By determining the grid test parameter range and performing static and dynamic tests on the performance test method of adjustable loads participating in primary frequency regulation, the problem of lack of adjustable load test methods in the prior art is solved, and high accuracy of primary frequency regulation performance is achieved Evaluate.

CN119001291AActive Publication Date: 2024-11-22ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411131052.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-22
Estimated Expiration
2044-08-16

AI Technical Summary

Technical Problem

The lack of performance testing methods for adjustable loads participating in primary frequency regulation in the prior art, resulting in a lack of unified standards for testing steps and technical indicators, poor real-time performance, insufficient testing accuracy and insufficient comprehensive testing scope.

Method used

Provide a performance test method for adjustable loads participating in a frequency modulation. By determining the test parameters of the power grid, static tests and dynamic tests are carried out, including frequency measurement, power control command analysis, step response test and hill climb response test, and calculate dynamics. Performance metrics to evaluate static and dynamic performance of adjustable loads.

Benefits of technology

High-precision and repeatability testing of the frequency modulation performance of adjustable loads is achieved, which meets the needs of comprehensive and intuitive performance evaluation and solves the problem of lack of methods for adjustable load testing in the prior art.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119001291A_ABST
    Figure CN119001291A_ABST
Patent Text Reader

Abstract

The invention provides a performance test method for participation of an adjustable load in primary frequency modulation. The method comprises: determining a test parameter range of a power grid in which an adjustable load participates in primary frequency modulation, the test parameter range being a range representing parameters related to frequency in the power grid; performing a static test according to the test parameter range to obtain a static test result, and determining the static performance of the adjustable load participating in the primary frequency modulation according to the static test result; step response testing and climbing response testing are carried out according to the test parameter range, a dynamic test result is obtained, a dynamic performance index is calculated according to the dynamic test result, and the dynamic performance of the adjustable load participating in primary frequency modulation is determined according to the dynamic performance index. According to the invention, the problem that the performance test of the adjustable load participating in the primary frequency modulation is lacked in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power system performance testing, and in particular to a performance testing method for an adjustable load participating in primary frequency regulation. Background Art

[0002] The adjustable frequency load is a load that can be adjusted in order to maintain the balance between supply and demand of the power system. With the continuous exploration of the ability of adjustable loads to participate in the primary frequency regulation of the power system, there are more and more scenarios in which adjustable loads participate in primary frequency regulation. Therefore, the impact of adjustable loads on the primary frequency regulation of the power grid cannot be ignored. In the prior art, performance experiments are usually carried out on the process of adjustable loads participating in primary frequency regulation, such as static tests and dynamic tests. However, the technical steps and technical indicators in the existing tests lack unified standards, poor real-time performance, insufficient test accuracy, and incomplete test range. At the same time, most of the prior art is carried out for hydropower units and nuclear power units, and lacks test method standards for adjustable loads.

[0003] Therefore, a performance testing method for an adjustable load participating in primary frequency regulation is needed. Summary of the invention

[0004] The main purpose of the present application is to provide a performance test method for an adjustable load participating in primary frequency regulation, so as to at least solve the problem of lack of a performance test method for an adjustable load participating in primary frequency regulation in the prior art.

[0005] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a performance test method for an adjustable load participating in primary frequency regulation is provided, comprising: determining a test parameter range of a power grid in which an adjustable load participates in primary frequency regulation, wherein the test parameter range is a range of frequency-related parameters characterizing the power grid; performing a static test according to the test parameter range to obtain a static test result, and determining the static performance of the adjustable load participating in the primary frequency regulation according to the static test result; performing a step response test and a climbing response test according to the test parameter range to obtain a dynamic test result, calculating a dynamic performance index according to the dynamic test result, and determining the dynamic performance of the adjustable load participating in the primary frequency regulation according to the dynamic performance index.

[0006] Optionally, a static test is performed according to the test parameter range to obtain a static test result, including: when the frequency of the power grid changes, recording the sampling period, measurement resolution and sampling delay time collected by the frequency measurement unit; when the frequency of the power grid changes, recording the issuance time of the power control instruction of the adjustable load and the output time of the target control power, and calculating the difference between the output time and the issuance time to obtain a primary frequency modulation dead zone, wherein the power control instruction is used to output the target control power of the adjustable load; setting the frequency change deviation of the power grid to be greater than the standard frequency modulation dead zone, and recording the adjustment rate under the condition of the frequency change deviation; when the primary frequency modulation has a limit, respectively obtaining the first frequency modulation limit value of the adjustable load corresponding to the high load condition of the power grid and the second frequency modulation limit value corresponding to the adjustable load under the low load condition; when the power grid is under a preset rated active power condition, obtaining the third frequency modulation limit value corresponding to the adjustable load under the preset rated active power condition.

[0007] Optionally, determining the static performance of the adjustable load participating in primary frequency modulation according to the static test result includes: comparing the static test result with a corresponding allowable error range; and when the static test result is within the allowable error range, determining that the static performance of the primary frequency modulation is normal.

