By obtaining the map modeling information of the building and configuring the equipment attributes, and using building robots for on-site control, the problem of the existing technology being difficult to control devices without IoT functions is solved, and reliable centralized control of these devices is achieved, avoiding the Requirements for equipment updates.
Patent Information
- Application Number
- CN202411563789.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
It is difficult to control equipment that do not have IoT functions at a low cost, and updating these equipment is expensive.
By obtaining the map modeling information of the building, configuring equipment attribute information, and using the building robot to perform on-site control according to the control instructions, combining the map modeling and configuration information to determine whether the control instructions are successful, and if they fail, they will be executed repeatedly.
Centralized control of building equipment that does not have IoT functions is achieved, ensuring the reliability of control instructions and avoiding the necessity of replacing equipment.
Smart Images

Figure CN119065263A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building control, and in particular to an intelligent building control method and system. Background Art
[0002] Building control, also known as Building Automation System (BAS), is a system that centrally manages and decentralized controls equipment in a building. It intelligently controls and manages various equipment in the building, such as heating, air conditioning, water supply and drainage, elevators, lighting equipment, etc.
[0003] At present, it is usually necessary for the equipment in the building to have communication capabilities and support the Internet of Things technology in order to connect the building equipment to the building automation system and centrally manage and control the building equipment. However, for the equipment already installed in the building, if it does not support the Internet of Things function and cannot communicate, it is impossible to centrally control the equipment, and updating these devices requires a high cost. Therefore, how to achieve low-cost control of the equipment installed in the building that does not have the Internet of Things function is a problem that needs to be solved urgently. Summary of the invention
[0004] In order to realize the control of the devices installed in the building but without the Internet of Things function at a low cost, the present application provides a smart building control method and system.
[0005] In the first aspect, the present application provides an intelligent building control method, which adopts the following technical solution: An intelligent building control method, comprising: Obtain map modeling information of the target building; Configure property information of building equipment; Receive control instructions for target building equipment from the building control center; Based on the map modeling information and the control instruction, control the building robot to move to the target building equipment represented by the control instruction to perform on-site control of the target building equipment; Based on the configuration information, determine whether the execution of the control instruction is successful. If so, return the execution completion feedback to the building control center; if not, repeat the execution of the control instruction.
[0006] Optionally, the attribute information includes a unique identifier, trigger mode and status information of the building equipment; the attribute information of the configured building equipment includes: Generate a unique identifier for the building equipment based on the location of the building equipment in the target building; Configure the triggering methods allowed by the building equipment; wherein the control method includes infrared triggering and physical button triggering; Obtain the initial state of the building equipment and the trigger state after the trigger mode is correctly executed to obtain the state information.
[0007] Optionally, the configuration of the triggering mode allowed by the building equipment includes: If the triggering method is infrared triggering, then obtaining the infrared signal of the building equipment performing the preset action, and analyzing the coding information and frequency information of the pulse sequence of the infrared signal corresponding to each preset action; or, If the triggering mode is physical button triggering, the image data of the building equipment is acquired, and the features of the physical buttons in the image data are extracted to obtain button features.
[0008] Optionally, the types of the state information include static state and environment variable state; the initial state of the building equipment and the trigger state after the trigger mode is correctly executed are obtained to obtain the state information, including: If the type of the state information is a static state, a first image of the building equipment in an initial state and a second image of the trigger state after the trigger mode is correctly executed are respectively acquired; obtaining the state information based on the first image and the second image; If the type of the state information is an environmental variable state, obtaining first sensor data of the surrounding environment of the building equipment in an initial state and second sensor data of a trigger state after the trigger mode is correctly executed; The difference between the first sensor data and the second sensor data is used as the state information.
[0009] Optionally, based on the map modeling information and the control instruction, controlling the building robot to move to a target building device represented by the control instruction to perform on-site control of the target building device includes: Parse the control instructions to obtain the unique identification and triggering method of the target building equipment; Decoding the unique identifier to obtain location information of the target building equipment, and controlling the building robot to move to the target building equipment based on the location information and map modeling information; The target building equipment is controlled on-site according to the triggering method.
