Real-time high-reliability control method for power system

By adopting multi-objective optimization solution and parallel redundancy mechanism in the AGC control of the power system, the hysteresis and inaccurate allocation problems in the AGC control of the power system are solved, real-time and high-reliable power adjustment is achieved, and real-time AGC control of the power system is improved. Sex and accuracy.

CN119010210APending Publication Date: 2024-11-22STATE GRID ANHUI ELECTRIC POWER CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411066460.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing AGC control method of power system has the problem of insufficient accuracy in hysteresis control and power adjustment distribution, especially when the power shortage changes drastically, it is difficult to achieve accurate prediction and practical application.

Method used

The host and backup machine simultaneously collect data, build the AGC control model and flow model of the power system based on the collected data, obtain the power distribution plan through multi-objective optimization solution, and determine the adjustment instructions through differential verification, establish a parallel redundancy mechanism to improve real-time Sex and accuracy.

Benefits of technology

Real-time high reliability of AGC control in the power system is realized, the accuracy and real-time nature of power regulation and distribution are ensured, and the prediction problems of lag of traditional control algorithms and dynamic optimization control are overcome.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119010210A_ABST
    Figure CN119010210A_ABST
Patent Text Reader

Abstract

The invention relates to automation of a power system, in particular to a real-time high-reliability control method of the power system, which comprises the following steps: a host determines an objective function of AGC control of the power system and a first constraint condition of AGC control of the power system based on acquired data, and constructs an AGC control model of the power system according to the objective function of AGC control of the power system and the first constraint condition; carrying out multi-objective optimization solution on the power system AGC control model to obtain a first power distribution scheme sent by the AGC master station to each power station; meanwhile, the standby machine performs multi-objective optimization solution on the power system stability control model to obtain a second power distribution scheme sent by the AGC master station to each power station; performing difference checking on the first power distribution scheme and the second power distribution scheme, determining an AGC regulation instruction according to a checking result, and issuing the AGC regulation instruction to each power station; according to the technical scheme provided by the invention, the defects that a traditional control algorithm is lagged in control and power regulation and distribution are not accurate enough can be overcome.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to power system automation, and in particular to a real-time high-reliability control method for a power system. Background Art

[0002] Automatic Generation Control (AGC) of power systems is one of the main contents of power system dispatching automation. It realizes automatic adjustment and distribution of the active output of generator sets in each power station in the control area through automatic control programs to maintain the system frequency and interconnection line exchange power within the planned target range.

[0003] Many scholars at home and abroad have conducted research in this field and achieved remarkable results. Existing power system AGC control methods are mainly divided into two categories: traditional control algorithms and dynamic optimization control strategies. Traditional control algorithms are mainly adjusted according to existing deviations and belong to hysteresis control. When the power shortage changes drastically, this method can quickly compensate for the shortage. However, when the environment is in a large hysteresis link, hysteresis control is likely to cause over-regulation and under-regulation of the total regional regulation power, and the power regulation distribution is not accurate enough.

[0004] The dynamic optimization control strategy takes into account the changes in load forecast information and area control error (ACE), adjusts the unit in advance through ultra-short-term load forecasting, and optimizes the AGC adjustment power in each period of the next cycle with economic or technical indicators as the goal. However, when the power shortage changes drastically, this method cannot achieve accurate short-term prediction, and considering factors such as calculation and convergence, it is difficult to apply it to actual control at this stage. Summary of the invention

[0005] 1. Technical issues to be resolved

[0006] In view of the above-mentioned shortcomings of the prior art, the present invention provides a real-time high-reliability control method for an electric power system, which can effectively overcome the defects of the prior art such as the control lag of the traditional control algorithm and the inaccurate power regulation and distribution.

[0007] (II) Technical solution

[0008] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0009] A real-time high-reliability control method for a power system, wherein a host and a standby in an AGC master station simultaneously collect data, the host determines an objective function of the AGC control of the power system and a first constraint condition of the AGC control of the power system based on the collected data, constructs an AGC control model of the power system according to the objective function and the first constraint condition of the AGC control of the power system, performs multi-objective optimization on the AGC control model of the power system, and obtains a first power allocation scheme sent by the AGC master station to each power station;

[0010] At the same time, the standby machine constructs a power system flow model for AGC power distribution based on the collected data, constructs a power system stability control model based on the power system flow model using the objective function determined by the host, determines the second constraint condition of the power system stability control model, and performs multi-objective optimization on the power system stability control model to obtain a second power distribution plan sent by the AGC master station to each power station;

[0011] The first power allocation plan and the second power allocation plan are checked for differences, and the AGC adjustment instructions are determined according to the check results and sent to each power station.

