Train control method, device, equipment and medium
Through the brainwave train control system, the brainwave processing device and sending device are used for identity authentication and permission management, which solves the problem of large space occupied by the train control system equipment and weak information security, and achieves more efficient and safe vehicle control.
Patent Information
- Application Number
- CN202411354275.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-12-03
AI Technical Summary
The rail transit train control system has problems such as large equipment occupying space, high intrusion risk and weak information security.
The brain wave train control system is adopted, and communication is conducted through the brain wave processing device and multiple brain wave sending devices, the identity authentication of the target being tested is determined and the brain wave interaction permissions are opened to achieve control of the vehicle, reduce the number of equipment and enhance safety.
It reduces the number of train control equipment, reduces space occupation, improves information acquisition efficiency and control security, and enhances information security.
Smart Images

Figure CN119058774A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of rail transit technology, and in particular to a train control method, device, equipment and medium. Background Art
[0002] At present, the control systems of rail transit trains mainly rely on hardware devices such as keys, driver controllers, buttons, switches and human-machine interface (HMI) screens.
[0003] With the trend of increasing intelligence, although some hardware devices of the train control system, such as buttons and switches, have been reduced or integrated into soft switches on the HMI screen, the types and number of equipment related to the train control system have not decreased, and the hardware startup method and software control still have security risks. At the same time, the information security of the train network system is relatively weak, and there is a potential threat of hacker intrusion.
[0004] In view of the above problems, how to solve the problems faced by the current train control system, such as large equipment space occupation, high intrusion risk and weak information security, is an urgent problem to be solved by technical personnel in this field. Summary of the invention
[0005] The purpose of this application is to provide a train control method, device, equipment and medium to solve the problems faced by current train control systems, such as large equipment space occupation, high intrusion risk and weak information security.
[0006] In order to solve the above technical problems, the present application provides a train control method, which is applied to a brain wave train control system; the brain wave control system includes a brain wave processing device and a plurality of brain wave transmitting devices; the brain wave processing device and each brain wave transmitting device are communicatively connected; the method includes:
[0007] Determine the detected target within the corresponding detection range through the brain wave sending device, and send the brain wave signal containing the vehicle travel service information to the detected target;
[0008] Determining whether the brain wave transmitting device receives the brain wave signal representing the vehicle control request sent by the measured target;
[0009] If it is confirmed that the brain wave signal representing the vehicle control request sent by the measured target is received, the brain wave signal representing the identity authentication request is sent to the measured target through the brain wave sending device, and the brain wave signal containing the identity authentication information fed back by the measured target according to the identity authentication request is received;
[0010] Determine whether the target under test has passed the identity authentication according to the identity authentication information;
[0011] If it is confirmed that the target has passed the identity authentication, the brainwave interaction permission between the brainwave processing device and the target is opened, so that the target can interact with the brainwave processing device to control the vehicle.
[0012] On the one hand, the brainwave processing device is installed in the head car of the train, and each brainwave transmitting device is installed in each car of the train, and each brainwave transmitting device is connected to each other in sequence.
[0013] On the other hand, the step of sending a brain wave signal representing an identity authentication request to a target under test through a brain wave sending device, and receiving a brain wave signal containing identity authentication information fed back by the target under test according to the identity authentication request, includes:
[0014] Sending a brain wave signal representing a key verification request to the target under test through a brain wave sending device;
[0015] Receiving the brain wave signal containing the key fed back by the target through the brain wave transmitting device;
[0016] Correspondingly, judging whether the detected target has passed the identity authentication according to the identity authentication information includes:
[0017] Determine whether the key fed back by the target is correct;
[0018] If the key is confirmed to be correct, it is confirmed that the target has passed the identity authentication;
[0019] If the confirmation key is wrong, it is confirmed that the target under test has not passed the identity authentication.
[0020] On the other hand, after the permission for the brainwave processing device to interact with the target is opened, the method further includes:
[0021] Sending a brain wave signal representing a secondary identity authentication request to the target under test through a brain wave transmitting device, and receiving a brain wave signal containing secondary identity authentication information fed back by the target under test according to the secondary identity authentication request;
[0022] The operating authority of the target under test for the train is determined based on the secondary identity authentication information, and the operating authority of the train is opened to the target under test.
