Method for operating wind turbine and system for wind power generation
By using actuators in wind turbines for small-range pitch angle offset changes and statistical analysis, the pitch angle of wind turbines is optimized, which solves the problems of optimization difficulties and high cost in the prior art, and improves power generation efficiency and components life.
Patent Information
- Application Number
- CN202380032464.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-04-07
- Filing Date
- 2023-04-03
- Publication Date
- 2024-11-19
AI Technical Summary
The prior art is difficult to effectively optimize the pitch angle of wind turbines, resulting in unstable power output and high cost, and cannot adapt to changes in attributes of blades due to wear and other changes during use.
In the operating mode of the wind turbine, the actuator is used to perform a small-scale repeated offset change of the pitch angle, and the optimal pitch angle is determined in combination with statistical analysis, the generator output power is optimized, and the component load status and service life are improved.
It realizes optimization of pitch angle during normal operation of the wind turbine, improves power generation efficiency and component life, reduces the reduction of power output, and reduces the cost and efficiency losses of the optimization process.
Smart Images

Figure CN118984910A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for operating a wind turbine comprising a rotor with a plurality of rotor blades, at least one actuator for adjusting the pitch angle of the rotor blades and a generator driven by the rotor. Background Art
[0002] In wind turbines, power below rated power can be optimized by using an optimal pitch angle. The optimal pitch angle for given operating conditions can be obtained by theoretical aerodynamic models. Simplifications in these models and / or tolerances during commissioning, production and installation of the blades may result in differences from the theoretical behavior or pitch angle deviations and, therefore, may lead to non-optimal operating conditions.
[0003] It is known to use optical measurements to determine the actual specifications of the produced blades, and to use these specifications to minimize the pitch error differences between different blades.
[0004] The methods discussed for minimising errors in the pitch angle can be laborious and expensive, and generally have the disadvantage that they cannot be used to compensate for changes in blade properties in use, such as changes due to wear.
[0005] It is also known to measure the power output of a wind turbine after changing the pitch angle to determine whether the new pitch angle is beneficial. To allow robust detection of potential improvements, relatively large pitch angle changes are required. Therefore, during these measurements, power generation efficiency may be significantly reduced.
[0006] EP 2 175 129 A1 describes a method for determining the quality of an initial value of a blade pitch angle.
[0007] Therefore, the problem to be solved is to provide an improved method for optimizing the pitch angle, which method is preferably easy to implement and cost-effective. Summary of the invention
[0008] According to one aspect, the problem is solved by a method for operating a wind turbine comprising a rotor with a plurality of rotor blades, at least one actuator for adjusting a pitch angle of at least one rotor blade and a generator to be driven by the rotor.
[0009] wherein in at least one operating mode of the wind turbine, the actuator is configured to vary the pitch angle to improve a load condition of at least one component of the wind turbine, in particular a load condition of a bearing, by adding a time-varying pitch offset to a given pitch angle, wherein the pitch offset is varied within a given offset interval of up to 2° by performing repeated offset variations, the offset variation comprising the following steps:
[0010] increasing the pitch offset to a first pitch offset limit within the offset interval, and
[0011] Subsequently, the pitch offset is reduced to a second pitch angle limit within the offset interval,
[0012] wherein the corresponding pitch deviation limit is constant or varies between at least some repeated variations of said deviation,
[0013] wherein the given pitch angle depends on calibration information, wherein a measure of the change in output power of the generator due to a change in the pitch angle is determined based on a statistical analysis of measurements of the output power of the generator taken during at least 10 repetitions of the offset change, and
[0014] Therein, the calibration information is determined or updated based on the measurement.
[0015] It has been found that small pitch angle changes, for example alternating in steps of 1.0 or 0.5 degrees per minute in both directions, are possible without significantly reducing the operating efficiency. Such small pitch angle changes are used in the method of the invention to improve the load conditions of at least one component. For example, using small changes in the load conditions of the bearings or gear sets of the pitch transmission can significantly increase the service life of such components.
[0016] According to an alternative and / or additional aspect, the problem is solved by a method according to claim 1 and / or according to an independent system claim having a system comprising a control unit adapted / configured for implementing an embodiment of one of the methods. The system is adapted for generating electrical energy from wind energy and comprises at least one wind turbine, the respective wind turbine comprising a rotor with a plurality of rotor blades, at least one actuator for adjusting the pitch angle of the rotor blades and a generator driven by the rotor, wherein the system further comprises at least one control unit, wherein the control unit is configured to implement the method of the invention for adjusting the pitch angle of the at least one wind turbine or at least one respective wind turbine.
[0017] Contrary to the prejudice of the skilled person, it has been found that when power measurements during multiple repeated offset changes are aggregated and statistically evaluated, even these small pitch angle changes can be used to determine an optimum pitch angle or at least improve the pitch angle. The sign of the change in output power can then indicate in which direction the pitch angle needs to be changed to reach the optimum pitch angle, and the magnitude of the change can indicate the amount of change required to reach the optimum pitch angle.
[0018] Thus, for the first time, it is prevented that a considerable pitch angle change is required to determine the optimum pitch angle. In detail, it is prevented that a change in the output power due to the angle change needs to exceed other influencing factors, such as due to changes in wind speed and wind direction, thereby causing changes in the measurement results regarding the output power. Thus, since only small pitch angle changes are used, a reduction in power output during this optimization in the case of considerable pitch angle changes is mitigated / prevented.
[0019] Thus, the method of the invention can be operated continuously in the background during normal operation of the wind turbine, in particular since small pitch angle movements should be used anyway to improve the load conditions of the components. As described below, the acquisition of measurement data is preferably interrupted only during non-normal operation to determine or update calibration information. Thus, the method of the invention allows pitch angle optimization without any significant efficiency loss.
