Method and apparatus for CSI reporting on multi-panel pusch

By proposing a variety of CSI reporting schemes in the wireless communication system, the CSI reporting on PUSCH is optimized, and the problems of outdated CSI reporting on PUSCH by UE on PUSCH are solved, and the efficiency and performance of the communication system are improved.

CN119013904APending Publication Date: 2024-11-22APPLE INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380034135.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-04-15
Filing Date
2023-03-23
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In wireless communication systems, it is difficult for the prior art to effectively manage and optimize the channel status information (CSI) report of user equipment (UE) on physical uplink shared channel (PUSCH), resulting in possible reporting of obsolete or improper resource utilization, affecting communication efficiency.

Method used

Propose a variety of CSI reporting schemes, including loop and sequential mapping methods on PUSCH, PUSCH transmission and multiplexing strategies based on multi-panels, and optimize CSI reporting timing and resource usage through RRC signaling and DCI scheduling to ensure the accuracy of CSI reporting. Sex and efficiency.

Benefits of technology

By optimizing the CSI reporting scheme, the accuracy and efficiency of CSI reporting are improved, the resource consumption delay is reduced, and the performance and reliability of wireless communication systems are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119013904A_ABST
    Figure CN119013904A_ABST
Patent Text Reader

Abstract

A user equipment (UE) is configured for multi-panel physical uplink shared channel (PUSCH) transmission using a plurality of antenna panels. The UE may transmit a UE capability message to a base station to indicate a plurality of channel state information (CSI) reporting schemes supported by the UE. The UE processes signals from the base station to configure the UE for a selected CSI reporting scheme of the plurality of CSI reporting schemes. The UE determines whether one or more conditions associated with the selected CSI reporting scheme are satisfied. Based on whether the one or more conditions associated with the selected CSI reporting scheme are satisfied, the UE transmits CSI to the base station in one or more PUSCHs from one or more antenna panels of the plurality of antenna panels.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates generally to wireless communication systems, including channel state information (CSI) reporting. Background Art

[0002] Wireless mobile communication technologies use various standards and protocols to send data between base stations and wireless communication devices. Wireless communication system standards and protocols may include, for example, the 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) (e.g., 4G), 3GPP New Radio (NR) (e.g., 5G), and the IEEE 802.11 standard for wireless local area networks (WLANs) (commonly referred to within industry organizations as WLANs). ).

[0003] As envisioned by 3GPP, different wireless communication system standards and protocols may use various radio access networks (RANs) to communicate between base stations of the RAN (which may also sometimes be referred to as RAN nodes, network nodes, or simply nodes) and wireless communication devices referred to as user equipment (UE). 3GPP RANs may include, for example, Global System for Mobile Communications (GSM), Enhanced Data Rates for GSM Evolution (EDGE) RAN (GERAN), Universal Terrestrial Radio Access Network (UTRAN), Evolved Universal Terrestrial Radio Access Network (E-UTRAN), and / or Next Generation Radio Access Network (NG-RAN).

[0004] Each RAN may use one or more radio access technologies (RATs) for communication between base stations and UEs. For example, GERAN implements GSM and / or EDGE RAT, UTRAN implements Universal Mobile Telecommunications System (UMTS) RAT or other 3GPP RAT, E-UTRAN implements LTE RAT (sometimes referred to as LTE), and NG-RAN implements NR RAT (sometimes referred to as 5G RAT, 5G NR RAT, or NR in this document). In some deployments, E-UTRAN may also implement NR RAT. In some deployments, NG-RAN may also implement LTE RAT.

[0005] The base stations used by the RAN may correspond to the RAN. An example of an E-UTRAN base station is an Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Node B (also commonly denoted as an evolved Node B, enhanced Node B, eNodeB, or eNB). An example of an NG-RAN base station is a Next Generation Node B (also sometimes referred to as a gNodeB or gNB).

[0006] The RAN provides communication services together with external entities through its connection with the Core Network (CN). For example, E-UTRAN may utilize the Evolved Packet Core (EPC) and NG-RAN may utilize the 5G Core Network (5GC). BRIEF DESCRIPTION OF THE DRAWINGS

[0007] To easily identify the discussion of any particular element or act, the most significant digit(s) in a reference number refers to the drawing number that first introduces the element.

[0008] Figure 1A An example timing diagram of a first scheme of CSI reporting on PUSCH that may be used according to one embodiment is illustrated.

[0009] Figure 1B An example timing diagram illustrating a second scheme of CSI reporting on PUSCH that may be used according to one embodiment is illustrated.

[0010] Figure 2 Aperiodic CSI reporting according to one embodiment is illustrated, where the base station scheduling attempts adhere to minimum Z and Z' requirements.

[0011] Figure 3 An example multiplexing scheme for multi-panel based PUSCH transmission according to one embodiment is illustrated.

[0012] Figure 4 An example CSI reporting scheme according to one embodiment is illustrated.

[0013] Figure 5 A method for a UE according to one embodiment is illustrated.

[0014] Figure 6 A method for a base station according to one embodiment is illustrated.

[0015] Figure 7 An example architecture of a wireless communication system according to embodiments disclosed herein is illustrated.

[0016] Figure 8 A system for performing signaling between a wireless device and a network device according to embodiments disclosed herein is illustrated. DETAILED DESCRIPTION

[0017] The various embodiments are described with respect to a UE. However, reference to a UE is provided for illustrative purposes only. The example embodiments may be used with any electronic component that can establish a connection with a network and is configured with hardware, software, and / or firmware for exchanging information and data with the network. Therefore, a UE as described herein is used to represent any suitable electronic component.

[0018] In some wireless communication systems (e.g., 3GPP Release 17 (Rel-17)), a physical uplink shared channel (PUSCH) may be transmitted in N repetitions based on M beams (e.g., M=1 or 2). The N repetitions may be multiplexed in a time division multiplexing (TDM) manner. The beams and repetitions may be mapped in a cyclic or sequential manner.

[0019] Two schemes for CSI reporting on PUSCH may be supported. In the first scheme (Scheme 1), the UE reports CSI to the base station in the first PUSCH repetition. In the second scheme (Scheme 2), the UE reports CSI to the base station in the first PUSCH repetition for each beam. Scheme 2 may be enabled by radio resource control (RRC) signaling and may be used to report aperiodic CSI or semi-persistent CSI when the time domain duration of two PUSCH repetitions with CSI is the same and no other uplink control information is multiplexed. For semi-persistent CSI reporting on PUSCH, in some implementations, N is equal to 2.

[0020] Figure 1A An example timing diagram for a first scheme for CSI reporting on PUSCH that may be used in accordance with certain embodiments is illustrated. Figure 1B An example timing diagram is illustrated for a second scheme for CSI reporting on PUSCH that may be used in accordance with certain embodiments.

[0021] Figure 1A and Figure 1B Both show examples of cyclic mapping 102 and sequential mapping 104. In cyclic mapping 102, beams (e.g., beam 1 and beam 2) alternate between being mapped to subsequent repetitions (e.g., repetition 1, repetition 2, repetition 3, and repetition 4). For example, the first beam (beam 1) is mapped to the first repetition (repetition 1), and the second beam (beam 2) is mapped to the second repetition (repetition 2), then the first beam (beam 1) is mapped to the third repetition (repetition 3), and the second beam (beam 2) is mapped to the fourth repetition (repetition 4). In sequential mapping 104, the first beam (beam 1) is mapped to sequential repetitions (repetition 1 and repetition 2), after which the second beam (beam 2) is mapped to subsequent sequential repetitions (repetition 3 and repetition 4).

[0022] In the first solution, if Figure 1A As shown, the UE sends CSI in the first repetition (repetition 1). That is, for two beams (beam 1 and beam 2), the UE reports CSI in the first repetition (repetition 1).

[0023] In the second solution, if Figure 1BAs shown, the UE sends CSI in the first repetition corresponding to each beam. Therefore, for the cyclic mapping 102 under the second scheme, the UE reports the CSI for the first beam (Beam 1) in the first repetition (Repetition 1), and the UE reports the CSI for the second beam (Beam 2) in the second repetition (Repetition 2). And for the sequential mapping 104 under the second scheme, the UE reports the CSI for the first beam (Beam 1) in the first repetition (Repetition 1), and the UE reports the CSI for the second beam (Beam 2) in the third repetition (Repetition 3) (i.e., the first repetition corresponds to the second beam).