[0023] On the other hand, determining the operating authority of the detected target to the train according to the secondary identity authentication information includes:
[0024] When the measured target is determined to be a crew member according to the secondary identity authentication information, the operation authority of the measured target is determined to be the weak current system control authority;
[0025] When the target to be measured is determined to be a train operation and maintenance personnel according to the secondary identity authentication information, the operation authority of the target to be measured is determined to be the whole vehicle control authority;
[0026] Among them, train operation and maintenance personnel include at least drivers, mechanics and inspection and maintenance personnel.
[0027] On the other hand, the opening of the train operation authority to the detected target includes:
[0028] When the target to be measured is determined to be a crew member, the control authority of the train's weak current system is opened to the target to be measured;
[0029] When the target to be tested is determined to be a driver or a mechanic, the control authority of the entire train is opened to the target to be tested;
[0030] When the target to be measured is determined to be a maintenance personnel, it is determined whether the current train is in operation;
[0031] If yes, then the control authority of the train's weak current system is opened to the target under test;
[0032] If not, the entire train control authority is opened to the target under test.
[0033] On the other hand, it also includes:
[0034] Get train status information;
[0035] The brain wave signal containing the train status information is sent to the crew and / or train operation and maintenance personnel through the brain wave sending device.
[0036] In order to solve the above technical problems, the present application also provides a train control device, which is applied to a brain wave train control system; the brain wave control system includes a brain wave processing device and a plurality of brain wave transmitting devices; the brain wave processing device and each brain wave transmitting device are communicatively connected; the device includes:
[0037] A determination module, used to determine the detected target within the corresponding detection range through the brain wave sending device, and send a brain wave signal containing vehicle travel service information to the detected target;
[0038] The first judgment module is used to judge whether the brain wave sending device has received the brain wave signal representing the vehicle control request sent by the measured target; if it is confirmed that the brain wave signal representing the vehicle control request sent by the measured target has been received, the transceiver module is triggered;
[0039] The transceiver module is used to send a brain wave signal representing an identity authentication request to the target under test through a brain wave sending device, and receive a brain wave signal containing identity authentication information fed back by the target under test according to the identity authentication request;
[0040] The second judgment module is used to judge whether the target under test has passed the identity authentication according to the identity authentication information; if it is confirmed that the target under test has passed the identity authentication, the permission opening module is triggered;
[0041] The permission opening module is used to open the brainwave interaction permission between the brainwave processing device and the target to be measured, so that the target to be measured can interact with the brainwave processing device to control the vehicle.
[0042] In order to solve the above technical problems, the present application also provides a train control device, including:
[0043] Memory for storing computer programs;
[0044] A processor is used to implement the steps of the above-mentioned train control method when executing the computer program.
[0045] In order to solve the above technical problems, the present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above train control method are implemented.
[0046] The train control method provided in the present application is applied to a brainwave train control system; the brainwave control system includes a brainwave processing device and multiple brainwave sending devices; the brainwave processing device and each brainwave sending device are communicatively connected; the method specifically determines the target under test within the corresponding detection range through the brainwave sending device, and sends a brainwave signal containing vehicle travel service information to the target under test; determines whether the brainwave sending device receives the brainwave signal representing the vehicle control request sent by the target under test; if it is confirmed that the brainwave signal representing the vehicle control request sent by the target under test is received, then sends a brainwave signal representing an identity authentication request to the target under test through the brainwave sending device, and receives a brainwave signal containing identity authentication information fed back by the target under test according to the identity authentication request; determines whether the target under test passes the identity authentication based on the identity authentication information; if it is confirmed that the target under test passes the identity authentication, then opens the brainwave interaction permission between the brainwave processing device and the target under test, so that the target under test and the brainwave processing device can interact to control the vehicle. It can be seen that this scheme specifically sets up a brainwave train control system composed of a brainwave processing device and multiple brainwave sending devices, which can directly map the vehicle travel service information to the target under test in the form of brainwaves, thereby improving the efficiency of information acquisition of the target under test; at the same time, when the target under test passes the identity authentication, the brainwave interaction authority between the brainwave processing device and the target under test is opened, so that the target under test can interact with the brainwave processing device to achieve control of the vehicle. This train control method reduces the number of train control equipment, reduces vehicle procurement costs, reduces the space occupied by the driver's room and the mechanic's room, and increases the vehicle's carrying area and passenger capacity; at the same time, since the target under test is safely identified through brainwaves, the control safety of the train is greatly enhanced.
