By optimizing the gun hole arrangement and detonator delay range in the deep hole pulling groove top break, the problem of damage to thrown ore and unblasted areas is solved, safe and reliable top breaking and mining costs are achieved, and the existing technology breaking is solved Problems of top failure and throwing ore.
Patent Information
- Application Number
- CN202411438912.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-15
- Publication Date
- 2024-12-06
AI Technical Summary
During the deep hole pulling groove top breaking process, the existing technology has the problem of throwing a large amount of ore into the upper chamber and the gun hole in the unblasted area being damaged, which may even lead to failure of the top breaking, making the processing difficult and safety risks high.
By optimizing the arrangement of the gun holes in the top breaking area, adjusting the charging structure and setting the detonator delay range, we ensure that the blasting energy effectively acts on the rock breaking, reducing the damage in the ore throwing and unblasting areas, we adopt the design of cutting grooves and cutting patios to set up throwing Buffer zone and compensation space control the arrangement order of charge and detonator to ensure stable and efficient top breaking.
It realizes a safe and reliable top break, reduces the problem of mine throwing in the upper chamber, reduces mining costs, avoids the occurrence of double "funnel" on the upper and lower levels, and improves the reliability and safety of blasting.
Smart Images

Figure CN119084000A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of mining, and in particular relates to a deep hole slot blasting low throw top breaking method. Background Art
[0002] Deep hole grooving and roof breaking is a crucial link in the large-diameter deep hole lateral caving and subsequent backfill mining method. It is a prerequisite for subsequent large-scale lateral caving in the mining area. The blasting reliability is very high. In the process of roof breaking blasting in the mining area, it is usually encountered that a large amount of ore is thrown into the upper chamber and the blastholes in the unblasted area are damaged after breaking the roof. There is even a double "funnel phenomenon" of upper and lower double "funnel phenomenon" due to the failure of breaking the roof. Once the roof breaking fails, the handling difficulty and safety risk are extremely high. Summary of the invention
[0003] In order to solve the above-mentioned technical problems existing in the prior art, the applicant has conducted relevant technical research and obtained the approval of Guangxi Key R&D Plan Project, project number: Guikejizi
[2023] No. 26; project number: Guike AB23026094; project name: Research on rock movement laws and low settlement filling mining technology in underground mining under complex surface environment; The present invention specifically provides a deep hole slot breaking and top blasting method in a large-diameter deep hole lateral collapse and subsequent filling mining method, which can solve the problems existing in the prior art such as excessive ore throwing in the upper chamber, damage to unblasted blastholes, and even failure of top blasting.
[0004] In order to achieve the above object, the technical solution adopted by the present invention is as follows:
[0005] A deep hole slot blasting low throw top breaking method comprises the following steps:
[0006] In a mining area that requires deep hole grooving and roof breaking blasting, the first step is to determine the roof breaking range of the mining area and arrange the blastholes according to the roof breaking range; the second step is to determine the blasting plan and implement the blasting step by step; the third step is to adjust the blasting charge structure; the fourth step is to determine the delay position arrangement of the detonator and the roof breaking.
