Construction method for mounting 7-shaped cantilever pipe truss
Through unsupported construction method and pre-reverse deformation treatment, combined with lifting auxiliary devices and guide centering structure, the rapid high-altitude installation of 7-shaped cantilever tube trusses is achieved, solving the problems of long construction period and high safety risks, and reducing temporary Support costs and high-altitude welding workload.
Patent Information
- Application Number
- CN202411214312.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-31
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-08-31
AI Technical Summary
The high-altitude installation of 7-shaped cantilever tube truss structures has high safety risks, long construction period and high costs, especially the lack of rapid positioning methods and high altitude welding workload, and the temporary support cost is high.
Unsupported construction method is adopted, structural deformation is calculated through overall modeling analysis, pre-reverse deformation treatment is performed, and corresponding reverse deformation quantity control is performed during factory processing, operating platform and finished support are set up, and lifting auxiliary devices and guides are used. The centering structure achieves rapid installation and reduces high-altitude welding and temporary support.
The 7-shaped cantilever tube truss is installed in place at a high altitude at one time, reducing temporary support costs, shortening construction periods, reducing safety risks and high-altitude operation time.
Smart Images

Figure CN119062005A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a construction method for installing a 7-shaped cantilever tube truss. Background Art
[0002] The tube truss structure is a lattice structure composed of round rods connected at the ends. The trusses make the truss structure economical in material, light in weight, and easy to form various shapes to suit different uses, such as simply supported trusses, arches, frames and towers.
[0003] In spatial steel structures, the 7-shaped cantilever tube truss structure is usually used in the design of roof canopies in large outdoor stadiums or public buildings. The high-altitude installation of the 7-shaped truss requires operators to operate on the truss, which poses a high safety risk. At present, the construction methods of the 7-shaped cantilever tube truss structure include the following two methods: 1. The 7-shaped cantilever tube truss structure is manufactured in two sections in the factory, and then the two sections are assembled on the ground at the construction site, and then installed by high-altitude docking, but temporary supports are set at the docking point of the two sections; 2. When the equipment has sufficient lifting capacity and the on-site working conditions are good, the overall ground assembly is used and then installed at high altitude at one time. Among them, the first construction method has the disadvantages of large workload of high-altitude welding, difficult quality control, prominent safety risks of high-altitude operations, and high cost of temporary facilities. It is generally used for structures with large cantilever lengths or structures that cannot be hoisted and constructed as a whole at one time due to restrictions on lifting equipment and sites; the second construction method is divided into two cases: with support and without support. When there is support, it is usually necessary to set up temporary steel structure support at the cantilever end. After the roof steel structure construction is completed, the temporary support is removed. After the overall unloading is completed, the roof metal system is continued to be constructed. It has the disadvantages of high cost of measures and long construction period. The unsupported hoisting lacks a quick positioning method for multiple installation nodes, and also has the disadvantages of high cost of measures, long construction period, and great construction difficulty. Summary of the invention
[0004] In view of this, the purpose of the present invention is to provide a construction method for the installation of a 7-shaped cantilever tube truss, which utilizes a support-free construction method to install the 7-shaped cantilever tube truss structure in place at high altitude at one time; and by simulating the construction steps in advance, calculating and analyzing the overall stress and deformation of the structure, and taking pre-reverse deformation measures, so as to achieve reasonable structural stress and deformation that meets the requirements of the specifications, thereby reducing the investment in temporary support costs.
[0005] The present invention provides a construction method for installing a 7-shaped cantilever tube truss, comprising the following steps:
[0006] S1. Model the 7-shaped cantilever tube truss structure to be installed as a whole, and analyze and calculate the maximum downward deformation of the cantilever section during the construction phase, and then make the corresponding reverse deformation when processing the truss structure in the factory to control the overall deformation;
[0007] S2. Before installing the truss, set up an operating platform near the structural column at the installation node and install the finished support, and then install a centering structure for centering the hemispherical structure installation guide on the tube truss on the finished support;
[0008] S3. Assemble and weld the truss on the ground assembly stand according to the design drawings, and after the welding quality is inspected and accepted, install the truss lifting auxiliary device and ladder on the truss;
[0009] S4. Use lifting equipment to lift the truss and lift it off the ground appropriately. The operator climbs up the truss through a ladder and adjusts the truss lifting state to the installation state through the lifting auxiliary device;
[0010] S5. Use the lifting equipment to transfer the truss to the top of the installation node, and check whether the truss is in the hoisting state. If it is correct, use the centering structure on the finished support to center the truss installation guide, and then weld the hemispherical structure on the tube truss to the finished support;
[0011] S6. Unhook the lifting equipment and remove the redundant lifting auxiliary devices on the truss to complete the lifting of the single truss.
