Operation dispatching method and device for air source heat pump units in scenic area buildings
By obtaining and analyzing information of air source heat pump units and photovoltaic power generation systems in the scenic area building complex, using the target energy center model and the target operation scheduling model, the scheduling equipment is dispatched to suppress the cold island effect and maximize the utilization of photovoltaic resources, the problems of energy waste and high operating costs in the existing technology are solved, and more efficient energy management and carbon emission reduction are achieved.
Patent Information
- Application Number
- CN202411649870.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-19
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2044-11-19
AI Technical Summary
The existing scenic spot energy management system has failed to effectively suppress the cold island effect between air source heat pump units and make full use of photovoltaic resources, resulting in energy waste and increased operating costs.
By obtaining the air source heat pump unit information, building complex information, environmental information and output power information of the photovoltaic power generation system of the target scenic spot, using the target energy center model, the target operation scheduling model and the target thermodynamic model, the target operation state parameters of each device are calculated, and each device is dispatched to achieve suppression of the cold island effect and maximize the utilization of photovoltaic resources.
In the case of suppressing the cold island effect, reduce the electricity demand proposed by the target scenic spot to the distribution network, improve the efficiency of the air source heat pump unit, reduce energy operation cost, reduce carbon emissions, and realize the best operating strategy of the scenic spot building complex system.
Smart Images

Figure CN119150438B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy management and control systems, and in particular to an operation scheduling method, device, equipment, medium and program product for an air source heat pump unit of a building complex in a scenic area. Background Art
[0002] As one of the main energy consumers, buildings have great potential in energy conservation and emission reduction. Air source heat pumps have been widely used as a heat supply source for scenic area construction projects, and photovoltaics have been used as a power supply source for scenic area buildings. Both have achieved significant energy-saving effects.
[0003] For large-scale building complexes, such as commercial buildings in scenic spots, multiple heat pumps are used to form a group of air source heat pumps to meet their heating needs. However, in the actual application of air source heat pumps, due to the limitation of available space for air source heat pumps, the minimum spacing requirements between air source heat pumps may not be met, resulting in a cold island effect, which affects the efficiency of the entire air source heat pump unit. In addition, for some areas, more and more photovoltaic equipment is used, and photovoltaic resources are abundant, but due to the single electricity consumption mode and insufficient absorption capacity in the area, a large amount of photovoltaic resources are difficult to use locally. The existing scenic area energy management system fails to fully consider the impact of the cold island effect and photovoltaic resource access on system performance, resulting in energy waste and increased operating costs. Summary of the invention
[0004] In view of the above problems, the present invention provides an operation scheduling method, device, equipment, medium and program product for air source heat pump units in scenic area buildings.
[0005] According to a first aspect of the present invention, there is provided an operation scheduling method for air source heat pump units in a building complex in a scenic area, comprising: obtaining information on the air source heat pump units of a target scenic area, information on the building complex and environmental information of the target scenic area; wherein the target scenic area is equipped with a photovoltaic power generation system; environmental information includes solar radiation intensity; information on the building complex includes structural information and energy consumption information; generating output power information of the photovoltaic power generation system according to the solar radiation intensity and a predetermined photoelectric conversion coefficient; based on the information on the air source heat pump units of the target scenic area, information on the building complex, environmental information and output power information of the target scenic area, using a target energy center model, a target operation scheduling model and a target thermodynamic model to calculate target operating state parameters of each device; and scheduling each device to operate with each target operating state parameter, so that the power demand put forward by the target scenic area to the distribution network is minimized while suppressing the cold island effect between the devices.
[0006] Another aspect of the present invention provides an operation scheduling device for an air source heat pump unit of a scenic area building complex, comprising: an acquisition module, a generation module, a calculation module and a scheduling module.
[0007] The acquisition module is used to obtain the air source heat pump unit information, the building complex information and the environmental information of the target scenic spot; wherein the target scenic spot is equipped with a photovoltaic power generation system; the environmental information includes the solar radiation intensity; the building complex information includes the structural information and the energy consumption information. The generation module is used to generate the output power information of the photovoltaic power generation system according to the solar radiation intensity and the predetermined photoelectric conversion coefficient. The calculation module is used to calculate the target operating state parameters of each device based on the air source heat pump unit information, the building complex information, the environmental information and the output power information of the target scenic spot using the target energy center model, the target operation scheduling model and the target thermodynamic model. The scheduling module is used to schedule each device to operate with each target operating state parameter, so that the power demand of the target scenic spot to the distribution network is minimized while suppressing the cold island effect between the devices.
[0008] A third aspect of the present invention provides an electronic device, comprising: one or more processors; a memory for storing one or more computer programs, wherein the one or more processors execute the one or more computer programs to implement the steps of the above method.
[0009] The fourth aspect of the present invention further provides a computer-readable storage medium on which a computer program is stored, and when the computer program is executed by a processor, the above-mentioned operation scheduling method is implemented.
[0010] The fifth aspect of the present invention also provides a computer program product, including a computer program, which implements the above-mentioned operation scheduling method when executed by a processor.
[0011] According to an embodiment of the present invention, by obtaining the air source heat pump unit information of the target scenic spot, the information of the building complex, the environmental information of the target scenic spot and the output power information of the photovoltaic power generation system, the cold island effect and the photovoltaic power generation boundary are introduced as optimization constraints to realize the coordinated operation of the air source heat pump system and photovoltaics, establish a target energy center model, a target operation scheduling model and a target thermodynamic model, and use the above models to calculate the target operating state parameters of each device. Each device operates with the target operating state parameters to improve the efficiency of the air source heat pump unit, so that the power demand of the target scenic spot to the distribution network is minimized while suppressing the cold island effect between the devices, and the optimal operation strategy of the scenic spot building complex system is realized, which can maximize the utilization efficiency of photovoltaics while reducing energy operation consumption costs and carbon emissions. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] The above contents and other objects, features and advantages of the present invention will become more apparent through the following description of the embodiments of the present invention with reference to the accompanying drawings, in which:
[0013] Figure 1 An application scenario diagram showing an operation scheduling method for an air source heat pump unit in a scenic area building complex according to an embodiment of the present invention is shown;
[0014] Figure 2 A flow chart showing an operation scheduling method for an air source heat pump unit for a scenic area building complex according to an embodiment of the present invention is shown;
[0015] Figure 3 A flowchart of constructing a target energy center model in an operation scheduling method according to an embodiment of the present invention is shown;
[0016] Figure 4 A flowchart of constructing a target operation scheduling model in an operation scheduling method according to an embodiment of the present invention is shown;
[0017] Figure 5 A flowchart of constructing a target thermodynamic model in an operation scheduling method according to an embodiment of the present invention is shown;
[0018] Figure 6 A graph showing the relationship between the ambient temperature and the heat output of the heat pump according to an embodiment of the present invention is shown;
[0019] Figure 7a It shows the state result diagram of the air source heat pump obtained after the optimized scheduling according to the embodiment of the present invention;
[0020] Figure 7b The result diagram of the air source heat pump status obtained after scheduling according to the relevant technology is shown;
[0021] Figure 8 It shows a structural block diagram of an operation scheduling device for an air source heat pump unit for a scenic area building complex according to an embodiment of the present invention;
[0022] Fig. 9 A block diagram of an electronic device suitable for implementing a relay protection method for a radiation power grid according to an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0023] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings, but it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention.