[0008] Optionally, a step response test is performed according to the test parameter range to obtain a dynamic test result, including: connecting the communication interface of the adjustable load, obtaining the format of the data message, and verifying whether the format of the data message is a predetermined format; when the format of the data message is a predetermined format, collecting voltage data and current data; setting a frequency action dead zone, and generating an increasing step signal and a decreasing step signal through a standard frequency signal source, and respectively testing a first step response result corresponding to the increasing step signal and a second step response result corresponding to the decreasing step signal.

[0009] Optionally, performing a climbing response test according to the test parameter range to obtain a dynamic test result also includes: setting multiple steady-state frequencies and a climbing rate corresponding to each of the steady-state frequencies to obtain multiple groups of combinations of the steady-state frequencies and the climbing rates, and testing the climbing response of each group of the steady-state frequencies and the climbing rates at a predetermined duration to obtain a climbing response test result.

[0010] Optionally, the dynamic performance index is calculated according to the dynamic test results, including: calculating the difference between the issuance time of the power control instruction of the adjustable load and the output time of the target control power to obtain a frequency modulation dead zone; calculating the frequency response interval in the step response test and the ramp response test; calculating the deviation between the maximum response value and the minimum response value to obtain a maximum response deviation, wherein the maximum response value is the maximum value of the step response or the ramp response test, and the minimum response value is the minimum value of the step response or the ramp response; calculating the integral of the response quantity over time to obtain a response integral quantity, wherein the response quantity is a step response quantity or a ramp response quantity.

[0011] Optionally, calculating the dynamic performance index based on the dynamic test results also includes: calculating the difference between the time when the power control instruction is issued and the time when the power change first reaches a first predetermined percentage of the target control power to obtain the start-up time; calculating the difference between the time when the power control instruction is issued and the time when the power change first reaches a second predetermined percentage of the target control power to obtain the response time, wherein the first predetermined percentage is less than the second predetermined percentage; calculating the difference between the time when the power control instruction is issued and the time when the power change first reaches the target control power to obtain the adjustment time.

[0012] Optionally, the method also includes: setting the voltage of the power grid to fluctuate and the frequency to remain unchanged, and testing whether the power grid has a low voltage ride-through fault or a high voltage ride-through fault; setting the voltage of the power grid to fluctuate and the frequency to change, and testing whether the power grid has a low voltage ride-through fault or a high voltage ride-through fault.

[0013] Optionally, the method further comprises: after a predetermined interval period, re-performing the static test, the step response test and the ramp response test under high load conditions and low load conditions.

[0014] Optionally, determining the test parameter range for the adjustable load to participate in primary frequency modulation includes: determining the primary frequency modulation dead zone range of the primary frequency modulation; determining the under-response frequency interval and the over-response frequency interval of the primary frequency modulation; determining the time interval for issuing frequency modulation control instructions of each two adjacent primary frequency modulations, wherein the frequency modulation control instruction is an instruction for controlling the adjustable load to perform primary frequency modulation.

[0015] Apply the technical solution of the present application to determine the test parameter range of the power grid in which the adjustable load participates in the primary frequency modulation, wherein the test parameter range is the range of frequency-related parameters in the power grid; perform a static test according to the test parameter range to obtain a static test result, and determine the static performance of the adjustable load participating in the primary frequency modulation according to the static test result; perform a step response test and a climbing response test according to the test parameter range to obtain a dynamic test result, calculate a dynamic performance index according to the dynamic test result, and determine the dynamic performance of the adjustable load participating in the primary frequency modulation according to the dynamic performance index. Compared with the prior art, which lacks a performance test method for the adjustable load participating in the primary frequency modulation, the present application can obtain the test results through static performance test and dynamic performance test, and evaluate the performance according to the test results, and can comprehensively and intuitively test the primary frequency modulation performance of the adjustable load while meeting the requirements of high-precision and repeatable operation test. Therefore, it can solve the problem of the lack of a performance test method for the adjustable load participating in the primary frequency modulation in the prior art, and achieve the effect of testing the performance of the primary frequency modulation. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The drawings constituting part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0017] Figure 1 A schematic flow chart of a performance test method for an adjustable load participating in primary frequency regulation provided by an embodiment of the present application is shown;

[0018] Figure 2 A schematic flow chart of a specific performance test method for an adjustable load participating in primary frequency regulation provided in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0019] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0020] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0021] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0022] For the convenience of description, some nouns or terms involved in the embodiments of the present application are explained below:

[0023] Adjustable load: A load that can change its output power according to the needs of the power system;

[0024] Primary frequency regulation: It is an automatic control process in the power system. When the frequency of the power grid deviates from the rated value, the control system of the unit in the power grid will automatically adjust the active power of the unit to limit the change of the power grid frequency, thereby maintaining the stability of the power grid frequency.

[0025] As introduced in the background technology, the prior art lacks a performance test method for adjustable loads participating in primary frequency regulation. In order to solve the problem of lack of a performance test method for adjustable loads participating in primary frequency regulation, an embodiment of the present application provides a performance test method for adjustable loads participating in primary frequency regulation.

