Fabricated subway station structure
Through the combination of the modular overall prefabricated cylinder structure and frame structure, the problem of insufficient construction efficiency and waterproofing effect of prefabricated subway stations is solved, the stress performance of the structure is optimized, and more efficient construction and lower water leakage risk is achieved.
Patent Information
- Application Number
- CN202411308251.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-19
- Publication Date
- 2024-11-22
AI Technical Summary
The existing prefabricated subway station structures have shortcomings in construction efficiency and waterproofing effects, and the stress performance under extreme loads is poor, making it difficult to maximize improvement.
The modular overall prefabricated cylinder structure and frame structure are combined. The cylinder structure is a three-dimensional structure. The inner and outer side walls of the cylinder can be subjected to stress. The cylinder is seamlessly connected to the train, and it is passed through multiple waterproof structures and specific connection methods (such as shears). Force keys, hinge connections, grouting sleeves) optimize structural performance.
It significantly reduces the number of joints, improves the waterproofing effect of the structure and soil pressure resistance, optimizes the stress performance of the station, shortens the construction cycle, and reduces the risk of water leakage.
Smart Images

Figure CN118997220A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of underground structure engineering, and in particular relates to an assembled subway station structure. Background Art
[0002] With the continuous acceleration of my country's urbanization process and the continuous growth of population, a large number of people have gathered in limited urban centers, and many megacities have emerged. Many cities are facing the dilemma of insufficient ground space. In order to improve the urban traffic environment, it is necessary to develop and utilize underground space, among which the construction of rail transit has been widely recognized. Traditional subway construction mainly adopts cast-in-place concrete construction technology, such as the patent technology with patent publication number CN116378096A, which discloses a construction method for subway stations. After the excavation of the foundation pit, the bottom plate, side wall, beam, plate and other load-bearing components of the station will be cast from the bottom of the foundation pit to the top layer by layer, and combined with the secondary masonry structure construction, to achieve fast flow construction and solve the purpose of cycle. However, due to the use of cast-in-place concrete construction method, its construction cycle still depends on factors such as on-site concrete curing time, seasonal temperature, construction environment, etc., and the construction cycle cannot be effectively shortened.
[0003] Based on the above problems, with the rapid development of prefabricated construction technology, prefabricated subway stations have been widely used in recent years because of their fast construction speed, short cycle, little impact on seasonal construction, and little impact on the environment. For example, the patented technology with patent announcement number CN215630125U discloses a prefabricated subway station, whose bottom plate and bottom longitudinal beam are cast-in-place structures, while the side walls, beams, columns, middle plates, top plates and other structures are prefabricated structures. For example, the patented technology with patent announcement number CN216809988U, whose bottom plate and bottom longitudinal beam structures are both prefabricated structures, thus realizing a prefabricated structure in which all structures are prefabricated in the factory, making the most of the advantages of prefabricated construction technology. However, such prefabricated structures objectively have the problem of many splicing gaps, and the vehicle driving tunnel and pedestrian access corridor are often spliced together, which will result in the need for secondary structure construction and decoration after the main structure is constructed, and the rapid opening of the subway cannot be achieved. In addition, due to the special environment of underground structures, they need to withstand the soil pressure and water pressure underground all the time. These joints will become the weak points of subway stations, increasing the risk of subway water leakage, which is extremely unfavorable for subway operations. Regarding the problem of joint waterproofing, there are many ways to waterproof joints in the prior art, such as the patented technology with patent publication numbers CN117905105A and CN108104162A, which discloses a combination of waterproof structures such as self-waterproof concrete, waterproof coating, water-stop strips, grouting, etc. However, these solutions still cannot fundamentally solve the problem of joint leakage.
[0004] In addition, we also found that the existing prefabricated buildings, due to their use of prefabricated structures for assembly, often use a large number of rigid connection points in order to ensure the stability of the structural connection, which makes the overall rigidity of the station structure very large, but this leads to poor stress performance of the structure, especially under the action of extreme loads such as earthquakes, the load can only be resisted by the strength of the structure, which greatly increases the cost of structural materials. Although the patent technology with patent publication number CN114737608A mentions the use of structures such as dampers combined with composite beams, plates, and walls to achieve toughness earthquake resistance, or the patent technology with patent publication number CN109853636A uses arc rubber bearings to transform rigid nodes into hinged nodes to improve the earthquake resistance effect, the setting of these earthquake-resistant structures is still based on assembly structures with joints, and cannot maximize the improvement of the stress characteristics of the structure.