[0020] It may be advantageous to limit the pitch angle change and / or the determination of calibration information to operating modes of the wind turbine, wherein the wind turbine is operated below a maximum rated power.
[0021] The previous discussion assumes that the pitch angle should be optimized to maximize output power. In some cases, it may be advantageous to optimize for a slightly lower power output. This can also be achieved by the discussed method, for example, for a given pitch angle, the goal is not a change in output power of approximately zero, but a slightly higher or lower value.
[0022] The statistical analysis may include determining one or more statistical measures, such as corresponding medians or means for corresponding measurement subgroups. For example, each subgroup may include corresponding measurements measured at or near corresponding pitch angle limits. The determination of the median or mean may be used to eliminate or reduce the effects of other factors, such as changes in wind speed and / or wind direction, to a certain extent. Large changes in operating conditions, such as significant changes in wind speed, may be taken into account by distinguishing between multiple operating conditions and determining separate calibration information for each operating condition. The details of this method will be discussed later.
[0023] Alternatively or additionally, statistical measures like for example the variance may be a measure of the variation of the output power due to a pitch angle variation, in particular when determined for all measurements, or when they are calculated for a subgroup of measurements, may be a measure for the consistency of the measurements within a subgroup and thus for example the measurement quality.
[0024] Preferably, only a given pitch angle is changed based on calibration information and optionally operating parameters of the wind turbine, as described below. The offset variation, in particular the first and / or second pitch offset limits, may be independent of the calibration information and optionally independent of operating parameters and be described, for example, by a fixed or random pattern. The offset variation may describe a variation of a given pitch angle in two directions, i.e. a symmetrical variation or an asymmetrical variation, or one of the offset limits may be equal to zero, resulting in a variation of the pitch angle in only one direction.
[0025] The offset change and in particular the pitch offset limit may in particular be independent of measurements on the output power taken during the same and / or previously repeated offset change. Preferably, the same pitch offset limit may be used for all repetitions or at least a plurality of consecutive repetitions, for example at least 3 or 5 or 10 consecutive repetitions of the offset change. Preferably, the pitch offset is kept at the respective pitch offset limit for at least 10% or 20% of the time spent by the respective repeated offset change. Preferably, the pitch offset is changed continuously when not at one of the pitch offset limits. The offset change is preferably repeated without delays between repetitions.
[0026] The operating mode for determining the change in output power due to a change in the pitch angle is preferably normal power production, and this determination and the determination or updating of the calibration information can be performed essentially continuously during normal operation, except for special operating states, which occur, for example, during startup, at sudden standstill and / or in the presence of errors.
[0027] The control unit may be integrated in the respective wind turbine or it may be an external device which controls, for example, several wind turbines.
[0028] By repeatedly determining or updating the calibration information, an iterative optimization of the calibration information and thus of a given pitch angle can be performed. If, for example, there is initially a relatively large deviation of the used pitch angle from the optimal pitch angle, the applied correction may be relatively large and thus the optimal pitch angle may be exceeded or undershot. However, the error will generally decrease and thus a smaller correction may be used in the next correction step.
[0029] The updating of the calibration information may in particular comprise adding or subtracting an offset determined based on a measure of the change in power output to the previous calibration information. The discussed method may be combined with known methods for determining a desired pitch angle simply by adding the offset given by the calibration information to this other pitch angle.
[0030] When the method is used for example for a plurality of wind turbines in a wind farm, the plurality of wind turbines may use the same basic calibration, for example when the rotor blades are expected to be identical or at least very similar. If a clear trend to change the calibration is detected in a subgroup of wind turbines, for example when a subgroup shows a need for a strong negative angle offset, the common calibration for the other wind turbines may also be adjusted.
[0031] The offset interval may be limited to a width of up to 1° or up to 0.5°. This may further increase the efficiency of the wind turbine and may be sufficient to determine calibration information and improve the loading conditions of components.
[0032] Additionally or alternatively, the statistical analysis may be applied to measurements of the output power of the generator taken during at least 20 or at least 50 repeated offset changes, and / or to at least 20 or at least 100 or at least 500 measurements. By increasing the number of measurements and / or repetitions considered, the same accuracy of determining the calibration information may be achieved using smaller pitch angle changes. Alternatively, for a given size of pitch angle change, the accuracy of determining the calibration information may be further improved.
[0033] The given pitch angle may further depend on at least one operating parameter of the wind turbine. For example, the calibration information may describe the dependency of the offset and initial pitch angle or the given pitch angle on the operating parameter, for example by providing corresponding values of the offset or the given pitch angle for a plurality of intervals of values of the operating parameter.
[0034] The operating parameter or at least one of the operating parameters may be an average value of the output power of the generator and / or the wind speed and / or the tip speed ratio and / or the torque of the rotor shaft of the wind turbine.
[0035] As previously described, the pitch offset may vary in each repetition of the offset variation according to a fixed variation pattern. Alternatively, different patterns may be used for different repetitions, such as corresponding random or pseudo-random patterns. When different patterns are used for different repetitions, these patterns may, for example, vary in the pitch offset limits used and / or the timing of the variation, such as varying the steepness or shape of the slope between the pitch offset limits.
[0036] The determination of the measure of the change in the output power and the determination or updating of the calibration information may be performed repeatedly, in particular continuously or at fixed intervals, while a calibration condition depending on the operating parameter or one operating parameter or at least one further operating parameter of the wind turbine is met. Additionally or alternatively, while determining the measure of the change in the output power of the generator, at least a portion of the output power of the generator may be fed to the grid and / or the energy storage device. As mentioned before, the proposed calibration method can be used during normal operation and power generation of the wind turbine and in particular can be used with a wide range of operating parameters. However, it may still be advantageous not to update the calibration under certain, in particular abnormal operating conditions.