[0024] Figure 2 Aperiodic CSI reporting according to certain embodiments is illustrated, wherein the base station scheduling attempts to follow the minimum Z and Z' requirements. In this example, the relative timing of the physical downlink control channel (PDCCH) 202 is shown relative to the CSI report 204 including the timing advance (TA). A skilled person will recognize from the present disclosure herein that the PDCCH 202 can trigger the CSI report 204. Z is defined as the offset between the last symbol of the PDCCH 202 and the first symbol of the CSI report 204 including the TA. Z' is defined as the offset between the last symbol of the channel measurement resources (CMR) 206 and the interference measurement resources (IMR) 208 and the first symbol of the CSI report 204 including the TA. If the base station schedules the CSI report with a smaller offset than the minimum value of Z and / or Z', the UE may report outdated CSI.

[0025] In 3GPP Rel-15 and 3GPP Rel-16, a CSI processing unit (CPU) may be used (see, e.g., Technical Specification (TS) 38.214, section 5.2.1.6), where the UE indicates supported simultaneous CSI calculations N CPU If the UE supports N CPU simultaneous CSI calculations, it is said to have N for processing CSI reports across the configured cells. CPU If L CPUs are occupied for the computation of CSI reports in a given OFDM symbol, the UE has N CPU - L unoccupied CPUs. The UE may process one or more than one CSI measurement and reporting, depending on the UE capability of multiple CPUs.

[0026] The CPU occupancy rules may be defined as follows (for CSI reports where reportQuantity is not set to "None"). Periodic or semi-persistent CSI reporting (excluding the initial semi-persistent CSI reporting on PUSCH after a PDCCH triggers a report) occupies the CPU starting from the first symbol of the earliest of each CSI reference signal (CSI-RS), CSI interference measurement (CSI-IM), and / or synchronization signal block (SSB) resource used for channel or interference measurement, with the corresponding latest CSI-RS / CSI-IM / SSB timing no later than the corresponding CSI reference resource until the last symbol of the configured PUSCH or uplink control channel (PUCCH) carries the report.

[0027] The non-periodic CSI report occupies the CPU from the first symbol after the PDCCH triggers the CSI report until the last symbol of the scheduled PUSCH carries the report.

[0028] The initial semi-persistent CSI report on PUSCH after PDCCH triggering occupies the CPU from the first symbol after PDCCH until the last symbol of the scheduled PUSCH carries the report.

[0029] In 3GPP Rel-18, simultaneous multi-panel based PUSCH transmission can be used, where the UE can use multiple antenna panels to send multiple PUSCHs simultaneously. PUSCH can be multiplexed using frequency domain multiplexing (FDM), spatial domain multiplexing (SDM), or hybrid FDM / SDM / TDM. PUSCH can be scheduled by a single downlink control information (DCI) or multiple DCIs. For multi-DCI (mDCI) based operation, each DCI schedules one PUSCH.

[0030] For example, Figure 3 Example multiplexing schemes for multi-panel based PUSCH transmissions according to certain embodiments are illustrated. The FDM scheme 302 separates resources for the first beam 314 and the second beam 316 by frequency. The SDM scheme 304 separates resources for the first beam 314 and the second beam 316 by spatial layer. The hybrid SDM and TDM scheme 306 separates resources for the first beam 314 and the second beam 316 by both spatial layer and time. The hybrid FDM and TDM scheme 308 separates resources for the first beam 314 and the second beam 316 by both frequency and time. The hybrid SDM and FDM scheme 310 separates resources for the first beam 314 and the second beam 316 by both spatial layer and frequency. The hybrid SDM, FDM and TDM scheme 312 separates resources for the first beam 314 and the second beam 316 by spatial layer, frequency and time.

[0031] Embodiments disclosed herein include methods for supporting CSI reporting on a multi-panel based PUSCH. In certain embodiments, a CSI reporting scheme and control signaling are provided for CSI reporting scheme selection. Additionally, or in other embodiments, a definition of a minimum CSI processing delay is provided. Additionally, or in other embodiments, a CPU occupancy rule is provided.

[0032] CSI Reporting Program

[0033] Figure 4 Example CSI reporting schemes according to certain embodiments are shown. In a first CSI reporting scheme 402 (Scheme 1), the UE reports CSI from a PUSCH from a single antenna panel or beam. In the illustrated example of the first CSI reporting scheme 402, the first beam 410 includes CSI 414 and the second beam 412 does not include the CSI.

[0034] In a second CSI reporting scheme 404 (Scheme 2), the UE reports CSI as N repetitions in N PUSCHs from N antenna panels or beams. Each CSI repetition is reported in one PUSCH from one panel or beam. In the illustrated example of the second CSI reporting scheme 404, the first beam 410 includes a CSI first repetition 416 (CSI repetition 1), and the second beam 412 includes a CSI second repetition 418 (CSI repetition 2).

[0035] In the third CSI reporting scheme 406 (scheme 3), the UE reports CSI as one repetition in N PUSCHs from N panels or beams. In the illustrated example of the third CSI reporting scheme 406, CSI 420 is included in both the first beam 410 and the second beam 412.

[0036] In a fourth CSI reporting scheme 408 (Scheme 4), the UE reports different CSI in different PUSCHs, where each CSI is reported in one PUSCH from one panel or beam. In this scheme, X (X≤N) CSIs may be reported in N PUSCHs. In the illustrated example of the fourth CSI reporting scheme 408, the first beam 410 includes a first CSI 422 (CSI1), and the second beam 412 includes a second CSI 424 (CSI2).

[0037] In certain implementations, all four of the CSI reporting schemes may be supported. In other implementations, only a subset of the CSI reporting schemes are supported (ie, only one or more of the schemes are supported).

[0038] In some embodiments, a PUSCH sent from a single configured grant may reuse the same operation as a single DCI based PUSCH, and a PUSCH sent from multiple configured grants may reuse the same operation as a multiple DCI based PUSCH. In some such embodiments, it is assumed that each configured grant is associated with a transmit-receive point (TRP), e.g., a control resource set (CORESET) pool index (i.e., CORESETPoolIndex).

[0039] In certain embodiments, the solution disclosed herein for CSI reporting may be extended for HARQ-ACK reporting.

[0040] CSI Reporting Options

[0041] In certain embodiments, the UE reports the CSI reporting schemes it supports as UE capabilities to the base station (e.g., gNB). Based on the reported UE capabilities, the base station configures the CSI reporting scheme using higher layer signaling (e.g., RRC signaling).

[0042] In certain embodiments, one or more CSI reporting schemes may be enabled only under certain conditions. When the UE is configured with a specific CSI reporting scheme, if the conditions are not met, the UE may fall back to using a predetermined CSI reporting scheme (e.g., the first CSI reporting scheme) or the UE may not use multi-panel based PUSCH to report CSI.

[0043] In certain implementations, a subset or all of the following seven conditions may be used for the second CSI reporting scheme, the third CSI reporting scheme, and the fourth CSI reporting scheme.

[0044] The first condition is that the durations of corresponding PUSCH transmission opportunities with CSI are the same.

[0045] The second condition is that the frequency domain resources used for corresponding PUSCH transmission opportunities with CSI are the same.

[0046] The third condition is that no other uplink control information (UCI) is multiplexed except CSI.

[0047] The fourth condition is based on the PUSCH multiplexing scheme. For example, the CSI reporting scheme may only be applicable to some PUSCH multiplexing schemes.

[0048] The fifth condition is based on the scheduling operation (ie, whether the PUSCH is scheduled by a single DCI or multiple DCIs). For example, the third CSI reporting scheme may only apply to PUSCH based on a single DCI, while the fourth CSI reporting scheme may only apply to PUSCH based on multiple DCIs.

[0049] The sixth condition is based on the transport block (TB) transmission scheme (ie, whether the PUSCH is used to carry one TB or TB repetition). In one example, the second CSI reporting scheme may be applicable only if the PUSCH is used to carry TB repetition.

[0050] The seventh condition is based on the time domain reporting type (ie, aperiodic and semi-persistent). In one example, the fourth CSI reporting scheme may only apply to semi-persistent CSI reporting.

[0051] First CSI Reporting Scheme Example Implementation

[0052] As discussed above, in the first CSI reporting scheme, the UE reports CSI in the PUSCH from a single antenna panel or beam.

