Method and apparatus for resource allocation in wireless communication system

By introducing side control information and dynamic TDD information into the wireless communication system, the DL/UL direction of the RU is dynamically adjusted, which solves the problem of judging dynamic TDD DL/UL information in resource allocation, improves resource utilization efficiency and interference management capabilities, and enhances network coverage and communication quality.

CN119032539APending Publication Date: 2024-11-26LG ELECTRONICS INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380036110.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-04-28
Filing Date
2023-04-18
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

Existing wireless communication systems struggle to effectively identify and determine dynamic TDD DL/UL information during resource allocation, resulting in low resource utilization efficiency. In particular, without configuring or indicating dynamic TDD DL/UL information, they are unable to accurately allocate semi-static TDD flexible resources.

Method used

By introducing side control information, utilizing the semi-static TDD DL/UL configuration and dynamic TDD information of the MT, and combining the time slot format indication and scheduling information of DCI format 2_0, the DL/UL direction of the RU is dynamically adjusted, thereby achieving accurate judgment and allocation of the RU's semi-static TDD flexible resources.

Benefits of technology

It improves the resource utilization efficiency of wireless communication systems, realizes adaptive beam operation and effective interference management, compensates for the propagation delay between RU-UE links, and enhances network coverage and communication quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119032539A_ABST
    Figure CN119032539A_ABST
Patent Text Reader

Abstract

According to various embodiments of the present disclosure, a method performed by an electronic device including a first device and a second device in a wireless communication system is provided. The method may comprise: a step in which a first device receives, from a base station, first semi-static time division duplex (TDD) resource allocation information including a plurality of first flexible resources not allocated to an uplink (UL) or a downlink (DL); a step in which the first device receives TDD UL-DL additional configuration information from the base station; a step in which the second device determines second semi-static TDD resource allocation information by updating one or more of a plurality of first flexible resources in the first semi-static TDD resource allocation information on the basis of the TDD UL-DL additional configuration information; and a step in which the second device forwards a signal from the base station to a user equipment (UE) or forwards a signal from the UE to the base station on the basis of the second semi-static TDD resource allocation information.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a wireless communication system and more particularly to a method and device for resource allocation in a wireless communication system. Background Art

[0002] Wireless communication systems have been widely deployed to provide various types of communication services such as voice or data. Generally speaking, wireless communication systems are multiple access systems that can support communication with multiple users by sharing available system resources (bandwidth, transmit power, etc.). Examples of multiple access systems include code division multiple access (CDMA) systems, frequency division multiple access (FDMA) systems, time division multiple access (TDMA) systems, orthogonal frequency division multiple access (OFDMA) systems, and single carrier frequency division multiple access (SC-FDMA) systems.

[0003] In particular, since many communication devices require large communication capacity, enhanced mobile broadband (eMBB) communication technology that goes further than existing radio access technology (RAT) has been proposed. Not only massive machine-type communication (mMTC) that provides various services anytime and anywhere by connecting a large number of devices and objects has been proposed, but also communication systems that consider services / user equipment (UE) that are sensitive to reliability and latency have been proposed. Various technical configurations have been proposed for this purpose. Summary of the invention

[0004] Technical issues

[0005] In order to solve the above problems, the present disclosure provides a method and device for resource allocation in a wireless communication system.

[0006] In order to solve the above problem, the present disclosure provides a method for judging / determining DL / UL information in a semi-static TDD flexible resource of a RU based on dynamic TDD DL / UL information of a MT.

[0007] In order to solve the above problem, the present disclosure provides a method for judging / determining DL / UL information in a semi-static TDD flexible resource of a RU when dynamic TDD DL / UL information of a MT is not configured / indicated.

[0008] The technical objectives to be achieved by the present disclosure are not limited to those described above by way of example only, and other technical objectives not mentioned can be clearly understood by those skilled in the art to which the present disclosure belongs from the following description.

[0009] Technical Solution

[0010] In an operating method of an electronic device in a wireless communication device according to an embodiment of the present disclosure, the electronic device includes a first device and a second device, and the method may include: receiving, by the first device from a base station, first semi-static time division duplex (TDD) resource allocation information including multiple first flexible resources that are not allocated to an uplink (UL) or a downlink (DL); receiving, by the first device, TDD UL-DL additional configuration information from the base station; determining, by the second device, second semi-static TDD resource allocation information by updating one or more of the multiple first flexible resources in the first semi-static TDD resource allocation information based on the TDD UL-DL additional configuration information; and forwarding, by the second device, a signal from the base station to a user equipment (UE) or forwarding a signal from the UE to the base station based on the second semi-static TDD resource allocation information.

[0011] The TDD UL-DL additional configuration information may include dynamic TDD uplink-downlink (UL-DL) configuration information to be applied to the first device. The TDD UL-DL additional configuration information may be received through control information for the first device, or the TDD UL-DL additional configuration information may be received through scheduling information for the first device.

[0012] The second semi-static TDD resource allocation information may include information of one or more second flexible resources. The one or more second flexible resources are propagation delays between UL and DL, and forwarding of the signal by the second device may not be performed in the one or more second flexible resources.

[0013] The TDD UL-DL additional configuration information may include dynamic TDD uplink-downlink (UL-DL) configuration information to be applied to the first device. The second semi-static TDD resource allocation information may include information of one or more second flexible resources. The one or more second flexible resources may be a propagation delay between UL and DL, and forwarding of the signal by the second device may not be performed in the one or more second flexible resources.

[0014] The second semi-static TDD resource allocation information may be determined by updating one or more of the plurality of first flexible resources in the first semi-static TDD resource allocation information to be the same as one or more resources in the TDD UL-DL additional configuration information.

[0015] Resources not corresponding to the TDD UL-DL additional configuration information among the plurality of first flexible resources may be maintained as second flexible resources in the second semi-static TDD resource allocation information.

[0016] The TDD UL-DL additional configuration information may include only UL or DL ​​information for a specific symbol included in a specific time slot among multiple first flexible resources. Based on the specific symbol being UL, the second semi-static TDD resource allocation information may be determined by updating all first flexible resources included in a specific time slot among multiple first flexible resources to UL. Based on the specific symbol being DL, the second semi-static TDD resource allocation information may be determined by updating all first flexible resources included in a specific time slot among multiple first flexible resources to DL.

[0017] The TDD UL-DL additional configuration information may include UL or DL ​​information for a first symbol included in a first time slot among multiple first flexible resources and UL or DL ​​information for a second symbol included in a second time slot adjacent to the first time slot among the first flexible resources. Based on the first symbol and the second symbol being UL, the second semi-static TDD resource allocation information may be determined by updating all first flexible resources between the first symbol and the second symbol to UL. Based on the first symbol and the second symbol being DL, the second semi-static TDD resource allocation information may be determined by updating all first flexible resources between the first symbol and the second symbol to DL.

[0018] Based on the fact that the second semi-static TDD resource allocation information to be applied to the second device is different from the third semi-static TDD resource allocation information to be applied to the first device, sending and receiving of signals by the first device and sending and receiving of signals by the second device can be performed based on the third semi-static TDD resource allocation information.

[0019] Based on the fact that the second semi-static TDD resource allocation information to be applied to the second device is different from the third semi-static TDD resource allocation information to be applied to the first device, sending and receiving of signals by the first device and sending and receiving of signals by the second device can be performed based on the second semi-static TDD resource allocation information.

[0020] According to an embodiment of the present disclosure, an operation method of a base station in a wireless communication system may include: sending first semi-static time division duplex (TDD) resource allocation information including multiple first flexible resources not allocated to an uplink (UL) or a downlink (DL) to a first device of an electronic device including a first device and a second device; sending TDD UL-DL additional configuration information to the first device; and receiving a signal forwarded from a second device from a user equipment (UE) or sending a signal to be forwarded to the UE to the second device based on the second semi-static TDD resource allocation information, wherein the second semi-static TDD resource allocation information may be information obtained by updating one or more of the multiple first flexible resources in the first semi-static TDD resource allocation information based on the TDD UL-DL additional configuration information.

[0021] The TDD UL-DL additional configuration information may include dynamic TDD uplink-downlink (UL-DL) configuration information to be applied to the first device. The TDD UL-DL additional configuration information may be received through control information for the first device, or the TDD UL-DL additional configuration information may be received through scheduling information for the first device.

[0022] The second semi-static TDD resource allocation information may include information of one or more second flexible resources. The one or more second flexible resources may be a propagation delay between UL and DL, and forwarding of the signal by the second device may not be performed in the one or more second flexible resources.

[0023] The second semi-static TDD resource allocation information may be determined by updating one or more of the plurality of first flexible resources in the first semi-static TDD resource allocation information to be the same as one or more resources in the TDD UL-DL additional configuration information.

[0024] Resources not corresponding to the TDD UL-DL additional configuration information among the plurality of first flexible resources may be maintained as second flexible resources in the second semi-static TDD resource allocation information.

[0025] The TDD UL-DL additional configuration information may include only UL or DL ​​information for a specific symbol included in a specific time slot among multiple first flexible resources. Based on the specific symbol being UL, the second semi-static TDD resource allocation information may be determined by updating all first flexible resources included in a specific time slot among multiple first flexible resources to UL. Based on the specific symbol being DL, the second semi-static TDD resource allocation information may be determined by updating all first flexible resources included in a specific time slot among multiple first flexible resources to DL.

[0026] An electronic device in a communication system according to an embodiment of the present disclosure may include: a first device, which includes a first transceiver; a second device, which includes a second transceiver; at least one processor; and at least one memory, which is operably connected to the at least one processor and stores instructions for performing operations based on execution by the at least one processor, wherein the operations may include all steps of the method according to any one of claims 1 to 10.

[0027] A base station in a communication system according to an embodiment of the present disclosure may include: a transceiver; at least one processor; and at least one memory operably connected to the at least one processor and storing instructions for performing operations based on execution by the at least one processor.

[0028] The operation may comprise all the steps of the method according to any one of claims 11 to 16.

[0029] According to an embodiment of the present disclosure, a control device for controlling an electronic device in a communication system may include at least one processor and at least one memory operably connected to the at least one processor, wherein the at least one memory may store instructions for performing operations based on execution by the at least one processor, and the operations may include all steps of the method according to any one of claims 1 to 10.

[0030] In one or more non-transitory computer-readable media storing one or more instructions according to an embodiment of the present disclosure, the one or more instructions may be based on being executed by one or more processors to perform operations, and the operations may include all steps of the method according to any one of claims 1 to 10.

[0031]

Beneficial Effects

[0032] In order to solve the above problems, the present disclosure provides a method and device for resource allocation in a wireless communication system.

[0033] According to the present disclosure, adaptive beam operation and effective interference management are possible when a dynamic TDD DL / UL allocation scheme is used within the coverage of an NCR.

[0034] According to the present disclosure, the propagation delay between the RU-UE link can be compensated by the RU shutting down the semi-static TDD flexible resources of the MT.

[0035] According to the present disclosure, the propagation delay between the RU-UE links can be compensated by the RU shutting down the dynamic TDD flexible resources of the MT.

[0036] According to the present disclosure, the propagation delay between RU-UE links can be compensated by turning off, by the RU, resources of a separate DL / UL that is not scheduled by the RU as a MT.

[0037] According to the present disclosure, even if the dynamic TDD DL / UL information of the MT is not configured / indicated, the RU is able to judge / determine the DL / UL information in the semi-static TDD flexible resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] The accompanying drawings, which are included to provide a further understanding of the present disclosure and constitute a part of the specific implementation scheme, illustrate embodiments of the present disclosure and are used together with the specification to illustrate the technical features of the present disclosure. The technical features of the present disclosure are not limited to the specific drawings, and the features disclosed in each drawing can be combined with each other to form new embodiments. The reference numerals in each drawing may represent structural elements.