[0037] The further operating parameter or a respective further operating parameter may be: a current pitch angle; and / or a given pitch angle; and / or a determined measure of a change in the output power of the generator; and / or the time elapsed since entering the operating mode or an operating mode of the wind turbine in which at least part of the output power of the generator is fed to the grid and / or to the energy storage device; and / or activation of another actuator of the wind turbine for adjusting the yaw angle of the wind turbine and / or the time since its last activation; and / or sensor data and / or predicted data about the temperature and / or humidity in the environment of the wind turbine.
[0038] As previously mentioned, these further operating parameters may be used in particular to not update the calibration or not measure the data on which the calibration is based or to discard the data when the parameters indicate that there may be data corruption or uncertainty in the measurement data or more generally an operation outside normal operating conditions. As described below, the determination of the calibration information may be based in particular on a plurality of power measurements and, for example, these power measurements may be suspended or the measurement data may be discarded when the calibration conditions are not met.
[0039] For example, it is possible that the calibration condition may only be met if the current pitch angle and / or the given pitch angle is within the optimum pitch angle range, eg is not too far from the expected optimum pitch angle.
[0040] A strong variation in output power, such as a large difference between the minimum and maximum measured power, may indicate a strong change in wind strength and thus reduce the robustness of the discussed calibration procedure. Thus, preferably, the calibration condition is not met when the variation exceeds a threshold value.
[0041] The proposed calibration is more robust when the wind turbine is operating under stable operating conditions. Therefore, it may be advantageous that the calibration condition can only be met when a certain minimum time has elapsed since entering an operating mode in which the wind turbine generates electricity for the grid and / or the energy storage device. For example, a delay of 20 minutes after the start of such electricity generation may be used before the calibration condition can be met.
[0042] It may also be advantageous to avoid calibration during or close to a yaw movement.Thus, for example, the calibration conditions may not be met during activation of the further actuator or for example up to two minutes after the last activation.
[0043] Calibration conditions may also not be met when sensor data and / or prediction data indicate a risk of icing or other conditions that may prevent error-free calibration.
[0044] Since calibration is preferably performed under normal operating conditions, calibration conditions may not be met, for example when any alarm or warning in the wind turbine is detected, when power output is curtailed, when the wind turbine is used in a safe mode, or when some other restrictions exist.
[0045] During each repeated offset change, the pitch offset is maintained at a first pitch offset limit or within a given angular interval from the first pitch offset limit for a corresponding first time interval, and is maintained at a second pitch offset limit or within a given angular interval from the second pitch offset limit for a corresponding second time interval, wherein a first measurement of the output power of the generator is performed during at least a portion of the corresponding first time interval, a second measurement of the output power of the generator is performed during at least a portion of the corresponding second time interval, and a measure of the change in the output power of the generator is determined based on the first measurement and the second measurement, in particular based on an average value or median of the first measurement and an average value or median of the second measurement obtained within a given measurement interval including multiple repeated offset changes.
[0046] The measure of the change in output power may be, for example, the difference between the mean or median of the first measurement and the mean or median of the second measurement, or may be determined based on the difference. The measurement result regarding power may be a measurement of power, or a measurement of a variable on which power depends, such as a current and / or voltage measurement result.
[0047] A substantially rectangular pattern of pitch angles is produced when the first and second time intervals alternate directly without an extended intermediate time interval and the pitch excursions are substantially maintained at the respective pitch excursion limits during the respective time intervals. As discussed at the outset, this is a good way to vary the pitch angles to increase component life.
[0048] As described, the statistical analysis may determine the statistical properties of a subset of the measurements, and therefore, determine, for example, the respective mean and / or median of the first and / or second measured values. Even when the pitch offset limit varies between repetitions, for example, when the variation of the respective pitch angle limit is significantly less than the difference between the pitch angle limits, it may be sufficient to use the mean or median value. For larger variations of the pitch angle limits, it may be advantageous to use a more detailed statistical analysis. For example, a regression may be performed based on the paired measurements and the used pitch offset limits to determine the slope of the relationship, and use the slope as a measure of the variation in output power due to the variation in pitch angle.
[0049] The measurement interval may comprise at least 10 or at least 20 or at least 50 repeated offset changes. This improves the robustness of the determined calibration information and allows the use of smaller offset intervals.
[0050] Since the wind flow may be disturbed by the pitch angle change, and stable operating conditions are desired for calibration, and therefore for the first and second measurements, it may be advantageous not to perform any measurements or to discard the performed measurements during the initial delay time during each first and second interval. For example, the document IEC 61400-12-1:2017 shows the effect of a pitch angle change of about three rotor diameters upstream of a wind turbine on the air flow. If, for example, a rotor diameter of 100 meters is used, and a wind speed of 10 meters per second is assumed, this will result in a delay of 30 seconds. Therefore, when the pitch angle changes approximately every minute, about half of the first and second measurement intervals can be used for calibration purposes, even if this part of the corresponding measurement interval may also be disturbed, for example when the rotor speed is not yet stationary. However, it may also be advantageous to use the alternation between the first pitch offset limit and the second pitch offset limit over a longer time range to allow a longer stabilization time, so that, for example, the first and second time intervals may each be three minutes or five minutes or ten minutes long. In order to increase the bearing life, in this case, it may still be advantageous to perform a slight change of the pitch angle within the corresponding time interval. Therefore, in this case, it may be advantageous to keep the pitch angle within a given angular interval from the respective pitch angle limit during the respective time interval. The angular interval may be significantly smaller than the angular distance between the first and second pitch excursion limits, for example less than 30% or less than 20% or less than 10% of the angular distance.
