Metal wire drawing machine control method and system and metal wire drawing machine
By monitoring and optimizing the startup operation and historical parameter data of the metal wire drawing machine, priority wire drawing data is determined and control data is generated, which solves the wear and accuracy problems caused by frequent parameter adjustments and achieves efficient and stable wire drawing production.
Patent Information
- Application Number
- CN202411225924.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When faced with multiple orders with different drawing requirements, existing metal wire drawing machines need to frequently adjust their operating parameters, which is time-consuming, labor-intensive, and causes rapid wear and tear, affecting the drawing accuracy.
By monitoring the start-up operation of the metal wire drawing machine, historical parameter data is obtained, priority wire drawing data is determined, and control data is generated based on the priority wire drawing data and historical parameter data to optimize the production plan, reduce the frequency of parameter adjustment, and improve wire drawing accuracy and stability.
This reduces the wear rate of metal wire drawing machines, improves wire drawing accuracy and production efficiency, and ensures on-time order delivery.
Smart Images

Figure CN119035288A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of metal processing technology, and in particular, relates to a metal wire drawing machine control method, system and metal wire drawing machine. Background Art
[0002] Metal wire drawing machine is a mechanical device that processes metal raw materials into wire or wire shape. Metal wire drawing machine makes metal blanks into required metal wire through a series of rotation, stretching and extrusion processes. Metal wire drawing machine is widely used in the processing of metal materials, especially the production of wires of non-ferrous metals such as copper and aluminum.
[0003] When a metal wire drawing machine in the related technology is drawing metal raw materials, if the wire drawing requirements of multiple orders are different, it is necessary to frequently adjust the working parameters set by the metal wire drawing machine according to the wire drawing requirements, and then control the operation of the metal wire drawing machine by the adjusted working parameters. This is not only time-consuming and labor-intensive, but also causes the metal wire drawing machine to wear quickly, thereby affecting the wire drawing accuracy of the metal wire drawing machine. Summary of the invention
[0004] The embodiments of the present application provide a metal wire drawing machine control method, system and metal wire drawing machine, which can solve the problem of rapid wear and low wire drawing accuracy of the metal wire drawing machine caused by frequent adjustment of the wire drawing working parameters of the metal wire drawing machine.
[0005] In a first aspect, an embodiment of the present application provides a metal wire drawing machine control method, comprising:
[0006] Monitoring the start-up operation of the metal wire drawing machine;
[0007] In response to the startup operation of the metal wire drawing machine, historical parameter data of the metal wire drawing machine is acquired; wherein the historical parameter data is used to reflect the wire drawing working parameters of the metal wire drawing machine that have not been reset after the previous use when the metal wire drawing machine is in the current startup state;
[0008] Determine priority wire drawing data; wherein the priority wire drawing data is target parameter data corresponding to order data for preferentially using the metal wire drawing machine for wire drawing work;
[0009] According to the priority wire drawing data and the historical parameter data, control data is obtained; wherein the control data is used to control the metal wire drawing machine to perform wire drawing;
[0010] Wire drawing is performed based on the control data.
[0011] The metal wire drawing machine control method provided by the present application can determine that the components of the metal wire drawing machine are in a normal state after monitoring the start-up operation of the metal wire drawing machine, so that the metal wire drawing machine can smoothly perform the wire drawing work; in response to the start-up operation of the metal wire drawing machine, the historical parameter data of the metal wire drawing machine is obtained, and the wire drawing working parameters of the metal wire drawing machine in the current start-up state that have not been reset after the previous use can be obtained, which serves as a basis for subsequent work; and then the priority wire drawing data is determined. By determining the priority wire drawing data system, the production plan can be reasonably arranged to determine the priority work. The order data of wire drawing work can ensure that all order data can meet the delivery time of the order; then the control data is obtained according to the priority wire drawing data and historical parameter data. By determining and analyzing the priority wire drawing data and historical parameter data, the wire drawing parameters of the metal wire drawing machine can be accurately determined, thereby reducing time and labor consumption, and reducing the wear rate of the metal wire drawing machine. Finally, the wire drawing work is performed based on the control data, thereby further improving the wire drawing accuracy and quality of the metal wire drawing machine, thereby improving the production efficiency of the metal wire drawing machine and improving the wire drawing stability and reliability of the metal wire drawing machine.
[0012] In a possible implementation manner of the first aspect, determining the priority drawing data includes:
[0013] Detecting order data from the order system; wherein the order data is used to reflect the order placement time, delivery time and wire drawing requirements;
[0014] When the order system has at least two order data, extracting all the order data from the order system;
[0015] Each of the order data is analyzed to obtain the priority wire drawing data.
[0016] In a possible implementation manner of the first aspect, analyzing each of the order data to obtain the priority wire drawing data includes:
[0017] Determine the remaining time data corresponding to each of the order data based on the order placement time and the delivery time indicated by each of the order data; wherein the remaining time data is used to indicate the remaining manufacturing time of the to-be-drawn product corresponding to the corresponding order data;
[0018] Analyzing the wire drawing requirements in each of the order data to obtain the demand parameter data corresponding to each of the order data; wherein the demand parameter data is used to indicate the wire drawing working parameters set corresponding to satisfying the wire drawing requirements;
[0019] Matching the wire drawing working parameters indicated by the demand parameter data corresponding to each of the order data with the wire drawing working parameters indicated by the historical parameter data to obtain parameter similarity data corresponding to each of the order data; wherein the parameter similarity data is used to reflect the parameter difference between the wire drawing working parameters indicated by the demand parameter data and the wire drawing working parameters indicated by the historical parameter data, and the parameter difference includes a wire drawing speed parameter and a wire drawing aperture parameter;
[0020] The priority wire drawing data is obtained by analyzing the remaining time data and the parameter similar data corresponding to each order data.
[0021] In a possible implementation of the first aspect, the analyzing the remaining time data and the parameter similarity data corresponding to each of the order data to obtain the priority wire drawing data includes:
[0022] Based on each of the order data, the corresponding preset time data, the allowable time error data and the allowable parameter error data are determined; wherein the preset time data is used to indicate the manufacturing time required to complete the corresponding order data, the allowable time error data is used to indicate the time range that is allowed to exceed when the wire drawing work is performed according to the corresponding order data, and the allowable parameter error data is used to indicate the difference range that is allowed to exceed when the wire drawing work is performed according to the historical parameter data corresponding to each of the order data;
[0023] The remaining time data corresponding to each of the order data are respectively compared with the corresponding preset time data to determine the order data that meets the first preset condition among the order data; wherein the first preset condition means that the manufacturing time indicated by the remaining time data is the same as the manufacturing time indicated by the preset time data, or the manufacturing time indicated by the remaining time data exceeds the manufacturing time indicated by the preset time data and meets the allowed excess time range indicated by the allowable time error data;
[0024] Compare the parameter similar data corresponding to each of the order data with the corresponding allowable parameter error data respectively, and determine the order data that meets the second preset condition among the order data; wherein the second preset condition means that the parameter difference indicated by the parameter similar data is within the difference range allowed to exceed indicated by the allowable parameter error data;
[0025] The priority wire drawing data is obtained according to the order data that meets the first preset condition in each of the order data and the order data that meets the second preset condition in each of the order data.