[0012] Preferably, the host determines the objective function of the AGC control of the power system based on the collected data, including:

[0013] S11. Determine the grid regulation requirements;

[0014] S12, determining the remaining regulation amount of the power grid according to the regulation amount issued by the power grid and the execution status of the power grid units;

[0015] S13, according to the grid regulation demand and the remaining grid regulation amount, determine the regulation amount sent by the AGC master station;

[0016] S14, determining the first objective function of the AGC control of the power system according to the adjustment amount sent by the AGC master station;

[0017] S15. Determine the second objective function of the AGC control of the power system based on the prescribed mileage fee of the power station unit.

[0018] Preferably, determining the grid regulation demand in S11 includes:

[0019] S111. Determine the power grid control deviation D according to the automatic power generation control mode of the power grid:

[0020] D = k1·a·Δf+k2·ΔTB;

[0021] Among them, Δf is the grid frequency deviation, k1 is the frequency component coefficient, a is the frequency deviation coefficient, ΔTB is the tie line deviation, and k2 is the tie line component coefficient;

[0022] S112, determining the grid regulation demand AD according to the grid control deviation D:

[0023] AD=C1+C2+C3;

[0024] Wherein, C1 is the proportional component, C1=b·D, b is the proportional component gain coefficient;

[0025] C2 is the integral component, C2=c·D I , D I is the integral component of the power grid control deviation D, c is the integral component gain coefficient;

[0026] C3 is the CPS component, C3 = d·Δf', Δf' is the grid frequency deviation Δf after filtering, and d is the CPS component gain coefficient;

[0027] In S12, the remaining regulation amount of the power grid is determined according to the regulation amount issued by the power grid and the execution status of the power grid units, including:

[0028] According to the regulation amount issued by the power grid and the execution status of the power grid units, the remaining regulation amount AQ of the power grid is determined:

[0029]

[0030] Among them, AQ Ti is the target output of the i-th grid unit, AQ Ni is the current output of the i-th grid unit, AQ Ci is the regulation amount sent by the power grid received by the i-th power grid unit, e is the regulation coefficient, e<1, and n is the number of power grid units;

[0031] In S13, the AGC master station determines the regulation amount to be sent according to the grid regulation demand and the remaining regulation amount of the grid, including:

[0032] According to the grid regulation demand AD and the grid remaining regulation quantity AQ, the regulation quantity AQ' sent by the AGC master station is determined:

[0033] AQ'=AD+AQ.

[0034] Preferably, in S14, according to the adjustment amount sent by the AGC master station, determining the first objective function of the AGC control of the power system includes:

[0035] According to the adjustment quantity AQ' sent by the AGC master station, the first objective function F1 of the power system AGC control is determined:

[0036]

[0037] Among them, p jt is the actual power of the jth power station at time t, and s is the number of power stations;

[0038] In S15, based on the prescribed mileage fee of the power plant unit, the second objective function of the AGC control of the power system is determined, including:

[0039] Based on the stipulated mileage fee E of the power station unit j , determine the second objective function F2 of the power system AGC control:

[0040]

[0041] Among them, E j is the prescribed mileage fee for the j-th power station unit.

[0042] Preferably, the multi-objective optimization solution of the power system AGC control model is performed to obtain the first power allocation scheme sent by the AGC master station to each power station, including:

[0043] Based on the AGC control model of the power system, the multi-objective cuckoo search algorithm MOCS is used to perform multi-objective optimization on the first objective function F1 and the second objective function F2, and the first power allocation scheme sent by the AGC master station to each power station that meets the first constraint condition is obtained, which specifically includes:

[0044] S21, randomly generating initial positions of multiple bird nests in the search space as an initial solution set, and initializing parameters;

[0045] S22, using Levy flight to update the location of the bird's nest;

[0046] S23, using the objective function to evaluate each nest position and calculate the corresponding fitness value;

[0047] S24, judge the superiority relationship between the new solution and the previous generation optimal solution set through the Pareto dominance relationship, retain all non-inferior solutions, and update the previous generation optimal solution set;

[0048] S25, randomly changing the location of the bird's nest to simulate the situation where the host bird finds the cuckoo's eggs and abandons them or builds a new nest;

[0049] S26, judging whether the iteration termination condition is satisfied, if not, returning to S22, otherwise taking the current optimal solution set as the first power allocation scheme sent by the AGC master station to each power station that satisfies the first constraint condition.