[0012] Further, in step S1, the reverse deformation amount of the truss structure during factory processing is half of the maximum downward deformation amount.
[0013] Further, in step S2, the centering structure includes an outer stop block arranged on the mounting surface of the finished product support and a guide centering component symmetrically arranged on the side wall of the finished product support, the guide centering component includes a support seat for connecting with the side wall of the finished product support, a limit block and a support plate arranged on the support seat, and a guide plate rotatably arranged on the support plate, the limit block is provided with a limit surface that can limit the rotation angle of the guide plate, and the guide plate is squeezed and rotated toward the limit block during the falling process of the hemispherical structure on the tube truss until it contacts the upper limit surface of the limit block and cooperates with the outer stop block to center the hemispherical structure on the tube truss on the mounting surface of the finished product support.
[0014] Furthermore, the distance between the rotation point of the guide plate in its length direction and the end close to the hemispherical structure on the tube truss is smaller than the distance between the rotation point and the end far from the hemispherical structure on the tube truss.
[0015] Furthermore, it also includes an inner stopper arranged on the mounting surface of the finished product support, and the inner stopper is used to limit the flipping of the guide plate in a free state.
[0016] Furthermore, it also includes a pushing component for making the hemispherical structure on the tube truss close to the push-out block, and the pushing component is arranged on the opposite side wall of the finished support close to the side wall of the outer stop block; the pushing component includes a jack and a jack support seat for installing the jack, and the jack support seat is connected and fixed to the side wall of the finished support.
[0017] Further, in step S3, the lifting auxiliary device includes a slip rope, a safety wire rope, a lifting wire rope, a reflective sticker and a hand winch.
[0018] Further, in steps S4 and S5, the operator adjusts the hoisting state of the truss mainly by pulling the lifting wire rope with a hand winch to adjust the hoisting state of the truss, and then uses a total station to align the reflective sticker to verify or check whether the truss is in the installed state.
[0019] Further, in step S6, redundant lifting auxiliary devices including slip ropes, hand winches and lifting wire ropes are removed.
[0020] The present invention has the following beneficial effects:
[0021] 1. Overall assembly, no support: Through force analysis and calculation, the force and deformation of the structure without support are verified. Under the condition of safe force, the overall ground welding is adopted, and the high-altitude hoisting is put into place. The truss is not segmented and there is no high-altitude welding;
[0022] 2. Effectively control the deformation of the truss structure: According to the calculation and analysis of the structure, pre-deformation measures are adopted during the structural in-depth design and assembly to reduce the deformation of the truss structure.