[0051] It is also possible to use a different variation pattern for the pitch angle change, for example a sinusoidal variation pattern. In this case, it may be advantageous to perform the first and second measurements only during relatively short sections of the respective time interval, in particular during movement sections close to the pitch excursion limit. This results in a significant difference in the measured power. In addition, the gradient of the pitch angle change in these regions is low and the airflow is therefore hardly disturbed.
[0052] In an alternative method of timing the measurements, it may also be advantageous to ensure that at least some of the first and second measurements are performed in short time intervals. In this case, the measurements are more robust with respect to changes in operating conditions, for example with respect to changes in wind speed. For example, at least one first measurement may be performed close to the end of the respective first time interval and at least one second measurement may be performed close to the beginning of the flowing second time interval, and / or vice versa. In particular, a plurality of first and second measurements may be performed, respectively, to average the measured power during at least one complete rotation of the generator or rotor. When using this method, it may be advantageous to directly calculate the difference between the powers determined from the first and second measurements performed in short time intervals. This difference may then be averaged over a longer period, for example over ten or twenty minutes.
[0053] The change in the output power of the generator can be determined based on first measurements performed in a plurality of first time intervals separated by at least a single second time interval and / or based on second measurements performed in a plurality of second time intervals separated by at least a single first time interval. In particular, averaging can be performed over a relatively long operating period of, for example, several days or weeks, in order to achieve a high degree of accuracy. However, it is also possible to take into account only a few repeated offset changes, for example only ten or twenty repeated offset changes. In this case, it may be advantageous to perform only minor changes to the calibration information during each iteration of updating the calibration information. Therefore, the pitch law for determining a given pitch angle is optimized in an iterative manner. In order to prevent runaway, limits for the calibration information or for the given pitch angle resulting therefrom may be set.
[0054] The measurement interval may end once an end condition is met, wherein the meeting of the end condition depends firstly on the number of acquired first and / or second measurements or on the number of these first and / or second measurements satisfying a selection criterion depending on the operating parameter, and / or secondly on a measure of the variance of the first and / or second measurements acquired during the measurement interval and / or satisfying the selection criterion. The given criteria for the end condition may be used in particular to ensure that a large number of measurements and a low variance are measured to ensure a robust calibration.
[0055] In particular, the end condition may be met when the number exceeds or reaches a threshold value, while the measure of variance is less than or equal to a threshold value. The end condition may also be met when both the number and the measure of variance exceed a respective other threshold value, since this indicates bad measurement conditions, such as strong changes in wind speed and / or measurement errors, and should therefore lead to discarding the measurement data and starting a new acquisition, in particular after a certain waiting time.
[0056] As will be discussed below, different calibration information may be used depending on operating parameters of the wind turbine or in general depending on operating conditions. For example, it may be necessary to use different correction offsets at high and low wind speeds or when the generator power production is high or low. It has been found to be advantageous to distinguish between different wind speeds and thus, for example, different power levels. Thus, for example, different power levels, each of which covers, for example, 10% of the rated power, may be distinguished as different operating conditions. Thus, the selection criterion may select only calibration-relevant measurements for specific operating conditions, and when these selected measurements meet an end condition, the measurement interval for this calibration may end and the calibration may be updated.
[0057] The measurement intervals of the calibration for different operating conditions may overlap. For example, it is possible that a first set of measurements is acquired under a first operating condition, then the operating condition is changed to a second operating condition, further measurements are acquired under the second operating condition, at a later time the operating condition is returned to the first operating condition and additional measurements of the first operating condition are acquired, and this results in the measurement interval for the calibration for the first operating condition ending, while the measurement interval for the second operating condition may still continue.
[0058] The measure of the variance may be the mathematical variance, but may also be, for example, the square root of the mathematical variance and thus the standard deviation.
[0059] The first time interval and / or the second time interval may extend over multiple revolutions of the rotor of the wind turbine.
[0060] Preferably, the respective first and / or second time interval extends over an integer number of complete rotations of the rotor of the wind turbine.This allows averaging out the effects of the angular position of the rotor of the generator and of eg asymmetries of the rotor of the wind turbine.
[0061] A measure of a change in the output power of the generator may be determined for a plurality of operating conditions, wherein the current operating condition is determined based on the operating parameter or an operating parameter and / or at least one further operating parameter of the wind turbine, wherein separate calibration information is determined for each operating condition, wherein a given pitch angle depends on the calibration information for the current operating condition. In particular, it is possible that the respective calibration information describes an offset to be applied to the initial pitch angle under the given operating condition. For example, a lookup table may be used, which provides calibration information, such as an offset relative to the initial pitch angle, based on the operating condition. The lookup table may be updated when the calibration information is updated, such as when a measurement interval for the respective operating condition or for all operating conditions ends.
[0062] The respective calibration information for the respective operating condition may be determined based on measurements of the output power of the generator taken during the respective operating condition.
[0063] For at least a subset of operating conditions, a corresponding parameter interval of the operating parameter or the corresponding operating parameter and / or the further operating parameter or the corresponding further operating parameter may be defined, wherein these operating conditions can only be selected if the operating parameter or each operating parameter and / or the further operating parameter or each further operating parameter is within the corresponding parameter interval of the operating parameter and / or the further operating parameter of the operating condition. For example, a fixed number of bins may be defined, such as five or eight bins, during which all measurements during which an operating parameter is within a specific interval assigned to a bin are sorted into these bins to determine a calibration for this bin and thus for the operating mode defined by this bin.
[0064] After determining that a different operating condition exists, a measurement of the output power of the generator for the respective first operating condition may be retained, wherein at a later point in time, after returning to the first operating condition, an additional measurement of the output power of the generator is recorded and used in conjunction with the retained measurement to determine a measure of the change in the output power of the generator for the first operating condition. This allows for the acquisition of data over a long period of time and therefore allows for a robust calibration, even when different calibrations are determined for a plurality of operating modes.
