Juncao planting optimization system based on adaptive site selection
Through the adaptive site selection optimization system of mushroom grass planting, combined with multi-level analysis and simulation models, the shortcomings of traditional site selection methods are solved, and the in-depth screening and reasonable selection of mushroom grass planting areas are realized, which improves the effect of mushroom grass planting .
Patent Information
- Application Number
- CN202411562114.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional mushroom grass planting and site selection methods lack comprehensiveness and accuracy, making them difficult to adapt to climate change and ecological environment changes, resulting in poor growth effect of mushroom grass, and existing site selection technologies based on big data analysis and machine learning are difficult to carry out in-depth And multi-angle analysis.
Provide a mushroom grass planting optimization system based on adaptive site selection, including reference area module, planting reference module, primary site selection optimization module and secondary site selection optimization module. Through multi-level analysis and simulation models, deep screening is more suitable. planting area.
The deep and three-dimensional analysis of the fungus grass planting area is achieved, and the most suitable cultivation area is accurately screened to ensure the rationality of fungus grass planting and the improvement of yield.
Smart Images

Figure CN119090242A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of planting optimization, and more specifically, to a mushroom grass planting optimization system based on adaptive site selection. Background Art
[0002] As a plant with efficient growth, strong adaptability and rich nutritional value, Juncao has shown great application potential in many fields such as agriculture, animal husbandry and ecological restoration. However, the planting effect of Juncao is affected by many factors, including soil conditions, water resource distribution, climate conditions, and pest and disease conditions. Therefore, scientific and reasonable selection of planting sites is crucial to improving the yield and quality of Juncao.
[0003] Traditional methods of selecting sites for Juncao cultivation mainly rely on empirical judgment or simple analysis of geographical conditions, which often lack comprehensiveness and accuracy. For example, empirical judgment alone may lead to overly subjective site selection, while considering only geographical conditions may ignore other environmental factors that have an important impact on Juncao growth. In addition, with climate change and changes in the ecological environment, traditional site selection methods may not be able to adapt to new planting conditions, resulting in poor growth of Juncao.
[0004] In order to overcome the limitations of traditional site selection methods, some advanced site selection technologies have begun to be applied to the field of Juncao cultivation in recent years. These technologies are usually based on big data analysis and machine learning algorithms, but these site selection technologies also have the problem of relatively one-sided site selection analysis, usually focusing on the analysis of one or several specific environmental factors, and it is difficult to conduct in-depth and multi-angle analysis of the site selection area. Summary of the invention
[0005] In view of the deficiencies in the prior art, the object of the present invention is to provide a Juncao planting optimization system based on adaptive site selection.
[0006] To achieve the above object, the present invention provides the following technical solutions: A Juncao planting optimization system based on adaptive site selection, including a reference area module, a planting reference module, a primary site selection optimization module, and a secondary site selection optimization module; The reference area module is used to obtain all reference planting areas of Juncao; The planting reference module is used to set the primary site selection time and obtain the planting reference value of the reference planting area based on the primary site selection time; The primary site selection optimization module obtains the primary site selection value of each reference planting area when the primary site selection time is over, and determines whether to mark the reference planting area as the primary site selection area based on the comparison result between the primary site selection value and the primary site selection threshold; The secondary site selection optimization module is used to obtain the secondary site selection value of each primary site selection area, mark the primary site selection area with the largest secondary site selection value as the planting addressing area, and arrange to plant mushroom grass in the planting addressing area.
[0007] Furthermore, the planting reference value of the reference planting area is obtained based on the primary site selection duration, specifically: a plurality of time points with equal time intervals are set within the primary site selection duration, and the planting reference value of the reference planting area is obtained at each time point of the primary site selection duration.
[0008] Furthermore, the planting reference value of the reference planting area is obtained by the following steps: collecting various types of planting consideration data of the reference planting area at the current time point, and then obtaining the consideration influence value of each type of planting consideration data, setting the consideration influence threshold, when the consideration influence value is greater than or equal to the consideration influence threshold, marking the type of planting consideration data as planting influence data, when the consideration influence value is less than the consideration influence threshold, marking the type of planting consideration data as planting reliable data, marking the total number of planting influence data as MDc, obtaining the total number of distinguishable reliable groups SDg, and using the formula The planting reference value ZCK of the reference planting area is obtained, where wa is the planting influence coefficient and wb is the distinction reliability coefficient.
