Tunnel vault concrete pouring assembly
By using the support main frame, shift screw lifting mechanism and pouring monitoring casing assembly in the tunnel vault concrete pouring system, the problems of uneven speed of insertion or disengagement of grouting pipes and uneven grouting are solved, and high and low speed replacement is achieved The stop and rotary casting reduces construction cycle and safety hazards, and ensures even casting of tunnel lining vaults.
Patent Information
- Application Number
- CN202411176237.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-29
AI Technical Summary
The grouting pipes on the tunnel lining vault lack high and low speed shifting function, which leads to uneven speed insertion or detachment of the grouting pipe, causing the internal pressure of the concrete to increase, which may lead to collapse or detachment. The pressure of the grouting system is too high, causing the pipeline to be blocked and injected. The slurry is uneven, the construction period is long, and the internal monitoring function is lacking, so the pouring flow and angle cannot be flexibly adjusted.
It adopts support main frame, shift screw lift mechanism, grouting pipe installation box and casting monitoring casing assembly, and high-low speed shifting and rotary casting are realized through gear transmission and cyclic drive mechanism, and the square diversion port is increased to reduce the outlet pressure. And install monitoring equipment on the top of the grouting tube for real-time monitoring.
The automatic shifting of high and low speed grouting pipes is realized, uniformly spraying, reducing construction cycle, avoiding problems of collapse and blockage, and can flexibly adjust the pouring flow and angle according to real-time monitoring data to ensure uniform pouring of tunnel lining vaults and Safety.
Smart Images

Figure CN119041941A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel lining vault grouting, and in particular relates to a tunnel vault concrete pouring assembly. Background Art
[0002] Since there are several grouting pipes for the tunnel lining vault along the tunnel, when pouring the lining concrete, the unnecessary grouting pipes should be detached from the lining formwork relatively quickly, so that the volume of concrete slurry poured during the withdrawal is as consistent as possible with the gap left after the grouting pipe is withdrawn. However, the grouting pipe lifting mechanism for the tunnel vault currently lacks the high and low speed shifting function, resulting in the grouting pipe being inserted into or out of the tunnel vault pouring area and rising and falling at a uniform speed. In the case of a large amount of grouting, if the grouting pipe descends too slowly, it will cause concrete extrusion, causing the internal pressure of the vault to increase instantly, resulting in the collapse of the tunnel lining vault in the later stage or the occurrence of voids during the later connection. The voids are due to the thermal expansion and contraction of the air, which can cause cracks in the lining concrete in severe cases, leading to water leakage on the top of the tunnel, posing a safety hazard to the subsequent tunnel construction.
[0003] At present, the tunnel lining vault grouting pipe can only spray concrete through the top port when pouring lining concrete. Therefore, a large grouting system pressure is required to deliver concrete to the tunnel lining vault. However, if the grouting pipe outlet pressure is too high, it is easy to cause the slurry and gravel in the concrete in the grouting pipe to separate and flow. The slurry flows faster and is therefore sprayed faster, while the gravel flows slower and stays and gathers in the grouting pipe, causing the pipe to be blocked. Moreover, the current injection angle of the grouting pipe is uncontrolled. When the outlet pressure is too high, the concrete is sprayed to a random side under the action of gravity, resulting in uneven slurry inside the tunnel lining, which cannot quickly fill the inside of the tunnel lining and has a long construction period. At present, the tunnel lining vault grouting pipe lacks internal monitoring function, resulting in no knowledge of the internal pouring situation of the tunnel lining vault. It can only be judged that it is full by concrete overflow and pouring is stopped, resulting in the inability to flexibly adjust the pouring flow and pouring angle according to the internal pouring situation in time. Summary of the invention
[0004] The present invention aims to provide a tunnel vault concrete pouring assembly, which reduces the grouting outlet pressure, automatically switches between high and low speed lifting and lowering, and sprays grout evenly, so as to solve the problems that the tunnel lining vault collapses or becomes empty due to the uniform lifting of the grouting pipe inserted into or out of the tunnel vault pouring area, the excessive pressure of the grouting system causes the pipeline to be blocked, the uneven grouting of the grouting pipe causes a long construction period, and the lack of internal monitoring function causes the inability to flexibly adjust the pouring flow and pouring angle.
[0005] To this end, the technical solution adopted by the present invention is: a tunnel vault concrete pouring assembly, including a supporting main frame, a shift screw lifting mechanism installed on the supporting main frame, a grouting pipe installation box that moves up and down along the supporting main frame, and a pouring monitoring sleeve assembly installed on the grouting pipe installation box. When the shift screw lifting mechanism is started, the grouting pipe installation box drives the pouring monitoring sleeve assembly to rise and fall synchronously, thereby driving the pouring monitoring sleeve assembly to enter or leave the tunnel vault concrete pouring area. Vertical guide rails and a slide that slides along the vertical guide rails are installed on the front and rear sides of the supporting main frame. The grouting pipe installation box includes a top cover plate, a right cover plate, a mounting base installed on the screw lifting nut of the shift screw lifting mechanism, and side plates correspondingly overlapped on the slide at the front and rear. The pouring monitoring sleeve assembly includes a bottom rotatably mounted on the mounting base A grouting pipe, a liftable sleeve sleeved on the grouting pipe and a monitoring device located at the top of the grouting pipe, the casting monitoring sleeve assembly passes through the top cover plate and the top of the supporting main frame in turn to enter the tunnel vault, a rotary drive mechanism for realizing rotation is installed at the bottom of the grouting pipe, thereby driving the monitoring equipment entering the concrete pouring area of the tunnel vault to rotate and align with the pouring area for monitoring, a rotary drive mechanism for realizing rotation is installed at the bottom of the grouting pipe, the upper part of the grouting pipe extends into the tunnel lining vault and is horizontally penetrated by a square diversion opening near the top, a pipe top plugging cover is horizontally installed at the top end of the grouting pipe, and a conical diversion column is provided in the center of the bottom surface of the pipe top plugging cover facing downward, and a lifting drive mechanism is provided at the bottom of the liftable sleeve, thereby driving the liftable sleeve to rise to be flush with the top surface of the monitoring equipment or to fall to expose the square diversion opening.
