Method and device for determining temporary plugging regulation and control opportunity of complex fracture network of fractured reservoir

By generating natural fracture distribution maps and constructing a numerical simulation model for fracturing expansion, the timing of temporary blockage of horizontal wells was determined, and the problem of invalid perforation and casing deformation of multi-perforation clusters in horizontal wells was solved, and the perforation clusters were realized balanced expansion and improvement of fracturing effect.

CN119083966APending Publication Date: 2024-12-06CHINA OILFIELD SERVICES LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411234670.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

During the fracturing process, the existing multi-perforated clusters of horizontal wells lead to deformation of ineffective perforated clusters and casings, which are difficult to achieve balanced cracking and expansion. There is a lack of quantitative evaluation to determine the temporary blockage timing. , affects the fracturing effect.

Method used

By generating natural crack distribution maps, a numerical simulation model for segmented fracturing expansion of horizontal wells is constructed, stress field information is updated, temporary blocking and fracturing expansion of different machines are performed, the timing of temporary blocking and control of complex seams is determined, and temporary blocking construction is optimized.

Benefits of technology

The construction effect of temporary blocking and fracturing of horizontal wells is improved, ensuring balanced expansion of perforation clusters is improved, and the fracturing transformation effect is avoided improper use of temporary blocking materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083966A_ABST
    Figure CN119083966A_ABST
Patent Text Reader

Abstract

The invention discloses a method and device for determining temporary plugging regulation and control opportunity of a complex fracture network of a fractured reservoir, and the method comprises the steps: generating a natural fracture distribution diagram according to the distribution characteristics of natural fractures; a horizontal well staged fracturing extension numerical simulation model is constructed based on the natural fracture distribution map so as to simulate fracture extension information under the non-temporary plugging condition; updating stress field information of the horizontal well staged fracturing extension numerical simulation model; according to the updated stress field information, horizontal well temporary plugging fracturing expansion numerical simulation is carried out based on different opportunities, and the complex fracture network temporary plugging regulation opportunity is determined according to the complex fracture network transformation volume obtained through simulation. According to the method, the temporary plugging regulation and control opportunity of the complex fracture network is determined through simulation, so that the temporary plugging fracturing construction effect of the horizontal well is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present invention relate to the technical field of fracturing transformation technology, and specifically to a method and device for determining the timing of temporary plugging and regulation of complex fracture networks in fracture-type reservoirs. Background Art

[0002] In the multi-cluster competitive fracturing mode, due to the strong stress interference, it is very easy to cause many invalid perforation clusters, which ultimately leads to a significant decrease in the fracturing effect. Through microseismic and fiber optic detection data, it was found that during the entire horizontal well segmented multi-cluster fracturing process, many perforation clusters did not absorb the fracturing fluid, and their contribution to the overall production was very limited. Furthermore, due to the differences in fluid inflow, some layers will also produce a strong stress concentration effect, which may eventually cause casing deformation. Therefore, how to optimize the fluid inflow of multi-perforation clusters in horizontal wells and ensure balanced fracturing and expansion of perforation clusters in horizontal wells is an important problem in fracturing engineering.

[0003] The existing methods for balanced fracturing and expansion control of perforation clusters mainly include acid pretreatment technology, temporary plugging fracturing technology, and flow limiting fracturing technology. Among them, temporary plugging fracturing is a common fracturing operation mode for volume transformation of tight reservoirs. The plugging effect of temporary plugging materials can achieve the plugging of the first fractures, and then on this basis, new fractures can be formed in more locations. The important advantage of temporary plugging fracturing in horizontal wells is that it solves the problem of the inability to fracture and expand between fractures, ensuring that the hydraulic fracturing perforation cluster can expand evenly.

[0004] Temporary plugging timing is a key factor affecting the effect of temporary plugging fracturing. Its core lies in determining the time to put in temporary plugging agents according to the expansion of the initial fracture cluster. The existing temporary plugging timing is generally set based on field experience, lacking quantitative evaluation means and methods. Temporary plugging construction under subjective conditions is likely to cause the temporary plugging materials to fail to play their maximum role, and even have the opposite effect on the final fracturing transformation effect. Summary of the invention

[0005] In view of the above problems, embodiments of the present invention are proposed to provide a method and device for determining the timing of temporary plugging and regulation of complex fracture networks in fractured reservoirs that overcome the above problems or at least partially solve the above problems.