[0026] In a possible implementation manner of the first aspect, the method further includes:
[0027] In the case of order data that meets the first preset condition in each of the order data, the parameter similar data corresponding to each of the order data are respectively compared with the corresponding allowable parameter error data to determine the order data that meets the third preset condition in each of the order data; wherein the third preset condition means that the parameter difference indicated by the parameter similar data is not within the difference range allowed to exceed indicated by the allowable parameter error data;
[0028] Reminder adjustment data is generated based on the order data that meets the third preset condition in each of the order data; wherein the reminder adjustment data is used to send a reminder signal and a value that needs to be adjusted to the technician.
[0029] In a possible implementation manner of the first aspect, the method further includes:
[0030] The remaining time data corresponding to each of the order data are respectively compared with the corresponding preset time data to determine the order data that meets the fourth preset condition among the order data; wherein the fourth preset condition is that the manufacturing time indicated by the remaining time data is different from the manufacturing time indicated by the preset time data, and does not meet the allowed excess time range indicated by the allowable time error data;
[0031] Feedback data is generated based on the order data that meets the fourth preset condition in each of the order data; wherein the feedback data is used to remind the operator that the manufacturing time does not meet the requirements and display that the order cannot be completed.
[0032] In a possible implementation manner of the first aspect, the method includes:
[0033] In response to the startup operation of the metal wire drawing machine, extracting parameter data from the metal wire drawing machine, and determining whether the parameter data extracted from the metal wire drawing machine is valid;
[0034] If the wire drawing working parameters indicated by the extracted parameter data are not zero or the wire drawing working parameters with a value of zero account for less than half of the total wire drawing working parameters, it is determined that the parameter data extracted from the metal wire drawing machine is valid, and the wire drawing working parameters extracted from the metal wire drawing machine are confirmed as the historical parameter data;
[0035] And / or, the method further comprises:
[0036] If the wire drawing working parameters indicated by the extracted parameter data are all zero or the wire drawing working parameters with a value of zero account for half or more of the total wire drawing working parameters, it is determined that the parameter data extracted from the metal wire drawing machine is invalid;
[0037] Re-establishing machine parameter data according to the priority wire drawing data; wherein the machine parameter data is wire drawing working parameter data for controlling the metal wire drawing machine to perform wire drawing work;
[0038] Wire drawing is performed based on the machine parameter data.
[0039] In a possible implementation manner of the first aspect, the method further includes:
[0040] In response to the start-up operation of the metal wire drawing machine, order data is detected from an order system; wherein the order data is used to reflect the customer's order time, delivery time and wire drawing requirements;
[0041] When there is only one order data in the order system, extract the current order data in the order system;
[0042] The priority wire drawing data is obtained according to the order data.
[0043] In a second aspect, an embodiment of the present application provides a metal wire drawing machine control system, comprising:
[0044] A monitoring unit, used for monitoring the start-up operation of the metal wire drawing machine;
[0045] An acquisition unit, configured to acquire historical parameter data of the metal wire drawing machine in response to the startup operation of the metal wire drawing machine; wherein the historical parameter data is used to reflect the wire drawing working parameters of the metal wire drawing machine that have not been reset after the previous use when the metal wire drawing machine is in the current startup state;
[0046] A determination unit, used to determine priority wire drawing data; wherein the priority wire drawing data is target parameter data corresponding to order data for preferentially using the metal wire drawing machine for wire drawing work;
[0047] A result unit, used to obtain control data according to the priority wire drawing data and the historical parameter data; wherein the control data is used to control the metal wire drawing machine to perform wire drawing;
[0048] A control unit is used to perform wire drawing based on the control data.
[0049] In a third aspect, an embodiment of the present application provides a metal wire drawing machine, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program, when executed by the processor, implements a method as described in any one of the first aspects above.
[0050] In a fourth aspect, an embodiment of the present application provides a computer program product. When the computer program product is run on a metal wire drawing machine, the metal wire drawing machine executes the metal wire drawing machine control method described in any one of the first aspects above.
[0051] It can be understood that the beneficial effects of the second to fourth aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0053] Figure 1 It is a flow chart of a metal wire drawing machine control method provided in one embodiment of the present application;
[0054] Figure 2 It is a partial flow chart of a metal wire drawing machine control method provided in an embodiment of the present application;
[0055] Figure 3 It is a partial flow chart of a metal wire drawing machine control method provided in an embodiment of the present application;
[0056] Figure 4 It is a schematic diagram of the implementation flow of step S300 in the metal wire drawing machine control method provided in one embodiment of the present application;
[0057] Figure 5 It is a schematic diagram of the implementation flow of step S330 in the metal wire drawing machine control method provided in one embodiment of the present application;
[0058] Figure 6 It is a schematic diagram of the implementation flow of step S334 in the metal wire drawing machine control method provided in one embodiment of the present application;
[0059] Figure 7 It is a partial flow chart of a metal wire drawing machine control method provided in an embodiment of the present application;
[0060] Figure 8 It is a partial flow chart of a metal wire drawing machine control method provided in an embodiment of the present application;
[0061] Fig. 9 It is a structural schematic diagram of a metal wire drawing machine control system provided in an embodiment of the present application;
[0062] Fig.10It is a structural schematic diagram of a control device for a metal wire drawing machine provided in an embodiment of the present application. DETAILED DESCRIPTION
[0063] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0064] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.
[0065] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0066] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.
[0067] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0068] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0069] Metal wire drawing machine is a mechanical device that processes metal raw materials into wire or wire shape. Metal wire drawing machine makes metal blanks into required metal wire through a series of rotation, stretching and extrusion processes. Metal wire drawing machine is widely used in the processing of metal materials, especially the production of wires of non-ferrous metals such as copper and aluminum.
[0070] When a metal wire drawing machine in the related art is drawing metal raw materials, if the wire drawing requirements of multiple orders are different, it is necessary to frequently adjust the working parameters set by the metal wire drawing machine according to the wire drawing requirements, and then control the metal wire drawing machine to work by the adjusted working parameters, which is not only time-consuming and labor-intensive, but also causes the metal wire drawing machine to wear quickly, thereby affecting the wire drawing accuracy of the metal wire drawing machine. To solve the above problems, the embodiments of the present application provide a metal wire drawing machine control method, system and metal wire drawing machine.
