Medium-voltage flexible direct-current switching station topological structure containing energy storage and design method of medium-voltage flexible direct-current switching station topological structure
By designing the topological structure of medium voltage flexible and straight opening and closing containing energy storage, combined with DC transformer and energy storage device, the shortcomings in power supply and stability of traditional AC power supply systems are solved, and the reliability of medium voltage DC power supply is achieved Improved performance and efficiency, suitable for high-voltage application scenarios.
Patent Information
- Application Number
- CN202411169097.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-12-06
AI Technical Summary
Traditional AC power supply and consumption systems cannot meet the demand for increased power supply by new technologies such as 5G and cloud computing. DC power supply and consumption technology has shortcomings in improving equipment stability and reliability, especially in high-voltage applications, where voltage drops and power supply are present. Reliability issues.
A medium voltage flexible direct opening and closing topology structure containing energy storage is designed. Through the combination of AC inlet line, rectifier, flexible direct converter, DC transformer and energy storage device, the medium voltage DC power supply is realized and the DC transformer is set up. It is a backup solution, and is equipped with energy storage on the medium and low voltage side to ensure short-term power outage operation. It adopts flexible DC to avoid voltage drop. It is suitable for large DC loads such as data centers and electrolytic plating.
Improve the stability and reliability of the equipment, avoid the problem of voltage drop, realize the advantages of impact-free combined ring and multi-line connection, ensure the short-term non-power operation of important power supply loads and auxiliary equipment, and improve the DC power supply Reliability and efficiency.
Smart Images

Figure CN119093310A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of switchgear, and in particular to a medium-voltage flexible direct current switchgear topological structure with energy storage and a design method thereof. Background Art
[0002] With the continuous development of new technologies such as 5G, cloud computing, and the Internet of Things, the requirements for power supply are also increasing. Faced with the urgent need to simplify the power conversion link and improve the conversion efficiency, the traditional AC power supply system often cannot meet these needs, while DC power supply technology can perfectly solve these problems and improve the stability and reliability of equipment. The advantages of DC power supply technology include greatly improved reliability, great energy savings, and greatly improved load capacity. These advantages have enabled high-voltage DC power supply technology to be successfully applied in many fields and have achieved remarkable results. In the fields of information and communication base stations, data centers, and optical storage buildings, DC power supply technology is becoming the first choice. Summary of the invention
[0003] The object of the present invention is to overcome the shortcomings of the prior art and to provide a medium voltage flexible direct current switchgear topology structure with energy storage and a design method thereof.
[0004] The object of the present invention is achieved through the following technical solutions: A medium-voltage flexible DC switchgear topology structure containing energy storage, comprising an AC incoming line, a first AC bus, a first low-voltage DC bus, a DC incoming line and a medium-voltage DC bus, wherein the AC incoming line is connected to the first AC bus, the first AC bus is connected to the input end of the transformer substation, the output end of the transformer substation is connected to the input end of the rectifier, the output end of the rectifier is connected to the first low-voltage DC bus, the DC incoming line is connected to the medium-voltage DC bus, the medium-voltage DC bus is connected to the input end of the flexible DC converter, and the flexible DC The output end of the converter is connected to the second AC bus, the first AC bus and the second AC bus are connected through a first circuit breaker, the medium-voltage DC bus is connected to a medium-voltage energy storage device, the medium-voltage DC bus is connected to the input end of the DC transformer, the output end of the DC transformer is connected to the second low-voltage DC bus, the second low-voltage DC bus is connected to a low-voltage energy storage device, the first low-voltage DC bus and the second low-voltage DC bus are connected through a second circuit breaker, the first AC bus and the second AC bus are respectively connected to a plurality of AC output lines, and the medium-voltage DC bus is connected to a plurality of DC output lines.
[0005] A design method for a medium voltage flexible direct current switchgear topology structure with energy storage comprises the following steps:
[0006] Step S1: Determine the number of medium voltage DC outgoing line circuits according to the number of users who need medium voltage DC power supply and the power supply required by each load;
[0007] Step S2: Determine the number of outgoing lines of each AC bus section;
[0008] Step S3: Determine the capacity of the flexible DC converter;
[0009] Step S4: Determine the capacity of the DC transformer;
[0010] Step S5: medium voltage energy storage capacity design;
[0011] Step S6: Low voltage energy storage capacity design
[0012] Specifically, the number of medium voltage DC outgoing line circuits is:
[0013]
[0014] Where N1 is the number of medium voltage DC circuits, ceil() is the upward rounding function, and n DC Number of users supplied with medium voltage DC power, M i The power supply required for each load, p DC is the maximum power supply of a single medium voltage DC line, and k is the margin coefficient of the DC load taking into account line loss, simultaneity rate and load rate.
