Base station demand response reliable adjustment method considering mobile user service demand

By building base station energy consumption and energy storage models, the model is optimized to ensure the power reliability of base stations in extreme situations, the existing technology has failed to analyze the risk of base station energy consumption and power outage in extreme situations, and the base station needs are achieved Power and communication quality assurance during the response period.

CN119012250AInactive Publication Date: 2024-11-22ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411246943.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The prior art fails to analyze the communication quality requirements of mobile users and the basic energy consumption under the harsh communication quality of the base station in the case of extreme communication interference, and does not consider the potential risk of power outages during the demand response, resulting in the participation of the base station in demand response adjustment cannot be guaranteed.

Method used

By obtaining base station energy consumption parameters and mobile user information, a base station energy consumption calculation model is built, the remaining power of the energy storage device and the shortest sustainable discharge time is calculated, the demand response optimization model is built, optimization goals and constraints are defined, and control variables are output to ensure that The power reliability of base stations in extreme cases.

Benefits of technology

The base station load regulation and energy storage device discharge strategy in extreme cases is realized to ensure the communication quality and power reliability of the base station during the demand response period, and to avoid the insufficient power caused by power outages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119012250A_ABST
    Figure CN119012250A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of base station demand response adjustment, solves the technical problem that the prior art has an extreme influence on the construction failure rate of a demand response optimization model, and particularly relates to a base station demand response reliable adjustment method considering the service demand of a mobile user. The method comprises the following steps: acquiring base station energy consumption parameters and mobile user basic information in a current time period t in any region; and constructing a base station energy consumption calculation model during demand response according to the base station energy consumption parameters and the basic information of the mobile user, and calculating the energy consumption of the base station n considering the service demand of the mobile user in the time period t based on the base station energy consumption calculation model. According to the method, the maximum adjustable capacity of the base station load is quantified under the condition that the service requirements of mobile users are considered, then the residual electric quantity of the energy storage device of the base station is evaluated, the load voltage is reduced to a specified threshold value of a power grid, and the situation that the energy storage residual electric quantity cannot support normal service development of the base station during power failure of the power grid is avoided to the minimum extent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of base station demand response regulation, and in particular to a reliable regulation method for base station demand response taking into account mobile user service demands. Background Art

[0002] The power grid can accurately control the power consumption of 5G base stations based on real-time supply and demand conditions and forecast data, thereby adjusting the overall supply and demand balance of the power system and promoting base stations to participate in demand response. This adjustment method can not only effectively reduce the operating costs of the power system and improve energy efficiency, but also promote the consumption of renewable energy and promote the green and low-carbon development of the power system.

[0003] Existing research and engineering basically model the load of base stations, analyze the transmission and load operation constraints of mobile user base stations, build base station demand response optimization models, and output base station load control and energy storage discharge strategies to ensure that base stations can complete the grid load voltage reduction task. However, in the modeling process, the existing technology does not analyze the communication quality requirements of mobile users under extreme communication interference, does not measure the basic energy consumption of base stations under poor communication quality, and does not consider the potential risks of power outages during demand response. As a result, the real-time strategy of energy storage device discharge is not analyzed for the power demand of base stations under power outages, resulting in the inability to ensure the regulation of base stations participating in demand response. Summary of the invention

[0004] In view of the deficiencies of the prior art, the present invention provides a reliable adjustment method for base station demand response taking into account the service needs of mobile users, thereby solving the technical problem that the prior art does not consider the impact of extreme rate conditions when constructing a demand response optimization model.

[0005] To solve the above technical problems, the present invention provides the following technical solution: a reliable adjustment method for base station demand response considering the service demand of mobile users, the method comprising the following steps:

[0006] S1. Obtaining base station energy consumption parameters and basic information of mobile users in any area in the current time period t;

[0007] S2. Build a base station energy consumption calculation model for demand response based on base station energy consumption parameters and basic information of mobile users, and calculate the energy consumption of base station n in time period t considering the service needs of mobile users based on the base station energy consumption calculation model.