[0071] In the method, after monitoring the start-up operation of the metal wire drawing machine, it can be determined that the components of the metal wire drawing machine are in a normal state, so that the metal wire drawing machine can smoothly perform the wire drawing work; in response to the start-up operation of the metal wire drawing machine, the historical parameter data of the metal wire drawing machine is obtained, and the wire drawing working parameters of the metal wire drawing machine in the current start-up state that have not been reset after the previous use can be obtained, which serves as a basis for subsequent work; then the priority wire drawing data is determined, and by determining the priority wire drawing data system, the production plan can be reasonably arranged, and the order data for priority wire drawing work can be determined, so that all order data can meet the delivery time of the order; then according to the priority wire drawing data and the historical parameter data, the control data is obtained, and by determining and analyzing the priority wire drawing data and the historical parameter data, the wire drawing parameters of the metal wire drawing machine can be determined, the time-consuming and labor-consuming situation can be reduced, and the wear rate of the metal wire drawing machine can be reduced. Finally, the wire drawing work is performed based on the control data, and the wire drawing accuracy and wire drawing quality of the metal wire drawing machine are further improved. While the production efficiency of the metal wire drawing machine is improved, the wire drawing stability and reliability of the metal wire drawing machine are improved.
[0072] The metal wire drawing machine control method provided in the embodiment of the present application can be applied to a metal wire drawing machine. In this case, the metal wire drawing machine is the executor of the metal wire drawing machine control method provided in the embodiment of the present application. The embodiment of the present application does not impose any restrictions on the specific type of the metal wire drawing machine.
[0073] For example, a metal wire drawing machine includes a wire drawing device and a control device, and the wire drawing device and the control device are connected by communication; the wire drawing device can be various mechanical devices that can realize the metal wire drawing function, such as a disc wire drawing machine, a continuous wire drawing machine, etc., but not limited thereto. The wire drawing device can include a wire drawing wheel, which is a component that can stretch the metal material. For example, the wire drawing wheel can be a wheel with different diameters and shapes, etc., but not limited thereto. The tension adjusting member is mainly used to adjust the tension during the wire drawing process. For example, the tension adjusting member can be a pneumatic tensioner, a hydraulic tensioner, etc., but not limited thereto. The guide wheel is a wheel structure that can be used to guide the metal wire through the wire drawing wheel. For example, the guide wheel can be a wheel with different angles and sizes, etc., but not limited thereto. The guide wheel can make the metal wire have the correct guidance during the wire drawing process. The control device can be a structure integrated with the wire drawing device, for example, it can be a console or control screen in the control room in the production workshop, or it can be a tablet computer, a laptop computer, a netbook, a desktop computer, a smart large screen, a computer, a laptop computer and other devices.
[0074] In order to better understand the metal wire drawing machine control method provided in the embodiment of the present application, the specific implementation process of the metal wire drawing machine control method provided in the embodiment of the present application is exemplarily introduced below.
[0075] Figure 1 A schematic flow chart of a metal wire drawing machine control method provided in an embodiment of the present application is shown, and the metal wire drawing machine control method includes:
[0076] S100, monitoring the start-up operation of the metal wire drawing machine.
[0077] For example, the start operation can be monitored when the operator presses the start button of the metal wire drawing machine itself, and the metal wire drawing machine control system receives an electrical signal. This electrical signal is transmitted to the processing unit (which can be a single-chip microcomputer, etc.) through the input module. The start button is connected to a relay. After receiving the operator's instruction, the relay closes and generates an electrical signal, which is converted into a digital signal and transmitted to the processing unit through the internal bus. The built-in microprocessor of the processing unit decodes the signal and confirms that this is a start instruction to monitor the start operation of the metal wire drawing machine. It can also be when the operator performs the start operation through a console or control panel on a control device that is connected to the metal wire drawing machine.
[0078] S200, in response to the start-up operation of the metal wire drawing machine, obtaining historical parameter data of the metal wire drawing machine; wherein the historical parameter data is used to reflect the wire drawing working parameters of the metal wire drawing machine that have not been reset after the previous use when the metal wire drawing machine is in the current start-up state.
[0079] For example, after responding to the start-up operation of the metal wire drawing machine, the historical parameter data stored in the control component of the metal wire drawing machine may be accessed, and these data also record the wire drawing working parameters of the metal wire drawing machine after the previous use, including key indicators such as wire drawing speed, tension, temperature, etc. By analyzing these historical data, it can also be obtained from a database, which can be accumulated over a long period of time.
[0080] In one possible implementation, see Figure 2 , methods include:
[0081] S201A, in response to a start-up operation on the metal wire drawing machine, extract parameter data from the metal wire drawing machine, and determine whether the parameter data extracted from the metal wire drawing machine is valid.
[0082] Exemplarily, when the operator issues a start command, it can immediately communicate with the internal control system of the metal wire drawing machine, extract the parameter data of the current equipment, extract the wire drawing working parameter data inside the metal wire drawing machine, and perform validity verification according to the judgment conditions after extraction. For example, it can be determined whether the parameter data extracted from the metal wire drawing machine is valid based on whether the values of the wire drawing working parameters meet the requirements.
[0083] S202A, if the wire drawing working parameters indicated by the extracted parameter data are not zero or the wire drawing working parameters with a value of zero account for less than half of the total wire drawing working parameters, then the parameter data extracted from the metal wire drawing machine is determined to be valid, and the wire drawing working parameters extracted from the metal wire drawing machine are confirmed as historical parameter data.
[0084] Exemplarily, the extracted wire drawing working parameters can be checked so that none of the wire drawing working parameters are zero, because a zero value may indicate a sensor failure or that the data is not correctly recorded. If all wire drawing working parameters are not zero, they can still be considered valid, or a proportional analysis can be performed on all wire drawing working parameters. If there are wire drawing working parameters with a value of zero, the proportion of these zero value parameters to the total parameters can be calculated. If the proportion is less than 50%, the extracted parameter data is considered to be within an acceptable range and can still be considered valid. Once the extracted parameter data is confirmed to be valid, these parameter data can be saved as historical parameter data. For example, the wire drawing working parameters that can be adjusted in a metal wire drawing machine may include wire drawing speed parameters, wire drawing aperture parameters, tension parameters, temperature parameters, lubrication parameters, mold parameters, cooling parameters, and energy consumption parameters, etc., which are not specifically limited in this embodiment.
[0085] In one possible implementation, see Figure 3 , the method further comprises:
[0086] S121, if the wire drawing working parameters indicated by the extracted parameter data are all zero or the wire drawing working parameters with a value of zero account for half or more of the total wire drawing working parameters, it is determined that the parameter data extracted from the metal wire drawing machine is invalid.