[0039] Figure 1 Illustrated is an example of physical channels and general signal transmission used in a 3GPP system.

[0040] Figure 2 An example of the structure of a radio frame used in NR is illustrated.

[0041] Figure 3 An example of a time slot structure of an NR frame is illustrated.

[0042] Figure 4 An example of a self-contained time slot is illustrated.

[0043] Figures 5 to 8 An example of a transport network architecture for 5G is illustrated.

[0044] Fig. 9 An example of a topology in which an NCR performs transmission and reception between a base station and a UE is illustrated.

[0045] Fig.10 An example of beamforming operation of an existing RF repeater is illustrated.

[0046] Fig.11 An example of beamforming operation of NCR is illustrated.

[0047] Fig.12 is a flowchart for a signal transmitting / receiving method according to an embodiment of the present disclosure.

[0048] Fig.13 is a flowchart of a signal transmitting / receiving method according to another embodiment of the present disclosure.

[0049] Fig.14 A communication system applied to various embodiments of the present disclosure is illustrated.

[0050] Fig.15 A wireless device suitable for use with various embodiments of the present disclosure is illustrated.

[0051] Fig.16 Another example of a wireless device suitable for various embodiments of the present disclosure is illustrated.

[0052] Fig.17 The signal processing circuit for transmitting the signal is shown.

[0053] Fig.18 An example of a wireless communication device suitable for use with the present disclosure is illustrated. DETAILED DESCRIPTION

[0054] In various embodiments of the present disclosure, "A or B" may mean "only A", "only B", or "both A and B". In other words, in various embodiments of the present disclosure, "A or B" may be interpreted as "A and / or B". For example, in various embodiments of the present disclosure, "A, B, or C" may mean "only A", "only B", "only C", or "any combination of A, B, and C".

[0055] The slash ( / ) or comma used in various embodiments of the present disclosure may mean "and / or". For example, "A / B" may mean "A and / or B". Thus, "A / B" may mean "only A", "only B", or "both A and B". For example, "A, B, C" may mean "A, B, or C".

[0056] In various embodiments of the present disclosure, “at least one of A and B” may mean “only A”, “only B”, or “both A and B”. In addition, in various embodiments of the present disclosure, the expression “at least one of A or B” or “at least one of A and / or B” can be interpreted in the same meaning as “at least one of A and B”.

[0057] Furthermore, in various embodiments of the present disclosure, “at least one of A, B, and C” may mean “only A”, “only B”, “only C”, or “any combination of A, B, and C”. In addition, “at least one of A, B, or C” or “at least one of A, B and / or C” may mean “at least one of A, B, and C”.

[0058] In addition, the brackets used in various embodiments of the present disclosure may mean "for example". Specifically, when describing "control information (PDCCH)", "PDCCH" may be proposed as an example of "control information". In other words, in various embodiments of the present disclosure, "control information" is not limited to "PDCCH", and "PDDCH" may also be proposed as an example of "control information". In addition, even when describing "control information (ie, PDCCH)", "PDCCH" may be proposed as an example of "control information".

[0059] In various embodiments of the present disclosure, technical features individually described in one drawing in various embodiments of the present disclosure may be implemented individually or simultaneously.

[0060] The following technology can be applied to various wireless access systems such as code division multiple access (CDMA), frequency division multiple access (FDMA), time division multiple access (TDMA), orthogonal frequency division multiple access (OFDMA), or single carrier frequency division multiple access (SC-FDMA). CDMA can be implemented as a radio technology such as Universal Terrestrial Radio Access (UTRA) or CDMA2000. TDMA can be implemented as a radio technology such as Global System for Mobile Communications (GSM) / General Packet Radio Service (GPRS) / Enhanced Data Rates for GSM Evolution. OFDMA can be implemented as a radio technology such as Institute of Electrical and Electronics Engineers (IEEE) 802.11 (Wi-Fi), IEEE 802.16 (WiMAX), IEEE 802.20, Evolved UTRA (E-UTRA), etc. UTRA is part of Universal Mobile Telecommunications System (UMTS). 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) is a part of Evolved UMTS (E-UMTS) using E-UTRA and LTE-Advanced (A) / LTE-A pro is an evolved version of 3GPP LTE. 3GPP NR (New Radio or New Radio Access Technology) is an evolved version of 3GPP LTE / LTE-A / LTE-A pro.

[0061] For the sake of clarity of description, the technical spirit of the present disclosure is described based on a 3GPP communication system (e.g., LTE or NR, etc.), but the technical spirit of the present disclosure is not limited thereto. LTE means the technology after 3GPP TS 36.xxx version 8. In detail, the LTE technology after 3GPP TS 36.xxx version 10 is called LTE-A, and the LTE technology after 3GPP TS 36.xxx version 13 is called LTE-A pro. 3GPP NR means the technology after TS 38.xxx version 15. 3GPP 6G may mean the technology after TS version 17 and / or version 18. "xxx" represents the detailed standard document number. LTE / NR / 6G may be collectively referred to as a 3GPP system. For the background technology, terms, abbreviations, etc. used in the present disclosure, it is possible to refer to the items described in the standard documents issued before the present disclosure. For example, the following documents may be referred to.

[0062] 3GPP LTE

[0063] - 36.101: User Equipment (UE) radio transmission and reception

[0064] - 36.211: Physical channels and modulation

[0065] - 36.212: Multiplexing and channel coding

[0066] - 36.213: Physical layer procedures

[0067] - 36.214: Physical layer measurements

[0068] - 36.321: Media Access Control (MAC) Protocol Specification

[0069] - 36.331: Radio Resource Control (RRC)

[0070] - 37.213: Physical layer procedures for shared spectrum channel access

[0071] 3GPP NR

[0072] - 38.101-1: Part 1: Scope 1 Independent

[0073] - 38.101-2: Part 2: Scope 2 Independent

[0074] - 38.101-2: Part 3: Scope 1 and Scope 2 interoperability with other radio equipment

[0075] - 38.211: Physical channels and modulation

[0076] - 38.212: Multiplexing and channel coding

[0077] - 38.213: Physical Layer Procedures

[0078] - 38.214: Physical layer measurements

[0079] - 38.215: Physical layer measurements

[0080] - 38.321: Media Access Control (MAC) Protocol Specification

[0081] - 38.331: Radio Resource Control (RRC)

[0082] For the purpose of illustrating the present disclosure, terms not defined above are as follows.

[0083] IAB node: A RAN node that supports wireless access of UEs and wirelessly backhauls access services.

[0084] IAB Donor: A RAN node that provides the UE to core network interface and wireless backhaul functions to the IAB node.

[0085] Abbreviations used in this disclosure may be defined as follows.

[0086] IAB: Integrated Access and Postbacks

[0087] CSI-RS: Channel State Information Reference Signal

[0088] DgNB: Donor gNB

[0089] AC: Access

[0090] BH: Backhaul

[0091] FH: The Prequel

[0092] CU: Centralized Unit

[0093] DU Distributed Unit

[0094] RU: Remote Unit

[0095] MT: Mobile Terminal

[0096] CU: Centralized Unit

[0097] IAB-MT: IAB Mobile Terminal

[0098] NGC: Next Generation Core Network

[0099] SA: Independent

[0100] NSA: Non-Independent

[0101] EPC: Evolved Packet Core Network

[0102] Physical channel and frame structure

[0103] Physical channels and general signaling

[0104] Figure 1 Diagram showing the physical channels and general signal transmission used in 3GPP systems Example .

[0105] In a wireless communication system, a UE receives information from an eNB through a downlink (DL), and the UE transmits information from the eNB through an uplink (UL). The information transmitted and received by the eNB and the UE includes data and various control information, and there are various physical channels according to the type / purpose of the information transmitted and received by the eNB and the UE.

[0106] When the UE is powered on or newly enters a cell, the UE performs an initial cell search operation (S11), such as synchronization with the eNB. To this end, the UE may receive a primary synchronization signal (PSS) and (a secondary synchronization signal (SSS)) from the eNB, synchronize with the eNB and acquire information such as a cell ID. Thereafter, the UE may receive a physical broadcast channel (PBCH) from the eNB and acquire intra-cell broadcast information. At the same time, the UE receives a downlink reference signal (DL RS) in the initial cell search step to check the downlink channel status.

[0107] The UE that has completed the initial cell search acquires more specific system information by receiving a physical downlink control channel (PDCCH) and a physical downlink shared channel (PDSCH) according to information loaded on the PDCCH (S12).

[0108] When there is no radio resource to first access the eNB or for signal transmission, the UE may perform a random access procedure (RACH) to the eNB (S13 to S16). To this end, the UE may transmit a specific sequence with a preamble through a physical random access channel (PRACH) (S13 and S15), and receive a response message (random access response (RAR) message) to the preamble through a PDCCH and a corresponding PDSCH. In the case of a contention-based RACH, a contention resolution procedure (S16) may be additionally performed.

[0109] Then, the UE performing the above process may perform PDCCH / PDSCH reception (S17) and physical uplink shared channel (PUSCH) / physical uplink control channel (PUCCH) transmission (S18) as a general uplink / downlink signal transmission process. The control information sent by the UE to the base station may be referred to as uplink control information (UCI). UCI may include hybrid automatic repeat and request (HARQ) acknowledgement / negative ACK (ACK / NACK), scheduling request (SR), channel state information (CSI), etc. CSI may include channel quality indication (CQI), precoding matrix indication (PMI), rank indication (RI), etc. UCI may generally be transmitted on PUCCH, but if control information and data need to be transmitted simultaneously, UCI may be transmitted on PUSCH. The UE may periodically send UCI to the base station on PUSCH according to the request / instruction of the network.

[0110] New Radio Access Technologies (New RAT, NR) are described below.

[0111] As more and more communication devices require greater communication capacity, enhanced mobile broadband communication is needed compared to existing radio access technologies (RATs). Large-scale machine type communication (MTC), which provides various services anytime and anywhere by connecting many devices and objects, is also one of the main issues to be considered in the next generation of communications. In addition, the design of communication systems considering services / UEs that are sensitive to reliability and latency is also being discussed. As above, the introduction of next-generation RATs considering enhanced mobile broadband communication, massive MTC, ultra-reliable and low-latency communication (URLLC), etc. is discussed, and for convenience in various embodiments of the present disclosure, the technology is referred to as new RAT or NR.

[0112] Orthogonal Frequency Division Multiplexing (OFDM) numerology

[0113] Figure 2 An example of the structure of a radio frame used in NR is illustrated.

[0114] The new radio access technology (RAT) system uses an OFDM transmission scheme or a transmission scheme similar thereto. The new RAT system may follow OFDM parameters different from those of LTE. Alternatively, the new RAT system may follow the parameter set of the existing LTE / LTE-A as is, but with a larger system bandwidth (e.g., 100 MHz). Alternatively, one cell may support multiple parameter sets. In other words, UEs operating in different parameter sets may coexist in one cell.

[0115] refer to Figure 2 , in NR, uplink transmission and downlink transmission consist of frames. A radio frame has a length of 10 ms and is defined as two 5 ms half frames (HF). A half frame is defined as five 1 ms subframes (SF). A subframe is divided into one or more slots, and the number of slots in a subframe depends on the subcarrier spacing (SCS). Depending on the cyclic prefix (CP), each slot includes 12 or 14 OFDM (A) symbols. When a normal CP is used, each slot includes 14 symbols. When an extended CP is used, each slot includes 12 symbols. Symbols may include OFDM symbols (or CP-OFDM symbols) and SC-FDMA symbols (or DFT-s-OFDM symbols).

[0116] Table 1 shows that when a normal CP is used, the number of symbols per slot, the number of slots per frame, and the number of slots per subframe vary depending on the SCS.

[0117] [Table 1]

[0118]

[0119] In Table 1, N slot symb is the number of symbols in a time slot, N frame,u slot is the number of time slots in a frame, and N subframe,u slot is the number of slots in a subframe.