[0010] Optionally, based on the configuration information, determining whether the execution of the control instruction is successful includes: Get the status information in the configuration information; Obtaining on-site status information of target building equipment after executing control instructions; The status information in the configuration information is compared with the field status information. If the comparison result is a match, it is determined that the execution of the control instruction is successful; if the comparison result is a mismatch, it is determined that the execution of the control instruction fails.
[0011] Optionally, also include: Obtain inspection tasks from the building control center; Based on the inspection task and the map modeling information, the building robot is controlled to collect on-site status information of each of the building devices in the area specified by the inspection task.
[0012] In a second aspect, the present application provides an intelligent building control system, which adopts the following technical solutions: An intelligent building control system, comprising: A map acquisition module is used to obtain map modeling information of a target building; Configuration module, used to configure property information of building equipment; A command receiving module, used for receiving control commands of target building equipment from a building control center; An execution module, configured to control the building robot to move to a target building device represented by the control instruction based on the map modeling information and the control instruction, and to perform on-site control on the target building device; The feedback module is used to determine whether the execution of the control instruction is successful based on the configuration information. If so, it returns the execution completion feedback to the building control center; if not, it repeats the execution of the control instruction.
[0013] In a third aspect, the present application provides a computer device, which adopts the following technical solution: A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program according to any one of the above methods.
[0014] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution: A computer-readable storage medium includes a computer program that can be loaded by a processor and executed in the above method.
[0015] In summary, the present application includes the following beneficial technical effects: First, the map modeling information of the target building is obtained to ensure that the building robot can accurately identify and navigate to various locations in the building when performing tasks. Then, by configuring attribute information for the device, when the building robot receives the control instruction later, the corresponding control operation is performed according to the specific attributes of the building equipment. Finally, the building robot moves to the target building equipment for on-site control according to the map modeling information and the control instruction. During the execution process, it is also determined whether the control instruction is successfully executed based on the configuration information. If successful, the feedback of the execution completion is immediately returned to the building control center; if it fails, the control instruction is repeatedly executed according to the preset logic. Thereby ensuring the reliability of the building robot controlling the building equipment to execute the control instruction, through the transmission of the control instruction between the building control center and the building robot, the building robot realizes the on-site control of the building equipment without the Internet of Things capability, so as to realize the centralized control of the building equipment without the Internet of Things function installed in the target building without the need to replace the original building equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 is a flow chart of an intelligent building control method according to one embodiment of the present application; Figure 2 This is a flow chart of a method for generating status information in one embodiment of the present application; Figure 3 This is a flow chart of a method for generating different types of status information in one embodiment of the present application; Figure 4 is a flow chart of a method for performing on-site control of building equipment according to one embodiment of the present application; Figure 5 This is a flow chart of a method for feeding back execution results in one embodiment of the present application; Figure 6 It is a schematic diagram of an intelligent building control system according to one embodiment of the present application. DETAILED DESCRIPTION
[0017] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0018] The present application embodiment discloses a smart building control method. Figure 1 , an intelligent building control method, comprising: Step S101: Obtaining map modeling information of a target building; The map modeling information includes the floor plan, floor layout, building equipment location, door location, emergency exit and other information of the target building. The map modeling information can be obtained through preliminary on-site surveys, for example, by using sensors such as lidar and cameras to scan and build a three-dimensional model. Through the map modeling information, the building robot can obtain the spatial structure of the target building in order to plan the optimal movement path.
[0019] Step S102: configuring property information of building equipment; Among them, the attribute information includes the unique identification, triggering method and status information of the building equipment.
[0020] As an example, building equipment includes elevators, air conditioners and lighting systems. The triggering method refers to the method of controlling the building equipment, for example, elevators and lighting systems can be controlled by buttons, and air conditioners can be controlled by infrared information.