[0065] The operating parameter or at least one of the operating parameters may be an average output power of the generator and / or a wind speed and / or a blade tip speed ratio and / or a torque and / or a rotational speed of the rotor of the wind turbine. The average output power used as operating parameter may in particular be an output power averaged over a plurality of first and second time intervals. The described operating parameters are particularly useful because they are associated with the loads on the wind turbine blades and thus with potential changes in the optimal pitch angle on the one hand and with potential changes in the necessary offset provided by the calibration on the other hand.
[0066] The actuator may be used to continuously repeat the change of the pitch angle due to repeated offset changes in at least one operating mode of the wind turbine and / or for at least 1 hour or 6 hours and / or for at least 100 or 1000 revolutions of the rotor of the wind turbine. As mentioned before, in addition to the determination or updating of the calibration information, the change of the pitch angle serves additional purposes, such as extending the service life of the pitch bearing, and should therefore be performed as continuously as possible, such as always during normal operation.
[0067] The features discussed with respect to the method of the invention can be transferred to the system of the invention together with the advantages discussed, and vice versa. The control unit can be a common control unit for all wind turbines, or multiple control units for multiple subgroups of wind turbines can be used. It is also possible that a separate control unit is used for each wind turbine, or that the system comprises only a single wind turbine. The control unit can be integrated in the wind turbine or in one of the wind turbines, or it can be arranged outside the wind turbine, for example in a control center of the wind park.
[0068] Additionally and / or alternatively, another aspect and / or an embodiment in particular being one of the aforementioned aspects and / or embodiments is disclosed, namely a method for operating a wind turbine, in particular an offshore wind turbine, further in particular a floating offshore wind turbine, and / or a method for feeding electrical energy and / or chemical energy to an electrical grid and / or a chemical network, the method comprising the following steps:
[0069] performing the steps of an embodiment or combination of embodiments of the method as disclosed above, and / or operating an embodiment of the apparatus as disclosed above,
[0070] generating electrical power and / or electrical energy by means of a wind turbine and in particular generating chemical energy in the form of a gas or liquid, in particular in the form of hydrogen, at least partially from the electrical energy, further in particular by converting the electrical energy into hydrogen by means of electrolysis,
[0071] at least partially transmitting electrical power, electrical energy and / or chemical energy to an energy receiving arrangement, in particular wherein the receiving arrangement is not located in international waters, on shore and / or within a 12 mile zone of a respective sovereign state over which the respective state has jurisdiction, and
[0072] The electrical power, electrical energy and / or chemical energy is at least partially supplied to an electrical and / or chemical utility network, in particular to an onshore electrical and / or chemical utility network and / or to a chemical / electrical storage device.
[0073] The term "chemical energy" includes ways of storing energy in chemical substances, such as hydrogen. For example, the chemical energy network can be a gas (hydrogen) network and / or a storage device.
[0074] It is to be understood that the features mentioned above, such as increasing the pitch offset to a first pitch offset limit within the offset interval and subsequently reducing the pitch offset to a second pitch angle limit within the offset interval, and those features not yet explained below or not yet disclosed above, can be used not only in the respective combinations shown, but also in other combinations, such as in combination with a specific configuration of a controller including a system for generating electricity, without departing from the scope of the invention. In particular, features of different aspects, embodiments and / or methods of the invention can be combined with each other unless otherwise stated. BRIEF DESCRIPTION OF THE DRAWINGS
[0075] The foregoing and other features and advantages of the present invention will become further apparent from the following detailed description read in conjunction with the accompanying drawings, in which like reference numerals represent like elements.
[0076] Figure 1 An exemplary embodiment of a system for wind power generation according to the present invention is shown.
[0077] Figure 2 A flow chart showing an exemplary embodiment of a method according to the invention, and
[0078] Figure 3 An example of a variation of the pitch angle over time and the resulting power produced by a generator of a wind turbine is shown. DETAILED DESCRIPTION
[0079] Figure 1 A system for wind power generation is shown, which in this example comprises a single wind turbine 1. Alternative embodiments may also comprise a greater number of wind turbines. The wind turbine 1 comprises a rotor 2 with a plurality of rotor blades 3, an actuator 4 for adjusting the pitch angle 5 of the rotor blades 3, and a generator 6 driven by the rotor 2. In addition, it comprises a further actuator 14 for adjusting the yaw angle 26. In at least one operating mode, the wind turbine 1 outputs power to a grid 24. Alternatively, it may output power, for example, to an energy storage device, for example to a battery or to an energy storage device that uses electrolysis to produce hydrogen for energy storage.
[0080] In this example, the control unit 13 is integrated in the wind turbine 1, but it can also be an external device which can control, for example, a plurality of wind turbines, according to which reference will now be made additionally. Figure 2 A method is discussed for controlling the operation of a wind turbine 1 .
[0081] In step S1, at least one operating parameter 9 of the wind turbine 1 is acquired by the control unit 13. The following example will assume that the average power output of the generator 6 is used as operating parameter 9. However, for example, a wind speed, which can be determined by a sensor 17 and / or a blade tip speed ratio, which can be determined based on the wind speed, and revolutions per minute, which can be measured in the generator 6, can also be used additionally or alternatively as operating parameters.
[0082] Based on the operating parameter 9, a current operating condition 18 is selected in step S2 from a plurality of possible operating conditions. In this example, a corresponding parameter interval of the operating parameter 9 is assigned to each operating condition 18, and the operating condition matching the current parameter value is selected. For example, different operating conditions may define five different power levels or power intervals for the wind turbine 1, and the power level containing the measured average power is selected.