[0007] Furthermore, the deep hole grooving blasting low throw breaking method specifically comprises the following steps:
[0008] Step 1: Determine the range of the top breaking in the mining area and arrange blastholes according to the range of the top breaking: Determine the position of the cutting groove before mining and blasthole construction, and the range of the cutting groove is the top breaking range; a top breaking and throwing buffer zone is left between the cutting groove and the cutting patio, the width of the entire cutting groove is the width of the mining area, and the length is the blasting step distance, from the inside to the outside: a circular cutting patio with a center hole and inner and outer circles composed of a number of charging holes and a number of empty holes, a peripheral hole circular circle composed of a number of blastholes is arranged around the cutting patio, and a number of side collapse blastholes are arranged between the peripheral hole circular circle and the top breaking incision as a top breaking and throwing buffer zone;
[0009] Step 2: Determine the blasting plan and implement the blasting step by step: After the cutting shaft is blasted to a certain height (5-7m), the cutting shaft and the surrounding holes and side collapse holes are blasted simultaneously to achieve the blasting of the cutting slot and create a free surface and compensation space for the top blasting;
[0010] Step 3: Determine the charging structure for top-breaking blasting: The bottoms of all blastholes are filled firmly with cement lumps and / or river sand. Except for the central hole of the cutting skylight, which uses continuous charging, the other blastholes are charged with intervals, and double detonating cords are installed in the holes for detonation transmission; the blastholes of the cutting skylight use a charging structure of 1-2 emulsion explosives and river sand, and the surrounding blastholes use a charging structure of 2 emulsion explosives and river sand; all blasthole openings are filled with river sand;
[0011] Step 4: Determine the layout of the delayed detonator positions and the roof breaking: All blastholes are detonated with double detonators in the same hole and section. The detonation order is that the cutting shaft is detonated first to create a free surface, followed by the detonation of the surrounding blastholes to expand the free surface, and then the side blasting holes are blasted to collapse the ore to the incision to complete the roof breaking of the mining area; the specific detonator section layout is as follows: the cutting shaft center hole is detonated first, the cutting shaft inner circle holes are spaced apart by 4 to 6 sections, the cutting shaft outer circle holes are spaced apart by 4 to 10 sections, the cutting shaft is spaced apart by 2 to 4 sections from the surrounding holes, the remaining cutting slot blastholes are spaced apart by 1 to 4 sections from the surrounding holes, and the side blasting holes are spaced apart by 1 to 4 sections from the cutting slot blastholes.
[0012] Furthermore, in the first step, the width of the entire cutting groove is the width of the mining area, and the length is the blasting step distance of 8-13m, from the inside to the outside. There are: a circular cutting shaft with a diameter of 2.6-3.0m, consisting of 13 charging holes and 4 empty holes; a circular circle of peripheral holes with a diameter of 5.6-6.0m is arranged around the cutting shaft, consisting of 10 blast holes; at least one row of side collapse blast holes is set between the circular circle of peripheral holes and the top breaking incision as a top breaking throwing buffer zone, and the distance between the blast hole at the incision position and the next blasting blast hole is enlarged, and arranged at a spacing of 2.4-2.6m.
[0013] Furthermore, in the circular cut shaft, the 13 charging holes include a central hole located in the middle, four inner circle holes evenly distributed and arranged outside the central hole, and eight outer circle holes evenly distributed and arranged outside the inner circle holes. The four empty holes are spaced apart from the four inner circle holes and are evenly spaced to form an encirclement around the outer periphery of the central hole.
[0014] Furthermore, in the second step, before breaking the roof, the depth of the cut shaft blasthole is controlled at 5.5-6.5m, and the depth of the peripheral holes and side collapse holes is controlled at 12-15m.
[0015] Furthermore, in the third step, the bottom resistance line of the cutting skylight blasthole is 0.8-1.0m, and the bottom resistance lines of the remaining blastholes are 1.0-1.2m; except for the cutting skylight center hole blasthole which uses continuous charging, the other blastholes are all charged at intervals, and double detonating cords are arranged in the hole for detonation transmission; the cutting skylight blasthole uses a charging structure of 1-2 90mm emulsion explosives with 0.8m of river sand at intervals, and the peripheral blastholes use a charging structure of 2 90mm emulsion explosives with 1.5m of river sand at intervals; the cutting skylight blasthole mouth resistance line is 0.8-1.0m, which is filled with river sand; the peripheral blasthole mouth resistance line is 1.5m, which is filled with river sand; the last row of side collapse blasthole mouth resistance line is 2.2-2.4m, which is filled with river sand to reduce the impact on the blastholes in the unblasted area.
[0016] Furthermore, in the fourth step, the blasting sequence follows the principle of first the middle and then the two sides, with the blast holes close to the free surface being detonated first; adjacent holes are arranged in the same section to reduce the occurrence of blind shots.