[0047] In addition, the present application also provides a train control device, equipment and medium, with the same effects as above. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] In order to more clearly illustrate the embodiments of the present application, the following is a brief introduction to the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0049] FIG1 is a flow chart of a train control method provided by an embodiment of the present application;
[0050] FIG2 is a schematic diagram of the placement of a brain wave processing device and a brain wave transmitting device provided in an embodiment of the present application;
[0051] FIG3 is a schematic diagram of a train control device provided in an embodiment of the present application;
[0052] FIG4 is a schematic diagram of a train control device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0053] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0054] The core of this application is to provide a train control method, device, equipment and medium to solve the problems faced by the current train control system, such as large equipment space occupation, high intrusion risk and weak information security.
[0055] In order to enable those skilled in the art to better understand the present application, the present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0056] With the trend of increasing intelligence, although some hardware devices of the train control system, such as buttons and switches, have been reduced or integrated into soft switches in the HMI screen, the types and quantities of equipment related to the train control system have not been reduced, and there are still security risks in the hardware startup method and software control. At the same time, the information security of the train network system is relatively weak, and there is a potential threat of hacker intrusion. Therefore, in order to solve the above problems, the present application provides a train control method.
[0057] It should be noted that the method provided in this application is applied to a brainwave train control system; the brainwave control system includes a brainwave processor (BWP) and multiple brainwave transmitters (BWT); the brainwave processor and each brainwave transmitter are connected in communication. BWT and BWP are a wireless brain-computer interface (BCI) device, which is a technical device that enables the human brain to transmit and communicate information with the outside world without relying on the normal output pathways of the brain (peripheral nerves and muscle tissue). Under normal circumstances, the human brain affects external things by relying on human nerves and limb muscles, while BCI technology builds a new channel for the human brain to interact with the outside world, directly using the brain to express ideas or control equipment. There is a close connection between human consciousness and brain activity. The EEG signals generated by the human brain under a certain specific thinking have fixed characteristics. It is currently confirmed that the brain waves under wakefulness are alpha waves (8-13Hz) and beta waves (18-30Hz), and the sleep state is delta waves (0.5-3Hz) and theta waves (4-7Hz). BCI technology makes use of this law, using bioelectric sensors to collect human brain wave signal data and input it into a computer. After the computer analyzes the signal characteristics, it identifies the type of human thoughts and then maps the human brain thoughts into control instructions to achieve control of external devices.
[0058] This application does not limit the specific number of BWTs and the specific locations of BWTs and BWPs on the train, which will be determined based on the specific implementation situation.
[0059] FIG1 is a flow chart of a train control method provided by an embodiment of the present application. As shown in FIG1 , the method includes:
[0060] S10: Determine the detected target within the corresponding detection range through the brain wave sending device, and send a brain wave signal containing vehicle travel service information to the detected target.
[0061] The brainwave transmitter has a corresponding detection range. When the detected target (including passengers, crew members and train operators) is within the detection range, the brainwave transmitter interacts with it through brainwaves. By determining the brainwave frequency, the detected target individual within the detection range can be determined. After determining the detected target within the detection range, a brainwave signal containing vehicle travel service information is sent to the detected target, so that the detected target can obtain the vehicle travel service information of the train, such as vehicle running speed, train number, arrival information, transfer information, compartment temperature, real-time news information and scenery along the way.
[0062] It should be noted that in the specific implementation, a brain wave compiler, a safety identification device, a safety authorization device, an information verification system and a data recorder can be set in the brain wave sending device. Specifically, the safety identification device determines the target individual within the detection range of the brain wave sending device through the brain wave frequency. The vehicle travel service information is mapped into the brain of the target through the brain wave compiler.