[0005] In summary, it is crucial to improve the construction efficiency of subway traffic, improve the structural waterproofing efficiency and optimize the structural form of subway stations to ensure the overall safety and economy of subway stations from construction to operation. Summary of the invention
[0006] The object of the present invention is to provide a prefabricated subway station structure, aiming to minimize the construction time of the subway station, reduce the joint settings of the prefabricated station, and improve the effect of resisting soil pressure and water pressure.
[0007] In order to achieve the above-mentioned invention object, the present invention provides the following technical solutions: an assembled subway station, comprising annular standard components, a plurality of the annular standard components are combined and arranged in the depth direction, the annular standard components include a frame structure, the frame structure includes a bottom plate, a middle plate and a top plate, the annular standard components also include a modular prefabricated cylinder structure, the modular prefabricated cylinder structure includes a train cylinder and a corridor cylinder, wherein the train cylinder is located between the bottom plate and the middle plate, and the corridor cylinder is located between the middle plate and the top plate.
[0008] Through the modular overall prefabricated cylinder structure setting, the modular cylinder structure is a three-dimensional structure with stronger resistance to soil pressure. Both the inner and outer walls of the cylinder can bear force. At the same time, it can be seamlessly connected with the train to match the running train. Its internal facilities and functions are all factory-installed, and the cylinder structure is installed and can be opened to traffic. In addition, the modular cylinder structure reduces the cracks in the assembly of components, and the overlapping structural arrangement of the cylinder structure and the plate has a better waterproof effect.
[0009] Furthermore, the frame structure also includes lower columns, upper columns, longitudinal beams, cross beams and platforms; longitudinal beams are arranged on the lower columns and upper columns, and cross beams are arranged on the longitudinal beams; the train cylinder, lower columns and platform are arranged on the bottom plate; the middle plate is arranged on the cross beams and the train cylinder, and the corridor cylinder and upper columns are arranged on the middle plate; the top plate is arranged on the corridor cylinder and the cross beams.
[0010] Furthermore, the bottom plate in the frame structure is a cast-in-place structure, and the middle plate, top plate, lower column, upper column, longitudinal beam, cross beam and platform are all prefabricated structures.
[0011] A modular prefabricated structure is also used for the frame structure, which can further improve the assembly rate of subway stations and increase the construction speed.
[0012] Furthermore, shear keys are provided between the bottom plate and the train cylinder, between the train cylinder and the middle plate, between the corridor cylinder and the middle plate, and between the top plate and the corridor cylinder; and / or, hinges are used to connect the crossbeam to the train cylinder and the corridor cylinder; and / or, grouting sleeves are used to connect the lower column to the bottom plate, as well as the upper column to the lower column; and / or, mortise and tenon joints are used to connect the bottom plate and the train cylinder, between the train cylinder and the corridor cylinder, and between the train cylinder and the top plate; and / or, anchor rods are used to connect the middle plate and the crossbeam, as well as the top plate and the crossbeam.
[0013] Since shear keys are set on the cylinder and the base plate, the installation accuracy of the structure can be improved, and the shear bearing capacity of the structure can be improved. By setting connection structures such as hinge connections, the flexibility of the overall structure can be improved and the stress performance of the station can be optimized.
[0014] Furthermore, at least two waterproof structures are arranged between the train cylinder and the bottom plate and the middle plate; and / or, at least two waterproof structures are arranged between the corridor cylinder and the middle plate and the top plate; and / or, at least one waterproof structure is arranged between the train cylinder and the corridor cylinder.
[0015] The modular prefabricated cylinder structure reduces the number of joints, but considering that there is still a gap between the cylinder and the plate, it may cause water leakage inside the station in extreme cases. Therefore, by setting a waterproof structure between the cylinder and the plate, the risk of water leakage inside the station can be reduced. In addition, due to the setting of the modular prefabricated cylinder, the contact area between the top and bottom of the cylinder and the plate is very large, so multiple waterproof structures can be set. In addition, waterproof structures can also be set between the cylinders, so on the one hand, the risk of water leakage inside the station can be further reduced, and on the other hand, the cylinder can further avoid water leakage in its own structure under the action of the waterproof structure between the plate and the cylinder structure itself.
