Transformer maintenance support

By designing the transformer maintenance bracket, the magnets and coils are used to adsorb the transformer surface, the difficulty in selecting suspension points is solved, and a stable suspension points are achieved, which reduces the safety hazards of maintenance personnel and ensures life safety.

CN119008170APending Publication Date: 2024-11-22STATE GRID XINJIANG ELECTRIC POWER COMPANY HAMI POWERSUPPLY COMPANY
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411168745.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

During the transformation maintenance process, difficulty in selecting suspension points leads to safety hazards, and it is difficult to find a suitable suspension point in the existing technology, which is prone to high fall accidents.

Method used

A transformer maintenance bracket is designed, including a connector, an insulated support rod and an adsorption assembly. It uses the magnet and coil to adsorb on the transformer surface to provide a stable suspension point, and adjust the magnetization direction to achieve adsorption and separation to ensure the safety belt. suspension.

Benefits of technology

It effectively solves the problem of finding suspension points, provides stable and powerful adsorption, reduces the risk of falling maintenance personnel, and ensures life safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119008170A_ABST
    Figure CN119008170A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of transformer maintenance, in particular to a transformer maintenance support which comprises a connecting body, an insulating supporting rod and an adsorption assembly. The device is reasonable and compact in structure, the shells are placed on the upper surface of a to-be-overhauled transformer, then the first coil and the second coil are electrified, so that the two shells are tightly adsorbed to the upper surface of the transformer, a maintainer can connect the hanging end of the safety belt and the connecting body together to carry out overhaul operation, and after the overhaul operation is completed, the safety belt is fixed to the upper surface of the to-be-overhauled transformer. The direction of current in the first coil and the second coil is changed, the magnetic poles of the first magnet and the second magnet are changed, and the magnetization directions of the magnetic poles of the first magnet and the second magnet are offset by the magnetization directions of the third magnet and the fourth magnet, so that the magnetic field around the shell is eliminated, and the demagnetization effect is achieved. According to the transformer shell, stable and strong adsorption force can be provided on the metal surface such as the transformer shell, and the life safety of a maintainer is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of transformer maintenance, in particular to a transformer maintenance bracket. Background Art

[0002] As a key equipment in the power grid, the safety and efficiency of the maintenance work of the transformer directly affect the stable operation of the power grid. Every year, the State Grid Corporation will test various parameters of the transformer in spring and autumn. When the maintenance personnel climb to the top of the transformer, the fall height is more than 2 meters. According to the safety regulations, anti-fall measures should be taken, and the simplest ones are safety belts and safety ropes. Since more than 90% of large transformers do not require customized anti-fall facilities in the production agreement, the operators have nowhere to use safety belts and safety ropes during maintenance and testing. Generally, two measures are taken to use safety belts (safety ropes). One is to remove the bolts of several oil tanks and oil storage cabinets (oil pillows) to install anti-fall devices to solve the correct use of safety belts (safety ropes), which will cause oil tanks and oil pillows to leak. The second is to save trouble and tie the safety belt (safety rope) to the high-voltage bushing of the transformer in violation of regulations. In this case, it is easy to cause a high-fall accident, and the high-voltage bushing will break and damage the equipment.

[0003] During transformer maintenance, the selection of safety belt suspension points has always been a difficult problem. Traditional safety belt suspension methods are often affected by factors such as the complex structure of the transformer and the restrictions of the surrounding environment. It is difficult to find a suitable suspension point, and even the phenomenon of hanging low and using high may occur, which brings safety hazards to maintenance personnel. Summary of the invention

[0004] The present invention provides a transformer maintenance bracket, which overcomes the deficiencies of the above-mentioned prior art and can effectively solve the problems of difficulty in finding hanging points and potential safety hazards in the existing transformer maintenance process.