[0063] S11: Determine whether the brain wave transmitting device receives the brain wave signal representing the vehicle control request sent by the measured target; if so, proceed to step S12.
[0064] Further, it is determined whether the brainwave transmitting device receives the brainwave signal representing the vehicle control request sent by the measured target. Specifically, the information verification system in the brainwave transmitting device can determine whether the brainwave transmitting device receives the brainwave signal representing the vehicle control request sent by the measured target. If it is confirmed that the brainwave transmitting device does not receive the brainwave signal representing the vehicle control request sent by the measured target, it returns to continue to determine whether the brainwave transmitting device receives the brainwave signal representing the vehicle control request sent by the measured target.
[0065] S12: Sending a brain wave signal representing an identity authentication request to the target under test through a brain wave transmitting device, and receiving a brain wave signal containing identity authentication information fed back by the target under test according to the identity authentication request.
[0066] If it is confirmed that the brainwave sending device receives the brainwave signal representing the vehicle control request sent by the target under test, it is necessary to start the identity authentication of the target under test to determine whether the target under test is an ordinary passenger or a staff member. The brainwave sending device sends the brainwave signal representing the identity authentication request to the target under test, and receives the brainwave signal containing the identity authentication information fed back by the target under test according to the identity authentication request. It can be understood that this process can be specifically implemented by the information verification system of the brainwave sending device.
[0067] It should be noted that the specific method of identity authentication is not limited in this embodiment. For example, it can be verified by the identity information of the target being tested, or it can be authenticated by inputting a key, depending on the specific implementation situation.
[0068] S13: Determine whether the target has passed the identity authentication according to the identity authentication information; if so, proceed to step S14.
[0069] After obtaining the identity authentication information of the target under test, it is determined whether the target under test has passed the identity authentication according to the identity authentication information; if it is determined that the target under test has not passed the identity authentication, the process ends.
[0070] S14: Opening the brainwave interaction authority between the brainwave processing device and the target to be measured, so that the target to be measured can interact with the brainwave processing device to control the vehicle.
[0071] It is understandable that there are multiple subsystems in the train, including auxiliary power system (APS), battery (BC), electronic door control unit (ECDU), vehicle air conditioning system (VAC), inverter control unit (ICU), inverter (INV), traction control function (TCF) and brake control unit (BCU). These subsystems are controlled by the brain wave processing device. When it is confirmed that the target has passed the identity authentication and is confirmed to be a train staff member with train control authority, the brain wave interaction authority between the brain wave processing device and the target is opened, so that the target can interact with the brain wave processing device to control the vehicle.
[0072] It should be noted that in this embodiment, there is no restriction on the specific permissions opened to the target under test, which depends on the specific implementation situation.
[0073] In this embodiment, by setting up a brainwave train control system composed of a brainwave processing device and a plurality of brainwave transmitting devices, the vehicle travel service information can be directly mapped to the target under test in the form of brainwaves, thereby improving the efficiency of obtaining information from the target under test; at the same time, when the target under test passes the identity authentication, the brainwave interaction authority between the brainwave processing device and the target under test is opened, so that the target under test can interact with the brainwave processing device to achieve control of the vehicle. This train control method reduces the number of train control devices, reduces vehicle procurement costs, reduces the space occupied by the driver's room and the mechanic's room, and increases the vehicle's carrying area and passenger capacity; at the same time, since the target under test is safely identified through brainwaves, the control safety of the train is greatly enhanced.
[0074] Fig. 2 is a schematic diagram of the locations of the brainwave processing device and the brainwave transmitting device provided in the embodiment of the present application. Based on the above embodiment, in some embodiments, as shown in Fig. 2, the brainwave processing device is arranged in the head car of the train, and each brainwave transmitting device is arranged in each car of the train, and each brainwave transmitting device is connected to each other in sequence.