[0024] As global warming becomes increasingly serious, buildings still rely heavily on fossil fuels for heating, which leads to a large amount of greenhouse gas emissions. Therefore, the transition to more reliable, energy-saving and green building heating methods is imminent. In the context of comprehensive energy development, it is particularly important to improve the overall energy efficiency of the system and save more energy.
[0025] As one of the main energy consumers, buildings have great potential in energy conservation and emission reduction. At present, the demand for low-carbon environmental protection and efficient energy utilization in scenic area buildings is increasing. Photovoltaic and air source heat pump systems have gradually become the preferred solution for power supply and heating systems in scenic area buildings due to their high efficiency, energy saving and environmental protection. The combination of the two has achieved significant energy-saving effects.
[0026] For large-scale building complexes, such as commercial buildings in scenic spots, multiple heat pumps are used to form a group of air source heat pumps to meet their heating needs. However, in the actual application of air source heat pumps, due to the limitation of available space for air source heat pumps, the minimum spacing requirements between air source heat pumps may not be met. When the distance between heat pumps is too close, a single air source heat pump can affect the air temperature around the evaporator of the air source heat pump, causing the surrounding temperature to drop, thereby affecting the heat absorption capacity of other air source heat pumps, thereby reducing the overall thermal efficiency of the system, that is, the cold island effect.
[0027] In some areas, more and more photovoltaic equipment is used and photovoltaic resources are abundant, but due to the single electricity consumption mode and insufficient absorption capacity in the area, a large number of photovoltaic resources are difficult to use locally. The existing scenic spot energy management system fails to fully consider the impact of cold island effect and photovoltaic resource access on system performance, resulting in energy waste and increased operating costs.
[0028] In view of the above problems, an embodiment of the present invention provides an operation scheduling method for air source heat pump units in scenic area building complexes. By acquiring the air source heat pump unit information of the target scenic area, the information of the building complex, the environmental information of the target scenic area and the output power information of the photovoltaic power generation system, the cold island effect and the photovoltaic power generation boundary are introduced as optimization constraints to achieve the coordinated operation of the air source heat pump system and photovoltaics, establish a target energy center model, a target operation scheduling model and a target thermodynamic model, and use the above models to calculate the target operating state parameters of each device. Each device operates with the target operating state parameters to improve the efficiency of the air source heat pump unit, so that the power demand of the target scenic area to the distribution network is minimized while suppressing the cold island effect between the devices, and the optimal operation strategy of the scenic area building complex system is achieved. While maximizing the photovoltaic utilization efficiency, it can reduce the energy operation consumption cost and reduce carbon emissions.
[0029] Figure 1 An application scenario diagram of the operation scheduling method for air source heat pump units in a scenic area building complex according to an embodiment of the present invention is shown.
[0030] like Figure 1 As shown, the application scenario 100 according to this embodiment includes a first terminal device 104 , a network 105 , and a server 106 .
[0031] The energy supply diagram of the scenic area building complex 107 includes power supply resources, energy centers, distributed networks, and heating and power supply users, describing the basic energy flow from power supply resources to scenic area buildings. Power supply resources include power resources provided by the distributed photovoltaic and distribution networks in the region, where the distributed photovoltaic in the region can be a distributed photovoltaic power generation system configured by the scenic area itself, or a distributed photovoltaic power generation system available near the scenic area. The energy center includes electrical energy and thermal energy. Electrical energy can be converted into thermal energy through an air source heat pump 101 for regional heating. The transformer 102 is responsible for converting voltage or current from one level to another to adapt to different transmission and application requirements during the transmission of electricity from the upper grid to the regional grid. The thermal energy and electrical energy provided in the distributed network flow to the heating and power supply users, for example, the heating and power supply users can be the scenic area building complex 103.
[0032] The network 105 is used to provide a medium for a communication link between the first terminal device 104 and the server 106. The network 105 may include various connection types, such as wired, wireless communication links or optical fiber cables.
[0033] The user can use the first terminal device 104 to interact with the server 106 through the network 105 to receive or send messages, etc. For example, the user can transmit the air source heat pump unit information, building complex information, target scenic area environmental information and output power information of the target scenic area to the server 106 through the network 105. Through the constructed target energy center model, target operation scheduling model and target thermodynamic model, the server 106 calculates the target operating status parameters of each device.
[0034] Various communication client applications may be installed on the first terminal device 104, such as shopping applications, web browser applications, search applications, instant messaging tools, email clients, social platform software, etc. (only as examples). The first terminal device 104 may be various electronic devices with a display screen and supporting web browsing, including but not limited to tablet computers, laptop portable computers, and desktop computers, etc.
[0035] The server 106 may be a server that provides various services, such as a background management server (only as an example) that provides support for websites browsed by the user using the first terminal device 104. The background management server may analyze and process the received data such as user requests, and feed back the processing results (such as web pages, information, or data obtained or generated according to user requests) to the terminal device.
[0036] It should be noted that the operation scheduling method for the air source heat pump unit for the scenic area building complex provided in the embodiment of the present invention can generally be executed by the server 106. Correspondingly, the operation scheduling device for the air source heat pump unit for the scenic area building complex provided in the embodiment of the present invention can generally be arranged in the server 106. The operation scheduling method for the air source heat pump unit for the scenic area building complex provided in the embodiment of the present invention can also be executed by a server or server cluster that is different from the server 106 and can communicate with the first terminal device 104 and / or the server 106. Correspondingly, the operation scheduling device for the air source heat pump unit for the scenic area building complex provided in the embodiment of the present invention can also be arranged in a server or server cluster that is different from the server 106 and can communicate with the first terminal device 104 and / or the server 106.
[0037] Alternatively, the operation scheduling method for the air source heat pump unit for the scenic area building complex provided in the embodiment of the present invention may also be executed by the first terminal device 104, or may also be executed by other terminal devices different from the first terminal device 104. Accordingly, the operation scheduling device for the air source heat pump unit for the scenic area building complex provided in the embodiment of the present invention may also be set in the first terminal device 104, or in other terminal devices different from the first terminal device 104.
[0038] It should be understood that Figure 1 The number of terminal devices, networks, servers, air source heat pumps, transformers, and scenic area buildings in the embodiment is only illustrative. According to the implementation requirements, there can be any number of terminal devices, networks, servers, air source heat pumps, transformers, and scenic area buildings.
[0039] The following will be based on Figure 1 The scene described by Figure 2 ~ Figure 7 describes in detail the operation scheduling method for the air source heat pump unit for the scenic area building complex according to an embodiment of the present invention.
[0040] Figure 2 A flow chart of an operation scheduling method for an air source heat pump unit for a scenic area building complex according to an embodiment of the present invention is shown.
[0041] like Figure 2 As shown, the operation scheduling method 200 for the air source heat pump unit for the scenic area building complex of this embodiment includes operations S210 to S240.
[0042] In operation S210, air source heat pump unit information, building complex information, and environmental information of the target scenic spot are obtained.
[0043] In operation S220, output power information of the photovoltaic power generation system is generated according to the solar radiation intensity and a predetermined photoelectric conversion coefficient.