[0087] Exemplarily, the extracted wire drawing working parameters can be checked so that the wire drawing working parameters are not all zero; if the wire drawing working parameters are all zero, this may indicate a sensor failure or a problem with the data recording system, and these parameter data can be immediately marked as invalid and proceed to the next step of processing, or if the zero wire drawing working parameters are greater than or equal to 50% of all wire drawing working parameters, the extracted parameter data is considered to be within an unacceptable range, and these parameter data can be determined to be invalid; when it is determined that the parameter data is invalid, an error diagnosis signal will be issued, and an alarm message will be displayed to the operator through the human-machine interface. The operator needs to immediately check the relevant sensors and data recording system to identify the problem and solve it.
[0088] S122, re-establishing machine parameter data according to the priority wire drawing data; wherein the machine parameter data is wire drawing working parameter data for controlling the metal wire drawing machine to perform wire drawing work.
[0089] For example, the priority wire drawing data can be evaluated to make it meet the current production needs, material properties and machine status. If there are multiple priority data sets, they can be filtered according to preset priority rules (such as the latest data first, the best data under specific conditions, etc.). After the priority data is selected, the data can be mapped to the control parameters of the metal wire drawing machine, which includes converting the wire drawing operating parameters such as speed, temperature, and pressure into machine-recognizable control instructions. During the conversion process, necessary adjustments will be made based on the specific configuration and performance characteristics of the machine to improve the accuracy and effectiveness of the parameter settings.
[0090] S123, performing wire drawing based on machine parameter data.
[0091] For example, the metal wire drawing machine can be placed in a preset working state by loading the machine parameter data that has been created, including transmitting key parameters such as speed, temperature, pressure, tension, etc. to various control units and actuators of the wire drawing machine. Before the wire drawing officially starts, the preheating procedure can be performed according to the parameter data to make the machine reach the optimal working temperature, and the relevant components can be pre-lubricated or adjusted to reduce wear and improve efficiency. At the same time, the operator will check the preparation of the raw materials to meet the production requirements. When the preheating is completed, the wire drawing machine can be started automatically or according to the operator's instructions. During the wire drawing process, various parameters are monitored in real time, including the operating status of the machine, the feed speed of the raw materials, the diameter and quality of the wire drawing, etc. During the wire drawing process, the parameter settings can be dynamically adjusted according to the data monitored in real time. For example, if it is detected that the wire drawing diameter deviates from the target value, the wire drawing speed or pressure can be automatically adjusted to correct the deviation. After the wire drawing work is completed, it is subjected to a quality inspection, including measuring the wire drawing diameter, surface quality, strength and other key indicators, and the inspection results can be compared with the preset quality standards to determine whether the product is qualified. At the same time, all data in the production process are recorded, including parameter settings, production time, product quantity and quality information, etc., to provide a basis for subsequent analysis and improvement.
[0092] S300, determining priority wire drawing data; wherein the priority wire drawing data is target parameter data corresponding to order data for preferentially using a metal wire drawing machine for wire drawing work.
[0093] Exemplarily, to determine the priority wire drawing data, all pending wire drawing orders can be collected and preliminarily evaluated, including the urgency of the order, delivery deadline, required material type, wire drawing specification requirements, etc. The collected order data is organized into a table (the table contains order number, customer name, material type, wire drawing diameter, length, delivery deadline, etc.) and prioritized according to the urgency and delivery deadline of the order. The priority wire drawing data can be determined by comparing the unrestored wire drawing working parameters in the metal wire drawing machine with the modifications to the unrestored wire drawing working parameters in the metal wire drawing machine due to processing requirements in each order data; the emergency method can be used to determine, for example, urgent orders are scored as the first processing, ordinary orders are scored as the second processing, and non-urgent orders are scored as the third processing.
[0094] In one possible implementation, see Figure 4 , S300, determine the priority drawing data, including:
[0095] S310, detecting order data from the order system; wherein the order data is used to reflect the order placement time, delivery time and wire drawing requirements.
[0096] For example, an interface connected to an order management system can be established to obtain the latest order data in real time. This can be achieved through programming, such as using API (application programming interface) calls or database queries; order data can be automatically extracted from the order system periodically or based on set trigger conditions to improve the real-time and accuracy of the data.
[0097] S320, when there are at least two order data in the order system, extract all the order data from the order system.
[0098] For example, extracting all order data can be done by setting a trigger condition, and when there are at least two order data in the order system, the data extraction program is automatically started. Use database query language (such as SQL) to write query statements, and filter out qualified order data according to specific conditions (such as order status, order time, etc.). The filtered order data is transmitted to the metal wire drawing machine control system through the data interface to improve the real-time and accuracy of the data, and the extracted data is preliminarily analyzed, including calculating the urgency and delivery deadline of the order, and evaluating the required material type and wire drawing specification requirements.
[0099] S330, analyzing each order data to obtain priority wire drawing data.
[0100] For example, each order data may be reviewed in detail, including factors such as order quantity, delivery deadline, and order specification requirements. The order data may be organized into a table using a spreadsheet or statistical tool to facilitate analysis. A weighted scoring method may be applied to assign different weights to each order data to reflect its comprehensive importance in terms of urgency, delivery deadline, customer relationship, etc., and a ranking analysis may be performed. The unrestored wire drawing working parameters in the metal wire drawing machine and the modification of the unrestored wire drawing working parameters in the metal wire drawing machine due to processing requirements in each order data may be used to determine the priority wire drawing data. In addition, the sorting results can be verified and adjusted in combination with historical data and experience to make them reasonable. The priority sorting results can be input into the metal wire drawing machine control system so that the metal wire drawing machine can produce in order of priority. After analyzing the order data, the priority drawing data can be obtained, which can improve the adjustment of the wire drawing working parameters of the metal wire drawing machine and reduce the frequency of adjustment of the wire drawing working parameters of the metal wire drawing machine. By detecting the order data from the order system, when there are at least two order data in the order system, all the order data are extracted from the order system to serve as the basis for subsequent work.
[0101] In one possible implementation, see Figure 5 , S330, analyzing each order data to obtain priority drawing data, including:
[0102] S331, determining the remaining time data corresponding to each order data based on the order time and delivery time indicated by each order data; wherein the remaining time data is used to indicate the remaining manufacturing time of the to-be-drawn product corresponding to the corresponding order data.
[0103] For example, the order time and delivery time information of each order can be extracted from the order system, and the remaining time of each order can be calculated, that is, the delivery time minus the order time, to obtain the remaining manufacturing time of each order. Delays may occur during the production process. A buffer time is set for each order so that the delivery deadline can be met in actual production. The calculated remaining time data is combined with the buffer time to generate a comprehensive remaining time index for evaluating the urgency of each order. Orders are sorted according to the remaining time index, and orders with shorter remaining time are given priority to ensure on-time delivery; in the actual production process, the production progress of the order is monitored in real time, and the ordering is dynamically adjusted according to the actual remaining time, so that production resources can be reasonably allocated.
