The invention discloses a kerb mechanized operation construction method. The kerb mechanized operation construction method comprises the following steps that S1, construction preparation is carried out, and continuous and effective construction can be ensured; S2, measuring and setting out are carried out; S3, the kerb is subjected to slotting; S4, curb stone is installed, and the site is cleaned;and S5, curing and finished product protection are carried out, specifically, finished product protection and curing are conducted through plastic film covering, the curing period of the kerb is notshorter than 3 d, and collision should be strictly prevented in the period. According to the kerb mechanized operation construction method, a traditional construction method is reformed and innovated,the slotting depth is guaranteed through a longitudinal slope control system, the width of adjacent block joints is controlled through improved clamping pieces, construction is simplified through advanced instruments and equipment, the construction straightness of the kerb is guaranteed, full joint filling is guaranteed through small tools, and other measures are adopted, so that the constructionquality is effectively improved, the construction cost is saved, and the method has remarkable economic benefits and social benefits, and has very wide application prospects.