[0021] Step S103: receiving a control instruction of a target building device from a building control center; As an example, a building control center can be a central system responsible for monitoring, management, and control of the entire target building, capable of receiving control instructions from various sources, such as user requests, preset plans, sensor data, etc., in order to issue appropriate control instructions, which are sent by the building control center to the building robot.
[0022] The control instruction includes the unique identification and triggering method of the target building equipment.
[0023] Step S104: Based on the map modeling information and the control instruction, the building robot is controlled to move to the target building equipment represented by the control instruction to perform on-site control of the target building equipment.
[0024] The building robot is connected to the building control center through remote communication. The building robot is applied to the target building environment to execute tasks from the building control center. After the building robot reaches the target building equipment represented by the control instruction, the building robot interacts with the target building equipment through physical contact or wireless communication according to the action represented by the control instruction, and executes the control action, thus realizing remote control without updating the building equipment.
[0025] Step S105: Based on the configuration information, determine whether the execution of the control instruction is successful, if yes, execute step S106; if no, execute step S107; Step S106: Return the execution completion feedback to the building control center; Step S107: Repeat the execution of the control instruction.
[0026] In the above implementation, first, the map modeling information of the target building is obtained to ensure that the building robot can accurately identify and navigate to various locations in the building when performing tasks. Then, by configuring attribute information for the device, when the building robot receives the control instruction later, the corresponding control operation is performed according to the specific attributes of the building equipment. Finally, the building robot moves to the target building equipment for on-site control according to the map modeling information and the control instruction. During the execution process, it is also determined whether the control instruction is successfully executed based on the configuration information. If successful, the feedback of the execution completion is immediately returned to the building control center; if failed, the control instruction is repeatedly executed according to the preset logic. Thereby ensuring the reliability of the building robot controlling the building equipment to execute the control instruction, through the transmission of the control instruction between the building control center and the building robot, the building robot realizes the on-site control of the building equipment without the Internet of Things capability, so as to realize the centralized control of the building equipment without the Internet of Things function installed in the target building without the need to replace the original building equipment.
[0027] Reference Figure 2 As an implementation of step S102, step S102 specifically includes steps S1021 to S1023, which are described in detail below.
[0028] Step S1021: Generate a unique identifier of the building equipment based on the location of the building equipment in the target building.
[0029] The location of the building equipment is derived from the map modeling data of the target building, including the floor, specific coordinates and equipment orientation of the building equipment. Since the location of the building equipment is unique in the same target building, in this implementation, the location of the building equipment in the target building can be used to generate a unique identifier that can uniquely characterize the building equipment. At the same time, since the unique identifier can be reversely parsed to obtain the location of the building equipment, there is no need to repeatedly record the location of the building equipment.
[0030] Specifically, the floor, specific coordinates and equipment orientation of the building equipment can be converted into digital values, and the digital values are sorted in sequence according to a preset order and converted into binary codes respectively. At the same time, an invalid mask and check code are added to the preset positions in the binary code, and then converted into a decimal value to obtain the unique identification of the building equipment.
[0031] Step S1022: configure the triggering modes allowed by the building equipment.
[0032] Among them, the control methods include infrared triggering and physical button triggering.
[0033] Step S1023: Acquire the initial state of the building equipment and the trigger state after the trigger mode is correctly executed to obtain state information.
[0034] The initial state refers to the state of the building equipment before it is triggered or operated. The initial state may include one or more of the switch state, operation state, and parameter settings of the building equipment. The state after triggering refers to the expected state change of the building equipment after it receives the correct trigger signal and performs the corresponding operation.
[0035] In the above implementation, first, a unique identifier is generated for the building equipment based on the specific location information of the building equipment in the target building, so that the building equipment can be quickly and accurately located and identified in the target building. Then, by configuring the triggering mode allowed by the building equipment, the building robot generates valid control instructions based on this, obtains the initial state of the building equipment and the triggering state after the triggering mode is correctly executed, so as to judge whether the execution of the control instruction is successful based on this.