[0044] In operation S230, based on the air source heat pump unit information of the target scenic area, the information of the building complex, the environmental information of the target scenic area and the output power information, the target energy center model, the target operation scheduling model and the target thermodynamic model are used to calculate the target operation status parameters of each device.
[0045] In operation S240, each device is scheduled to operate with each target operating state parameter, so that the power demand of the target scenic spot on the distribution network is minimized while suppressing the cold island effect between the devices.
[0046] According to an embodiment of the present invention, the target scenic spot is equipped with a photovoltaic power generation system or an area adjacent to the target scenic spot is equipped with a photovoltaic power generation system.
[0047] The environmental information of the target scenic area includes the solar radiation intensity of the scenic area, which is related to the output power of the photovoltaic power generation system. As shown in the following formula (1), the output power information of the photovoltaic power generation system can be generated according to the solar radiation intensity and the predetermined photoelectric conversion coefficient:
[0048] (1)
[0049] in, is the output power of distributed photovoltaic in the scenic area at time t, is the solar radiation intensity at time t, is the conversion factor.
[0050] The air source heat pump unit information includes the number of air source heat pumps in the air source heat pump unit, the positional arrangement relationship between the air source heat pumps, the distance between the air source heat pumps, the power consumption of the air source heat pumps, the heat generated, and the maximum thermal power.
[0051] The information of the building complex includes the number of buildings, structural information and energy consumption information. The structural information includes the information of the building envelope, such as the thermal capacity and thermal resistance of the wall, the temperature of the wall, etc. The energy consumption information includes the electricity consumption of the building, the heat required by the building, etc.
[0052] According to an embodiment of the present invention, each target operating state parameter of each device includes the operating state of each air source heat pump at a specific moment. For example, at moment t, the thermal efficiency of the air source heat pump numbered n is 50%.
[0053] The target operating status parameters of each device can be calculated through the acquired air source heat pump unit information, building complex information, environmental information and output power information of the target scenic area, using the constructed target energy center model, target operation scheduling model and target thermodynamic model.
[0054] The target operating state parameters are calculated based on the model, and each device is scheduled to operate according to the target operating state parameters. Since the influence of the cold island effect is taken into account when constructing the target model, and the output electric energy of photovoltaic power generation is also taken into account, each device can maximize the photovoltaic utilization efficiency during the scheduling process while reducing the influence of the cold island effect, so as to achieve the minimum electricity demand put forward by the target scenic spot to the distribution network.
[0055] According to an embodiment of the present invention, by obtaining the air source heat pump unit information of the target scenic spot, the information of the building complex, the environmental information of the target scenic spot and the output power information of the photovoltaic power generation system, the cold island effect and the photovoltaic power generation boundary are introduced as optimization constraints to realize the coordinated operation of the air source heat pump system and photovoltaics, establish a target energy center model, a target operation scheduling model and a target thermodynamic model, and use the above models to calculate the target operating state parameters of each device. Each device operates with the target operating state parameters to improve the efficiency of the air source heat pump unit, so that the power demand of the target scenic spot to the distribution network is minimized while suppressing the cold island effect between the devices, and the optimal operation strategy of the scenic spot building complex system is realized, which can maximize the utilization efficiency of photovoltaics while reducing energy operation consumption costs and carbon emissions.
[0056] According to an embodiment of the present invention, the operation scheduling method further includes: constructing a target energy center model based on the power balance relationship, the thermal power balance relationship and the power consumption restriction conditions of the target scenic area, using the power demand parameters, the output power parameters of the photovoltaic power generation system, the energy parameters of the air source heat pump unit and the energy parameters of the building complex; constructing a target operation scheduling model based on the influence relationship between the distance between each device and the ambient temperature difference, the electric-to-heat conversion relationship of the air source heat pump unit and the relationship between the operating status and the output thermal power of each device, using the operating status parameters of each device, the maximum output power parameters of each device, the energy parameters of the air source heat pump unit, the electric-to-heat conversion efficiency parameters, the distance parameters between each device, the power consumption parameters of each device and the output pipe temperature parameters of each device; constructing a target thermodynamic model based on the thermal balance relationship between the enclosure structures of the building complex and the thermal balance relationship of the indoor area of the building complex, using the thermodynamic parameters of the enclosure structures of the building complex, the orientation parameters of the enclosure structures, the window parameters installed on the enclosure structures, the energy parameters of the building complex and the indoor gas heat capacity parameters.
[0057] According to an embodiment of the present invention, the power balance relationship includes the balance relationship between power demand, the output power of the photovoltaic power generation system, the power consumption of the air source heat pump unit and the power consumption of the building complex. The thermal power balance relationship includes the balance relationship between the heat generated by the air source heat pump unit and the heat required by the building complex.
[0058] The electric-to-heat conversion relationship of the air-source heat pump unit includes the balance relationship between the power consumption of the air-source heat pump unit, the electric-to-heat conversion efficiency of the air-source heat pump, and the heat generated by the air-source heat pump unit.
[0059] The thermal balance relationship between the various envelope structures of the building complex and the thermal balance relationship of the indoor area of the building complex include the balance relationship between the thermodynamic parameters of the envelope structures of the building complex, the orientation parameters of the envelope structures, the window parameters installed on the envelope structures, the energy parameters of the building complex and the indoor gas heat capacity parameters.
[0060] According to an embodiment of the present invention, by introducing the influence of the cold island effect, the output electric energy of photovoltaic power generation and the thermodynamics of the buildings in the target scenic area, a target energy center model, a target operation scheduling model and a target thermodynamic model are constructed to calculate the target operating state parameters, so that the air source heat pump can be combined with the actual building conditions of the target scenic area during the scheduling and operation process, maximize the photovoltaic utilization efficiency while reducing the influence of the cold island effect, and achieve the minimum electricity demand put forward by the target scenic area to the distribution network.
[0061] Figure 3 A flow chart of constructing a target energy center model in an operation scheduling method according to an embodiment of the present invention is shown.
[0062] like Figure 3 As shown, the method 300 for constructing a target energy center model in the operation scheduling method of this embodiment includes operations S301 to S305.
[0063] In operation S301 , a target function is constructed according to scheduled electricity transaction information 301 and electricity demand parameters 302 in a target period.
[0064] In operation S302 , based on the power balance relationship, a power balance constraint is constructed between the output power parameter 303 , the first power usage parameter 304 , the second power usage parameter 305 , and the power demand parameter 302 .
[0065] In operation S303 , a thermal power balance constraint between the heat supply parameter 306 and the heat demand parameter 307 is constructed based on the thermal power balance relationship.
[0066] In operation S304 , based on the power consumption restriction condition 308 , a power consumption demand constraint proposed by the target scenic spot to the power distribution network is constructed.
[0067] In operation S305, based on the above operations S301 to S304, a target energy center model is constructed.
[0068] The target energy center model includes objective function, power balance constraint, thermal power balance constraint and power demand constraint.
[0069] According to an embodiment of the present invention, an objective function is constructed based on the scheduled electricity transaction information and electricity demand parameters of the target period, wherein the scheduled electricity transaction information of the target period includes the electricity prices at different times, and the electricity demand parameters include the amount of electricity purchased by the target scenic spot from the distribution network. The constructed objective function is shown in the following formula (2), which represents the cost of purchasing electricity from the energy center:
[0070] (2)
[0071] in, is the amount of electricity purchased from the distribution network at time t; is the electricity price at time t; T is the time period, which is set to 96; the time step is 15 minutes.