[0006] As a preferred embodiment of the above scheme, the shift screw lifting mechanism includes a main lifting reducer motor, a gear transmission assembly, a speed shift assembly and a main lifting trapezoidal screw, the gear transmission assembly includes a gear box installed on the supporting main frame, a driven shaft and a driving shaft all located in the gear box, a driven gear group installed at both ends of the driven shaft, and a driving gear group installed on the driving shaft, the driven shaft and the driving shaft are arranged laterally with an interval up and down, and both ends are rotatably installed in the gear box through bearing seats, the driven gear group includes a driven large gear near the left end and a driven small gear near the right end, the driving gear group includes a driving small gear and a driving large gear fixedly connected on the left and right sides, and the right end of the driven shaft extending out of the gear box is provided with a transmission main gear, the upper and lower ends of the main lifting trapezoidal screw are rotatably installed on the supporting main frame through bearing seats, and the main lifting trapezoidal screw is provided with a sub-gear meshing with the transmission main gear near the top, thereby realizing the lifting and lowering of the screw lifting nut of the main lifting trapezoidal screw.
[0007] When the grouting pipe rises and enters the tunnel lining, it adopts high speed. When the grouting pipe is pulled out and leaves the tunnel lining, the gear-shift reducer motor starts. The structure is interlocking and the design is reasonable.
[0008] Further preferably, the speed regulation and shifting assembly includes a speed regulation box installed on the front side of the gear box, a shift reducer motor installed on the speed regulation box, and a movable rack located in the speed regulation box, the movable rack is meshed with the gear at the output end of the shift reducer motor, and the right end of the movable rack is provided with a shift fork extending horizontally backward and clamping the active large gear. When the output shaft of the shift reducer motor rotates, it drives the movable rack to move horizontally left and right, and drives the active gear set to move left and right alternately through the shift fork to mesh with the upper and lower large and small gears, thereby realizing high and low speed shifting.
[0009] The movable rack is driven to move left and right through gear meshing, and finally the driving gear set is driven to move left and right alternately through the shift fork until the driving small gear meshes with the driven large gear, thereby realizing high-speed shifting to low-speed to lower the grouting pipe. When the driving small gear meshes with the driven large gear, low-speed movement is achieved, and when the driving large gear meshes with the driven small gear, high-speed movement is achieved, automatic control, and fast gear shifting.
[0010] Further preferably, the left end of the movable rack is provided with an explosion-proof travel switch lever which extends horizontally forward and protrudes out of the speed regulating box, the front plate of the speed regulating box is provided with a strip limit opening for the explosion-proof travel switch lever to extend, and explosion-proof travel switches are installed on the left and right parts corresponding to the strip limit opening, and the rear plate of the speed regulating box is provided with an opening for the shift fork to extend and move horizontally, when the explosion-proof travel switch lever moves left and right along the strip limit opening to exceed the safe activity range and toggles the explosion-proof travel switch, the system controls the motor main lifting reducer motor to stop, thereby ensuring safe operation and reasonable design.
[0011] The length of the bar-shaped limit opening is greater than the movable distance of the upper and lower large and small gears of the active gear set driven by the shift fork to engage with each other, which effectively avoids the obstruction of the movement of the shift fork and has a reasonable design size. The active shaft adopts a spline shaft to avoid easy movement and ensure the gear meshing effect. The selection is reasonable. The active shaft is close to the right side of the active large gear and is provided with a stop washer and a nut to the right in sequence to ensure the activity resistance of the active large gear and will not move easily to ensure the gear meshing effect. Anti-collision pads are provided on the inner sides of the bearing seats on the left and right ends of the active shaft to prevent component collision. The transmission main gear and auxiliary gear both adopt bevel gears, and the spatial layout is reasonable.
[0012] Further preferably, the supporting main frame includes a base frame, an "I"-shaped main frame and a top cover which are sequentially erected from bottom to top, and a guide rail mounting plate is fixed to the front and rear side panels of the "I"-shaped main frame, and the guide rail mounting plate and the vertical guide rails are provided with mounting holes at intervals up, down, left and right, so that the vertical guide rails are fixedly mounted on the guide rail mounting plate through the corresponding front and rear mounting holes, and the left groove of the "I"-shaped main frame is provided with a horizontal support plate for installing a gear box, and the middle horizontal plate is provided with a corresponding notch for the transmission main gear to pass through, with a reasonable design structure and stable installation.