[0006] According to one aspect of an embodiment of the present invention, a method for determining the timing of temporary plugging and regulation of a complex fracture network in a fractured reservoir is provided, the method comprising:

[0007] According to the distribution characteristics of natural fractures, a natural fracture distribution map is generated;

[0008] A numerical simulation model for staged fracturing expansion in horizontal wells was constructed based on the natural fracture distribution map to simulate the fracture expansion information under non-temporary plugging conditions;

[0009] Update the stress field information of the numerical simulation model of staged fracturing expansion in horizontal wells;

[0010] According to the updated stress field information, numerical simulation of temporary plugging and fracturing expansion of horizontal wells is carried out at different times, and the timing of temporary plugging and regulation of complex fracture networks is determined according to the complex fracture network transformation volume obtained by simulation.

[0011] According to another aspect of an embodiment of the present invention, a device for determining the timing of temporary plugging and regulation of a complex fracture network in a fractured reservoir is provided, comprising:

[0012] A natural fracture distribution map module, adapted to generate a natural fracture distribution map according to the distribution characteristics of natural fractures;

[0013] The simulation model module is suitable for constructing a numerical simulation model for staged fracturing expansion of horizontal wells based on the natural fracture distribution map to simulate the fracture expansion information under non-temporary plugging conditions;

[0014] Update stress field module, suitable for updating stress field information of horizontal well staged fracturing expansion numerical simulation model;

[0015] The timing determination module is suitable for performing numerical simulation of temporary plugging and fracturing expansion of horizontal wells based on different timings according to the updated stress field information, and determining the timing of temporary plugging and regulation of complex fracture networks according to the complex fracture network transformation volume obtained by simulation.

[0016] According to another aspect of an embodiment of the present invention, there is provided a computing device, comprising: a processor, a memory, a communication interface and a communication bus, wherein the processor, the memory and the communication interface communicate with each other via the communication bus;

[0017] The memory is used to store at least one executable instruction, and the executable instruction enables the processor to execute operations corresponding to the method for determining the timing of temporary plugging and regulation of complex fracture networks in fracture-type reservoirs.

[0018] According to another aspect of an embodiment of the present invention, a computer storage medium is provided, wherein the storage medium stores at least one executable instruction, wherein the executable instruction enables a processor to perform operations corresponding to the method for determining the timing of temporary plugging and regulation of a complex fracture network in a fractured reservoir as described above.

[0019] According to another aspect of an embodiment of the present invention, a computer program product is provided, comprising at least one executable instruction, wherein the executable instruction enables a processor to execute operations corresponding to the method for determining the timing of temporary plugging and regulation of a complex fracture network in a fractured reservoir as described above.

[0020] According to the method and device for determining the timing of temporary plugging and regulation of complex fracture networks in fracture-type reservoirs provided by the embodiments of the present invention, a natural fracture map is generated according to the distribution characteristics of natural fractures, and a numerical simulation model for staged fracturing and expansion of horizontal wells is constructed. The expansion of multiple clusters of fractures in horizontal wells is numerically simulated by globally embedding cohesive force units to obtain the fracture expansion transformation volume without considering temporary plugging conditions. The positions of the clusters of non-balanced expansion of multiple clusters of fractures are analyzed and the current stress field information before temporary plugging is updated, different temporary plugging times are set, and based on the current stress field information of temporary plugging, numerical simulations of temporary plugging and fracturing expansion of horizontal wells under different timing conditions are carried out. The temporary plugging timing is determined by the overall complex fracture network transformation volume, and the temporary plugging timing under different conditions is obtained to improve the construction effect of temporary plugging and fracturing of horizontal wells.