[0053] For multi-panel PUSCH based on a single DCI under the first CSI reporting scheme, one or more of the following options may be used for PUSCH selection for CSI reporting: selecting the PUSCH corresponding to the first or last indicated transmission configuration indicator (TCI); selecting the PUSCH corresponding to the TCI with the lowest or highest identifier (ID); selecting the PUSCH that starts earlier; selecting the PUSCH transmitted in the lowest or highest frequency position; indicating the PUSCH selection from the base station to the UE via DCI; the CSI report may be carried on the PUSCH using a lower or higher modulation and coding scheme (MCS) of the PUSCH (e.g., to minimize CSI overhead or establish a better link with improved performance); and / or the CSI report may be a carrier on an uplink (UL) transmission without power limitation and power scaling (e.g., if two different PUSCH transmissions are not power limited, then other options above may be used to determine the PUSCH selection).

[0054] For multi-DCI-based multi-panel PUSCH under the first CSI reporting scheme, one or more of the following options may be used for PUSCH selection for CSI reporting: selecting a PUSCH corresponding to the first or last control resource set (CORESET) pool index (i.e., CORESETPoolIndex) (e.g., CORESETPoolIndex may be configured per CORESET to imply a TRP index); selecting a PUSCH corresponding to a TCI with a lowest or highest ID; selecting a PUSCH that starts earlier; selecting a PUSCH that is sent in the lowest or highest frequency position; selecting a PUSCH with an earlier (or later) starting (or ending) scheduled PDCCH; selecting a PUSCH with a minimum Z and / or Z' or a maximum Z and / or Z' (e.g., see Figure 2 ); and / or indicating PUSCH selection from the base station to the UE via DCI.

[0055] In one implementation of rate matching for CSI reported in PUSCH under the first CSI reporting scheme, the rate matching operation (e.g., see TS 38.212, section 6.3.2.4.1.1) is based on PUSCH transmission opportunities with CSI. This assumes that N PUSCH transmission opportunities can carry N repetitions for one TB or different TBs with the same TB size. In another implementation, the rate matching operation is based on all PUSCH transmission opportunities carrying one TB (including the TB with CSI reporting), assuming that N PUSCH transmission opportunities can carry one TB.

[0056] In certain embodiments, Z and Z' (eg, see Figure 2 ) is counted based on the first symbol of the PUSCH transmission opportunity with the CSI report. Alternatively, Z and Z' may be counted based on the first symbol of the entire PUSCH.

[0057] In some embodiments, the CPU is occupied until the last symbol of the PUSCH transmission opportunity with the CSI report. Alternatively, the CPU may be occupied until the last symbol of the entire PUSCH.

[0058] Second CSI reporting scheme example implementation scheme

[0059] As discussed above, in the second CSI reporting scheme, the UE reports CSI as N repetitions in N PUSCHs from N antenna panels or beams. Each CSI repetition is reported in one PUSCH from one panel or beam.

[0060] In certain embodiments, for rate matching of CSI repetitions under the second CSI reporting scheme, the number of coded bits is the same in different CSI repetitions to support soft combining. For example, the number of coded bits for CSI may be defined in 3GPPP TS 38.212, section 6.3.2.4.1.1. If the number of coded bits is different (e.g., due to different coding rates in different PUSCH transmission opportunities with CSI reporting), the UE may fall back to reporting CSI using the first CSI reporting scheme, or the UE may not report CSI.

[0061] In certain embodiments, for single DCI based operation under the second CSI reporting scheme, Z and Z' are counted based on the first symbol of the PUSCH transmission opportunity with the earlier started CSI report (eg, see Figure 2 ). The CPU may be occupied until the last symbol of the PUSCH transmission opportunity with the CSI report. Alternatively, the CPU may be occupied until the last symbol of the entire PUSCH.

[0062] In certain embodiments, for multi-DCI based operation, Z and Z' are counted based on the last symbol of the later ending DCI and the first symbol of the PUSCH transmission opportunity with the earlier starting CSI report. The CPU may be occupied starting from the earlier starting DCI until the last symbol of the PUSCH transmission opportunity with the CSI report. Alternatively, the CPU may be occupied until the last symbol of the entire PUSCH.

[0063] Third CSI reporting scheme example implementation scheme

[0064] As discussed above, in the third CSI reporting scheme, the UE reports the CSI as one repetition of N PUSCHs from N panels or beams.

[0065] In certain embodiments using the third CSI reporting scheme, rate matching for CSI is determined by the PUSCH with CSI reporting. In one such embodiment, the number of coded bits is determined by the sum of coded bits calculated per PUSCH. In another embodiment, the number of coded bits is determined based on a rate matching operation across the PUSCH, which may be applicable to a PUSCH with a single TB.

[0066] In certain embodiments using the third CSI reporting scheme, Z and Z' are counted based on the first symbol of a PUSCH transmission opportunity with a CSI report (eg, see Figure 2 Alternatively, Z and Z' may be counted based on the first symbol of the entire PUSCH.

[0067] In certain embodiments using the third CSI reporting scheme, the CPU is occupied until the last symbol of the PUSCH transmission opportunity with the CSI report. Alternatively, the CPU may be occupied until the last symbol of the entire PUSCH.

[0068] Example Implementation of the Fourth CSI Reporting Scheme

[0069] As discussed above, in the fourth CSI reporting scheme, the UE reports different CSIs in different PUSCHs, where each CSI is reported in one PUSCH from one panel or beam. X CSIs may be reported in N PUSCHs, where X≤N.

[0070] In certain embodiments, for single DCI-based operation under the fourth CSI reporting scheme, a PUSCH with a selection of beam, panel, and / or TCI (e.g., first or second TCI) for each CSI may be configured by a base station (e.g., a gNB). In one such embodiment, the PUSCH selection is configured in a CSI report configuration (i.e., CSI-reportConfig) information element (IE). For reported CSI for a corresponding CSI-reportConfig, the UE reports the CSI at a PUSCH with the corresponding TCI. In another embodiment, the PUSCH selection is indicated by a DCI from the base station to the UE. For example, the base station may indicate the reported TCI for each triggered CSI-reportConfig via a DCI.

[0071] In certain embodiments, for multi-DCI based operation under the fourth CSI reporting scheme, the triggered CSI is sent via a PUSCH triggered by the corresponding DCI. In addition, the base station may configure or indicate to the UE whether cross-beam CSI reporting is enabled via RRC or DCI. If cross-beam CSI reporting is enabled, a DCI with a first beam may trigger CSI reported via a PUSCH in a second beam.

[0072] In certain embodiments under the fourth CSI reporting scheme, Z and Z' are defined based on the scheduled PUSCH and the scheduling PDCCH (see, for example, Figure 2 Discussion) and CPU usage rules.

[0073] Figure 5 is a flow chart of a method 500 for a UE configured for multi-panel PUSCH transmission using multiple antenna panels according to one embodiment. In box 502, the method 500 includes: reporting from the UE to a base station UE capabilities indicating multiple CSI reporting schemes supported by the UE. In box 504, the method 500 includes: processing a signal from the base station at the UE to configure the UE for a selected CSI reporting scheme from the multiple CSI reporting schemes. In box 506, the method 500 includes: determining at the UE whether one or more conditions associated with the selected CSI reporting scheme are met. In box 508, the method 500 includes: based on whether one or more conditions associated with the selected CSI reporting scheme are met, sending CSI from the UE to the base station in one or more PUSCHs from one or more antenna panels of the multiple antenna panels.

[0074] In certain embodiments, as shown in block 510, if one or more conditions are met, 500 includes: using the selected CSI reporting scheme to transmit CSI to the base station based on the multi-panel PUSCH transmission. In block 512, if the one or more conditions are not met, the method 500 may include: falling back to a first CSI reporting scheme that reports CSI in a single beam from a single antenna panel of the multiple antenna panels, or not reporting CSI based on the multi-panel PUSCH transmission.

[0075] In certain embodiments of the method 500, the first CSI reporting scheme is independent of one or more conditions. Further, the one or more conditions are selected from the group consisting of: the duration of corresponding PUSCH transmission opportunities with CSI is the same; the frequency domain resources used for corresponding PUSCH transmission opportunities with CSI are the same; no uplink control information (UCI) is multiplexed except for CSI; the selected CSI reporting scheme is applicable to the PUSCH multiplexing scheme configured for the UE; the selected CSI reporting scheme is applicable to the scheduling operation configured for the UE to schedule one or more PUSCHs; the selected CSI reporting scheme is applicable to the transport block (TB) transmission scheme configured for the UE to transmit one or more PUSCHs to carry one TB or TB repetition; and the selected CSI reporting scheme is applicable to the time domain reporting type configured for the UE.