[0008] S3, based on energy consumption Calculate the remaining power Q of the base station energy storage device after the current period t ends n,t-1 , and according to the remaining power Q n,t-1 Calculate the shortest sustainable discharge time of base station energy storage devices Demand response end time remaining

[0009] S4, based on the remaining power Q n,t-1 , Shortest sustainable discharge time Demand response end time remaining Construct a base station demand response optimization model;

[0010] S5. Define optimization objectives and constraints to optimize the base station demand response optimization model, and output the control variables in time period t;

[0011] S6. Time period T when the demand response ends DREND Determine whether the current demand response has ended;

[0012] If t>T DREND , it indicates that the demand response is over. At this time, the base station no longer adjusts the energy consumption and does not discharge the energy storage device, and the regulation is over;

[0013] If t≤T DREND , then return to step S1.

[0014] Furthermore, in step S1, the base station energy consumption parameters include the static power consumption of base station n The power consumption coefficient γ of the base station and the maximum upper limit of the dynamic power consumption of base station n

[0015] The minimum transmission rate that mobile user terminal m can accept after accessing the base station in time period t The maximum transmission rate of information transmitted by mobile user terminal m after accessing the base station

[0016] Furthermore, in step S2, the specific process includes the following steps:

[0017] S21. Establish a base station energy consumption model according to the base station energy consumption parameters. The expression of the base station energy consumption model is:

[0018]

[0019] In the above formula, is a variable, representing the energy consumption of base station n in time period t; is a variable, representing the dynamic power consumption of base station n in time period t;

[0020] S22. Establish a mobile user service demand model based on the basic information of the mobile user. The expression of the mobile user service demand model is:

[0021]

[0022] In the above formula, is a variable, representing the information transmission rate of mobile user terminal m accessing base station n during time period t; m,n,t is a constant, indicating whether the mobile user terminal m accesses the base station in time period t. If it is connected, it is 1, otherwise it is 0;

[0023] S23, determining the information transmission rate when base station n participates in demand response Impact on energy consumption The signal-to-interference-to-noise ratio δ m,n,t , signal-to-interference-to-noise ratio δ m,n,t Subject to the following constraints:

[0024]

[0025] In the above formula, θ is a constant, which represents the average power of white noise; M t A collection of mobile user terminals; is a constant, indicating the maximum bandwidth that can be allocated by base station n; h m,n is a constant, which indicates the channel gain when the mobile user terminal m transmits the signal to the base station n; r m,n is a constant, representing the physical distance from the mobile user terminal m to the base station n; α is a constant, representing the path fading factor; is the dynamic power consumption of mobile user terminal l in time period t; r m,l represents the physical distance from mobile user terminal m to mobile user terminal l; h m,l Indicates the channel gain when mobile user terminal m transmits a signal to mobile user terminal l;

[0026] S24, when determining the dynamic power consumption of base station n, assume that the dynamic power consumption of other base stations is the largest. At this time, the signal to interference noise ratio δ m,n,t The power consumption constraints under extreme conditions must be met:

[0027]

[0028] In the above formula, is a constant, indicating the minimum transmission rate that the mobile user terminal m can accept after accessing the base station in time period t;

[0029] S25. Calculate the dynamic power consumption of base station n considering the service demand of mobile users under the power consumption constraint that the signal to noise ratio must meet the limit state

[0030] S26, calculating the energy consumption of base station n in time period t through the base station energy consumption calculation model

[0031] Furthermore, in step S21, the dynamic power consumption The following constraints are met:

[0032]

[0033] In the above formula, It is the maximum upper limit of dynamic power consumption.

[0034] Furthermore, in step S25, the specific process includes the following steps:

[0035] S251. Obtain the maximum upper limit of the current base station dynamic power consumption

[0036] S252, initialization, dynamic power consumption

[0037] S253, Order Where ΔP is the power adjustment interval during the optimization process;

[0038] S254, determine the current dynamic power consumption Whether the value meets the power consumption constraint under the extreme state; if it does, it indicates that the current dynamic power consumption It is also possible to try to further reduce the power, in which case the process returns to step S253; otherwise, the process proceeds to step S255;

[0039] S255, output

[0040] Further, in step S3, the remaining power Q n,t-1 The calculation formula is:

[0041]

[0042] In the above formula, Q n,t is the remaining power of the base station energy storage device during period t;

[0043] Set the base station to maximum power, that is Then the base station energy storage device continues to discharge, and the shortest sustainable discharge time The following constraints are met:

[0044]

[0045] Demand response end time remaining The value of satisfies the following constraints:

[0046]

[0047] In the above formula, T DREND is a constant, indicating the period when the demand response ends; It represents the discharge efficiency of the energy storage device; Δt represents the time interval.