[0016] Furthermore, the thickness of the outer wall of the modular prefabricated cylinder structure is greater than or equal to the thickness of the inner wall.
[0017] The modular prefabricated cylinder structure is a three-dimensional structure, with its inner and outer walls both serving as load-bearing components. Considering that when the subway station is buried deep, the outer wall will be subject to greater soil pressure, the thickness of the outer wall can also be greater than the thickness of the inner wall to ensure the stability of the load-bearing structure.
[0018] Furthermore, an entrance and exit are arranged on the side of the train cylinder close to the platform, and its position and height match those of the train; an entrance and exit are arranged on the side of the corridor cylinder close to the station.
[0019] After the entrances and exits are set up, the other parts of the train cylinder can realize the load-bearing function except the entrance and exit holes, which can avoid the on-site installation of glass curtain walls, and the relevant train information can be installed in the factory to avoid on-site work during night train shutdowns. However, the size of the entrance and exit holes of the train cylinder should not be too large to prevent affecting the vertical load-bearing of the cylinder structure; in addition, the entrances and exits set on the upper corridor cylinder can ensure the traffic requirements and facilitate traffic diversion and relief. The opening of this hole can be set larger.
[0020] Furthermore, no less than two transverse stress-bearing steel bars are arranged within 500mm above the entrance and exit of the train cylinder.
[0021] The upper portion of the entrance and exit openings of the train cylinder belongs to the structural reinforcement area, so no less than two transverse stress-bearing steel bars are arranged to ensure the strength of the cylinder opening.
[0022] Furthermore, the upper and lower inner walls of the train cylinder and the corridor cylinder are coaxially arranged.
[0023] The coaxial arrangement of the inner wall of the cylinder can ensure the effective transfer of vertical loads and improve structural stability.
[0024] Furthermore, the lower columns and the upper columns are evenly arranged in the depth direction, and the tops of the lower columns and the upper columns are provided with column corbels for supporting the longitudinal beams, and the longitudinal beams are provided with beam corbels for supporting the transverse beams.
[0025] The setting of corbels can improve the stability of the connection between structures.
[0026] Compared with the prior art, the present invention has at least the following beneficial effects:
[0027] 1. The modular overall prefabricated cylinder structure is set up and combined with the frame structure, which effectively reduces the number of joints and improves the waterproof effect of the structure. The modular cylinder structure is a three-dimensional structure that can be seamlessly connected with the train. The adjacent cylinders are connected by a frame structure, and the adjacent cylinders are synergistically stressed. Both the inner and outer walls of the cylinder can be stressed. The stress on the outer wall enables the structure to have a stronger resistance to soil pressure.
[0028] 2. The modular prefabricated cylinder structure can be matched with the running train. The cylinder structure and internal facilities can be fully assembled in the factory. The cylinder structure can be opened to traffic after being installed on site. The frame structure can also be prefabricated, which greatly shortens the construction period.
[0029] 3. The contact area between the cylinder and the bottom plate, middle plate and top plate is large, so multiple waterproofing can be set to further reduce the risk of overall structural leakage.
[0030] 4. The station as a whole is a flexible structure, which optimizes the stress performance of the station. Shear keys are set on the cylinder and the bottom plate to improve the installation accuracy and the shear bearing capacity of the structure. The crossbeams, longitudinal beams, columns and cylinders are hinged to improve the flexibility of the structure.
[0031] 5. Except for the opening, the other parts of the modular train cylinder can realize the load-bearing function, and the on-site installation of glass curtain walls can be avoided. In addition, the relevant train information can be installed in the factory, avoiding on-site work during the night train suspension period. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a three-dimensional structural schematic diagram of the assembled subway station structure of the present invention.
[0033] Figure 2 It is a cross-sectional schematic diagram of the assembled subway station structure of the present invention.