[0009] Furthermore, the considered influence value of each type of planting consideration data is obtained through the following steps: obtaining the considered influence model of each type of planting consideration data, inputting each type of planting consideration data into the corresponding considered influence model, and then outputting the considered influence value of each type of planting consideration data.
[0010] Furthermore, the total number SDg of distinguishable reliable groups is obtained through the following steps: all implantation reliable data are matched pairwise into a reliable group, the considered influence values of two implantation influence data in the reliable group are difference calculated and the absolute value is taken to obtain the implantation reliable distinction value, and the implantation reliable distinction threshold is set. When the implantation reliable distinction value is greater than or equal to the implantation reliable distinction threshold, the reliable group is marked as a distinguishable reliable group, and the total number of distinguishable reliable groups is marked as SDg.
[0011] Furthermore, based on the comparison result between the primary site selection value and the primary site selection threshold, it is determined whether to mark the reference planting area as the primary site selection area. Specifically, the primary site selection threshold is set, and when the primary site selection value of the reference planting area is greater than or equal to the primary site selection threshold, the reference planting area is marked as the primary site selection area.
[0012] Furthermore, the primary site selection value of the reference planting area is obtained by the following steps: obtaining all planting reference values of the reference planting area, sorting all planting reference values in the order of the time points of the primary site selection duration, performing difference calculation on the planting reference values of two adjacent time points after sorting and taking the absolute value to obtain the reference fluctuation value, summing up all the reference fluctuation values and taking the average value to obtain the reference fluctuation mean GBY, obtaining the total planting reference value FMZ, and using the formula The primary site selection value PCTS of the reference planting area is obtained, where fa is the reference fluctuation coefficient and fb is the reference total coefficient.
[0013] Furthermore, the total planting reference value FMZ is obtained through the following steps: construct a rectangular coordinate system with the planting reference value as the X-axis and the primary site selection time as the Y-axis, determine the coordinates of the planting reference value corresponding to the time point in the rectangular coordinate system, mark the coordinate points of the planting reference value corresponding to the time point, connect the adjacent coordinate points in the rectangular coordinate system to obtain the planting reference curve, draw perpendicular lines from the two end points of the planting reference curve to the X-axis, and obtain the reference head and tail lines after the perpendicular line intersects the X-axis, and mark the total area of the closed figure formed by the planting reference curve, the two reference head and tail lines and the X-axis as the total planting reference value FMZ.
[0014] Furthermore, the secondary site selection value of the primary site selection area is obtained through the following steps: collecting various types of planting consideration data of the primary site selection area at various time points within the primary site selection period, and packaging and marking them as historical environmental data, obtaining the planting target data of Juncao, and constructing a Juncao growth model based on the historical environmental data and the planting target data. The Juncao growth model is simulated J times to obtain the Juncao growth value LCj of each simulation process, and the Juncao growth coefficient is set to NCa. The formula The secondary site selection value CXZS of the primary site selection area is obtained, where j=1, 2,…, J, and j is the sequence number of the simulation process.
[0015] Furthermore, the growth value of the grass in the simulation process is obtained by the following steps: the growth duration of the simulation process is marked as KSE, and after the simulation process is completed, the growth evaluation value BNG of the grass is obtained, and the formula is used The growth value LCj of the Juncao in the simulation process is obtained, where va is the growth duration coefficient and vb is the growth evaluation coefficient; The growth evaluation of Juncao is obtained through the following steps: after the simulation process is completed, the growth index data of Juncao is obtained, the growth index model of Juncao is obtained simultaneously, the growth index data is input into the growth index model, and the growth index model outputs the growth evaluation of Juncao.