[0005] The technical solution of the present invention is achieved through the following measures: a transformer maintenance bracket, including a connector, an insulating support rod and an adsorption component, the left and right ends of the connector are both equipped with insulating support rods, the lower end of each insulating support rod is fixedly equipped with an adsorption component that can be adsorbed on the outside of the transformer, the adsorption component includes a first coil, a second coil, a first magnet, a second magnet and a box-shaped shell with an opening downward, the lower end of the insulating support rod is fixedly installed together with the center of the upper end of the shell, a plurality of first magnets are fixedly installed at intervals on the left and right sides of the inner side of the upper part of the shell, the inner side of the upper part of the shell corresponding to the position between two adjacent first magnets is fixedly installed with a second magnet, and the lower end of the second magnet The magnetic pole on the side is opposite to the magnetic pole on the lower side of the first magnet at the adjacent position, a third magnet is fixedly installed on the inner side of the lower part of the shell corresponding to the lower left position of each second magnet, a fourth magnet is fixedly installed on the inner side of the lower part of the shell corresponding to the lower right position of each second magnet, the magnetic poles on the right side of the third magnet, the left side of the fourth magnet and the lower side of the second magnet are the same, the magnetic poles on the left side of the third magnet, the right side of the fourth magnet and the lower side of the first magnet are the same, a first coil wound with several turns is provided between the first magnet and the second magnet at the position above each third magnet, and a second coil wound with several turns is provided between the first magnet and the second magnet at the position above each fourth magnet.

[0006] The following are further optimizations and / or improvements to the above technical solutions: A cross-shaped guide rail can be fixedly installed on the upper side of the above-mentioned shell, and a T-shaped slide groove with an opening facing upward and a cross-section that is narrow at the top and wide at the bottom is provided on the upper side of the guide rail. A slider is slidably installed in the slide groove, and two connecting screws are installed on the upper part of the slider for rotation from left to right. A support block slidably installed on the upper side of the guide rail is fixedly installed on the lower side of the insulating support rod, and four connecting holes that penetrate up and down are evenly distributed along the circumference on the upper side of the support block. The upper ends of the two connecting screws pass through the corresponding connecting holes and are screwed with connecting nuts.

[0007] A hanging ring can be fixedly installed on the upper end of the insulating support rod, and a connecting ring is fixedly installed on the lower part of the hanging ring. The left and right ends of the connector are connected with the corresponding connecting rings, and a plurality of hanging buckles are arranged at intervals from left to right on the outside of the connector.

[0008] A buffer sleeve may be fixedly mounted on the outer side of the insulating support rod.

[0009] An auxiliary bracket may be fixedly mounted on the outer side of the upper portion of the buffer sleeve, and an anti-slip layer is provided on the lower side of the shell.

[0010] The above may also include a first magnetic force controller and a second magnetic force controller, both ends of the first coil are connected to the first magnetic force controller, and both ends of the second coil are connected to the second magnetic force controller.

[0011] The present invention has a reasonable and compact structure. The shell is placed on the upper surface of the transformer to be repaired, and the distance between the two shells is adjusted so that the distance between the connector and the transformer meets the suspension requirements of the safety belt. Then, the first coil and the second coil are energized so that the magnetic poles on the right side of the third magnet, the left side of the fourth magnet and the lower side of the second magnet are the same, the magnetic poles on the left side of the third magnet, the right side of the fourth magnet and the lower side of the first magnet are the same, and the magnetic poles on the lower side of the second magnet are opposite to the magnetic poles on the lower side of the first magnet at the adjacent position. In this way, the two shells are tightly adsorbed on the upper surface of the transformer, and the insulating support rod is fixed. The maintenance personnel can connect the hanging end of the safety belt with the connector and then carry out maintenance work. After the maintenance work is completed, the direction of the current in the first coil and the second coil is changed, thereby changing the magnetization direction, that is, changing the magnetic poles of the first magnet and the second magnet. The magnetization directions of the magnetic poles of the first magnet and the second magnet are offset by the magnetization directions of the third magnet and the fourth magnet. In this way, the magnetic field around the shell is eliminated, thereby achieving the effect of demagnetization, and facilitating the mutual separation between the shell and the transformer. The present invention can provide a stable and strong adsorption force on metal surfaces such as the transformer shell, effectively resist the impact force during accidental falling, and thus ensure the life safety of the maintenance personnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Attached Figure 1 It is a schematic diagram of the main cross-sectional structure of the best embodiment of the present invention.

[0013] Attached Figure 2 It is a schematic diagram of the left side cross-sectional structure of the shell in the best embodiment of the present invention.

[0014] Attached Figure 3 It is a schematic diagram of the top view of the shell in the best embodiment of the present invention.

[0015] Attached Figure 4 This is a circuit control block diagram of the best embodiment of the present invention.