[0076] In certain embodiments, for the first CSI reporting scheme and for single downlink control information (single DCI) scheduling of multi-panel PUSCH transmission, method 500 also includes: selecting a selected PUSCH for reporting CSI based on one or more options selected from a group including: the selected PUSCH corresponds to the first indicated transmission configuration indicator (TCI) or the last indicated TCI; the selected PUSCH corresponds to the selected TCI with the lowest identifier (ID) or the highest ID; the selected PUSCH starts earliest; the selected PUSCH is transmitted in the lowest frequency position or the highest frequency position; the selected PUSCH is indicated from the base station to the UE via downlink control information; the selected PUSCH corresponds to a lower modulation and coding scheme (MCS) or a higher MCS; and the selected PUSCH corresponds to an uplink transmission without power limitation and power scaling.

[0077] In certain embodiments, for the first CSI reporting scheme and for multiple downlink control information (multi-DCI) scheduling sent by a multi-panel PUSCH, the method 500 also includes: selecting a selected PUSCH for reporting CSI based on one or more options selected from a group including the following: the selected PUSCH corresponds to a first control resource set (CORESET) pool index or a last CORESET pool index; the selected PUSCH corresponds to a transmission configuration indicator (TCI) with a lowest identifier (ID) or a highest ID; the selected PUSCH starts earliest; the selected PUSCH is sent in a lowest frequency position or a highest frequency position; the selected PUSCH corresponds to a scheduled physical downlink control channel (PDCCH) that starts earliest or ends latest; the selected PUSCH corresponds to a minimum offset Z or a minimum offset Z', wherein the offset Z is between the last symbol of the PDCCH and the first symbol of the CSI report, and wherein the offset Z' is between the last symbol of the channel measurement resource (CMR) or the interference measurement resource (IMR) and the first symbol of the CSI report; the selected PUSCH corresponds to a maximum offset Z or a maximum offset Z'; and the selected PUSCH is indicated from the base station to the UE via downlink control information.

[0078] In certain embodiments, for the first CSI reporting scheme and for rate matching of CSI reported in one or more PUSCHs, the method 500 further includes performing a rate matching operation. The rate matching operation may be based on a selected PUSCH transmission opportunity with a CSI report, wherein the N PUSCH transmission opportunities carry N CSI repetitions for one transport block (TB) or different TBs with the same TB size. Alternatively, the rate matching operation is based on N PUSCH transmission opportunities carrying one TB including the selected TB with a CSI report.

[0079] In certain embodiments, for the first CSI reporting scheme, method 500 further includes: determining offset Z and offset Z' based on the first symbol of a PUSCH transmission opportunity with a CSI report, wherein offset Z is between the last symbol of a physical downlink control channel (PDCCH) and the first symbol of a PUSCH transmission opportunity with a CSI report, and wherein offset Z' is between the last symbol of a channel measurement resource (CMR) or an interference measurement resource (IMR) and the first symbol of a PUSCH transmission opportunity with a CSI report; or determining offset Z and offset Z' based on the first symbol of a multi-panel PUSCH.

[0080] In certain embodiments of the method 500, for the first CSI reporting scheme: the CSI processing unit (CPU) is occupied until the last symbol of a PUSCH transmission opportunity with a CSI report; or the CPU is occupied until the last symbol of a multi-panel PUSCH.

[0081] In certain embodiments of method 500, the second CSI reporting scheme includes reporting CSI as N repetitions in N PUSCHs from N antenna panels, and reporting each of the N repetitions of CSI in one beam from one of the N antenna panels.

[0082] In certain embodiments, for the second CSI reporting scheme, method 500 further includes: determining the same number of coded bits for the N repetitions for rate matching to support soft combining. The same number of coded bits may be predefined.

[0083] In certain embodiments, for the second CSI reporting scheme, method 500 further includes: determining a different number of coded bits for N repetitions for rate matching; and in response to determining the different number of coded bits, falling back to the first CSI reporting scheme or not reporting CSI.

[0084] In certain embodiments, for the second CSI reporting scheme and for single downlink control information (single DCI) scheduling of multi-panel PUSCH transmissions, method 500 further includes: determining an offset Z and an offset Z' based on a first symbol of a PUSCH transmission opportunity with an earlier started CSI report, wherein the offset Z is between a last symbol of a physical downlink control channel (PDCCH) and a first symbol of the PUSCH transmission opportunity, and wherein the offset Z' is between a last symbol of a channel measurement resource (CMR) or an interference measurement resource (IMR) and a first symbol of the PUSCH transmission opportunity. In certain such embodiments, for the second CSI reporting scheme: a CSI processing unit (CPU) is occupied until a last symbol of a PUSCH transmission opportunity with a CSI report; or the CPU is occupied until a last symbol of a multi-panel PUSCH.

[0085] In certain embodiments, for a second CSI reporting scheme and for multiple downlink control information (multi-DCI) scheduling for multi-panel PUSCH transmissions, method 500 further includes: determining an offset Z and an offset Z' based on a last symbol of a later ending first DCI and a first symbol of a PUSCH transmission opportunity with an earlier starting CSI report, wherein the offset Z is between a last symbol of a physical downlink control channel (PDCCH) and a first symbol of a PUSCH transmission opportunity, and wherein the offset Z' is between a last symbol of a channel measurement resource (CMR) or an interference measurement resource (IMR) and a first symbol of a PUSCH transmission opportunity. In certain such embodiments, for the second CSI reporting scheme: a CSI processing unit (CPU) is occupied starting from the earlier starting second DCI until a last symbol of a PUSCH transmission opportunity with a CSI report; or the CPU is occupied until a last symbol of a multi-panel PUSCH.

[0086] In certain embodiments of method 500, a third CSI reporting scheme includes reporting the CSI as one repetition among N PUSCHs from N antenna panels.

[0087] In certain embodiments, for the third CSI reporting scheme, rate matching for the CSI is based on N PUSCHs having the CSI, and method 500 further includes: determining the number of coded bits for rate matching as the sum of coded bits calculated based on each PUSCH; or determining the number of coded bits for rate matching based on a rate matching operation across N PUSCHs.

[0088] In certain embodiments, for the third CSI reporting scheme, the method 500 further includes: determining the offset Z and the offset Z' based on the first symbol of the PUSCH transmission opportunity with the CSI report, wherein the offset Z is between the last symbol of the physical downlink control channel (PDCCH) and the first symbol of the PUSCH transmission opportunity, and wherein the offset Z' is between the last symbol of the channel measurement resource (CMR) or the interference measurement resource (IMR) and the first symbol of the PUSCH transmission opportunity; or determining the offset Z and the offset Z' based on the first symbol of the multi-panel PUSCH. In certain such embodiments, for the third CSI reporting scheme: the CSI processing unit (CPU) is occupied until the last symbol of the PUSCH transmission opportunity with the CSI report; or the CPU is occupied until the last symbol of the multi-panel PUSCH.

[0089] In certain embodiments of method 500, a fourth CSI reporting scheme includes reporting different CSIs in different PUSCHs, and reporting each CSI in one PUSCH from one antenna panel.

[0090] In certain embodiments, for the fourth CSI reporting scheme and for a single downlink control information (single DCI) scheduling for multi-panel PUSCH transmission, the method 500 further includes: selecting a selected PUSCH for reporting CSI based on the configuration of the base station. Further, the selected PUSCH: is configured in a CSI reporting configuration (i.e., CSI-reportConfig) information element (IE), and the UE reports CSI at the selected PUSCH with a corresponding transmission configuration indicator (TCI); or is indicated by downlink control information (DCI), where the base station indicates the TCI for reporting for each triggered CSI-reportConfig.

[0091] In certain embodiments, for the fourth CSI reporting scheme and for multiple downlink control information (multi-DCI) scheduling sent by multi-panel PUSCH, the method 500 also includes: sending CSI in a selected PUSCH triggered by corresponding downlink control information (DCI). In certain such embodiments, for the fourth CSI reporting scheme, the method 500 also includes: determining at the UE by indication or configuration of the base station that cross-beam CSI reporting is enabled by radio resource control (RRC) signaling or DCI; and in response to determining that cross-beam CSI reporting is enabled, determining that the DCI with the first beam triggers CSI reported by the PUSCH in the second beam.

