be 6 meters, 7 meters, 8 meters, 10 meters or other data between 5-10 meters.
[0053] (4) Please refer to Figure 1 (c), a connecting beam 15 is constructed on the top of the steel pipe pile 14, and the connecting beam 15 connects the steel pipe piles into a whole. The space between the connecting beam 15 and the ground forms a shaft construction space, and then a shaft control device 16 is set up on the connecting beam. In this embodiment, in order to improve the operation efficiency, the connecting beam adopts a prefabricated steel structure beam. It can be understood that in another embodiment, a connecting beam constructed on site by a steel section can also be adopted. The connecting beam can also adopt a steel concrete structure. When a steel concrete structure is adopted, a prefabricated beam or a cast-in-place beam can be selected as needed.
[0054] Please also see Figure 3 In this embodiment, the shaft control device 16 includes a lifting mechanism and a pressing mechanism, wherein the lifting mechanism is used to bear the weight of the shaft, and the pressing mechanism is used to push the shaft downward. The lifting mechanism in this embodiment specifically includes a bracket 168 mounted on the upper side of the connecting beam and an electric hoist 161 fixed on the bracket 168. A rope threading hole 151 is provided on the connecting beam, and a lifting rope 162 of the electric hoist freely passes through the rope threading hole 151, and a hook 163 is installed at the lower end of the lifting rope.
[0055] The pressing mechanism specifically adopts a jack, and both a mechanical jack and a hydraulic jack are acceptable. There is no special requirement for the structural form of the jack, and other forms of jacks may also be adopted. In the present embodiment, a hydraulic jack is specifically adopted, and the hydraulic jack is arranged between the connecting beam and the shaft to be sunk.
[0056] In this embodiment, the electric hoist serving as the lifting mechanism is installed on a bracket above the connecting beam. It can be understood that in another implementation, the electric hoist can also be installed on the ground, and then the lifting rope can be passed through a pulley installed on the bracket and then hooked on the wellbore. Of course, in yet another embodiment, the lifting mechanism can also use a winch, and the winding machine can be specifically installed on the connecting beam or the ground. Of course, other lifting equipment can also be used.
[0057] (5) Please refer to Figure 1 (d) Cast the first section of the shaft 21 in the shaft construction space, and wrap the wall of the first section of the shaft around the steel pipe pile. Figure 5 and Figure 6 When pouring the first section of the shaft 21, a bottom mold 51 is first laid on the ground. To facilitate the removal of the bottom mold 51, the bottom mold adopts a block assembly structure. Specifically, in the present embodiment, the bottom mold 51 is divided into an inner bottom mold 53 and an outer bottom mold 54 as a whole, and the inner bottom mold is divided into a plurality of inner sub-bottom molds 531, and the outer bottom mold 54 is divided into a plurality of outer sub-bottom molds 541. A bottom mold hole 52 is opened on the bottom mold for the steel pipe pile to pass through, and the outer semicircle of the bottom mold hole is located on the outer bottom mold, and the inner semicircle is located on the inner bottom mold. Figure 6 This is only to illustrate the structure of the bottom mold, not a specific implementation example. During actual construction, the inner and outer sub-bottom molds need to be specifically designed and cut according to the needs of removing the bottom mold.
[0058] After the laying of the bottom form 51 is completed, the steel cage 26 is tied on the bottom form, and the inner and outer formworks are supported. The support of the inner and outer formworks and the tying of the steel cage can be constructed according to the existing technology, and there are no special requirements. Finally, concrete 27 is poured. After the concrete reaches the design strength, the first section of the shaft 21 is formed. A blade foot and a bottom plate groove are provided at the bottom of the first section of the shaft. The blade foot and the bottom plate groove are not shown in the accompanying drawings. They can be constructed according to the existing conventional design. For the convenience of hooking, a lifting ear 28 is embedded at the top of the first section of the shaft. In order to avoid the lifting ear affecting the sinking of the upper shaft, it is preferred to set the lifting ear to a sinking type so that the top of the lifting ear does not exceed the top surface of the first section of the shaft. If it is necessary to make the top surface of the lifting ear face upwards beyond the top surface of the first section of the shaft, before sinking the second section of the shaft, the lifting ear on the first section of the shaft needs to be cut off, or a receiving cavity for accommodating the lifting ear is provided at the bottom of the second section of the shaft. This method was used in the subsequent pouring construction of other shafts and will not be elaborated on here.