[0016] The codes in the accompanying drawings are: 1 is a connector, 2 is an insulating support rod, 3 is a first coil, 4 is a second coil, 5 is a first magnet, 6 is a second magnet, 7 is a third magnet, 8 is a fourth magnet, 9 is a shell, 10 is a guide rail, 11 is a slide groove, 12 is a slider, 13 is a connecting screw, 14 is a support block, 15 is a connecting nut, 16 is a hanging ring, 17 is a connecting ring, 18 is a hanging buckle, 19 is a buffer sleeve, 20 is an auxiliary bracket, and 21 is an anti-slip layer. DETAILED DESCRIPTION

[0017] The present invention is not limited by the following embodiments, and specific implementation methods can be determined based on the technical solution of the present invention and actual conditions.

[0018] In the present invention, for the convenience of description, the relative position relationship of each component is described according to the attached Figure 1The layout is described in detail, such as the positional relationship of front, back, top, bottom, left, right, etc., which is based on the attached manual. Figure 1 It is determined by the layout direction.

[0019] The present invention will be further described below in conjunction with embodiments and drawings: Embodiment 1: As shown in the attached Figure 1 , 2 As shown, the transformer maintenance bracket includes a connector 1, an insulating support rod 2 and an adsorption component. The left and right ends of the connector 1 are both equipped with insulating support rods 2. The lower end of each insulating support rod 2 is fixedly equipped with an adsorption component that can be adsorbed on the outside of the transformer. The adsorption component includes a first coil 3, a second coil 4, a first magnet 5, a second magnet 6 and a box-shaped shell 9 with an opening downward. The lower end of the insulating support rod 2 is fixedly installed together with the center of the upper end of the shell 9. A plurality of first magnets 5 are fixedly installed at intervals on the left and right sides of the upper inner side of the shell 9. Second magnets 6 are fixedly installed on the inner side of the upper part of the shell 9 at positions between two adjacent first magnets 5. The magnetic poles on the lower sides of the second magnets 6 are aligned with the magnetic poles on the adjacent positions of the first magnets 5. The magnetic poles on the lower side of the first magnet 5 are opposite, and a third magnet 7 is fixedly installed on the inner side of the lower part of the shell 9 at the lower left position of each second magnet 6, and a fourth magnet 8 is fixedly installed on the inner side of the lower part of the shell 9 at the lower right position of each second magnet 6. The magnetic poles on the right side of the third magnet 7, the left side of the fourth magnet 8 and the lower side of the second magnet 6 are the same, and the magnetic poles on the left side of the third magnet 7, the right side of the fourth magnet 8 and the lower side of the first magnet 5 are the same. A first coil 3 wound with several turns is provided between the first magnet 5 and the second magnet 6 at the upper position of each third magnet 7, and a second coil 4 wound with several turns is provided between the first magnet 5 and the second magnet 6 at the upper position of each fourth magnet 8.

[0020] According to the requirements, the first magnet 5 and the second magnet 6 are both existing well-known reversible magnets, the third magnet 7 and the fourth magnet 8 are both existing well-known permanent magnets, the first coil 3 and the second coil 4 are both wound by existing well-known insulated copper wires, and the connector 1 is existing well-known technology, such as a steel wire rope. The two ends of the steel wire rope are fixedly connected to the insulating support rod 2 by a steel wire rope buckle, and can also be a telescopic rod. The material of the insulating support rod 2 is existing well-known glass fiber reinforced plastic or insulating alloy.

[0021] During use, the shell 9 is placed on the upper surface of the transformer to be repaired, and the distance between the two shells 9 is adjusted so that the distance between the connector 1 and the transformer meets the suspension requirements of the safety belt. Then, the first coil 3 and the second coil 4 are energized so that the magnetic poles on the right side of the third magnet 7, the left side of the fourth magnet 8 and the bottom side of the second magnet 6 are the same, the magnetic poles on the left side of the third magnet 7, the right side of the fourth magnet 8 and the bottom side of the first magnet 5 are the same, and the magnetism on the bottom side of the second magnet 6 is opposite to the magnetism on the bottom side of the first magnet 5 at the adjacent position, as shown in the attached figure. Figure 1The magnetic lines of force in the transformer make the two shells 9 tightly adsorbed on the upper surface of the transformer, which plays a fixing role on the insulating support rod 2. The maintenance personnel can connect the hanging end of the safety belt to the connector 1 and then carry out maintenance work. After the maintenance work is completed, the direction of the current in the first coil 3 and the second coil 4 is changed, thereby changing the magnetization direction, that is, changing the magnetic poles of the first magnet 5 and the second magnet 6. The magnetization directions of the magnetic poles of the first magnet 5 and the second magnet 6 are offset by the magnetization directions of the third magnet 7 and the fourth magnet 8, thus eliminating the magnetic field around the shell 9, thereby achieving the effect of demagnetization, and facilitating the mutual separation between the shell 9 and the transformer. The present invention can provide a stable and strong adsorption force on metal surfaces such as the transformer casing, effectively resist the impact force during accidental falling, thereby ensuring the life safety of the maintenance personnel.