[0013] It is further preferred that the left and right side edges of the vertical guide rail are chamfered to form a step profile, and the slide includes an outer mounting plate and pulleys fixedly installed on the inner side of the outer mounting plate at left and right upper and lower intervals, the pulleys clamp the vertical guide rail on the left and right, and the middle small diameter section of the pulley matches the left and right step profiles of the vertical guide rail, thereby realizing rolling along the vertical guide rail. The structural design is interlocking and the pulley runs smoothly.
[0014] The 45° bend pipe is shaped like a 45° pipe and has an O-ring at the bottom that fits the pipe tightly.
[0015] The slewing gear of the embodiment of the present invention is a gearbox which is designed to move the slewing bearing cap to the bearing cap of the slewing bearing cap, and a gear reducer which provides a rotational driving force for the slewing bearing cap, wherein the slewing bearing cap is provided with a driving threaded mounting hole which is threadedly connected to the outer ring of the slewing supporting seat on the circumference of the grouting pipe through-hole of the mounting base, so that the grouting pipe can be driven to rotate through the slewing supporting seat, and the design structure is reasonable; the lifting driving mechanism comprises a lifting driving motor, a driving sprocket horizontally located at the output end of the lifting driving motor, a vertical trapezoidal screw rod rotatably mounted in the grouting pipe mounting box through a bearing seat, and a driven sprocket wheel fixedly mounted on the vertical trapezoidal screw rod, the driving sprocket wheel and the driven sprocket wheel are connected by a horizontal chain, and the bottom outer wall of the lifting sleeve is integrally provided with a horizontal connecting plate connected to the screw nut of the vertical trapezoidal screw rod. When the lifting driving motor is started, the driving sprocket wheel drives the driven sprocket wheel and the vertical trapezoidal screw rod to rotate synchronously, and drives the lifting sleeve to move along the grouting pipe through the horizontal connecting plate. The structure is interlocking, automatically lifts and lowers, and the design is reasonable.
[0016] It is further preferred that the mounting base is provided with a through hole corresponding to the output end of the lifting drive motor, and the side panel is provided with a through hole corresponding to the output shaft of the gear reducer, and both are equipped with a manual rocker spare tool that can pass through the through hole to manually rotate the output end of the lifting drive motor. When the lifting drive motor and the gear reducer cannot be used, manual control can be performed through the manual rocker spare tool. The design is reasonable, an observation window is provided in the middle and upper part of the side panel, and a limit support plate overlapped on the outside of the slide is provided on the left side of the side panel. The design is reasonable; the output end of the lifting drive motor is provided with a motor support seat installed on the mounting base, and the grouting pipe is vertically symmetrically provided with cable placement grooves along the outer wall of the pipe body for accommodating cables from monitoring equipment, ensuring the overall aesthetics, neatly storing the wiring harness, and reducing the safety hazards of line entanglement. The bottom of the cable placement groove is connected with a bent cable pipe that passes vertically downward through the mounting flange, so as to lead the cable out of the grouting pipe installation box. The design is reasonable to avoid line accumulation.
[0017] Further preferably, the monitoring equipment includes a glass cover, an upper cover plate located on the top of the glass cover, a camera pressure seat centrally installed on the pipe top plugging cover, a camera installed on the camera pressure seat and a fill light installed on the bottom of the upper cover plate. The glass cover fits the outer contour of the casting pipe and is combined with the upper cover plate and the pipe top plugging cover to form a closed cylindrical cavity. The upper cover plate is bolted to the pipe top plugging cover, and the structure is firmly installed to facilitate real-time monitoring.
[0018] Beneficial effects of the present invention:
[0019] (1) Compared with the existing grouting pipe lifting mechanism for tunnel vaults, which lacks high-speed and low-speed shifting functions, this scheme adopts a shifting screw lifting mechanism to achieve high-speed and low-speed shifting functions. When the grouting pipe rises and enters the tunnel lining, a low speed is used. When the unnecessary grouting pipe is pulled out of the tunnel lining, the shift reducer motor is started and shifted to a high speed that is ten times faster than the low speed. This can effectively ensure that the grouting pipe is pulled out of the lining formwork at a relatively high speed, so that the volume of the concrete slurry poured during the withdrawal is kept consistent with the gap left after the grouting pipe is pulled out, avoiding a sudden increase in internal pressure, ensuring that the concrete is full, and avoiding internal collapse or voiding. The desired descent speed can also be achieved by adjusting the large and small gear ratios. The design concept is ingenious, effectively avoiding the occurrence of voiding of the tunnel lining vault, eliminating safety hazards, and the design structure is linked together.
[0020] (2) Compared with the excessive pressure of the grouting system causing pipeline blockage, this solution cleverly provides square diversion openings horizontally running through the front and back of the grouting pipe near the top, thereby increasing the concrete outlet area and effectively reducing the outlet pressure requirement. The upper part of the grouting pipe extends into the tunnel lining arch, thereby also reducing the outlet pressure requirement. The grouting system pressure can be uniformly reduced by 5MPa, effectively avoiding the situation where the slurry and gravel flow separately due to the high system grouting pressure, the slurry flows faster and is ejected faster, and the gravel flows slower and stays and accumulates in the grouting pipe, causing pipeline blockage. The conception is ingenious and the design is novel.