[0050] Preferably, updating the bird's nest position by using Levy flight in S22 includes:

[0051] The following formula is used to update the nest position using Levy flight:

[0052] P i k+1 =Pi k +α·L(s,λ);

[0053] Among them, P i k is the position of the i-th bird's nest at the k-th iteration, P i k+1 is the position of the ith bird's nest at the k+1th iteration, α is the step-size scaling factor, L(s,λ) is the step-size of the Levy flight, which is a random walk and follows a specific heavy-tailed distribution.

[0054] The calculation formula of Levy flight step length L(s,λ) is:

[0055]

[0056] In the above formula, s is a random variable related to the step size, λ is the Levy flight parameter, and Γ(·) is the Gamma function, which is used to calculate the generalization of factorial.

[0057] Preferably, the standby machine constructs a power system flow model for AGC power distribution based on the collected data, and constructs a power system stability control model based on the power system flow model using an objective function determined by the host machine, including:

[0058] S31, setting the active power exchange between each sub-area and the external area to a fixed value, and regarding the power system AGC control function as the distribution of unbalanced power by multiple balancing machines in the power system in coordination according to the distribution factor;

[0059] S32, introducing the unbalanced power distribution coefficient into the conventional power flow model to obtain the power balance equation and the cross-sectional power flow equation, and combining the two equations to obtain the power system power flow model for AGC power distribution;

[0060] S33. Based on the power system flow model, the first objective function F1 and the second objective function F2 are taken as objective functions to construct a power system stability control model.

[0061] Preferably, the multi-objective optimization solution of the power system stability control model is performed to obtain the second power allocation scheme sent by the AGC master station to each power station, including:

[0062] Based on the power system stability control model, the multi-objective firefly algorithm MOFA is used to perform multi-objective optimization on the first objective function F1 and the second objective function F2, and the second power allocation scheme sent by the AGC master station to each power station that meets the second constraint condition is obtained, which specifically includes:

[0063] S41, randomly generate an initial firefly population, set an initial position and initial brightness for each firefly, and initialize parameters;

[0064] S42, calculating a corresponding objective function value for each firefly, and evaluating the brightness of the firefly according to the objective function value;

[0065] S43, updating the firefly position according to the brightness of the fireflies and the distance between the fireflies;

[0066] S44, recalculate the brightness of the fireflies, judge the superiority relationship between the new solution and the previous generation of optimal solutions through the Pareto dominance relationship, and retain all non-inferior solutions;

[0067] S45, replace the fireflies with lower brightness in the previous generation of optimal solution set with the fireflies with higher brightness in this round of iteration to obtain the current optimal solution set;

[0068] S46, judging whether the iteration termination condition is satisfied, if not, returning to S42, otherwise taking the current optimal solution set as the second power allocation scheme sent by the AGC master station to each power station that satisfies the second constraint condition.

[0069] Preferably, in S43, updating the firefly position according to the brightness of the fireflies and the distance between the fireflies includes:

[0070] The following formula is used to update the position of fireflies according to the brightness of fireflies and the distance between them:

[0071]

[0072] in, is the position of the y-th firefly at the m-th iteration, is the position of the x-th firefly at the m-th iteration, is the position of the y-th firefly at the m+1-th iteration, is the attraction of the x-th firefly to the y-th firefly at the m-th iteration, β is the step size control factor, and ε is the random term;

[0073] Attractiveness The calculation formula is:

[0074]

[0075] In the above formula, A max is the maximum attraction, A min is the minimum value of attraction, σ is the light absorption coefficient, is the Euclidean distance between the x-th firefly and the y-th firefly at the m-th iteration.

[0076] Preferably, the performing of difference verification on the first power allocation scheme and the second power allocation scheme, determining the AGC adjustment instruction according to the verification result, and sending it to each power station includes:

[0077] Performing a difference check on the first power allocation scheme and the second power allocation scheme, if the difference percentage between the two is less than a preset threshold, determining an AGC adjustment instruction according to the first power allocation scheme and the second power allocation scheme, and sending it to each power station;

[0078] If the difference percentage between the two is not less than the preset threshold, the current power system AGC control process ends and enters the next power system AGC control process.