[0022] The above transformer maintenance bracket can be further optimized and / or improved according to actual needs: Embodiment 2: As an optimization of the above embodiment, as shown in the attached Figure 1 , 2 As shown in Figure 3, a cross-shaped guide rail 10 is fixedly installed on the upper side of the shell 9, and a T-shaped slide groove 11 with an opening facing upward and a cross-section that is narrow at the top and wide at the bottom is provided on the upper side of the guide rail 10. A slider 12 is slidably installed in the slide groove 11, and two connecting screws 13 are installed on the upper part of the slider 12 to rotate from left to right at intervals. A support block 14 slidably installed on the upper side of the guide rail 10 is fixedly installed on the lower side of the insulating support rod 2, and four connecting holes that penetrate up and down are evenly distributed along the circumference on the upper side of the support block 14. The upper ends of the two connecting screws 13 pass through the corresponding connecting holes and are screwed with connecting nuts 15.

[0023] During use, through such a setting, the distance between the two insulating support rods 2 can be adjusted, so that the two shells 9 can be placed in a safe position according to the surface space of the transformer, which can not only improve the flexibility of the maintenance bracket during installation, but also ensure the contact area between the two shells 9 and the transformer, thereby improving the stability and safety of the maintenance bracket.

[0024] Embodiment 3: As an optimization of the above embodiment, as shown in the attached Figure 1 As shown, a hanging ring 16 is fixedly installed on the upper end of the insulating support rod 2, and a connecting ring 17 is fixedly installed on the lower part of the hanging ring 16. The left and right ends of the connector 1 are connected together with the corresponding connecting rings 17, and a plurality of hanging buckles 18 are spaced from left to right on the outside of the connector 1.

[0025] According to the requirements, the hanging ring 16 is a known technology, such as a bow-shaped shackle, and the hanging buckle 18 is a known technology, such as a fall arrester. During use, the hanging ring 16 is provided to facilitate the hanging of the safety belt of the maintenance personnel, the connecting ring 17 is provided to facilitate the connection between the connector 1 and the insulating support rod 2, and the hanging buckle 18 is provided to increase the range of movement of the maintenance personnel after the safety belt of the maintenance personnel is connected to the hanging buckle 18.

[0026] Embodiment 4: As an optimization of the above embodiment, as shown in the attached Figure 1 As shown, a buffer sleeve 19 is fixedly installed on the outer side of the insulating support rod 2.

[0027] According to the requirements, the material of the buffer sleeve 19 is foam or elastic material. In the process of use, through such an arrangement, it is possible to avoid the maintenance personnel from being injured and reduce the safety risk.

[0028] Embodiment 5: As an optimization of the above embodiment, as shown in the attached Figure 1 , 2 As shown, an auxiliary bracket 20 is fixedly mounted on the outer side of the upper portion of the buffer sleeve 19 , and an anti-slip layer 21 is provided on the lower side of the shell 9 .

[0029] According to the requirements, the auxiliary bracket 20 is a known technology, such as an adjustable triangular bracket, and the anti-skid layer 21 is a known technology, such as an anti-skid pad or an anti-skid pattern rolled on the lower side of the shell 9. During use, the auxiliary bracket 20 can be flexibly adjusted according to the operation requirements of the maintenance personnel to provide additional support points or balance, which can improve the stability of the maintenance bracket. By setting the anti-skid layer 21, the friction between the lower side of the shell 9 and the surface of the transformer can be increased, which has an anti-skid effect and improves the safety performance of the maintenance bracket when in use.

[0030] Embodiment 6: As an optimization of the above embodiment, as shown in the attached Figure 1 , 4 As shown, it also includes a first magnetic force controller and a second magnetic force controller. Both ends of the first coil 3 are connected to the first magnetic force controller, and both ends of the second coil 4 are connected to the second magnetic force controller.