[0026] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0027] In this embodiment, a performance test method for an adjustable load participating in primary frequency regulation running on a mobile terminal, a computer terminal or a similar computing device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0028] Figure 1 It is a flow chart of a performance test method of an adjustable load participating in primary frequency regulation according to an embodiment of the present application.

[0029] like Figure 1 As shown, the method comprises the following steps:

[0030] Step S201, determining a test parameter range of a power grid in which an adjustable load participates in primary frequency regulation, wherein the test parameter range is a range of frequency-related parameters characterizing the power grid;

[0031] Specifically, before conducting the test, it is necessary to first determine the test method, test requirements, test items, etc. Among them, the test method includes: a single adjustable load under the condition of adjustable load aggregation should be carried out by remote full-volume testing and single sampling testing, and the sampling ratio is determined by the dispatching agency according to the situation of the power grid. The same type of adjustable load equipment can select one test point for testing, and the test results can be applied to other adjustable load equipment. The test requirements include: the test condition should select the period when the operating power of the adjustable load is greater than 80% PN (rated power) for testing. If there are specific requirements for the 100% rated active power condition, a frequency modulation test under the 100% rated active power condition should be carried out. The on-site test instrument equipment should meet the needs of high-frequency data acquisition and recording, and the data acquisition interval should be less than or equal to 20ms. The test items include: static test and dynamic test. It also includes determining the test parameter range, which includes the frequency modulation dead zone range, under-frequency response frequency range, over-frequency response frequency range, and the time interval for issuing instructions. In the specific implementation process, the test method, test requirements, test items and test parameter range can be selected according to the actual situation of the power grid.

[0032] Step S202, performing a static test according to the test parameter range to obtain a static test result, and determining the static performance of the adjustable load participating in the primary frequency modulation according to the static test result;

[0033] Specifically, after determining the test parameter range, a static test is first performed, that is, by setting static parameters to test whether the parameters in the primary frequency modulation process are within the allowable error range. The static test includes a frequency measurement unit data acquisition test of an adjustable load, a primary frequency modulation dead zone test, a modulation error rate test, and a frequency modulation limit test.

[0034] Step S203, performing a step response test and a ramp response test according to the above test parameter range to obtain dynamic test results, calculating dynamic performance indicators according to the above dynamic test results, and determining the dynamic performance of the above adjustable load participating in the above primary frequency modulation according to the above dynamic performance indicators.

[0035] Specifically, the dynamic test is to test the dynamic response process in the primary frequency modulation process, and the dynamic test includes the step response test and the ramp response test. The data in the dynamic test process is recorded and analyzed, the dynamic performance index is calculated, and the dynamic performance is determined, such as the dynamic response time.

[0036] Through this embodiment, the test parameter range of the power grid in which the adjustable load participates in the primary frequency modulation is determined, wherein the test parameter range is the range of frequency-related parameters in the power grid; a static test is performed according to the test parameter range to obtain a static test result, and the static performance of the adjustable load participating in the primary frequency modulation is determined according to the static test result; a step response test and a climbing response test are performed according to the test parameter range to obtain a dynamic test result, a dynamic performance index is calculated according to the dynamic test result, and the dynamic performance of the adjustable load participating in the primary frequency modulation is determined according to the dynamic performance index. Compared with the prior art, which lacks a performance test method for the adjustable load participating in the primary frequency modulation, the present application can obtain test results through static performance tests and dynamic performance tests, and evaluate the performance according to the test results, and can comprehensively and intuitively test the primary frequency modulation performance of the adjustable load while meeting the requirements of high-precision and repeatable operation tests. Therefore, the problem of the lack of a performance test method for the adjustable load participating in the primary frequency modulation in the prior art can be solved, and the effect of testing the performance of the primary frequency modulation can be achieved.

[0037] In the specific implementation process, the above-mentioned step S202 performs a static test according to the above-mentioned test parameter range to obtain a static test result, which can be achieved by the following steps: when the frequency of the above-mentioned power grid changes, record the sampling period, measurement resolution and sampling delay time collected by the frequency measurement unit, wherein the above-mentioned measurement resolution is the resolution measured by the above-mentioned frequency measurement unit; when the frequency of the above-mentioned power grid changes, record the issuance time of the power control instruction of the above-mentioned adjustable load and the output time of the target control power, and calculate the difference between the above-mentioned output time and the above-mentioned issuance time to obtain a primary frequency modulation dead zone, wherein the above-mentioned power control instruction is used to output the above-mentioned target control power of the above-mentioned adjustable load; set the frequency change deviation of the above-mentioned power grid to be greater than the standard frequency modulation dead zone, and record the adjustment rate under the condition of the above-mentioned frequency change deviation; when the above-mentioned primary frequency modulation has a limit, respectively obtain the first frequency modulation limit value of the above-mentioned adjustable load corresponding to the above-mentioned power grid under high load conditions and the second frequency modulation limit value corresponding to the above-mentioned adjustable load under low load conditions; when the above-mentioned power grid is under a preset rated active power condition, obtain the third frequency modulation limit value corresponding to the above-mentioned adjustable load under the preset rated active power condition. The method performs a static test through the above steps, so that the static performance of the adjustable load participating in a primary frequency modulation process can be accurately determined.