[0036] As an implementation of step S1022, step S1022 includes one of step S10221 or step S10222, which is described in detail below.
[0037] Step S10221: if the triggering mode is infrared triggering, then obtaining the infrared signal of the building equipment performing the preset action, and analyzing the coding information and frequency information of the pulse sequence of the infrared signal corresponding to each preset action; As an example, the infrared signal for executing the preset action may be generated by a remote controller of the building equipment. For example, if the building equipment is an air conditioner, the preset action may be power on, power off, temperature adjustment, and operating mode adjustment. The infrared signal for executing the preset action is then converted into an electrical signal for processing, and the electrical signal is analyzed to obtain the encoding information of the pulse sequence of the infrared signal and the frequency information.
[0038] Among them, infrared signals usually exist in the form of pulse sequences, and the encoded information of the pulse sequence may include the width, interval and order of each pulse. In addition, different building equipment or different preset actions will use infrared signals of different frequencies to distinguish. Therefore, it is also necessary to analyze the frequency information of the infrared signal in order to accurately identify the preset action and determine the operation to be performed.
[0039] Step S10222: If the triggering mode is physical button triggering, image data of the building equipment is acquired, and features of the physical buttons in the image data are extracted to obtain button features.
[0040] As an example, key features may include position, shape, size and color information. For example, features of physical keys in image data may be extracted through an image recognition algorithm, which may be an edge detection algorithm, a contour extraction algorithm or a shape matching processing technique.
[0041] In the above implementation, in the infrared trigger mode, the pulse sequence coding information and frequency information of the infrared signal are analyzed to ensure accurate recognition and execution of the preset action. In the physical key trigger mode, image processing technology is used to extract features of the physical keys in the image, so that the keys can be located according to the key features.
[0042] Reference Figure 3 In some embodiments, the types of status information include static status and environmental variable status. When the building equipment is an elevator and a lighting system, the status information is a static status. When the building equipment is an air conditioner, the building equipment is an environmental variable status. Step S1023 may include steps S10231-S10234, which are described in detail below.
[0043] Step S10231: If the type of the state information is a static state, a first image of the building equipment in an initial state and a second image of the trigger state after the trigger mode is correctly executed are respectively obtained.
[0044] The static state generally refers to the physical form of the building equipment or its components. For example, if the building equipment is a lighting system, the static state may be the on / off state of the lighting system switch.
[0045] Step S10232: Obtain status information based on the first image and the second image.
[0046] It should be understood that by comparing the first image and the second image to identify the difference between the first image and the second image, the state change of the building equipment before and after the trigger is reflected to generate corresponding state information.
[0047] Step S10233: If the type of the state information is an environmental variable state, first sensor data of the surrounding environment of the building equipment in an initial state and second sensor data of a trigger state after the trigger mode is correctly executed are obtained.
[0048] The environmental variables may include temperature, humidity and light intensity, and the first sensor data and the second sensor data are collected by using sensors in the initial state and the trigger state, respectively. For example, the sensor may be a temperature sensor, a humidity sensor, a light sensor, etc.
[0049] Step S10234: taking the difference between the first sensor data and the second sensor data as the state information.
[0050] As an example, when the building equipment is an air conditioner, taking the first sensor data and the second sensor data as temperature values, first obtain the first sensor data in the initial state, and then obtain the second sensor data in the trigger state after the trigger mode is correctly executed, that is, the temperature value in the initial state and the temperature value in the trigger state after the trigger mode is correctly executed, and use the difference between the two as the state information. For example, if the temperature in the initial state is 28°C, and the temperature value in the trigger state after the trigger mode is correctly executed is 24°C, then the state information may be a temperature change of 4°C.
[0051] In the above implementation, when the state information belongs to a static state, the image change of the building equipment between the initial state and the triggered state is obtained, and the two image data are compared using image processing technology, so as to accurately obtain and reflect the change of the building equipment state. As for the environmental variable state, the first sensor data and the second sensor data of the surrounding environment of the building equipment in the initial state and the triggered state are collected in real time, and the difference between the two is calculated to quantify the change of the environmental variable, so as to measure the impact of the building equipment on the surrounding environment after the trigger mode is executed.