[0120] Table 2 shows that when the extended CP is used, the number of symbols per slot, the number of slots per frame, and the number of slots per subframe vary depending on the SCS.

[0121] [Table 2]

[0122]

[0123] NR supports multiple parameter sets (or subcarrier spacing (SCS)) for supporting various fifth generation (5G) services. For example, if the SCS is 15 kHz, NR supports wide areas in regular cellular frequency bands; if the SCS is 30 kHz / 60 kHz, NR supports dense cities, low latency, and wider carrier bandwidths; and if the SCS is 60 kHz or higher, NR supports bandwidths greater than 24.25 GHz to overcome phase noise.

[0124] The NR frequency band may be defined as two types of frequency ranges FR1 and FR2. The value of the frequency range may be changed. For example, two types of frequency ranges FR1 and FR2 may be defined as in Table 3 below.

[0125] [Table 3]

[0126]

[0127] For convenience of explanation, FR1 among the frequency ranges used in the NR system may mean "range below 6 GHz", and FR2 may mean "range above 6 GHz" and may be referred to as millimeter wave (mmW). As described above, the value of the frequency range of the NR system may vary. For example, FR1 may include the following Figure 4 The range of 410 MHz to 7125 MHz is shown.

[0128] [Table 4]

[0129]

[0130] refer to Figure 4 , FR1 may include a frequency band of 6 GHz (or 5850, 5900, 5925 MHz, etc.) or higher. For example, a frequency band of 6 GHz (or 5850, 5900, 5925 MHz, etc.) or higher included in FR1 may include an unlicensed band. The unlicensed band may be used for various purposes, for example, for vehicle (e.g., self-driving) communications. In the NR system, OFDM (A) parameter sets (e.g., SCS, CP length, etc.) may be configured differently between multiple cells merged into one UE. Therefore, the (absolute time) duration of a time resource (e.g., a subframe (SF), a time slot, or a transmission time interval (TTI)) (collectively referred to as a time unit (TU) for convenience) consisting of the same number of symbols may be configured differently between the merged cells.

[0131] Figure 3 An example of a time slot structure of an NR frame is illustrated.

[0132] refer to Figure 3, a time slot includes multiple symbols in the time domain. For example, a time slot includes seven symbols in a normal CP, whereas a time slot includes six symbols in an extended CP. A carrier includes multiple subcarriers in the frequency domain. A resource block (RB) is defined as multiple (e.g., 12) consecutive subcarriers in the frequency domain. A bandwidth part (BWP) is defined as multiple consecutive (P)RBs in the frequency domain and may correspond to a parameter set (e.g., SCS, CP length, etc.). A carrier may include up to N (e.g., 5) BWPs. Data communication may be performed through an activated BWP, and only one BWP may be activated in one UE. In a resource grid, each element is called a resource element (RE), and a complex symbol may be mapped to each RE.

[0133] Figure 4 An example of a self-contained time slot is illustrated.

[0134] In the NR system, a frame is characterized by a self-contained structure in which all of a DL control channel, DL or UL data, and a UL control channel can be included in one time slot. For example, the first N symbols in a time slot can be used to send a DL control channel (hereinafter referred to as a DL control region), and the last M symbols in a time slot can be used to send a UL control channel (hereinafter referred to as a UL control region), where N and M are integers greater than or equal to 0. The resource region between the DL control region and the UL control region (hereinafter referred to as a data region) can be used for DL ​​data transmission or UL data transmission. For example, the following configuration can be considered. Each duration is listed in chronological order.

[0135] 1. DL configuration only

[0136] 2. UL configuration only

[0137] 3. Hybrid UL-DL configuration

[0138] - Dl area + protection period (GP) + UL control area

[0139] - Dl control area + GP + UL area

[0140] * DL area: (i) DL data area, (ii) DL control area + DL data area

[0141] * UL area: (i) UL data area, (ii) UL data area + UL control area

[0142] The PDCCH may be sent in the DL control region, and the PDSCH may be sent in the DL data region. The PUCCH may be sent in the UL control region, and the PUSCH may be sent in the UL data region. On the PDCCH, downlink control information (DCI) such as DL data scheduling information, UL data scheduling information, etc. may be sent. On the PUCCH, uplink control information (UCI) for DL ​​data such as acknowledgement / negative acknowledgement (ACK / NACK) information, channel state information (CSI), scheduling request (SR), etc. may be sent. The GP provides a time gap in the process of switching the base station and the UE from a transmission mode to a reception mode or from a reception mode to a transmission mode. Some symbols in a subframe when the DL is switched to the UL may be configured as a GP.

[0143] Figures 5 to 8 An example of a transport network architecture for 5G is illustrated.

[0144] refer to Figure 5 , ITU-T (Telecommunication Standardization Sector) has adopted a slightly different 5G transport network architecture consisting of three logical elements of Control Unit (CU), Distributed Unit (DU) and Radio Unit (RU). In this model, the functions of the middle and low layers are split into DU and RU. Based on the functions split between DU and RU, the RU implements the Radio Frequency (RF) functions and, if possible, also the Low PHY functions and the High PHY functions.

[0145] refer to Figures 6 to 8 , CU, DU and RU can be grouped in different combinations based on network requirements to form actual physical network elements. This can provide flexibility to adapt to various network architectures, applications and transport network requirements.

[0146] like Figures 5 to 8 As shown, the transmission network between the fifth generation core network (5GC) and the CU is called backhaul, and the backhaul network implements the 3GPP next generation (NG) interface. In the same way, the transmission network between the CU and the DU is called midhaul, and the midhaul network implements the 3GPP F1 interface. Finally, the transmission network between the DU and the RU is called fronthaul. Backhaul, midhaul, and fronthaul are generally referred to as xhaul.

[0147] Reconfigurable Smart Surface (RIS)

[0148] RIS can be used to control the propagation of electromagnetic waves by changing the electrical and magnetic properties of the electromagnetic waves on the surface. RIS is also known as intelligent reflective surface (IRS) and large intelligent surface (LIS) and can have a programmable structure. In addition to controlling the propagation of electromagnetic waves, RIS can also be used to sense the wireless environment by integrating sensing functions. By deploying RIS in the environment where the wireless system operates, the properties of the wireless channel can be at least partially controlled.

[0149] The functionality of a RIS can provide many advantages, including the possibility of improved stability and coverage performance through beamforming or range extension. The ability to control the propagation environment has slightly changed the existing wireless system design paradigm where the wireless channel is always considered an uncontrollable entity that distorts the transmitted signal. Therefore, the transmitter (TX) and receiver (RX) have been traditionally designed to equalize the effects of the channel. There are various expected scenarios, for example, a single RIS is deployed on a wall to indicate a signal from a predetermined direction.

[0150] The use of RIS can provide a “transmission effect” of the gNB signal allowing external signals to be sent into buildings, and can improve coverage for shadowed areas by providing a “reflection effect” of the NLoS environment.

[0151] Network Controlled Repeater (NCR) for NR

[0152] Existing RF Repeaters

[0153] An RF repeater is a non-regenerative relay node that simply amplifies and retransmits everything it receives. The main advantages of RF repeaters are their low cost, ease of deployment, and no added latency. The main disadvantage of RF repeaters is their ability to amplify signals and noise to cause increased interference (contamination) in the system.

[0154] RF Repeater (RAN4) Release (Rel)-17 Working Group (WI)

[0155] RF repeaters are specified in RAN4's Rel-17 for Frequency Range 1 (FR1) Frequency Division Duplex (FDD) / Time Division Duplex (TDD) and Frequency Range 2 (FR2) bands. The Rel-17 WID contains only RF requirements. The RAN4 Working Group Description (WID) (RP-210818) specifies that RF repeaters are assumed not to perform adaptive beamforming to the UE.

[0156] NCR for Rel-18 NR

[0157] Coverage is a fundamental aspect of cellular network deployment. When deployed, mobile operators rely on various types of network nodes to provide overall coverage. Deployment of conventional full-stack cells is an option, but is not always possible (e.g., no backhaul availability) or economically feasible.

[0158] As a result, new types of network nodes have been considered to increase the network deployment flexibility of mobile operators. For example, Integrated Access and Backhaul (IAB) has been introduced in Rel-16 and enhanced in Rel-17 to a new type of network node that does not require wired backhaul. Another type of network node is an RF repeater that simply amplifies and forwards all signals it receives. RF repeaters have been widely deployed to supplement the coverage provided by conventional full-stack cells in 2G, 3G, and 4G. In Rel-17, RAN4 has specified RF and electromagnetic compatibility (EMC) requirements for RF repeaters for NR targeting both FR1 and FR2.

[0159] RF repeaters provide a cost-effective means of extending network coverage. However, RF repeaters have limitations when simply performing amplification and forwarding operations without considering various factors that can improve performance. These factors may include information about semi-static and / or dynamic downlink / uplink configuration information, adaptive transmitter / receiver spatial beamforming, switch states, etc.

[0160] Compared to existing RF repeaters, NCR improves the ability to receive and process side control information. The side control information enables network-controlled repeaters to perform amplification and forwarding operations in a more efficient manner. Potential advantages may include mitigation of unnecessary noise amplification, better spatial directionality of transmission and reception, and simplified network integration.

[0161] The study of NCR for NR focuses on the following scenarios and assumptions. NCR is an in-band RF repeater used to extend the network range in FR1 and FR2 bands, and FR2 deployment during the study can be prioritized over both outdoor scenarios and outdoor-to-indoor (O2I) scenarios. It corresponds only to a single-hop fixed NCR. NCR is transparent to the UE. NCR can maintain the gNodeB (gNB)-repeater link and the relay-UE link simultaneously. Here, cost-effectiveness is the main consideration for NCR.

[0162] In RAN1, there is a study and identification of whether the NCR needs the following side control information (including the maximum transmission power assumption). That is, there is a study and identification of whether the NCR needs side control information such as beamforming information, timing information for aligning the transmission / reception boundary of the NCR, uplink-downlink TDD configuration information, switch information for efficient interference management and energy efficiency enhancement, and power control information for efficient interference management (as a second priority). In addition, RAN1 has a study and identification of L1 / L2 (Layer 1 / Layer 2) signals (including the configuration of L1 / L2) for transmitting side control information.

[0163] RAN2 and RAN3 conduct research on the identification and authentication of NCR. Coordination with SA3 may be necessary here. The Network Controlled Repeater (NCR) can be composed of RU and MT.

[0164] Fig. 9 The diagram illustrates an example of a topology in which the NCR performs transmission and reception between the gNB and the UE.

[0165] exist Fig. 9 In the , gNB can include CU and / or DU, and NCR can be connected to gNB. NCR can be composed of mobile terminal (MT) and RU.

[0166] The RU may consist of only the RF layer. The RU may receive a signal sent by the gNB at the RF end and send the signal to the UE, and the RU may receive a signal sent by the UE at the RF end and send the signal to the gNB. The RU only sends signals between the gNB and the UE, but cannot generate a signal / channel by itself and send it to the gNB / UE or receive a signal / channel from the gNB / UE and search for it. The RU may consider adjusting the transmit / receive beam direction, downlink / uplink direction, whether to turn on / off, transmit power, etc. at the RF end in order to send the received signal. However, this operation of the RU cannot be determined by the NCR itself and may be fully controlled by the gNB.

[0167] The MT may include an RF layer and L1, L2, and / or L3 layers. For example, the MT may include an RF layer and an L1 layer or an L1 / L2 layer, or the MT may include an RF layer and an L1 / L1 / L3 layer. The MT may search / receive a signal / channel sent by the gNB, and the MT may generate and send a signal / channel sent to the gNB. The MT may receive information required to control the operation of the RU (i.e., side control information) from the gNB. The MT does not perform transmission / reception with the UE.

[0168] When compared to existing RF repeaters, the NCR can operate as follows.