[0048] Further, in step S4, the base station demand response optimization model includes the base station operator objective function, the base station energy storage unit discharge cost, the base station energy storage discharge model, the base station power balance model, the base station participation demand response power regulation constraint and the multivariable simplified model;

[0049] The base station operator's objective function is as follows:

[0050]

[0051] In the above formula, is a variable, representing the total operating cost of the mobile operator in period t; The constant represents the electricity price of base station n in time period t; is a constant, which represents the unit capacity subsidy that the mobile operator can obtain by participating in demand response after adjusting the power of base station n and the energy storage output in time period t; is a constant, representing the baseline load of base station n when it does not participate in demand response in period t; n,t is a 0-1 variable, indicating whether base station n reduces its power demand on the grid by using energy storage devices in time period t;

[0052] The unit discharge cost of the base station energy storage device is as follows:

[0053]

[0054] In the above formula, is a variable, which represents the unit discharge cost of the energy storage device for base station n in time period t; α is a constant, which represents the unit operating cost of the energy storage device; M is a constant, which represents a maximum value;

[0055] The base station energy storage discharge model is as follows:

[0056]

[0057] In the above formula, is a variable, representing the charging power of the energy storage device of base station n in time period t; is a constant, indicating the maximum charging power; is a variable, representing the discharge power of the energy storage device of base station n in time period t; is a constant, indicating the maximum discharge power; Q n,t is the remaining power of the energy storage device of base station n in time period t; and They represent the charging and discharging efficiency of the energy storage device respectively; Δt represents the time interval; and Respectively represent the maximum and minimum capacity of the energy storage device; is a variable, which represents the energy consumption of base station n in time period t;

[0058] The base station power balance model is as follows:

[0059]

[0060] In the above formula, is a variable, which represents the power purchased by base station n in time period t;

[0061] The constraints for base station power regulation in demand response are as follows:

[0062]

[0063] In the above formula, is a constant, indicating the load reduction amount that the power grid expects the base station to participate in demand response;

[0064] The multivariate simplified model is as follows:

[0065]

[0066] -y n,t ≤z n,t ≤My n,t

[0067] In the above formula, z n,t is the introduced auxiliary variable.

[0068] Further, in step S5, the base station operator objective function is used as the overall optimization target, and the base station energy storage unit discharge cost, base station energy storage discharge model, base station power balance model, base station participation in demand response power regulation constraints and multivariable simplified model are used as constraints to optimize the base station demand response optimization model, and output the control variables in time period t, including whether the base station n reduces the power demand y of the power grid through the use of energy storage devices in time period t n,t And the discharge power of the energy storage device of base station n in time period t

[0069] By means of the above technical solution, the present invention provides a reliable adjustment method for base station demand response considering the service demand of mobile users, which has at least the following beneficial effects:

[0070] 1. The present invention quantifies the maximum adjustable capacity of the base station load while considering the business needs of mobile users, and then evaluates the remaining power of the base station energy storage device. By constructing a base station demand response optimization model, a real-time adjustment strategy is output, which not only reduces the load to the threshold specified by the power grid, but also avoids the situation where the remaining energy storage power cannot support the normal business of the base station during power outages.

[0071] 2. The present invention can ensure the normal operation of the base station business under extreme circumstances, including the deterioration of the communication environment and power outages during the demand response period, thereby considering the potential risk of power outages during the demand response period, analyzing the real-time strategy of discharging the energy storage device according to the power demand of the base station under the power outage state, and realizing reliable regulation. BRIEF DESCRIPTION OF THE DRAWINGS

[0072] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0073] Figure 1 A flow chart of a reliable adjustment method for base station demand response according to the present invention;

[0074] Figure 2 The present invention is a flow chart of calculating dynamic power consumption using an exhaustive method. DETAILED DESCRIPTION

[0075] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific implementation methods, so that the implementation process of how the present application uses technical means to solve technical problems and achieve technical effects can be fully understood and implemented accordingly.