[0016] Compared with the prior art, the present invention has the following beneficial effects: Through the reference area module, planting reference module and primary site optimization module, the data that needs to be considered in the reference planting area for Juncao planting is analyzed in depth and in a three-dimensional manner, and the areas that are more suitable for Juncao planting are accurately and efficiently selected in the reference planting area; Through the secondary site selection optimization module, a secondary analysis of the Juncao planting area is carried out after the primary screening. Through the simulation and analysis of Juncao planting, the most suitable area for Juncao planting is accurately selected. Through two different optimization site selection methods, the rationality of Juncao planting is guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a system flow chart of a Juncao planting optimization system based on adaptive site selection; Figure 2 A flow chart for obtaining planting reference values for reference planting areas; Figure 3 This is a system module diagram of a Juncao planting optimization system based on adaptive site selection. DETAILED DESCRIPTION
[0018] Reference Figure 1-Figure 3 A Juncao planting optimization system based on adaptive site selection includes a reference area module, a planting reference module, a primary site selection optimization module, and a secondary site selection optimization module.
[0019] Reference area module: obtain all reference planting areas of Juncao (reference planting areas are areas suitable for Juncao planting that are pre-selected based on comprehensive geographical and ecological conditions).
[0020] Planting reference module: Set the primary site selection duration, set multiple time points with equal time intervals within the primary site selection duration, and obtain the planting reference value of the reference planting area at each time point of the primary site selection duration.
[0021] The planting reference value of the reference planting area is obtained through the following steps: collect various types of planting consideration data in the reference planting area at the current time point (the planting consideration data type of the reference planting area includes but is not limited to soil data, water resource data, meteorological data, and pest data. The above types of planting consideration data will affect the actual planting effect of Juncao), and then obtain the consideration influence value of each type of planting consideration data, set the consideration influence threshold (the consideration influence threshold is a system preset value, and the size is set by the system itself), when the consideration influence value is greater than or equal to the consideration influence threshold, mark this type of planting consideration data as planting influence data, and when the consideration influence value is less than the consideration influence threshold, mark this type of planting consideration data as planting influence data. When the threshold is reached, the considered data of this type of planting is marked as reliable planting data, the total number of planting impact data is marked as MDc, all reliable planting data are matched into a reliable group, the difference between the considered impact values of the two planting impact data in the reliable group is calculated and the absolute value is taken to obtain the reliable planting difference value, and the reliable planting difference threshold is set (the reliable planting difference threshold is a system preset value, and the size is set by the system itself). When the reliable planting difference value is greater than or equal to the reliable planting difference threshold, the reliable group is marked as a reliable difference group. When the reliable planting difference value is less than the reliable planting difference threshold, no processing is performed, and the total number of reliable difference groups is marked as SDg. The formula is used. The planting reference value ZCK of the reference planting area is obtained, where wa is the planting influence coefficient, wb is the distinction reliability coefficient, the value of wa is 0.83, and the value of wb is 0.71.
[0022] The consideration influence values of each type of planting consideration data are obtained through the following steps: obtaining the consideration influence model of each type of planting consideration data, inputting each type of planting consideration data into the corresponding consideration influence model, and then outputting the consideration influence values of each type of planting consideration data.
[0023] In this embodiment, a consideration impact model is set for each type of planting consideration data. The only difference between each consideration impact model is the replacement between training data. In this embodiment, meteorological data is taken as an example to disclose the construction method of the consideration impact model: meteorological data at i time points are collected, and each meteorological data includes but is not limited to the following data: temperature data, humidity data, precipitation data, and light data. A deep learning model is constructed, and the meteorological data is used as training data for the deep learning model (if it is a consideration impact model for soil data, soil data at i time points are collected, and each soil data includes but is not limited to the following data: soil temperature data, soil pH data, soil fertility data, and soil The data is used as the training data of the deep learning model), and a considered influence value is assigned to each training data. The range of the considered influence value is (0.1~0.9). The larger the value of the considered influence value, the more unfavorable the meteorological data is for Juncao planting, and the smaller the value of the considered influence value, the more favorable the meteorological data is for Juncao planting (if it is a considered influence model of soil data, the larger the value of the considered influence value, the more unfavorable the soil data is for Juncao planting, and the smaller the value of the considered influence value, the more favorable the soil data is for Juncao planting). All training data are divided into 55% training set and 45% validation set, and the training set and validation set are trained. After the training is completed, the considered influence model of meteorological data is obtained.