[0169] Fig.10 An example of beamforming operation of an existing RF repeater is illustrated. Fig.11 An example of beamforming operation of NCR is illustrated.

[0170] refer to Fig.10 and Fig.11 , existing RF repeaters such as Fig.10 Beamforming is performed using omnidirectional or fixed directions as shown. Fig.11 As illustrated, the NCR is able to obtain beamforming gain by adaptively adjusting the transmit / receive beam direction of the NCR based on the location of the UE and the channel condition of the UE.

[0171] Existing RF repeaters cannot distinguish the downlink direction and the uplink direction in the TDD system, and always perform transmission and reception simultaneously in the downlink direction and the uplink direction. Alternatively, existing RF repeaters only apply fixed TDD configuration to switch between the downlink direction and the uplink direction according to a given time pattern. On the other hand, NCR can perform downlink / uplink switching in the case of considering TDD configuration. Therefore, this enables adaptive downlink / uplink operation and can reduce the power waste and interference caused by sending unnecessary signals.

[0172] Existing RF repeaters always amplify and forward the power of received signals regardless of whether the gNB and UE are transmitting signals. Therefore, this unnecessarily wastes power and increases interference to the surrounding environment. NCR can perform an on / off operation to shut down the operation of the RU when there is no signal to be sent to the gNB / UE, so as not to transmit unnecessary signals.

[0173] Existing RF repeaters amplify and forward the power of received signals at a fixed ratio. On the other hand, when sending signals with unnecessarily large power, the interference effect on the surrounding environment can be reduced by reducing the transmission power of the NCR, thereby reducing interference, and when sending signals with low power, the signal can be stably sent to the receiver by increasing the transmission power of the NCR.

[0174] Existing RF repeaters operate without knowing the downlink / uplink time slot boundaries. On the other hand, the NCR should know the transmission / reception boundaries of the downlink and uplink in order to adaptively adjust beamforming, on / off, downlink / uplink direction, transmission power, etc. as described above. Through this, the NCR can efficiently apply the operation of the RU per unit time (e.g., time slot or symbol).

[0175] Based on this discussion, the present disclosure proposes a method for an NCR to determine / set TDD resource allocation information and a method for receiving an instruction from a base station.

[0176] The present disclosure assumes operation in NCR. However, the present disclosure can be applied to devices other than NCR. Specifically, the content of the present invention can be applied to the operation of RIS. To this end, the NCR mentioned in the present invention can be replaced with RIS and expanded / interpreted. In this case, the RU can perform the role of forwarding signals from the gNB to the UE and the role of forwarding signals from the UE to the gNB in ​​the RIS, and the MT can perform the role of receiving side control information from the gNB for controlling the signal transmission of the RU. In the present disclosure, the network can be replaced with gNB or CU / DU and interpreted. In addition, the gNB can be replaced with the network or CU / DU and interpreted.

[0177] NCR aims to overcome the limitations of existing radio frequency (RF) repeaters that only amplify and forward signals and provide smarter RU operation control. To this end, the concept of side control information is newly introduced in NCR. By sending and receiving side control information between gNB and MT, the operation of RU can be partially controlled.

[0178] However, as the cost-effectiveness of NCR becomes an important factor, it may be difficult for MT to have complete control capabilities in the form of a complete protocol stack. However, NCR has the advantage of being able to differentiate from existing RF repeaters in that only effective control of RUs utilizing side control information is enabled. By developing smart motion technology for NCR, it is expected that the application of technology that can achieve performance improvement at a lower cost can be realized.

[0179] In NCR, in order to forward the signal received by RU, it is possible to consider adjusting the transmit / receive beam direction, DL / UL direction, on / off, transmission power, etc. at the RF side. However, the operation of RU may not be determined by NCR itself and may be completely controlled by gNB. To this end, MT can receive the information required to control the operation of RU (i.e., side control information) from gNB.

[0180] For example, the side control information may include all or part of the following information.

[0181] 1) Beamforming information

[0182] Information about the transmit and receive beam directions of the RU

[0183] The information may include beam directions for UL transmission to the gNB, DL reception from the gNB, DL transmission to the UE, and / or UL reception from the UE.

[0184] 2) Timing information used to align the transmit / receive boundaries of network-controlled repeaters

[0185] Information used to align RUs to transmit / receive time slots or boundaries

[0186] 3) DL-UL TDD configuration information

[0187] Information about the DL / UL direction of the RU

[0188] 4) Switching information for efficient interference management and improved energy efficiency

[0189] Information about the switching operation of RU

[0190] 5) Power control information for efficient interference management

[0191] Information about the transmit power of the RU

[0192] This information may include the UL power sent to the gNB and / or the DL transmit power to the UE.

[0193] In the present disclosure, it is proposed to use the DL / UL information determined by the MT to determine the information about the TDD DL / UL direction of the RU. That is, if the MT determines that a specific resource is DL (UL), the RU can also determine that the RU operates as DL (UL) on the corresponding resource. To this end, the semi-static TDD DL / UL configuration of the MU can be used. That is, if the MT determines that a specific resource is DL (UL) through the semi-static TDD DL / UL configuration of the MT, the RU can also determine that the RU operates as DL (UL) on the corresponding resource.

[0194] The semi-static TDD DL / UL configuration of the MT used for such judgment may include only the TDD-UL-DL-configurationCommon information, or may include both the TDD-UL-DL-configurationCommon information and the TDD-UL-DL-configurationDedicated information. For example, if the semi-static TDD DL / UL configuration of the MT includes only the TDD-UL-DL-configurationCommon information, and if the MT judges a specific resource as a specific resource direction (ie, DL, UL, or flexible (F)) through the TDD-UL-DL-configurationCommon information, the RU may also determine that the resource has the same resource direction.

[0195] When the semi-static TDD DL / UL configuration of the MT used to determine the DL / UL information of the RU includes both TDD-UL-DL-configurationCommon information and TDD-UL-DL-configurationDedicated information, if the MT determines a specific time resource as a specific resource direction (i.e., DL, UL or F) through the TDD-UL-DL-configurationCommon information and the TDD-UL-DL-configurationDedicated information, the RU can also determine that the resource has the same resource direction in the corresponding time resource.

[0196] The side control information of the NCR can be sent through a carrier / component carrier (CC) of a link separately established for exchanging control information between the gNB and the MT, and the TDD DL / UL information has a feature that can be independently configured / indicated to the MT semi-statically / dynamically.

[0197] For example, a minimum initial access procedure may be required between the gNB and the MT to generate a link for exchanging side control information between the gNB and the MT. In this case, in order for the MT to correctly perform the beam management process involving beam scanning of the synchronization signal / physical broadcast channel (SS / PBCH) blocks and beam refinement through the channel state information reference signal (CSI-RS), the semi-static / dynamic TDD DL / UL information of the MT needs to be configured / indicated accordingly. A method for determining the DL / UL information in the semi-static TDD flexible resources of the RU by appropriately utilizing such dynamic TDD DL / UL information of the MT may be considered.

[0198] Therefore, the present disclosure proposes a method for judging / determining DL / UL information in the semi-static TDD flexible resources of the RU based on the dynamic TDD DL / UL information of the MT. Here, the semi-static TDD flexible resources of the RU can be pre-configured based on the semi-static TDD information (D / F / U) of the MT.

[0199] The additional advantages, purposes and features of the present disclosure will be described in the following description, and part of them will be obvious to those skilled in the art, or can be known from the practice of the present disclosure. The purposes and other advantages of the present disclosure can be realized and obtained by the structures specifically pointed out in the present disclosure and claims and the drawings.

[0200] The configuration, operation, and other features of the present disclosure will be understood by describing the embodiments of the present disclosure with reference to the accompanying drawings.

[0201] Similar to the RF repeater in the prior art, the RU does not have the ability to make decisions on its own, but can be effectively controlled by the side control information newly introduced in the NCR.

[0202] One of the link adaptation methods that can be considered in NCR between gNB and MT using the newly introduced side control information is dynamic TDD resource (DL / UL) allocation. This is not possible using existing RF repeaters that perform amplification and transmission only in fixed time / frequency resources.

[0203] In particular, when a dynamic TDD DL / UL allocation scheme is used within the coverage of the NCR, adaptive beam operation and effective interference management are possible.

[0204] In the present disclosure, it is proposed that the MT uses the semi-static TDD DL / UL configuration of the MT and the dynamic DL / UL information of the MT to determine the DL / UL direction of the RU. That is, when the MT determines the DL / UL direction information in a specific time resource based on the dynamic TDD DL / UL information, the RU can also determine that it has the same DL / UL direction in the corresponding time resource.

[0205] Since the RU does not have control capability, it is possible to consider determining the DL / UL information in the semi-static TDD flexible resources of the RU based on the dynamic TDD DL / UL information indicated to the MT.

[0206] Here, the dynamic TDD or dynamic TDD DL / UL information indicated to the MT may be information indicated to the MT via a slot format indication (SFI) of a DCI format 2_0, and / or may be resources configured / indicated to the MT via semi-static configuration or dynamic indication to send a DL signal / channel or receive a UL signal / channel.

[0207] The present disclosure proposes a method for indicating how to judge / determine DL / UL information in a semi-static TDD flexible resource of a RU based on dynamic TDD DL / UL information of a MT.

[0208] 5.1 Determine RU's DL / UL information based on MT's timeslot format information

[0209] A method for determining DL / UL information of an RU by an RU based on the time slot format information of an MT is proposed. Here, the time slot format information of the MT may mean additional DL / UL directional information for the semi-static TDD flexible resources of the MT. For example, in addition, the DL / UL indication information may be dynamic TDD DL / UL information indicated to the MT via the SFI of DCI format 2_0 in the semi-static TDD flexible resources of the MT.

[0210] Here, a more specific process of performing dynamic TDD may mean a series of processes, wherein, when the MT receives an SFI indication in DCI format 2_0 as group common signaling through a PDCCH for semi-static TDD flexible resources configured via TDD-UL-DL-configurationCommon information and / or TDD-UL-DL-configurationDedicated information of RRC that is cell-specific and / or UE-specific as described in TS 38.213, the TDD D / F / U pattern is determined in the order of slot format # (i.e., TS38.213 Table 11.1.1.-1), which is a subset of slotFormatCombinations configured in slotFormatCombinationId of RRC corresponding to the SFI-index indicated by the offset of positionInDCI included in the DCI container. In the present disclosure, UE-specific may be MT-specific.

[0211] The RU does not have an individual control capability. Therefore, the RU can determine the DL / UL information of the RU by using the DL / UL information of the MT as it is. A method for determining the DL / UL information of the RU based on the slot format information of the MT is disclosed.

[0212] Alt 1. The RU determines that the semi-static TDD flexible resources in the MT are closed.

[0213] The RU may determine that the semi-static TDD flexible resources in the MT are turned off. Here, the semi-static TDD flexible resources of the MT may be resources that are not allocated to DL / UL through the TDD-UL-DL-configurationCommon information and / or TDD-UL-DL-configurationDedicated information of the RRC (i.e., configured as semi-static TDD flexible resources) or resources that are not indicated by the SFI of the DCI format 2_0. Alternatively, there may be a situation where the SFI has been sent but not received by the MT.

[0214] In addition, the RU determining the semi-static TDD flexible resources in the MT as off may mean that the RU does not perform transmission and reception for the relay. More specifically, the RU determining the semi-static TDD flexible resources in the MT as off may mean that the RU does not perform any DL operations via the RU on the links from the gNB to the RU and from the RU to the UE, and may mean that the RU does not perform any UL operations via the RU on the links from the UE to the RU and from the RU to the gNB. The RU can compensate for the propagation delay between the RU-UE link by determining the semi-static TDD flexible resources of the MT as off.

[0215] Alt 2. The dynamic TDD information (D / F / U) of the MT is also similarly applied to the RU.