[0076] In this embodiment, demand response refers to dealing with short-term electricity supply and demand tensions, difficulties in absorbing renewable energy power, etc., through measures mainly based on economic incentives, guiding electricity users to voluntarily adjust their electricity consumption behavior according to the needs of power system operation, achieve peak shaving and valley filling, improve the flexibility of the power system, ensure the safe and stable operation of the power system, and promote the absorption of renewable energy power.

[0077] Demand-side resources refer to the adjustable loads, distributed power sources, new energy storage and other power resources widely distributed on the user side that can be aggregated and optimized and participate in the operation and regulation of the power system. Figure 1 As shown, the present invention aims at the problem of power reliability when 5G base stations participate in demand response, and proposes a reliable adjustment method for base station demand response considering the service needs of mobile users. The method includes the following steps:

[0078] S1. Obtain the energy consumption parameters of the base stations and basic information of mobile users in any area in the current time period t. In this embodiment, it is assumed that there are N 5G base stations in a certain area, and there are a total of T time periods in a day. In time period t, the number of mobile users to be accessed in the area is M. t N, T and M t Represent the base station set, time set and mobile user set respectively. The base station energy consumption parameters include γ、 Mobile user basic information includes x m,n,t , h m,n 、r m,n 、α.

[0079] in, is a constant, representing the static power consumption of base station n; γ is a constant, representing the power consumption coefficient of the base station; It is the maximum upper limit of dynamic power consumption.

[0080] x m,n,t is a constant, indicating whether the mobile user terminal m accesses the base station in time period t. If it is connected, it is 1, otherwise it is 0; is a constant, indicating the minimum transmission rate that the mobile user terminal m can accept after accessing the base station in time period t; is a constant, indicating the maximum transmission rate of information transmitted by mobile user terminal m after accessing the base station; h m,n is a constant, which indicates the channel gain when the mobile user terminal m transmits the signal to the base station n; r m,n is a constant, representing the physical distance from the mobile user terminal m to the base station n; α is a constant, representing the path fading factor.

[0081] S2. Build a base station energy consumption calculation model for demand response based on base station energy consumption parameters and basic information of mobile users, and calculate the energy consumption of base station n in time period t considering the service needs of mobile users based on the base station energy consumption calculation model. The base station energy consumption calculation model is composed of a base station energy consumption model and a mobile user service demand model. Therefore, in step S2, the specific process includes the following steps:

[0082] S21. Establish a base station energy consumption model according to the base station energy consumption parameters. The expression of the base station energy consumption model is:

[0083]

[0084] In the above formula, is a variable, representing the energy consumption of base station n in time period t; is a variable, representing the dynamic power consumption of base station n in time period t; due to the dynamic power consumption The size is affected by parameters such as signal-to-interference-noise ratio and bandwidth, so the dynamic power consumption The following constraints are met:

[0085]

[0086] In the above formula, is the maximum upper limit of dynamic power consumption;

[0087] S22. Establish a mobile user service demand model based on the basic information of the mobile user. The expression of the mobile user service demand model is:

[0088]

[0089] In the above formula, is a variable, representing the information transmission rate of mobile user terminal m accessing base station n during time period t; m,n,t is a constant, indicating whether the mobile user terminal m accesses the base station in time period t. If it is connected, it is 1, otherwise it is 0;

[0090] S23, determining the information transmission rate when base station n participates in demand response Impact on energy consumption The signal-to-interference-to-noise ratio δ m,n,t ; Specifically, the information transmission rate It affects the bandwidth allocated by the base station to the mobile user terminal, and the bandwidth size further affects the overall energy consumption of the base station. The relationship between the information transmission rate and the bandwidth allocated by the base station satisfies the Shannon formula constraint, that is:

[0091]

[0092] In the above formula, B m,n,t is a variable, which represents the bandwidth allocated by base station n to mobile user terminal m in time period t; m,n,t is a variable, and is the signal-to-interference-to-noise ratio (SINR) of the mobile user terminal m during access to the base station n in time period t. It can be found that under the same bandwidth, the larger the SINR, the greater the information transmission rate. m,n,t Subject to the following constraints:

[0093]

[0094] In the above formula, θ is a constant, which represents the average power of white noise; M t A collection of mobile user terminals; is a constant, indicating the maximum bandwidth that can be allocated by base station n; h m,n is a constant, which indicates the channel gain when the mobile user terminal m transmits the signal to the base station n; r m,n is a constant, representing the physical distance from the mobile user terminal m to the base station n; α is a constant, representing the path fading factor; is the dynamic power consumption of mobile user terminal l in time period t; r m,l represents the physical distance from mobile user terminal m to mobile user terminal l; h m,l It indicates the channel gain when mobile user terminal m transmits signals to mobile user terminal l.