[0015] Specifically, the number of outgoing lines of each AC bus section is:
[0016]
[0017] Where N2 is the number of outgoing lines of each AC busbar, ceil() is the upward rounding function, and n AC The number of users supplying medium voltage AC power; p AC L is the maximum power supply capacity of a single medium voltage DC line; i is the power supply capacity required for each AC load; k' is the margin coefficient of the AC load that comprehensively considers line loss, simultaneity rate and load rate.
[0018] Specifically, the capacity V1 of the flexible DC converter is:
[0019]
[0020] Where V1 is the capacity of the flexible DC converter; k is the margin coefficient of the DC load that comprehensively considers line loss, simultaneous rate and load rate; M i The power supply required for each load; V swi and P swi They are the maximum capacity of AC power supply for the switchgear station and the maximum power supply power of auxiliary facilities of the switchgear station, as shown in the following formula:
[0021]
[0022] Pswi =k”(P 空调 +P 风机 +P 照明 +P 应急插座 )
[0023] Wherein, k” is the margin coefficient of the auxiliary facilities of the switch station, which comprehensively considers the line loss, simultaneity rate and load rate; n AC The number of users supplying medium voltage AC power; L i The power supply capacity required for each AC load; P 空调 , P 风机 , P 照明 and P 应急插座 They are the power of air conditioning, lighting, fan and emergency socket respectively.
[0024] Specifically, the capacity of the DC transformer is:
[0025] V2=P swi =k”(P 空调 +P 风机 +P 照明 +P 应急插座 )
[0026] Wherein, V2 is the capacity of the DC transformer; P swi is the maximum power supply power of the auxiliary facilities of the switch station, k” is the margin coefficient of the auxiliary facilities of the switch station that comprehensively considers line loss, simultaneity rate and load rate, P 空调 , P 风机 , P 照明 and P 应急插座 They are the power of air conditioning, lighting, fan and emergency socket respectively.
[0027] Specifically, the medium voltage energy storage capacity is:
[0028]
[0029] Among them, ∑E AC and ∑E DC are the sum of the AC and DC medium voltage primary loads respectively; T1 is the continuous power supply duration of the medium voltage energy storage to the primary important load, which is generally 0.5 hours; P mvstr and V mvstr are the maximum power of the medium voltage converter and the battery energy storage capacity respectively. Specifically, the low voltage energy storage capacity is:
[0030]
[0031] Where, T2 = 2 hours, k" is the margin factor of the auxiliary facilities of the switch station that comprehensively considers line loss, simultaneity rate and load rate; P 空调 , P 风机 , P照明 and P 应急插座 are the power of air conditioning, lighting, fan and emergency socket respectively; P lvstr and V lvstr They are the maximum power of the converter and the battery energy storage capacity of the low-voltage energy storage.
[0032] The present invention has the following advantages:
[0033] 1. The present invention arranges the AC outlet to avoid the voltage sag problem of users with the help of flexible DC. The DC outlet can directly supply large-scale DC loads such as large-scale fast charging, data centers, electrolysis and electroplating at medium voltage. In terms of power grid operation mode, the flexible DC can be used to make the distribution system have the advantages of impact-free closing and multi-line connection without increasing short-circuit current.
[0034] 2. The present invention is equipped with a DC transformer, and the low-voltage side and the DC rectified by the low-voltage side of another station transformer are used as backup for each other. DC power supply is used for DC equipment such as air conditioners, lighting, fans, etc. in the switchgear. In order to ensure power supply reliability, energy storage is set on the medium and low voltage sides to ensure short-term non-stop operation of important power supply loads and auxiliary equipment of the switchgear. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 A schematic diagram of the topological structure of a medium voltage flexible direct current switchgear of the present invention;
[0036] In the figure: 1-AC incoming line, 2-first AC bus, 3-substation transformer, 4-first circuit breaker, 5-medium voltage DC bus, 6-medium voltage energy storage device, 7-DC incoming line, 8-DC outlet, 9-DC transformer, 10-flexible DC converter, 12-second low voltage DC bus, 13-second circuit breaker, 14-first low voltage DC bus, 15-rectifier, 16-AC outlet, 17-second AC bus, 18-low voltage energy storage device. DETAILED DESCRIPTION
[0037] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention, that is, the embodiments described are only part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings herein can be arranged and designed in various different configurations.