[0083] like Figure 3 As shown in , the pitch angles 5, 22 of the rotor blades 3 typically vary around a given pitch angle 33, limiting the variation using an upper pitch excursion limit 7 and a lower pitch excursion limit 8. In step S3, the given pitch angle 33 is selected based on current operating conditions 18.
[0084] In principle, it would be possible to assign a fixed respective given pitch angle 33 to each operating condition 18. As already discussed in the introductory part of the description, tolerances during the production of the wind turbine blades 3 and / or the use of incomplete models may lead to undesired pitch angle deviations, which would reduce the efficiency of the wind turbine 1 when a fixed assignment would be used.
[0085] therefore, Figure 2 The method shown in additionally uses calibration information 10 to determine the given pitch angle 33. In particular, separate calibration information 10 may be used for each operating condition 18. The calibration information 10 may directly describe the given pitch angle 33. However, preferably, the calibration information 10 only describes a deviation from an initial base value.
[0086] In step S4, the actuator 4 is controlled to set or maintain the current pitch angle 5, 22 to the sum of the given pitch angle 33 and the currently selected one of the pitch excursion limits 7, 8. Figure 3As shown in the lower half of FIG. 1 , an approximately rectangular pattern of pitch angle control is used, in which the pitch offset is alternately increased to a first pitch offset limit 7 and subsequently decreased to a second pitch offset limit 8 with continuously repeated pitch offset changes. For a first time interval 11, the pitch angle is maintained at the first pitch offset limit 7. During a subsequent second time interval 12, the pitch angle moves to the second pitch offset limit 8. After the end of the second time interval, another first time interval 11 begins, and so on. Preferably, each of the time intervals 11, 12 extends over several complete rotations of the rotor 2.
[0087] In step S5, it is checked whether the current time interval 11, 12 has expired. For example, a timer can be started at the beginning of the respective time interval 11, 12 and the timer value can be compared with a threshold value. If the time interval 11, 12 has not yet expired, the method is repeated from step S1.
[0088] Otherwise, the control mode is switched in step S6 to use the other of the pitch excursion limits 7, 8. Thus, during the next repetition of steps S1 to S6, the actuator 4 is controlled to move the pitch angle 5, 22 to the other pitch excursion limit 7, 8.
[0089] The remaining steps S7 to S12 relate to the updating of the calibration information 10. The initial steps S7 and S8 ensure that the measurements for updating the calibration are only performed under stable measurement conditions. The following steps are then used to determine the variation of the output power of the generator 6, in this example for various operating conditions 18, and to update the calibration data 10 based on this variation.
[0090] In step S7, several further operating parameters of the wind turbine 1 are determined. In this example, the current pitch angle 22, the elapsed time 23 since entering an operating mode in which at least a portion of the output power of the generator 6 is fed to the grid 24, the time 25 since the last activation of the further actuator 14 to adjust the yaw angle 26 of the wind turbine 1, and sensor and prediction data 27, 28 are determined. The sensor data 27 may, for example, be recorded by internal sensors 15 of the wind turbine 1, and the prediction data may be received via the communication unit 16, for example from a server providing weather data. The sensor data 27 and the prediction data 28 may in particular relate to the temperature and / or humidity in the environment of the wind turbine, and may in particular be relevant for predicting whether ice is present on the wind turbine 1, which corresponds to special operating conditions, during which calibration for normal operation should not be performed.
[0091] In step S8 , calibration conditions 21 are checked which depend on the further operating parameters determined in step S7 and may for example further depend on operating parameters 9 , a given pitch angle 33 determined during a previous iteration of the method, the presence of error patterns or the like.
[0092] The calibration condition 21 is selected in such a way that it is satisfied during normal operation and that it is not satisfied when a disturbance is expected. Details about the calibration condition 21 have been discussed in the general part of the specification and are therefore not repeated. When the calibration condition 21 is not satisfied, for example after a certain delay, the method is repeated from the previous step, for example step S7. When the calibration condition 21 is satisfied, the method instead continues to step S9.
[0093] In step S9 , a first measurement 19 is performed if the wind turbine 1 is currently operating in one of the first time intervals 11 , and a second measurement 20 is performed if the wind turbine 1 is currently operating in one of the second time intervals 12 .
[0094] Figure 3 Schematically, the development of the output power 34 of the generator 6 over time 32 is shown in FIG. It can be appreciated that the output power 34 tends to be lower when the pitch angle 5, 22 is at the pitch excursion limit 8 than when the pitch angle 5, 22 is at the pitch excursion limit 7. This can be used to determine the change in the output power 34 due to the change in the pitch angle 5, 22, as described below.
[0095] As already discussed in the introductory part of the description, it may be advantageous to perform measurements 19 , 20 not during the entire respective time interval 11 , 12 , but only during a sub-interval, for example ignoring the first few tens of seconds of the respective time interval 11 , 12 .
[0096] In step S10, a selection criterion is applied to the measurements 19, 20 recorded in step S9 to assign the measurements 19, 20 to one of several bins, wherein each bin is assigned to one of the possible operating conditions 18. The measurement data are aggregated, for example in respective buffers for the bins, so that after a certain amount of time each bin will contain a plurality of measurements 19, 20, wherein the first and second measurements 19, 20 remain separated within each bin.
[0097] Since the output power 34 depends on other factors besides the pitch angle 5, 22, such as changes in turbulence and wind speed, the individual measurements 19, 20 are rather noisy. It is therefore advantageous to aggregate the measurements 19, 20 over a relatively long period of time, in particular measurements over a plurality of first and second time intervals 11, 12, by acquiring and evaluating measurement data during at least 10 or 20 or 100 or 500 repetitions of the offset variation. As already discussed in the general part of the description, it is even possible to aggregate measurements during multiple changes of the operating conditions 18.