[0031] According to the requirements, the first magnetic force controller and the second magnetic force controller are both existing well-known technologies, such as CC-5A magnetic force controller. During use, by setting the first magnetic force controller and the second magnetic force controller, it is convenient to control the current direction of the first coil 3 and the second coil 4, thereby changing the magnetic poles of the first magnet 5 and the second magnet 6, thereby controlling the third magnet 7 and the fourth magnet 8 and the transformer surface to be adsorbed or separated from each other, and the control is more convenient.

[0032] The above technical features constitute the embodiments of the present invention, which have strong adaptability and implementation effect. Non-essential technical features can be added or reduced according to actual needs to meet the requirements of different situations.

Claims

1. A transformer maintenance support, characterized in that The invention comprises a connector, an insulating support rod and an adsorption component. The left and right ends of the connector are both provided with insulating support rods. The lower end of each insulating support rod is fixedly provided with an adsorption component capable of being adsorbed on the outer side of the transformer. The adsorption component comprises a first coil, a second coil, a first magnet, a second magnet and a box-shaped shell with an opening downward. The lower end of the insulating support rod is fixedly provided with the center of the upper end of the shell. A plurality of first magnets are fixedly provided with intervals on the left and right sides of the inner side of the upper part of the shell. A second magnet is fixedly provided on the inner side of the upper part of the shell at positions between two adjacent first magnets. The magnetic poles on the lower side of the second magnet are opposite to the magnetic poles on the lower side of the first magnet at adjacent positions. A third magnet is fixedly provided on the inner side of the lower part of the shell at the lower left position of each second magnet. A fourth magnet is fixedly provided on the inner side of the lower part of the shell at the lower right position of each second magnet. The magnetic poles on the right side of the third magnet, the left side of the fourth magnet and the lower side of the second magnet are the same. The magnetic poles on the left side of the third magnet, the right side of the fourth magnet and the lower side of the first magnet are the same. A first coil wound with several turns is provided between the first magnet and the second magnet at positions above each third magnet. A second coil wound with several turns is provided between the first magnet and the second magnet at positions above each fourth magnet.

2. The transformer maintenance support according to claim 1 is characterized in that A cross-shaped guide rail is fixedly installed on the upper side of the shell, and a T-shaped slide groove with an opening facing upward and a cross-section that is narrow at the top and wide at the bottom is provided on the upper side of the guide rail. A slider is slidably installed in the slide groove, and two connecting screws are installed on the upper part of the slider for rotation from left to right. A support block slidably installed on the upper side of the guide rail is fixedly installed on the lower side of the insulating support rod, and four connecting holes that penetrate up and down are evenly distributed along the circumference on the upper side of the support block. The upper ends of the two connecting screws pass through the corresponding connecting holes and are screwed with connecting nuts.

3. The transformer maintenance support according to claim 1 or 2, characterized in that A hanging ring is fixedly installed on the upper end of the insulating support rod, a connecting ring is fixedly installed on the lower part of the hanging ring, the left and right ends of the connector are connected with the corresponding connecting rings, and a plurality of hanging buckles are arranged at intervals from left to right on the outside of the connector.

4. The transformer maintenance support according to claim 1 or 2, characterized in that A buffer sleeve is fixedly installed on the outer side of the insulating support rod.

5. The transformer maintenance support according to claim 3 is characterized in that A buffer sleeve is fixedly installed on the outer side of the insulating support rod.

6. The transformer maintenance support according to claim 4 is characterized in that An auxiliary bracket is fixedly installed on the outer side of the upper part of the buffer sleeve, and an anti-slip layer is arranged on the lower side of the shell body.

7. The transformer maintenance support according to claim 5 is characterized in that An auxiliary bracket is fixedly installed on the outer side of the upper part of the buffer sleeve, and an anti-slip layer is arranged on the lower side of the shell body.

8. The transformer maintenance support according to claim 1 or 2 or 5 or 6 or 7, characterized in that It also includes a first magnetic force controller and a second magnetic force controller. Both ends of the first coil are connected to the first magnetic force controller, and both ends of the second coil are connected to the second magnetic force controller.

9. The transformer maintenance support according to claim 3 is characterized in that It also includes a first magnetic force controller and a second magnetic force controller. Both ends of the first coil are connected to the first magnetic force controller, and both ends of the second coil are connected to the second magnetic force controller.

10. The transformer maintenance support according to claim 4, characterized in that It also includes a first magnetic force controller and a second magnetic force controller. Both ends of the first coil are connected to the first magnetic force controller, and both ends of the second coil are connected to the second magnetic force controller.

Citation Information

Cited By

  • Transformer comprehensive test board and test method thereof

    CN119224652A