[0017] Beneficial effects of the present invention:
[0018] The present invention optimizes the arrangement of blastholes in the roof breaking area, adjusts the charging structure and sets the delay position of the detonator, so as to fully utilize the blasting energy to break the rock, reduce the upward rush of blasting energy to throw ore and the damage to the blastholes in the unblasted area, thereby achieving safe, reliable, stable and efficient roof breaking while solving the problem of ore throwing in the upper chamber. The invention has the advantages of reasonable design, convenient construction, safety and reliability, and can essentially eliminate the problem of ore throwing in the upper chamber and reduce mining costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is the layout of blastholes and detonator delay time chart in the roof breaking area;
[0020] Figure 2 The charge arrangement diagram for the blastholes in the top-breaking area;
[0021] Figure 3 Schematic diagram of the charge structure. DETAILED DESCRIPTION
[0022] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0023] Example
[0024] A deep hole slot blasting low throw top breaking method comprises the following steps: in a mining field requiring deep hole slot blasting, the first step is to determine the top breaking range of the mining field and arrange blastholes according to the top breaking range; the second step is to determine the blasting plan and gradually implement the blasting; the third step is to adjust the blasting charge structure; the fourth step is to determine the time delay position arrangement of the detonator.
[0025] Specifically, the deep hole slotting blasting low throw breaking method comprises the following steps:
[0026] Step 1: Determine the range of the top breaking in the mining area and arrange the blastholes according to the top breaking range: Determine the position of the cutting groove before mining and blasthole construction. The range of the cutting groove is the top breaking range. There should be enough top breaking and throwing buffer zone between the cutting groove and the cutting skylight to reduce the amount of top breaking ore thrown. Figure 1 As shown in the figure, the width of the entire cutting groove is the width of the stope, and the length is the blasting step (8-13m). From the inside to the outside, they are: a circular cutting ceiling with a diameter of 2.8m (grooving area), consisting of 13 charging holes (grooving holes L1, L2, L3, L4, L5, L6, L7, L8, L9, L10, L11, L12, L13, among which L1 is the center hole, located in the middle, L2-L5 are 4 inner circle holes, surrounded by L1, L6-L13 are 8 outer circle holes, each outer circle hole is evenly distributed to form a circular circle and surrounded by the inner circle hole) and 4 empty holes (K1, K2, K3, K4, to create a free surface and compensation space for cutting shaft blasting, the 4 empty holes and the 4 inner circle holes are arranged at intervals and evenly distributed to form a square circle and are arranged around the outer periphery of L1); a peripheral hole circular circle with a diameter of about 5.8m is arranged around the cutting shaft, consisting of 10 blastholes (3-1, 3-2, 3-3, 3-3a, 3-4, 4-1, 4-2, 4-3, 4-4a, 4-4); no less than one row of side collapse blastholes is arranged between the peripheral hole circular circle and the top breaking incision (in this embodiment, as Figure 1 As shown, the side collapse blast holes include the first row 1-1, 2-1, 5-1, 6-1, the second row 1-2, 2-2, 5-2, 6-2, the third row 1-3, 2-3, 5-3, 6-3, the fourth row 1-4, 2-4, 5-4, 6-4, the fifth row 1-5, 2-5, 3-5a, 3-5b, 4-5a, 4-5b, 4-5c, 5-5, 6-5) as the top breaking and throwing buffer zone, and the distance between the blast hole at the incision position and the blast hole for the next blasting is increased, and they are arranged at a spacing of 2.4m to 2.6m to reduce the damage of the top breaking to the rear row of blast holes.
[0027] Step 2: Determine the blasting plan and implement the blasting step by step: After the cutting shaft is blasted to 5-7m first, the cutting shaft and the surrounding holes and side collapse holes are blasted simultaneously to achieve the blasting of the cutting slot and create a free surface and compensation space for the top blasting. Before the top is broken, the depth of the cutting hole is controlled at about 6m, and the surrounding holes and side collapse holes are controlled at 12-15m. Sufficient thickness is reserved in the slot area to ensure the safety of the top blasting operation. Figure 2 .