[0038] Specifically, the static test includes: 1) Frequency measurement unit data acquisition test: by continuously changing the simulated grid frequency signal, that is, when the grid frequency changes, the sampling period, measurement resolution and acquisition delay time of the frequency measurement unit are tested and recorded. The frequency measurement unit collects voltage and current signal data, and the frequency data is calculated by the above voltage and current sampling data. 2) Primary frequency modulation dead zone test: by continuously changing the simulated grid frequency signal to test the primary frequency modulation dead zone, that is, also when the grid frequency changes, record the time when the power control instruction of the adjustable load is issued, and the time when the power control instruction starts to output the target control power, the difference between the two times is the primary frequency modulation dead zone. 3) Difference rate test: by giving a simulated grid frequency signal, and the frequency change deviation is outside the primary frequency modulation control dead zone, that is, the frequency change deviation is greater than the standard frequency modulation dead zone, record the time when the power control instruction of the adjustable load is issued, and verify the difference rate. 4) Frequency limit test: For power grids with primary frequency limit, the primary frequency limit value under high load conditions, i.e., the first frequency limit value, and the primary frequency limit value under low load conditions, i.e., the second frequency limit value, should be tested separately. The preset rated active power condition usually refers to the 100% rated active power condition. If there are specific requirements for the 100% rated active power condition, a primary frequency limit value test under the 100% rated active power condition should be carried out to obtain the third frequency limit value corresponding to the 100% rated active power condition. The frequency of the power system is the same value, so the frequency measurement unit can be selected at any location. The frequency measurement unit is usually installed at the grid connection point where the load can be adjusted.

[0039] In some optional implementations, the above step S202 determines the static performance of the above adjustable load participating in the primary frequency modulation according to the above static test result, which can be achieved by the following steps: comparing the above static test result with the corresponding error allowable range; when the above static test result is within the above error allowable range, determining that the static performance of the above primary frequency modulation is normal. The method determines that the static performance of the adjustable load participating in the primary frequency modulation is normal through the above steps, so that the static performance can be accurately determined.

[0040] In the specific implementation process, the test results obtained in the above static test steps are collectively referred to as static test results, including sampling period, measurement resolution and sampling delay time, primary frequency modulation dead zone, modulation error rate and each frequency modulation limit value. When the above static test results are all within the error tolerance range, it is determined that the static performance of the primary frequency modulation is normal. The error tolerance range can be determined based on the value submitted by the applicant for the test.

[0041] In order to perform dynamic testing, the above step S203 performs a step response test according to the above test parameter range to obtain dynamic test results, which can be achieved by the following steps: connecting the communication interface of the above adjustable load, obtaining the format of the data message, and verifying whether the format of the above data message is a predetermined format; when the format of the above data message is a predetermined format, collecting voltage data and current data; setting the frequency action dead zone, and generating an increasing step signal and a decreasing step signal through a standard frequency signal source, respectively testing the first step response result corresponding to the above increasing step signal and the second step response result corresponding to the above decreasing step signal. The method performs a step response test through the above steps, so that the dynamic performance of the adjustable load participating in primary frequency modulation can be tested.

[0042] Specifically, the dynamic test is divided into a step response test and a ramp response test. The steps of the step response test are: a) First, check the wiring. After the wiring check is correct, connect the communication interface of the adjustable load to verify whether the format of the communication data message is accurate, including data reporting, power control and other data. The accuracy of the message format can be determined by verifying whether the above data is in a predetermined format. b) When the data message format is in a predetermined format, the primary frequency modulation test device collects voltage data and current data, records voltage data and current data, and verifies data density and correctness. c) Set the frequency action dead zone. d) Generate a set of downward frequency step signals, i.e., decreasing step signals (-0.03Hz, -0.05Hz, -0.1Hz, -0.2Hz, -0.25Hz, -0.4Hz, -0.45Hz, each lasting 10s) through a standard frequency signal source to test the response results under different frequency signals. e) Generate a set of upward frequency step signals, i.e., increasing step signals (0.03 Hz, 0.05 Hz, 0.1 Hz, 0.2 Hz, 0.25 Hz, 0.4 Hz, 0.45 Hz, each lasting 10 s) through a standard frequency signal source, and test the response results under different frequency signals.

[0043] In some optional implementations, performing a ramp response test according to the above test parameter range to obtain a dynamic test result further includes: setting a plurality of steady-state frequencies and a climbing rate corresponding to each of the above steady-state frequencies to obtain a plurality of groups of combinations of the above steady-state frequencies and the above climbing rates, and testing the climbing response of each group of the above steady-state frequencies and the above climbing rates for a predetermined duration to obtain a ramp response test result. The method performs a ramp response test through the above steps, so that it can test whether the ramp response function of the power grid is normal.