[0038] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work are within the scope of protection of the present invention.
[0039] It should be noted that relational terms such as "first" and "second" are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "including a..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0040] The present invention is further described below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following description. Figure 1As shown, a medium-voltage flexible DC switchgear topology structure with energy storage includes an AC incoming line 1, a first AC bus 2, a first low-voltage DC bus 14, a DC incoming line 7 and a medium-voltage DC bus 5, wherein the AC incoming line 1 is connected to the first AC bus 2, the first AC bus 2 is connected to the input end of the substation transformer 3, the output end of the substation transformer 3 is connected to the input end of the rectifier 15, the output end of the rectifier 15 is connected to the first low-voltage DC bus 14, the DC incoming line 7 is connected to the medium-voltage DC bus 5, the medium-voltage DC bus 5 is connected to the input end of the flexible DC converter 10, and the output end of the flexible DC converter 10 is connected to the first low-voltage DC bus 14. Two AC busbars 17, the first AC busbar 2 and the second AC busbar 17 are connected through a first circuit breaker 4, the medium-voltage DC busbar 5 is connected to a medium-voltage energy storage device 6, the medium-voltage DC busbar 5 is connected to the input end of the DC transformer 9, the output end of the DC transformer 9 is connected to the second low-voltage DC busbar 12, the second low-voltage DC busbar 12 is connected to a low-voltage energy storage device 18, the first low-voltage DC busbar 14 and the second low-voltage DC busbar 12 are connected through a second circuit breaker 13, the first AC busbar 2 and the second AC busbar 17 are respectively connected to a plurality of AC output lines 16, and the medium-voltage DC busbar 5 is connected to a plurality of DC output lines 8. In this embodiment, based on the conventional typical two-input and twelve (four, six)-output switchgear, one of the incoming lines is replaced by medium-voltage DC after AC-DC conversion, and a DC-AC conversion and medium-voltage DC outgoing line circuit is set at the same time to form a switchgear with AC-DC mixed outgoing lines. The AC outgoing line avoids the voltage drop problem of users with the help of flexible DC, and the DC outgoing line can directly supply large-scale DC loads such as large-scale fast charging, data centers, electrolysis and electroplating at medium voltage; in terms of power grid operation mode, the flexible DC can be used to make the distribution system have the advantages of impact-free closing and multi-line connection without increasing short-circuit current. One of the two 30 kVA station transformers in the conventional switchgear is cancelled, and a DC transformer is set. The low-voltage side and the DC rectified on the low-voltage side of the other station transformer are used as backup for each other. DC power supply is used for DC equipment such as air conditioners, lighting, and fans in the switchgear, and the original rectification circuits of air conditioners, lighting, and fans are cancelled; in order to ensure power supply reliability, energy storage is set on both the medium and low voltage sides to ensure short-term non-stop operation of important power supply loads and auxiliary equipment of the switchgear respectively.