[0021] (3) Compared with the current uneven grouting of the tunnel lining vault grouting pipe, this solution adds a rotary drive part at the bottom of the grouting pipe, thereby providing a rotary driving force to drive the grouting pipe to rotate, which can achieve rotary uniform pouring and effectively solve the problem of only pouring one side and then flowing to fill the other side, resulting in a long pouring period. It automatically controls the rotation, has a reasonable design structure, reduces time costs, and shortens the construction period.
[0022] (4) Compared with the current market, which lacks grouting pipes equipped with monitoring equipment, this solution installs monitoring equipment on the top of the grouting pipe, so that the pouring flow and pouring angle can be flexibly adjusted in real time according to the internal pouring conditions, thereby achieving rapid pouring and effectively shortening the construction period. This solution also uses a lifting sleeve for the monitoring equipment to repeatedly rise and scrape off the concrete attached to the outer wall of the grouting pipe to achieve timely cleaning of the monitoring equipment on the top of the grouting pipe, thereby ensuring the clarity of the monitoring equipment camera and increasing the service life of the monitoring equipment. The solution is ingenious in conception and novel in design. The lifting drive mechanism automatically rises and falls, saving time and effort.
[0023] In summary, it has the advantages of automatic control, fast high and low speed shifting, reducing the grouting outlet pressure, preventing pipeline blockage, rotary uniform spraying, shortening the construction period, and reducing the influence of lifting torque force. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a structural schematic diagram of the present invention.
[0025] Figure 2 It is a structural schematic diagram of the slide installed on the vertical guide rail.
[0026] Figure 3 It is a structural schematic diagram of the shift screw lifting mechanism installed on the supporting main frame.
[0027] Figure 4 It is a cross-sectional view of the shift screw lifting mechanism.
[0028] Figure 5 It is a structural schematic diagram of the speed regulating and shifting assembly.
[0029] Figure 6It is a schematic diagram of the internal structure of the speed control and shifting assembly.
[0030] Figure 7 This is a schematic diagram of the structure of the pouring monitoring sleeve assembly installed on the grouting pipe installation box.
[0031] Figure 8 It is a schematic diagram of the internal structure of the installation of the lifting drive mechanism and the liftable sleeve.
[0032] Fig. 9 It is a cross-sectional view of a liftable sleeve tightly fitted on a grouting pipe.
[0033] Fig.10 for Fig. 9 A partial enlarged view of point A.
[0034] Fig.11 This is a partial view showing the liftable sleeve tightly fitted on the grouting pipe.
[0035] Fig.12 It is a schematic diagram of the installation structure of the rotary drive mechanism and the grouting pipe.
[0036] Fig.13 Schematic diagram of the structure of the grouting pipe.
[0037] Fig.14 A cross-sectional view of the monitoring device. DETAILED DESCRIPTION
[0038] The present invention will be further described below by way of embodiments and in conjunction with the accompanying drawings:
[0039] Combination Figure 1 — Fig.14 As shown, a tunnel vault concrete pouring assembly is composed of a supporting main frame 1, a shift screw lifting mechanism 2 installed on the supporting main frame 1, a grouting pipe installation box 3 that moves up and down along the supporting main frame 1, and a pouring monitoring sleeve component 4 installed on the grouting pipe installation box 3.
[0040] The shift screw lifting mechanism 2 is composed of a main lifting reducer motor 21 , a gear transmission assembly 22 , a speed regulating shift assembly 23 and a main lifting trapezoidal screw 24 .
[0041] The gear transmission assembly 22 is composed of a gear box 221 installed on the supporting main frame 1, a driven shaft 222 located in the gear box 221, a driving shaft 223, a driven gear set installed at both ends of the driven shaft 222, and a driving gear set installed on the driving shaft 223.
[0042] The driven shaft 222 and the driving shaft 223 are arranged horizontally with an interval up and down, and both ends are rotatably mounted in the gear box 221 through bearing seats.
[0043] The driven gear set is composed of a driven large gear 224 near the left end and a driven small gear 225 near the right end.
[0044] The driving gear set is composed of a driving pinion 226 and a driving gear 227 which are fixedly connected to each other. The right end of the driven shaft 222 extending out of the gear box 221 is provided with a transmission main gear 229.
[0045] The upper and lower ends of the main lifting trapezoidal screw rod 24 are rotatably mounted on the supporting main frame 1 through bearing seats. The main lifting trapezoidal screw rod 24 is provided with a sub-gear 241 meshing with the transmission main gear 229 near the top, thereby realizing the lifting and lowering of the screw lifting nut of the main lifting trapezoidal screw rod 24.
[0046] The speed regulating and shifting assembly 23 is composed of a speed regulating box 231 installed on the front side of the gear box 221 , a shifting reducer motor 232 installed on the speed regulating box 231 , and a movable rack 233 located in the speed regulating box 231 .
[0047] The movable rack 233 meshes with the gear at the output end of the gear-shift reducer motor 232 .
[0048] A shift fork 235 is provided at the right end of the movable rack 233 and extends horizontally backward and clamps the driving large gear 227.
[0049] When the output shaft of the gear-shift reducer motor 232 rotates, it drives the movable rack 233 to move horizontally left and right, and drives the driving gear set to move left and right alternately through the shift fork 235 until the upper and lower large and small gears are engaged, thereby realizing high and low speed shifting.