[0092] In certain embodiments of method 500, for a fourth CSI reporting scheme, a Z offset, a Z' offset, and a CSI processing unit (CPU) occupancy rule are defined based on a scheduled PUSCH and a scheduled physical downlink control channel (PDCCH), wherein the offset Z is located between the last symbol of the scheduled PDCCH and the first symbol of the CSI report, and wherein the offset Z' is located between the last symbol of the channel measurement resource (CMR) or the interference measurement resource (IMR) and the first symbol of the CSI report.

[0093] Embodiments contemplated herein include an apparatus comprising means for performing one or more elements of the method 500. For example, the apparatus may be an apparatus of a UE (such as the wireless device 802 as a UE, as described herein).

[0094] Embodiments contemplated herein include one or more non-transitory computer-readable media including instructions that, when executed by one or more processors of an electronic device, cause the electronic device to perform one or more elements of method 500. For example, the non-transitory computer-readable medium may be a memory of a UE (such as memory 806 of wireless device 802 as a UE, as described herein).

[0095] Embodiments contemplated herein include an apparatus comprising logic, modules, or circuits operable to perform one or more elements of the method 500. For example, the apparatus may be an apparatus of a UE (such as the wireless device 802 as a UE, as described herein).

[0096] Embodiments contemplated herein include an apparatus comprising: one or more processors and one or more computer-readable media comprising instructions that, when executed by the one or more processors, cause the one or more processors to perform one or more elements of the method 500. For example, the apparatus may be an apparatus of a UE (such as the wireless device 802 as a UE, as described herein).

[0097] Embodiments contemplated herein include signals as described in or in connection with one or more elements of method 500 .

[0098] Embodiments contemplated herein include a computer program or computer program product including instructions, wherein execution of the program by a processor causes the processor to perform one or more elements of the method 500. The processor may be a processor of a UE (such as the processor 804 of the wireless device 802 as a UE, as described herein). For example, the instructions may be located in the processor and / or on a memory of the UE (such as the memory 806 of the wireless device 802 as a UE, as described herein).

[0099] Figure 6 6 is a flow chart of a method 600 for a base station according to one embodiment. In block 602, the method 600 includes: processing, at the base station, a UE capability message from a UE indicating a plurality of CSI reporting schemes supported by the UE. In block 604, the method 600 includes: selecting, at the base station, a selected CSI reporting scheme from among the plurality of CSI reporting schemes based at least in part on the UE capability message. In block 606, the method 600 includes: signaling, from the base station to the UE, a configuration of the selected CSI reporting scheme from among the plurality of CSI reporting schemes.

[0100] In certain embodiments of method 600, the signaling includes radio resource control (RRC) signaling.

[0101] In certain embodiments, the method 600 further includes: determining, by the base station, the configuration according to at least one of a CSI report configuration, a bandwidth part, a serving cell, and a UE.

[0102] In certain implementations of method 600, for a first CSI reporting scheme, CSI is reported in a single beam from a single antenna panel of a plurality of antenna panels.

[0103] In some embodiments, for the first CSI reporting scheme, the method 600 further includes: indicating, from the base station to the UE through downlink control information, a selected PUSCH for the UE to report CSI.

[0104] In certain embodiments of method 600, for a second CSI reporting scheme, CSI is reported as N repetitions in N PUSCHs from N antenna panels, and wherein each of the N repetitions of CSI is reported in one beam from one of the N antenna panels.

[0105] In certain embodiments of method 600, for the third CSI reporting scheme, CSI is reported as one repetition among N PUSCHs from N antenna panels.

[0106] In certain embodiments of the method 600, for a fourth CSI reporting scheme, different CSIs are reported in different PUSCHs, and each CSI is reported in one PUSCH from one antenna panel.

[0107] In certain embodiments, for the fourth CSI reporting scheme and for single downlink control information (single DCI) scheduling for multi-panel PUSCH transmission, method 600 also includes: configuring, by the base station, a selected PUSCH for reporting CSI, and wherein the selected PUSCH: is configured in a CSI reporting configuration (i.e., CSI-reportConfig) information element (IE) for the UE to report CSI at the selected PUSCH with a corresponding transmission configuration indicator (TCI); or is indicated by downlink control information (DCI), wherein the base station indicates the TCI for reporting for each triggered CSI-reportConfig.

[0108] In certain embodiments, for the fourth CSI reporting scheme and for multiple downlink control information (multi-DCI) scheduling sent by multi-panel PUSCH, the method 600 further includes: configuring downlink control information (DCI) to trigger a selected PUSCH for the UE to send CSI. In certain such embodiments, the method 600 further includes: indicating, by the base station to the UE, enabling cross-beam CSI reporting through radio resource control (RRC) signaling or DCI.

[0109] Embodiments contemplated herein include an apparatus comprising means for performing one or more elements of method 600. For example, the apparatus may be an apparatus of a base station (such as network device 818 acting as a base station, as described herein).

[0110] Embodiments contemplated herein include one or more non-transitory computer-readable media including instructions that, when executed by one or more processors of an electronic device, cause the electronic device to perform one or more elements of method 600. For example, the non-transitory computer-readable medium may be a memory of a base station (such as memory 822 of network device 818 acting as a base station, as described herein).

[0111] Embodiments contemplated herein include an apparatus comprising logic, modules, or circuits operable to perform one or more elements of the method 600. For example, the apparatus may be an apparatus of a base station (such as the network device 818 as a base station, as described herein).

[0112] Embodiments contemplated herein include an apparatus comprising: one or more processors and one or more computer-readable media comprising instructions that, when executed by the one or more processors, cause the one or more processors to perform one or more elements of the method 600. For example, the apparatus may be an apparatus of a base station (such as the network device 818 as a base station, as described herein).

[0113] Embodiments contemplated herein include a signal as described in or associated with one or more elements of method 600 .

[0114] Embodiments contemplated herein include a computer program or computer program product including instructions, wherein execution of the program by a processing element causes the processing element to perform one or more elements of method 600. The processor may be a processor of a base station (such as processor 820 of network device 818 as a base station, as described herein). For example, these instructions may be located in a processor and / or on a memory of a base station (such as memory 822 of network device 818 as a base station, as described herein).

[0115] Figure 7 An example architecture of a wireless communication system 700 according to an embodiment disclosed herein is illustrated. The following description is provided for an example wireless communication system 700 operating in conjunction with the LTE system standard and / or the 5G or NR system standard provided in the 3GPP technical specifications.

[0116] like Figure 7 As shown, wireless communication system 700 includes UE 702 and UE 704 (although any number of UEs may be used). In this example, UE 702 and UE 704 are illustrated as smartphones (e.g., handheld touch screen mobile computing devices capable of connecting to one or more cellular networks), but may also include any mobile or non-mobile computing device configured for wireless communication.

[0117] UE 702 and UE 704 may be configured to be communicatively coupled to RAN 706. In an embodiment, RAN 706 may be NG-RAN, E-UTRAN, etc. UE 702 and UE 704 utilize connections (or channels) (shown as connection 708 and connection 710, respectively) with RAN 706, where each connection (or channel) includes a physical communication interface. RAN 706 may include one or more base stations (such as base station 712 and base station 714) to implement connection 708 and connection 710.

[0118] In this example, connection 708 and connection 710 are air interfaces that enable such communicative coupling and may conform to the RAT used by the RAN 706 , such as, for example, LTE and / or NR.

[0119] In some embodiments, UE 702 and UE 704 may also directly exchange communication data via side link interface 716. UE 704 is shown as being configured to access an access point (shown as AP 718) via connection 720. For example, connection 720 may include a local wireless connection, such as any connection conforming to the IEEE 802.11 protocol, wherein AP 718 may include In this example, AP 718 may not be connected to another network (eg, the Internet) through CN 724.

[0120] In an embodiment, UE 702 and UE 704 may be configured to communicate with each other or with base station 712 and / or base station 714 over a multi-carrier communication channel using orthogonal frequency division multiplexing (OFDM) communication signals according to various communication techniques, such as, but not limited to, orthogonal frequency division multiple access (OFDMA) communication techniques (e.g., for downlink communication) or single carrier frequency division multiple access (SC-FDMA) communication techniques (e.g., for uplink and ProSe or sidelink communication), although the scope of the embodiment is not limited in this respect. The OFDM signal may include multiple orthogonal subcarriers.