[0052] Reference Figure 4 As an implementation of step S104, step S104 specifically includes steps S1041 to S1043, which are described in detail below.
[0053] Step S1041: parse the control instruction to obtain the unique identification and triggering method of the target building equipment.
[0054] Step S1042: Decode the unique identifier, obtain the location information of the target building equipment, and control the building robot to move to the target building equipment based on the location information and map modeling information.
[0055] Specifically, when decoding the unique identifier, the unique identifier of the building equipment is first converted into a binary code, and then the invalid mask and check code at the preset position are deleted, and then the binary codes of the floor, specific coordinates and device orientation are sequentially extracted based on the preset order, and the binary code is converted to obtain a decimal digital value for representing the floor, specific coordinates and device orientation of the building equipment. As an example, the floor can be represented by a two-digit value, the specific coordinates can be represented by a set of four-digit digital values to represent the horizontal and vertical coordinates respectively, and the device orientation can be represented by a three-digit value to represent the offset angle of the device orientation relative to the reference orientation.
[0056] Step S1043: Perform on-site control of the target building equipment according to the triggering method.
[0057] In the above implementation, first, the control instruction is parsed to obtain the unique identifier of the target building equipment and the required triggering method, and then the unique identifier is decoded to extract the location information of the target building equipment. There is no need to additionally transmit the location information of the target building information, which simplifies the communication interaction between the building robot and the building control center. Finally, combined with the map modeling information, the building robot is controlled to move to the target building equipment, and the target building equipment is controlled on-site according to the parsed triggering method.
[0058] Reference Figure 5 As an implementation method of step S105, step S105 specifically includes steps S1051 to S1053, which are introduced in detail below.
[0059] Step S1051: Obtain status information in the configuration information; Step S1052: obtaining on-site status information of the target building equipment after executing the control instruction; Among them, the on-site status information is the status information collected on-site by the building robot on the target building equipment after executing the control instructions.
[0060] Step S1053: Compare the status information in the configuration information with the field status information. If the comparison result is a match, it is determined that the execution of the control instruction is successful; if the comparison result is a mismatch, it is determined that the execution of the control instruction fails.
[0061] As an example, when the target building equipment is an air conditioner, the expected status information after executing the control instruction is that the temperature drops by 4°C. If the collected on-site status information shows that the temperature only drops by 1°C, the two do not match, and it is determined that the execution of the control instruction fails. If the collected on-site status information shows that the temperature only drops by 3.8°C, it can be considered that the two match, and it is determined that the execution of the control instruction is successful.
[0062] In the above implementation, the state information preset in the configuration information is first obtained to clarify the target state to be achieved. Subsequently, the on-site state information of the target building equipment after the control instruction is executed is captured in real time, and then the two are compared. If they match, the successful execution of the control instruction is confirmed; if they do not match, the execution failure is promptly determined so that the control instruction can be repeatedly executed later.
[0063] As an intelligent building control method and system, it also includes: Step S201: Obtaining inspection tasks from a building control center; Step S202: Based on the inspection task and the map modeling information, the building robot is controlled to collect on-site status information of each building device in the area specified by the inspection task.
[0064] In the above implementation, by collecting on-site status information and transmitting the on-site status information to the building control center, centralized management and monitoring of the status of building equipment without IoT capabilities are achieved, making it have online capabilities.
[0065] In addition, an embodiment of the present application discloses an intelligent building control system. The intelligent building control system can be applied to a computer device, which is a schematic diagram of the architecture of a computer device for implementing the above method provided by an embodiment of the present invention. In this embodiment, the computer device may include an intelligent building control system, a machine-readable storage medium, and a processor.