[0104] S332, analyzing the wire drawing requirements in each order data to obtain demand parameter data corresponding to each order data; wherein the demand parameter data is used to indicate the wire drawing working parameters set corresponding to meet the wire drawing requirements.
[0105] Exemplarily, the wire drawing requirements in each order data can be reviewed, including key parameters such as the required material type, wire drawing diameter, wire drawing speed, and wire drawing length, and the wire drawing requirements in the order data can be organized into a tabular form to facilitate multi-dimensional analysis and parameter matching. According to the wire drawing requirements, the wire drawing working parameters that match the order requirements are retrieved from the preset wire drawing parameter database, and the retrieved wire drawing working parameters are verified to ensure that they meet the accuracy and feasibility of the order requirements. In combination with the actual performance and historical production data of the metal wire drawing machine, the wire drawing working parameters are fine-tuned to optimize production efficiency and product quality; the finalized demand parameter data is input into the metal wire drawing machine control system so that the wire drawing machine produces according to the set parameters to achieve an efficient and precise metal wire drawing production process.
[0106] S333, matching the wire drawing working parameters indicated by the demand parameter data corresponding to each order data with the wire drawing working parameters indicated by the historical parameter data to obtain parameter similar data corresponding to each order data; wherein, the parameter similar data is used to reflect the parameter difference between the wire drawing working parameters indicated by the demand parameter data and the wire drawing working parameters indicated by the historical parameter data, and the parameter difference includes the wire drawing speed parameter and the wire drawing aperture parameter.
[0107] For example, historical production data can be extracted from the metal wire drawing machine control system, including wire drawing working parameters of historical orders, such as wire drawing speed parameters and wire drawing aperture parameters, and the demand parameter data of the current order can be compared with the historical parameter data to find out the difference between the two. For speed parameters, the difference between the speed required by the current order and the historical average speed is calculated to evaluate whether the speed setting of the wire drawing machine needs to be adjusted; for aperture parameters, the difference between the aperture required by the current order and the historical average aperture is calculated to determine whether the aperture setting of the wire drawing machine needs to be adjusted. It can be determined to fine-tune the difference in wire drawing working parameters, and then obtain similar parameter data corresponding to each order data, so as to meet the needs of the current order as much as possible, thereby improving the production efficiency and product quality of the metal wire drawing machine to meet the personalized needs of customers.
[0108] S334, analyzing the remaining time data and parameter-similar data corresponding to each order data to obtain priority wire drawing data.
[0109] Exemplarily, the remaining time data of each order can be collected and organized, including the remaining time from the order placement time to the scheduled delivery time, and the remaining time data can be associated with similar parameter data corresponding to each order so that both production efficiency and delivery deadline can be considered during analysis. Optimization algorithms, such as linear programming or heuristic algorithms, are used to sort the orders, giving priority to orders with shorter remaining times and similar parameter data indicating lower production difficulty. The priority of each order is analyzed to maximize the utilization and production efficiency of the metal wire drawing machine while meeting customer needs. Based on the priority results, priority wire drawing data is generated, which will guide the production scheduling of the metal wire drawing machine so that high-priority orders are given priority.
[0110] In one possible implementation, see Figure 6 , S334, analyzing the remaining time data and the similar parameter data corresponding to each order data to obtain the priority drawing data, including:
[0111] S3341, determine the corresponding preset time data, allowable time error data and allowable parameter error data based on each order data; wherein the preset time data is used to indicate the manufacturing time required to complete the corresponding order data, the allowable time error data is used to indicate the time range that is allowed to exceed when the wire drawing work is performed according to the corresponding order data, and the allowable parameter error data is used to indicate the difference range that is allowed to exceed when the wire drawing work is performed according to the historical parameter data corresponding to each order data.
[0112] For example, it can be based on the order data, including order completion time, actual manufacturing time, parameter settings and other information, and then conduct a preliminary analysis of the current order data to extract the key features of the order, such as order type, product complexity, material type, etc., and use statistical analysis methods, which can be regression analysis, cluster analysis, etc., to process the historical order data to identify historical orders similar to the current order. By comparing the preset time, actual completion time and parameter settings of similar orders, the preset time data, allowable time error data and allowable parameter error data of the current order are calculated; it can also be a machine learning model that uses a large amount of order data as analysis data to generate the corresponding preset time data, allowable time error data and allowable parameter error data.
[0113] S3342, compare the remaining time data corresponding to each order data with the corresponding preset time data, and determine the order data in each order data that meets the first preset condition; wherein, the first preset condition means that the manufacturing time indicated by the remaining time data is the same as the manufacturing time indicated by the preset time data, or the manufacturing time indicated by the remaining time data exceeds the manufacturing time indicated by the preset time data and meets the allowed excess time range indicated by the allowable time error data.
[0114] For example, if the remaining time indicated by the remaining time data corresponding to the order data is 5 hours, and the remaining time indicated by the corresponding preset time data is 5 hours, the first preset condition is satisfied, which means that the manufacturing time indicated by the remaining time data is the same as the manufacturing time indicated by the preset time data. This order data can be determined as order data that satisfies the first preset condition. It can also be that if the remaining time indicated by the remaining time data corresponding to the order data is 5 hours and 3 minutes, and the remaining time indicated by the corresponding preset time data is 5 hours, but the allowed time error data indicates that the allowed excess time range is 10 minutes, then both the manufacturing time indicated by the remaining time data exceeds the manufacturing time indicated by the preset time data and the allowed excess time range indicated by the allowed time error data is satisfied. Therefore, it can be proved that the order data satisfies the first preset condition.
[0115] S3343, respectively compare the parameter similar data corresponding to each order data with the corresponding allowable parameter error data, and determine the order data in each order data that meets the second preset condition; wherein the second preset condition refers to that the parameter difference indicated by the parameter similar data is within the allowable excess difference range indicated by the allowable parameter error data.
[0116] For example, the difference indicated by the parameter-similar data corresponding to each order data is 3, and the difference range indicated by the allowable parameter error data is 5. This satisfies the requirement that the parameter difference indicated by the parameter-similar data is within the difference range allowed to exceed that indicated by the allowable parameter error data. Therefore, it can be proved that the order data meets the first preset condition.
[0117] S3344, obtaining priority wire drawing data according to order data satisfying the first preset condition in each order data and order data satisfying the second preset condition in each order data.