[0034] In the figure:
[0035] 1. Train cylinder; 2. Corridor cylinder; 3. Bottom plate; 4. Lower column; 5. Upper column; 6. Longitudinal beam; 7. Cross beam; 8. Middle plate; 9. Top plate; 10. Platform; 11. Column corbel; 12. Grouting sleeve; 13. Anchor rod; 14. Mortise and tenon; 15. Hinge; 16. Waterproof structure; 17. Beam corbel. DETAILED DESCRIPTION
[0036] The following is a further description of the assembled subway station structure combining the modular cylinder and the frame structure in the present invention in conjunction with the accompanying drawings in the examples of the present invention. The following examples are only used to illustrate the present invention and are not intended to limit the present invention.
[0037] First embodiment:
[0038] See also Figure 1 to Figure 2 The assembled subway station of the present invention is firstly formed by combining a modular prefabricated cylinder structure and a frame structure to form an annular standard component, and then a plurality of the annular standard components are combined and arranged in the depth direction to form an overall station structure.
[0039] Specifically, it at least includes a bottom plate 3, a middle plate 8 and a top plate 9 constituting a frame structure, and a train cylinder 1 and a corridor cylinder 2 constituting a modular prefabricated cylinder structure. The train cylinder 1 is located between the bottom plate 3 and the middle plate 8, and the corridor cylinder 2 is located between the middle plate 8 and the top plate 9.
[0040] The subway station is divided into the first and second underground floors, where the train cylinder is located on the second underground floor and the corridor cylinder is located on the first underground floor. The upper cylinder structure can be used as a corridor or a transfer station passage, and the lower cylinder structure is used as a load-bearing component and a train travel section. The train cylinder and the corridor cylinder are preferably arranged as two symmetrical ones. For special subway stations, they can also be arranged in one or more than two forms, and the specific number is not limited here.
[0041] The modular prefabricated cylinder structure is a three-dimensional structure with stronger resistance to soil pressure. Both the inner and outer walls of the cylinder can bear force. At the same time, it can be seamlessly connected with the train to match the running train. Its internal facilities and functions are all factory-installed, so that the cylinder structure is installed and can be opened to traffic. In addition, the modular cylinder structure reduces the cracks in the assembly of components and has a better waterproof effect.
[0042] See also Figure 1 to Figure 2 The frame structure may further include a lower column 4, an upper column 5, a longitudinal beam 6, a cross beam 7 and a platform 10; wherein, the lower column 4 and the upper column 5 are both provided with a longitudinal beam 6, and the cross beam 7 is provided on the longitudinal beam 6; the train cylinder 1, the lower column 4 and the platform 10 are provided on the bottom plate; the middle plate 8 is provided on the cross beam 7 and the train cylinder 1, and the corridor cylinder 2 and the upper column 5 are provided on the middle plate 8; the top plate 9 is provided on the corridor cylinder 2 and the cross beam 7.
[0043] The above-mentioned frame structure can be a prefabricated structure or a cast-in-place structure. Although the construction period of the cast-in-place structure may be longer than that of the prefabricated structure, the waterproof performance of the cast-in-place structure is better than that of the prefabricated structure, and the construction cost is lower. Therefore, the specific structural form can be selected according to needs.
[0044] In order to improve the waterproof effect, two waterproof structures 16 are set between the train cylinder 1 and the bottom plate 3 and the middle plate 8; two waterproof structures 16 are set between the corridor cylinder 2 and the middle plate 8 and the top plate 9; and one waterproof structure 16 is set between the train cylinder 1 and the corridor cylinder 2.
[0045] Since the contact area between the cylinder structure and the plate is large, more than two waterproof structures can be provided as needed, and more than one waterproof structure can be provided between the corresponding cylinder structures. In addition, in consideration of cost saving and construction efficiency, when the waterproof requirement is low, the above-mentioned waterproof structures can also be provided one by one or in combination of two based on the actual waterproof position.
[0046] Although the modular prefabricated cylinder structure reduces the number of joints, there is still a gap between the cylinder and the plate, which may cause water leakage inside the station in extreme cases. Therefore, a waterproof structure is set between the cylinder and the plate to reduce the risk of water leakage inside the station. In addition, due to the setting of the modular prefabricated cylinder, the contact area between the top and bottom of the cylinder and the plate is very large, so multiple waterproof structures can be set. In addition, waterproof structures can also be set between the cylinders. Therefore, on the one hand, the risk of water leakage inside the station can be further reduced. On the other hand, the cylinder can further avoid water leakage in its own structure under the action of the waterproof structure between the plate and the cylinder structure itself.