[0023] 3. Quick installation: A quick centering device is designed at the support of the truss structure to enable the truss structure to be quickly and accurately positioned at high altitude, thus reducing the time for high altitude installation and lowering safety management risks. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:
[0025] Figure 1 It is a structural schematic diagram of the centering structure in the present invention in a free state on a finished support;
[0026] Figure 2 It is a schematic diagram of the structure after the finished support and the hemispherical structure are aligned in the present invention;
[0027] Figure 3 It is a top view of the structure after the finished support and the hemispherical structure are aligned in the present invention;
[0028] Figure 4 It is a schematic diagram of the structure of other angles after the finished support and the hemispherical structure are aligned in the present invention;
[0029] Figure 5 It is a schematic diagram of the installation structure of the 7-shaped cantilever tube truss in the present invention;
[0030] Explanation of the accompanying drawings: 1-structural column; 2-finished product support; 3-hemispherical structure; 4-support seat; 5-support plate; 6-limiting block; 7-guide plate; 8-inner stopper; 9-jack support seat; 10-jack; 11-outer stopper; 12-ladder; 13-slip rope; 14-lifting wire rope; 15-safety wire rope; 16-hand hoist; 17-crane cable; 18-reflective sticker; 19-operating platform. DETAILED DESCRIPTION
[0031] The present invention provides a construction method for installing a 7-shaped cantilever tube truss, comprising the following steps:
[0032] S1. Model the 7-shaped cantilever tube truss structure to be installed as a whole, and analyze and calculate the maximum downward deformation of the cantilever section during the construction phase. Then, when processing the truss structure in the factory, make the corresponding reverse deformation to control the overall deformation; the reverse deformation of the truss structure during factory processing is half of the maximum downward deformation. For example, if the maximum downward deformation of the cantilever section is a, then the reverse deformation should be a / 2 during truss processing, thereby achieving the purpose of controlling the overall deformation;
[0033] S2. Before the truss is installed, an operating platform 19 is set up near the structural column 1 at the installation node and the finished support 2 is installed, and then a centering structure for installing a guide centering on the hemispherical structure 3 on the tube truss is installed on the finished support 2;
[0034] S3. According to the design drawings, the truss is assembled and welded on the ground assembly stand, and the welding quality is inspected and accepted, and then the truss lifting auxiliary device and the ladder 12 are installed on the truss; the ladder is used for the operator to climb to the lifting point of the truss to adjust the truss lifting state after the truss is hoisted;
[0035] S4. Use a lifting device to lift the truss and leave the ground appropriately. The operator climbs up the truss through the ladder 12 and adjusts the truss hoisting state to the installation state through the lifting auxiliary device;
[0036] S5. Then use the lifting equipment to transfer the truss to the top of the installation node, and check whether the truss is in the hoisting state. After it is correct, use the centering structure on the finished support to center the truss installation guide, and then weld the hemispherical structure 3 on the tube truss to the finished support 2;
[0037] S6. Unhook the lifting equipment and remove the redundant lifting auxiliary devices on the truss to complete the lifting of the single truss.
[0038] In this embodiment, in step S1, in this embodiment, in step S2, the centering structure includes an outer stopper 11 arranged on the mounting surface of the finished support and a guide centering component symmetrically arranged on the side wall of the finished support 2; combined Figure 1 As shown, by respectively arranging an outer stopper 11 and a guide centering component on the finished support 2 to form a three-sided guide structure, the hemispherical structure 3 on the tube truss can rely on the outer stopper 11 and the guide centering component to achieve rapid installation guidance during the lifting and falling process, and the hemispherical structure 3 can fall at a central position on the finished support 2 to complete welding and fixation, thereby solving the problem in the prior art of lacking a device for quickly installing and positioning the finished support with the hemispherical structure at the truss installation node, and enabling the hemispherical structure on the tube truss to be quickly aligned with the finished support at the installation node and installed in place at one time, thereby reducing the time for high-altitude operations, saving construction period, and reducing safety risks.
[0039] In this embodiment, the guide centering component includes a support seat 4 for connecting to the side wall of the finished product support 2, a limit block 6 and a support plate 5 arranged on the support seat 4, and a guide plate 7 rotatably arranged on the support plate 5, wherein the limit block 6 is provided with a limit surface that can limit the rotation angle of the guide plate 7, and the guide plate 7 is squeezed and rotated toward the limit block 6 during the falling process of the hemispherical structure 3 on the tube truss until it contacts the upper limit surface of the limit block 6 and cooperates with the outer stopper 11 to center the hemispherical structure 3 on the tube truss on the installation surface of the finished product support 2; combined with Figures 1 to 4 As shown, the guide plate 7 is connected to the support plate 5 by bolts, so that the guide plate 7 can rotate on the support plate 5 toward the direction close to the limit block 6 when the upper hemispherical structure 3 is squeezed during the falling process; when the hemispherical structure 3 on the tube truss is installed, it gradually falls from the wider upper opening formed by the symmetrically arranged guide plates 7, and is forced to be centered along the outer baffle plate 11; when the hemispherical structure 3 on the tube truss falls to the lower section of the guide plate 7, the guide plate 7 rotates and abuts against the limit surface on the limit block 6, and the hemispherical structure 3 on the tube truss continues to fall along the guide plate 7 until it is stuck between the inner stop block 8 and the guide plate 7, completing the forced centering process.