[0041] A design method for a medium voltage flexible direct current switchgear topology structure with energy storage comprises the following steps:
[0042] Step S1: Determine the number of medium voltage DC outgoing line circuits according to the number of users who need medium voltage DC power supply and the power supply required by each load;
[0043]
[0044] Where N1 is the number of medium voltage DC circuits, ceil() is the upward rounding function, and n DCNumber of users supplied with medium voltage DC power, M i The power supply required for each load, p DC is the maximum power supply of a single medium voltage DC line, k is the margin factor of the DC load taking into account line loss, simultaneity rate and load rate;
[0045] Step S2: Determine the number of outgoing lines of each AC bus section;
[0046]
[0047] Where N2 is the number of outgoing lines of each AC busbar, ceil() is the upward rounding function, and n AC The number of users supplying medium voltage AC power; p AC L is the maximum power supply capacity of a single medium voltage DC line; i is the power supply capacity required for each AC load; k' is the margin coefficient of the AC load that comprehensively considers line loss, simultaneity rate and load rate;
[0048] Step S3: Determine the capacity of the flexible DC converter;
[0049]
[0050] Where V1 is the capacity of the flexible DC converter; k is the margin coefficient of the DC load that comprehensively considers line loss, simultaneous rate and load rate; M i The power supply required for each load; V swi and P swi They are the maximum capacity of the AC power supply of the switchgear and the maximum power supply power of the auxiliary facilities of the switchgear (air conditioning, lighting, fans and emergency sockets), as shown in the following formula:
[0051]
[0052] P swi =k”(P 空调 +P 风机 +P 照明 +P 应急插座 )
[0053] Wherein, k” is the margin coefficient of the auxiliary facilities of the switch station, which comprehensively considers the line loss, simultaneity rate and load rate; n AC The number of users supplying medium voltage AC power; L i The power supply capacity required for each AC load; P 空调 , P 风机 , P 照明 and P 应急插座 They are the power of air conditioning, lighting, fans and emergency sockets respectively;
[0054] Step S4: Determine the capacity of the DC transformer;
[0055] V2=P swi =k”(P 空调 +P 风机 +P 照明 +P 应急插座 )
[0056] Wherein, V2 is the capacity of the DC transformer; P swi is the maximum power supply power of the auxiliary facilities of the switch station, k” is the margin coefficient of the auxiliary facilities of the switch station that comprehensively considers line loss, simultaneity rate and load rate, P 空调 , P 风机 , P 照明 and P 应急插座 They are the power of air conditioning, lighting, fans and emergency sockets respectively;
[0057] Step S5: medium voltage energy storage capacity design;
[0058] The medium voltage energy storage capacity is:
[0059]
[0060] Among them, ∑E AC and ∑E DC are the sum of the AC and DC medium voltage primary loads respectively; T1 is the continuous power supply duration of the medium voltage energy storage to the primary important load, which is generally 0.5 hours; P mvstr and V mvstr are respectively the maximum power of the converter and the battery energy storage capacity of the medium voltage energy storage; Step S6: low voltage energy storage capacity design;
[0061]
[0062] Where, T2 = 2 hours, k" is the margin factor of the auxiliary facilities of the switch station that comprehensively considers line loss, simultaneity rate and load rate; P 空调 , P 风机 , P 照明 and P 应急插座 are the power of air conditioning, lighting, fan and emergency socket respectively; P lvstr and V lvstr They are the maximum power of the converter and the battery energy storage capacity of the low-voltage energy storage.
[0063] The above is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any technician familiar with the art can make many possible changes and modifications to the technical solution of the present invention by using the above-mentioned technical content without departing from the scope of the technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any changes, modifications, equivalent changes and modifications made to the above embodiments based on the technology of the present invention without departing from the content of the technical solution of the present invention belong to the protection scope of the present technical solution.
Claims
1. A medium voltage flexible DC switchgear topology with energy storage, Features: The invention comprises an AC incoming line (1), a first AC busbar (2), a first low-voltage DC busbar (14), a DC incoming line (7) and a medium-voltage DC busbar (5), wherein the AC incoming line (1) is connected to the first AC busbar (2), the first AC busbar (2) is connected to the input end of a transformer substation transformer (3), the output end of the transformer substation transformer (3) is connected to the input end of a rectifier (15), the output end of the rectifier (15) is connected to the first low-voltage DC busbar (14), the DC incoming line (7) is connected to the medium-voltage DC busbar (5), the medium-voltage DC busbar (5) is connected to the input end of a flexible DC converter (10), the output end of the flexible DC converter (10) is connected to a second AC busbar (17), and the first An AC bus (2) is connected to a second AC bus (17) via a first circuit breaker (4); the medium-voltage DC bus (5) is connected to a medium-voltage energy storage device (6); the medium-voltage DC bus (5) is connected to an input end of a DC transformer (9); the output end of the DC transformer (9) is connected to a second low-voltage DC bus (12); the second low-voltage DC bus (12) is connected to a low-voltage energy storage device (18); the first low-voltage DC bus (14) and the second low-voltage DC bus (12) are connected via a second circuit breaker (13); the first AC bus (2) and the second AC bus (17) are respectively connected to a plurality of AC output lines (16); and the medium-voltage DC bus (5) is connected to a plurality of DC output lines (8).