[0075] Specifically, the brainwave processing device is set in the head car and the whole car for information exchange and collection, vehicle control authorization, vehicle status display, fault record, fault handling prompt, instruction release, etc. The brainwave sending device is installed in the passenger compartment of each car, which is responsible for brainwave interaction with the target to be measured, passenger and driver identification, information transmission with brainwave sending devices in other passenger compartments, information interaction of single car subsystems, and sending the interaction information to the brainwave processing device. It can be understood that when the driver enters the car, the vehicle can be remotely controlled at any position through the brainwave processing device and the brainwave sending device; passengers can understand travel information, real-time information and vehicle travel service equipment information through the brainwave sending device; crew members can remotely control the passenger compartment lighting, temperature, media information and understand the status of passengers in the car through the brainwave processing device and the brainwave sending device.
[0076] On the basis of the above embodiments, in some embodiments, a brain wave signal representing an identity authentication request is sent to a target under test by a brain wave sending device, and a brain wave signal containing identity authentication information fed back by the target under test according to the identity authentication request is received, including:
[0077] S121: Sending a brain wave signal representing a key verification request to the target under test through a brain wave sending device;
[0078] S122: Receive the brain wave signal containing the key fed back by the target through the brain wave sending device.
[0079] In order to authenticate the identity of the target under test, in this embodiment, a brain wave signal representing a key verification request is sent to the target under test by a brain wave sending device. After receiving the key verification request, the target under test feeds back a brain wave signal containing the key to the brain wave sending device, so that the brain wave sending device receives the brain wave signal containing the key fed back by the target under test, thereby achieving identity authentication of the target under test.
[0080] Correspondingly, judging whether the target has passed the identity authentication according to the identity authentication information includes:
[0081] S131: Determine whether the key fed back by the target under test is correct; if the key is confirmed to be correct, it is confirmed that the target under test has passed the identity authentication; if the key is confirmed to be wrong, it is confirmed that the target under test has not passed the identity authentication.
[0082] Specifically, the information verification system in the brain wave transmitting device determines whether the key fed back by the measured target is correct. If it is confirmed that the key fed back by the measured target is correct, it is confirmed that the measured target has passed the identity authentication, otherwise it is confirmed that the measured target has not passed the identity authentication. Through the key verification method, the security of train control is improved.
[0083] In order to clarify the specific operation authority of the target under test on the train, based on the above embodiments, in some embodiments, after opening the brain wave interaction authority between the brain wave processing device and the target under test, it also includes:
[0084] S15: sending a brain wave signal representing a secondary identity authentication request to the target under test through a brain wave transmitting device, and receiving a brain wave signal containing secondary identity authentication information fed back by the target under test according to the secondary identity authentication request;
[0085] S16: Determine the operating authority of the target to operate the train according to the secondary identity authentication information, and open the operating authority of the train to the target.
[0086] Specifically, after the target under test is connected to the brain wave processing device through the brain wave sending device, since the target under test may be a driver, crew member, mechanic or maintenance personnel, different targets under test have different operating permissions to the train. Therefore, in order to determine the specific operating permissions of the target under test for the train, the identity of the target under test needs to be authenticated again.
[0087] Specifically, a brain wave signal representing a secondary identity authentication request is sent to the target under test through a brain wave transmitting device, and a brain wave signal containing secondary identity authentication information fed back by the target under test according to the secondary identity authentication request is received. In this embodiment, there is no restriction on the specific method of secondary identity authentication, for example, it can be verified by the name and work number of the target under test. After obtaining the secondary identity authentication information of the target under test, the target under test's operating authority for the train is determined based on the secondary identity authentication information, and the target under test is given the operating authority for the train.
[0088] It should be noted that since different measured targets have different operating permissions for trains, when opening the operating permissions for trains to the measured targets, the corresponding operating permissions need to be opened to ensure the safety of train operation.
[0089] Based on the above embodiments, in some embodiments, determining the operating authority of the detected target to the train according to the secondary identity authentication information includes:
[0090] S161: when it is determined that the target to be measured is a crew member according to the secondary identity authentication information, determining that the operation authority of the target to be measured is a weak current system control authority;
[0091] S162: when it is determined according to the secondary identity authentication information that the target to be measured is a train operation and maintenance personnel, determining that the operation authority of the target to be measured is the whole vehicle control authority;
[0092] Among them, train operation and maintenance personnel include at least drivers, mechanics and inspection and maintenance personnel.