[0040] In this embodiment, the distance between the rotation point of the guide plate 7 in its length direction and the end close to the hemispherical structure 3 on the tube truss is smaller than the distance between the rotation point and the end away from the hemispherical structure 3 on the tube truss; Figure 1 As shown, the guide plate 7 is a structure with a long upper section and a short lower section. Due to the unbalanced deadweight, the guide plate 7 is always in an outwardly inclined state in a free state, so that a larger opening is formed between the two symmetrically arranged guide plates 7 for the hemispherical structure 3 to fall into the centering structure.
[0041] In this embodiment, an inner stopper 8 is also provided on the mounting surface of the finished support, and the inner stopper 8 is used to limit the rotation of the guide plate 7 in the free state; Figure 2 and Figure 4 As shown, since the guide plate 7 has a structure with a long upper section and a short lower section and is always in an outwardly inclined state in a free state, in order to prevent the guide plate 7 from rotating excessively and leaving the mounting surface of the finished support 2 in the vertical direction, an inner stopper 8 is provided on the mounting surface of the finished support 2 to limit the maximum outwardly inclined angle of the guide plate 7 so as to prevent the guide plate 7 from rotating excessively and leaving the mounting surface of the finished support 2 in a vertical direction.
[0042] In this embodiment, it also includes a pushing component, which is arranged on the opposite side wall of the finished support 2 close to the side wall of the outer stop block 11; the pushing component includes a jack 10 and a jack support seat 9 for installing the jack 10, and the jack support seat 9 is connected and fixed to the side wall of the finished support 2; when the hemispherical structure 3 on the pipe truss falls on the mounting surface of the finished support 2 through the outer stop block 11 and the guide centering component, the hemispherical structure 3 and the finished support 2 are welded, and in order to ensure the welding strength between the hemispherical structure 3 and the finished support 2, when the hemispherical structure 3 on the pipe truss is about to fall on the mounting surface of the finished support 2, the jack 10 is used to push the hemispherical structure 3 to fit tightly with the outer stop block 1 to achieve centering, and then before the hemispherical structure 3 and the finished support 2 are welded, the hemispherical structure 3 is clamped between the jack 10 and the outer stop block 11 to ensure the welding strength between the hemispherical structure 3 and the finished support 2.
[0043] In this embodiment, in step S3, the lifting auxiliary device includes a slip rope 13, a safety wire rope 15, a lifting wire rope 14, a reflective sticker 18 and a hand chain hoist 16; Figure 5 As shown, one end of the lifting wire rope 14 is fixed on the upper chord of the 7-shaped cantilever tube truss, and the other end is connected and fixed to the hand winch 16 which is also fixed on the upper chord of the 7-shaped cantilever tube truss. The crane cable 17 is connected to the lifting wire rope 14 for lifting. The slip rope 13 and the hand winch 16 are used to adjust the lifting state of the truss. The safety wire rope 15 is used for the operator to wear a safety belt on the truss. There are two reflective stickers 18 which are respectively set on the lower chord of the 7-shaped cantilever tube truss and are used to cooperate with the total station to verify the lifting state of the truss.
[0044] In this embodiment, in steps S4 and S5, the operator adjusts the hoisting state of the truss mainly by pulling the lifting wire rope with a hand winch to adjust the hoisting state of the truss, and then uses the total station to align with the reflective sticker to verify or check whether the truss is in the installation state; the operator first climbs up the truss through the ladder 12, and then adjusts the hand winch 16 to keep the left and right chords of the truss in the same plane, and then the surveyor measures the coordinates of the two points on the ground with the total station aimed at the reflective sticker 18 to calculate the H value, and compares it with the calculated value of the designed roof slope H1=Ltanα, adjusts the hand winch 16 to change the truss elevation angle, so that H=H1; after the lifting equipment transfers the truss to the top of the installation node, the total station is used to remeasure the H value, and further adjust it if there is any change.
[0045] In this embodiment, in step S6, only the slip rope 13, the lifting wire rope 14 and the hand winch 16 need to be removed from the truss, and other parts can be left on the truss for subsequent inspection or maintenance.