[0098] In step S11, an end condition 29 is checked. In this example, the end condition 29 is checked for each bin and therefore for each operating condition 18 respectively. The end condition 29 can in particular be met when the number of acquired first and second measurements that meet the corresponding selection criterion 31 for the respective bin and therefore at the time of acquisition reaches a certain threshold, while at the same time, a measure of variance, such as the standard deviation, for the first and second measurements is less than a second threshold. This indicates that the measurement data are sufficiently robust to allow updating the calibration information 10 for this operating condition 18, and the method can therefore continue with step S12. When the end condition 29 is not met for the respective bin, the method is repeated from step S7.
[0099] With the discussed method, the calibration information 10 for different operating conditions 18 may be updated at different times. Alternatively, any calibration information 10 will be updated only when the end condition 29 is met for all bins and therefore for all operating conditions 18.
[0100] In step S12, a measure 30 of the variation of the output power 34 of the generator 6 due to the variation of the pitch angle 5, 22 between the two pitch angle limits 7, 8 is determined by performing a statistical analysis of the measurements on the output power 37. In this example, this is achieved by calculating the average of all first measurements in the respective box and then subtracting the average of all second measurements in the respective box to calculate the average difference between the first and second measurements for that box. As discussed in the general part of the description, alternative approaches are also possible.
[0101] Alternatively, the metric 30 may be scaled using a calculated wind power, which may be determined, for example, from the wind speed measured by the sensor 17. However, this is usually not necessary, as different operating conditions 18 may already take different wind speeds into account.
[0102] As discussed in detail in the Overview section, the sign of the metric 30 indicates the direction in which the optimum pitch angle lies relative to the current given pitch angle 33. The magnitude of the metric 30 indicates the magnitude of the deviation from the optimum pitch angle.
[0103] In a simple example, the updating of the calibration information 10 for the respective operating conditions 18 may be a selection between several fixed corrections. If the absolute value of the metric 30 is below a certain threshold, a shift of 0° may be used, and thus the calibration information 10 may remain unchanged. When the absolute value of the metric 30 exceeds a first threshold, a small correction of, for example, 0.25° may be used. When the absolute value of the metric 30 exceeds a second threshold, a larger correction may be applied, for example a correction step of 0.5°.
[0104] Since the method for updating the calibration information 10 is performed continuously during most of the operating time of the wind turbine, it can be used to compensate for considerable deviations from the optimal pitch angle even if it is limited to small adjustments during a single iteration of the method. Thus, for example, it may be sufficient to use a single threshold value for the absolute value of the metric 30. However, using multiple threshold values may be advantageous for achieving faster corrections, in particular when the aggregation of measurements for each correction is quite long, for example several days.
[0105] Although the present invention has been described in detail with reference to preferred embodiments, the present invention is not limited to the disclosed examples, from which a skilled person will be able to derive other variations without departing from the scope of the present invention.
[0106] Although specific embodiments are disclosed herein, various changes and modifications may be made without departing from the scope of the invention. The present embodiments should be considered in all aspects as illustrative and not restrictive, and all changes coming within the meaning and equivalent range of the appended claims are intended to be included therein.
[0107] It is noted that embodiments of the invention have been described with reference to different subject matters. In particular, some embodiments have been described with reference to apparatus type claims, such as a wind turbine comprising a rotor having a plurality of rotor blades, at least one actuator for adjusting the pitch angles of the rotor blades, a generator driven by the rotor, and at least one control unit, while other embodiments have been described with reference to method type claims, such as an offset variation comprising the steps of increasing a pitch offset to a first pitch offset limit within an offset interval, and subsequently decreasing the pitch offset to a second pitch angle limit within the offset interval. However, a person skilled in the art will learn from the above description that, unless otherwise stated, in addition to any combination of features belonging to one type of subject matter, any combination between features relating to different subject matters, in particular any combination between features of apparatus type claims and features of method type claims, such as a combination of a wind turbine and the step of offset variation, is deemed to be disclosed with the present application, the wind turbine comprising a rotor having a plurality of rotor blades, at least one actuator for adjusting the pitch angles of the rotor blades, a generator driven by the rotor, and at least one control unit, the offset variation comprising the steps of increasing the pitch offset to a first pitch offset limit within an offset interval, and subsequently reducing the pitch offset to a second pitch angle limit within the offset interval.
Claims
1. A method for operating a wind turbine (1), comprising: A rotor having a plurality of rotor blades (3), at least one actuator (4) for adjusting the pitch angle (5, 22) of at least one of the rotor blades (3), and a generator (6) driven by the rotor (2), wherein in at least one operating mode of the wind turbine (1), the actuator (4) is used to change at least one of the pitch angles (5, 22) to improve the load condition of at least one component of the wind turbine (1), in particular the load condition of a bearing of a rotor blade (3), by adding a time-varying pitch offset to a given pitch angle (33), wherein the pitch offset is varied within a given offset interval of up to 2° by performing repeated offset variations, the offset variation comprising the following steps: increasing the pitch offset to a first pitch offset limit within the offset interval (7), and Subsequently, the pitch deviation is reduced to a second pitch angle limit (8) within the deviation interval, wherein the corresponding pitch deviation limit is constant or varies between at least some repeated variations of said deviation, wherein the given pitch angle (33) depends on calibration information (10), wherein the measure (30) of the change in output power (34) of the generator (6) due to a change in the pitch angle (5, 22) is determined based on a statistical analysis of measurements (19, 20) of the output power (37) of the generator made during at least 10 repetitions of the offset change, wherein the calibration information (10) is determined or updated based on the metric (30), wherein a corresponding metric (30) of a change in the output power (34) of the generator (6) is determined for a plurality of operating conditions (18), wherein the current operating condition (18) is determined based on an operating parameter (9) of the wind turbine (1) and / or at least one further operating parameter, wherein separate calibration information (10) is determined for each operating condition (18), and Wherein the given pitch angle (33) depends on the calibration information (10) for the current operating conditions (18).