[0050] An explosion-proof travel switch lever 234 is provided at the left end of the movable rack 233 and extends horizontally forward and out of the speed regulating box 231 .
[0051] The front plate of the speed regulating box 231 is provided with a strip-shaped limit opening 231a for the explosion-proof travel switch lever 234 to extend out, and explosion-proof travel switches 236 are installed on the left and right parts corresponding to the strip-shaped limit opening 231a.
[0052] The rear plate of the speed regulating box 231 is provided with an opening for the shift fork 235 to extend and move laterally.
[0053] When the explosion-proof travel switch lever 234 moves left and right along the strip limit opening 231a to exceed the safe range of movement and toggles the explosion-proof travel switch 236, the system controls the motor main lifting reducer motor 21 to stop. The length of the strip limit opening 231a is greater than the movement distance of the fork 235 to drive the upper and lower large and small gears of the driving gear set to engage.
[0054] The driving shaft 223 is a spline shaft.
[0055] The driving shaft 223 is close to the right side of the driving gear 227 and is provided with a stop washer 228 and a nut in sequence to the right.
[0056] Anti-collision pads are provided inside the bearing seats at the left and right ends of the driving shaft 223, and the main transmission gear 229 and the auxiliary gear 241 are both bevel gears.
[0057] When the shift screw lifting mechanism 2 is started, the grouting pipe installation box 3 drives the pouring monitoring sleeve assembly 4 to rise and fall synchronously, thereby driving the pouring monitoring sleeve assembly 4 to enter or leave the tunnel vault concrete pouring area.
[0058] Vertical guide rails 14 and slide platforms 15 sliding along the vertical guide rails 14 are installed on the front and rear sides of the supporting main frame 1 .
[0059] The supporting main frame 1 is composed of a base frame 11, an I-shaped main frame 12 and a top cover 13 which are sequentially erected from bottom to top.
[0060] The front and rear side plates of the “I” type main frame 12 are fixed with guide rail placement plates 121 .
[0061] The guide rail installation plate 121 and the vertical guide rail 14 are both provided with installation holes at intervals in the upper, lower, left and right directions, so that the vertical guide rail 14 is fixedly installed on the guide rail installation plate 121 through the corresponding installation holes at the front and rear sides.
[0062] The left notch of the “I”-shaped main frame 12 is provided with a horizontal support plate 16 for installing the gear box 221, and the middle cross plate is correspondingly provided with a notch for the main transmission gear 229 to pass through.
[0063] The left and right side edges of the vertical guide rail 14 are chamfered to form a step profile.
[0064] The slide 15 is composed of an outer placement plate 151 and pulleys 152 fixedly installed on the inner side of the outer placement plate 151 at intervals left and right and up and down.
[0065] The pulley 152 clamps the vertical guide rail 14 on the left and right, and the small diameter section in the middle of the pulley 152 matches the left and right step profiles of the vertical guide rail 14 , so as to achieve rolling along the vertical guide rail 14 .
[0066] The grouting pipe installation box 3 is composed of a top cover plate 31, a right cover plate 32, a mounting base 33 installed on the screw lifting nut of the gear shift screw lifting mechanism 2, and side plates 34 correspondingly overlapped on the slide 15 at the front and rear.
[0067] The pouring monitoring sleeve assembly 4 consists of a grouting pipe 41 whose bottom is rotatably mounted on the mounting base 33 , a liftable sleeve 42 sleeved on the grouting pipe 41 , and a monitoring device 43 located at the top of the grouting pipe 41 .
[0068] The pouring monitoring sleeve assembly 4 passes through the top cover plate 31 and the top of the supporting main frame 1 in sequence and enters the tunnel vault.
[0069] A rotary drive mechanism 44 is installed at the bottom of the grouting pipe 41 to realize rotation, so as to drive the monitoring equipment 43 entering the tunnel vault concrete pouring area to rotate and align with the pouring area for monitoring.
[0070] A mounting flange 414 is provided at the lower portion of the grouting pipe 41 .
[0071] The bottom end of the grouting pipe 41 is provided with a pipe joint 415 that can be butt-jointed with a 45° bent pipe.
[0072] A rotary drive mechanism 44 for realizing rotation is installed at the bottom of the grouting pipe 41 .
[0073] The upper portion of the grouting pipe 41 extends into the tunnel lining vault and is horizontally penetrated by a square branch flow opening 411 near the top.
[0074] A pipe top plugging cover 412 is horizontally installed at the top end of the grouting pipe 41 .
[0075] A conical diversion column 413 is disposed in the center of the bottom surface of the pipe top plugging cover 412 facing downward, so that the concrete sprayed from the grouting pipe 41 can be evenly diverted out along the square diversion opening 411.
[0076] The grouting pipe 41 is provided with cable placement grooves 416 symmetrically vertically along the outer wall of the pipe body, for accommodating cables from the monitoring equipment 43 .
[0077] The bottom of the cable placement groove 416 is connected with a cable tube 417 that is bent and vertically passes through the mounting flange 414 downward, so as to lead the cable out of the grouting pipe installation box 1. The bottom of the liftable sleeve 42 is equipped with a lifting drive mechanism 45.
