Ship operation control system and method

By obtaining and processing the operation data of the ship's compartment and loading and unloading location, determining the operational hazard value and adjusting the loading and unloading parameters, the problem that the existing technology cannot effectively monitor and control the operation risks, and improve the safety of ship operations.

CN119047830AInactive Publication Date: 2024-11-29HUANGHUA JISHENG TOURISM CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411147527.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing ship cabin indoor positioning system cannot effectively monitor and control the dangers of operating personnel, making it difficult to reduce operating risks.

Method used

By obtaining operation data of the internal compartment and loading and unloading locations, the current operating hazard value is determined, and the ship loading and unloading parameters, including the number of loading and unloading personnel and equipment operating parameters, are adjusted based on this to reduce operational risks.

Benefits of technology

The coordinated monitoring of the loading and unloading operations of the ship's internal compartment and shore is realized, which improves operational safety and reduces risks and potential losses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119047830A_ABST
    Figure CN119047830A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a ship operation control method, an Internet of Things system and a medium, and the method comprises the steps: obtaining first operation data of an internal cabin, the first operation data comprising the static goods type and quantity, the dynamic goods type and quantity and the personnel flow frequency of the internal cabin in a preset time period; second operation data of the loading and unloading position are obtained, wherein the second operation data comprise the to-be-loaded and unloaded goods quantity and the number of operators of the loading and unloading position; processing the first operation data and the second operation data at a preset frequency, and determining a current operation danger value; based on the current operation danger value, ship loading and unloading parameters are adjusted, and the ship loading and unloading parameters comprise the number of loading and unloading personnel and equipment operation parameters in the loading and unloading process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present specification relates to the field of ship control technology, and in particular to a ship operation control system and method. Background Art

[0002] Ship operations involve multiple links. Ship operations include not only internal cabin operations, such as cargo stacking, equipment maintenance, pipeline inspection, etc., but also loading and unloading operations when the ship is docked at the shore. The construction environment is complex, with many people involved and many sight blocks. Relying solely on on-site manual control, it is easy to have untimely information transmission, incomplete information collection and processing.

[0003] In order to identify the situation of personnel operating in ship cabins, CN109163725A discloses a ship cabin positioning system and positioning method. The positioning beacon installed in the cabin sends information such as ID and signal strength. Personnel carry positioning tags into the cabin. The Bluetooth module of the positioning tag scans and receives information. The base station then sends the information to the server, and the location information of the positioning tag in the cabin is obtained through the positioning algorithm. This system can operate in conditions of high dust concentration and high noise and obtain high positioning accuracy, but it cannot effectively monitor and control the operating conditions of personnel and the danger of the operating scene, and does not involve aspects such as the operating risk assessment of operators.

[0004] Therefore, a ship operation control system and method are provided, whereby the administrator can monitor and adjust the operation site conditions in real time through a computer in the monitoring room, a handheld tablet or a smart phone, thereby reducing the risk of ship operation and effectively improving operation safety. Summary of the invention

[0005] One or more embodiments of the present specification provide a ship operation control method, characterized in that the method includes: obtaining first operation data of an internal cabin, the first operation data including static cargo types and quantities, dynamic cargo types and quantities, and personnel flow frequency in the internal cabin within a preset time period; obtaining second operation data of a loading and unloading position, the second operation data including the amount of cargo to be loaded and unloaded and the number of operating personnel at the loading and unloading position; processing the first operation data and the second operation data at a preset frequency to determine a current operation hazard value; and adjusting ship loading and unloading parameters based on the current operation hazard value, the ship loading and unloading parameters including the number of loading and unloading personnel and equipment operation parameters during the loading and unloading process.

[0006] One or more embodiments of the present specification provide a ship operation control system, including an acquisition module, a danger determination module and a parameter adjustment module; the acquisition module is configured to: acquire first operation data of an internal cabin, the first operation data including static cargo types and quantities, dynamic cargo types and quantities and personnel flow frequency in the internal cabin within a preset time period; acquire second operation data of a loading and unloading position, the second operation data including the amount of cargo to be loaded and unloaded and the number of operating personnel at the loading and unloading position; the danger determination module is configured to process the first operation data and the second operation data at a preset frequency to determine a current operation danger value; the parameter adjustment module is configured to adjust ship loading and unloading parameters based on the current operation danger value, the ship loading and unloading parameters including the number of loading and unloading personnel and equipment operation parameters during the loading and unloading process.

[0007] One or more embodiments of the present specification provide a ship operation control device, including a processor, wherein the processor is used to execute the ship operation control method described in any one of the above embodiments.

[0008] One or more examples of this specification provide a computer-readable storage medium, which stores computer instructions. When a computer reads the computer instructions in the storage medium, the computer executes the ship operation control method described in any one of the above embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] This specification will be further described in the form of exemplary embodiments, which will be described in detail by the accompanying drawings. These embodiments are not restrictive, and in these embodiments, the same number represents the same structure, wherein:

[0010] Figure 1 is an exemplary module diagram of a ship operation control system according to some embodiments of this specification;

[0011] Figure 2 is an exemplary flow chart of a ship operation control method according to some embodiments of this specification;

[0012] Figure 3 is an exemplary schematic diagram of determining the current operation danger value according to some embodiments of this specification;

[0013] Figure 4 is an exemplary flow chart for determining target loading and unloading parameters according to some embodiments of the present specification. DETAILED DESCRIPTION

[0014] In order to more clearly illustrate the technical solutions of the embodiments of this specification, the following is a brief introduction to the drawings required for the description of the embodiments. Obviously, the drawings described below are only some examples or embodiments of this specification. For ordinary technicians in this field, this specification can also be applied to other similar scenarios based on these drawings without creative work. Unless it is obvious from the language environment or otherwise explained, the same reference numerals in the figures represent the same structure or operation.