[0072] According to an embodiment of the present invention, the energy parameters of the air source heat pump unit include a first electricity consumption parameter and a heat supply parameter, and the energy parameters of the building complex include a second electricity consumption parameter and a heat demand parameter, wherein the first electricity consumption parameter includes the total electricity consumption of all air source heat pumps in the air source heat pump unit, the second electricity consumption parameter includes the total electricity consumption of the target scenic spot building complex, the heat supply parameter includes the heat generated by the air source heat pump unit, and the heat demand parameter includes the heat required by the target scenic spot buildings.
[0073] The calculation formula of the first power consumption parameter is shown in the following formula (3):
[0074] (3)
[0075] in, is the power consumption of the air source heat pump numbered n1 at time t; It is the total power consumption of the air source heat pump unit at time t, that is, the first power consumption parameter.
[0076] Based on the power balance relationship, the power balance constraint between the output power parameter, the first power parameter, the second power parameter and the power demand parameter is constructed, as shown in the following formula (4):
[0077] (4)
[0078] in, is the amount of electricity purchased from the distribution network at time t; is the total power consumption of the air source heat pump unit at time t, i.e., the first power consumption parameter; is the power consumption of the scenic area buildings at time t, i.e. the second power consumption parameter; is the output power of the distributed photovoltaic system in the scenic area at time t, that is, the output power parameter.
[0079] Based on the thermal power balance relationship, the thermal power balance constraint between the heat supply parameter and the heat demand parameter is constructed, as shown in the following formula (5):
[0080] (5)
[0081] in, The heat generated by the air source heat pump unit; Provides heat for buildings in the scenic area; is the heat generated by the air source heat pump numbered n1 at time t; is the heat required by the building numbered n2 at time t; N1 and N2 are the total number of heat pumps and the total number of buildings.
[0082] Due to the limitation of power transmission between the distribution network and the target scenic spot, the target scenic spot has restrictions on power consumption, and the power consumption restriction conditions include the maximum limit of power demand put forward to the distribution network at a specific time.
[0083] Based on the power consumption restriction conditions, the power consumption demand constraint proposed by the target scenic spot to the distribution network is constructed, as shown in the following formula (6):
[0084] (6)
[0085] in, The maximum power consumption.
[0086] According to an embodiment of the present invention, a target energy center model is constructed through the power balance relationship, thermal power balance relationship and power consumption restriction conditions of the target scenic spot. Combined with other constructed models, the target operating state parameters are calculated together to complete the reasonable operation and scheduling of the air source heat pump unit, improve the photovoltaic utilization efficiency, suppress the cold island effect and thus achieve the purpose of energy conservation and emission reduction, and realize the minimum power demand put forward by the target scenic spot to the distribution network.
[0087] Figure 4 A flow chart of constructing a target operation scheduling model in an operation scheduling method according to an embodiment of the present invention is shown.
[0088] like Figure 4 As shown, the method 400 for constructing a target operation scheduling model in the operation scheduling method of this embodiment includes operations S401 to S404.
[0089] In operation S401 , based on the influence relationship between the distance between the devices and the ambient temperature difference, the distance parameter 401 between the devices, the operating state parameter 402 of each device, and the predetermined ambient temperature parameter 403 , the actual ambient temperature parameter of each device is determined.
[0090] In operation S402, based on the electric-to-heat conversion relationship of the air source heat pump unit, electric-to-heat conversion constraints are constructed using the real ambient temperature parameters 404 of each device, the power consumption parameters 405 of each device, the temperature parameters 406 of the output pipe of each device, the electric-to-heat conversion efficiency parameters 407 and the heat supply parameters 306 of each device.
[0091] In operation S403 , based on the relationship between the operating state of each device and the output thermal power, a power output constraint is constructed using the operating state parameter 402 of each device, the maximum output power parameter 408 of each device, and the heat supply parameter 306 of each device.
[0092] In operation S404, based on the above operations S401 to S403, a target operation scheduling model is constructed.
[0093] According to an embodiment of the present invention, the operating state parameters of each device include the operating state of the air source heat pump at different times, which may be, for example, 30% to 100%, indicating the thermal efficiency of the air source heat pump. The operating state parameters can be adjusted by setting different component parameters of the air source heat pump. The calculation method of the operating state parameters is shown in the following formula (7):
[0094] (7)
[0095] in, is the operating status of the air source heat pump numbered n1 at time t, that is, the operating status parameter, and the value range of m is an integer between 3 and 10.
[0096] According to an embodiment of the present invention, the distance parameters between each device include the distance between adjacent air source heat pumps, and also include the distance between separated air source heat pumps. For example, the distance parameter between the air source heat pump numbered n1 and the air source heat pump numbered n2 is 0.5m, and the distance parameter between the air source heat pump numbered n1 and the air source heat pump numbered n9 is 6.8m.
[0097] When the distance between air source heat pumps exceeds a certain amount, it is assumed that they are not affected by the cold island effect. The relationship between the distance between each device and the ambient temperature difference is shown in the following formula (8):
[0098] (8)
[0099] in, The ambient temperature difference caused by the fully loaded air source heat pump numbered n1; is the distance between two different air source heat pumps; is the maximum distance of the cold island effect, set to 9.1629m.
[0100] Considering the cold island effect, based on the influence relationship between the distance between each device and the ambient temperature difference described by the above formula (8), the distance parameters between each device, the operating status parameters of each device and the predetermined ambient temperature parameters, the actual ambient temperature parameters of each device are determined. The calculation method is shown in the following formula (9):
[0101] (9)
[0102] in, is the actual ambient temperature parameter of the air source heat pump, is the basic ambient temperature, i.e. the predetermined ambient temperature parameter, is the operating status of the air source heat pump numbered n1 at time t, This is the ambient temperature difference caused by the fully loaded air source heat pump numbered n1.
[0103] According to an embodiment of the present invention, COP is an important parameter for evaluating the efficiency of an air source heat pump, which is affected by the outside temperature and the discharge water temperature. The calculation formula of COP is shown in the following formula (10):
[0104] (10)
[0105] in, is the efficiency of the n1th air source heat pump at time t, i.e., the electric-to-heat conversion efficiency parameter; is the actual ambient temperature parameter of the air source heat pump; is the temperature parameter of the air source heat pump output pipe, which is 55℃.
[0106] The electric-to-heat conversion efficiency parameter obtained by formula (10) is combined with the power consumption parameters and heat supply parameters of each device, and based on the electric-to-heat conversion relationship of the air source heat pump unit, the electric-to-heat conversion constraint is constructed, as shown in the following formula (11):
[0107] (11)
[0108] in, is the heat generated by the air source heat pump numbered n1 at time t; is the power consumption of the air source heat pump numbered n1 at time t.
[0109] According to an embodiment of the present invention, the relationship between the operating status of each device and the output thermal power can be used as another important method for evaluating the performance of an air source heat pump. Based on the above relationship, the power output constraint is constructed by combining the acquired operating status parameters of each device, the maximum output power parameters of each device and the heat supply parameters of each device, as shown in the following formula (12):
[0110] (12)
[0111] in, is the maximum thermal power of the air source heat pump, that is, the maximum output power parameter, It can be calculated by formula (7).