[0079] (III) Beneficial effects

[0080] Compared with the prior art, the real-time high-reliability control method for a power system provided by the present invention has the following beneficial effects:

[0081] 1) The host determines the objective function of the AGC control of the power system and the first constraint condition of the AGC control of the power system based on the collected data, constructs the AGC control model of the power system according to the objective function and the first constraint condition of the AGC control of the power system, and uses the multi-objective cuckoo search algorithm MOCS to quickly perform multi-objective optimization on the AGC control model of the power system to obtain the first power allocation plan sent by the AGC master station to each power station;

[0082] 2) At the same time, the standby machine builds a power system flow model for AGC power distribution based on the collected data, builds a power system stability control model based on the power system flow model using the objective function determined by the host, determines the second constraint of the power system stability control model, and uses the multi-objective firefly algorithm MOFA to quickly perform multi-objective optimization on the power system stability control model to obtain the second power distribution plan sent by the AGC master station to each power station;

[0083] 3) Perform a difference check on the first power allocation scheme and the second power allocation scheme, determine the AGC adjustment command according to the check result, and establish a parallel redundant mechanism for the AGC control of the power system based on the host and backup machines in the AGC master station. This can not only effectively improve the real-time performance of the AGC control of the power system, but also ensure the accuracy of power adjustment and allocation through difference check, thereby establishing a real-time and highly reliable AGC control method for the power system. BRIEF DESCRIPTION OF THE DRAWINGS

[0084] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0085] Figure 1 It is a principle block diagram of the present invention;

[0086] Figure 2 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION

[0087] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0088] A real-time high-reliability control method for a power system, such as Figure 1 and Figure 2 As shown, the host and standby machines in the AGC master station collect data simultaneously, and the host determines the objective function of the AGC control of the power system and the first constraint condition of the AGC control of the power system based on the collected data, constructs the AGC control model of the power system according to the objective function and the first constraint condition of the AGC control of the power system, and performs multi-objective optimization solution on the AGC control model of the power system to obtain the first power allocation plan sent by the AGC master station to each power station.

[0089] ① The host determines the objective function of the power system AGC control based on the collected data, including:

[0090] S11. Determine the grid regulation requirements;

[0091] S12, determining the remaining regulation amount of the power grid according to the regulation amount issued by the power grid and the execution status of the power grid units;

[0092] S13, according to the grid regulation demand and the remaining grid regulation amount, determine the regulation amount sent by the AGC master station;

[0093] S14, determining the first objective function of the AGC control of the power system according to the adjustment amount sent by the AGC master station;

[0094] S15. Determine the second objective function of the AGC control of the power system based on the prescribed mileage fee of the power station unit.

[0095] S11 determines the grid regulation requirements, including:

[0096] S111. Determine the power grid control deviation D according to the automatic power generation control mode of the power grid:

[0097] D = k1·a·Δf+k2·ΔTB;

[0098] Among them, Δf is the grid frequency deviation, k1 is the frequency component coefficient, a is the frequency deviation coefficient, ΔTB is the tie line deviation, and k2 is the tie line component coefficient;

[0099] S112, determining the grid regulation demand AD according to the grid control deviation D:

[0100] AD=C1+C2+C3;

[0101] Wherein, C1 is the proportional component, C1=b·D, b is the proportional component gain coefficient;

[0102] C2 is the integral component, C2=c·D I , D I is the integral component of the power grid control deviation D, c is the integral component gain coefficient;

[0103] C3 is the CPS component, C3=d·Δf', Δf' is the grid frequency deviation Δf after filtering, and d is the CPS component gain coefficient.

[0104] In S12, the remaining regulation amount of the power grid is determined according to the regulation amount issued by the power grid and the execution status of the power grid units, including:

[0105] According to the regulation amount issued by the power grid and the execution status of the power grid units, the remaining regulation amount AQ of the power grid is determined:

[0106]

[0107] Among them, AQ Ti is the target output of the i-th grid unit, AQ Ni is the current output of the i-th grid unit, AQ Ci is the regulation amount issued by the power grid received by the i-th power grid unit, e is the regulation coefficient, e<1, and n is the number of power grid units.