[0078] A bushing 421 that fits tightly against the outer wall of the grouting pipe 41 is installed on the top of the liftable sleeve 42 , and a limiting copper sleeve 422 that fits against the outer wall of the grouting pipe 41 is installed on the inner wall of the bottom.
[0079] The upper inner wall of the liftable sleeve 42 corresponds to the "O"-shaped sealing ring 423 installed at intervals above and below the bushing 421 to tighten the outer wall of the grouting pipe 41, and the lower inner wall of the liftable sleeve 42 is tightly attached to the limiting copper sleeve 422 and an elastic retaining ring is installed just below the outer wall of the grouting pipe 41.
[0080] Two “O”-shaped sealing rings 423 are preferably used.
[0081] The bushing 421 is preferably made of PA6 nylon.
[0082] The “O”-shaped sealing ring 423 is preferably made of rubber.
[0083] The bottom of the liftable sleeve 42 is equipped with a lift drive mechanism 45, so as to drive the liftable sleeve 42 to rise to be flush with the top surface of the monitoring device 43 or to fall to expose the square diversion port 411.
[0084] The monitoring device 43 consists of a glass cover 431, an upper cover plate 432 located on the top of the glass cover 431, a camera pressure seat 433 centrally installed on the pipe top plugging cover 412, a camera 434 installed on the camera pressure seat 433 and a fill light 435 installed at the bottom of the upper cover plate 432.
[0085] The glass cover 431 fits the outer contour of the casting pipe 41 , and is combined with the upper cover plate 432 and the pipe top plugging cover 412 to form a closed cylindrical cavity.
[0086] The upper cover plate 432 is bolted to the pipe top plugging cover 412 .
[0087] The rotary drive mechanism 44 is composed of a rotary support seat 441 whose inner ring is threadedly connected to the mounting flange 414 and a gear reducer 442 that provides a rotary driving force for the rotary support seat 441 .
[0088] The grouting pipe through hole of the mounting base 33 is provided with a driving threaded mounting hole threadedly connected to the outer ring of the rotary support seat 441.
[0089] When the gear reducer 442 is started, the grouting pipe 41 is driven to rotate through the rotary support seat 441 .
[0090] The right cover plate 32 is provided with an opening through which the gear reducer 442 is exposed.
[0091] The side plate 34 is provided with a through hole corresponding to the output shaft of the gear reducer 442, and is equipped with a manual rocker spare tool that can pass through the through hole to manually rotate the output shaft of the gear reducer 442.
[0092] An observation window 341 is provided at the upper middle portion of the side plate 34 , and a position limiting support plate 342 overlapped on the outer side of the slide is provided on the left side of the side plate 34 .
[0093] The lifting drive mechanism 45 consists of a lifting drive motor 453, a driving sprocket 454 horizontally located at the output end of the lifting drive motor 453, a vertical trapezoidal lead screw 451 rotatably mounted in the grouting pipe mounting box 3 through a bearing seat, and a driven sprocket 452 fixedly mounted on the vertical trapezoidal lead screw 451.
[0094] The driving sprocket 454 and the driven sprocket 452 are connected by a horizontal chain 455 .
[0095] A horizontal connecting plate 424 connected to the screw nut of the vertical trapezoidal screw 451 is integrally formed on the outer wall of the bottom of the liftable sleeve 42 .
[0096] When the lifting drive motor 453 is started, the driving sprocket 454 drives the driven sprocket 452 and the vertical trapezoidal lead screw 451 to rotate synchronously, and drives the liftable sleeve 42 to move along the grouting pipe 41 through the horizontal connecting plate 424 .
[0097] The mounting base 33 is provided with a through hole corresponding to the output end of the lifting drive motor 453 , and is equipped with a manual rocker spare tool that can pass through the through hole to manually rotate the output end of the lifting drive motor 453 .
[0098] The output end of the lifting drive motor 453 is provided with a motor support seat 331 mounted on the mounting base 33. When the lifting drive mechanism 45 drives the liftable sleeve 42 to move along the grouting pipe 41, the liftable sleeve 42 can be raised to be flush with the top surface of the monitoring device 43 or lowered to expose the square diversion port 411.
[0099] First, the 45° bent pipe is connected through the pipe joint 415 and connected to the grouting pipeline on the lining trolley, and then the upper part of the grouting pipe 41 is vertically extended into the tunnel lining vault.
[0100] After the grouting pipe 41 is sealed and fixed on the tunnel lining arch formwork, the gear reducer 442 is started and concrete is transported for grouting.
[0101] The fill light 435 is turned on, and the pouring situation is observed in real time through the camera 434, and then the grouting pipe 41 is rotated by the rotary drive mechanism 44, so as to perform 360° no-blind-angle monitoring and pouring.