[0112] According to an embodiment of the present invention, by considering the influence of the ambient temperature of the air source heat pump when there is a cold island effect between the air source heat pumps and when there is no cold island effect, the real ambient temperature parameters of the air source heat pump are calculated. By obtaining the real ambient temperature parameters, power consumption parameters, temperature parameters in the output pipe, electric heat conversion efficiency parameters, heat supply parameters, operating state parameters, and maximum output power parameters of the air source heat pump, the electric heat conversion constraints and power output constraints are respectively constructed, and the target operation scheduling model is established from the two perspectives of the electric heat conversion efficiency and output power of the air source heat pump, so that the optimal operation scheduling strategy is achieved when the air source heat pump has a cold island effect, the operating state of each air source heat pump is optimized, the efficient operation of the system is ensured, and the power demand of the target scenic spot to the distribution network is minimized.
[0113] Figure 5 A flow chart of constructing a target thermodynamic model in an operation scheduling method according to an embodiment of the present invention is shown.
[0114] like Figure 5 As shown, the method 500 for constructing a target thermodynamic model in the operation scheduling method of this embodiment includes operations S501 to S503.
[0115] In operation S501, based on the thermal balance relationship between the enclosure structures of the building complex, thermal balance constraints between the walls and roofs are constructed using thermodynamic parameters 501 of the enclosure structures of the building complex, orientation parameters 502 of the enclosure structures, and predetermined solar radiation intensity parameters 503.
[0116] In operation S502, based on the thermal balance relationship of the indoor area of the building complex, the thermal balance constraints of the indoor area are constructed using the thermodynamic parameters 501 of the building complex's envelope structure, the orientation parameters 502 of the envelope structure, the window parameters 504 installed on the envelope structure, the heat demand parameters 307 and the indoor gas heat capacity parameters 505.
[0117] In operation S503 , based on the above operations S501 to S502 , a target thermodynamic model is constructed.
[0118] According to an embodiment of the present invention, the target thermodynamic model includes thermal balance constraints of walls and roofs and thermal balance constraints of indoor areas; and the energy parameters of the building complex include heat demand parameters.
[0119] The building envelope includes the enclosures on all sides of the building and the room, such as walls, roofs, etc. The envelope generally has the ability to keep warm, insulate, and be waterproof and moisture-proof. The constructed target thermodynamic model is mainly composed of thermal resistance (R) and thermal capacity (C). R and C represent their heat transfer and thermal insulation capabilities, respectively. In the target thermodynamic model, there are two types of nodes, wall nodes and room nodes, which are connected to each other by R and C according to thermal capacity. The thermal dynamics of scenic area buildings are modeled by using a resistor-capacitor (RC) network to quantify the flexibility of scenic area buildings.
[0120] Furthermore, considering the slow dynamic process of wall heat dissipation and indoor temperature change of scenic area buildings, when constructing the target thermodynamic model, the thermal balance constraints of the wall and roof and the thermal balance constraints of the indoor area were first constructed.
[0121] According to an embodiment of the present invention, the thermodynamic parameters of the building envelope include the heat capacity and thermal resistance of the wall, the wall temperature, the temperature inside the scenic area building, the heat absorption rate and surface area of the wall, the solar radiation received by the wall, etc.
[0122] The orientation parameters of the enclosure structure include east, south, west, north and top.
[0123] Based on the thermal balance relationship between the building envelope structures, the thermal balance constraints of the wall and roof are constructed, as shown in the following formula (13):
[0124] (13)
[0125] in, Contains all directions of scenic area buildings; , are the thermal capacity and thermal resistance of the wall; is the wall temperature; is the temperature inside the scenic area building; Indicates whether the wall is exposed to sunlight in direction d, if yes, it is 1, otherwise it is 0; , denote the heat absorption rate and surface area of the wall in direction d, respectively. is the expected solar radiation intensity; T out is the first external environment temperature.
[0126] Based on the indoor area heat balance relationship of the building complex, the heat balance constraint of the indoor area is constructed, as shown in the following formula (14):
[0127] (14)
[0128] in, is the indoor gas heat capacity of the scenic spot building numbered n2; , is the thermal resistance in the d direction and the window area; is the window transmittance; T out is the second external environment temperature; The heat required for building numbered n2.
[0129] According to an embodiment of the present invention, based on the thermal balance relationship between the enclosure structures of the building complex and the thermal balance relationship of the indoor area of the building complex, the thermal balance constraints of the wall and the roof and the thermal balance constraints of the indoor area are constructed by using the thermodynamic parameters of the enclosure structures of the building complex, the orientation parameters of the enclosure structures, the parameters of the windows installed on the enclosure structures and the heat capacity parameters of the indoor gas, and then the target thermodynamic model is constructed. The target thermodynamic model is used to simulate the thermodynamic characteristics of the scenic area buildings in the scenic area building complex, taking into account the thermal inertia of the buildings, and exploring the flexibility of the buildings. At the same time, the influence of external environmental factors such as light intensity and solar radiation on the heat demand of the buildings is also considered, and the flexibility of the scenic area buildings is reasonably quantified. The target thermodynamic model combines the target energy center model and the target operation scheduling model to optimize the operation scheduling method of the air source heat pump, improve the energy utilization rate of the heat pump system, reduce the energy consumption of the scenic area building complex, and achieve the minimum electricity demand proposed by the target scenic area to the distribution network.
[0130] According to an embodiment of the present invention, based on the air source heat pump unit information of the target scenic area, the information of the building complex, the environmental information of the target scenic area and the output power information, the target energy center model, the target operation scheduling model and the target thermodynamic model are used to calculate and obtain the target operating status parameters of each device, including: inputting the air source heat pump unit information of the target scenic area, the information of the building complex, the environmental information of the target scenic area and the output power information into the target calculation engine accordingly, and outputting the target operating status parameters.
[0131] For example: the air source heat pump unit information, building complex information, environmental information and output power information of the target scenic area are input into the target calculation engine accordingly, and the output operating status parameters of each target are as follows: the operating status parameter of the air source heat pump numbered n1 is 40%, the operating status parameter of the air source heat pump numbered n2 is 60%, the operating status parameter of the air source heat pump numbered n3 is 100%, the operating status parameter of the air source heat pump numbered n4 is 70%, etc.
[0132] According to an embodiment of the present invention, a target energy center model, a target operation scheduling model and a target thermodynamic model are loaded into the target computing engine.
[0133] According to an embodiment of the present invention, through a target calculation engine loaded with a target energy center model, a target operation scheduling model and a target thermodynamic model, the input air source heat pump unit information of the target scenic spot, the information of the building complex, the environmental information of the target scenic spot and the output power information are calculated to obtain the target operation state parameters for use in the operation scheduling of the air source heat pump units in the scenic spot building complex, thereby improving the energy utilization rate of the heat pump system, reducing the energy consumption of the scenic spot building system, and achieving the minimum electricity demand put forward by the target scenic spot to the distribution network.