[0015] It should be understood that the "system", "device", "unit" and / or "module" used herein are a method for distinguishing different components, elements, parts, portions or assemblies at different levels. However, if other words can achieve the same purpose, the words can be replaced by other expressions.

[0016] As shown in this specification and claims, unless the context clearly indicates an exception, the words "a", "an", "an" and / or "the" do not refer to the singular and may also include the plural. Generally speaking, the terms "comprise" and "include" only indicate the inclusion of the steps and elements that have been clearly identified, and these steps and elements do not constitute an exclusive list. The method or device may also include other steps or elements.

[0017] Flowcharts are used in this specification to illustrate the operations performed by the system according to the embodiments of this specification. It should be understood that the preceding or following operations are not necessarily performed precisely in order. Instead, the steps may be processed in reverse order or simultaneously. At the same time, other operations may also be added to these processes, or one or more operations may be removed from these processes.

[0018] The working environment of a ship is complex, and the internal cabin and loading and unloading operations need to be carried out in a safe and stable environment. CN109163725A only locates the information of the operators in the cabin and does not involve the hazard assessment of the cabin operation site.

[0019] Therefore, some embodiments of the present specification provide a ship operation control method and system, which can evaluate the internal and external operation conditions of the ship, including the operation conditions of the internal cabins and loading and unloading locations, so as to comprehensively judge the operation risks, and make timely adjustments to reduce the risks, thereby realizing the linkage monitoring of the internal cabin operations of the ship and the shore loading and unloading operations.

[0020] Figure 1 It is a schematic diagram of an application scenario of a ship operation control system according to some embodiments of this specification.

[0021] In some embodiments, the ship operation control system 100 may include an acquisition module 110 , a hazard determination module 120 and a parameter adjustment module 130 .

[0022] In some embodiments, the acquisition module 110 is configured to acquire first operation data of the internal compartment. The first operation data includes static cargo types and quantities, dynamic cargo types and quantities, and personnel flow frequency of the internal compartment within a preset period of time.

[0023] In some embodiments, the acquisition module 110 is configured to acquire second operation data of the loading and unloading location. The second operation data includes the quantity of goods to be loaded and unloaded and the number of operators at the loading and unloading location.

[0024] In some embodiments, the risk determination module 120 is configured to process the first operation data and the second operation data at a preset frequency to determine a current operation risk value.

[0025] In some embodiments, the internal compartment includes a plurality of sub-compartments, and the first operation data includes operation data of the plurality of sub-compartments.

[0026] In some embodiments, the hazard determination module 120 is further configured to: determine the sub-internal operation hazard value of each sub-compartment based on the operation data of each sub-compartment; determine the internal operation hazard value of the internal compartment by weighted summing up the sub-internal operation hazard values ​​of each sub-compartment based on a first weight set, wherein the first weight set includes the sub-weights corresponding to each sub-compartment; determine the external operation hazard value based on the second operation data; and determine the current operation hazard value by weighted summing up the internal operation hazard value and the external operation hazard value based on the second weight set.

[0027] For more information about sub-compartments, internal operation risk values, first weight set, second weight set, and external operation risk values, see Figure 2 .

[0028] In some embodiments, the hazard determination module 120 is further configured to: construct a clustering database, the clustering database includes vectors to be clustered, the vectors to be clustered include a first clustering vector and a second clustering vector, the first clustering vector is constructed based on the historical operation data and historical accident information of each sub-compartment, and the second clustering vector is constructed based on the current operation data of each sub-compartment; clustering the vectors to be clustered in the clustering database using the operation data of the sub-compartment as clustering indicators to obtain multiple clustering clusters, and taking the clustering cluster where the current operation data of each sub-compartment is located as the target clustering cluster for each sub-compartment; and determining the internal operation hazard value of each sub-compartment based on the historical accident information corresponding to the multiple first clustering vectors in the target clustering cluster.

[0029] In some embodiments, the parameter adjustment module 130 is configured to adjust the ship loading and unloading parameters based on the current operation risk value. The ship loading and unloading parameters include the number of loading and unloading personnel and the equipment operation parameters during the loading and unloading process.

[0030] In some embodiments, the parameter adjustment module 130 is further configured to: generate multiple candidate loading and unloading parameters in response to the current operation hazard value being greater than an adjustment threshold; determine the estimated operation hazard value corresponding to each candidate loading and unloading parameter based on the current operation hazard value and the current ship loading and unloading parameters; and determine the target loading and unloading parameters based on multiple estimated operation hazard values.

[0031] For details about the above embodiments, please refer to Figure 2-Figure 4 And related instructions.

[0032] In some embodiments, the acquisition module 110, the danger determination module 120 and the parameter adjustment module 130 of the ship operation control system 100 can be integrated into a processor, and the processor is configured to process information and / or data related to the ship operation control system 100. The processor can also process data obtained from other devices, such as user terminals, which may include personal computers, mobile devices, etc.

[0033] In some embodiments, the processor may include a combination of one or more of a microcontroller (MCU), an embedded processor (Embedded Processor), a graphics processing unit (Graphics Processing Unit, GPU), etc.

[0034] It should be noted that the above description of the ship operation control system and its modules is only for the convenience of description and cannot limit the present specification to the scope of the embodiments. It is understandable that for those skilled in the art, after understanding the principle of the system, it is possible to arbitrarily combine the modules or form a subsystem to connect with other modules without deviating from this principle. In some embodiments, Figure 1 The acquisition module, risk determination module and parameter adjustment module disclosed in the specification can be different modules in a system, or one module can realize the functions of two or more modules. For example, each module can share a storage module, or each module can have its own storage module. Such variations are all within the scope of protection of this specification.

[0035] Figure 2 200 is an exemplary flow chart of a ship operation control method according to some embodiments of the present specification. Figure 2 As shown, the process 200 includes the following steps 210-240. In some embodiments, the process 200 can be executed by a processor.

[0036] Step 210, obtaining first operation data of the internal cabin.

[0037] Interior cabins are rooms located inside the ship.