[0095] S24. When determining its own dynamic power consumption, it is assumed that other base stations have the largest dynamic power consumption. Here, the robust idea is adopted to assume that other base stations have the largest impact on the signal to noise ratio. At this time, when determining its own dynamic power consumption, it is assumed that other base stations have the largest dynamic power consumption. At this time, the signal to noise ratio δ m,n,t The power consumption constraints under extreme conditions must be met:

[0096]

[0097] In the above formula, is a constant, indicating the minimum transmission rate that the mobile user terminal m can accept after accessing the base station in time period t;

[0098] S25. Calculate the dynamic power consumption of base station n considering the service demand of mobile users under the power consumption constraint that the signal to noise ratio must meet the limit state In step S25, due to the dynamic power consumption The size is affected by parameters such as signal-to-interference-noise ratio and bandwidth size, so an exhaustive method is used to calculate dynamic power consumption. The value of . Figure 2 As shown, the specific process includes the following steps:

[0099] S251. Obtain the maximum upper limit of the current base station dynamic power consumption

[0100] S252, initialization, dynamic power consumption

[0101] S253, Order Where ΔP is the power adjustment interval during the optimization process;

[0102] S254, determine the current dynamic power consumption Whether the value meets the power consumption constraint under the extreme state; if it does, it indicates that the current dynamic power consumption It is also possible to try to further reduce the power, in which case the process returns to step S253; otherwise, the process proceeds to step S255;

[0103] S255, output

[0104] S26, calculating the energy consumption of base station n in time period t through the base station energy consumption calculation model On the basis of meeting the business demand model of mobile users, dynamic power consumption The energy consumption can be solved according to the base station energy consumption model. in is a constant, representing the static power consumption of base station n; γ is a constant, representing the power consumption coefficient of the base station, both of which are known quantities in the energy consumption parameters of the base station.

[0105] This embodiment can take into account the communication quality requirements of mobile users under extreme communication interference conditions, and calculate the basic energy consumption of base stations under poor communication quality. At the same time, it analyzes the real-time strategy of discharging the energy storage device according to the power demand of the base station under a power outage. On this basis, a demand response optimization model for the base station is constructed, so that the base station can participate in the demand response process, which can not only ensure the completion of the load regulation tasks specified by the power grid and reduce the load to the specified threshold, but also ensure its own power reliability, avoid power outages during the demand response period, and cause the remaining energy storage to be insufficient to support the base station to carry out business until the demand response ends.

[0106] S3, based on energy consumption Calculate the remaining power Q of the base station energy storage device after the current period t ends n,t-1 , and according to the remaining power Q n,t-1 Calculate the shortest sustainable discharge time of base station energy storage devices Demand response end time remaining Specifically, the energy consumption of base station n in time period t is calculated as After that, according to the remaining power Q of the base station energy storage device during time period t n,t Reduce energy consumption You can directly get the remaining power Q n,t-1 ,Right now:

[0107]

[0108] In the above formula, Q n,t is the remaining power of the base station energy storage device during period t;

[0109] The numerical calculation idea of ​​the shortest sustainable discharge time can be referred to as follows: Assume that the base station is at maximum power, that is Then the base station energy storage device continues to discharge. The shortest sustainable discharge time The following constraints are met:

[0110]

[0111] Demand response end time remaining The value of satisfies the following constraints:

[0112]

[0113] In the above formula, T DREND is a constant, indicating the period when the demand response ends; It represents the discharge efficiency of the energy storage device; Δt represents the time interval.

[0114] S4, based on the remaining power Q n,t-1 , Shortest sustainable discharge time Demand response end time remaining A base station demand response optimization model is constructed. The base station demand response optimization model includes the base station operator objective function, the base station energy storage unit discharge cost, the base station energy storage discharge model, the base station power balance model, the base station participation in demand response power regulation constraints and the multivariable simplified model.