[0216] The RU determines the DL / UL information by using the dynamic TDD information (D / F / U) of the MT as it is. That is, when the dynamic TDD information (D / F / U) for a specific time slot / symbol of the MT is configured / indicated by the SFI of DCI format 2_0, the RU also applies the dynamic TDD information (D / F / U) of the MT to the same time slot / symbol of the RU. In this case, the dynamic TDD information (D / F / U) of the MT may mean determining the TDD pattern according to the order of the time slot format # configured in the subset of the slotFormatCombinations set of the RRC corresponding to the SFI index indicated by the offset of the positionInDCI of the DCI format 2_0, wherein the radio network temporary identifier (SFI-RNTI) scrambling is performed in the semi-static TDD flexible resources of the MT. Alternatively, the dynamic TDD information (D / F / U) may be the DL / UL indication information of a separate time slot / symbol for a specific purpose within the semi-static TDD flexible resources of the MT.

[0217] The RU does not have an independent control capability. Therefore, the RU can determine the D / F / U information in the same slot / symbol of the RU by using the dynamic TDD information (D / F / U) of the MT configured / indicated in the slot / symbol in the semi-static TDD flexible resources of the RU as is.

[0218] Alt 2-1. When the dynamic TDD information (D / F / U) of the MT is a flexible resource, the RU sends the dynamic TDD information (D / F / U) is judged as closed.

[0219] For a slot / symbol in which the dynamic TDD information (D / F / U) of the MT is specifically indicated as a flexible resource, the RU judges the dynamic TDD information (D / F / U) of the MT in the same slot / symbol as off.

[0220] The dynamic TDD information of the MT being indicated as a flexible resource may mean that the TDD information of the SFI of the DCI format 2_0 in the semi-static TDD flexible resource indicated as the MT is indicated as flexible, rather than the DL / UL information.

[0221] In addition, the RU determining the semi-static TDD flexible resources in the MT as off may mean that the RU does not perform transmission and reception for relay. More specifically, the RU determining the semi-static TDD flexible resources in the MT as off may mean that the RU does not perform any DL operations via the RU on the links from the gNB to the RU and from the RU to the UE, and may mean that the RU does not perform any UL operations via the RU on the links from the UE to the RU and from the RU to the gNB. The propagation delay between the RU-UE link can be compensated by the RU turning off the dynamic TDD flexible resources of the MT.

[0222] 5.2 Determining RU’s DL / UL information based on MT’s scheduling information

[0223] A method for determining, by a RU, DL / UL information of the RU based on scheduling information of the MT is proposed. Here, the scheduling information of the MT may mean resources defined as DL / UL in the process of configuring the MT for sending / receiving a signal / channel. That is, the RU may operate by implicitly determining resources configured / indicated to send DL signals / channels as DL resources through semi-static configuration or dynamic indication, and by implicitly determining resources configured / indicated to receive DL signals / channels as UL resources.

[0224] As such, when the MT implicitly determines the DL / UL information through the configuration / indication of the DL / UL signal / channel for specific resources, the RU may also determine that the RU operates in the same DL / UL direction for the corresponding resources.

[0225] At this time, the transmission / reception configuration of the signal / channel for the MT may be performed in the time slot / symbol in which the semi-static TDD flexible resources of the MT are not individually indicated as DL / UL. The case in which the semi-static TDD flexible resources of the MT are not indicated as DL / UL may be the case in which the semi-static TDD flexible resources of the MT in the flexible time slot / symbol are not indicated as DL / UL by the SFI in the DCI format 2_0 or the case in which the MT does not receive the SFI.

[0226] A method for determining DL / UL information of RU based on scheduling information defined by DL / UL in the process of configuring transmission / reception of a signal / channel for MT is proposed. Only one of the methods proposed below may be applied, or both methods may be applied simultaneously.

[0227] Alt 1. When the MT is not scheduled as a separate DL / UL, the RU determines the same slot / symbol as off.

[0228] With respect to the time slot / symbol in which the MT is not scheduled using separate DL / UL information, the RU judges the same time slot / symbol of the RU as closed. Here, the time slot / symbol in which the MT is not scheduled using DL / UL information means the case where the final defined resource of the MT is a flexible resource. The RU does not have a separate control capability. Therefore, the RU judges the same time slot / symbol of the RU as closed with respect to the time slot / symbol defined as a flexible resource in which the MT is not scheduled as DL / UL information.

[0229] In addition, the RU determining the same timeslot / symbol as off may mean that the RU does not perform transmission and reception for relay. More specifically, the RU determining the same timeslot / symbol as off may mean that the RU does not perform any DL operation via the RU on the link from gNB to RU and from RU to UE, and may mean that the RU does not perform any UL operation via the RU on the link from UE to RU and from RU to gNB. The propagation delay between the RU-UE links can be compensated by turning off the resources that are not scheduled by the RU as MT separate DL / UL.

[0230] Alt 2. During the transmission / reception of the MT configuration signal / channel, the scheduling information defined as DL / UL is also applied to the RU.

[0231] The RU may use the DL / UL information of the time slot / symbol determined during the transmission / reception process of the signal / channel configured by the MT for the same time slot / symbol of the RU. That is, when the MT implicitly determines the DL / UL information through the configuration / indication of the DL / UL signal / channel for a specific resource, the RU may also determine that the RU operates in the same DL / UL direction for the corresponding resource.

[0232] When the RU uses the DL / UL information judged by the MT in the above Alt1 and Alt2, the RU will use the information of the MT at the same time point at a specific time point. That is, the DL / UL information that the MT has in time slot #n is judged to be the DL / UL information of the RU in time slot #n at the same time point. At this time, the scheduled DL / UL information that the MT has in time slot #n may be the information configured / indicated before time slot k. Therefore, the condition for the RU to judge the validity of the DL / UL information may be: the time slot #nk of the MT, which is the indication / configuration time point of the scheduled DL / UL information existing in the time slot #n of the MT, should be the criterion.

[0233] The reason why the difference of k time slots should be used as a criterion here may be that the time boundary between the MT and the RU does not match. For example, when there is a time boundary mismatch between the MT and the U, there may be a processing time delay (=k) for correcting errors. At this time, the DL / UL information of the time slot #n of the MT judged at a time point after the time slot #nk may be information that may not be applied to the time slot #n of the RU. Therefore, in order to make the DL / UL information in the time slot #n judged by the RU valid, the DL / UL information in the time slot #n of the MT must be configured / indicated at least before the time slot #nk.

[0234] Alternatively, when the RU determines that the D / U operation should be switched at a specific time point, processing time may be required before the RU actually switches and applies the D / U operation. In addition, if the DL / UL time slot boundaries of the RU do not match, gap time may be required to match the time boundaries. Therefore, even if the RU determines that the D / U operation is switched, it is difficult for the RU to apply the switch immediately. When the MT determines the D / U operation at a specific time point and the RU also determines to apply the same D / U information at the corresponding time point, the MT must determine the D / U information at a specific time before the corresponding time point by considering the processing time of the RU, so that the RU can actually apply the D / U information determined at the corresponding time point. With this in mind, the following operation is proposed.

[0235] When MT determines the DL / UL information scheduled in time slot #n before time slot #nk, RU can determine the corresponding information as RU's DL / UL information in time slot #n. When MT determines the DL / UL information scheduled in time slot #n after time slot #nk, RU does not use the corresponding information for RU's DL / UL determination.

[0236] In this case, the k value may be a fixed value of the DL / UL information judged by the RU to be valid. Alternatively, the k value may be a value set by the RRC so that the DL / UL information judged by the RU is valid.

[0237] 5.3 MT determines RU’s DL / UL information when slot format / scheduling does not indicate DL / UL information

[0238] When DL / UL is not configured / indicated for a specific resource of the MT by the proposed method, the RU may not be able to determine the DL / UL information. When separate DL / UL information is configured / indicated in the corresponding resource of the MT, a method for judging the DL / UL information for the corresponding resource by the RU is proposed.

[0239] Configuring / indicating separate DL / UL information for specific resources in MT may mean configuring / indicating DL / UL only for specific time slots / symbols. DL / UL information for corresponding resources of RU may mean DL / UL information configured / indicated in specific time slots / symbols of MT.

[0240] More specifically, when the RU determines the time slot / symbol of the RU based on the DL / UL information configured / indicated for the specific time slot / symbol of the MT, a method for determining the adjacent resources of the corresponding time slot / symbol by the RU is proposed. Here, the adjacent resources may mean adjacent symbols based on the corresponding time slot / symbol or adjacent time slots within the corresponding time slot.

[0241] Method 1: When a specific symbol in a specific time slot is determined to be DL / UL, the corresponding symbol in the time slot can be implicitly determined. Remaining symbols.

[0242] For DL / UL judgment of RU, when symbol #n in a specific time slot of RU is judged as DL, RU can judge symbol #0 to symbol #n, which are the first symbols of the corresponding time slot of RU, as DL. Alternatively, when symbol #n in a specific time slot of RU is judged as UL, RU can judge symbol #n to the last symbol of the time slot of RU as UL.

[0243] Method 2: For two adjacent time slots, when a specific symbol in one time slot is When the two symbols are all judged as DL or UL, all symbols between the two symbols can be implicitly judged.

[0244] That is, for two adjacent time slots of the RU, when symbol #m of the first time slot is judged as DL and symbol #n of the second time slot is judged as DL, if there is no symbol judged as UL between symbol #m and symbol #n, the RU may judge the symbol between symbol #m and symbol #n as DL. Alternatively, for two adjacent time slots of the RU, when symbol #m of the first time slot is judged as UL and symbol #n of the second time slot is judged as UL, if there is no symbol judged as DL between symbol #m and symbol #n, the RU may judge the symbol between symbol #m and symbol #n as UL.

[0245] 5.4 When the final DL / UL information of the MT is different from the DL / UL information of the RU, determine the DL / UL information of the RU

[0246] There may be a situation where the DL / UL information of the RU is different from the DL / UL information finally configured in the MT. For example, the DL / UL information of the RU received through the side control information may be different from the DL / UL information determined by the MT through the TDD DL / UL configuration. For example, the situation where the information is different may mean that in the same time slot / symbol interval of the MT and the RU, the MT is configured as DL, but the RU determines that the time slot / symbol is UL, or the MT is configured as UL, but the RU determines that the time slot / symbol is DL, that is, there may be a conflict situation in which the DL / UL pattern of the time slot determined by the RU is DDDDDDDUUUUUUU, but the DL / UL pattern of the time slot finally configured / indicated to the MT is UUUUUUUUDDDDDDD. A method for the R to determine the DL / UL information of the RU in such a conflict situation is proposed.

[0247] Method 1: The DL / UL information of the MT is covered and used by the RU.

[0248] The RU uses the DL / UL information that the corresponding slot / symbol of the MT has with respect to the slot / symbol of the RU where the collision occurs.

[0249] Method 2: The DL / UL information of the RU is applied to the MT.

[0250] The MT applies the DL / UL information used by the corresponding slot / symbol of the RU to the same slot / symbol of the MT relative to the slot / symbol of the MT where the collision occurred.

[0251] Fig.12 is a flowchart of a signal transmitting / receiving method according to an embodiment of the present invention.

[0252] exist Fig.12 In the embodiment, the first device may be the MT described above, and the second device may be the RU described above. In addition, the first device and the second device may be included in one electronic device (eg, NCR).

[0253] refer to Fig.12 , the first device may receive first semi-static TDD resource allocation information (S1210). The first device may receive first semi-static TDD resource allocation information from a BS, which includes a plurality of first flexible resources that are not allocated to UL or DL.

[0254] The first device may receive TDD UL-DL additional configuration information (S1220). The first device may receive TDD UL-DL additional configuration information from the BS (S1220).

[0255] Here, the TDD UL-DL additional configuration information may be dynamic TDD UL-DL configuration information to be applied to the first device.The TDD UL-DL additional configuration information may be received via control information for the first device or via scheduling information for the first device.