[0059] A hook is installed on the lifting rope 162 of the electric hoist in this embodiment, so a lifting ear is set at the top of the wellbore. It can be understood that in other embodiments, other forms of hanging components can be set as needed. For example, an internal threaded pipe can be embedded in the top of the wellbore, and the hook can be replaced with a bolt. When sinking the wellbore, the bolt is screwed onto the internal threaded pipe.
[0060] In order to reduce the friction between the shaft and the steel pipe pile, in this embodiment, a plastic film is wrapped on the outer wall of the steel pipe pile, and the plastic film is used as an isolation film. It can be understood that in another embodiment, geotextile can also be used to replace the plastic film, or isolation paint can be applied on the outer wall of the steel pipe pile, and the paint film formed by the isolation paint forms an isolation film. When pouring each section of the shaft, it is necessary to re-set the isolation film on the outer wall of the steel pipe pile to avoid damage to the isolation film due to friction.
[0061] (6) Please refer to Figure 1 (e) After the concrete of the first section of the shaft 21 reaches the designed strength, the hook of the shaft control device is hung on the lifting lug of the first section of the shaft, and the first section of the shaft is sunk into the guide groove using the steel pipe pile as a guide rod. The sinking speed of the first section of the shaft is adjusted using the shaft control device.
[0062] During the sinking process of the first section of the wellbore, the sinking is mainly completed by the deadweight of the first section of the wellbore. When sinking only by its deadweight, if it cannot sink or the sinking speed is too slow, the jack as a downward pressure mechanism will be arranged between the first section of the wellbore and the connecting beam, and the jack will be used to provide auxiliary sinking force.
[0063] (7) Please also refer to Figure 1 (f) and see Figure 1 (g) Repeat steps (5) and (6) until all the shafts are sunk and adjacent shafts are connected up and down to form a shaft caisson wall 20. Figure 1 In (f), the second section of the shaft 22 has sunk into the ground and the third section of the shaft 23 has been cast.
[0064] During the sinking process of each wellbore, the mud in the guide groove is pumped out by a mud pump.
[0065] (8) Please also refer to Figure 1 (h) and Figure 1 (i) Earth is excavated in the caisson wall to form a well hole 40 of the caisson. In this embodiment, when the earth is excavated, a surrounding purlin 41 is simultaneously erected on the inner surface of the caisson wall.
[0066] (9) Please refer to Figure 1 (j) Lay a cushion layer in the wellbore and construct the bottom plate 61, middle plate and top plate of the underground structure 60.
[0067] (10) Please continue to participate Figure 1 (j) After the underground structure 60 is constructed to zero, the steel pipe piles 14 are removed and recycled, and the holes left by the removal of the steel pipe piles are filled with concrete.
[0068] In this embodiment, when one section of the wellbore is completely inserted into the guide groove, the next section of the wellbore is cast, and when the next section of the wellbore sinks, it pushes the wellbore in the guide groove to continue to sink until all the wellbores have completed the sinking and reached the set position. It can be understood that in another embodiment, each section of the wellbore can also sink to its set position at once when it sinks.
[0069] In this embodiment, a pipe insertion hole 29 is reserved on each wellbore along the axial direction of the wellbore, and the pipe insertion holes on adjacent wellbores are connected along the axial direction of the wellbore. When the wellbore is difficult to sink, the water jet pipe is inserted into the pipe insertion hole, and water is sprayed through the water jet pipe to the bottom of the first section of the wellbore to punch and cut the mud below the first section of the wellbore. The downward pressure mechanism and the water jet pipe can be used simultaneously or separately, and can be selected according to the specific conditions of the construction. The water jet pipe is specifically made of steel pipe.
[0070] Since the caisson in this embodiment is circular, the steel pipe piles are evenly spaced along the circumference of the caisson, and the steel pipe piles are located in the middle of the shaft in the wall thickness direction. It can be understood that in another embodiment, the caisson can also be rectangular, for details, please refer to Figure 7 Of course, the caisson can also be other regular or irregular shapes.