[0108] In S13, the AGC master station determines the regulation amount to be sent according to the grid regulation demand and the remaining regulation amount of the grid, including:

[0109] According to the grid regulation demand AD and the grid remaining regulation quantity AQ, the regulation quantity AQ' sent by the AGC master station is determined:

[0110] AQ'=AD+AQ.

[0111] In S14, according to the adjustment amount sent by the AGC master station, the first objective function of the AGC control of the power system is determined, including:

[0112] According to the adjustment quantity AQ' sent by the AGC master station, the first objective function F1 of the power system AGC control is determined:

[0113]

[0114] Among them, p jt is the actual power of the jth power station at time t, and s is the number of power stations.

[0115] In S15, based on the prescribed mileage fee of the power plant unit, the second objective function of the AGC control of the power system is determined, including:

[0116] Based on the stipulated mileage fee E of the power station unit j , determine the second objective function F2 of the power system AGC control:

[0117]

[0118] Among them, E j is the prescribed mileage fee for the j-th power station unit.

[0119] ② Perform multi-objective optimization on the AGC control model of the power system to obtain the first power distribution plan sent by the AGC master station to each power station, including:

[0120] Based on the AGC control model of the power system, the multi-objective cuckoo search algorithm MOCS is used to perform multi-objective optimization on the first objective function F1 and the second objective function F2, and the first power allocation scheme sent by the AGC master station to each power station that meets the first constraint condition is obtained, which specifically includes:

[0121] S21, randomly generating initial positions of multiple bird nests in the search space as an initial solution set, and initializing parameters;

[0122] S22, using Levy flight to update the location of the bird's nest;

[0123] S23, using the objective function to evaluate each nest position and calculate the corresponding fitness value;

[0124] S24, judge the superiority relationship between the new solution and the previous generation optimal solution set through the Pareto dominance relationship, retain all non-inferior solutions, and update the previous generation optimal solution set;

[0125] S25, randomly changing the location of the bird's nest to simulate the situation where the host bird finds the cuckoo's eggs and abandons them or builds a new nest;

[0126] S26, judging whether the iteration termination condition is satisfied, if not, returning to S22, otherwise taking the current optimal solution set as the first power allocation scheme sent by the AGC master station to each power station that satisfies the first constraint condition.

[0127] Specifically, in S22, the location of the bird's nest is updated by using Levy flight, including:

[0128] The following formula is used to update the nest position using Levy flight:

[0129] P i k+1 =P i k +α·L(s,λ);

[0130] Among them, P i k is the position of the i-th bird's nest at the k-th iteration, P i k+1 is the position of the ith bird's nest at the k+1th iteration, α is the step-size scaling factor, L(s,λ) is the step-size of the Levy flight, which is a random walk and follows a specific heavy-tailed distribution.

[0131] The calculation formula of Levy flight step length L(s,λ) is:

[0132]

[0133] In the above formula, s is a random variable related to the step size, λ is the Levy flight parameter, and Γ(·) is the Gamma function, which is used to calculate the generalization of factorial.

[0134] In the above technical solution, the host determines the objective function of the AGC control of the power system and the first constraint condition of the AGC control of the power system based on the collected data, constructs the AGC control model of the power system according to the objective function and the first constraint condition of the AGC control of the power system, and adopts the multi-objective cuckoo search algorithm MOCS to perform fast multi-objective optimization solution on the AGC control model of the power system, and obtains the first power allocation plan sent by the AGC master station to each power station.

[0135] At the same time, Figure 1 and Figure 2 As shown, the standby machine builds a power system flow model for AGC power distribution based on the collected data, builds a power system stability control model based on the power system flow model using the objective function determined by the host machine, determines the second constraint condition of the power system stability control model, and performs multi-objective optimization solution on the power system stability control model to obtain the second power distribution plan sent by the AGC master station to each power station.

[0136] ① The standby machine builds a power system flow model for AGC power distribution based on the collected data, and builds a power system stability control model based on the power system flow model using the objective function determined by the host, including:

[0137] S31, setting the active power exchange between each sub-area and the external area to a fixed value, and regarding the power system AGC control function as the distribution of unbalanced power by multiple balancing machines in the power system in coordination according to the distribution factor;

[0138] S32, introducing the unbalanced power distribution coefficient into the conventional power flow model to obtain the power balance equation and the cross-sectional power flow equation, and combining the two equations to obtain the power system power flow model for AGC power distribution;

[0139] S33. Based on the power system flow model, the first objective function F1 and the second objective function F2 are taken as objective functions to construct a power system stability control model.