[0093] In a specific implementation, the target to be measured who passes the first identity authentication may be a driver, crew member, mechanic or maintenance personnel, among which the driver, mechanic and maintenance personnel are train operation and maintenance personnel. Therefore, when the target to be measured is determined to be a crew member according to the secondary identity authentication information, the operation authority of the target to be measured is determined to be the weak current system control authority. When the target to be measured is determined to be a train operation and maintenance personnel according to the secondary identity authentication information, the operation authority of the target to be measured is determined to be the whole vehicle control authority.
[0094] It should be noted that the weak current system control authority specifically refers to the control authority over air conditioning, lighting, travel service information, etc. that do not involve safe operation. The whole vehicle control authority refers to the control authority over all subsystems of the whole train.
[0095] Correspondingly, the train operation permissions are opened to the target under test, including:
[0096] S163: when it is determined that the detected target is a crew member, the weak current system control authority of the train is opened to the detected target;
[0097] S164: when it is determined that the target to be measured is a driver or a mechanic, the whole vehicle control authority of the train is opened to the target to be measured;
[0098] S165: When it is determined that the target under test is a maintenance personnel, determine whether the current train is in operation; if so, open the weak current system control authority of the train to the target under test; if not, open the whole vehicle control authority of the train to the target under test.
[0099] In order to open the corresponding train operation authority to the measured target, when the measured target is determined to be a crew member, the train's weak current system control authority is opened to the measured target, so that the crew can control the train's air conditioning, lighting, travel service information, etc. that do not involve safe operation. When the measured target is determined to be a driver or mechanic, the train's entire vehicle control authority is opened to the measured target.
[0100] It should be noted that when the target to be measured is determined to be a maintenance personnel, it is necessary to determine whether the current train is in operation. If it is confirmed that the current train is in operation, the control authority of the train's weak current system is opened to the target to be measured, that is, only the maintenance personnel are allowed to control the train's air conditioning, lighting, travel service information, etc. that do not involve safe operation, thereby ensuring the safety of the train's operation; if it is confirmed that the current train is not in operation, the control authority of the entire train is opened to the target to be measured, that is, the maintenance personnel are allowed to fully control and maintain the train.
[0101] In order to enable the detected target to better understand the running status of the train, based on the above embodiments, in some embodiments, the method further includes:
[0102] S17: Obtain train status information;
[0103] S18: The brain wave signal containing the train status information is sent to the crew and / or train operation and maintenance personnel through the brain wave sending device.
[0104] In a specific implementation, the train status information can also be obtained, and the brain wave signal containing the train status information can be further sent to the crew and / or train operation and maintenance personnel through the brain wave sending device, so that the staff on the train can better understand the operation of the train and control the train.
[0105] In the above embodiments, the train control method is described in detail, and the present application also provides corresponding embodiments of the train control device.
[0106] FIG3 is a schematic diagram of a train control device provided in an embodiment of the present application. The device is applied to a brain wave train control system; the brain wave control system includes a brain wave processing device and multiple brain wave transmitting devices; the brain wave processing device and each brain wave transmitting device are in communication connection; as shown in FIG3 , the device includes:
[0107] The determination module 10 is used to determine the detected target within the corresponding detection range through the brain wave sending device, and send a brain wave signal containing vehicle travel service information to the detected target.
[0108] The first judgment module 11 is used to judge whether the brain wave sending device receives the brain wave signal representing the vehicle control request sent by the measured target; if it is confirmed that the brain wave signal representing the vehicle control request sent by the measured target is received, the transceiver module 12 is triggered.
[0109] The transceiver module 12 is used to send a brain wave signal representing an identity authentication request to the target under test through a brain wave sending device, and receive a brain wave signal containing identity authentication information fed back by the target under test according to the identity authentication request.