[0071] In this embodiment, the wellbore control device has a lifting mechanism and a pressing mechanism, wherein the lifting mechanism is used to bear the weight of the wellbore, and the pressing mechanism is used to push the wellbore downward. Figure 4 In another embodiment, the lifting mechanism and the pressing mechanism can be combined into one mechanism, and the piston cylinder 17 is directly used. When the piston cylinder 17 is used as the wellbore control device, the cylinder barrel 171 of the piston cylinder is fixed to the top of the connecting beam 15, and a corresponding piston hole 152 is provided on the connecting beam, so that the piston rod 172 of the piston cylinder can extend downward through the piston hole and be detachably connected to the wellbore after freely passing through the piston hole. The piston cylinder is preferably an electric piston cylinder or a hydraulic piston cylinder for unified control.
[0072] In this embodiment, the circular caisson includes six shaft sections. It can be understood that in another embodiment, when the circular caisson includes only one shaft section, that is, when the circular caisson includes only the first shaft section, after completing step (6), the first shaft section is formed into the caisson shaft wall, and then the construction of step (8) is started.
Claims
1. A method for constructing a caisson, It is characterized in that The caisson comprises N shaft sections connected together in the height direction, where N is an integer ≥ 1, and the construction method comprises the following steps: (1) Construction of guide wall; (2) constructing a guide groove and forming a cement soil continuous wall on the lower side of the guide groove, wherein the top surface of the cement soil continuous wall is lower than the set elevation of the bottom surface of the foundation pit; the soil in the guide groove becomes mud; (3) inserting a steel pipe pile into the guide groove, and inserting the lower end of the steel pipe pile into the cement soil continuous wall; (4) constructing a connecting beam on the steel pipe pile, the space between the connecting beam and the ground forms a shaft construction space, and a shaft control device is installed on the connecting beam; (5) Casting the first section of the wellbore in the wellbore construction space, with the wall of the first section of the wellbore wrapped around the steel pipe pile; (6) After the concrete of the first section of the shaft reaches the designed strength, the first section of the shaft is sunk into the guide groove using the steel pipe pile as a guide rod, and the sinking speed of the first section of the shaft is adjusted using the shaft control device; during the sinking process of the first section of the shaft, the mud in the guide groove is pumped out; (7) When N=1, the first section of the shaft is completed and forms the caisson wall; When N≥2, repeat steps (5) and (6) until all shafts are sunk and adjacent shafts are connected up and down to form a shaft sinking wall. (8) Excavating earth in the wall of the caisson to form a well hole for the caisson; (9) Construction of underground structures in well boreholes; (10) After the underground structure is constructed to zero, the steel pipe piles are removed and the holes left by the removal of the steel pipe piles are filled.
2. The construction method according to claim 1, It is characterized in that When constructing the guide trough, slurry is sprayed into the underground soil at the same time to stir the underground soil into mud.
3. The construction method according to claim 2, It is characterized in that The slurry is prepared by stirring the following components in percentage by mass: 70-90% of clean water, 5-29% of bentonite, and 1-5% of a binder.
4. The construction method according to claim 1, It is characterized in that The bottom of the steel pipe pile is closed.
5. The construction method according to claim 1, It is characterized in that A pipe insertion hole is reserved axially on each wellbore, and the pipe insertion holes on adjacent wellbores are connected axially. When the wellbore is difficult to sink, a water jet tube is inserted into the pipe insertion hole, and water is sprayed through the water jet tube to the bottom of the first section of the wellbore to cut the mud below the first section of the wellbore.
6. The construction method according to claim 1, It is characterized in that An isolation membrane is arranged on the outer wall of the steel pipe pile.
7. The construction method according to claim 1, It is characterized in that The wellbore control device comprises a lifting mechanism and a pressing mechanism, wherein the lifting mechanism is used to bear the weight of the wellbore, and the pressing mechanism is used to push the wellbore downward.
8. The construction method according to claim 7, It is characterized in that The hoisting mechanism is fixedly installed on the ground or on a connecting beam, and the pressing mechanism adopts a jack, which is arranged between the connecting beam and the wellbore to be sunk.
9. The construction method according to claim 1, It is characterized in that The wellbore control device comprises a piston cylinder, a cylinder barrel of the piston cylinder is fixed on a connecting beam, and a piston rod of the piston cylinder extends downward and is detachably connected to the wellbore.
10. A caisson, It is characterized in that The structure is constructed by the construction method described in any one of claims 1 to 9.