[0047] The thickness of the outer wall of the modular prefabricated cylinder structure is greater than or equal to the thickness of the inner wall.
[0048] The modular prefabricated cylinder structure is a three-dimensional structure, with its inner and outer walls both serving as load-bearing components. Considering that when the subway station is buried deep, the outer wall will be subject to greater soil pressure, the thickness of the outer wall can also be greater than the thickness of the inner wall to ensure the stability of the load-bearing structure.
[0049] The train cylinder 1 is provided with an entrance and exit on the side close to the platform 10, whose position and height match those of the train, and whose width is 100-150mm larger than the width of the train door; the corridor cylinder 2 is provided with an entrance and exit on the side close to the station.
[0050] After the entrances and exits are set up, the other parts of the train cylinder can realize the load-bearing function except the entrance and exit holes, which can avoid the on-site installation of glass curtain walls, and the relevant train information can be installed in the factory to avoid on-site work during night train shutdowns. However, the size of the entrance and exit holes of the train cylinder should not be too large to prevent affecting the vertical load-bearing of the cylinder structure; in addition, the entrances and exits set on the upper corridor cylinder can ensure the traffic requirements and facilitate traffic diversion and relief. The opening of this hole can be set larger.
[0051] No less than two transverse stress-bearing steel bars are arranged within 500 mm above the entrance and exit of the train cylinder 1.
[0052] The upper part of the entrance and exit openings of the train cylinder belongs to the structural reinforcement area, so no less than two transverse stress-bearing steel bars are set to ensure the strength of the cylinder opening.
[0053] The inner walls of the train cylinder 1 and the corridor cylinder 2 are coaxially arranged up and down.
[0054] The coaxial arrangement of the inner wall of the cylinder can ensure the effective transfer of vertical loads and improve structural stability.
[0055] The lower columns 4 and the upper columns 5 are evenly arranged in the depth direction. The tops of the lower columns 4 and the upper columns 5 are provided with column corbels 11 for supporting the longitudinal beams, and the longitudinal beams are provided with beam corbels 17 for supporting the transverse beams.
[0056] The setting of corbels can improve the stability of the connection between structures.
[0057] Second embodiment:
[0058] This embodiment has the same main structure as the first embodiment and will not be described again here. The limitation lies only in the selection of the frame structure. Specifically, the bottom plate in the frame structure is a cast-in-place structure, and the middle plate, top plate, lower column, upper column, longitudinal beam, cross beam and platform are all prefabricated structures.
[0059] A modular prefabricated structure is also used for the frame structure, which can further improve the assembly rate of subway stations and increase the construction speed.
[0060] In order to more clearly determine the force analysis between the frame structure and the cylinder, shear keys are provided between the bottom plate and the train cylinder, between the train cylinder and the middle plate, between the corridor cylinder and the middle plate, and between the top plate and the corridor cylinder; hinges are used to connect the crossbeams to the train cylinder and the corridor cylinder; grouting sleeves are used to connect the lower column and the bottom plate, as well as the upper column and the lower column; mortise and tenon joints are used to connect the bottom plate and the train cylinder, between the train cylinder and the corridor cylinder, and between the train cylinder and the top plate, and grouting joints are reserved in the middle for grouting later; anchor rods are used to connect the middle plate and the crossbeam, as well as between the top plate and the crossbeam.
[0061] The above-mentioned connection structure is only an exemplary choice and is not limited to prefabricated structures. On the one hand, it can be equivalently replaced by any other connection structure that can achieve connection. On the other hand, it can also be used or adaptively adjusted for non-prefabricated frame structures. In addition, the specific structure setting is not unique. For example, taking a shear key as an example, it can be a shear key structure composed of a mortise and tenon, or other equivalent structures; or taking a hinge connection as an example, it can be a hinge structure formed by an angle steel, or other equivalent structures. And the setting of the connection structure can also be based on the actual connection strength requirements and a single or combined selection setting.
[0062] Since shear keys are set on the cylinder and the bottom plate, the installation accuracy of the structure can be improved, and the shear bearing capacity of the structure can be improved. By setting connection structures such as hinge connections, the flexibility of the overall structure of the station can be improved and the stress performance of the station can be optimized.