[0044] In the specific implementation process, six groups of steady-state frequencies and the above-mentioned climbing rates are set, and the predetermined duration is set to 5s. They are: a) steady-state frequency 49.95Hz, climbing rate 0.01Hz / s, lasting 5s; b) steady-state frequency 50.00Hz, climbing rate 0.02Hz / s, lasting 5s; c) steady-state frequency 50.10Hz, climbing rate 0.05Hz / s, lasting 5s; d) steady-state frequency 50.35Hz, climbing rate -0.05Hz / s, lasting 5s. e) steady-state frequency 50.10Hz, climbing rate -0.02Hz / s, lasting 5s. f) steady-state frequency 50.00Hz, climbing rate -0.01Hz / s, lasting 5s. Test the climbing response of each group of the above-mentioned steady-state frequencies and the above-mentioned climbing rates to obtain the climbing response test results.

[0045] In some optional implementations, the calculation of the dynamic performance index according to the above dynamic test results can be achieved by the following steps: calculating the difference between the issuance time of the power control instruction of the above adjustable load and the output time of the target control power to obtain a primary frequency modulation dead zone; calculating the frequency response interval in the above step response test and the above ramp response test; calculating the deviation between the maximum response value and the minimum response value to obtain the maximum response deviation, wherein the above maximum response value is the maximum value of the step response or the above ramp response test, and the above minimum response value is the minimum value of the above step response or the above ramp response; calculating the integral of the response quantity over time to obtain the response integral quantity, wherein the above response quantity is the step response quantity or the ramp response quantity. The method calculates the dynamic performance index through the above steps, so that the dynamic performance index can be calculated to determine the dynamic performance of the adjustable load participating in the primary frequency modulation.

[0046] Specifically, the frequency modulation dead zone means that no action is taken within this interval. The primary frequency modulation dead zone is obtained by calculating the difference between the issuance time of the power control instruction of the above-mentioned adjustable load and the output time of the target control power. If it is within the range of the primary frequency modulation dead zone, it means that there is no problem with the primary frequency modulation dead zone; the frequency response interval means that no action is taken normally within this interval, including the frequency response interval in the step response test and the climbing response test; the maximum response deviation: is the maximum deviation in the response process, the difference between the maximum response value and the minimum response value; the primary frequency modulation response integral: is the integral of the response quantity over time.

[0047] In some optional implementations, calculating the dynamic performance index based on the above dynamic test results also includes: calculating the difference between the above-mentioned issuance time of the power control instruction and the time when the power change first reaches the first predetermined percentage of the target control power to obtain the start-up time; calculating the difference between the above-mentioned issuance time of the power control instruction and the time when the power change first reaches the second predetermined percentage of the target control power to obtain the response time, wherein the above-mentioned first predetermined percentage is less than the above-mentioned second predetermined percentage; calculating the difference between the above-mentioned issuance time of the power control instruction and the time when the power change first reaches the target control power to obtain the adjustment time. The method calculates the start-up time, response time and adjustment time of the adjustable load participating in a frequency modulation process through the above steps, so that the time response performance of a frequency modulation process can be tested.

[0048] During the specific implementation process, the start-up time (s) is the time from the receipt of the control signal until the power change reaches the first predetermined percentage of the target control power for the first time, and the first predetermined percentage is set to 10%; the response time (s) is the time from the receipt of the control signal until the power change reaches the second predetermined percentage of the target control power for the first time, and the second predetermined percentage is set to 90%; the adjustment time (s) is the time from the receipt of the control signal until the starting moment when the power reaches the target control power and the power deviation is always controlled within ±2%.

[0049] In order to test the anti-disturbance performance during the primary frequency modulation process, the method further includes the following steps: setting the voltage fluctuation of the power grid and the frequency unchanged, testing whether the power grid has a low voltage ride-through fault or a high voltage ride-through fault; setting the voltage fluctuation of the power grid and the frequency change, testing whether the power grid has a low voltage ride-through fault or a high voltage ride-through fault. The method performs an anti-disturbance test through the above steps, so that the anti-disturbance performance can be tested.

[0050] In the specific implementation process, the anti-disturbance function of the adjustable load during the high and low voltage ride-through transient process is tested. The test contents are as follows: 1) Voltage fluctuation, frequency unchanged, test whether the primary frequency modulation function works normally. 2) Voltage fluctuation, frequency change, test whether the primary frequency modulation function works normally. There may be low voltage ride-through faults and high voltage ride-through faults. The corresponding test contents and frequency change waveforms are shown in Table 1:

[0051] Table 1

[0052]

[0053] In some optional implementations, the method further comprises the following steps: after a predetermined interval, under high load conditions and low load conditions, re-performing the static test, the step response test and the ramp response test. The method performs a recheck test through the above steps, so that the performance of the adjustable load participating in the primary frequency regulation can be repeatedly verified to ensure that the performance of the power grid is normal.