[0256] Some of the plurality of first flexible resources received in S1210 may not correspond to TDD UL-DL additional configuration information, and the remaining ones may correspond to TDD UL-DL additional configuration information.

[0257] The TDD UL-DL additional configuration information may include only UL or DL ​​information for a specific symbol included in a specific slot among the plurality of first flexible resources.

[0258] The TDD UL-DL additional configuration information may include UL or DL ​​information for a first symbol included in a first slot among the plurality of first flexible resources and UL or DL ​​information for a second symbol included in a second slot adjacent to the first slot among the first flexible resources.

[0259] The second device may determine second semi-static TDD resource allocation information ( S1230 ).

[0260] The second device can determine the second semi-static TDD resource allocation information by updating one or more of the plurality of first flexible resources in the first semi-static TDD resource allocation information based on the TDD UL-DL additional configuration information.

[0261] The second semi-static TDD resource allocation information may include information of one or more second flexible resources. Here, the one or more second flexible resources may be a propagation delay between UL and DL.

[0262] The second semi-static TDD resource allocation information may be determined by updating one or more of the plurality of first flexible resources in the first semi-static TDD resource allocation information to be the same as one or more resources in the TDD UL-DL additional configuration information.

[0263] When some of the first flexible resources included in the first semi-static TDD resource allocation information in S1210 do not correspond to the TDD UL-DL additional configuration information received in S1220, the first flexible resources not corresponding to the TDD UL-DL additional configuration information may be maintained as second flexible resources in the second semi-static TDD resource allocation information.

[0264] The TDD UL-DL additional configuration information received in S1220 includes only UL or DL ​​information for a specific symbol included in a specific time slot among multiple first flexible resources, and when the specific symbol is UL, all first flexible resources included in the specific time slot among multiple first flexible resources are updated to UL, thereby determining the second semi-static TDD resource allocation information, and when the specific symbol is DL, all first flexible resources included in the specific time slot among multiple first flexible resources are updated to DL, thereby determining the second semi-static TDD resource allocation information.

[0265] The TDD UL-DL additional configuration information received in S1220 includes UL or DL ​​information for a first symbol included in a first time slot among multiple first flexible resources and UL or DL ​​information for a second symbol included in a second time slot adjacent to the first time slot among the first flexible resources, and when the first symbol and the second symbol are UL, all first flexible resources between the first symbol and the second symbol among the multiple first flexible resources are updated to UL, thereby determining the second semi-static TDD resource allocation information, and when the first symbol and the second symbol are DL, all first flexible resources between the first symbol and the second symbol among the multiple first flexible resources are updated to DL, thereby determining the second semi-static TDD resource allocation information.

[0266] The second device may forward a signal based on the second semi-static TDD resource allocation information (S1240). The second device may forward a signal from the BS to the UE, or forward a signal from the UE to the BS, based on the second semi-static TDD resource allocation information.

[0267] In case the second semi-static TDD resource allocation information in S1230 includes information of one or more second flexible resources, the second device may not forward a signal on the one or more second flexible resources.

[0268] At the same time, when the second semi-static TDD resource allocation information to be applied to the second device is different from the third semi-static TDD resource allocation information to be applied to the first device, the sending and receiving of signals by the first device and the sending and receiving of signals by the second device can be performed based on the second semi-static TDD resource allocation information.

[0269] On the contrary, when the second semi-static TDD resource allocation information to be applied to the third semi-static second device is different from the third semi-static TDD resource allocation information to be applied to the first device, the sending and receiving of signals by the first device and the sending and receiving of signals by the second device can be performed based on the corresponding TDD resource allocation information.

[0270] Fig.13 is a flowchart of a signal transmitting / receiving method according to another embodiment of the present disclosure.

[0271] exist Fig.13 In the embodiment, the first device may be the MT described above, and the second device may be the RU described above. In addition, the first device and the second device may be included in one electronic device (eg, NCR).

[0272] refer to Fig.13 The BS may receive first semi-static TDD resource allocation information (S1310). The BS may send the first semi-static TDD resource allocation information to the first device, which includes a plurality of first flexible resources not allocated to UL or DL.

[0273] The BS may transmit TDD UL-DL additional configuration information (S1320). The BS may transmit TDD UL-DL additional configuration information to the first device.

[0274] Here, the TDD UL-DL additional configuration information may be dynamic TDD UL-DL configuration information to be applied to the first device. The TDD UL-DL additional configuration information may be transmitted via control information for the first device or via scheduling information for the first device.

[0275] Some of the plurality of first flexible resources transmitted in S1310 may not correspond to the TDD UL-DL additional configuration information, and the remaining ones may correspond to the TDD UL-DL additional configuration information.

[0276] The TDD UL-DL additional configuration information may include only UL or DL ​​information for a specific symbol included in a specific slot among the plurality of first flexible resources transmitted in S1310 .

[0277] The TDD UL-DL additional configuration information may include UL or DL ​​information for a first symbol included in a first slot among the plurality of first flexible resources received in S1310 and UL or DL ​​information for a second symbol included in a second slot adjacent to the first slot among the first flexible resources.

[0278] The BS may transmit and receive a signal based on the second semi-static TDD resource allocation information (S1330).

[0279] A signal from a user equipment (UE) based on the second semi-static TDD resource allocation information for forwarding from the second device may be received, or a signal to be forwarded to the UE based on the second semi-static TDD resource allocation information may be sent to the second device.

[0280] The second semi-static TDD resource allocation information may be information obtained by updating one or more of the plurality of first flexible resources in the first semi-static TDD resource allocation information based on the TDD UL-DL additional configuration information.

[0281] The second semi-static TDD resource allocation information may include information of one or more second flexible resources, and the one or more second flexible resources may be a propagation delay between UL and DL, and forwarding of the signal by the second device may not be performed in the one or more second flexible resources.

[0282] The second semi-static TDD resource allocation information may be determined to be the same as one or more resources in the TDD UL-DL additional configuration information by updating one or more of the plurality of first flexible resources in the first semi-static TDD resource allocation information.

[0283] When some of the first flexible resources included in the TDD resource allocation information sent in S1310 do not correspond to the TDD UL-DL additional configuration information sent in S1320, the first flexible resources not corresponding to the TDD UL-DL additional configuration information may be maintained as second flexible resources in the second semi-static TDD resource allocation information.

[0284] The TDD UL-DL additional configuration information sent in S1310 only includes UL or DL ​​information for a specific symbol included in a specific time slot among multiple first flexible resources, and when the specific symbol is UL, all first flexible resources included in the specific time slot among multiple first flexible resources are updated to UL, thereby determining the second semi-static TDD resource allocation information, and when the specific symbol is DL, all first flexible resources included in the specific time slot among multiple first flexible resources are updated to DL, thereby determining the second semi-static TDD resource allocation information.

[0285] The TDD UL-DL additional configuration information sent in S1310 includes UL or DL ​​information for a first symbol included in a first time slot among multiple first flexible resources and UL or DL ​​information for a second symbol included in a second time slot adjacent to the first time slot among the first flexible resources, and when the first symbol and the second symbol are both UL, all first flexible resources between the first symbol and the second symbol among the multiple first flexible resources are updated to UL, thereby determining the second semi-static TDD resource allocation information, and when the first symbol and the second symbol are DL, all first flexible resources between the first symbol and the second symbol among the multiple first flexible resources are updated to DL, thereby determining the second semi-static TDD resource allocation information.

[0286] At the same time, when the second semi-static TDD resource allocation information to be applied to the second device is different from the third semi-static TDD resource allocation information to be applied to the first device, the sending and receiving of signals by the first device and the sending and receiving of signals by the second device can be performed based on the second semi-static TDD resource allocation information.

[0287] On the contrary, when the second semi-static TDD resource allocation information to be applied to the third semi-static second device is different from the third semi-static TDD resource allocation information to be applied to the first device, the sending and receiving of signals by the first device and the sending and receiving of signals by the second device can be performed based on the corresponding TDD resource allocation information.

[0288] Communication system applicable to the present disclosure

[0289] Fig.14 A communication system suitable for use with various embodiments of the present disclosure is illustrated.

[0290] refer to Fig.14, the communication system 1 applied to the present disclosure includes a wireless device, a base station (BS), and a network. Here, the wireless device refers to a device that uses a radio access technology (RAT) (e.g., 5G new RAT (NR) or long term evolution (LTE), 6G wireless communication) to perform communication, and may be referred to as a communication / radio / 5G device / 6G device. The wireless device may include, but is not limited to, a robot 100a, vehicles 100b-1 and 100b-2, an extended reality (XR) device 100c, a handheld device 100d, a home appliance 100e, an Internet of Things (IoT) device 100f, and an artificial intelligence (AI) device / server 400. For example, a vehicle may include a vehicle with a wireless communication function, an autonomous driving vehicle, and a vehicle capable of communicating between vehicles. Here, a vehicle may include an unmanned aerial vehicle (UAV) (e.g., a drone). XR devices may include augmented reality (AR) / virtual reality (VR) / mixed reality (MR) devices, and may be implemented in the form of a head mounted device (HMD), a head up display (HUD) installed in a vehicle, a television, a smartphone, a computer, a wearable device, a home appliance device, a digital signage, a vehicle, a robot, etc. Handheld devices may include smartphones, smart boards, wearable devices (e.g., smart watches or smart glasses), and computers (e.g., laptops). Home appliances may include televisions, refrigerators, and washing machines. IoT devices may include sensors and smart meters. For example, a BS and a network may be implemented as wireless devices, and a specific wireless device 200a may operate as a BS / network node relative to other wireless devices.

[0291] The wireless devices 100a to 100f may be connected to the network 300 through the BS 200. AI technology may be applied to the wireless devices 100a to 100f, and the wireless devices 100a to 100f may be connected to the AI ​​server 400 through the BS. The network 300 may be configured using a 3G network, a 4G (e.g., LTE) network, a 5G (e.g., NR) network, or a 6G network. Although the wireless devices 100a to 100f may communicate with each other through the BS 200 / network 300, the wireless devices 100a to 100f may perform direct communication (e.g., side link communication) with each other without going through the BS / network. For example, the vehicles 100b-1 and 100b-2 may perform direct communication (e.g., vehicle-to-vehicle (V2V) / vehicle-to-everything (V2X) communication). An IoT device (e.g., a sensor) may perform direct communication with other IoT devices (e.g., sensors) or other wireless devices 100a to 100f.

[0292] Wireless communication / connection 150a, 150b or 150c may be established between wireless devices 100a to 100f / BS 200 or BS 200 / BS 200. Here, wireless communication / connection may be established through various RATs (e.g., 5G NR) such as uplink / downlink communication 150a, sidelink communication 150b (or D2D communication) or inter-BS communication (e.g., relay, integrated access backhaul (IAB)). The wireless device and the BS / wireless device may send / receive radio signals to / from each other through wireless communication / connection 150a and 150b. For example, wireless communication / connection 150a and 150b may send / receive signals through various physical channels. To this end, various configuration information configuration processes for sending / receiving radio signals, various signal processing processes (e.g., channel coding / decoding, modulation / demodulation and resource mapping / demapping), and at least a portion of the resource allocation process may be performed based on various suggestions of the present disclosure.

[0293] Wireless devices suitable for the present disclosure

[0294] An example of a wireless device to which various embodiments of the present disclosure are applied is described below.

[0295] Fig.15 A wireless device suitable for use with various embodiments of the present disclosure is illustrated.

[0296] refer to Fig.15 , the first wireless device 100 and the second wireless device 200 may transmit radio signals via various RATs (eg, LTE and NR). Here, {the first wireless device 100 and the second wireless device 200} may correspond to Fig.14 {wireless device 100x and BS 200} and / or {wireless device 100x and wireless device 100x}.