[0110] The second judgment module 13 is used to judge whether the target under test has passed the identity authentication according to the identity authentication information; if it is confirmed that the target under test has passed the identity authentication, the permission opening module 14 is triggered.
[0111] The permission opening module 14 is used to open the brainwave interaction permission between the brainwave processing device and the target to be measured, so that the target to be measured can interact with the brainwave processing device to control the vehicle.
[0112] Since the embodiments of the apparatus part correspond to the embodiments of the method part, please refer to the description of the embodiments of the method part for the embodiments of the apparatus part, which will not be repeated here.
[0113] FIG4 is a schematic diagram of a train control device provided in an embodiment of the present application. As shown in FIG4 , the train control device includes:
[0114] A memory 20, for storing computer programs;
[0115] The processor 21 is used to implement the steps of the train control method mentioned in the above embodiment when executing the computer program.
[0116] The train control device provided in this embodiment may include but is not limited to a smart phone, a tablet computer, a laptop computer or a desktop computer.
[0117] Among them, the processor 21 may include one or more processing cores, such as a 4-core processor, an 8-core processor, etc. The processor 21 can be implemented in at least one hardware form of a digital signal processor (DSP), a field programmable gate array (FPGA), and a programmable logic array (PLA). The processor 21 may also include a main processor and a coprocessor. The main processor is a processor for processing data in an awake state, also known as a central processing unit (CPU); the coprocessor is a low-power processor for processing data in a standby state. In some embodiments, the processor 21 may be integrated with a graphics processing unit (GPU), and the GPU is responsible for rendering and drawing the content to be displayed on the display screen. In some embodiments, the processor 21 may also include an artificial intelligence (AI) processor, which is used to process computing operations related to machine learning.
[0118] The memory 20 may include one or more computer-readable storage media, which may be non-transitory. The memory 20 may also include a high-speed random access memory, and a non-volatile memory, such as one or more disk storage devices, flash memory storage devices. In this embodiment, the memory 20 is at least used to store the following computer program 201, wherein, after the computer program is loaded and executed by the processor 21, it can implement the relevant steps of the train control method disclosed in any of the aforementioned embodiments. In addition, the resources stored in the memory 20 may also include an operating system 202 and data 203, etc., and the storage method may be temporary storage or permanent storage. Among them, the operating system 202 may include Windows, Unix, Linux, etc. Data 203 may include but is not limited to data related to the train control method.
[0119] In some embodiments, the train control device may also include a display screen 22 , an input / output interface 23 , a communication interface 24 , a power supply 25 , and a communication bus 26 .
[0120] Those skilled in the art will appreciate that the structure shown in FIG. 4 does not constitute a limitation on the train control device and may include more or fewer components than those shown in the figure.
[0121] Finally, the present application also provides an embodiment corresponding to a computer-readable storage medium. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps recorded in the above method embodiment are implemented.
[0122] It is understandable that if the method in the above embodiment is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk and other media that can store program code.
[0123] The above is a detailed introduction to a train control method, device, equipment and medium provided by the present application. The various embodiments in the specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the various embodiments can be referenced to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present application, several improvements and modifications can be made to the present application, and these improvements and modifications also fall within the scope of protection of the present application.
[0124] It should also be noted that, in this specification, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprise", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the statement "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.
Claims
1. A train control method, characterized in that: Applicable to a brain wave train control system; the brain wave control system comprises a brain wave processing device and a plurality of brain wave transmitting devices; The brain wave processing device is communicatively connected with each brain wave sending device; the method comprises: Determine the detected target within the corresponding detection range through the brain wave sending device, and send the brain wave signal containing the vehicle travel service information to the detected target; Determining whether the brain wave transmitting device receives the brain wave signal representing the vehicle control request sent by the measured target; If it is confirmed that the brain wave signal representing the vehicle control request sent by the measured target is received, the brain wave signal representing the identity authentication request is sent to the measured target through the brain wave sending device, and the brain wave signal containing the identity authentication information fed back by the measured target according to the identity authentication request is received; Determine whether the target under test has passed the identity authentication according to the identity authentication information; If it is confirmed that the target has passed the identity authentication, the brainwave interaction permission between the brainwave processing device and the target is opened, so that the target can interact with the brainwave processing device to control the vehicle.