[0118] Exemplarily, a scoring standard can be set for each preset condition. For example, the degree of satisfaction of the first preset condition can be assigned a score, and the degree of satisfaction of the second preset condition can also be assigned a score. Then, the scores of each order data under the two preset conditions are summarized to obtain a comprehensive score. For example, the degree of satisfaction can be that if there are two orders, the first one is that the difference indicated by the parameter-similar data corresponding to the order data is 3 and the second one is that the difference indicated by the parameter-similar data corresponding to the order data is 2, then the degree of satisfaction of the second one is higher than the degree of satisfaction of the first one. Then, according to the comprehensive scoring result, the order data are sorted; wherein, the purpose of sorting is to determine the priority order of each order so as to give priority to orders with higher scores in production scheduling. Sorting can adopt a variety of methods, such as quick sorting, merge sorting, etc., to improve the efficiency of the sorting process.
[0119] With such settings, continuous improvement of the production process can be achieved through continuous optimization and adjustment. The preset conditions and priority drawing standards can be continuously optimized to adapt to changes in the production environment, which can improve the efficiency of production scheduling and the quality of order completion.
[0120] In one possible implementation, see Figure 7 , the method further comprises:
[0121] S33401A, in the case of order data that meets the first preset condition in each order data, the parameter similar data corresponding to each order data are compared with the corresponding allowable parameter error data, so as to determine the order data that meets the third preset condition in each order data; wherein the third preset condition means that the parameter difference indicated by the parameter similar data is not within the allowable excess difference range indicated by the allowable parameter error data.
[0122] For example, the difference indicated by the parameter-similar data corresponding to each order data is 6, and the difference range indicated by the allowable parameter error data is 5. This means that the parameter difference indicated by the parameter-similar data is not within the difference range allowed to exceed the allowable parameter error data indication, so it can be proved that the order data meets the third preset condition.
[0123] S33402A, generating reminder adjustment data based on the order data that meets the third preset condition in each order data; wherein the reminder adjustment data is used to send a reminder signal and a value that needs to be adjusted to the technician.
[0124] Exemplarily, the order data that meets the third preset condition can be summarized and classified, and the order data that meets the third preset condition can be analyzed. The data can be processed using statistical analysis methods, such as regression analysis, cluster analysis, etc., to find out the key factors of parameter differences, and based on the analysis results, reminder adjustment data can be generated, including the name of the parameter to be adjusted, the current value, the target value, and adjustment suggestions. The reminder adjustment data can then be sent to relevant technical personnel through the system interface or email, so that the relevant technical personnel can receive the reminder signal in a timely manner.
[0125] In one possible implementation, see Figure 8 , the method further comprises:
[0126] S33401B, compare the remaining time data corresponding to each order data with the corresponding preset time data, and determine the order data in each order data that meets the fourth preset condition; wherein the fourth preset condition means that the manufacturing time indicated by the remaining time data is different from the manufacturing time indicated by the preset time data, and does not meet the allowed excess time range indicated by the allowable time error data.
[0127] For example, if the remaining time data corresponding to the order data indicates a remaining time of 5 hours and 5 minutes, and the corresponding preset time data indicates a remaining time of 5 hours, but the allowed time error data indicates a time range that is allowed to exceed the limit of 3 minutes, then the fourth preset condition is met, i.e., the manufacturing time indicated by the remaining time data is different from the manufacturing time indicated by the preset time data, and does not meet the allowed time error data. The range of the time indicated by the allowed time error data proves that the order data meets the fourth preset condition.
[0128] S33402B, generating feedback data based on the order data that meets the fourth preset condition in each order data; wherein the feedback data is used to remind the operator that the manufacturing time does not meet the requirements and display that the order cannot be completed.
[0129] Exemplarily, by aggregating and classifying the order data that meet the fourth preset condition in each order data, the order data that meets the fourth preset condition is analyzed, and the data is processed using statistical analysis methods, such as regression analysis, cluster analysis, etc., to find out the key factors of parameter differences, and the selected order data is automatically filled with the relevant information in the template according to the analysis results to generate specific feedback content. For example, "Order No. XX", the current remaining manufacturing time is 10 hours, the preset manufacturing time is 8 hours, the allowed time range is 5 minutes, and the allowed error range is 1 hour and 55 minutes, so that the order can be completed on time, please confirm and repair it in time. "Then determine the method of delivering feedback data based on the internal processes of the enterprise and the preferences of the operators. It may include email, text messages, system messages, etc.
[0130] With such a configuration, through the above-mentioned detailed and specific processes and steps, effective feedback data can be generated based on the order data that meets the fourth preset condition in each order data, reminding the operator that the manufacturing time does not meet the requirements, and taking corresponding measures to ensure that the order can be completed on time, thereby improving production efficiency.
[0131] In a possible implementation, the method further includes:
[0132] S310A, in response to the start-up operation of the metal wire drawing machine, detecting order data from the order system; wherein the order data is used to reflect the customer's order time, delivery time and wire drawing requirements.
[0133] For example, the status of the metal wire drawing machine can be monitored in real time so as to respond immediately when the start-up operation occurs. This can be achieved through sensors or manual input. When the metal wire drawing machine is detected to be started, the detection mechanism can be automatically triggered, or relevant technicians can retrieve relevant order data from the order system. Retrieval conditions can be defined according to the metal wire drawing machine start-up operation, including key information such as customer order time, delivery time, and wire drawing requirements, and a retrieval operation can be performed in the order database to filter out order data that meets the retrieval conditions.
[0134] S320A, when there is only one order data in the order system, extract the current order data in the order system.
[0135] For example, the number of orders in the order system may be checked regularly. When there is only one order data in the order system, the current unique order data will be extracted from the order system, including key information such as customer information, order time, delivery time, and wire drawing requirements. The extracted order data may be analyzed by weight or priority to determine the priority of the order, the urgency of the delivery time, and the specific parameters of the wire drawing requirements. A corresponding production plan may be generated based on the analysis results so that the metal wire drawing machine can operate according to the order requirements, which may include adjusting the parameter settings of the wire drawing machine, arranging the production sequence, etc.
[0136] S330A, get the priority drawing data according to the order data.
[0137] Exemplarily, information retrieval can be performed on the data in the order data to identify key parameters such as customer order time, delivery time, and wire drawing requirements. Priority standards can be set according to the company's production strategy and customer needs, such as the urgency of delivery time, order amount, special circumstances, etc. Sorting algorithms (such as quick sort, merge sort, etc.) can be used to prioritize order data so that high-priority orders are ranked first. A priority list containing all orders can be generated for subsequent operations. High-priority order data can be filtered out from the priority list so that these orders can be processed first, and wire drawing requirement parameters in high-priority orders can be extracted, such as wire drawing diameter, length, material, etc., and then a corresponding production plan can be generated based on the extracted priority wire drawing data to increase the priority orders. Priority orders can get production resources first.
[0138] With such a setting, through the above detailed and specific processes and steps, it is possible to quickly respond and detect relevant order data from the order system when the metal wire drawing machine starts up. These data are used to reflect the customer's order time, delivery time and wire drawing requirements, thereby generating an efficient production plan and making the production process go smoothly. Such a process not only improves production efficiency, but also improves the on-time delivery of orders, further improving efficiency.