[0046] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.
Claims
1. A construction method for installing a 7-shaped cantilever tube truss, characterized in that: The following steps are involved: S1. Model the 7-shaped cantilever tube truss structure to be installed as a whole, and analyze and calculate the maximum downward deformation of the cantilever section during the construction phase, and then make the corresponding reverse deformation when processing the truss structure in the factory to control the overall deformation; S2. Before installing the truss, set up an operating platform near the structural column at the installation node and install the finished support, and then install a centering structure for centering the hemispherical structure installation guide on the tube truss on the finished support; S3. Assemble and weld the truss on the ground assembly stand according to the design drawings, and after the welding quality is inspected and accepted, install the truss lifting auxiliary device and ladder on the truss; S4. Use lifting equipment to lift the truss and lift it off the ground appropriately. The operator climbs up the truss through a ladder and adjusts the truss lifting state to the installation state through the lifting auxiliary device; S5. Use the lifting equipment to transfer the truss to the top of the installation node, and check whether the truss is in the hoisting state. If it is correct, use the centering structure on the finished support to center the truss installation guide, and then weld the hemispherical structure on the tube truss to the finished support; S6. Unhook the lifting equipment and remove the redundant lifting auxiliary devices on the truss to complete the lifting of the single truss.
2. The construction method for installing a 7-shaped cantilever tube truss according to claim 1, characterized in that: In step S1, the reverse deformation of the truss structure during factory processing is half of the maximum downward deformation.
3. The construction method for installing a 7-shaped cantilever tube truss according to claim 1, characterized in that: In step S2, the centering structure includes an outer stop block arranged on the mounting surface of the finished product support and a guide centering component symmetrically arranged on the side wall of the finished product support, the guide centering component includes a support seat for connecting with the side wall of the finished product support, a limit block and a support plate arranged on the support seat, and a guide plate rotatably arranged on the support plate, the limit block is provided with a limit surface that can limit the rotation angle of the guide plate, and the guide plate is squeezed and rotated toward the limit block during the falling process of the hemispherical structure on the tube truss until it contacts the upper limit surface of the limit block and cooperates with the outer stop block to center the hemispherical structure on the tube truss on the mounting surface of the finished product support.
4. The construction method for installing a 7-shaped cantilever tube truss according to claim 3, characterized in that: The distance between the rotation point of the guide plate in its length direction and the end close to the hemispherical structure on the tube truss is smaller than the distance between the rotation point and the end far from the hemispherical structure on the tube truss.
5. The construction method for installing a 7-shaped cantilever tube truss according to claim 4, characterized in that: It also includes an inner stopper arranged on the mounting surface of the finished support, and the inner stopper is used to limit the flipping of the guide plate in a free state.
6. The construction method for installing a 7-shaped cantilever tube truss according to claim 5, characterized in that: It also includes a pushing assembly for making the hemispherical structure on the pipe truss close to the push-out block, and the pushing assembly is arranged on the opposite side wall of the finished support close to the side wall of the outer stop block; the pushing assembly includes a jack and a jack support seat for installing the jack, and the jack support seat is connected and fixed to the side wall of the finished support.
7. The construction method for installing a 7-shaped cantilever tube truss according to claim 1, characterized in that: In step S3, the lifting auxiliary device includes a slip rope, a safety wire rope, a lifting wire rope, a reflective sticker and a hand winch.
8. The construction method for installing a 7-shaped cantilever tube truss according to claim 7, characterized in that: In steps S4 and S5, the operator adjusts the hoisting state of the truss mainly by pulling the lifting wire rope with a hand winch to adjust the hoisting state of the truss, and then uses a total station to align the reflective sticker to verify or check whether the truss is in the installed state.
9. The construction method for installing a 7-shaped cantilever tube truss according to claim 1, characterized in that: In step S6, redundant lifting auxiliary devices including slip ropes, hand winches and lifting wire ropes are removed.
Citation Information
Patent Citations
Large 7-shaped truss structure turn-over lifting method
CN109653513A
Zone module construction method of steel structure construction
WO1994027003A1
Construction operation method and system for outer curtain walls of high-altitude large-span building corridor
WO2023201837A1