[0134] According to an embodiment of the present invention, the above-mentioned operation scheduling method for air source heat pump units for scenic area building complexes takes into account the cold island effect and photovoltaic absorption, and especially optimizes scheduling while considering the cold island effect between the photovoltaic power supply and the air source heat pump in the scenic area, and provides the optimal energy management strategy, thereby providing power and heat for the scenic area building complex to improve energy utilization efficiency, reduce carbon emissions and reduce operating costs.
[0135] Specifically, the present invention realizes the above energy management method by constructing a target energy center model, a target operation scheduling model and a target thermodynamic model. When constructing the target energy center model, the distributed photovoltaic power generation system of the scenic area is fully utilized and coordinated with the external power grid. By dynamically adjusting the power output of the air source heat pump group, the photovoltaic power is consumed locally, so that the system can achieve optimal economic operation under different electricity prices. Based on the real-time electricity price and photovoltaic power generation situation, the load distribution of the system is dynamically adjusted to realize the coordinated scheduling of photovoltaic power generation and power grid power supply. The target operation scheduling model aims to establish an optimization model of the air source heat pump unit. In the scenic building complex, the heating system composed of multiple air source heat pumps (ASHP) meets the heating needs of multiple scenic building complexes. By introducing the cold island effect as a constraint condition of the optimization scheduling model, the operating state of each air source heat pump is optimized to ensure the efficient operation of the system. By using the resistor-capacitor (RC) network model to simulate the thermodynamic characteristics of the scenic building in the scenic building complex, considering the thermal inertia of the building, and exploring the flexibility of the building, the target thermodynamic model is constructed. The model also considers the influence of external environmental factors such as light intensity and solar radiation on the heat demand of the building.
[0136] In particular, during operation, the heat pumps located at the edge of the heat pump group are started first according to the needs of different heat loads to avoid the negative impact of the cold island effect on the performance of the heat pump and suppress the cold island effect. When the load demand is high, the load of the equipment located in the middle of the heat pump group is gradually increased to ensure the efficient operation of the overall system. By intelligently scheduling the local load ratio (PLR) of the air source heat pump, the impact of the cold island effect on system efficiency is avoided, ultimately reducing power consumption, improving the local absorption capacity of photovoltaics, and meeting the heating comfort requirements of scenic area buildings.
[0137] Figure 6A graph showing the relationship between the ambient temperature and the heat output of a heat pump according to an embodiment of the present invention is shown.
[0138] like Figure 6 As shown, as time goes by, the ambient temperature first increases and then decreases. Correspondingly, by scheduling the operation state of the air source heat pump, the heat generation of the air source heat pump changes with the change of the ambient temperature. By utilizing the operation scheduling method of the present invention, the cold island effect is introduced as a constraint condition, and the air source heat pump is optimized and scheduled, so that the air source heat pump can be adjusted in real time according to the actual environmental conditions, which significantly improves the energy efficiency of the heat pump system.
[0139] Figure 7a A diagram showing the state results of an air source heat pump obtained after optimized scheduling according to an embodiment of the present invention is shown. Figure 7b The figure shows the status result of the air source heat pump obtained after scheduling according to the relevant technology.
[0140] like Figure 7a and Figure 7b As shown, the area surrounded by the dotted line represents the setting range of the air source heat pump unit. The air source heat pump is placed within this range at a specific distance and in a specific manner. The closed lines represent isotherms, and different depths represent different temperatures. The specific temperature value is referenced to the scale on the right.
[0141] By using the above-mentioned target operation scheduling model, the air source heat pump after optimized scheduling and the air source heat pump obtained by scheduling without considering the cold island effect of related technologies are simulated and calculated. Figure 7a and Figure 7b As shown, the temperature distribution in the central area of the air source heat pump unit is more uniform after considering the cold island effect, while the temperature difference in the central area of the air source heat pump unit without considering the cold island effect is larger and the temperature value in the central area is lower, indicating that by optimizing the operating state of the air source heat pump group, especially when considering the cold island effect, the present invention significantly improves the energy utilization efficiency of the heat pump system.
[0142] Specifically, the operating efficiency of the air source heat pump unit group and the construction cost of the scenic area are compared when the cold island effect is considered and when the cold island effect is not considered. The results are shown in Table 1:
[0143] Table 1: Comparison of power consumption and total power cost
[0144]
[0145] 1 indicates that the operation scheduling method of the embodiment of the present invention is adopted, and the cold island effect is considered; 2 indicates a method in the related art that does not consider the cold island effect.
[0146] The results show that by adopting the operation scheduling method of the embodiment of the present invention, the operating energy efficiency of the scenic area buildings is reduced by 3.29%, and the total cost is reduced by 3.11%. By adopting the above-mentioned target thermodynamic model, the scenic area building complex can autonomously control the state of the air source heat pump group, effectively reducing energy consumption and energy costs.
[0147] According to an embodiment of the present invention, a method for operating and scheduling air source heat pump units for scenic area buildings is proposed, which takes into account the cold island effect and photovoltaic absorption. The cost of purchasing electricity and the electric and thermal constraints of the energy center are considered to construct a target energy center model. Considering the cold island effect impact constraints and photovoltaic output boundaries, a target operation scheduling model is constructed to achieve the optimal scheduling method for the operation of air source heat pump units. A resistor-capacitor (RC) network is used to simulate the constraints of the thermodynamic process of scenic area buildings, and a target thermodynamic model is constructed to quantify the flexibility of scenic area buildings.
[0148] The impact of the cold island effect between air source heat pumps is studied, including the change in ambient temperature of the air source heat pump when the cold island effect is not considered and the calculation of the ambient temperature of a single air source heat pump considering the cold island effect. The scenic area building complex can autonomously control the status of the air source heat pump group, and compare the energy consumption and electricity cost under different strategies.
[0149] By optimizing the operating state of the air source heat pump group, especially considering the cold island effect, the present invention significantly improves the energy utilization efficiency of the heat pump system. The example shows that after optimized scheduling, the energy consumption of the scenic area building system is reduced by about 3.29%. By adjusting the local load ratio of the air source heat pump, the power consumption is reduced during peak electricity prices, the distributed photovoltaic power generation is maximized, and the overall operating cost of the system is reduced. The experimental results show that compared with the traditional operation method that does not consider the cold island effect, the operating cost of the scenic area building is reduced by about 3.11%. By optimizing the coordinated scheduling of photovoltaic power generation and the power grid, the use of clean energy is maximized, the carbon emissions of the system are reduced, and the low-carbon goal of the scenic area building complex is contributed to. By optimizing the start-stop sequence and load adjustment of the air source heat pump, the negative impact of the cold island effect on the operating performance of the scenic area building system is avoided, ensuring the efficient operation of each air source heat pump.
[0150] The present invention is applicable to the optimization operation of scenic area buildings, especially in areas with distributed photovoltaic power generation and air source heat pump group heating systems. The invention has a high prospect of promotion and application, and can provide efficient energy management solutions for different types of scenic area buildings.
[0151] Based on the above-mentioned operation scheduling method for air source heat pump units in scenic area buildings, the present invention also provides an operation scheduling device for air source heat pump units in scenic area buildings. Figure 8 The device is described in detail.
[0152] Figure 8 A structural block diagram of an operation scheduling device for an air source heat pump unit for a scenic area building complex according to an embodiment of the present invention is shown.