[0139] S400, obtaining control data according to the priority wire drawing data and the historical parameter data; wherein the control data is used to control the metal wire drawing machine to perform wire drawing.
[0140] Exemplarily, after analyzing the obtained priority wire drawing data and the historical parameter data extracted from the metal wire drawing machine, relevant metal wire drawing machine parameter data, including drawing speed, tension, temperature, etc., can be extracted from the historical production records, and the collected historical parameter data can be sorted out for subsequent analysis and application. The current priority wire drawing data can be matched and compared with the historical parameter data to find similar production cases to determine the parameters that need to be adjusted. A machine learning algorithm (for example, regression analysis, neural network, etc.) can be used to train the historical parameter data to generate a prediction model, and control data can be generated based on the prediction model and the current priority wire drawing data so that the metal wire drawing machine can operate according to the optimal parameters.
[0141] S500, wire drawing work is performed based on control data.
[0142] Exemplarily, the status of the metal wire drawing machine can be checked first to ensure that the metal wire drawing machine is in good condition and has no faults or hidden dangers. The operator can load the generated control data into the control system of the metal wire drawing machine to enable the equipment to operate according to predetermined parameters. According to the order requirements, the operator selects raw materials that meet the specifications to improve the wire drawing quality. The wire drawing work can pre-treat the raw materials, such as cleaning and drying, so that the wire drawing process can proceed smoothly. The operator starts the metal wire drawing machine according to the control so that the equipment can operate according to the predetermined control data. During the wire drawing process, the metal wire drawing machine system automatically performs online quality inspection to improve the wire drawing quality of the metal wire drawing machine so that it meets the usage requirements.
[0143] Such a setting, through the above-mentioned detailed and specific processes and steps, can improve the metal wire drawing machine to operate according to the parameters indicated by the control data during the production process, can determine the wire drawing parameters of the metal wire drawing machine, reduce time and labor consumption, improve the wire drawing stability and reliability of the metal wire drawing machine, reduce the wear rate of the metal wire drawing machine, further improve the wire drawing accuracy and quality of the metal wire drawing machine, and improve the production efficiency of the metal wire drawing machine.
[0144] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0145] Corresponding to the metal wire drawing machine control method described in the above embodiment, the embodiment of the present application also provides a metal wire drawing machine control system, and each unit of the system can implement each step of the metal wire drawing machine control method. Fig. 9 A structural block diagram of a metal wire drawing machine control system provided in an embodiment of the present application is shown. For ease of explanation, only the parts related to the embodiment of the present application are shown.
[0146] Reference Fig. 9 , the metal wire drawing machine control system includes:
[0147] A monitoring unit, used to monitor the start-up operation of the metal wire drawing machine;
[0148] An acquisition unit, used for acquiring historical parameter data of the metal wire drawing machine in response to a startup operation of the metal wire drawing machine; wherein the historical parameter data is used to reflect the wire drawing working parameters of the metal wire drawing machine that have not been reset after the previous use when the metal wire drawing machine is in a current startup state;
[0149] A determination unit, used to determine the priority wire drawing data; wherein the priority wire drawing data is the target parameter data corresponding to the order data for preferentially using the metal wire drawing machine for wire drawing work;
[0150] A result unit is used to obtain control data according to the priority wire drawing data and the historical parameter data; wherein the control data is used to control the metal wire drawing machine to perform wire drawing work;
[0151] A control unit is used to perform wire drawing work based on control data.
[0152] It should be noted that the information interaction, execution process, etc. between the above-mentioned systems / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0153] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the system can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0154] The embodiment of the present application also provides a metal wire drawing machine, Fig.10 This is a schematic diagram of the structure of a control device for a metal wire drawing machine provided in one embodiment of the present application. Fig.10 As shown, the control device 6 of this embodiment includes: at least one processor 60 ( Fig.10 Only one is shown), at least one memory 61 ( Fig.10 Only one is shown) and a computer program 62 stored in the at least one memory 61 and executable on the at least one processor 60. When the processor 60 executes the computer program 62, the control device 6 implements the steps in any of the above-mentioned metal wire drawing machine control method embodiments, or implements the functions of the modules / units in the above-mentioned system embodiments.
[0155] Exemplarily, the computer program 62 may be divided into one or more modules / units, which are stored in the memory 61 and executed by the processor 60 to complete the present application. The one or more units may be a series of computer program instruction segments capable of completing specific functions, which are used to describe the execution process of the computer program 62 in the control device 6.
[0156] The control device 6 may be a computing device such as a desktop computer, a notebook, a palm computer, etc. The control device may include, but is not limited to, a processor 60 and a memory 61. Those skilled in the art will understand that Fig.10 It is only an example of the control device 6 and does not constitute a limitation on the control device 6. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, buses, etc.
[0157] The processor 60 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0158] In some embodiments, the memory 61 may be an internal storage unit of the control device 6, such as a hard disk or memory of the control device 6. In other embodiments, the memory 61 may also be an external storage device of the control device 6, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the control device 6. Further, the memory 61 may also include both an internal storage unit and an external storage device of the control device 6. The memory 61 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program. The memory 61 may also temporarily store data that has been output or is to be output.
[0159] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.
[0160] An embodiment of the present application provides a computer program product. When the computer program product is run on a metal wire drawing machine, the metal wire drawing machine implements the steps in any of the above-mentioned method embodiments.
[0161] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to the metal wire drawing machine, a recording medium, a computer memory, a read-only memory (ROM, Read-Only Memory), a random access memory (RAM, Random Access Memory), an electric carrier signal, a telecommunication signal, and a software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.
[0162] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0163] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0164] In the embodiments provided in the present application, it should be understood that the disclosed metal wire drawing machine control system, metal wire drawing machine and method can be implemented in other ways. For example, the metal wire drawing machine system and metal wire drawing machine embodiments described above are merely schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.
[0165] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0166] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A metal wire drawing machine control method, It is characterized in that Applied to a metal wire drawing machine, the method comprises: Monitoring the start-up operation of the metal wire drawing machine; In response to the startup operation of the metal wire drawing machine, historical parameter data of the metal wire drawing machine is acquired; wherein the historical parameter data is used to reflect the wire drawing working parameters of the metal wire drawing machine that have not been reset after the previous use when the metal wire drawing machine is in the current startup state; Determine priority wire drawing data; wherein the priority wire drawing data is target parameter data corresponding to order data for preferentially using the metal wire drawing machine for wire drawing work; According to the priority wire drawing data and the historical parameter data, control data is obtained; wherein the control data is used to control the metal wire drawing machine to perform wire drawing; Wire drawing is performed based on the control data.