2. A method for designing a topological structure of a medium voltage flexible direct current switchgear with energy storage as claimed in claim 1, Features: The following steps are involved: Step S1: Determine the number of medium voltage DC outgoing line circuits according to the number of users who need medium voltage DC power supply and the power supply required by each load; Step S2: Determine the number of outgoing lines of each AC bus section; Step S3: Determine the capacity of the flexible DC converter; Step S4: Determine the capacity of the DC transformer; Step S5: medium voltage energy storage capacity design; Step S6: low voltage energy storage capacity design.
3. According to the design method of the topological structure of a medium voltage flexible direct current switchgear with energy storage according to claim 2, Features: The number of medium voltage DC outgoing line circuits is: Among them, N 1 is the number of medium voltage DC circuits, ceil() is the upward rounding function, n DC Number of users supplied with medium voltage DC power, M i The power supply required for each load, p DC is the maximum power supply of a single medium voltage DC line, and k is the margin coefficient of the DC load taking into account line loss, simultaneity rate and load rate.
4. According to the design method of the topological structure of a medium voltage flexible direct current switchgear with energy storage according to claim 2, Features: The number of outgoing lines of each AC bus section is: Among them, N 2 is the number of outgoing lines of each AC busbar, ceil() is the upward rounding function, n AC The number of users supplying medium voltage AC power; p AC L is the maximum power supply capacity of a single medium voltage DC line; i is the power supply capacity required for each AC load; k' is the margin coefficient of the AC load that comprehensively considers line loss, simultaneity rate and load rate.
5. The design method of a medium voltage flexible direct current switch structure with energy storage according to claim 3, Features: The capacity of the flexible DC converter V 1 for: Among them, V 1 is the capacity of the flexible DC converter; k is the margin coefficient of the DC load taking into account the line loss, simultaneous rate and load rate; M i The power supply required for each load; V swi and P swi They are the maximum capacity of AC power supply for the switchgear station and the maximum power supply power of auxiliary facilities of the switchgear station, as shown in the following formula: P swi =k”(P 空调 +P 风机 +P 照明 +P 应急插座 ) Wherein, k” is the margin coefficient of the auxiliary facilities of the switch station, which comprehensively considers the line loss, simultaneity rate and load rate; n AC The number of users supplying medium voltage AC power; L i The power supply capacity required for each AC load; P 空调 , P 风机 , P 照明 and P 应急插座 They are the power of air conditioning, lighting, fan and emergency socket respectively.
6. The design method of a medium voltage flexible direct current switch structure with energy storage according to claim 2, Features: The capacity of the DC transformer is: V 2 =P swi =k”(P 空调 +P 风机 +P 照明 +P 应急插座 ) Among them, V 2 is the capacity of the DC transformer; P swi is the maximum power supply power of the auxiliary facilities of the switch station, k” is the margin coefficient of the auxiliary facilities of the switch station that comprehensively considers line loss, simultaneity rate and load rate, P 空调 , P 风机 , P 照明 and P 应急插座 They are the power of air conditioning, lighting, fan and emergency socket respectively.
7. The design method of a medium voltage flexible direct current switch structure with energy storage according to claim 2, Features: The medium voltage energy storage capacity is: Among them, ∑E AC and ∑E DC are the sum of the AC and DC medium voltage primary loads respectively; T 1 P is the continuous power supply duration of medium voltage energy storage to the primary important load, which is generally 0.5 hours; mvstr and V mvstr They are the maximum power of the converter and the battery energy storage capacity of the medium voltage energy storage.
8. The design method of a medium voltage flexible direct current switch structure with energy storage according to claim 2, Features: The low-voltage energy storage capacity is: Among them, T 2 = 2 hours, k" is the margin factor of the auxiliary facilities of the switch station, which comprehensively considers the line loss, simultaneity rate and load rate; P 空调 , P 风机 , P 照明 and P 应急插座 are the power of air conditioning, lighting, fan and emergency socket respectively; P lvstr and V lvstr They are the maximum power of the converter and the battery energy storage capacity of the low-voltage energy storage.