[0115] In this embodiment, the goal of the base station operator is to minimize the total operating cost, and the objective function is as follows:

[0116]

[0117] In the above formula, is a variable, representing the total operating cost of the mobile operator in period t; The constant represents the electricity price of base station n in time period t; is a constant, which represents the unit capacity subsidy that the mobile operator can obtain by participating in demand response after adjusting the power of base station n and the energy storage output in time period t; is a constant, representing the baseline load of base station n when it does not participate in demand response in period t; n,t is a 0-1 variable, indicating whether base station n reduces its power demand on the grid by using the energy storage device in time period t.

[0118] Setting of unit discharge cost of base station energy storage:

[0119] Determine the remaining power of the base station energy storage device according to the maximum power of the base station The duration of continuous discharge and the remaining time for the end of demand response determine whether the base station energy storage device is suitable for participating in demand response. If it is not suitable, the discharge cost of the base station energy storage is high. If it is suitable, the discharge cost of the base station energy storage is low. The unit discharge cost of the base station energy storage device is as follows:

[0120]

[0121] In the above formula, is a variable, representing the unit discharge cost of the energy storage device for base station n in time period t; α is a constant, representing the unit operating cost of the energy storage device; M is a constant, representing a maximum value.

[0122] Base station energy storage discharge model:

[0123] The operation mode of the energy storage device of base station n is as follows:

[0124]

[0125] In the above formula, is a variable, representing the charging power of the energy storage device of base station n in time period t; is a constant, indicating the maximum charging power; is a variable, representing the discharge power of the energy storage device of base station n in time period t; is a constant, indicating the maximum discharge power; Q n,t is the remaining power of the energy storage device of base station n in time period t; and They represent the charging and discharging efficiency of the energy storage device respectively; Δt represents the time interval; and Respectively represent the maximum and minimum capacity of the energy storage device; is a variable, representing the energy consumption of base station n in time period t.

[0126] Base station power balance model:

[0127] The base station needs to ensure power balance, and the power source used comes from energy storage devices and the power grid, namely:

[0128]

[0129] In the above formula, is a variable, which represents the power purchased by base station n in time period t.

[0130] Base station participation in demand response power regulation constraints:

[0131] Mobile operators need to ensure that after all base stations adjust their power and charge and discharge energy storage, the overall power change is greater than the load reduction that the grid expects the base stations to participate in demand response, and meets the following constraints:

[0132]

[0133] In the above formula, is a constant, indicating the amount of load that the grid expects the base station to reduce by participating in demand response.

[0134] Multivariate simplified model:

[0135] because and n,t are all variables. The base station operator objective function and base station power balance model include So let’s It is transformed for fast solution. The transformed constraints are as follows:

[0136]

[0137] -y n,t ≤z n,t ≤My n,t

[0138] In the above formula, z n,t is the introduced auxiliary variable.

[0139] S5. Taking the base station operator's objective function as the overall optimization target, the base station energy storage unit discharge cost, base station energy storage discharge model, base station power balance model, base station participation in demand response power regulation constraints and multivariable simplified model are used as constraints to optimize the base station demand response optimization model, and output the control variables in time period t, including whether the base station n reduces the power demand y on the grid through the use of energy storage devices in time period t. n,t And the discharge power of the energy storage device of base station n in time period t In this embodiment, a conventional mixed integer linear programming method is used to optimize the demand response optimization model, and the control variables in time period t are finally output, including y n,t and After determining the optimization objectives and constraints, the demand response optimization model can be directly optimized using the known existing mixed integer linear programming method. This optimization method is an existing technical means and will not be described in detail here.

[0140] S6. Time period T when the demand response ends DREND Determine whether the current demand response has ended; if t>T DREND , it indicates that the demand response is over. At this time, the base station no longer adjusts the energy consumption and does not discharge the energy storage device, and the regulation is over. If t≤T DREND , then return to step S1.

[0141] The present invention realizes the control of specific base station load and the discharge of energy storage device by proposing a reliable adjustment method for base station demand response taking into account the business needs of mobile users, so as to ensure the normal business of the base station under extreme conditions, including the deterioration of the communication environment and power outages during the demand response period. In this way, the potential risk of power outages during the demand response period is considered, and the real-time strategy of discharging the energy storage device is analyzed according to the power demand of the base station under the power outage state to realize reliable adjustment.