[0063] The above embodiments describe the present invention in detail, but the contents are only preferred embodiments of the present invention and cannot be considered to limit the scope of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the present invention.
Claims
1. An assembled subway station, comprising annular standard components, characterized in that: A plurality of the annular standard components are combined and arranged in the depth direction, the annular standard components include a frame structure, the frame structure includes a bottom plate (3), a middle plate (8) and a top plate (9), the annular standard components also include a modular prefabricated cylinder structure, the modular prefabricated cylinder structure includes a train cylinder (1) and a corridor cylinder (2), wherein the train cylinder (1) is located between the bottom plate (3) and the middle plate (8), and the corridor cylinder (2) is located between the middle plate (8) and the top plate (9).
2. The assembled subway station according to claim 1, characterized in that: The frame structure also includes a lower column (4), an upper column (5), a longitudinal beam (6), a cross beam (7) and a platform (10); The lower column (4) and the upper column (5) are both provided with the longitudinal beam (6), and the transverse beam (7) is provided on the longitudinal beam (6); The train cylinder (1), the lower column (4) and the platform (10) are arranged on the bottom plate (3); The middle plate (8) is arranged on the cross beam (7) and the train cylinder (1), and the corridor cylinder (2) and the upper column (5) are arranged on the middle plate (8); The top plate (9) is arranged on the corridor cylinder (2) and the crossbeam (7).
3. The assembled subway station according to claim 2, characterized in that: The bottom plate (3) in the frame structure is a cast-in-place structure, and the middle plate (8), the top plate (9), the lower column (4), the upper column (5), the longitudinal beam (6), the cross beam (7) and the platform (10) are all prefabricated structures.
4. The assembled subway station according to claim 3, characterized in that: Shear keys are provided between the bottom plate (3) and the train cylinder (1), between the train cylinder (1) and the middle plate (8), between the corridor cylinder (2) and the middle plate (8), and between the top plate (9) and the corridor cylinder (2); And / or, the cross beam (7) is connected to the train cylinder (1) and the corridor cylinder (2) by hinges (15); And / or, the lower column (4) and the bottom plate (3) as well as the upper column (5) and the lower column (4) are connected by a grouting sleeve (12); And / or, mortise and tenon joints (13) are arranged between the bottom plate (3) and the train cylinder (1), between the train cylinder (1) and the corridor cylinder (2), and between the train cylinder (1) and the top plate (9), and grouting joints are reserved for grouting at a later stage; And / or, the middle plate (8) and the cross beam (7) as well as the top plate (9) and the cross beam (7) are connected by anchor rods (14).
5. The assembled subway station according to any one of claims 1 to 4, characterized in that: At least two waterproof structures are arranged between the train cylinder (1) and the bottom plate (3) and the middle plate (8); And / or, at least two waterproof structures are provided between the corridor cylinder (2) and the middle plate (8) and the top plate (9); And / or, at least one waterproof structure is provided between the train cylinder (1) and the corridor cylinder (2).
6. The assembled subway station according to any one of claims 1 to 4, characterized in that: The thickness of the outer wall of the modular prefabricated cylinder structure is greater than or equal to the thickness of the inner wall.
7. The assembled subway station according to any one of claims 1 to 4, characterized in that: The train cylinder (1) is provided with an entrance and exit on the side close to the platform, and its position and height match those of the train; the corridor cylinder (2) is provided with an entrance and exit on the side close to the station.
8. The assembled subway station according to claim 7, characterized in that: No less than two transverse stress-bearing steel bars are arranged within a range of 500 mm above the entrance and exit of the train cylinder (1).
9. The assembled subway station according to claim 7, characterized in that: The inner walls of the train cylinder (1) and the corridor cylinder (2) are coaxially arranged.
10. The assembled subway station according to any one of claims 2 to 4, characterized in that: The lower columns (4) and the upper columns (5) are evenly arranged in the depth direction; the tops of the lower columns (4) and the upper columns (5) are provided with column brackets (11) for supporting the longitudinal beams (6); and the longitudinal beams (6) are provided with beam brackets (17) for supporting the cross beams (7).