[0021] The above description is only an overview of the technical solution of the embodiment of the present invention. In order to more clearly understand the technical means of the embodiment of the present invention, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the embodiment of the present invention more obvious and easy to understand, the specific implementation method of the embodiment of the present invention is specifically listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the embodiments of the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0023] Figure 1 A flow chart showing a method for determining the timing of temporary plugging and regulation of a complex fracture network in a fractured reservoir according to an embodiment of the present invention is shown;

[0024] Figure 2 A schematic diagram of the natural fracture distribution is shown;

[0025] Figure 3 A schematic diagram of the global embedded cohesion unit is shown;

[0026] Figure 4 A schematic diagram of numerical simulation results without considering temporary blocking conditions is shown;

[0027] Figure 5 A schematic diagram of numerical simulation results considering temporary blocking conditions is shown;

[0028] Figure 6 The diagram of temporary plugging and fracturing structure of horizontal well is shown;

[0029] Figure 7 A schematic diagram of the structure of a device for determining the timing of temporary plugging and regulation of a complex fracture network in a fractured reservoir according to an embodiment of the present invention is shown;

[0030] Figure 8 A schematic structural diagram of a computing device according to an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0031] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to enable the scope of the present invention to be fully communicated to those skilled in the art.

[0032] Figure 1 FIG. 1 is a flow chart showing a method for determining the timing of temporary plugging and regulation of a complex fracture network in a fractured reservoir according to an embodiment of the present invention. Figure 1 As shown, the method comprises the following steps:

[0033] Step S101, generating a natural fracture distribution map according to the distribution characteristics of natural fractures.

[0034] By collecting imaging logging and core observation data, the basic distribution characteristics of natural fractures, including occurrence and density, are determined. By using micro-bedding surface directional technology and imaging logging technology, the fracture development direction of the block is analyzed to obtain the distribution characteristics of natural fractures.

[0035] According to the distribution characteristics, a natural fracture distribution map is generated by, for example, the Monte Carlo method. Specifically, a pseudo-random number generator (PRNG) is used to generate random numbers, such as a linear congruential generator (LCG) or a Mersenne Twister algorithm. The random numbers can affect the properties of natural fractures, such as fracture length, inclination, and density. Different random numbers will result in different fracture lengths, inclinations, and densities of the natural fracture distribution map generated subsequently. The corresponding random numbers are determined according to the implementation situation to generate the natural fracture distribution map.

[0036] The natural fracture distribution map is constructed and generated by random distribution method, using distribution functions such as normal distribution and Poisson distribution. Python programming is used according to random numbers to determine the parameters of natural fractures, such as fracture length, inclination and density, and simulate the natural fracture distribution map. If the normal distribution function is used, the following formula can be used for the density parameter:

[0037]

[0038] Among them, f(x) is the probability density function; π is the pi; σ is the standard deviation; μ is the variance, and the corresponding density is generated for the random number x.

[0039] According to the parameters such as fracture length, inclination and density of the natural fracture map, the following Figure 2 The distribution map of natural fractures is shown.

[0040] Step S102, constructing a numerical simulation model for staged fracturing expansion of horizontal wells based on the natural fracture distribution map.

[0041] Based on the generated natural fracture distribution map, the parameters of the natural fractures can be determined so that a numerical simulation model for staged fracturing expansion of horizontal wells can be constructed according to the parameters.

[0042] The horizontal well staged fracturing expansion numerical simulation model has multiple built-in functions, including the equilibrium equation, tangential and normal flow equations used in the model. Considering the erosion effect of the perforation holes, such as Figure 3 As shown in the figure, the numerical simulation of multi-cluster fracture expansion in horizontal wells is carried out by globally embedding cohesive force units, and the following results are obtained: Figure 4 Shown are the numerical simulation results of the fracture extension and transformation volume without considering temporary plugging conditions.

[0043] Specifically, the functions built into the horizontal well staged fracturing expansion numerical simulation model are as follows:

[0044] The hydraulic fracturing porous media control equations include two parts: the rock solid particle deformation equation and the pore fluid flow equation. Assuming that the rock deformation is linear elastic deformation, combined with the generalized Hooke's law and the principle of virtual work, the virtual work of the rock is equal to the virtual work generated by the force acting on the rock. The stress balance equation for the solid part of the porous medium is as follows:

[0045] ∫ V (σ i ' j -p p I):δεdV=∫ S tδεdS+∫ V fδεdV

[0046] Among them, t and f are the unit area force and unit volume force respectively, S is the surface area of ​​the microelement, V is the volume of the microelement, dS and dV are the load action area and the volume of the calculation microelement respectively, I is the unit matrix, δε is the virtual strain rate, p p is the pore pressure, σ i ' j is the stress, the subscript ij is the Kronecker symbol, and corresponds to the element of the unit matrix.