[0142] Those skilled in the art can understand that all or part of the steps in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a program, so the present application can take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application can take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.

[0143] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the above embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiments.

[0144] The above implementation methods have been described in detail. Specific examples are used herein to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.

Claims

1. A reliable adjustment method for base station demand response considering mobile user service demand, characterized in that: The method comprises the following steps: S1. Obtaining base station energy consumption parameters and basic information of mobile users in any area in the current time period t; S2. Build a base station energy consumption calculation model for demand response based on base station energy consumption parameters and basic information of mobile users, and calculate the energy consumption of base station n in time period t considering the service needs of mobile users based on the base station energy consumption calculation model. S3, based on energy consumption Calculate the remaining power Q of the base station energy storage device after the current period t ends n,t -1, and according to the remaining power Q n,t-1 Calculate the shortest sustainable discharge time of base station energy storage devices Demand response end time remaining S4, based on the remaining power Q n,t-1 , Shortest sustainable discharge time Demand response end time remaining Construct a base station demand response optimization model; S5. Define optimization objectives and constraints to optimize the base station demand response optimization model, and output the control variables in time period t; S6. Time period T when the demand response ends DREND Determine whether the current demand response has ended; If t>T DREND , it indicates that the demand response is over. At this time, the base station no longer adjusts the energy consumption and does not discharge the energy storage device, and the regulation is over; If t≤T DREND , then return to step S1.

2. The reliable adjustment method for base station demand response according to claim 1, characterized in that: In step S1, the base station energy consumption parameters include the static power consumption of base station n The power consumption coefficient γ of the base station and the maximum upper limit of the dynamic power consumption of base station n The basic information of mobile users includes whether the mobile user terminal m accesses the base station in time period t m,n,t , the minimum transmission rate that mobile user terminal m can accept after accessing the base station in time period t The maximum transmission rate of information transmitted by mobile user terminal m after accessing the base station The channel gain h when the mobile user terminal m transmits the signal to the base station n m,n , the physical distance r from mobile user terminal m to base station n m,n , path fading factor α.

3. The reliable adjustment method for base station demand response according to claim 1, characterized in that: In step S2, the specific process includes the following steps: S21. Establish a base station energy consumption model according to the base station energy consumption parameters. The expression of the base station energy consumption model is: In the above formula, is a variable, representing the energy consumption of base station n in time period t; is a variable, representing the dynamic power consumption of base station n in time period t; S22. Establish a mobile user service demand model based on the basic information of the mobile user. The expression of the mobile user service demand model is: In the above formula, is a variable, representing the information transmission rate of mobile user terminal m accessing base station n during time period t; m,n,t is a constant, indicating whether the mobile user terminal m accesses the base station in time period t. If it is connected, it is 1, otherwise it is 0; S23, determining the information transmission rate when base station n participates in demand response Impact on energy consumption The signal-to-interference-to-noise ratio δ m,n,t , signal-to-interference-to-noise ratio δ m,n,t Subject to the following constraints: In the above formula, θ is a constant, which represents the average power of white noise; M t A collection of mobile user terminals; is a constant, indicating the maximum bandwidth that can be allocated by base station n; h m,n is a constant, which indicates the channel gain when the mobile user terminal m transmits the signal to the base station n; r m,n is a constant, representing the physical distance from the mobile user terminal m to the base station n; α is a constant, representing the path fading factor; is the dynamic power consumption of mobile user terminal l in time period t; r m,l represents the physical distance from mobile user terminal m to mobile user terminal l; h m,l Indicates the channel gain when mobile user terminal m transmits a signal to mobile user terminal l; S24, when determining the dynamic power consumption of base station n, assume that the dynamic power consumption of other base stations is the largest. At this time, the signal to interference noise ratio δ m,n,t The power consumption constraints under extreme conditions must be met: In the above formula, is a constant, indicating the minimum transmission rate that the mobile user terminal m can accept after accessing the base station in time period t; S25. Calculate the dynamic power consumption of base station n considering the service demand of mobile users under the power consumption constraint that the signal to noise ratio must meet the limit state S26, calculating the energy consumption of base station n in time period t through the base station energy consumption calculation model 4. The reliable adjustment method for base station demand response according to claim 3, characterized in that: In step S21, dynamic power consumption The following constraints are met: In the above formula, It is the maximum upper limit of dynamic power consumption.