2. The metal wire drawing machine control method according to claim 1, It is characterized in that The step of determining the priority drawing data comprises: Detecting order data from the order system; wherein the order data is used to reflect the order placement time, delivery time and wire drawing requirements; When the order system has at least two order data, extracting all the order data from the order system; Each of the order data is analyzed to obtain the priority wire drawing data.
3. The metal wire drawing machine control method according to claim 2, It is characterized in that The step of analyzing each of the order data to obtain the priority wire drawing data includes: Determine the remaining time data corresponding to each of the order data based on the order placement time and the delivery time indicated by each of the order data; wherein the remaining time data is used to indicate the remaining manufacturing time of the to-be-drawn product corresponding to the corresponding order data; Analyzing the wire drawing requirements in each of the order data to obtain the demand parameter data corresponding to each of the order data; wherein the demand parameter data is used to indicate the wire drawing working parameters set corresponding to satisfying the wire drawing requirements; Matching the wire drawing working parameters indicated by the demand parameter data corresponding to each of the order data with the wire drawing working parameters indicated by the historical parameter data to obtain parameter similarity data corresponding to each of the order data; wherein the parameter similarity data is used to reflect the parameter difference between the wire drawing working parameters indicated by the demand parameter data and the wire drawing working parameters indicated by the historical parameter data, and the parameter difference includes a wire drawing speed parameter and a wire drawing aperture parameter; The priority wire drawing data is obtained by analyzing the remaining time data and the parameter similar data corresponding to each order data.
4. The metal wire drawing machine control method according to claim 3, It is characterized in that The analyzing the remaining time data and the parameter similar data corresponding to each of the order data to obtain the priority wire drawing data includes: Based on each of the order data, the corresponding preset time data, the allowable time error data and the allowable parameter error data are determined; wherein the preset time data is used to indicate the manufacturing time required to complete the corresponding order data, the allowable time error data is used to indicate the time range that is allowed to exceed when the wire drawing work is performed according to the corresponding order data, and the allowable parameter error data is used to indicate the difference range that is allowed to exceed when the wire drawing work is performed according to the historical parameter data corresponding to each of the order data; The remaining time data corresponding to each of the order data are respectively compared with the corresponding preset time data to determine the order data that meets the first preset condition among the order data; wherein the first preset condition means that the manufacturing time indicated by the remaining time data is the same as the manufacturing time indicated by the preset time data, or the manufacturing time indicated by the remaining time data exceeds the manufacturing time indicated by the preset time data and meets the allowed excess time range indicated by the allowable time error data; Compare the parameter similar data corresponding to each of the order data with the corresponding allowable parameter error data respectively, and determine the order data that meets the second preset condition among the order data; wherein the second preset condition means that the parameter difference indicated by the parameter similar data is within the difference range allowed to exceed indicated by the allowable parameter error data; The priority wire drawing data is obtained according to the order data that meets the first preset condition in each of the order data and the order data that meets the second preset condition in each of the order data.
5. The metal wire drawing machine control method according to claim 4, It is characterized in that The method further comprises: In the case of order data that meets the first preset condition in each of the order data, the parameter similar data corresponding to each of the order data are respectively compared with the corresponding allowable parameter error data to determine the order data that meets the third preset condition in each of the order data; wherein the third preset condition means that the parameter difference indicated by the parameter similar data is not within the difference range allowed to exceed indicated by the allowable parameter error data; Reminder adjustment data is generated based on the order data that meets the third preset condition in each of the order data; wherein the reminder adjustment data is used to send a reminder signal and a value that needs to be adjusted to the technician.
6. The metal wire drawing machine control method according to claim 4, It is characterized in that The method further comprises: The remaining time data corresponding to each of the order data are respectively compared with the corresponding preset time data to determine the order data that meets the fourth preset condition among the order data; wherein the fourth preset condition is that the manufacturing time indicated by the remaining time data is different from the manufacturing time indicated by the preset time data, and does not meet the allowed excess time range indicated by the allowable time error data; Feedback data is generated based on the order data that meets the fourth preset condition in each of the order data; wherein the feedback data is used to remind the operator that the manufacturing time does not meet the requirements and display that the order cannot be completed.
7. The metal wire drawing machine control method according to claim 1, It is characterized in that The method comprises: In response to the startup operation of the metal wire drawing machine, extracting parameter data from the metal wire drawing machine, and determining whether the parameter data extracted from the metal wire drawing machine is valid; If the wire drawing working parameters indicated by the extracted parameter data are not zero or the wire drawing working parameters with a value of zero account for less than half of the total wire drawing working parameters, it is determined that the parameter data extracted from the metal wire drawing machine is valid, and the wire drawing working parameters extracted from the metal wire drawing machine are confirmed as the historical parameter data; And / or, the method further comprises: If the wire drawing working parameters indicated by the extracted parameter data are all zero or the wire drawing working parameters with a value of zero account for half or more of the total wire drawing working parameters, it is determined that the parameter data extracted from the metal wire drawing machine is invalid; Re-establishing machine parameter data according to the priority wire drawing data; wherein the machine parameter data is wire drawing working parameter data for controlling the metal wire drawing machine to perform wire drawing work; Wire drawing is performed based on the machine parameter data.
8. The metal wire drawing machine control method according to claim 2, It is characterized in that The method further comprises: In response to the start-up operation of the metal wire drawing machine, order data is detected from an order system; wherein the order data is used to reflect the customer's order time, delivery time and wire drawing requirements; When there is only one order data in the order system, extract the current order data in the order system; The priority wire drawing data is obtained according to the order data.
9. A metal wire drawing machine control system, It is characterized in that include: A monitoring unit, used for monitoring the start-up operation of the metal wire drawing machine; An acquisition unit, configured to acquire historical parameter data of the metal wire drawing machine in response to the startup operation of the metal wire drawing machine; wherein the historical parameter data is used to reflect the wire drawing working parameters of the metal wire drawing machine that have not been reset after the previous use when the metal wire drawing machine is in the current startup state; A determination unit, used to determine priority wire drawing data; wherein the priority wire drawing data is target parameter data corresponding to order data for preferentially using the metal wire drawing machine for wire drawing work; A result unit, used to obtain control data according to the priority wire drawing data and the historical parameter data; wherein the control data is used to control the metal wire drawing machine to perform wire drawing; A control unit is used to perform wire drawing based on the control data.
10. A metal wire drawing machine comprising a memory, a processor and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the method according to any one of claims 1 to 8 is implemented.
Citation Information
Cited By
Intelligent wire drawer and control system thereof
CN119681037A
Intelligent cooperative control method and system for oxygen-free copper multi-head wire drawing production
CN120901105A
Photovoltaic solder strip copper wire multi-pass drawing speed and tension dynamic compensation method and system based on closed loop feedback
CN122410948A
A method and system for dynamic compensation of multi-pass drawing speed and tension of photovoltaic welding ribbon copper wire based on closed-loop feedback