[0054] During the specific implementation process, the adjustable load should be subject to a frequency regulation review test at regular intervals. The review can be conducted after a predetermined interval. The review period should not exceed 2 years. After the review test is completed, a test report should be provided to the power dispatching agency. After the relevant components that affect the primary frequency regulation performance of the adjustable load are reconstructed, overhauled, software upgraded, logic or parameter modified, a frequency regulation test should be conducted again and a test report should be provided to the power dispatching agency. The test items include the above-mentioned static test items and dynamic test items: primary frequency regulation dead zone test, limit test, step response test, and climbing response test. The test includes two working conditions: low load condition and high load condition.

[0055] In order to accurately determine the test parameter range, the above step S201 determines the test parameter range of the adjustable load participating in the primary frequency modulation, which can be achieved by the following steps: determining the primary frequency modulation dead zone range of the above primary frequency modulation; determining the under-response frequency interval and over-response frequency interval of the above primary frequency modulation; determining the time interval between the issuance of the frequency modulation control instructions of each adjacent two primary frequency modulations, wherein the frequency modulation control instructions are instructions for controlling the above adjustable load to perform a primary frequency modulation. The method determines the test parameter range through the above steps, so that the test can be carried out under the above test parameter range to ensure good test conditions.

[0056] Specifically, the frequency modulation dead zone range should be set to [49.95,50.05] Hz. The under-response frequency range should be set to [49.95-49.80] Hz. The over-response frequency range should be set to [50.05-50.20] Hz. The interval time between the issuance of adjacent frequency modulation control instructions should be set to 15 seconds.

[0057] In order to enable those skilled in the art to more clearly understand the technical solution of the present application, the implementation process of the performance test method of the adjustable load participating in primary frequency regulation of the present application will be described in detail below in combination with specific embodiments.

[0058] This embodiment relates to a specific performance test method for an adjustable load to participate in primary frequency regulation, such as Figure 2 As shown, the following steps are included:

[0059] Step S1: Determine the test method and test requirements: A single adjustable load in the case of adjustable load aggregation should be tested by remote full-scale testing and single sampling testing. The sampling ratio is determined by the dispatching agency according to the situation of the power grid. The same type of adjustable load equipment can choose one test point for testing, and the test results can be applied to other adjustable load equipment. The test requirements include: the test condition should be selected for the period when the operating power of the adjustable load is greater than 80% PN (rated power). If there are specific requirements for 100% rated active power conditions, a frequency modulation test under 100% rated active power conditions should be carried out. On-site test instrumentation and equipment should meet the needs of high-frequency data acquisition and recording, and the data acquisition interval should be less than or equal to 20ms. Test items include static tests and dynamic tests;

[0060] Step S2: Determine the test parameter range: 1) The frequency modulation dead zone should be set to [49.95, 50.05] Hz; 2) The under-frequency response frequency interval should be set to [49.95-49.80] Hz; 3) The over-frequency response frequency interval should be set to [50.05-50.20] Hz; 4) The interval time for sending adjacent frequency modulation control commands should be set to 15 seconds;

[0061] Step S3: Static test: 1) Frequency measurement unit data acquisition test: by continuously changing the simulated grid frequency signal, that is, when the grid frequency changes, test and record the sampling period, measurement resolution and acquisition delay time of the frequency measurement unit. 2) Primary frequency modulation dead zone test: by continuously changing the simulated grid frequency signal, test the primary frequency modulation dead zone, that is, also when the grid frequency changes, record the time when the power control instruction of the adjustable load is issued, and the time when the power control instruction starts to output the target control power, the difference between the two times is the primary frequency modulation dead zone. 3) Difference rate test: by giving a simulated grid frequency signal, and the frequency change deviation is outside the primary frequency modulation control dead zone, that is, the frequency change deviation is greater than the standard frequency modulation dead zone, record the time when the power control instruction of the adjustable load is issued, and check the difference rate. 4) Frequency modulation limit test: for a grid with a primary frequency modulation limit, the primary frequency modulation limit value under high load conditions, that is, the first frequency modulation limit value, and the primary frequency modulation limit value under low load conditions, that is, the second frequency modulation limit value, should be tested respectively. The preset rated active power condition usually refers to the 100% rated active power condition. If there are specific requirements for the 100% rated active power condition, a frequency modulation limit value test should be carried out under the 100% rated active power condition to obtain the third frequency modulation limit value corresponding to the 100% rated active power condition;