[0121] In some embodiments, all or part of the base station 712 or the base station 714 may be implemented as one or more software entities running on a server computer as part of a virtual network. In addition, or in other embodiments, the base station 712 or the base station 714 may be configured to communicate with each other via the interface 722. In an embodiment where the wireless communication system 700 is an LTE system (e.g., when the CN 724 is an EPC), the interface 722 may be an X2 interface. The X2 interface may be defined between two or more base stations (e.g., two or more eNBs, etc.) connected to the EPC and / or between two eNBs connected to the EPC. In an embodiment where the wireless communication system 700 is an NR system (e.g., when the CN 724 is a 5GC), the interface 722 may be an Xn interface. The Xn interface is defined between two or more base stations (e.g., two or more gNBs, etc.) connected to the 5GC, between the base station 712 (e.g., gNB) and the eNB connected to the 5GC, and / or between two eNBs connected to the 5GC (e.g., CN 724).

[0122] RAN 706 is shown as being communicatively coupled to CN 724. CN 724 may include one or more network elements 726 configured to provide various data and telecommunication services to customers / subscribers (e.g., UE 702 and users of UE 704) connected to CN 724 via RAN 706. The components of CN 724 may be implemented in one physical device or separate physical devices, including components for reading and executing instructions from a machine-readable or computer-readable medium (e.g., a non-transitory machine-readable storage medium).

[0123] In an embodiment, CN 724 may be an EPC, and RAN 706 may be connected to CN 724 via an S1 interface 728. In an embodiment, S1 interface 728 may be divided into two parts: an S1 user plane (S1-U) interface, which carries traffic data between base station 712 or base station 714 and a serving gateway (S-GW); and an S1-MME interface, which is a signaling interface between base station 712 or base station 714 and a mobility management entity (MME).

[0124] In an embodiment, CN 724 may be a 5GC, and RAN 706 may be connected to CN 724 via an NG interface 728. In an embodiment, NG interface 728 may be divided into two parts: an NG user plane (NG-U) interface, which carries traffic data between base station 712 or base station 714 and a user plane function (UPF); and an S1 control plane (NG-C) interface, which is a signaling interface between base station 712 or base station 714 and an access and mobility management function (AMF).

[0125] In general, the application server 730 may be an element that provides applications (e.g., packet-switched data services) that use Internet Protocol (IP) bearer resources with the CN 724. The application server 730 may also be configured to support one or more communication services (e.g., VoIP sessions, group communication sessions, etc.) for the UE 702 and the UE 704 via the CN 724. The application server 730 may communicate with the CN 724 via an IP communication interface 732.

[0126] Figure 8 A system 800 for performing signaling 834 between a wireless device 802 and a network device 818 according to embodiments disclosed herein is shown. The system 800 can be part of a wireless communication system as described herein. For example, the wireless device 802 can be a UE of the wireless communication system. For example, the network device 818 can be a base station (e.g., an eNB or a gNB) of the wireless communication system.

[0127] The wireless device 802 may include one or more processors 804. The processor 804 may execute instructions to perform various operations of the wireless device 802, as described herein. The processor 804 may include one or more baseband processors implemented using, for example, a central processing unit, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a controller, a field programmable gate array (FPGA) device, another hardware device, a firmware device, or any combination thereof configured to perform the operations described herein.

[0128] The wireless device 802 may include a memory 806. The memory 806 may be a non-transitory computer-readable storage medium that stores instructions 808 (which may include, for example, instructions executed by the processor 804). The instructions 808 may also be referred to as program code or a computer program. The memory 806 may also store data used by the processor 804 and results computed by the processor.

[0129] The wireless device 802 may include one or more transceivers 810, which may include radio frequency (RF) transmitter and / or receiver circuitry that uses an antenna 812 of the wireless device 802 to facilitate signaling (e.g., signaling 834) sent or received by the wireless device 802 with other devices (e.g., network device 818) according to a corresponding RAT.

[0130] The wireless device 802 may include one or more antennas 812 (e.g., one, two, four, or more), which may also be referred to herein as antenna panels or simply panels. For implementations with multiple antennas 812 (or panels), the wireless device 802 may take full advantage of the spatial diversity of such multiple antennas 812 to transmit and / or receive multiple different data streams on the same time and frequency resources. This behavior may be referred to as, for example, multiple-input multiple-output (MIMO) behavior (referring to multiple antennas used at each of the transmitting device and the receiving device to implement this aspect). The MIMO transmission performed by the wireless device 802 may be implemented based on precoding (or digital beamforming) applied to the wireless device 802, which multiplexes data streams between the antennas 812 based on known or assumed channel characteristics, so that each data stream is received with appropriate signal strength relative to other streams and at a desired location in the spatial domain (e.g., the location of the receiver associated with the data stream). Certain embodiments may use a single-user MIMO (SU-MIMO) approach (where data streams are all directed to a single receiver) and / or a multi-user MIMO (MU-MIMO) approach (where separate data streams may be directed to separate (different) receivers in different locations in the spatial domain).

[0131] In certain embodiments with multiple antennas, the wireless device 802 may implement analog beamforming techniques whereby the phases of signals transmitted by the antennas 812 are relatively adjusted such that the (joint) transmissions of the antennas 812 are directional (this is sometimes referred to as beam steering).

[0132] The wireless device 802 may include one or more interfaces 814. The interface 814 may be used to provide input to the wireless device 802 or provide output from the wireless device. For example, a wireless device 802 that is a UE may include an interface 814, such as a microphone, a speaker, a touch screen, buttons, etc., to allow a user of the UE to input and / or output to the UE. Other interfaces of such a UE may be composed of transmitters, receivers, and other circuits (e.g., in addition to the transceiver 810 / antenna 812 described above), which allow the UE to communicate with other devices and may communicate according to known protocols (e.g., etc.) to perform the operation.

[0133] The wireless device 802 may include a CSI reporting module 816. The CSI reporting module 816 may be implemented via hardware, software, or a combination thereof. For example, the CSI reporting module 816 may be implemented as a processor, circuitry, and / or instructions 808 stored in the memory 806 and executed by the processor 804. In some examples, the CSI reporting module 816 may be integrated within the processor 804 and / or the transceiver 810. For example, the CSI reporting module 816 may be implemented by a combination of software components (e.g., executed by a DSP or general purpose processor) and hardware components (e.g., logic gates and circuits) within the processor 804 or the transceiver 810.

[0134] The CSI reporting module 816 may be used in various aspects of the present disclosure, for example, Figure 5 Aspects of method 500 are shown.

[0135] The network device 818 may include one or more processors 820. The processor 820 may execute instructions to perform various operations of the network device 818, as described herein. The processor 820 may include one or more baseband processors implemented using, for example, a central processing unit, a DSP, an ASIC, a controller, an FPGA device, another hardware device, a firmware device, or any combination thereof configured to perform the operations described herein.

[0136] The network device 818 may include a memory 822. The memory 822 may be a non-transitory computer-readable storage medium that stores instructions 824 (which may include, for example, instructions executed by the processor 820). The instructions 824 may also be referred to as program code or a computer program. The memory 822 may also store data used by the processor 820 and results calculated by the processor.

[0137] The network device 818 may include one or more transceivers 826, which may include RF transmitter and / or receiver circuitry that uses an antenna 828 of the network device 818 to facilitate signaling (e.g., signaling 834) sent or received by the network device 818 with other devices (e.g., wireless device 802) according to a corresponding RAT.

[0138] The network device 818 may include one or more antennas 828 (e.g., one, two, four, or more), which may also be referred to herein as antenna panels or simply panels. In embodiments with multiple antennas 828 (or panels), the network device 818 may perform MIMO, digital beamforming, analog beamforming, beam steering, etc., as described.

[0139] The network device 818 may include one or more interfaces 830. The interface 830 may be used to provide input to or output from the network device 818. For example, the network device 818 as a base station may include an interface 830 composed of a transmitter, a receiver, and other circuit systems (e.g., in addition to the transceiver 826 / antenna 828 described above), which enables the base station to communicate with other devices in the core network and / or enables the base station to communicate with external networks, computers, databases, etc., in order to achieve the purpose of performing operations, management, and maintenance of the base station or other devices operably connected thereto.