[0047] According to the principle of fluid mass conservation, the total mass of the fluid flowing into the matrix within a certain period of time is equal to the sum of the fluid increment in the matrix and the outflow mass. According to the fluid mass conservation equation in the microelement and the nonlinear seepage law, the seepage balance equation of the fluid in the porous medium can be obtained as follows:

[0048]

[0049] Among them, ρ f is the fracturing fluid pressure, φ is the porosity, V is the control volume of the unit, S is the surface area, q m is the unit control volume flow; n is the unit normal vector.

[0050] The seepage process during hydraulic fracturing is based on Darcy's law, and slick water fracturing fluid is used in fracturing, using the continuity equation of incompressible Newtonian fluid in one-dimensional flow direction:

[0051]

[0052] Where q is the cross-sectional flow rate along the x direction, w is the crack width, x is the displacement along the expansion of the hydraulic crack, and q l is the total flow rate lost to the formation, and t is the time.

[0053] The fluid flow in the cohesive unit includes tangential flow and normal flow perpendicular to the unit. The calculation formula for the tangential flow of the fluid along the cohesive unit is as follows:

[0054]

[0055] Among them, q t is the tangential flow rate on the crack surface, P F is the pressure difference between fluid units, μ is the fluid dynamic viscosity, is the pressure per unit length of the crack.

[0056] The calculation formula for the normal flow of fluid along the upper and lower surfaces of the cohesive unit is as follows:

[0057] q nb =c t (P F -P nb )

[0058] q nt =c t (P F -P nt )

[0059] Among them, q nt and q nb are the normal flow rates of the fracturing fluid lost to the upper and lower surfaces of the fracture, respectively, and P nb and P nt are the fluid pore pressures on the upper and lower surfaces of the fracture, respectively, and c t is the total filtration coefficient, the filtration coefficient c of the fracture invasion area and the fracture non-invasion area fi and c fn The calculation is as follows:

[0060]

[0061] Among them, a fi is the area of ​​the crack intrusion zone, a fn is the area of ​​the crack uninvaded zone, V fi is the filtration volume of the fracture invasion zone, V fn is the filtration volume of the uninvaded area of ​​the fracture, ΔP is the pressure difference on both sides of the fracture, and t is the filtration time.

[0062] Based on the constructed horizontal well staged fracturing expansion numerical simulation model and its built-in cohesive force unit tangential flow and normal flow functions, the fracture expansion transformation volume without considering temporary plugging conditions can be simulated, such as Figure 4 shown.

[0063] Step S103, updating the stress field information of the horizontal well staged fracturing expansion numerical simulation model.

[0064] Considering the impact of erosion on borehole friction under large displacement conditions, the borehole friction is further corrected to calculate the temporary plugging pressure, and the stress field conditions without considering the temporary plugging conditions are updated to achieve the current stress field of temporary plugging fracturing. The current stress field information before temporary plugging is updated by analyzing the positions of the clusters of non-equilibrium expansion of multiple clusters of fractures. The current stress field needs to consider the local stiffness deformation induced stress generated by the formation of initial pressure fractures. It is necessary to calculate the liquid flow rate and fluid pressure of each cluster based on the wellbore conditions, such as the perforation section and the number of perforation clusters in the perforation section. The formula is as follows:

[0065] F(Q1,Q2,Q3,Q4,…,P w )=0

[0066] Among them, P w is the fluid pressure in the fracture, Q1, Q2, etc. are all flow rates, their subscripts represent the number of clusters, and F is the flow distribution function, which realizes flow distribution for multi-cluster fracturing. The fluid flows in from one side of the wellbore, and the flow rate on the other side is set to 0. The total injection flow rate is equal to the sum of the flow rates of all clusters, which realizes the constraint on the flow rate, distributes the subsequent temporary plugging flow rate, and updates the stress field information.

[0067] Step S104, based on the updated stress field information, numerical simulation of temporary plugging and fracturing expansion of horizontal wells is performed based on different timings, and the timing of temporary plugging and regulation of complex fracture networks is determined according to the complex fracture network transformation volume obtained by simulation.