[0062] Step S4: Dynamic test: The steps of the step response test are as follows: a) First, perform a wiring check. After the wiring check is correct, connect the communication interface of the adjustable load to verify whether the format of the communication data message is accurate, including data reporting, power control and other data. The accuracy of the message format can be determined by verifying whether the above data is in a predetermined format. b) When the data message format is in a predetermined format, the primary frequency modulation test device collects voltage data and current data, records the voltage data and current data, and verifies the data density and correctness. c) Set the frequency action dead zone. d) Generate a set of downward frequency step signals, i.e., decreasing step signals (-0.03Hz, -0.05Hz, -0.1Hz, -0.2Hz, -0.25Hz, -0.4Hz, -0.45Hz, each lasting 10s) through a standard frequency signal source to test the response results under different frequency signals. e) Generate a set of upward frequency step signals, i.e., increasing step signals (0.03Hz, 0.05Hz, 0.1Hz, 0.2Hz, 0.25Hz, 0.4Hz, 0.45Hz, each lasting 10s) through a standard frequency signal source, and test the response results under different frequency signals; The steps of the ramp response test are: set six groups of steady-state frequencies and the above-mentioned ramp rates, and set the predetermined duration to 5s. They are: a) steady-state frequency 49.95Hz, ramp rate 0.01Hz / s, lasting 5s; b) steady-state frequency 50.00Hz, ramp rate 0.02Hz / s, lasting 5s; c) steady-state frequency 50.10Hz, ramp rate 0.05Hz / s, lasting 5s; d) steady-state frequency 50.35Hz, ramp rate -0.05Hz / s, lasting 5s. e) steady-state frequency 50.10Hz, ramp rate -0.02Hz / s, lasting 5s. f) Steady-state frequency 50.00Hz, ramp rate -0.01Hz / s, lasting 5s. Test the ramp response of each group of the above steady-state frequency and the above ramp rate, and obtain the ramp response test results;

[0063] Step S5: Calculation of dynamic performance indicators: Calculate the difference between the issuance time of the power control instruction of the above-mentioned adjustable load and the output time of the target control power to obtain the frequency modulation dead zone; calculate the frequency response interval in the above-mentioned step response test and the above-mentioned climbing response test; calculate the deviation between the maximum response value and the minimum response value to obtain the maximum response deviation; calculate the integral of the response amount over time to obtain the response integral amount, wherein the above-mentioned response amount is the step response amount or the climbing response amount; calculate the difference between the above-mentioned issuance time of the above-mentioned power control instruction and the time when the power change amount first reaches the first predetermined percentage of the target control power to obtain the start-up time; calculate the difference between the above-mentioned issuance time of the above-mentioned power control instruction and the time when the power change amount first reaches the second predetermined percentage of the target control power to obtain the response time, wherein the above-mentioned first predetermined percentage is less than the above-mentioned second predetermined percentage; calculate the difference between the above-mentioned issuance time of the above-mentioned power control instruction and the time when the power change amount first reaches the target control power to obtain the adjustment time;

[0064] Step S6: Anti-disturbance test: Test the anti-disturbance function of the adjustable load during the transient process of high and low voltage ride-through. The test contents are as follows: 1) Voltage fluctuation, frequency unchanged, test whether the primary frequency modulation function works normally or high and low voltage ride-through fault occurs. 2) Voltage fluctuation, frequency change, test whether the primary frequency modulation function works normally or high and low voltage ride-through fault occurs. The test and waveform changes are shown in Table 1 above;

[0065] Step S7: Regular testing: The test items include static testing and dynamic testing under low load and high load conditions: primary frequency regulation dead zone test, limit test, step response test, and ramp response test. Adjustable loads should undergo a frequency regulation review test regularly, and the review cycle should not exceed 2 years. After the review test is completed, a test report should be provided to the power dispatching agency. After the relevant components that affect the primary frequency regulation performance of the adjustable load are reconstructed, overhauled, software upgraded, or logic or parameter modifications, a frequency regulation test should be carried out again and a test report should be provided to the power dispatching agency.

[0066] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.

[0067] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0068] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0069] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0070] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0071] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0072] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0073] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0074] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0075] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:

[0076] 1) In the performance test method for the adjustable load to participate in the primary frequency modulation of the present application, the test parameter range of the power grid in which the adjustable load participates in the primary frequency modulation is determined, wherein the test parameter range is the range of frequency-related parameters in the power grid; a static test is performed according to the test parameter range to obtain a static test result, and the static performance of the adjustable load participating in the primary frequency modulation is determined according to the static test result; a step response test and a climbing response test are performed according to the test parameter range to obtain a dynamic test result, and a dynamic performance index is calculated according to the dynamic test result, and the dynamic performance of the adjustable load participating in the primary frequency modulation is determined according to the dynamic performance index. Compared with the prior art, which lacks a performance test method for the adjustable load to participate in the primary frequency modulation, the present application can obtain the test results through static performance test and dynamic performance test, and evaluate the performance according to the test results, and can comprehensively and intuitively test the primary frequency modulation performance of the adjustable load while meeting the requirements of high-precision and repeatable operation test. Therefore, the problem of the lack of performance test methods for the adjustable load to participate in the primary frequency modulation in the prior art can be solved, and the effect of testing the performance of the primary frequency modulation can be achieved.

[0077] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A performance test method for an adjustable load participating in primary frequency modulation, characterized in that: include: Determine a test parameter range of a power grid in which an adjustable load participates in primary frequency regulation, wherein the test parameter range is a range of frequency-related parameters characterizing the power grid; Performing a static test according to the test parameter range to obtain a static test result, and determining the static performance of the adjustable load participating in the primary frequency modulation according to the static test result; A step response test and a climbing response test are performed according to the test parameter range to obtain dynamic test results, a dynamic performance index is calculated according to the dynamic test results, and the dynamic performance of the adjustable load participating in the primary frequency modulation is determined according to the dynamic performance index.