[0140] The network device 818 may include a CSI reporting module 832. The CSI reporting module 832 may be implemented via hardware, software, or a combination thereof. For example, the CSI reporting module 832 may be implemented as a processor, circuitry, and / or instructions 824 stored in the memory 822 and executed by the processor 820. In some examples, the CSI reporting module 832 may be integrated within the processor 820 and / or the transceiver 826. For example, the CSI reporting module 832 may be implemented by a combination of software components (e.g., executed by a DSP or general purpose processor) and hardware components (e.g., logic gates and circuits) within the processor 820 or the transceiver 826.

[0141] The CSI reporting module 832 may be used in various aspects of the present disclosure, for example, Figure 6 Aspects of method 600 are shown.

[0142] For one or more embodiments, at least one of the components set forth in one or more of the foregoing figures may be configured to perform one or more operations, techniques, processes, and / or methods as described herein. For example, a baseband processor as described herein in conjunction with one or more of the foregoing figures may be configured to operate according to one or more of the examples set forth herein. For another example, circuits associated with a UE, a base station, a network element, etc. as described above in conjunction with one or more of the foregoing figures may be configured to operate according to one or more of the examples set forth herein.

[0143] Unless otherwise expressly stated, any of the above embodiments may be combined with any other embodiment (or combination of embodiments). The foregoing description of one or more specific implementations provides illustration and description, but is not intended to be exhaustive or to limit the scope of the embodiments to the precise form disclosed. In view of the above teachings, modifications and variations are possible or can be obtained from the practice of various embodiments.

[0144] Embodiments and implementations of the systems and methods described herein may include various operations that may be embodied in machine executable instructions to be executed by a computer system. A computer system may include one or more general or special purpose computers (or other electronic devices). A computer system may include hardware components that include specific logic components for performing operations; or may include a combination of hardware, software, and / or firmware.

[0145] It should be appreciated that the systems described herein include descriptions of specific embodiments. These embodiments may be combined into a single system, partially combined into other systems, separated into multiple systems, or otherwise divided or combined. In addition, it is contemplated that parameters, attributes, aspects, etc. of another embodiment may be used in one embodiment. For clarity, these parameters, attributes, aspects, etc. are described only in one or more embodiments, and it should be appreciated that these parameters, attributes, aspects, etc. may be combined with or substituted for parameters, attributes, aspects, etc. of another embodiment unless expressly stated herein.

[0146] It is understood that the use of personally identifiable information should be subject to privacy policies and practices that are generally recognized to meet or exceed industry or government requirements for maintaining user privacy. Specifically, personally identifiable information data should be managed and processed to minimize the risk of unintentional or unauthorized access or use, and the nature of the authorized use should be clearly stated to users.

[0147] Although the foregoing has been described in considerable detail for the sake of clarity, it will be apparent that certain changes and modifications may be made without departing from the principles of the invention. It should be noted that there are many alternative ways to implement both the processes and the apparatus described herein. Therefore, the embodiments of the present invention should be regarded as illustrative rather than restrictive, and the specification is not limited to the details given herein, but may be modified within the scope and equivalents of the appended claims.

Claims

1. A method for a user equipment (UE), the user equipment being configured for multi-panel physical uplink shared channel (PUSCH) transmission using multiple antenna panels, the method comprising: reporting, from the UE to a base station, UE capabilities indicating a plurality of channel state information (CSI) reporting schemes supported by the UE; processing, at the UE, a signal from the base station to configure the UE for a selected CSI reporting scheme among the plurality of CSI reporting schemes; determining, at the UE, whether one or more conditions associated with the selected CSI reporting scheme are satisfied; as well as Based on whether the one or more conditions associated with the selected CSI reporting scheme are satisfied, CSI is sent from the UE to the base station in one or more PUSCHs from one or more antenna panels of the plurality of antenna panels.

2. The method according to claim 1, further comprising: If the one or more conditions are met, using the selected CSI reporting scheme to transmit the CSI to the base station based on the multi-panel PUSCH transmission; as well as If the one or more conditions are not met, fall back to a first CSI reporting scheme of reporting the CSI in a single beam from a single antenna panel among the multiple antenna panels, or do not report the CSI based on the multi-panel PUSCH transmission.

3. The method according to claim 2, wherein the first CSI reporting scheme is independent of the one or more conditions, and wherein the one or more conditions are selected from the group consisting of: The durations of corresponding PUSCH transmission opportunities with the CSI are the same; The frequency domain resources used for the corresponding PUSCH transmission opportunities with the CSI are the same; No uplink control information (UCI) is multiplexed except the CSI; The selected CSI reporting scheme is applicable to a PUSCH multiplexing scheme configured for the UE; The selected CSI reporting scheme is applicable to a scheduling operation configured for the UE to schedule the one or more PUSCHs; The selected CSI reporting scheme is applicable to a transport block (TB) transmission scheme configured for the UE to transmit the one or more PUSCHs to carry a TB or a TB repetition; and The selected CSI reporting scheme is applicable to a time domain reporting type configured for the UE.

4. The method of claim 2, wherein for the first CSI reporting scheme and for a single downlink control information (single DCI) scheduling for the multi-panel PUSCH transmission, the method further comprises: The selected PUSCH for reporting the CSI is selected based on one or more options selected from the group consisting of: The selected PUSCH corresponds to a first indicated transmission configuration indicator (TCI) or a last indicated TCI; The selected PUSCH corresponds to the selected TCI having the lowest identifier (ID) or the highest ID; The selected PUSCH starts earliest; The selected PUSCH is transmitted in the lowest frequency position or the highest frequency position; The selected PUSCH is indicated from the base station to the UE via downlink control information; The selected PUSCH corresponds to a lower modulation and coding scheme (MCS) or a higher MCS; and The selected PUSCH corresponds to uplink transmission without power limitation and power scaling.

5. The method according to claim 2, wherein for the first CSI reporting scheme and for multiple downlink control information (multi-DCI) scheduling sent by the multi-panel PUSCH, the method further comprises: The selected PUSCH for reporting the CSI is selected based on one or more options selected from the group consisting of: The selected PUSCH corresponds to a first control resource set (CORESET) pool index or a last CORESET pool index; The selected PUSCH corresponds to a transmission configuration indicator (TCI) having a lowest identifier (ID) or a highest ID; The selected PUSCH starts earliest; The selected PUSCH is transmitted in the lowest frequency position or the highest frequency position; The selected PUSCH corresponds to the earliest started or latest ended scheduled physical downlink control channel (PDCCH); The selected PUSCH corresponds to a minimum offset Z or a minimum offset Z', wherein the offset Z is located between a last symbol of the PDCCH and a first symbol of a CSI report, and wherein the offset Z' is located between a last symbol of a channel measurement resource (CMR) or an interference measurement resource (IMR) and the first symbol of the CSI report; The selected PUSCH corresponds to the maximum offset Z or the maximum offset Z'; and The selected PUSCH is indicated from the base station to the UE through downlink control information.

6. The method of claim 2, wherein for the first CSI reporting scheme and for rate matching of the CSI reported in the one or more PUSCHs, the method further comprises performing a rate matching operation, wherein the rate matching operation is based on selected PUSCH transmission opportunities with CSI reporting, wherein N PUSCH transmission opportunities carry N CSI repetitions for one transport block (TB) or different TBs with the same TB size, or The rate matching operation is based on the N PUSCH transmission opportunities carrying a TB including the selected TB having the CSI report.

7. The method according to claim 2, wherein for the first CSI reporting scheme, the method further comprises: determining an offset Z and an offset Z' based on a first symbol of a PUSCH transmission opportunity with a CSI report, wherein the offset Z is located between a last symbol of a physical downlink control channel (PDCCH) and the first symbol of the PUSCH transmission opportunity with the CSI report, and wherein the offset Z' is located between a last symbol of a channel measurement resource (CMR) or an interference measurement resource (IMR) and the first symbol of the PUSCH transmission opportunity with the CSI report; or The offset Z and the offset Z' are determined based on a first symbol of the multi-panel PUSCH.

8. The method of claim 2, wherein for the first CSI reporting scheme: The CSI processing unit (CPU) is occupied until the last symbol of the PUSCH transmission opportunity with CSI reporting; or The CPU is occupied until the last symbol of the multi-panel PUSCH.