[0297] The first wireless device 100 may include one or more processors 102 and one or more memories 104, and may further include one or more transceivers 106 and / or one or more antennas 108. The processor 102 may control the memory 104 and / or the transceiver 106, and may be configured to implement the description, functions, processes, proposals, methods, and / or operation flowcharts disclosed in this document. For example, the processor 102 may process the information in the memory 104 to generate first information / signals, and then transmit a radio signal including the first information / signals through the transceiver 106. The processor 102 may receive a radio signal including second information / signals through the transceiver 106, and then store information obtained by processing the second information / signals in the memory 104. The memory 104 may be connected to the processor 102 and may store various information related to the operation of the processor 102. For example, the memory 104 may store software codes including commands for executing part or all of the processes controlled by the processor 102, or for executing the description, functions, processes, proposals, methods, and / or operation flowcharts disclosed in this document. Here, the processor 102 and the memory 104 may be part of a communication modem / circuit / chip designed to implement a RAT (e.g., LTE or NR). The transceiver 106 may be connected to the processor 102 and send and / or receive radio signals through one or more antennas 108. Each transceiver 106 may include a transmitter and / or a receiver. The transceiver 106 may be used interchangeably with a radio frequency (RF) unit. In the present disclosure, a wireless device may represent a communication modem / circuit / chip.

[0298] The second wireless device 200 may include one or more processors 202 and one or more memories 204, and further include one or more transceivers 206 and / or one or more antennas 208. The processor 202 may control the memory 204 and / or the transceiver (206), and may be configured to implement the descriptions, functions, processes, proposals, methods, and / or operational flowcharts disclosed in this document. For example, the processor 202 may process the information in the memory 204 to generate third information / signals, and then transmit a radio signal including the third information / signals through the transceiver 206. The processor 202 may receive a radio signal including fourth information / signals through the transceiver 206, and then store information obtained by processing the fourth information / signals in the memory 204. The memory 204 may be connected to the memory 204, and may store various information related to the operation of the processor 202. For example, the memory 204 may store software codes including commands for executing part or all of the processes controlled by the processor or for executing the descriptions, functions, processes, proposals, methods, and / or operational flowcharts disclosed in this document. Here, the processor 202 and the memory 204 may be part of a communication modem / circuit / chip designed to implement a RAT (e.g., LTE or NR). The transceiver 206 may be connected to the processor 202 and send and / or receive radio signals through one or more antennas 208. Each transceiver 206 may include a transmitter and / or a receiver. The transceiver 206 may be used interchangeably with an RF unit. In the present disclosure, a wireless device may represent a communication modem / circuit / chip.

[0299] In the following, the hardware elements of the wireless devices 100 and 200 will be described in more detail. One or more protocol layers may be implemented by, but not limited to, one or more processors 102 and 202. For example, one or more processors 102 and 202 may implement one or more layers (e.g., functional layers such as PHY, MAC, RLC, PDCP, RRC, and SDAP). One or more processors 102 and 202 may generate one or more protocol data units (PDUs) and / or one or more service data units (SDUs) according to the descriptions, functions, processes, proposals, methods, and / or operational flowcharts disclosed in this document. One or more processors 102 and 202 may generate messages, control information, data, or information according to the descriptions, functions, processes, proposals, methods, and / or operational flowcharts disclosed in this document. The one or more processors 102 and 202 may generate a signal (e.g., a baseband signal) including a PDU, SDU, message, control information, data, or information according to the description, functions, procedures, proposals, methods, and / or operational flowcharts disclosed in this document, and provide the generated signal to the one or more transceivers 106 and 206. The one or more processors 102 and 202 may receive a signal (e.g., a baseband signal) from the one or more transceivers 106 and 206 and obtain the PDU, SDU, message, control information, data, or information according to the description, functions, procedures, proposals, methods, and / or operational flowcharts disclosed in this document.

[0300] One or more processors 102 and 202 may be referred to as controllers, microcontrollers, microprocessors, or microcomputers. One or more processors 102 and 202 may be implemented by hardware, firmware, software, or a combination thereof. For example, one or more application specific integrated circuits (ASICs), one or more digital signal processors (DSPs), one or more digital signal processing devices (DSPDs), one or more programmable logic devices (PLDs), or one or more field programmable gate arrays (FPGAs) may be included in one or more processors 102 and 202. The description, function, process, proposal, method, and / or operational flowchart disclosed in this document may be implemented using firmware or software, and the firmware or software may be configured to include modules, processes, or functions. Firmware or software configured to execute the description, function, process, proposal, method, and / or operational flowchart disclosed in this document may be included in one or more processors 102 and 202, or stored in one or more memories 104 and 204 so as to be driven by one or more processors 102 and 202. The description, function, process, proposal, method, and / or operational flowchart disclosed in this document may be implemented using firmware or software in the form of code, command, and command set.

[0301] One or more memories 104 and 204 may be connected to one or more processors 102 and 202 and store various types of data, signals, messages, information, programs, codes, instructions, and / or commands. One or more memories 104 and 204 may be configured by read-only memory (ROM), random access memory (RAM), electrically erasable programmable read-only memory (EPROM), flash memory, hard disk drive, register, buffer memory, computer-readable storage medium, and / or a combination thereof. One or more memories 104 and 204 may be located inside and / or outside of one or more processors 102 and 202. One or more memories 104 and 204 may be connected to one or more processors 102 and 202 via various technologies such as wired or wireless connections.

[0302] One or more transceivers 106 and 206 can send user data, control information and / or radio signals / channels mentioned in the method and / or operation flow chart of this document to one or more other devices. One or more transceivers 106 and 206 can receive user data, control information and / or radio signals / channels mentioned in the description, function, process, proposal, method and / or operation flow chart disclosed in this document from one or more other devices. For example, one or more transceivers 106 and 206 can be connected to one or more processors 102 and 202 and send and receive radio signals. For example, one or more processors 102 and 202 can perform control so that one or more transceivers 106 and 206 can send user data, control information or radio signals to one or more other devices. One or more processors 102 and 202 can perform control so that one or more transceivers 106 and 206 can receive user data, control information or radio signals from one or more other devices. One or more transceivers 106 and 206 may be connected to one or more antennas 108 and 208, and one or more transceivers 106 and 206 may be configured to send and receive user data, control information and / or radio signals / channels mentioned in the description, functions, processes, proposals, methods and / or operation flow charts disclosed in this document through one or more antennas 108 and 208. In this document, one or more antennas may be multiple physical antennas or multiple logical antennas (e.g., antenna ports). One or more transceivers 106 and 206 may convert received radio signals / channels, etc. from RF band signals to baseband signals, so as to facilitate processing of received user data, control information, radio signals / channels, etc. using one or more processors 102 and 202. One or more transceivers 106 and 206 may convert user data, control information, radio signals / channels, etc. processed using one or more processors 102 and 202 from baseband signals to RF band signals. To this end, one or more transceivers 106 and 206 may include (analog) oscillators and / or filters.

[0303] Fig.16 Another example of a wireless device suitable for various embodiments of the present disclosure is illustrated.

[0304] according to Fig.16 , the wireless device may include at least one processor 102 and 202 , at least one memory 104 and 204 , at least one transceiver 106 and 206 , and one or more antennas 108 and 208 .

[0305] Fig.15 The illustrated example of a wireless device is Fig.16 The difference between the illustrated examples of wireless devices is in Fig.15Processors 102 and 202 and memories 104 and 204 are separated from each other, but in Fig.16 The memories 104 and 204 are included in the processors 102 and 202 .

[0306] Here, the detailed description of the processors 102 and 202, the memories 104 and 204, the transceivers 106 and 206, and the antennas 108 and 208 are the same as above, and thus the repeated description is omitted in order to avoid unnecessary duplication of the description.

[0307] An example of a signal processing circuit to which various embodiments of the present disclosure are applied is described below.

[0308] Fig.17 The signal processing circuit for transmitting the signal is shown.

[0309] refer to Fig.17 , the signal processing circuit 1000 may include a scrambler 1010 , a modulator 1020 , a layer mapper 1030 , a precoder 1040 , a resource mapper 1050 , and a signal generator 1060 . Fig.17 The operations / functions can be performed by but not limited to Fig.15 The processors 102 and 202 and / or the transceivers 106 and 206 are executed. Fig.17 The hardware components can be Fig.15 For example, blocks 1010 to 1060 may be implemented by processors 102 and 202 and / or transceivers 106 and 206. Fig.15 Alternatively, blocks 1010 to 1050 may be implemented by processors 102 and 202. Fig.15 102 and 202, and block 1060 may be implemented by Fig.15 The transceivers 106 and 206 are implemented.

[0310] Codewords can be passed Fig.17 The signal processing circuit 1000 is converted into a radio signal. Here, the codeword is a coded bit sequence of an information block. The information block may include a transport block (e.g., UL-SCH transport block, DL-SCH transport block). The radio signal may be transmitted through various physical channels (e.g., PUSCH and PDSCH).

[0311] Specifically, the codeword may be converted into a scrambled bit sequence by the scrambler 1010. A scrambling sequence for scrambling may be generated based on an initialization value, and the initialization value may include the ID information of the wireless device. The scrambled bit sequence may be modulated into a modulation symbol sequence by the modulator 1020. The modulation scheme may include pi / 2-binary phase shift keying (pi / 2-BPSK), m-phase shift keying (m-PSK), and m-quadrature amplitude modulation (m-QAM). The complex modulation symbol sequence may be mapped to one or more transmission layers by the layer mapper 1030. The modulation symbol of each transmission layer may be mapped (precoded) to the corresponding antenna port by the precoder 1040. The output z of the precoder 1040 may be obtained by multiplying the output y of the layer mapper 1030 by the N*M precoding matrix W. In this article, N is the number of antenna ports and M is the number of transmission layers. The precoder 1040 may perform precoding after performing transform precoding (e.g., DFT) on the complex modulation symbol. Alternatively, the precoder 1040 may perform precoding without performing transform precoding.

[0312] The resource mapper 1050 may map the modulation symbols of each antenna port to time-frequency resources. The time-frequency resources may include multiple symbols in the time domain (e.g., CP-OFDMA symbols and DFT-s-OFDMA symbols) and multiple subcarriers in the frequency domain. The signal generator 1060 may generate a radio signal from the mapped modulation symbols and may send the generated radio signal to other devices through each antenna. For this purpose, the signal generator 1060 may include an inverse fast Fourier transform (IFFT) module, a cyclic prefix (CP) inserter, a digital-to-analog converter (DAC), and a frequency up-converter.

[0313] The signal processing for the signal received in the wireless device can be performed in Fig.17 The signal processing processes 1010 to 1060 are configured in the opposite manner. For example, a wireless device (e.g., Fig.15 100 and 200) can receive a radio signal from the outside through an antenna port / transceiver. The received radio signal can be converted into a baseband signal by a signal restorer. To this end, the signal restorer may include a frequency downlink converter, an analog-to-digital converter (ADC), a CP remover, and a fast Fourier transform (FFT) module. Next, the baseband signal can be restored to a codeword through a resource demapping process, a post-coding process, a demodulation processor, and a descrambling process. The codeword can be restored to the original information block by decoding. Therefore, a signal processing circuit (not shown) for receiving a signal may include a signal restorer, a resource demapper, a post-coder, a demodulator, a descrambler, and a decoder.

[0314] Fig.18An example of a wireless communication device suitable for use with the present disclosure is illustrated.

[0315] refer to Fig.18 , a wireless communication device (e.g., UE) may include at least one of a processor 2310 such as a digital signal processor (DSP) or a microprocessor, a transceiver 2335, a power management module 2305, an antenna 2340, a battery 2355, a display 2315, a keypad 2320, a global positioning system (GPS) chip 2360, a sensor 2365, a memory 2330, a subscriber identity module (SIM) card 2325, a speaker 2345, and a microphone 2350. A plurality of antennas and a plurality of processors may be provided.