Claims
1. A tunnel vault concrete pouring assembly, Features: The invention comprises a supporting main frame (1), a shift screw lifting mechanism (2) installed on the supporting main frame (1), a grouting pipe installation box (3) moving up and down along the supporting main frame (1), and a pouring monitoring sleeve assembly (4) installed on the grouting pipe installation box (3). When the shift screw lifting mechanism (2) is started, the grouting pipe installation box (3) drives the pouring monitoring sleeve assembly (4) to rise and fall synchronously, thereby driving the pouring monitoring sleeve assembly (4) to enter or leave the tunnel vault concrete pouring area. The supporting main frame (1) moves forward and backward. The sides of the grouting pipe installation box (3) are both provided with a vertical guide rail (14) and a slide table (15) sliding along the vertical guide rail (14); the grouting pipe installation box (3) comprises a top cover plate (31), a right cover plate (32), a mounting base (33) mounted on the screw lifting nut of the gear shift screw lifting mechanism (2), and side plates (34) correspondingly overlapped on the slide table (15) at the front and rear; the pouring monitoring sleeve assembly (4) comprises a grouting pipe (41) with a bottom rotatably mounted on the mounting base (33), a liftable sleeve sleeve mounted on the grouting pipe (41), and a grouting pipe (41) having a bottom rotatable on the mounting base (33). The grouting pipe (42) and the monitoring device (43) located at the top of the grouting pipe (41), the pouring monitoring sleeve assembly (4) sequentially passes through the top cover plate (31) and the top of the supporting main frame (1) to enter the tunnel vault, the bottom of the grouting pipe (41) is equipped with a rotary drive mechanism (44) for realizing rotation, so that the monitoring device (43) entering the concrete pouring area of the tunnel vault can be driven to rotate and align with the pouring area for monitoring, the bottom of the grouting pipe (41) is equipped with a rotary drive mechanism (44) for realizing rotation, and the grouting pipe ( The upper part of the grouting pipe (41) extends into the tunnel lining vault and is horizontally penetrated by a square diversion opening (411) near the top. A pipe top plugging cover (412) is horizontally installed at the top end of the grouting pipe (41). A conical diversion column (413) is centrally arranged on the bottom of the pipe top plugging cover (412) facing downward. A lifting drive mechanism (45) is provided at the bottom of the liftable sleeve (42), so that the liftable sleeve (42) can be lifted to be flush with the top surface of the monitoring device (43) or lowered to expose the square diversion opening (411).
2. A tunnel vault concrete pouring assembly according to claim 1, Features: The shift screw lifting mechanism (2) comprises a main lifting reducer motor (21), a gear transmission assembly (22), a speed shift assembly (23) and a main lifting trapezoidal screw (24); the gear transmission assembly (22) comprises a gear box (221) mounted on the supporting main frame (1), a driven shaft (222) both located in the gear box (221), a driving shaft (223), a driven gear set mounted on both ends of the driven shaft (222), and a driving gear set mounted on the driving shaft (223); the driven shaft (222) and the driving shaft (223) are arranged in a transverse manner with an interval up and down, and both ends are rotatably mounted in the gear box (221) through a bearing seat, The driven gear set comprises a driven large gear (224) near the left end and a driven small gear (225) near the right end, the driving gear set comprises a driving small gear (226) and a driving large gear (227) fixedly connected on the left and right sides, the right end of the driven shaft (222) extending out of the gear box (221) is provided with a transmission main gear (229), the upper and lower ends of the main lifting trapezoidal screw rod (24) are rotatably mounted on the supporting main frame (1) through bearing seats, and the main lifting trapezoidal screw rod (24) is provided with a sub-gear (241) meshing with the transmission main gear (229) near the top end, thereby realizing the lifting and lowering of the screw rod lifting nut of the main lifting trapezoidal screw rod (24).
3. A tunnel vault concrete pouring assembly according to claim 2, Features: The speed regulating and shifting assembly (23) comprises a speed regulating box (231) mounted on the front side of the gear box (221), a shifting reducer motor (232) mounted on the speed regulating box (231), and a movable rack (233) located in the speed regulating box (231); the movable rack (233) is meshed with a gear at the output end of the shifting reducer motor (232); a shift fork (235) extending horizontally backward and clamping the driving large gear (227) is provided at the right end of the movable rack (233); when the output shaft of the shifting reducer motor (232) rotates, the movable rack (233) is driven to move horizontally left and right, and the shift fork (235) is used to drive the driving gear set to move left and right alternately until the upper and lower large and small gears are meshed, thereby realizing high and low speed shifting.
4. A tunnel vault concrete pouring assembly according to claim 3, Features: The left end of the movable rack (233) is provided with an explosion-proof travel switch lever (234) extending horizontally forward and extending out of the speed regulating box (231); the front plate of the speed regulating box (231) is provided with a strip-shaped limit opening (231a) for the explosion-proof travel switch lever (234) to extend out, and explosion-proof travel switches (236) are installed on the left and right parts of the corresponding strip-shaped limit opening (231a); the rear plate of the speed regulating box (231) is provided with an opening for the shift fork (235) to extend and move horizontally, when the explosion-proof travel switch lever (234) moves left and right along the strip-shaped limit opening (231a) to exceed the safe range of movement, the speed regulating box (231) is opened. When the explosion-proof travel switch (236) is actuated, the system controls the motor main lifting reducer motor (21) to stop, the length of the strip-shaped limit opening (231a) is greater than the movable distance of the upper and lower large and small gears of the driving gear set driven by the shift fork (235) to engage, the driving shaft (223) adopts a spline shaft, the driving shaft (223) is closely attached to the right side of the driving large gear (227) and is provided with a stop washer (228) and a nut in sequence to the right, the inner sides of the left and right end bearing seats of the driving shaft (223) are provided with anti-collision pads, and the transmission main gear (229) and the auxiliary gear (241) are both bevel gears.