[0153] like Figure 8 As shown, the operation scheduling device 800 for the air source heat pump unit of the scenic area building complex in this embodiment includes an acquisition module 810, a generation module 820, a calculation module 830 and a scheduling module 840.
[0154] The acquisition module 810 is used to acquire the air source heat pump unit information of the target scenic spot, the information of the building complex and the environmental information of the target scenic spot; wherein the target scenic spot is equipped with a photovoltaic power generation system; the environmental information includes the solar radiation intensity; the information of the building complex includes the structural information and the energy consumption information. In one embodiment, the acquisition module 810 can be used to perform the operation S210 described above, which will not be repeated here.
[0155] The generating module 820 is used to generate output power information of the photovoltaic power generation system according to the solar radiation intensity and the predetermined photoelectric conversion coefficient. In one embodiment, the generating module 820 can be used to perform the operation S220 described above, which will not be described in detail here.
[0156] The calculation module 830 is used to calculate the target operating state parameters of each device based on the air source heat pump unit information of the target scenic area, the information of the building complex, the environmental information of the target scenic area, and the output power information using the target energy center model, the target operation scheduling model, and the target thermodynamic model. In one embodiment, the calculation module 830 can be used to perform the operation S230 described above, which will not be repeated here.
[0157] The scheduling module 840 is used to schedule each device to operate with each target operating state parameter so that the target scenic spot can minimize the power demand on the distribution network while suppressing the cold island effect between the devices. In one embodiment, the scheduling module 840 can be used to perform the operation S240 described above, which will not be repeated here.
[0158] According to an embodiment of the present invention, the above-mentioned device further includes: a first model construction module, a second model construction module and a third model construction module.
[0159] The first model building module is used to construct the target energy center model based on the power balance relationship, thermal power balance relationship and power consumption restriction conditions of the target scenic area, using power demand parameters, output power parameters of the photovoltaic power generation system, energy parameters of the air source heat pump unit and energy parameters of the building complex. The second model building module is used to construct the target operation scheduling model based on the influence relationship between the distance between each device and the ambient temperature difference, the electric heat conversion relationship of the air source heat pump unit and the relationship between the operating state and the output thermal power of each device, using the operating state parameters of each device, the maximum output power parameters of each device, the energy parameters of the air source heat pump unit, the electric heat conversion efficiency parameters, the distance parameters between each device, the power consumption parameters of each device and the output pipe temperature parameters of each device. The third model building module is used to construct the target thermodynamic model based on the thermal balance relationship between the enclosure structures of the building complex and the indoor area thermal balance relationship of the building complex, using the thermodynamic parameters of the enclosure structures of the building complex, the orientation parameters of the enclosure structures, the window parameters installed on the enclosure structures, the energy parameters of the building complex and the indoor gas heat capacity parameters.
[0160] According to an embodiment of the present invention, the energy parameters of the air source heat pump unit include a first power consumption parameter and a heat supply parameter; the energy parameters of the building complex include a second power consumption parameter and a heat demand parameter; the target energy center model includes an objective function, a power balance constraint, a thermal power balance constraint, and a power demand constraint. The first model construction module includes an objective function construction submodule, a power balance constraint construction submodule, a thermal power balance constraint construction submodule, and a power demand constraint construction submodule.
[0161] The objective function construction submodule is used to construct the objective function according to the scheduled electricity transaction information and electricity demand parameters of the target period. The power balance constraint construction submodule is used to construct the power balance constraint between the output power parameter, the first power parameter, the second power parameter and the power demand parameter based on the power balance relationship. The thermal power balance constraint construction submodule is used to construct the thermal power balance constraint between the heat supply parameter and the heat demand parameter based on the thermal power balance relationship. The power demand constraint construction submodule constructs the power demand constraint proposed by the target scenic spot to the distribution network based on the power restriction conditions.
[0162] According to an embodiment of the present invention, the energy parameters of the air source heat pump unit include heat supply parameters; the target operation scheduling model includes power output constraints and electric heat conversion constraints. The second model construction module includes a real ambient temperature determination submodule, an electric heat conversion constraint construction submodule, and a power output constraint construction submodule.
[0163] The real ambient temperature determination submodule is used to determine the real ambient temperature parameters of each device based on the influence relationship between the distance between each device and the ambient temperature difference, the distance parameters between each device, the operating status parameters of each device and the predetermined ambient temperature parameters. The electric heat conversion constraint construction submodule is used to construct the electric heat conversion constraint based on the electric heat conversion relationship of the air source heat pump unit, using the real ambient temperature parameters of each device, the power consumption parameters of each device, the temperature parameters in the output pipe of each device, the electric heat conversion efficiency parameters and the heat supply parameters of each device. The power output constraint construction submodule is used to construct the power output constraint based on the relationship between the operating status of each device and the output thermal power, using the operating status parameters of each device, the maximum output power parameters of each device and the heat supply parameters of each device.
[0164] According to an embodiment of the present invention, the target thermodynamic model includes thermal balance constraints of walls and roofs and thermal balance constraints of indoor areas; the energy parameters of the building complex include heat demand parameters. The third model construction module includes a thermal balance constraint construction submodule of walls and roofs and a thermal balance constraint construction submodule of indoor areas.
[0165] The submodule for constructing the thermal balance constraint of the wall and the roof is used to construct the thermal balance constraint of the wall and the roof based on the thermal balance relationship between the enclosure structures of the building complex, using the thermodynamic parameters of the enclosure structures of the building complex, the orientation parameters of the enclosure structures, and the predetermined solar radiation intensity parameters. The submodule for constructing the thermal balance constraint of the indoor area is used to construct the thermal balance constraint of the indoor area based on the thermal balance relationship of the indoor area of the building complex, using the thermodynamic parameters of the enclosure structures of the building complex, the orientation parameters of the enclosure structures, the parameters of the windows installed on the enclosure structures, the heat demand parameters, and the indoor gas heat capacity parameters.
[0166] According to an embodiment of the present invention, the calculation module includes an input sub-module, which is used to input the air source heat pump unit information of the target scenic area, the information of the building complex, the environmental information of the target scenic area and the output power information into the target calculation engine, and output each target operating state parameter, wherein the target calculation engine is loaded with a target energy center model, a target operation scheduling model and a target thermodynamic model.
[0167] Fig. 9 A block diagram of an electronic device suitable for implementing a relay protection method for a radiation power grid according to an embodiment of the present invention is shown.
[0168] like Fig. 9As shown, the electronic device 900 according to an embodiment of the present invention includes a processor 901, which can perform various appropriate actions and processes according to the program stored in the ROM 902 or the program loaded from the storage part 908 to the RAM 903. The processor 901 may include, for example, a general-purpose microprocessor (such as a CPU), an instruction set processor and / or a related chipset and / or a special-purpose microprocessor (for example, an application-specific integrated circuit (ASIC)), etc. The processor 901 may also include an onboard memory for caching purposes. The processor 901 may include a single processing unit or multiple processing units for performing different actions of the method flow according to an embodiment of the present invention.