[0038] The first operation data refers to the relevant parameters of the operation in the internal cabin. In some embodiments, the first operation data may include the static cargo type and quantity, dynamic cargo type and quantity and personnel flow frequency in the internal cabin within a preset time period. The preset time period refers to a preset historical time period with the current time as the end point of the time period.

[0039] Static cargo refers to cargo that has been stored in the vessel's internal compartments before a preset period of time.

[0040] Dynamic cargo refers to cargo that enters the internal compartments of the ship for storage within a preset period of time.

[0041] The personnel flow frequency refers to the number of people entering and leaving the internal cabins of the ship within a preset period of time. One person entering or one person leaving is counted as one person.

[0042] In some embodiments, the processor may obtain the first operation data in a variety of ways. For example, the processor may obtain the static goods type and quantity, dynamic goods type and quantity within a preset time period uploaded by the user through the user terminal. The user may be an operator or a manager, and the user terminal may be a mobile phone, a tablet, a personal computer, etc. For another example, the processor may determine the frequency of personnel circulation through monitoring videos or access control devices.

[0043] Step 220, obtaining second operation data of the loading and unloading position.

[0044] The loading and unloading position refers to the place outside the ship where the goods are loaded and unloaded, for example, the shore where the ship is docked.

[0045] The second operation data refers to the relevant parameters of loading and unloading goods at the loading and unloading location. In some embodiments, the second operation data includes the amount of goods to be loaded and unloaded at the loading and unloading location and the number of operators. The number of operators includes the number of all staff members involved in the loading and unloading work on the shore, including loading and unloading personnel, safety supervision personnel, material management personnel, etc.

[0046] In some embodiments, the processor may obtain the second operation data by having an administrator provide a report or input the quantity of goods to be loaded and unloaded and the number of operators into the mobile terminal.

[0047] Step 230: Process the first operation data and the second operation data at a preset frequency to determine a current operation risk value.

[0048] The preset frequency refers to the number of times the first operation data and the second operation data are processed per unit time. The preset frequency can be set according to demand, for example, the first operation data and the second operation data are processed twice per minute.

[0049] The current operation risk value is a parameter value that reflects the possible danger that may occur to the ship during its current operation.

[0050] In some embodiments, the processor can determine the current operation hazard value by a variety of methods based on the first operation data and the second operation data. For example, the processor can determine the current operation hazard value by searching a first preset table based on the first operation data and the second operation data. The first preset table includes a mapping relationship between the first operation data and the second operation data and the current operation hazard value, and the mapping relationship can be preset based on experience or historical data. Among them, the current operation hazard value is positively correlated with the static cargo quantity, dynamic cargo quantity and personnel flow frequency in the first operation data, and is positively correlated with the amount of cargo to be loaded and unloaded and the number of operators in the second operation data.

[0051] In some embodiments, the processor may also determine the sub-internal operation risk value of each sub-compartment based on the operation data of each sub-compartment; based on the first weight set, weighted sum the sub-internal operation risk values ​​of each sub-compartment to determine the internal operation risk value of the internal compartment; based on the second operation data, determine the external operation risk value; based on the second weight set, weighted sum the internal operation risk value and the external operation risk value to determine the current operation risk value. For details, please refer to Figure 3 And related instructions.

[0052] Step 240, adjusting the ship loading and unloading parameters based on the current operation risk value.

[0053] Ship loading and unloading parameters are relevant parameters that affect the ship loading and unloading conditions.

[0054] In some embodiments, the ship loading and unloading parameters may include the number of loading and unloading personnel and the equipment operating parameters during the loading and unloading process.

[0055] The equipment operation parameters refer to the operation parameters of the relevant equipment of the ship during the loading and unloading operation. In some embodiments, the equipment includes ventilation equipment, and the equipment operation parameters may include the number, operating power, working temperature and other parameters of the ventilation equipment.

[0056] In some embodiments, the processor can adjust the ship loading and unloading parameters by a variety of methods based on the current operation risk value. For example, the processor can search the second preset table to determine the ship loading and unloading parameters based on the current operation risk value, and adjust them. The second preset table includes a mapping relationship between the current operation risk value and the ship loading and unloading parameters, and the mapping relationship can be determined based on experience or historical data.

[0057] In some embodiments, the processor may further generate multiple candidate loading and unloading parameters in response to the current operation risk value being greater than the adjustment threshold; determine the estimated operation risk value corresponding to each candidate loading and unloading parameter based on the current operation risk value and the current ship loading and unloading parameters; and determine the target loading and unloading parameters based on the multiple estimated operation risk values. Figure 4 And related instructions.

[0058] Some embodiments of the present specification can link the first operation data of the internal cabin of the ship and the second operation data of the shore loading and unloading operation, estimate the current operation risk value, and adjust the ship loading and unloading parameters, taking into account the impact of India inside and outside the ship, which can improve the accuracy of the estimation of the current operation risk value, reduce the risk of ship operation or reduce the loss after the risk, and improve the safety of ship operation.

[0059] Figure 3 It is an exemplary schematic diagram of determining the current operation hazard value according to some embodiments of this specification.

[0060] In some embodiments, the internal compartment includes a plurality of sub-compartments, and the first operation data includes operation data of the plurality of sub-compartments. Figure 2 Related instructions.

[0061] The internal cabin of a ship is composed of multiple rooms, each of which is a sub-cabin. Figure 3 As shown, the internal compartment may include n sub-compartments, namely sub-compartment R1, sub-compartment R2, ..., sub-compartment R n .

[0062] The operation data of the sub-compartment refers to the first operation data corresponding to the sub-compartment. In some embodiments, the operation data of the sub-compartment includes the static goods type and quantity, dynamic goods type and quantity and personnel flow frequency of the sub-compartment within a preset time period.

[0063] In some embodiments, each sub-cabin is provided with an environmental detection device.