[0024] Primary site selection optimization module: When the primary site selection time ends, obtain the primary site selection value of each reference planting area, set the primary site selection threshold (the primary site selection threshold is a system preset value, and the size is set by the system). When the primary site selection value of the reference planting area is greater than or equal to the primary site selection threshold, the reference planting area is marked as a primary site selection area. When the primary site selection value of the reference planting area is less than the primary site selection threshold, no processing is performed.
[0025] The primary site selection value of the reference planting area is obtained by the following steps: obtain all planting reference values of the reference planting area, sort all planting reference values in the order of the time points of the primary site selection duration, calculate the difference between the planting reference values of two adjacent time points after sorting and take the absolute value to obtain the reference fluctuation value, sum all the reference fluctuation values and take the average to obtain the reference fluctuation average GBY, construct a rectangular coordinate system with the planting reference value as the X-axis and the primary site selection duration as the Y-axis, determine the coordinates of the planting reference value corresponding to the time point in the rectangular coordinate system, mark the coordinate points of the planting reference value corresponding to the time point, connect the adjacent coordinate points in the rectangular coordinate system to obtain the planting reference curve, draw perpendicular lines from the two end points of the planting reference curve to the X-axis, and obtain the reference head and tail lines after the perpendicular line intersects the X-axis, mark the total area of the closed figure formed by the planting reference curve, the two reference head and tail lines and the X-axis as the planting reference total value FMZ, and use the formula The primary site selection value PCTS of the reference planting area is obtained, where fa is the reference fluctuation coefficient, fb is the reference total coefficient, the value of fa is 3.52, and the value of fb is 2.18.
[0026] Secondary site selection optimization module: obtain the secondary site selection value of each primary site selection area, mark the primary site selection area with the largest secondary site selection value as the planting addressing area, and arrange the planting of mushroom grass in the planting addressing area.
[0027] The secondary site selection value of the primary site selection area is obtained through the following steps: collect various types of planting consideration data of the primary site selection area at various time points within the primary site selection period, and package and mark them as historical environmental data (organize and package various types of planting consideration data in a unified format), obtain the planting target data of Juncao (the planting target data is the data expected to be achieved by Juncao planting, such as yield and quality), build a Juncao growth model based on the historical environmental data and the planting target data, simulate the Juncao growth model J times, obtain the Juncao growth value LCj of each simulation process, set the Juncao growth coefficient to NCa, a=1, 2, 3, …a; NC1<NC2<NC3<…<NCa, each Juncao growth coefficient corresponds to a Juncao growth value within a range, first, the range of Juncao growth value includes (0, LC1], (LC1, LC2], …, (LCJ-1, LCJ], for example, when LCj∈(LC1, LC2], the Juncao growth coefficient is NC2, and the formula is used The secondary site selection value CXZS of the primary site selection area is obtained, where j=1, 2,…, J, and j is the sequence number of the simulation process.
[0028] Construct a Juncao growth model based on historical environmental data and planting target data. Specifically, select simulation software. The simulation software can be PlantFactory (features: supports highly customized and complex plant structure design, and can generate realistic plant models), SpeedTree (features: provides powerful real-time editing functions, can simulate the natural swaying of plants in the wind), GrowFX (features: as a plug-in for 3ds Max, it provides rich parametric modeling functions, can simulate the growth process of plants, and supports wind and gravity effects) or Blender (features: open source 3D modeling software, which can realize plant modeling functions through plug-ins and scripts). Build a Juncao model in the simulation software based on historical environmental data and planting target data, put the established Juncao model into the virtual environment, and complete the construction of the Juncao growth model.
[0029] The growth value of the grass in the simulation process is obtained by the following steps: the growth duration of the simulation process is marked as KSE. After the simulation process is completed, the growth evaluation value BNG of the grass is obtained, and the formula is used The growth value LCj of the grass in the simulation process is obtained, where va is the growth duration coefficient, vb is the growth evaluation coefficient, the value of va is 0.68, and the value of vb is 0.45.