2. The method according to claim 1, wherein: For at least a subset of the operating conditions (18), a corresponding parameter interval of the operating parameter (9) or the corresponding operating parameter (9) and / or the further operating parameter or the corresponding further operating parameter is defined, wherein these operating conditions (18) can only be selected when the operating parameter (9) or each operating parameter (9) and / or the further operating parameter or each further operating parameter is within the corresponding parameter interval of the operating parameter (9) and / or the further operating parameter of the operating conditions (18).
3. The method according to claim 1 or 2, in, After determining that different operating conditions (18) exist, retaining the measured values of the measurement (19, 20) of the output power (34) of the generator (6) for the respective first operating condition (18), wherein, at a later point in time after returning to the first operating condition (18), additional measurements (19, 20) of the output power (34) of the generator (6) are recorded and used in conjunction with the retained measurements to determine the measure (30) of the change in the output power (34) of the generator (6) for the first operating condition (18).
4. The method according to any one of the preceding claims, in, The deviation interval is limited to a width of up to 1° or up to 0.5°, wherein the statistical analysis is applied to measurements (19, 20) of the output power (37) of the generator carried out during at least 20 or at least 50 repetitions of the offset variation, and / or Therein, the statistical analysis is applied to at least 20 or at least 100 or at least 500 of the measurements (19, 20).
5. The method according to any one of the preceding claims, in, The given pitch angle (33) is additionally dependent on at least one operating parameter (9) of the wind turbine (1), and / or The pitch offset changes according to a fixed change pattern in each repeated change of the offset.
6. The method according to claim 5, wherein: The operating parameter (9) or at least one of the operating parameters (9) is an average value of the output power of the generator (6), the wind speed, the tip speed ratio and / or the torque of the rotor shaft of the wind turbine (1).
7. A method according to any one of the preceding claims, wherein: The determination (30) of the measure (30) of the change in the output power (34) and the determination or updating of the calibration information (10) are performed repeatedly, in particular continuously or at fixed intervals, while a calibration condition (21) which depends on the operating parameter (9) or one operating parameter (9) and / or at least one further operating parameter of the wind turbine (1) is satisfied.
8. The method according to claim 7, wherein: The further operating parameter or a corresponding further operating parameter is: the current pitch angle (22); and / or the given pitch angle (33); and / or the measure (30) of the determined change in the output power (34) of the generator (6); and / or the time (23) that has passed since entering the operating mode or an operating mode of the wind turbine (1) in which at least part of the output power (34) of the generator (6) is fed to a power grid (24) and / or an energy storage device; and / or the activation of a further actuator (14) of the wind turbine (1) for adjusting the yaw angle (26) of the wind turbine (1) and / or the time since its last activation (25); and / or sensor data (27) and / or forecast data (28) about the temperature and / or humidity in the environment of the wind turbine (1).
9. The method according to any one of the preceding claims, in, During each repetition of the offset variation, the pitch offset is maintained at the first pitch offset limit (7) or within a given angular interval from the first pitch offset limit (7) for a corresponding first time interval (11), and for a corresponding second time interval (12), is maintained at the second pitch excursion limit (8), or is maintained within a given angular interval from said second pitch excursion limit (8), wherein during at least a portion of the respective first time interval (11), a first measurement (19) is performed on the output power (37) of the generator (6), During at least a portion of the respective second time interval (12), a second measurement (20) is performed regarding the output power (34) of the generator (6), and The measure (30) of the change in the output power (34) of the generator (6) is determined based on the first measurement (19) and the second measurement (20), In particular, it is based on an average or median of the first measurements (19) and an average or median of the second measurements (20) taken within a given measurement interval comprising a plurality of repetitions of the offset variation.
10. The method according to claim 9, wherein: The measurement interval ends as soon as an end condition (29) is met, wherein the satisfaction of the end condition (29) depends firstly on the number of first and / or second measurements (19, 20) acquired, or on the number of these first and / or second measurements (19, 20) that satisfy a selection criterion (31) for the operating parameter (9), and / or secondly on a measure of the variance of the first and / or second measurements (19, 20) acquired during the measurement interval and / or that satisfy the selection criterion (31).
11. The method according to any one of claims 8 or 9, wherein: The respective first and / or second time intervals (11, 12) extend over a plurality of rotations of the rotor (2) of the wind turbine (1).
12. The method according to any one of claims 8 to 11, wherein: The respective first and / or second time intervals (11, 12) extend over an integer number of complete rotations of the rotor (2) of the wind turbine (1).
13. A method according to any one of the preceding claims, wherein: The actuator (4) is used to continuously repeat the variation of the pitch angle (5, 22) due to the repeated variation of the offset in the at least one operating mode of the wind turbine (1) and / or over at least 1 hour or 6 hours and / or during at least 100 or 1000 rotations of the rotor of the wind turbine.
14. A system for wind power generation, comprising at least one wind turbine (1), the respective wind turbine (1) comprising a rotor (2) having a plurality of rotor blades (3), at least one actuator (4) for adjusting the pitch angle (5, 22) of the rotor blades (3), and a generator (6) driven by the rotor (2), wherein: The system comprises at least one control unit (13), wherein the control unit (13) is designed to implement the method according to any of the preceding claims for adjusting the pitch angle (5, 22) of the at least one wind turbine (1) or at least one respective wind turbine (1).
Citation Information
Cited By
Estimating an upgraded power curve
US12692842B2
Estimating an upgraded power curve
US20240254971A1