[0064] The environment detection device is a device for detecting environmental data. In some embodiments, the environment detection device can be used to obtain environmental data of the sub-cabin. The environmental data may include temperature, dust concentration, gas flow rate, etc. The environment detection device includes at least one of a dust concentration detection device, a temperature detection device, and a flow rate detection device.

[0065] In some embodiments, the operation data of the sub-compartment also includes environmental data of the sub-compartment. The processor can obtain the environmental data of the sub-compartment through an environmental detection device.

[0066] Environmental data can affect the probability of accidents inside the ship. For example, if the temperature is too high, it is more likely that the goods will burn. If the dust concentration is too high, the workers are more likely to get heat stroke when the environment is too closed. When encountering special items, there is also a risk of poisoning. Therefore, obtaining environmental data can make the subsequent determination of the current operation hazard value more accurate.

[0067] In some embodiments, Figure 3 As shown, the processor can determine the sub-internal operation risk value of each sub-compartment based on the operation data of each sub-compartment; based on the first weight set 330, the sub-internal operation risk value of each sub-compartment is weighted and summed to determine the internal operation risk value 340 of the internal compartment; based on the second operation data 350, the external operation risk value 360 ​​is determined; based on the second weight set 370, the internal operation risk value 340 and the external operation risk value 360 ​​are weighted and summed to determine the current operation risk value 380. For the current operation risk value, please refer to Figure 2 Related instructions.

[0068] The sub-internal operation risk value is a parameter value reflecting the risk level of operation in the sub-cabin. Exemplarily, the sub-internal operation risk value can be set to 1-10.

[0069] In some embodiments, Figure 3 As shown, the internal compartment includes n sub-compartments, and the processor can determine the sub-internal operation hazard value 321 of the sub-compartment R1 based on the operation data 311 of the sub-compartment R1, determine the sub-internal operation hazard value 322 of the sub-compartment R2 based on the operation data 312 of the sub-compartment R2, and so on. n Operation data 313, determine the sub-cabin R n The sub-internal operation hazard value is 323.

[0070] In some embodiments, for the operation data of a certain sub-compartment, the processor may construct a first feature vector based on the operation data of the sub-compartment, search for at least one first reference vector in the first vector database whose vector distance with the first feature vector meets a preset condition, and use the average of at least one reference sub-internal operation hazard value corresponding to the at least one first reference vector as the sub-internal operation hazard value of the sub-compartment. The preset condition may include that the vector distance is greater than a preset threshold, and the vector distance may be represented by a cosine distance, an Euclidean distance, or the like.

[0071] The first vector database includes multiple first reference vectors and their corresponding reference sub-internal operation hazard values. Each first reference vector is constructed based on the operation data of the historical sub-compartment, and the reference sub-internal operation hazard value is constructed based on the historical internal accident information corresponding to the first reference vector. Historical internal accident information refers to the accident record information that has occurred in the internal compartment in the past. Historical internal accident information includes the accident type and severity of the accidents that have occurred in the internal compartment in the past. For example, the severity can be set to 0 to 10 levels, 0 represents no accident. If a fire with a severity of 6 occurs, the reference sub-internal operation hazard value is determined to be 6.

[0072] In some embodiments, the processor can construct a clustering database; use the operation data of the sub-compartment as the clustering index to cluster the vectors to be clustered in the clustering database to obtain multiple cluster clusters, and use the cluster cluster where the current operation data of each sub-compartment is located as the target cluster cluster of each sub-compartment; based on the historical accident information corresponding to multiple first cluster vectors in the target cluster cluster, determine the sub-internal operation hazard value of each sub-compartment.

[0073] In some embodiments, the clustering database includes vectors to be clustered. The vectors to be clustered are vectors that need to be clustered. The vectors to be clustered include a first clustering vector and a second clustering vector.

[0074] The first cluster vector is constructed based on the historical operation data and historical accident information of each sub-compartment. The second cluster vector is constructed based on the current operation data of each sub-compartment. The labels in the first cluster vector include the operation data and accident information of the sub-compartment, and the labels in the second cluster vector include the operation data of the sub-compartment. The number of first cluster vectors is greater than the number of second cluster vectors.

[0075] The historical operation data of a sub-cabin refers to the first operation data of the sub-cabin during the historical operation process. The current operation data of a sub-cabin refers to the first operation data of the sub-cabin during the current operation process. For more information about the first operation data, please refer to Figure 2 Related instructions.

[0076] Historical accident information refers to the record information of accidents that occurred in the cabin during historical operations. Historical accident information includes historical internal accident information, which includes the type and severity of accidents that occurred in the internal cabin during historical operations. For more information about historical internal accident information, please refer to the previous article.

[0077] In some embodiments, the processor can cluster the vectors to be clustered in the clustering database using the operation data of the sub-compartment as the clustering index to obtain multiple cluster clusters, and use the cluster where the current operation data of each sub-compartment is located as the target cluster cluster of each sub-compartment. The parameters used for clustering include the historical operation data of each sub-compartment in the first clustering vector and the current operation data of each sub-compartment in the second clustering vector. The number of target cluster clusters is less than or equal to the number of cluster clusters.

[0078] In some embodiments, a target cluster includes current operation data of at least one sub-compartment. A target cluster includes at least one first cluster vector and at least one second cluster vector. The number of target clusters is less than or equal to the number of sub-compartments.

[0079] Exemplarily, the internal cabin includes sub-cabins R1, R2...Rn, and clustering obtains d clusters, among which there are m target clusters containing the current operation data of the sub-cabins, where m is less than or equal to n, and m is less than or equal to d clusters.

[0080] In some embodiments, for a sub-compartment, corresponding to a second clustering vector and at least one first clustering vector, the processor can perform weighted summation based on the third weight set and the severity of historical internal accident information corresponding to at least one first clustering vector in the target clustering cluster of the sub-compartment to obtain the internal operation hazard value of the sub-compartment. The third weight set includes a weight value corresponding to each first clustering vector, and the weight value can be determined based on the vector distance between the second clustering vector and the first clustering vector, for example, the weight value is negatively correlated with the vector distance.