5. The reliable adjustment method for base station demand response according to claim 3, characterized in that: In step S25, the specific process includes the following steps: S251. Obtain the maximum upper limit of the current base station dynamic power consumption S252, initialization, dynamic power consumption S253, Order Where ΔP is the power adjustment interval during the optimization process; S254, determine the current dynamic power consumption Whether the value meets the power consumption constraint under the extreme state; if it does, it indicates that the current dynamic power consumption It is also possible to try to further reduce the power, in which case the process returns to step S253; otherwise, the process proceeds to step S255; S255, output 6. The reliable adjustment method for base station demand response according to claim 1, characterized in that: In step S3, the remaining power Q n,t-1 The calculation formula is: In the above formula, Q n,t is the remaining power of the base station energy storage device during period t; Set the base station to maximum power, that is Then the base station energy storage device continues to discharge, and the shortest sustainable discharge time The following constraints are met: Demand response end time remaining The value of satisfies the following constraints: In the above formula, T DREND is a constant, indicating the period when the demand response ends; It represents the discharge efficiency of the energy storage device; Δt represents the time interval.

7. The reliable adjustment method for base station demand response according to claim 1, characterized in that: In step S4, the base station demand response optimization model includes the base station operator objective function, the base station energy storage unit discharge cost, the base station energy storage discharge model, the base station power balance model, the base station participation demand response power regulation constraint and the multivariable simplified model; The base station operator's objective function is as follows: In the above formula, is a variable, representing the total operating cost of the mobile operator in period t; The constant represents the electricity price of base station n in time period t; is a constant, which represents the unit capacity subsidy that the mobile operator can obtain by participating in demand response after adjusting the power of base station n and the energy storage output in time period t; is a constant, representing the baseline load of base station n when it does not participate in demand response in period t; n,t is a 0-1 variable, indicating whether base station n reduces its power demand on the grid by using energy storage devices in time period t; The unit discharge cost of the base station energy storage device is as follows: In the above formula, is a variable, which represents the unit discharge cost of the energy storage device for base station n in time period t; α is a constant, which represents the unit operating cost of the energy storage device; M is a constant, which represents a maximum value; The base station energy storage discharge model is as follows: In the above formula, is a variable, representing the charging power of the energy storage device of base station n in time period t; is a constant, indicating the maximum charging power; is a variable, representing the discharge power of the energy storage device of base station n in time period t; is a constant, indicating the maximum discharge power; Q n,t is the remaining power of the energy storage device of base station n in time period t; and They represent the charging and discharging efficiency of the energy storage device respectively; Δt represents the time interval; and Respectively represent the maximum and minimum capacity of the energy storage device; is a variable, representing the energy consumption of base station n in time period t; The base station power balance model is as follows: In the above formula, is a variable, which represents the power purchased by base station n in time period t; The constraints for base station power regulation in demand response are as follows: In the above formula, is a constant, indicating the load reduction amount that the power grid expects the base station to participate in demand response; The multivariate simplified model is as follows: -and n,t ≤z n,t ≤My n,t In the above formula, z n,t is the introduced auxiliary variable.

8. The reliable adjustment method for base station demand response according to claim 1, characterized in that: In step S5, the base station operator objective function is used as the overall optimization target, and the base station energy storage unit discharge cost, base station energy storage discharge model, base station power balance model, base station participation in demand response power regulation constraints and multivariable simplified model are used as constraints to optimize the base station demand response optimization model, and output the control variables in time period t, including whether the base station n reduces the power demand y on the grid through the use of energy storage devices in time period t n,t And the discharge power of the energy storage device of base station n in time period t 9. A computer-readable storage medium, characterized in that: It stores computer executable instructions, which, when executed by a processor, can implement the reliable adjustment method for base station demand response as described in any one of claims 1 to 8.

10. A computer device, characterized in that: It comprises a processor and a memory, the memory is used to store a computer program, and when the computer program is executed by the processor, the reliable adjustment method for base station demand response as described in any one of claims 1 to 8 is implemented.