[0140] ② Perform multi-objective optimization on the power system stability control model to obtain the second power distribution plan sent by the AGC master station to each power station, including:

[0141] Based on the power system stability control model, the multi-objective firefly algorithm MOFA is used to perform multi-objective optimization on the first objective function F1 and the second objective function F2, and the second power allocation scheme sent by the AGC master station to each power station that meets the second constraint condition is obtained, which specifically includes:

[0142] S41, randomly generate an initial firefly population, set an initial position and initial brightness for each firefly, and initialize parameters;

[0143] S42, calculating a corresponding objective function value for each firefly, and evaluating the brightness of the firefly according to the objective function value;

[0144] S43, updating the firefly position according to the brightness of the fireflies and the distance between the fireflies;

[0145] S44, recalculate the brightness of the fireflies, judge the superiority relationship between the new solution and the previous generation of optimal solutions through the Pareto dominance relationship, and retain all non-inferior solutions;

[0146] S45, replace the fireflies with lower brightness in the previous generation of optimal solution set with the fireflies with higher brightness in this round of iteration to obtain the current optimal solution set;

[0147] S46, judging whether the iteration termination condition is satisfied, if not, returning to S42, otherwise taking the current optimal solution set as the second power allocation scheme sent by the AGC master station to each power station that satisfies the second constraint condition.

[0148] Specifically, in S43, updating the firefly position according to the brightness of the fireflies and the distance between the fireflies includes:

[0149] The following formula is used to update the position of fireflies according to the brightness of fireflies and the distance between them:

[0150]

[0151] in, is the position of the y-th firefly at the m-th iteration, is the position of the x-th firefly at the m-th iteration, is the position of the y-th firefly at the m+1-th iteration, is the attraction of the x-th firefly to the y-th firefly at the m-th iteration, β is the step size control factor, and ε is the random term;

[0152] Attractiveness The calculation formula is:

[0153]

[0154] In the above formula, A max is the maximum attraction, A min is the minimum value of attraction, σ is the light absorption coefficient, is the Euclidean distance between the xth firefly and the yth firefly at the mth iteration.

[0155] In the above technical scheme, the standby machine builds a power system flow model for AGC power distribution based on the collected data, builds a power system stability control model based on the power system flow model using the objective function determined by the host machine, determines the second constraint condition of the power system stability control model, and uses the multi-objective firefly algorithm MOFA to quickly perform multi-objective optimization solution on the power system stability control model to obtain the second power distribution plan sent by the AGC master station to each power station.

[0156] like Figure 1 and Figure 2 As shown, the difference between the first power allocation scheme and the second power allocation scheme is checked, and the AGC adjustment instruction is determined according to the check result and sent to each power station, specifically including:

[0157] The first power allocation scheme and the second power allocation scheme are checked for differences. If the difference percentage between the two is less than a preset threshold (such as Figure 1 As shown in , it is set to 5%), then the AGC adjustment instruction is determined according to the first power allocation scheme and the second power allocation scheme, and sent to each power station;

[0158] If the difference percentage between the two is not less than the preset threshold, the current power system AGC control process ends and enters the next power system AGC control process.

[0159] The above technical scheme performs a difference check on the first power allocation scheme and the second power allocation scheme, determines the AGC adjustment instruction according to the check result, and establishes a parallel redundant mechanism for the AGC control of the power system based on the main machine and the backup machine in the AGC master station. It can not only effectively improve the real-time performance of the AGC control of the power system, but also ensure the accuracy of power adjustment and allocation through the difference check, thereby establishing a real-time and highly reliable AGC control method for the power system.

[0160] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A real-time high-reliability control method for a power system, characterized by: The host and standby machines in the AGC master station collect data simultaneously, and the host determines the objective function of the AGC control of the power system and the first constraint condition of the AGC control of the power system based on the collected data, constructs the AGC control model of the power system according to the objective function and the first constraint condition of the AGC control of the power system, and performs multi-objective optimization solution on the AGC control model of the power system to obtain the first power allocation plan sent by the AGC master station to each power station; At the same time, the standby machine constructs a power system flow model for AGC power distribution based on the collected data, constructs a power system stability control model based on the power system flow model using the objective function determined by the host, determines the second constraint condition of the power system stability control model, and performs multi-objective optimization on the power system stability control model to obtain a second power distribution plan sent by the AGC master station to each power station; The first power allocation plan and the second power allocation plan are checked for differences, and the AGC adjustment instructions are determined according to the check results and sent to each power station.