[0081] By clustering, the internal operation hazard value of each sub-compartment is determined. A large amount of historical operation data and current operation data of different sub-compartments can be classified, and different weights can be assigned according to the different vector distances in the clustering clusters. In this way, the internal operation hazard value of each sub-compartment can be calculated more accurately based on the similarity between the historical operation data and the current operation data of the sub-compartment, thereby reducing the calculation error caused by individual abnormal parameters.

[0082] In some embodiments, the first weight set includes sub-weights corresponding to each sub-compartment. Figure 2 As shown, the internal compartment includes sub-compartments R1, R2, ... Rn, and the first weight set 330 includes a sub-weight 331 of the sub-compartment R1, a sub-weight 332 of the sub-compartment R2, ..., a sub-weight 333 of the sub-compartment Rn.

[0083] In some embodiments, the first weight set is related to the static quantity of goods in the sub-compartment. For example, the sub-weight of the sub-compartment is positively correlated with the static quantity of goods in the sub-compartment.

[0084] In some embodiments, the first set of weights may be determined based on the quantity of goods associated with each sub-compartment.

[0085] The quantity of associated goods refers to the sum of the static item quantities of other sub-compartments connected to a certain sub-compartment.

[0086] In some embodiments, the sub-weights in the first weight set are positively correlated with the quantity of goods associated with the sub-compartments. The processor may use the ratio of the quantity of goods associated with the multiple sub-compartments as the ratio of the multiple sub-weights corresponding to the multiple sub-compartments in the first weight set.

[0087] If a sub-compartment has goods burning, the fire will first spread to other sub-compartments connected to the sub-compartment. At this time, the number of associated goods will directly affect the extent of the fire. The first weight set is determined by the number of associated goods in the sub-compartment, and the sub-compartment with a large number of associated goods has a higher weight, so that the internal operation risk value calculated based on the first weight set is more accurate.

[0088] The internal operation risk value is a parameter value reflecting the overall risk level of operations performed in the internal cabin. Exemplarily, the internal operation risk value can be set to 1-10.

[0089] In some embodiments, the processor may perform a weighted summation of the sub-internal operation hazard values ​​of each sub-compartment to determine the internal operation hazard value of the internal compartment. The internal operation hazard value is positively correlated with the sub-internal operation hazard value and the sub-weight of the sub-compartment. For example, the processor may calculate the internal operation hazard value based on formula (1), which is as follows: Internal operation risk value = a1×b1+a2×b2+…+a n ×b n (1)

[0090] Where n means that there are n sub-cabins in the internal cabin; a1~a n Respectively represent the sub-internal operation hazard values ​​of the 1st to nth sub-cabins; b1~b n Respectively represent the sub-weights of the 1st to nth sub-cabins.

[0091] The external operation risk value is a parameter value used to reflect the risk level of loading and unloading operations at the loading and unloading location. For example, the external operation risk value can be set to 1-10.

[0092] In some embodiments, the processor may construct a second feature vector based on the current second operation data of the loading and unloading position, search for at least one second reference vector in the second vector database whose vector distance with the second feature vector meets a preset condition, and use the average of at least one reference external operation hazard value corresponding to the at least one second reference vector as the external operation hazard value of the cabin. The preset condition may include that the vector distance is less than a preset threshold, and the vector distance may be represented by cosine distance, Euclidean distance, etc.

[0093] The second vector database includes multiple second reference vectors and their corresponding reference external operation hazard values. Each second reference vector is constructed based on the historical second operation data of the loading and unloading position, and the reference external operation hazard value is constructed based on the historical external accident information corresponding to the second reference vector. The historical external accident information includes the accident type and severity of historical accidents outside the cabin. The processor can determine the severity of the accident in the historical accident information as the reference external operation hazard value. For example, assuming the severity is 0 to 10, 0 represents that no accident has occurred. If a fire with a severity of 6 occurs, the reference external operation hazard value is determined to be 6.

[0094] The second weight set includes weight values ​​corresponding to internal operation risk values ​​and weight values ​​corresponding to external operation risk values.

[0095] In some embodiments, the weight values ​​corresponding to the internal operation risk values ​​and the weight values ​​corresponding to the external operation risk values ​​may be preset based on experience.

[0096] In some embodiments, the second set of weights is associated with tilt data.

[0097] Tilt data is data reflecting the tilt degree of the ship. For example, the tilt data includes the tilt of the hull relative to the ground and the fluctuation of the tilt during a preset period. For more information about the preset period, see Figure 2 Related instructions.

[0098] In some embodiments, the vessel is provided with a plurality of tilt sensors, which are used to collect tilt data.

[0099] In some embodiments, the processor may determine the degree of ship shaking based on the tilt data; and determine the weight value corresponding to the internal operation hazard value in the second weight set based on the degree of ship shaking.

[0100] The degree of ship shaking is used to reflect the shaking of the ship's hull. In some embodiments, the degree of shaking is positively correlated with the tilt data, and the processor can use the statistical value of the numerical value of the tilt data collected continuously during a preset period as the degree of shaking, and the statistical value can be a standard deviation, etc.

[0101] In some embodiments, the weight value corresponding to the internal operation risk value in the second weight set is positively correlated with the degree of ship shaking. The processor can calculate the weight value corresponding to the internal operation risk value based on formula (2), and formula (2) is as follows: The weight value corresponding to the internal operation risk value = k1 × ship shaking degree (2)

[0102] Among them, k1 is a coefficient greater than 0 and can be preset based on experience.

[0103] The more the hull shakes, the greater the degree of shaking, and the cargo in the cabin is prone to collision and extrusion, causing damage to the cargo or inducing an accident. Therefore, the weight value corresponding to the internal operation risk value is determined based on the degree of ship shaking, and a higher weight value can be given to a ship with a large degree of shaking, so that the current operation risk value calculated based on the second weight set is more in line with the actual situation of the ship.