2. The performance test method according to claim 1, characterized in that: Perform a static test according to the test parameter range to obtain a static test result, including: When the frequency of the power grid changes, recording the sampling period, measurement resolution and sampling delay time collected by the frequency measurement unit; In the case where the frequency of the power grid changes, recording the issuance time of the power control instruction of the adjustable load and the output time of the target control power, and calculating the difference between the output time and the issuance time to obtain a primary frequency modulation dead zone, wherein the power control instruction is used to control the output of the target control power of the adjustable load; Setting the frequency change deviation of the power grid to be greater than the standard frequency regulation dead zone, and recording the frequency change deviation rate; In the case where the primary frequency modulation has a limit, respectively obtaining a first frequency modulation limit value of the adjustable load corresponding to the high load condition of the power grid and a second frequency modulation limit value corresponding to the adjustable load under the low load condition; When the power grid is under a preset rated active power condition, a third frequency modulation limit value corresponding to the adjustable load under the preset rated active power condition is obtained.

3. The performance test method according to claim 1, characterized in that: Determining the static performance of the adjustable load participating in primary frequency modulation according to the static test result includes: Comparing the static test result with the corresponding error tolerance range; When the static test result is within the allowable error range, it is determined that the static performance of the primary frequency modulation is normal.

4. The performance test method according to claim 1, characterized in that: Perform a step response test according to the test parameter range to obtain dynamic test results, including: Connecting to the communication interface of the adjustable load, obtaining the format of the data message, and verifying whether the format of the data message is a predetermined format; When the format of the data message is a predetermined format, collecting voltage data and current data; A frequency action dead zone is set, and an increasing step signal and a decreasing step signal are generated by a standard frequency signal source, and a first step response result corresponding to the increasing step signal and a second step response result corresponding to the decreasing step signal are tested respectively.

5. The performance test method according to claim 1, characterized in that: Performing a ramp response test according to the test parameter range to obtain dynamic test results also includes: A plurality of steady-state frequencies and a climbing rate corresponding to each of the steady-state frequencies are set to obtain a plurality of groups of combinations of the steady-state frequencies and the climbing rates. Within a predetermined duration, the climbing response of each group of the steady-state frequencies and the climbing rates is tested to obtain a climbing response test result.

6. The performance test method according to claim 1, characterized in that: Calculating dynamic performance indicators according to the dynamic test results includes: Calculating the difference between the issuance time of the power control instruction of the adjustable load and the output time of the target control power to obtain a primary frequency modulation dead zone; Calculating the frequency response intervals in the step response test and the ramp response test; Calculate the deviation between the maximum response value and the minimum response value to obtain the maximum response deviation, wherein the maximum response value is the maximum value of the step response or the ramp response test, and the minimum response value is the minimum value of the step response or the ramp response; The integral of the response amount over time is calculated to obtain a response integral amount, wherein the response amount is a step response amount or a climbing response amount.

7. The performance test method according to claim 1, characterized in that: Calculating the dynamic performance index according to the dynamic test results also includes: Calculate the difference between the time when the power control instruction is issued and the time when the power variation first reaches a first predetermined percentage of the target control power to obtain the start time; Calculate the difference between the issuing time of the power control instruction and the time when the power variation first reaches a second predetermined percentage of the target control power to obtain a response time, wherein the first predetermined percentage is less than the second predetermined percentage; The difference between the issuance time of the power control instruction and the time when the power variation reaches the target control power for the first time is calculated to obtain the adjustment time.

8. The performance test method according to claim 1, characterized in that: The method further comprises: Setting the voltage of the power grid to fluctuate and the frequency to remain unchanged, testing whether the power grid has a low voltage ride through fault or a high voltage ride through fault; The voltage of the power grid fluctuates and the frequency changes to test whether the power grid has a low voltage ride through fault or a high voltage ride through fault.

9. The performance test method according to claim 1, characterized in that: The method further comprises: After a predetermined interval, the static test, the step response test and the hill climbing response test are re-performed under high load conditions and low load conditions.

10. The performance test method according to claim 1, characterized in that: Determine the test parameter range for adjustable load to participate in primary frequency regulation, including: Determining a primary frequency modulation dead zone range of the primary frequency modulation; Determining an under-response frequency interval and an over-response frequency interval of the primary frequency modulation; Determine the time interval between issuing each two adjacent frequency modulation control instructions for the primary frequency modulation, wherein the frequency modulation control instruction is an instruction for controlling the adjustable load to perform a primary frequency modulation.

Citation Information

Patent Citations

  • Off-line real-time dynamic frequency response test method

    CN111896833A

  • Hydropower station governor primary frequency modulation test method, system, equipment and medium

    CN116109208A

  • DC motor phase detection method

    US20080116898A1