9. A method according to any one of claims 2 to claim 8, wherein the second CSI reporting scheme includes reporting the CSI as N repetitions in N PUSCHs from N antenna panels, and wherein each of the N repetitions of the CSI is reported in a beam from one antenna panel of the N antenna panels.

10. The method according to claim 9, wherein for the second CSI reporting scheme, the method further comprises: The same number of coded bits of the N repetitions for rate matching is determined to support soft combining. The method according to claim 10 , wherein the same number of coded bits is predefined.

12. The method according to claim 9, wherein for the second CSI reporting scheme, the method further comprises: determining a different number of coded bits for the N repetitions for rate matching; as well as In response to determining the different number of coded bits, fall back to the first CSI reporting scheme or do not report the CSI.

13. The method of claim 9, wherein for the second CSI reporting scheme and for a single downlink control information (single DCI) scheduling for the multi-panel PUSCH transmission, the method further comprises: An offset Z and an offset Z' are determined based on a first symbol of a PUSCH transmission opportunity with an earlier started CSI report, wherein the offset Z is between a last symbol of a physical downlink control channel (PDCCH) and the first symbol of the PUSCH transmission opportunity, and wherein the offset Z' is between a last symbol of a channel measurement resource (CMR) or an interference measurement resource (IMR) and the first symbol of the PUSCH transmission opportunity.

14. The method of claim 13, wherein for the second CSI reporting scheme: A CSI processing unit (CPU) is occupied until the last symbol of the PUSCH transmission opportunity having the CSI report; or The CPU is occupied until the last symbol of the multi-panel PUSCH.

15. The method of claim 9, wherein for the second CSI reporting scheme and for multiple downlink control information (multi-DCI) scheduling for the multi-panel PUSCH transmission, the method further comprises: The offset Z and the offset Z' are determined based on the last symbol of the first DCI that ends later and the first symbol of a PUSCH transmission opportunity with a CSI report that starts earlier, wherein the offset Z is between the last symbol of a physical downlink control channel (PDCCH) and the first symbol of the PUSCH transmission opportunity, and wherein the offset Z' is between the last symbol of a channel measurement resource (CMR) or an interference measurement resource (IMR) and the first symbol of the PUSCH transmission opportunity.

16. The method of claim 15, wherein for the second CSI reporting scheme: occupying a CSI processing unit (CPU) starting from the second DCI started earlier until the last symbol of the PUSCH transmission opportunity having the CSI report; or The CPU is occupied until the last symbol of the multi-panel PUSCH.

17. The method of any one of claims 2 to 8, wherein a third CSI reporting scheme comprises reporting the CSI as one repetition in N PUSCHs from N antenna panels.

18. The method of claim 17, wherein for the third CSI reporting scheme, rate matching for the CSI is based on the N PUSCHs with the CSI, and wherein the method further comprises: Determining the number of coded bits for the rate matching as a sum of coded bits calculated based on each PUSCH; or The number of coded bits for the rate matching is determined based on a rate matching operation across the N PUSCHs.

19. The method according to claim 17, wherein for the third CSI reporting scheme, the method further comprises: determining an offset Z and an offset Z' based on a first symbol of a PUSCH transmission opportunity with a CSI report, wherein the offset Z is located between a last symbol of a physical downlink control channel (PDCCH) and the first symbol of the PUSCH transmission opportunity, and wherein the offset Z' is located between a last symbol of a channel measurement resource (CMR) or an interference measurement resource (IMR) and the first symbol of the PUSCH transmission opportunity; or The offset Z and the offset Z' are determined based on a first symbol of the multi-panel PUSCH.

20. The method of claim 19, wherein for the third CSI reporting scheme: A CSI processing unit (CPU) is occupied until the last symbol of the PUSCH transmission opportunity having the CSI report; or The CPU is occupied until the last symbol of the multi-panel PUSCH.

21. The method according to any one of claims 2 to claim 8, wherein the fourth CSI reporting scheme comprises reporting different CSIs in different PUSCHs, and wherein each CSI is reported in one PUSCH from one antenna panel.

22. The method of claim 21, wherein for the fourth CSI reporting scheme and for single downlink control information (single DCI) scheduling for the multi-panel PUSCH transmission, the method further comprises: A selected PUSCH for reporting the CSI is selected based on a configuration performed by the base station, and wherein the selected PUSCH: configured in a CSI report configuration (i.e., CSI-reportConfig) information element (IE), and the UE reports the CSI at the selected PUSCH with a corresponding transmission configuration indicator (TCI), or Indicated by downlink control information (DCI), where the base station indicates the reported TCI for each triggered CSI-reportConfig.

23. The method of claim 21, wherein for the fourth CSI reporting scheme and for multiple downlink control information (multi-DCI) scheduling for the multi-panel PUSCH transmission, the method further comprises: The CSI is transmitted in a selected PUSCH triggered by corresponding downlink control information (DCI).

24. The method according to claim 23, wherein for the fourth CSI reporting scheme, the method further comprises: Determining, at the UE, by an indication or configuration performed by the base station, to enable cross-beam CSI reporting through radio resource control (RRC) signaling or the DCI; as well as In response to determining that the cross-beam CSI reporting is enabled, it is determined that the DCI with a first beam triggers the CSI reported by a PUSCH in a second beam.

25. The method of claim 21, wherein for the fourth CSI reporting scheme, a Z offset, a Z' offset and a CSI processing unit (CPU) occupancy rule are defined based on a scheduled PUSCH and a scheduled physical downlink control channel (PDCCH), wherein the offset Z is located between the last symbol of the scheduled PDCCH and the first symbol of the CSI report, and wherein the offset Z' is located between the last symbol of a channel measurement resource (CMR) or an interference measurement resource (IMR) and the first symbol of the CSI report.

26. A method for a base station, the method comprising: processing, at the base station, a UE capability message from a user equipment (UE) indicating a plurality of channel state information (CSI) reporting schemes supported by the UE; selecting, at the base station, a selected CSI reporting scheme from among the plurality of CSI reporting schemes based at least in part on the UE capability message; as well as The configuration of the selected CSI reporting scheme among the multiple CSI reporting schemes is notified from the base station to the UE through signaling.

27. The method of claim 26, wherein the signaling comprises radio resource control (RRC) signaling.

28. The method according to claim 26, further comprising: The configuration is determined by the base station according to at least one of a CSI report configuration, a bandwidth part, a serving cell, and the UE.

29. The method of claim 26, wherein for the first CSI reporting scheme, CSI is reported in a single beam from a single antenna panel of the plurality of antenna panels.

30. The method according to claim 29, wherein for the first CSI reporting scheme, the method further comprises: The base station indicates to the UE through downlink control information a selected PUSCH for the UE to report the CSI.

31. The method of claim 26, wherein for a second CSI reporting scheme, CSI is reported as N repetitions in N PUSCHs from N antenna panels, and wherein each of the N repetitions of the CSI is reported in one beam from one of the N antenna panels.

32. The method of claim 26, wherein for a third CSI reporting scheme, CSI is reported as one repetition in N PUSCHs from N antenna panels.

33. The method of claim 26, wherein for a fourth CSI reporting scheme, different CSIs are reported in different PUSCHs, and wherein each CSI is reported in one PUSCH from one antenna panel.

34. The method of claim 33, wherein for the fourth CSI reporting scheme and for single downlink control information (single DCI) scheduling of the multi-panel PUSCH transmission, the method further comprises: A selected PUSCH for reporting the CSI is configured by the base station, and wherein the selected PUSCH: configuring in a CSI report configuration (i.e., CSI-reportConfig) information element (IE) for the UE to report the CSI at the selected PUSCH with a corresponding transmission configuration indicator (TCI); or Indicated by downlink control information (DCI), where the base station indicates the TCI for reporting of each triggered CSI-reportConfig.

35. The method of claim 33, wherein for the fourth CSI reporting scheme and for multiple downlink control information (multi-DCI) scheduling for the multi-panel PUSCH transmission, the method further comprises: Downlink control information (DCI) is configured to trigger a selected PUSCH for the UE to transmit CSI.

36. The method of claim 35, wherein for the fourth CSI reporting scheme, the method further comprises: The base station indicates to the UE that cross-beam CSI reporting is enabled through radio resource control (RRC) signaling or the DCI.

37. A computer program product comprising instructions which, when executed by a processor, implement the steps of the method according to any one of claims 1 to 36.

38. An apparatus comprising means for carrying out the steps of the method according to any one of claims 1 to 36.