[0104] In some embodiments, the processor may perform a weighted summation of the internal operation risk value and the external operation risk value based on the second weight set to determine the current operation risk value. The current operation risk value is positively correlated with the internal operation risk value, the external operation risk value, and the weight value in the second weight set. For example, the processor may calculate the current operation risk value based on formula (3), and formula (3) is as follows: Current operation risk value = c1 × internal operation risk value + c2 × external operation risk value (3)

[0105] Among them, c1 represents the weight value corresponding to the internal operation hazard value in the second weight set; c2 represents the weight value corresponding to the external operation hazard value in the second weight set.

[0106] In some embodiments, the processor can obtain the first personnel flow frequency within a preset time period; determine the correlation factor based on the first personnel flow frequency and the type of goods; and adjust the current operation risk value based on the correlation factor.

[0107] The first personnel flow frequency refers to the frequency of personnel entering and exiting between the loading and unloading position and the internal cabin. For example, if one person goes down from the ship to the shore, or one person goes up from the shore to the ship, it is recorded as 1 person. In some embodiments, the processor can count the number of times a person goes down from the ship to the shore and the number of times a person goes up from the shore to the ship within a preset time period, and take the total number of the two as the first personnel flow frequency.

[0108] Cargo type refers to the type of cargo being loaded or unloaded. Different types of cargo have different flammability.

[0109] The correlation factor is used to reflect the degree of danger caused by the correlation between the loading and unloading positions and the internal compartments.

[0110] In some embodiments, the processor may search a third preset table to determine the association factor based on the first personnel flow frequency and the type of goods. The third preset table includes a mapping relationship between the personnel flow frequency and the type of goods and the association factor. The association factor is positively correlated with the personnel flow frequency; the higher the flammability of the type of goods, the greater the association factor.

[0111] In some embodiments, the processor may use the sum of the current operation risk value and the correlation factor as the adjusted current operation risk value. Figure 2 .

[0112] There are goods placed on both the ship and the shore. Due to the flammability of the goods during transportation and the flow of personnel, once the goods on the ship / shore are burned, the shore / ship will also be implicated. Therefore, by determining the association, the current operation risk value is adjusted to be more in line with the actual situation.

[0113] Some embodiments of the present specification determine the internal operation hazard value by determining the sub-internal operation hazard values ​​of multiple compartments, and determine the current operation hazard value based on the internal operation hazard value and the external operation hazard value. This takes into account the different actual conditions inside and outside the ship and the different risks that may occur, thereby making the determined current operation hazard value of the ship more accurate.

[0114] Figure 4 4 is an exemplary flow chart of determining target loading and unloading parameters according to some embodiments of this specification. Process 400 is an exemplary process of determining target loading and unloading parameters. Figure 4 As shown, the process 400 includes the following steps 410-430. In some embodiments, the process 400 may be executed by a processor.

[0115] Step 410 , in response to the current operation risk value being greater than the adjustment threshold, generating a plurality of candidate loading and unloading parameters.

[0116] The adjustment threshold is a critical value at which the current operation risk value needs to be adjusted. The adjustment threshold can be preset based on experience or demand.

[0117] In some embodiments, the adjustment threshold can be determined based on the degree of shaking. For example, the adjustment threshold is negatively correlated with the degree of shaking. Figure 3 Related instructions.

[0118] The swaying of the ship's hull can also cause damage to cargo or trigger an accident, and the greater the swaying, the greater the danger. The adjustment threshold is determined based on the degree of swaying, taking into account the swaying of the ship's hull, so that the determined threshold is more in line with the actual situation.

[0119] In some embodiments, the adjustment threshold can be determined based on environmental data. Environmental data includes gas flow rate, temperature, etc. For more information about environmental data, see Figure 3 .

[0120] In some embodiments, the regulation threshold is inversely related to gas flow rate and temperature.

[0121] Environmental data will also affect the probability of accidents inside the ship. For example, if the temperature is too high, it is more likely that the goods will burn, and if the dust concentration is too high, it will endanger the health and safety of the operators. Determining the adjustment threshold based on environmental data is more in line with the actual environment inside the ship, making the determined adjustment threshold more accurate.

[0122] Candidate loading and unloading parameters refer to the ship loading and unloading parameters to be confirmed as target loading and unloading parameters. For more information about ship loading and unloading parameters, please refer to Figure 2 Related instructions.

[0123] In some embodiments, the candidate loading and unloading parameters include candidate numbers of loading and unloading personnel and candidate equipment operating parameters.

[0124] In some embodiments, in response to the current operation risk value being greater than an adjustment threshold, the processor may determine a candidate range set based on the current operation risk value; within the candidate range set, randomly generate n candidate loading and unloading parameters.

[0125] In some embodiments, when the current operation risk value is too large, the possibility of danger can be reduced by reducing the number of loading and unloading personnel and / or increasing the operating power of the ventilation equipment.

[0126] The candidate range set is a set of adjustment ranges of candidate loading and unloading parameters to be confirmed. The candidate range set includes personnel adjustment ranges and equipment operation parameter ranges.

[0127] The personnel adjustment range refers to the range of the number of loading and unloading personnel that can be adjusted based on the current number of loading and unloading personnel, for example, it can be reduced by 1 to 5 people. The width and upper limit of the personnel adjustment range are positively correlated with the current operation risk value. The larger the current operation risk value, the larger the width and upper limit of the personnel number range.

[0128] The equipment operating parameter range refers to the parameter range that can be adjusted based on the current equipment operating parameters (such as operating power), for example, the range of adjustment for increasing the equipment operating power. The width and upper limit of the equipment operating parameter range are positively correlated with the current operation risk value. The larger the current operation risk value, the larger the width and upper limit of the equipment operating parameter range.