[0030] The growth evaluation of Juncao is obtained through the following steps: after the simulation process is completed, the growth index data of Juncao is obtained, the growth index model of Juncao is obtained simultaneously, the growth index data is input into the growth index model, and the growth index model outputs the growth evaluation of Juncao.
[0031] The growth index model is obtained through the following steps: collecting k groups of growth index data of Juncao, the growth index data of each group of Juncao includes but is not limited to the following data: plant height data, number of tillers, fresh grass yield, building a deep learning model, using the growth index data of Juncao as training data of the deep learning model, assigning a growth evaluation value to each training data, and the value of the growth evaluation value is greater than zero. The larger the value of the growth evaluation value, the better the growth effect of Juncao, dividing all training data into 60% training set and 40% validation set, training the training set and validation set, and obtaining the growth index model after the training is completed.
[0032] A reference area module, a planting reference module and a primary site selection optimization module are set up to conduct an in-depth and three-dimensional analysis of the data that needs to be considered in the reference planting area for Juncao planting, and to accurately and efficiently screen out areas that are more suitable for Juncao planting in the reference planting area. A secondary site selection optimization module is set up to conduct a secondary analysis of the Juncao planting area after the primary screening. Through the simulation and analysis of Juncao planting, the most suitable area for Juncao planting is accurately selected, and the rationality of Juncao planting is guaranteed through two different optimization site selection methods.
[0033] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.
[0034] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.
[0035] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0036] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0037] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0038] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0039] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in the various embodiments of the present application. The aforementioned storage media include: various media that can store program codes, such as USB flash drives, mobile hard disks, read-only memories (ROM), random access memories (RAM), magnetic disks or optical disks.
[0040] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A Juncao planting optimization system based on adaptive site selection, characterized in that: It includes reference area module, planting reference module, primary site selection optimization module and secondary site selection optimization module; The reference area module is used to obtain all reference planting areas of Juncao; The planting reference module is used to set the primary site selection time and obtain the planting reference value of the reference planting area based on the primary site selection time; The primary site selection optimization module obtains the primary site selection value of each reference planting area when the primary site selection time is over, and determines whether to mark the reference planting area as the primary site selection area based on the comparison result between the primary site selection value and the primary site selection threshold; The secondary site selection optimization module is used to obtain the secondary site selection value of each primary site selection area, mark the primary site selection area with the largest secondary site selection value as the planting addressing area, and arrange to plant mushroom grass in the planting addressing area.
2. According to claim 1, a Juncao planting optimization system based on adaptive site selection is characterized in that: The planting reference value of the reference planting area is obtained based on the primary site selection duration, specifically: a plurality of time points with equal time intervals are set within the primary site selection duration, and the planting reference value of the reference planting area is obtained at each time point of the primary site selection duration.
3. The Juncao planting optimization system based on adaptive site selection according to claim 2 is characterized in that: The planting reference value of the reference planting area is obtained by the following steps: collecting various types of planting consideration data in the reference planting area at the current time point, and then obtaining the consideration influence value of each type of planting consideration data, setting the consideration influence threshold, when the consideration influence value is greater than or equal to the consideration influence threshold, marking the type of planting consideration data as planting influence data, when the consideration influence value is less than the consideration influence threshold, marking the type of planting consideration data as planting reliable data, marking the total number of planting influence data as MDc, obtaining the total number of distinguishable reliable groups SDg, and using the formula The planting reference value ZCK of the reference planting area is obtained, where wa is the planting influence coefficient and wb is the distinction reliability coefficient.
4. The Juncao planting optimization system based on adaptive site selection according to claim 3 is characterized in that: The consideration influence values of each type of planting consideration data are obtained through the following steps: obtaining the consideration influence model of each type of planting consideration data, inputting each type of planting consideration data into the corresponding consideration influence model, and then outputting the consideration influence values of each type of planting consideration data.