[0068] According to the updated stress field information, numerical simulation of temporary plugging and fracturing expansion of horizontal wells is carried out. During the simulation, failure judgment is also required based on the fracture criterion to ensure the correctness of the simulation.

[0069] Based on the square stress criterion as the initial loss criterion, that is, when the maximum stress value in any direction reaches the maximum strength of the crack, cracking occurs:

[0070]

[0071] Among them, t n ,t s ,t t are the normal, first tangential, and second tangential internal forces of the cohesive force unit, They are the limit stresses that the cohesive unit can withstand for normal damage, first tangential damage, and second tangential damage, respectively. <> is the Macaulay bracket, indicating that pure extrusion deformation or stress state will not cause damage.

[0072] After damage occurs, the Benzeggagh-Kenane criterion (BK fracture criterion) is used. The BK criterion is applicable to the case where the critical energy along the first and second shear directions is the same, as follows:

[0073]

[0074] Among them, G c is the normal energy release rate, is the critical normal fracture energy release rate, is the critical shear energy release rate, G S is the shear energy release rate, G T is the total energy release rate, and η is the mixing constant, which is set according to the implementation situation.

[0075] Through the above method, numerical simulation is carried out, in which the tension displacement relationship of the crack is calculated using the composite crack cohesion model, as follows:

[0076]

[0077] Among them, T n and T t are the normal and tangential cohesion, is the normal effective displacement, δ t is the tangential displacement, δ0 is the initial displacement, G t is the shear stiffness and Γ is the normal torque.

[0078] Based on the composite fracture cohesion model and fracture criterion, the horizontal well temporary plugging fracturing expansion numerical simulation is carried out, and the temporary plugging fracturing flow rate is dynamically allocated in combination with the hole pattern, and different temporary plugging times are set. The temporary plugging time can be different times such as 1 / 4, 1 / 3, 1 / 2, 2 / 3, 3 / 4 of the total construction time, and the temporary plugging fracturing numerical simulation is carried out. The simulation results can be shown as follows Figure 5 As shown, Figure 5 The following is an example of the simulation result of a temporary plugging condition. Figure 6 As shown in the figure, the horizontal well contains different fractures such as natural fractures, pre-fracturing fractures, and subsequent fractures, which are temporarily plugged by temporary plugging bodies. When temporary plugging is used for temporary plugging, the flow rate in the horizontal well staged fracturing expansion numerical simulation model will change. Then, under the premise of following the stress balance equation, seepage balance equation, and various built-in functions (functions of tangential flow and normal flow of cohesive force units) in the horizontal well staged fracturing expansion numerical simulation model, based on the fracture criterion and the tension-displacement relationship of the composite fracture cohesive force model, temporary plugging simulation is performed at different times to obtain the fracture extension morphology at different times. Different morphologies correspond to different complex fracture network transformation volumes. The complex fracture network transformation volume is composed of the length, width, and height of the fracture network. The length, width, and height of the fracture network at different times can be determined based on the temporary plugging simulation of the horizontal well staged fracturing expansion numerical simulation model.

[0079] Filter by complex fracture network transformation volume as follows:

[0080] T opt =max[SRV(t1)…SRV(t n )]

[0081] Among them, SRV is the maximum function of reservoir transformation volume, t1…t n For multiple different occasions, T opt It is the timing of temporary plugging and regulation of complex fracture network, which is the timing corresponding to the maximum SRV.

[0082] According to the method for determining the timing of temporary plugging and regulation of complex fracture networks in fracture-type reservoirs provided by an embodiment of the present invention, a natural fracture map is generated based on the distribution characteristics of natural fractures, and a numerical simulation model for staged fracturing expansion of horizontal wells is constructed. The expansion of multiple clusters of fractures in horizontal wells is numerically simulated by globally embedding cohesive force units to obtain the fracture expansion transformation volume without considering temporary plugging conditions. The positions of the clusters of non-balanced expansion of multiple clusters of fractures are analyzed and the current stress field information before temporary plugging is updated, different temporary plugging times are set, and based on the current stress field information of temporary plugging, numerical simulations of temporary plugging and fracturing expansion of horizontal wells under different timing conditions are carried out. The temporary plugging timing is determined by the overall complex fracture network transformation volume, and the temporary plugging timing under different conditions is obtained to improve the construction effect of temporary plugging and fracturing of horizontal wells.