[0129] In some embodiments, the processor can randomly generate v personnel adjustment quantities within the personnel adjustment range, adjust the current number of loading and unloading personnel based on the personnel adjustment quantities, and obtain v candidate numbers of loading and unloading personnel; randomly generate v equipment adjustment quantities within the equipment operating parameter range, adjust the current equipment operating parameters based on the equipment adjustment quantities, and obtain v candidate equipment operating parameters; randomly combine the v candidate numbers of personnel and the v candidate equipment operating powers to obtain u candidate loading and unloading parameters.

[0130] Step 420, based on the current operation risk value and the current ship loading and unloading parameters, determine the estimated operation risk value corresponding to each candidate loading and unloading parameter.

[0131] In some embodiments, the processor may construct a third feature vector based on the current operation risk value, the current ship loading and unloading parameters, and the candidate loading and unloading parameters, search for at least one third reference vector in the third vector database whose vector distance with the third feature vector meets a preset condition, and use the average of at least one reference operation risk value corresponding to the at least one third reference vector as the estimated operation risk value of the cabin. The preset condition may include that the vector distance is greater than a preset threshold, and the vector distance may be represented by a cosine distance, an Euclidean distance, or the like.

[0132] The third vector database includes multiple third reference vectors and their corresponding reference operation hazard values. Each third reference vector is constructed based on historical operation hazard values, historical ship loading and unloading parameters, and historical actual loading and unloading parameters, and the reference operation hazard value is constructed based on the historical accident information corresponding to the third reference vector. Historical accident information includes the type and severity of accidents that occurred in the cabin during historical operations. For example, the processor can use the severity of the accident in the historical accident information as a reference operation hazard value, assuming that the severity is 0 to 10 levels, 0 represents no accident, and if a fire with a severity of 6 occurs, the reference operation hazard value is determined to be 6.

[0133] Step 430, determining target loading and unloading parameters based on multiple estimated operation risk values.

[0134] In some embodiments, the processor may use the candidate loading and unloading parameters corresponding to the smallest estimated operation risk value among the estimated operation risk values ​​that are smaller than the adjustment threshold as the target loading and unloading parameters.

[0135] Some embodiments of the present specification, by determining the estimated operational risk values ​​of multiple candidate loading and unloading parameters, thereby determining the target loading and unloading parameters, can make the adjusted ship loading and unloading parameters less likely to become dangerous, thereby reducing the risk of ship operations or the loss after the risk occurs, and improving operational safety.

[0136] Some embodiments of the present specification provide a ship operation control device, including a processor, wherein the processor is used to execute the ship operation control method described in any of the above technical solutions.

[0137] Some embodiments of the present specification provide a computer-readable storage medium, which stores computer instructions. When the computer instructions are executed by a computer, the ship operation control method described in any one of the embodiments of the present specification is implemented.

[0138] The basic concepts have been described above. Obviously, for those skilled in the art, the above detailed disclosure is only for example and does not constitute a limitation of this specification. Although not explicitly stated here, those skilled in the art may make various modifications, improvements and corrections to this specification. Such modifications, improvements and corrections are suggested in this specification, so such modifications, improvements and corrections still belong to the spirit and scope of the exemplary embodiments of this specification.

[0139] At the same time, this specification uses specific words to describe the embodiments of this specification. For example, "one embodiment", "an embodiment", and / or "some embodiments" refer to a certain feature, structure or characteristic related to at least one embodiment of this specification. Therefore, it should be emphasized and noted that "one embodiment" or "an embodiment" or "an alternative embodiment" mentioned twice or more in different positions in this specification does not necessarily refer to the same embodiment. In addition, certain features, structures or characteristics in one or more embodiments of this specification can be appropriately combined.

[0140] In addition, unless explicitly stated in the claims, the order of the processing elements and sequences described in this specification, the use of alphanumeric characters, or the use of other names are not intended to limit the order of the processes and methods of this specification. Although the above disclosure discusses some invention embodiments that are currently considered useful through various examples, it should be understood that such details are only for illustrative purposes, and the attached claims are not limited to the disclosed embodiments. On the contrary, the claims are intended to cover all modifications and equivalent combinations that are consistent with the essence and scope of the embodiments of this specification. For example, although the system components described above can be implemented by hardware devices, they can also be implemented only by software solutions, such as installing the described system on an existing server or mobile device.

[0141] Similarly, it should be noted that in order to simplify the description disclosed in this specification and thus help understand one or more embodiments of the invention, in the above description of the embodiments of this specification, multiple features are sometimes combined into one embodiment, figure or description thereof. However, this disclosure method does not mean that the features required by the subject matter of this specification are more than the features mentioned in the claims. In fact, the features of the embodiments are less than all the features of the single embodiment disclosed above.

[0142] In some embodiments, numbers describing the number of components and attributes are used. It should be understood that such numbers used in the description of the embodiments are modified by the modifiers "about", "approximately" or "substantially" in some examples. Unless otherwise specified, "about", "approximately" or "substantially" indicate that the numbers are allowed to vary by ±20%. Accordingly, in some embodiments, the numerical parameters used in the specification and claims are approximate values, which may change according to the required features of individual embodiments. In some embodiments, the numerical parameters should take into account the specified significant digits and adopt the general method of retaining digits. Although the numerical domains and parameters used to confirm the breadth of their range in some embodiments of this specification are approximate values, in specific embodiments, the setting of such numerical values ​​is as accurate as possible within the feasible range.

[0143] Each patent, patent application, patent application publication, and other materials, such as articles, books, specifications, publications, documents, etc., cited in this specification are hereby incorporated by reference in their entirety. Except for application history documents that are inconsistent with or conflicting with the contents of this specification, documents that limit the broadest scope of the claims of this specification (currently or later attached to this specification) are also excluded. It should be noted that if the descriptions, definitions, and / or use of terms in the materials attached to this specification are inconsistent or conflicting with the contents described in this specification, the descriptions, definitions, and / or use of terms in this specification shall prevail.