[0316] The processor 2310 may implement the functions, processes, and methods described in this disclosure. Fig.18 The processor 2310 in may be Fig.16 Processors 102 and 202 in.

[0317] The memory 2330 is connected to the processor 2310 and stores information related to the operation of the processor 2310. The memory 2330 may be located inside or outside the processor 2310 and connected to the processor through various technologies such as a wired connection and a wireless connection. Fig.18 The memory 2330 may be Fig.16 The memories 204 and 204 in.

[0318] The user can input various types of information such as phone numbers using various techniques such as pressing buttons on keypad 2320 or using microphone 2350 to activate voice. Processor 2310 can receive and process the user's information and perform appropriate functions, such as calling using the entered phone number. In some scenarios, data can be retrieved from SIM card 2325 or memory 2330 to perform appropriate functions. In some scenarios, processor 2310 can display various types of information and data on display 2315 for user convenience.

[0319] The transceiver 2335 is connected to the processor 2310 and transmits and / or receives a radio frequency (RF) signal. The processor 2310 may control the transceiver 2335 to start communication or transmit an RF signal including various types of information or data such as voice communication data. The transceiver 2335 includes a transmitter and a receiver for transmitting and receiving RF signals. The antenna 2340 may facilitate the transmission and reception of RF signals. In some implementation examples, when the transceiver receives an RF signal, the transceiver may forward the signal and convert it to a baseband frequency for processing performed by the processor. The signal may be processed by various techniques such as conversion into audible or readable information and output through the speaker 2345. Fig.18The transceiver 2335 may be Fig.16 The transceivers 106 and 206 in FIG.

[0320] Despite Fig.18 Although not shown in the figure, various components such as a camera and a universal serial bus (USB) port may be additionally included in the UE. For example, the camera may be connected to the processor 2310.

[0321] Fig.18 This is only an example of an implementation of the UE, and the present disclosure is not limited thereto. The UE does not necessarily include Fig.18 All components shown. That is, some components such as keypad 2320, GPS chip 2360, sensor 2365 and SIM card 2325 may not be essential components. In this case, they may not be included in the UE.

[0322] In the above-mentioned embodiments, the components and features of the present disclosure are combined in a predetermined form. Unless otherwise clearly stated, each component or feature should be regarded as an option. Each component or feature can be implemented as not being associated with other components or features. In addition, the embodiments of the present disclosure can be configured by associating some components and / or features. The order of the operations described in the embodiments of the present disclosure can be changed. Some components or features of any embodiment can be included in another embodiment, or replaced with components and features corresponding to another embodiment. It is obvious that claims that are not clearly cited in the claims are combined to form embodiments, or are included in new claims by modifications after the application.

[0323] In the present disclosure, specific operations described as being performed by a base station may be performed by an upper node of the base station in some cases. That is, in a network of multiple network nodes including a base station, it is obvious that various operations performed for communication with a UE can be performed by a base station or a network node other than a base station. A base station may be replaced with terms such as a fixed station, a Node B, an eNodeB (eNB), and an access point.

[0324] The embodiments of the present disclosure may be implemented by hardware, firmware, software or a combination thereof. In the case of being implemented by hardware, according to the hardware implementation, the exemplary embodiments described herein may be implemented by using one or more application specific integrated circuits (ASICs), digital signal processors (DSPs), digital signal processing devices (DSPDs), programmable logic devices (PLDs), field programmable gate arrays (FPGAs), processors, controllers, microcontrollers, microprocessors, etc.

[0325] In the case of implementation by firmware or software, the embodiments of the present disclosure can be implemented in the form of modules, processes, functions, etc. to perform the above functions or operations. The software code can be stored in a memory and executed by a processor. The memory can be located inside or outside the processor and can send and receive data to / from the processor by various known means.

[0326] Although the embodiments of the present disclosure have been described using the LTE system, the LTE-A system, and the NR system, this is merely an example and the embodiments of the present disclosure can be applied to any communication system corresponding to the above definition.

[0327] In the present disclosure, specific operations described as being performed by a base station may be performed by an upper node of the base station in some cases. That is, in a network of multiple network nodes including a base station, it is apparent that various operations performed for communication with a UE can be performed by a base station or a network node other than a base station. The base station may be replaced with terms such as a fixed station, a Node B, an eNodeB (eNB), and an access point, and the name of the base station may be used as a comprehensive term including a remote radio head (RRH), an eNB, a transmission point (TP), a reception point (RP), a relay, and the like.

[0328] It is obvious to those skilled in the art that the present disclosure can be embodied in other specific forms without departing from the basic features of the present disclosure. Therefore, the above detailed description should not be interpreted as being restrictive in all aspects and should be considered illustrative. The scope of the present disclosure should be determined by the reasonable interpretation of the attached claims, and all modifications within the equivalent range of the present disclosure are included within the scope of the present disclosure.

Claims

1. A method for operating an electronic device in a wireless communication device, in, The electronic device includes a first device and a second device, and the method includes: Receiving, by the first device from a base station, first semi-static time division duplex (TDD) resource allocation information, the first semi-static time division duplex (TDD) resource allocation information comprising a plurality of first flexible resources not allocated to an uplink (UL) or a downlink (DL); Receiving, by the first device, TDD UL-DL additional configuration information from the base station; determining, by the second device based on the TDD UL-DL additional configuration information, second semi-static TDD resource allocation information by updating one or more of the plurality of first flexible resources in the first semi-static TDD resource allocation information; and The second device forwards a signal from the base station to a user equipment (UE) or forwards a signal from the UE to the base station based on the second semi-static TDD resource allocation information.

2. The method according to claim 1, in, The TDD UL-DL additional configuration information includes dynamic TDD uplink-downlink (UL-DL) configuration information to be applied to the first device, and wherein the TDD UL-DL additional configuration information is received through control information for the first device, or The TDD UL-DL additional configuration information is received through scheduling information for the first device.

3. The method according to claim 1, in, The second semi-static TDD resource allocation information includes information of one or more second flexible resources, and The one or more second flexible resources are propagation delays between UL and DL, and forwarding of the signal by the second device is not performed in the one or more second flexible resources.

4. The method according to claim 1, in, The TDD UL-DL additional configuration information includes dynamic TDD uplink-downlink (UL-DL) configuration information to be applied to the first device, and The second semi-static TDD resource allocation information includes information of one or more second flexible resources, and The one or more second flexible resources are propagation delays between UL and DL, and forwarding of the signal by the second device is not performed in the one or more second flexible resources.

5. The method according to claim 1, in, The second semi-static TDD resource allocation information is determined by updating one or more of the plurality of first flexible resources in the first semi-static TDD resource allocation information to be the same as one or more resources in the TDD UL-DL additional configuration information.

6. The method according to claim 1, in, Resources not corresponding to the TDD UL-DL additional configuration information among the plurality of first flexible resources are maintained as second flexible resources in the second semi-static TDD resource allocation information.

7. The method according to claim 1, in, The TDD UL-DL additional configuration information includes only UL or DL ​​information for a specific symbol included in a specific time slot among the plurality of first flexible resources, and wherein, based on the specific symbol being UL, the second semi-static TDD resource allocation information is determined by updating all first flexible resources included in the specific time slot among the plurality of first flexible resources to UL, and Wherein, based on the fact that the specific symbol is DL, the second semi-static TDD resource allocation information is determined by updating all first flexible resources included in the specific time slot among the multiple first flexible resources to DL.

8. The method according to claim 1, in, The TDD UL-DL additional configuration information includes UL or DL ​​information for a first symbol included in a first time slot among the plurality of first flexible resources, and UL or DL ​​information for a second symbol included in a second time slot adjacent to the first time slot among the first flexible resources, and wherein, based on the first symbol and the second symbol being UL, the second semi-static TDD resource allocation information is determined by updating all first flexible resources between the first symbol and the second symbol to UL, and Wherein, based on the fact that the first symbol and the second symbol are DL, the second semi-static TDD resource allocation information is determined by updating all first flexible resources between the first symbol and the second symbol to DL.

9. The method according to claim 1, in, Based on the fact that the second semi-static TDD resource allocation information to be applied to the second device is different from the third semi-static TDD resource allocation information to be applied to the first device, sending and receiving of signals by the first device and sending and receiving of signals by the second device are performed based on the third semi-static TDD resource allocation information.

10. The method according to claim 1, in, Based on the fact that the second semi-static TDD resource allocation information to be applied to the second device is different from the third semi-static TDD resource allocation information to be applied to the first device, the sending and receiving of the signal by the first device and the sending and receiving of the signal by the second device are performed based on the second semi-static TDD resource allocation information.

11. A method for operating a base station in a wireless communication system, the method include: Sending first semi-static time division duplex (TDD) resource allocation information to the first device of the electronic device including the first device and the second device, the first semi-static time division duplex (TDD) resource allocation information including a plurality of first flexible resources not allocated to an uplink (UL) or a downlink (DL); Sending TDD UL-DL additional configuration information to the first device; as well as receiving a signal forwarded from a user equipment (UE) based on the second semi-static TDD resource allocation information, or sending a signal to be forwarded to the UE to the second device, The second semi-static TDD resource allocation information is information obtained by updating one or more of the plurality of first flexible resources in the first semi-static TDD resource allocation information based on the TDD UL-DL additional configuration information.

12. The method according to claim 11, in, The TDD UL-DL additional configuration information includes dynamic TDD uplink-downlink (UL-DL) configuration information to be applied to the first device, and wherein the TDD UL-DL additional configuration information is received through control information for the first device, or The TDD UL-DL additional configuration information is received through scheduling information for the first device.

13. The method according to claim 11, in, The second semi-static TDD resource allocation information includes information of one or more second flexible resources, and The one or more second flexible resources are propagation delays between UL and DL, and forwarding of the signal by the second device is not performed in the one or more second flexible resources.

14. The method according to claim 11, in, The second semi-static TDD resource allocation information is determined by updating one or more of the plurality of first flexible resources in the first semi-static TDD resource allocation information to be the same as one or more resources in the TDD UL-DL additional configuration information.

15. The method according to claim 11, in, Resources not corresponding to the TDD UL-DL additional configuration information among the plurality of first flexible resources are maintained as second flexible resources in the second semi-static TDD resource allocation information.

16. The method according to claim 11, in, The TDD UL-DL additional configuration information includes only UL or DL ​​information for a specific symbol included in a specific time slot among the plurality of first flexible resources, and wherein, based on the specific symbol being UL, the second semi-static TDD resource allocation information is determined by updating all first flexible resources included in the specific time slot among the plurality of first flexible resources to UL, and Wherein, based on the fact that the specific symbol is DL, the second semi-static TDD resource allocation information is determined by updating all first flexible resources included in the specific time slot among the multiple first flexible resources to DL.

17. An electronic device in a communication system, include: a first device, the first device comprising a first transceiver; a second device, the second device comprising a second transceiver; at least one processor; as well as at least one memory operably connected to the at least one processor and storing instructions for performing operations based on execution by the at least one processor, The operation comprises all the steps of the method according to any one of claims 1 to 10.

18. A base station in a communication system, include: Transceiver; at least one processor; as well as at least one memory operably connected to the at least one processor and storing instructions for performing operations based on execution by the at least one processor, Wherein, the operation includes all steps of the method according to any one of claims 11 to 16.

19. A control device for controlling an electronic device in a communication system, include: at least one processor; as well as at least one memory, the at least one memory being operably connected to the at least one processor, wherein the at least one memory stores instructions for performing operations based on execution by the at least one processor, and The operation comprises all the steps of the method according to any one of claims 1 to 10.

20. One or more non-transitory computer-readable media storing one or more instructions, wherein the one or more instructions are based on being executed by one or more processors to perform operations, and in, The operation comprises all the steps of the method according to any one of claims 1 to 10.