[0083] Figure 7 The schematic diagram of the structure of the device for determining the timing of temporary plugging and regulation of complex fracture networks in fracture-type reservoirs provided by an embodiment of the present invention is shown. Figure 7 As shown, the device comprises:

[0084] The natural fracture distribution map module 710 is adapted to generate a natural fracture distribution map according to the distribution characteristics of the natural fractures;

[0085] The simulation model module 720 is adapted to construct a numerical simulation model for staged fracturing expansion of horizontal wells based on the natural fracture distribution map to simulate fracture expansion information under non-temporary plugging conditions;

[0086] The stress field updating module 730 is adapted to update the stress field information of the horizontal well staged fracturing extension numerical simulation model;

[0087] The timing determination module 740 is adapted to perform numerical simulation of temporary plugging and fracturing expansion of horizontal wells based on different timings according to the updated stress field information, and determine the timing of temporary plugging and regulation of complex fracture networks according to the complex fracture network transformation volume obtained by simulation.

[0088] Optionally, the natural fracture distribution map module 710 is further adapted to:

[0089] Determine the distribution characteristics of natural fractures based on imaging logging data and core observation data;

[0090] A natural fracture distribution map is generated based on the distribution characteristics and random numbers.

[0091] Optionally, the simulation model module 720 is further adapted to:

[0092] Based on the natural fracture distribution map, a horizontal well staged fracturing expansion numerical simulation model including the stress balance equation and the seepage balance equation is constructed, and the tangential flow and normal flow functions of the cohesive force unit of the horizontal well staged fracturing expansion numerical simulation model are set.

[0093] Optionally, the update stress field module 730 is further adapted to:

[0094] The flow distribution function is used to update the stress field information of the horizontal well staged fracturing extension numerical simulation model based on the wellbore conditions of the horizontal well staged fracturing extension numerical simulation model.

[0095] Optionally, the timing determination module 740 is further adapted to:

[0096] According to the updated stress field information, failure judgment is made using the fracture criterion, and numerical simulation of temporary plugging and fracturing expansion of horizontal wells is carried out at different times to obtain the complex fracture network transformation volume corresponding to different times; the complex fracture network transformation volume is composed of the length, width and height of the fracture network.

[0097] Optionally, the timing determination module 740 is further adapted to:

[0098] The complex fracture network reconstruction volumes obtained at different times are compared to obtain the maximum complex fracture network reconstruction volume;

[0099] The timing corresponding to the largest complex fracture network transformation volume is taken as the temporary plugging and regulation timing of the complex fracture network.

[0100] The description of each module above refers to the corresponding description in the method embodiment and will not be repeated here.

[0101] An embodiment of the present invention further provides a non-volatile computer storage medium storing at least one executable instruction, which can execute operations corresponding to the method for determining the timing of temporary plugging and regulation of complex fracture networks in fractured reservoirs in any of the above method embodiments.

[0102] An embodiment of the present application provides a computer program product, which includes at least one executable instruction or computer program, which enables a processor to execute operations corresponding to the method for determining the timing of temporary plugging and regulation of a complex fracture network in a fractured reservoir in any of the above method embodiments.

[0103] Figure 8 A schematic diagram of the structure of a computing device according to an embodiment of the present invention is shown, and the specific implementation of the embodiment of the present invention does not limit the specific implementation of the computing device.

[0104] like Figure 8 As shown, the computing device may include: a processor 802 , a communication interface 804 , a memory 806 , and a communication bus 808 .

[0105] in:

[0106] The processor 802 , the communication interface 804 , and the memory 806 communicate with each other via a communication bus 808 .

[0107] The communication interface 804 is used to communicate with other devices such as clients or other servers.

[0108] The processor 802 is used to execute the program 810, and specifically can execute the relevant steps in the embodiment of the method for determining the timing of temporary plugging and regulation of complex fracture networks in fractured reservoirs.

[0109] Specifically, the program 810 may include program codes, which include computer operation instructions.

[0110] The processor 802 may be a central processing unit (CPU), or an application-specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of the present invention. The one or more processors included in the computing device may be processors of the same type, such as one or more CPUs; or processors of different types, such as one or more CPUs and one or more ASICs.