2. The real-time high-reliability control method for a power system according to claim 1, characterized in that: The host determines the objective function of the AGC control of the power system based on the collected data, including: S11. Determine the grid regulation requirements; S12, determining the remaining regulation amount of the power grid according to the regulation amount issued by the power grid and the execution status of the power grid units; S13, according to the grid regulation demand and the remaining grid regulation amount, determine the regulation amount sent by the AGC master station; S14, determining the first objective function of the AGC control of the power system according to the adjustment amount sent by the AGC master station; S15. Determine the second objective function of the AGC control of the power system based on the prescribed mileage fee of the power station unit.

3. The real-time high-reliability control method for a power system according to claim 2, characterized in that: S11 determines the grid regulation requirements, including: S111. Determine the power grid control deviation D according to the automatic power generation control mode of the power grid: D = k1·a·Δf+k2·ΔTB; Among them, Δf is the grid frequency deviation, k1 is the frequency component coefficient, a is the frequency deviation coefficient, ΔTB is the tie line deviation, and k2 is the tie line component coefficient; S112, determining the grid regulation demand AD according to the grid control deviation D: AD=C1+C2+C3; Wherein, C1 is the proportional component, C1=b·D, b is the proportional component gain coefficient; C2 is the integral component, C2=c·D I , D I is the integral component of the power grid control deviation D, c is the integral component gain coefficient; C3 is the CPS component, C3 = d·Δf', Δf' is the grid frequency deviation Δf after filtering, and d is the CPS component gain coefficient; In S12, the remaining regulation amount of the power grid is determined according to the regulation amount issued by the power grid and the execution status of the power grid units, including: According to the regulation amount issued by the power grid and the execution status of the power grid units, the remaining regulation amount AQ of the power grid is determined: Among them, AQ Ti is the target output of the i-th grid unit, AQ Ni is the current output of the i-th grid unit, AQ Ci is the regulation amount sent by the power grid received by the i-th power grid unit, e is the regulation coefficient, e<1, and n is the number of power grid units; In S13, the AGC master station determines the regulation amount to be sent according to the grid regulation demand and the remaining regulation amount of the grid, including: According to the grid regulation demand AD and the grid remaining regulation quantity AQ, the regulation quantity AQ' sent by the AGC master station is determined: AQ'=AD+AQ.

4. The real-time high-reliability control method for a power system according to claim 3, characterized in that: In S14, according to the adjustment amount sent by the AGC master station, the first objective function of the AGC control of the power system is determined, including: According to the adjustment quantity AQ' sent by the AGC master station, the first objective function F1 of the power system AGC control is determined: Among them, p jt is the actual power of the jth power station at time t, and s is the number of power stations; In S15, based on the prescribed mileage fee of the power plant unit, the second objective function of the AGC control of the power system is determined, including: Based on the stipulated mileage fee E of the power station unit j , determine the second objective function F2 of the power system AGC control: Among them, E j is the prescribed mileage fee for the j-th power station unit.

5. The real-time high-reliability control method for a power system according to claim 4, characterized in that: The multi-objective optimization solution of the power system AGC control model is performed to obtain a first power distribution scheme sent by the AGC master station to each power station, including: Based on the AGC control model of the power system, the multi-objective cuckoo search algorithm MOCS is used to perform multi-objective optimization on the first objective function F1 and the second objective function F2, and the first power allocation scheme sent by the AGC master station to each power station that meets the first constraint condition is obtained, which specifically includes: S21, randomly generating initial positions of multiple bird nests in the search space as an initial solution set, and initializing parameters; S22, using Levy flight to update the location of the bird's nest; S23, using the objective function to evaluate each nest position and calculate the corresponding fitness value; S24, judge the superiority relationship between the new solution and the previous generation optimal solution set through the Pareto dominance relationship, retain all non-inferior solutions, and update the previous generation optimal solution set; S25, randomly changing the location of the bird's nest to simulate the situation where the host bird finds the cuckoo's eggs and abandons them or builds a new nest; S26, judging whether the iteration termination condition is satisfied, if not, returning to S22, otherwise taking the current optimal solution set as the first power allocation scheme sent by the AGC master station to each power station that satisfies the first constraint condition.