5. A tunnel vault concrete pouring assembly according to claim 3, Features: The supporting main frame (1) comprises a bottom frame (11), an "I"-shaped main frame (12) and a top cover (13) which are sequentially erected from bottom to top; a guide rail placement plate (121) is fixed to the front and rear side plates of the "I"-shaped main frame (12); the guide rail placement plate (121) and the vertical guide rail (14) are both provided with placement holes spaced apart in the upper and lower left and right directions, so that the vertical guide rail (14) is fixedly mounted on the guide rail placement plate (121) through the corresponding placement holes in the front and rear directions; a horizontal support plate (16) for mounting a gear box (221) is provided at a notch on the left side of the "I"-shaped main frame (12), and a notch for a transmission main gear (229) to pass through is correspondingly provided on the middle transverse plate.
6. A tunnel vault concrete pouring assembly according to claim 1, Features: The left and right side edges of the vertical guide rail (14) are chamfered to form a step profile, and the slide (15) comprises an outer placement plate (151) and pulleys (152) fixedly installed on the inner side of the outer placement plate (151) at intervals on the left and right and up and down. The pulleys (152) clamp the vertical guide rail (14) on the left and right, and the middle small diameter section of the pulley (152) matches the left and right step profiles of the vertical guide rail (14), so as to achieve rolling along the vertical guide rail (14).
7. A tunnel vault concrete pouring assembly according to claim 1, Features: The lower part of the grouting pipe (41) is provided with a mounting flange (414), the lower end of the grouting pipe (41) is provided with a pipe joint (415) capable of docking with a 45° bent pipe, the top of the liftable sleeve (42) is provided with a bushing (421) that is tightly fitted with the outer wall of the grouting pipe (41), and the bottom inner wall is provided with a limiting copper sleeve (422) that is tightly fitted with the outer wall of the grouting pipe (41), the upper inner wall of the liftable sleeve (42) is provided with an "O"-shaped sealing ring (423) that is arranged at intervals above and below the bushing (421) to tightly clamp the outer wall of the grouting pipe (41), and the lower inner wall of the liftable sleeve (42) is provided with an elastic retaining ring that is tightly fitted with the outer wall of the grouting pipe (41) and is tightly fitted with the limiting copper sleeve (422) directly below the limiting copper sleeve (422).
8. A tunnel vault concrete pouring assembly according to claim 1, Features: The rotary drive mechanism (44) comprises a rotary support seat (441) whose inner ring is threadedly connected to the mounting flange (414) and a gear reducer (442) that provides a rotational driving force for the rotary support seat (441). The grouting pipe through hole of the mounting base (33) is provided with a driving threaded mounting hole threadedly connected to the outer ring of the rotary support seat (441), so that the grouting pipe (41) can be driven to rotate through the rotary support seat (441); the lifting drive mechanism (45) comprises a lifting drive motor (453), a driving sprocket (454) horizontally located at the output end of the lifting drive motor (453), and a gear reducer (442) that can be rotatably mounted on the grouting pipe mounting box through a bearing seat. A vertical trapezoidal lead screw (451) in the body (3) and a driven sprocket (452) fixedly mounted on the vertical trapezoidal lead screw (451), the driving sprocket (454) and the driven sprocket (452) are connected via a horizontal chain (455), and a horizontal connecting plate (424) connected to a lead screw nut of the vertical trapezoidal lead screw (451) is integrally provided on the bottom outer wall of the liftable sleeve (42). When the lift drive motor (453) is started, the driving sprocket (454) drives the driven sprocket (452) and the vertical trapezoidal lead screw (451) to rotate synchronously, and drives the liftable sleeve (42) to move along the grouting pipe (41) via the horizontal connecting plate (424).
9. A tunnel vault concrete pouring assembly according to claim 8, Features: The mounting base (33) is provided with a through hole corresponding to the output end of the lifting drive motor (453), and the side plate (34) is provided with a through hole corresponding to the output shaft of the gear reducer (442), and both are equipped with a manual rocker spare tool that can pass through the through hole to manually rotate the output end of the lifting drive motor (453). An observation window (341) is provided in the middle and upper part of the side plate (34), and a limit support plate (342) overlapped on the outer side of the slide is provided on the left side of the side plate (34). The output end of the lifting drive motor (453) is provided with a motor support seat (331) installed on the mounting base (33). The grouting pipe (41) is vertically provided with a cable placement groove (416) symmetrically along the outer wall of the pipe body for accommodating cables from the monitoring equipment (43). The bottom of the cable placement groove (416) is connected with a cable pipe (417) bent vertically and passing through the mounting flange (414) downward, so as to lead the cable out of the grouting pipe mounting box (3).
10. A tunnel vault concrete pouring assembly according to claim 1, Features: The monitoring device (43) comprises a glass cover (431), an upper cover plate (432) located on the top surface of the glass cover (431), a camera pressure seat (433) centrally mounted on the pipe top plugging cover (412), a camera (434) mounted on the camera pressure seat (433), and a fill light (435) mounted on the bottom of the upper cover plate (432); the glass cover (431) matches the outer contour of the casting pipe (41), and is combined with the upper cover plate (432) and the pipe top plugging cover (412) to form a closed cylindrical cavity; the upper cover plate (432) is bolted to the pipe top plugging cover (412).