[0111] The memory 806 is used to store the program 810. The memory 806 may include a high-speed RAM memory, and may also include a non-volatile memory (non-volatile memory), such as at least one disk memory.

[0112] Program 810 can be specifically used to enable processor 802 to execute the method for determining the timing of temporary plugging and regulation of complex fracture networks in fracture-type reservoirs in any of the above-mentioned method embodiments. The specific implementation of each step in program 810 can refer to the corresponding descriptions in the corresponding steps and units in the above-mentioned embodiment of determining the timing of temporary plugging and regulation of complex fracture networks in fracture-type reservoirs, which will not be repeated here. Those skilled in the art can clearly understand that for the convenience and simplicity of description, the specific working process of the above-described equipment and modules can refer to the corresponding process description in the above-mentioned method embodiment, which will not be repeated here.

[0113] The algorithm or display provided herein is not inherently related to any particular computer, virtual system or other device. Various general purpose systems can also be used together with the teachings based on this. According to the above description, it is obvious that the structure required for constructing such systems. In addition, the embodiment of the present invention is not directed to any specific programming language either. It should be understood that various programming languages ​​can be utilized to realize the content of the embodiment of the present invention described herein, and the description of the above specific language is to disclose the preferred implementation of the embodiment of the present invention.

[0114] In the description provided herein, a large number of specific details are described. However, it is understood that embodiments of the present invention can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.

[0115] Similarly, it should be understood that in order to streamline the embodiments of the present invention and to aid in understanding one or more of the various inventive aspects, in the above description of the exemplary embodiments of the present invention, the various features of the embodiments of the present invention are sometimes grouped together into a single embodiment, figure, or description thereof. However, the disclosed method should not be interpreted as reflecting the following intention: that the claimed embodiments of the present invention require more features than the features explicitly recited in each claim. More specifically, as reflected in the claims below, the inventive aspects lie in less than all the features of the single embodiment disclosed above. Therefore, the claims that follow the specific embodiment are hereby expressly incorporated into the specific embodiment, wherein each claim itself serves as a separate embodiment of the present invention.

[0116] Those skilled in the art will appreciate that the modules in the devices in the embodiments may be adaptively changed and arranged in one or more devices different from the embodiments. The modules or units or components in the embodiments may be combined into one module or unit or component, and in addition they may be divided into a plurality of submodules or subunits or subcomponents. Except that at least some of such features and / or processes or units are mutually exclusive, all features disclosed in this specification (including the accompanying claims, abstracts and drawings) and all processes or units of any method or device disclosed in this manner may be combined in any combination. Unless otherwise expressly stated, each feature disclosed in this specification (including the accompanying claims, abstracts and drawings) may be replaced by an alternative feature providing the same, equivalent or similar purpose.

[0117] In addition, those skilled in the art will appreciate that, although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present invention and form different embodiments. For example, in the claims below, any one of the claimed embodiments may be used in any combination.

[0118] The various component embodiments of the present invention may be implemented in hardware, or in software modules running on one or more processors, or in a combination thereof. It should be understood by those skilled in the art that a microprocessor or digital signal processor (DSP) may be used in practice to implement some or all of the functions of some or all of the components according to the embodiments of the present invention. The embodiments of the present invention may also be implemented as a device or apparatus program (e.g., a computer program and a computer program product) for executing part or all of the methods described herein. Such a program implementing an embodiment of the present invention may be stored on a computer-readable medium, or may have the form of one or more signals. Such a signal may be downloaded from an Internet website, or provided on a carrier signal, or provided in any other form.

[0119] It should be noted that the above embodiments illustrate rather than limit the present invention, and that those skilled in the art may devise alternative embodiments without departing from the scope of the appended claims. In the claims, any reference symbol between brackets shall not be construed as a limitation on the claims. The word "comprising" does not exclude the presence of elements or steps not listed in the claims. The word "one" or "an" preceding an element does not exclude the presence of a plurality of such elements. The present invention may be implemented by means of hardware comprising a number of different elements and by means of a suitably programmed computer. In a unit claim listing a number of devices, several of these devices may be embodied by the same hardware item. The use of the words first, second, and third, etc. does not indicate any order. These words may be interpreted as names. The steps in the above embodiments, unless otherwise specified, should not be understood as limitations on the order of execution.