[0144] Finally, it should be understood that the embodiments described in this specification are only used to illustrate the principles of the embodiments of this specification. Other variations may also fall within the scope of this specification. Therefore, as an example and not a limitation, alternative configurations of the embodiments of this specification may be considered consistent with the teachings of this specification. Accordingly, the embodiments of this specification are not limited to the embodiments explicitly introduced and described in this specification.

Claims

1. A ship operation control method, characterized in that: The method comprises: Acquire first operation data of the internal cabin, wherein the first operation data includes static cargo type and quantity, dynamic cargo type and quantity, and personnel flow frequency of the internal cabin within a preset time period; Acquire second operation data of the loading and unloading location, wherein the second operation data includes the quantity of goods to be loaded and unloaded and the number of operators at the loading and unloading location; Processing the first operation data and the second operation data at a preset frequency to determine a current operation risk value; Based on the current operation risk value, the ship loading and unloading parameters are adjusted, and the ship loading and unloading parameters include the number of loading and unloading personnel and the equipment operation parameters during the loading and unloading process.

2. The method according to claim 1, characterized in that: The internal compartment includes a plurality of sub-compartments, the first operation data includes operation data of the plurality of sub-compartments, and the processing of the first operation data and the second operation data at a preset frequency to determine the current operation risk value includes: Determine the sub-internal operation hazard value of each sub-compartment based on the operation data of each sub-compartment; Based on a first weight set, weighted summing of the sub-internal operation hazard values ​​of each sub-compartment to determine the internal operation hazard value of the internal compartment, wherein the first weight set includes sub-weights corresponding to each sub-compartment; determining an external operation risk value based on the second operation data; Based on the second weight set, the internal operation risk value and the external operation risk value are weighted and summed to determine the current operation risk value.

3. The method according to claim 2, characterized in that: The determining of the sub-internal operation risk value of each sub-compartment based on the operation data of each sub-compartment includes: Constructing a clustering database, the clustering database includes vectors to be clustered, the vectors to be clustered include a first clustering vector and a second clustering vector, the first clustering vector is constructed based on historical operation data and historical accident information of each sub-compartment, and the second clustering vector is constructed based on current operation data of each sub-compartment; Taking the operation data of the sub-cabin as a clustering index, clustering the vectors to be clustered in the clustering database to obtain a plurality of cluster clusters, and taking the cluster where the current operation data of each sub-cabin is located as the target cluster cluster of each sub-cabin; Based on the historical accident information corresponding to the multiple first clustering vectors in the target cluster, the sub-internal operation hazard value of each sub-compartment is determined.

4. The method according to claim 1, characterized in that: The adjusting of ship loading and unloading parameters based on the current operation risk value includes: In response to the current operation risk value being greater than an adjustment threshold, generating a plurality of candidate loading and unloading parameters; Based on the current operation risk value and the current ship loading and unloading parameters, determining an estimated operation risk value corresponding to each of the candidate loading and unloading parameters; Based on the plurality of estimated operation risk values, target loading and unloading parameters are determined.

5. A ship operation control system, comprising an acquisition module, a danger determination module and a parameter adjustment module; The acquisition module is configured as follows: Acquire first operation data of the internal cabin, wherein the first operation data includes static cargo type and quantity, dynamic cargo type and quantity, and personnel flow frequency of the internal cabin within a preset time period; Acquire second operation data of the loading and unloading location, wherein the second operation data includes the quantity of goods to be loaded and unloaded and the number of operators at the loading and unloading location; The danger determination module is configured to process the first operation data and the second operation data at a preset frequency to determine a current operation danger value; The parameter adjustment module is configured to adjust ship loading and unloading parameters based on the current operation risk value, and the ship loading and unloading parameters include the number of loading and unloading personnel and equipment operation parameters during the loading and unloading process.

6. The system according to claim 5, characterized in that: The internal compartment includes a plurality of sub-compartments, the first operation data includes operation data of the plurality of sub-compartments, and the hazard determination module is further configured to: Determine the sub-internal operation hazard value of each sub-compartment based on the operation data of each sub-compartment; Based on a first weight set, weighted summing of the sub-internal operation hazard values ​​of each sub-compartment to determine the internal operation hazard value of the internal compartment, wherein the first weight set includes sub-weights corresponding to each sub-compartment; determining an external operation risk value based on the second operation data; Based on the second weight set, the internal operation risk value and the external operation risk value are weighted and summed to determine the current operation risk value.

7. The system according to claim 6, characterized in that: The risk determination module is further configured to: Constructing a clustering database, the clustering database includes vectors to be clustered, the vectors to be clustered include a first clustering vector and a second clustering vector, the first clustering vector is constructed based on historical operation data and historical accident information of each sub-compartment, and the second clustering vector is constructed based on current operation data of each sub-compartment; Taking the operation data of the sub-cabin as a clustering index, clustering the vectors to be clustered in the clustering database to obtain a plurality of cluster clusters, and taking the cluster where the current operation data of each sub-cabin is located as the target cluster cluster of each sub-cabin; Based on the historical accident information corresponding to the multiple first clustering vectors in the target cluster, the internal operation hazard value of each sub-compartment is determined.

8. The system according to claim 5, characterized in that: The parameter adjustment module is further configured to: In response to the current operation risk value being greater than an adjustment threshold, generating a plurality of candidate loading and unloading parameters; Based on the current operation risk value and the current ship loading and unloading parameters, determining an estimated operation risk value corresponding to each of the candidate loading and unloading parameters; Based on the plurality of estimated operation risk values, target loading and unloading parameters are determined.

9. A ship operation control device, comprising a processor, wherein the processor is used to execute the ship operation control method according to any one of claims 1 to 4.

10. A computer-readable storage medium, wherein the storage medium stores computer instructions. When a computer reads the computer instructions in the storage medium, the computer executes the ship operation control method according to any one of claims 1 to 4.