6. The real-time high-reliability control method for a power system according to claim 5, characterized in that: In S22, Levi's flight is used to update the nest position, including: The following formula is used to update the nest position using Levy flight: P i k+1 =P i k +α·L(s,λ); Among them, P i k is the position of the i-th bird's nest at the k-th iteration, P i k+1 is the position of the ith bird's nest at the k+1th iteration, α is the step-size scaling factor, L(s,λ) is the step-size of the Levy flight, which is a random walk and follows a specific heavy-tailed distribution. The calculation formula of Levy flight step length L(s,λ) is: In the above formula, s is a random variable related to the step size, λ is the Levy flight parameter, and Γ(·) is the Gamma function, which is used to calculate the generalization of factorial.

7. The real-time high-reliability control method for a power system according to claim 4, characterized in that: The standby machine constructs a power system flow model for AGC power distribution based on the collected data, and constructs a power system stability control model based on the power system flow model using an objective function determined by the host machine, including: S31, setting the active power exchange between each sub-area and the external area to a fixed value, and regarding the power system AGC control function as the distribution of unbalanced power by multiple balancing machines in the power system in coordination according to the distribution factor; S32, introducing the unbalanced power distribution coefficient into the conventional power flow model to obtain the power balance equation and the cross-sectional power flow equation, and combining the two equations to obtain the power system power flow model for AGC power distribution; S33. Based on the power system flow model, the first objective function F1 and the second objective function F2 are taken as objective functions to construct a power system stability control model.

8. The real-time high-reliability control method for a power system according to claim 7, characterized in that: The multi-objective optimization solution of the power system stability control model is performed to obtain the second power distribution scheme sent by the AGC master station to each power station, including: Based on the power system stability control model, the multi-objective firefly algorithm MOFA is used to perform multi-objective optimization on the first objective function F1 and the second objective function F2, and the second power allocation scheme sent by the AGC master station to each power station that meets the second constraint condition is obtained, which specifically includes: S41, randomly generate an initial firefly population, set an initial position and initial brightness for each firefly, and initialize parameters; S42, calculating a corresponding objective function value for each firefly, and evaluating the brightness of the firefly according to the objective function value; S43, updating the firefly position according to the brightness of the fireflies and the distance between the fireflies; S44, recalculate the brightness of the fireflies, judge the superiority relationship between the new solution and the previous generation of optimal solutions through the Pareto dominance relationship, and retain all non-inferior solutions; S45, replace the fireflies with lower brightness in the previous generation of optimal solution set with the fireflies with higher brightness in this round of iteration to obtain the current optimal solution set; S46, judging whether the iteration termination condition is satisfied, if not, returning to S42, otherwise taking the current optimal solution set as the second power allocation scheme sent by the AGC master station to each power station that satisfies the second constraint condition.

9. The real-time high-reliability control method for a power system according to claim 8, characterized in that: In S43, the positions of the fireflies are updated according to the brightness of the fireflies and the distance between the fireflies, including: The following formula is used to update the position of fireflies according to the brightness of fireflies and the distance between them: in, is the position of the y-th firefly at the m-th iteration, is the position of the x-th firefly at the m-th iteration, is the position of the y-th firefly at the m+1-th iteration, is the attraction of the x-th firefly to the y-th firefly at the m-th iteration, β is the step size control factor, and ε is the random term; Attractiveness The calculation formula is: In the above formula, A max is the maximum attraction, A min is the minimum value of attraction, σ is the light absorption coefficient, is the Euclidean distance between the x-th firefly and the y-th firefly at the m-th iteration.

10. The real-time high-reliability control method for a power system according to claim 1, characterized in that: The difference check between the first power allocation scheme and the second power allocation scheme, determining the AGC adjustment instruction according to the check result, and sending it to each power station includes: Performing a difference check on the first power allocation scheme and the second power allocation scheme, if the difference percentage between the two is less than a preset threshold, determining an AGC adjustment instruction according to the first power allocation scheme and the second power allocation scheme, and sending it to each power station; If the difference percentage between the two is not less than the preset threshold, the current power system AGC control process ends and enters the next power system AGC control process.