Claims

1. A method for determining the timing of temporary plugging and regulation of complex fracture networks in fractured reservoirs, characterized in that the method include: According to the distribution characteristics of natural fractures, a natural fracture distribution map is generated; Based on the natural fracture distribution map, a horizontal well staged fracturing expansion numerical simulation model is constructed to simulate fracture expansion information under non-temporary plugging conditions; Updating the stress field information of the horizontal well staged fracturing extension numerical simulation model; According to the updated stress field information, numerical simulation of temporary plugging and fracturing expansion of horizontal wells is carried out at different times, and the timing of temporary plugging and regulation of complex fracture networks is determined according to the complex fracture network transformation volume obtained by simulation.

2. The method according to claim 1, characterized in that The generating of the natural fracture distribution map according to the distribution characteristics of the natural fractures further comprises: Determine the distribution characteristics of natural fractures based on imaging logging data and core observation data; A natural fracture distribution map is generated according to the distribution characteristics and random numbers.

3. The method according to claim 1, characterized in that The constructing of a horizontal well staged fracturing expansion numerical simulation model based on the natural fracture distribution map further comprises: Based on the natural fracture distribution map, a horizontal well staged fracturing expansion numerical simulation model including a stress balance equation and a seepage balance equation is constructed, and the tangential flow and normal flow functions of the cohesive force unit of the horizontal well staged fracturing expansion numerical simulation model are set.

4. The method according to claim 1, characterized in that: The updating of the stress field information of the horizontal well staged fracturing extension numerical simulation model further includes: The flow distribution function is used to update the stress field information of the horizontal well staged fracturing extension numerical simulation model based on the wellbore conditions of the horizontal well staged fracturing extension numerical simulation model.

5. The method according to claim 1, characterized in that The method of performing horizontal well temporary plugging and fracturing expansion numerical simulation based on different timings according to the updated stress field information further includes: According to the updated stress field information, failure judgment is made using fracture criteria, and numerical simulation of temporary plugging and fracturing expansion of horizontal wells is carried out based on different timings to obtain the complex fracture network transformation volume corresponding to different timings; the complex fracture network transformation volume is composed of the length, width and height of the fracture network.

6. The method according to claim 1, characterized in that Determining the timing of temporary plugging and regulating the complex fracture network according to the complex fracture network transformation volume obtained by simulation further includes: The complex fracture network reconstruction volumes obtained at different times are compared to obtain the maximum complex fracture network reconstruction volume; The timing corresponding to the largest complex fracture network transformation volume is used as the temporary plugging and regulation timing of the complex fracture network.

7. A device for determining the timing of temporary plugging and regulation of complex fracture networks in fracture-type reservoirs, characterized in that: The device includes: A natural fracture distribution map module, adapted to generate a natural fracture distribution map according to the distribution characteristics of natural fractures; A simulation model module, adapted to construct a horizontal well staged fracturing expansion numerical simulation model based on the natural fracture distribution map, so as to simulate fracture expansion information under non-temporary plugging conditions; A stress field updating module, adapted to update stress field information of the horizontal well staged fracturing extension numerical simulation model; The timing determination module is suitable for performing numerical simulation of temporary plugging and fracturing expansion of horizontal wells based on different timings according to the updated stress field information, and determining the timing of temporary plugging and regulation of complex fracture networks according to the complex fracture network transformation volume obtained by simulation.

8. A computing device, characterized in that include: A processor, a memory, a communication interface and a communication bus, wherein the processor, the memory and the communication interface communicate with each other via the communication bus; The memory is used to store at least one executable instruction, and the executable instruction enables the processor to perform operations corresponding to the method for determining the timing of temporary plugging and regulation of complex fracture networks in fractured reservoirs according to any one of claims 1 to 6.

9. A computer storage medium, characterized in that The storage medium stores at least one executable instruction, and the executable instruction enables the processor to perform operations corresponding to the method for determining the timing of temporary plugging and regulation of a complex fracture network in a fractured reservoir according to any one of claims 1 to 6.

10. A computer program product, comprising at least one executable instruction, wherein the executable instruction enables a processor to execute operations corresponding to the method for determining the timing of temporary plugging and regulation of a complex fracture network in a fractured reservoir according to any one of claims 1 to 6.