[0028] Step 3: Determine the charging structure for top-breaking blasting: Deep hole grooving is a crucial step in the subsequent backfilling mining method for large-diameter deep hole lateral caving. It is also a prerequisite for subsequent large-scale lateral caving in the mining field, and requires high reliability for blasting. When the top is broken, the free surface and compensation space of the cutting well and the surrounding holes are small. The charging structure must ensure sufficient blasting charge to avoid blasting failures such as the upper and lower double "funnel phenomenon" and "hanging ore" around the cutting well. The bottom of all blastholes is firmly filled with cement lumps and / or an appropriate amount of river sand to reduce the discharge of blasting energy. The bottom resistance line of the cutting skylight blasthole is 0.8-1.0m, and the bottom resistance line of the remaining blastholes is 1.0-1.2m; except for the L1 (pull 1) blasthole which uses continuous charging, the other blastholes are all intermittently charged, and double detonating cords are installed in the hole to transmit the explosion; the cutting skylight blasthole uses a charging structure of 1-2 90mm emulsion explosives with 0.8m of river sand spaced apart. The surrounding blast holes use a charging structure with two 90mm emulsion explosives and 1.5m of river sand between them; the resistance line of the cutting well blast hole is 0.8-1.0m, which is filled with river sand to reduce the blasting energy uprush; the resistance line of the surrounding blast holes is 1.5m, which is filled with river sand; the resistance line of the 5th row of side collapse blast holes is 2.2-2.4m, which is filled with river sand, which can fully use the blasting energy to break the rock and reduce the damage to the blast holes in the unblasted area. Figure 3 .
[0029] Step 4: Determine the layout of the time delay position of the detonator and the top breaking: All blastholes adopt the "same hole and same section" double detonator detonation method to ensure the reliability of blasting; the detonation order is to detonate the cutting shaft first to create a free surface, then detonate the surrounding blastholes to expand the free surface, and then blast the side blasting holes to collapse the ore to the incision to complete the top breaking of the mining area. Because there is a throwing buffer zone between the holes around the cutting shaft and the incision, the cutting shaft and the surrounding holes have a high charge density and concentrated energy when breaking the top, and the amount of thrown ore is large. Most of the thrown ore is concentrated in the buffer zone. The buffer zone blastholes follow the direction of the cutting shaft to collapse the ore, and they collide with each other, preventing most of the ore from being thrown to the incision position, greatly reducing the amount of ore thrown in the upper chamber when the slot breaks the top. The blasting is safe and reliable, and the low-throw effect is significant. The specific arrangement is as follows: the central hole L1 of the cutting skylight explodes first, the inner circle holes (L2-L5) are spaced 4 to 6 sections apart, and the outer circle holes (L6-L13) are spaced 4 to 10 sections apart from the inner circle holes; the peripheral holes (3-1, 3-2, 3-3, 3-3a, 3-4, 4-1, 4-2, 4-3, 4-4a, 4-4) are spaced 2 to 4 sections apart from the grooved sections; the remaining cutting groove blastholes are spaced 1 to 4 sections apart from the peripheral holes; the side collapse holes are spaced 1 to 4 sections apart from the cutting groove blastholes; the blasting sequence follows the principle of first the middle and then the sides, with the blastholes close to the free surface detonated first; the adjacent holes are arranged in the same section to reduce the occurrence of blind shots. For specific detonator section arrangements, see Figure 1 .
[0030] Although the present invention has been disclosed as above with preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art may make some modifications and improvements without departing from the spirit and scope of the present invention. Therefore, the scope of protection of the present invention shall be based on the definition of the claims.
Claims
1. A deep hole slotting blasting low throw breaking method, characterized in that: The steps include: In a mining area that requires deep hole grooving and roof breaking blasting, the first step is to determine the roof breaking range of the mining area and arrange the blastholes according to the roof breaking range; the second step is to determine the blasting plan and implement the blasting step by step; the third step is to adjust the blasting charge structure; the fourth step is to determine the delay position arrangement of the detonator and the roof breaking.