[0066] In this embodiment, the machine-readable storage medium and the processor may be located in the computer device and the two may be separately arranged. The machine-readable storage medium may also be independent of the computer device and accessed by the processor. The intelligent building control system may include multiple functional modules stored in the machine-readable storage medium, such as various software functional modules included in the intelligent building control system. When the processor executes the computer program corresponding to the software functional module in the intelligent building control system, the intelligent building control system provided by the aforementioned method embodiment is implemented.
[0067] In this embodiment, the computer device may include one or more processors. The processor may process information and / or data related to the service request to perform one or more functions described in the present invention. In some embodiments, the processor may include one or more processing engines (e.g., a single-core processor or a multi-core processor). Just to give an example, the processor may include one or more hardware processors, such as a central processing unit CPU, an application-specific integrated circuit ASIC, a dedicated instruction set processor ASIP, a graphics processor GPU, a physical operation processing unit PPU, a digital signal processor DSP, a field programmable gate array FPGA, a programmable logic device PLD, a controller, a microcontroller unit, a reduced instruction set computer RISC, a microprocessor, etc., or similar or any combination thereof.
[0068] The machine-readable storage medium may store data and / or instructions. In some embodiments, the machine-readable storage medium may store acquired data or information. In some embodiments, the machine-readable storage medium may store data and / or instructions for execution or use by the computer device, and the computer device may implement the exemplary method described in the present application by executing or using the data and / or instructions. In some embodiments, the machine-readable storage medium may include a mass storage, a removable storage, a volatile read-write memory, a read-only memory ROM, etc., or any combination of the above examples. Exemplary mass storage may include a disk, an optical disk, a solid-state disk, etc. Exemplary removable storage may include a flash drive, a floppy disk, an optical disk, a memory card, a compressed disk, a magnetic tape, etc. Exemplary volatile read-write memory may include a random access memory RAM. Exemplary random access memory may include dynamic RAM, double rate synchronous dynamic RAM, static RAM, thyristor RAM, and zero capacitance RAM, etc. Exemplary ROM may include a masked ROM, a programmable ROM, an erasable programmable ROM, an electronically erasable programmable ROM, a compressed disk ROM, and a digital universal disk ROM, etc.
[0069] The intelligent building control system included in the computer device may include one or more software function modules. The software function modules may be programs and instructions stored in the machine-readable storage medium, and these software function modules are used to implement the above method when executed by the corresponding processor, for example, when executed by the processor of the drone, they are used to implement the method steps executed by the drone, or when executed by the computer device, they are used to implement the method steps executed by the computer device.
[0070] Refer to the detailed Figure 6 The embodiment of the present application discloses an intelligent building control system. An intelligent building control system includes: A map acquisition module is used to obtain map modeling information of a target building; Configuration module, used to configure property information of building equipment; A command receiving module, used for receiving control commands of target building equipment from a building control center; An execution module, used for controlling the building robot to move to the target building equipment represented by the control instruction based on the map modeling information and the control instruction to perform on-site control on the target building equipment; The feedback module is used to determine whether the execution of the control instruction is successful based on the configuration information. If so, it returns the execution completion feedback to the building control center; if not, it repeats the execution of the control instruction.
[0071] The intelligent building control system provided in the present application can implement the above-mentioned intelligent building control method, and the specific working process of an intelligent building control system can refer to the corresponding process in the above-mentioned method embodiment.
[0072] It should be noted that in the above embodiments, the description of each embodiment has different emphases, and for the parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0073] The present invention also discloses a computer-readable storage medium, which includes a computer program that can be loaded by a processor and executed as in any of the above methods.
[0074] In the embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, and the indirect coupling or communication connection of devices or units can be electrical, mechanical or other forms.
[0075] In addition, the functional modules in the various embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.
[0076] The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Any feature disclosed in this specification (including the abstract and drawings), unless otherwise stated, can be replaced by other equivalent or alternative features with similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.