2. The train control method according to claim 1, characterized in that: The brainwave processing device is arranged in the head car of the train, and each brainwave transmitting device is arranged in each car of the train, and each brainwave transmitting device is communicatively connected in sequence.
3. The train control method according to claim 1, characterized in that: The step of sending a brain wave signal representing an identity authentication request to a target under test by means of a brain wave sending device, and receiving a brain wave signal containing identity authentication information fed back by the target under test according to the identity authentication request, comprises: Sending a brain wave signal representing a key verification request to the target under test through a brain wave sending device; Receiving the brain wave signal containing the key fed back by the target through the brain wave transmitting device; Correspondingly, judging whether the detected target has passed the identity authentication according to the identity authentication information includes: Determine whether the key fed back by the target is correct; If the key is confirmed to be correct, it is confirmed that the target has passed the identity authentication; If the confirmation key is wrong, it is confirmed that the target under test has not passed the identity authentication.
4. The train control method according to claim 1, characterized in that: After the brainwave processing device and the target being measured have brainwave interaction rights opened, the method further includes: Sending a brain wave signal representing a secondary identity authentication request to the target under test through a brain wave transmitting device, and receiving a brain wave signal containing secondary identity authentication information fed back by the target under test according to the secondary identity authentication request; The operating authority of the target under test for the train is determined based on the secondary identity authentication information, and the operating authority of the train is opened to the target under test.
5. The train control method according to claim 4, characterized in that: Determining the operating authority of the detected target for the train according to the secondary identity authentication information includes: When the measured target is determined to be a crew member according to the secondary identity authentication information, the operation authority of the measured target is determined to be the weak current system control authority; When the target to be measured is determined to be a train operation and maintenance personnel according to the secondary identity authentication information, the operation authority of the target to be measured is determined to be the whole vehicle control authority; Among them, train operation and maintenance personnel include at least drivers, mechanics and inspection and maintenance personnel.
6. The train control method according to claim 5, characterized in that: The step of opening the train operation rights to the target under test includes: When the target to be measured is determined to be a crew member, the control authority of the train's weak current system is opened to the target to be measured; When the target to be tested is determined to be a driver or a mechanic, the control authority of the entire train is opened to the target to be tested; When the target to be measured is determined to be a maintenance personnel, it is determined whether the current train is in operation; If yes, then the control authority of the train's weak current system is opened to the target under test; If not, the entire train control authority is opened to the target under test.
7. The train control method according to claim 5 or 6, characterized in that: Also includes: Get train status information; The brain wave signal containing the train status information is sent to the crew and / or train operation and maintenance personnel through the brain wave sending device.
8. A train control device, characterized in that: Applicable to a brain wave train control system; the brain wave control system comprises a brain wave processing device and a plurality of brain wave transmitting devices; The brain wave processing device is communicatively connected with each brain wave sending device; the device comprises: A determination module, used to determine the detected target within the corresponding detection range through the brain wave sending device, and send a brain wave signal containing vehicle travel service information to the detected target; The first judgment module is used to judge whether the brain wave sending device has received the brain wave signal representing the vehicle control request sent by the measured target; if it is confirmed that the brain wave signal representing the vehicle control request sent by the measured target has been received, the transceiver module is triggered; The transceiver module is used to send a brain wave signal representing an identity authentication request to the target under test through a brain wave sending device, and receive a brain wave signal containing identity authentication information fed back by the target under test according to the identity authentication request; The second judgment module is used to judge whether the target under test has passed the identity authentication according to the identity authentication information; if it is confirmed that the target under test has passed the identity authentication, the permission opening module is triggered; The permission opening module is used to open the brainwave interaction permission between the brainwave processing device and the target to be measured, so that the target to be measured can interact with the brainwave processing device to control the vehicle.
9. A train control device, characterized in that: include: Memory for storing computer programs; A processor, configured to implement the steps of the train control method as claimed in any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the train control method according to any one of claims 1 to 7 are implemented.