2. A deep hole slotting blasting low throw breaking method as claimed in claim 1, characterized in that: The specific steps include: Step 1: Determine the scope of the top breaking in the mining area and arrange blastholes according to the scope of the top breaking: Determine the position of the cutting groove before mining and blasthole construction, and the scope of the cutting groove is the top breaking scope; a top breaking and throwing buffer zone is left between the cutting groove and the cutting patio, the width of the entire cutting groove is the width of the mining area, and the length is the blasting step distance. From the inside to the outside, they are: a circular cutting patio with inner and outer circles composed of a number of charging holes and a number of empty holes, a peripheral hole circular circle composed of a number of blastholes is arranged around the cutting patio, and a number of side collapse blastholes are arranged between the peripheral hole circular circle and the top breaking incision as a top breaking and throwing buffer zone; Step 2: Determine the blasting plan and implement the blasting step by step: After the cutting shaft is blasted to a certain height, the cutting shaft and the surrounding holes and side collapse holes are blasted simultaneously to achieve the blasting of the cutting slot and create a free surface and compensation space for the top blasting; Step 3: Determine the charging structure for top-breaking blasting: the bottoms of all blastholes are filled firmly with cement lumps and / or river sand, the central hole of the cutting skylight adopts continuous charging, and the other blastholes are charged with intervals, and double detonating cords are set in the holes for detonation transmission; the blastholes of the cutting skylight adopt a charging structure of 1-2 emulsion explosives and river sand, and the peripheral blastholes adopt a charging structure of 2 emulsion explosives and river sand; all blasthole openings are filled with river sand; Step 4: Determine the layout of the delayed detonator positions and the roof breaking: All blastholes are detonated with double detonators in the same hole and section. The detonation order is that the cutting shaft is detonated first to create a free surface, followed by the detonation of the surrounding blastholes to expand the free surface, and then the side blasting holes are blasted to collapse the ore to the incision to complete the roof breaking of the mining area; the specific detonator section layout is as follows: the cutting shaft center hole is detonated first, the cutting shaft inner circle holes are spaced apart by 4 to 6 sections, the cutting shaft outer circle holes are spaced apart by 4 to 10 sections, the cutting shaft is spaced apart by 2 to 4 sections from the surrounding holes, the remaining cutting slot blastholes are spaced apart by 1 to 4 sections from the surrounding holes, and the side blasting holes are spaced apart by 1 to 4 sections from the cutting slot blastholes.
3. A deep hole slotting blasting low throw breaking method as claimed in claim 2, characterized in that: In the first step, the width of the entire cutting groove is the width of the mining area, and the length is the blasting step distance of 8-13m. From the inside to the outside, there are: a circular cutting shaft with a diameter of 2.6-3.0m, consisting of 13 charging holes and 4 empty holes; a circular circle of peripheral holes with a diameter of 5.6-6.0m is arranged around the cutting shaft, consisting of 10 blast holes; at least one row of side collapse blast holes is set between the circular circle of peripheral holes and the top breaking incision as a top breaking throwing buffer zone, and the distance between the blast hole at the incision position and the next blasting blast hole is enlarged, and arranged at a spacing of 2.4-2.6m.
4. A deep hole slotting blasting low throw breaking method as claimed in claim 3, characterized in that: In the circular cut skylight, the 13 charging holes include a central hole located in the middle, four inner circle holes surrounding the central hole, and eight outer circle holes surrounding the inner circle holes. The four empty holes are spaced apart from the four inner circle holes and are arranged around the outer periphery of the central hole.
5. A deep hole slotting blasting low throw breaking method as claimed in claim 2, characterized in that: In the second step, before breaking the roof, the depth of the cutting hole is controlled at 5.5-6.5m, and the depth of the peripheral holes and side collapse holes is controlled at 12-15m.
6. A deep hole slotting blasting low throw breaking method as claimed in claim 2, characterized in that: In the third step, the bottom resistance line of the cutting skylight blasthole is 0.8-1.0m, and the bottom resistance lines of the other blastholes are 1.0-1.2m; except for the central hole of the cutting skylight which uses continuous charging, the other blastholes are all charged at intervals, and double detonating cords are arranged in the holes for detonation transmission; the cutting skylight blasthole uses a charging structure of 1-2 90mm emulsion explosives with 0.8m of river sand at intervals, and the peripheral blastholes use a charging structure of 2 90mm emulsion explosives with 1.5m of river sand at intervals; the opening resistance line of the cutting skylight blasthole is 0.8-1.0m, which is filled with river sand; the opening resistance line of the peripheral blastholes is 1.5m, which is filled with river sand; the opening resistance line of the last row of side collapse blastholes detonated is 2.2-2.4m, which is filled with river sand.
7. A deep hole slotting blasting low throw breaking method as claimed in claim 2, characterized in that: In the fourth step, the blasting sequence follows the principle of first blasting the middle and then the two sides, with the blast holes close to the free surface being detonated first; Adjacent holes are arranged in the same section to reduce the occurrence of blind shots.