Claims
1. A smart building control method, characterized in that: include: Obtain map modeling information of the target building; Configure property information of building equipment; Receive control instructions for target building equipment from the building control center; Based on the map modeling information and the control instruction, control the building robot to move to the target building equipment represented by the control instruction to perform on-site control of the target building equipment; Based on the configuration information, determine whether the execution of the control instruction is successful. If so, return the execution completion feedback to the building control center; if not, repeat the execution of the control instruction.
2. The method according to claim 1, characterized in that The attribute information includes the unique identification, triggering mode and status information of the building equipment; the attribute information of the configured building equipment includes: Generate a unique identifier for the building equipment based on the location of the building equipment in the target building; Configure the triggering methods allowed by the building equipment; wherein the control method includes infrared triggering and physical button triggering; Obtain the initial state of the building equipment and the trigger state after the trigger mode is correctly executed to obtain the state information.
3. The method according to claim 2, characterized in that The configuration of the triggering modes allowed by the building equipment includes: If the triggering method is infrared triggering, then obtaining the infrared signal of the building equipment performing the preset action, and analyzing the coding information and frequency information of the pulse sequence of the infrared signal corresponding to each preset action; or, If the triggering mode is physical button triggering, the image data of the building equipment is acquired, and the features of the physical buttons in the image data are extracted to obtain button features.
4. The method according to claim 2, characterized in that: The types of the state information include static state and environment variable state; the initial state of the building equipment and the trigger state after the trigger mode is correctly executed are obtained to obtain the state information, including: If the type of the state information is a static state, a first image of the building equipment in an initial state and a second image of the trigger state after the trigger mode is correctly executed are respectively acquired; obtaining the state information based on the first image and the second image; If the type of the state information is an environmental variable state, obtaining first sensor data of the surrounding environment of the building equipment in an initial state and second sensor data of a trigger state after the trigger mode is correctly executed; The difference between the first sensor data and the second sensor data is used as the state information.
5. The method according to claim 2, characterized in that: The step of controlling the building robot to move to a target building device represented by the control instruction to perform on-site control of the target building device based on the map modeling information and the control instruction includes: Parse the control instructions to obtain the unique identification and triggering method of the target building equipment; Decoding the unique identifier to obtain location information of the target building equipment, and controlling the building robot to move to the target building equipment based on the location information and map modeling information; The target building equipment is controlled on-site according to the triggering method.
6. The method according to claim 2, characterized in that Based on the configuration information, the step of determining whether the execution of the control instruction is successful includes: Get the status information in the configuration information; Obtaining on-site status information of target building equipment after executing control instructions; The status information in the configuration information is compared with the field status information. If the comparison result is a match, it is determined that the execution of the control instruction is successful; if the comparison result is a mismatch, it is determined that the execution of the control instruction fails.
7. The method according to claim 6, characterized in that Also includes: Obtain inspection tasks from the building control center; Based on the inspection task and the map modeling information, the building robot is controlled to collect on-site status information of each of the building devices in the area specified by the inspection task.
8. An intelligent building control system, characterized in that: include: A map acquisition module is used to obtain map modeling information of a target building; Configuration module, used to configure property information of building equipment; An instruction receiving module, used for receiving control instructions of target building equipment from a building control center; An execution module, for controlling the building robot to move to a target building device represented by the control instruction based on the map modeling information and the control instruction to perform on-site control on the target building device; The feedback module is used to determine whether the execution of the control instruction is successful based on the configuration information. If so, it returns the execution completion feedback to the building control center; if not, it repeats the execution of the control instruction.
9. A computer device, characterized in that: The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program according to any one of the methods of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The method comprises storing a computer program which can be loaded by a processor and execute the method according to any one of claims 1 to 7.
Citation Information
Patent Citations
Building control method, device, equipment and system, and storage medium
CN110187644A
Robot key control method and system
CN111531531A
Building information processing device based on artificial intelligence
CN111918028A
Building electric equipment control method and device, computer equipment and storage medium
CN113591788A
Household appliance control method and device, electronic equipment, storage medium and chip
CN116052403A