5. The Juncao planting optimization system based on adaptive site selection according to claim 3 is characterized in that: The total number SDg of distinguishable reliable groups is obtained through the following steps: all implant reliable data are matched into one reliable group in pairs, the considered influence values of two implant influence data in the reliable group are calculated by difference and the absolute value is taken to obtain the implant reliable distinction value, and the implant reliable distinction threshold is set. When the implant reliable distinction value is greater than or equal to the implant reliable distinction threshold, the reliable group is marked as a distinguishable reliable group, and the total number of distinguishable reliable groups is marked as SDg.
6. The Juncao planting optimization system based on adaptive site selection according to claim 1 is characterized in that: Based on the comparison result between the primary site selection value and the primary site selection threshold, determine whether to mark the reference planting area as the primary site selection area. Specifically: set the primary site selection threshold, and when the primary site selection value of the reference planting area is greater than or equal to the primary site selection threshold, mark the reference planting area as the primary site selection area.
7. The Juncao planting optimization system based on adaptive site selection according to claim 1 is characterized in that: The primary site selection value of the reference planting area is obtained by the following steps: obtain all planting reference values of the reference planting area, sort all planting reference values in the order of the time points of the primary site selection duration, calculate the difference between the planting reference values of two adjacent time points after sorting and take the absolute value to obtain the reference fluctuation value, sum up all the reference fluctuation values and take the average to obtain the reference fluctuation mean GBY, obtain the total planting reference value FMZ, and use the formula The primary site selection value PCTS of the reference planting area is obtained, where fa is the reference fluctuation coefficient and fb is the reference total coefficient.
8. The Juncao planting optimization system based on adaptive site selection according to claim 7 is characterized in that: The total reference planting value FMZ is obtained through the following steps: construct a rectangular coordinate system with the planting reference value as the X-axis and the primary site selection time as the Y-axis, determine the coordinates of the planting reference value corresponding to the time point in the rectangular coordinate system, mark the coordinate points of the planting reference value corresponding to the time point, connect the adjacent coordinate points in the rectangular coordinate system to obtain the planting reference curve, draw perpendicular lines from the two end points of the planting reference curve to the X-axis, and obtain the reference head and tail lines after the perpendicular line intersects the X-axis, and mark the total area of the closed figure formed by the planting reference curve, the two reference head and tail lines and the X-axis as the total reference planting value FMZ.
9. The Juncao planting optimization system based on adaptive site selection according to claim 1 is characterized in that: The secondary site selection value of the primary site selection area is obtained through the following steps: collect various types of planting consideration data at various time points in the primary site selection period, and package and mark them as historical environmental data, obtain the planting target data of Juncao, build a Juncao growth model based on the historical environmental data and the planting target data, simulate the Juncao growth model J times, obtain the Juncao growth value LCj of each simulation process, set the Juncao growth coefficient to NCa, and use the formula The secondary site selection value CXZS of the primary site selection area is obtained, where j=1, 2,…, J, and j is the sequence number of the simulation process.
10. The Juncao planting optimization system based on adaptive site selection according to claim 9 is characterized in that: The growth value of the grass in the simulation process is obtained by the following steps: the growth duration of the simulation process is marked as KSE. After the simulation process is completed, the growth evaluation value BNG of the grass is obtained, and the formula is used The growth value LCj of the Juncao in the simulation process is obtained, where va is the growth duration coefficient and vb is the growth evaluation coefficient; The growth evaluation of the Juncao is obtained through the following steps: after the simulation process is completed, the growth index data of the Juncao is obtained, the growth index model of the Juncao is obtained simultaneously, the growth index data is input into the growth index model, and the growth index model outputs the growth evaluation of the Juncao.
Citation Information
Patent Citations
Crop plantation site screening system and method
CN106017558A
Logistics transfer network site selection method and system, electronic equipment and storage medium
CN116822691A
Crop planting strategy generation method and device, electronic equipment and storage medium
CN117875728A
Forage grass planting area planning method based on image processing
CN118657666A
Planting a garden planning system using the sunshine analysis
KR101733955B1
Cited By
Traditional Chinese medicine planting site selection evaluation method, system and equipment based on big data and medium
CN119515207A
Radix ranunculi ternati planting planning system and method based on Internet
CN120373736A