[0169] In RAM903, various programs and data required for the operation of electronic device 900 are stored. Processor 901, ROM902 and RAM903 are connected to each other via bus 904. Processor 901 performs various operations of the method flow according to an embodiment of the present invention by executing the program in ROM902 and / or RAM903. It should be noted that the program can also be stored in one or more memories other than ROM902 and RAM903. Processor 901 can also perform various operations of the method flow according to an embodiment of the present invention by executing the program stored in one or more memories.
[0170] According to an embodiment of the present invention, the electronic device 900 may further include an I / O interface 905, which is also connected to the bus 904. The electronic device 900 may further include one or more of the following components connected to the I / O interface 905: an input portion 906 including a keyboard, a mouse, etc.; an output portion 907 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage portion 908 including a hard disk, etc.; and a communication portion 909 including a network interface card such as a LAN card, a modem, etc. The communication portion 909 performs communication processing via a network such as the Internet. A drive 910 is also connected to the I / O interface 905 as needed. A removable medium 911, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 910 as needed, so that a computer program read therefrom is installed into the storage portion 908 as needed.
[0171] The present invention also provides a computer-readable storage medium, which may be included in the device / apparatus / system described in the above embodiment; or may exist independently without being assembled into the device / apparatus / system. The above computer-readable storage medium carries one or more programs, and when the above one or more programs are executed, the method according to the embodiment of the present invention is implemented.
[0172] According to an embodiment of the present invention, a computer-readable storage medium may be a non-volatile computer-readable storage medium, for example, may include but is not limited to: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In the present invention, a computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, an apparatus or a device. For example, according to an embodiment of the present invention, a computer-readable storage medium may include the ROM902 and / or RAM903 described above and / or one or more memories other than ROM902 and RAM903.
[0173] The embodiment of the present invention also includes a computer program product, which includes a computer program, and the computer program contains program code for executing the method shown in the flowchart. When the computer program product is run in a computer system, the program code is used to enable the computer system to implement the relay protection method for the radiation power grid provided by the embodiment of the present invention.
[0174] The computer program executes the above functions defined in the system / device of the embodiment of the present invention when it is executed by the processor 901. According to the embodiment of the present invention, the system, device, module, unit, etc. described above can be implemented by a computer program module.
[0175] The embodiments of the present invention are described above. However, these embodiments are only for the purpose of illustration, and are not intended to limit the scope of the present invention. Although each embodiment is described above, it does not mean that the measures in each embodiment cannot be used in combination. The scope of the present invention is defined by the attached claims and their equivalents. Without departing from the scope of the present invention, those skilled in the art may make various substitutions and modifications, which should all fall within the scope of the present invention.
Claims
1. An operation scheduling method for an air source heat pump unit for a scenic area building complex, characterized in that: include: Acquire the air source heat pump unit information, building complex information and environmental information of the target scenic spot; wherein the target scenic spot is equipped with a photovoltaic power generation system; the environmental information includes solar radiation intensity; the building complex information includes structural information and energy consumption information; generating output electric energy information of the photovoltaic power generation system according to the solar radiation intensity and a predetermined photoelectric conversion coefficient; Based on the air source heat pump unit information of the target scenic area, the information of the building complex, the environmental information of the target scenic area and the output power information, the target energy center model, the target operation scheduling model and the target thermodynamic model are used to calculate and obtain the target operation state parameters of each device; and Dispatching each of the devices to operate with each of the target operating state parameters so that the target scenic spot minimizes the power demand on the distribution network while suppressing the cold island effect between the devices; Wherein, the target energy center model includes: Objective function: (1) in, is the amount of electricity purchased from the distribution network at time t; is the electricity price at time t; T is the time period; Power balance constraints: (2) in, is the amount of electricity purchased from the distribution network at time t; is the total power consumption of the air source heat pump unit at time t; is the electricity consumption of the scenic area buildings at time t; is the output power of the distributed photovoltaic system in the scenic area at time t; Thermal power balance constraints: (3) in, The heat generated by the air source heat pump unit; Provides heat for buildings in the scenic area; is the heat generated by the air source heat pump numbered n1 at time t; is the heat required by the building numbered n2 at time t; N1 and N2 are the total number of heat pumps and the total number of buildings; Electricity demand constraints: (4) in, is the maximum power consumption; The target operation scheduling model includes: Electric heat conversion constraints: (5) in, is the heat generated by the air source heat pump numbered n1 at time t; is the power consumption of the air source heat pump numbered n1 at time t; is the efficiency of the n1th air source heat pump at time t; Power output constraints: (6) in, is the maximum thermal power of the air source heat pump; is the operating status of the air source heat pump numbered n1 at time t; The target thermodynamic model includes: Thermal balance constraints between walls and roofs: (7) in, Contains all directions of scenic area buildings; , are the thermal capacity and thermal resistance of the wall; is the wall temperature; is the temperature inside the scenic area building; Indicates whether the wall is exposed to sunlight in direction d; , denote the heat absorption rate and surface area of the wall in direction d, respectively. is the expected solar radiation intensity; T out is the first external environment temperature; Thermal balance constraints for indoor areas: (8) in, is the indoor gas heat capacity of the building in the scenic area numbered n2; , is the thermal resistance in the d direction and the window area; is the window transmittance; T out is the second external environment temperature; The heat required for building numbered n2.
2. The method according to claim 1, characterized in that The method further comprises: Based on the power balance relationship, the thermal power balance relationship and the power consumption restriction conditions of the target scenic area, the target energy center model is constructed using the power demand parameters, the output power parameters of the photovoltaic power generation system, the energy parameters of the air source heat pump unit and the energy parameters of the building complex; Based on the influence relationship between the distance between each device and the difference in ambient temperature, the electric-heat conversion relationship of the air source heat pump unit, and the relationship between the operating state of each device and the output thermal power, the target operation scheduling model is constructed using the operating state parameters of each device, the maximum output power parameters of each device, the energy parameters of the air source heat pump unit, the electric-heat conversion efficiency parameters, the distance parameters between each device, the power consumption parameters of each device and the temperature parameters in the output pipe of each device; Based on the thermal balance relationship between the enclosing structures of the building complex and the thermal balance relationship of the indoor area of the building complex, the target thermodynamic model is constructed using the thermodynamic parameters of the enclosing structures of the building complex, the orientation parameters of the enclosing structures, the parameters of the windows installed on the enclosing structures, the energy parameters of the building complex and the heat capacity parameters of the indoor gas.
3. The method according to claim 2, characterized in that The energy parameters of the air source heat pump unit include a first power consumption parameter and a heat supply parameter; the energy parameters of the building complex include a second power consumption parameter and a heat demand parameter; The target energy center model is constructed based on the power balance relationship, the thermal power balance relationship and the power consumption restriction condition of the target scenic spot, using the power demand parameter, the output power parameter of the photovoltaic power generation system, the energy parameter of the air source heat pump unit and the energy parameter of the building complex, including: Constructing an objective function according to the scheduled electricity transaction information and the electricity demand parameters during the target period; Based on the power balance relationship, construct the power balance constraint between the output power parameter, the first power usage parameter, the second power usage parameter and the power demand parameter; Based on the thermal power balance relationship, constructing the thermal power balance constraint between the heat supply parameter and the heat demand parameter; Based on the power consumption restriction condition, the power consumption demand constraint proposed by the target scenic spot to the distribution network is constructed.
4. The method according to claim 2, characterized in that: The energy parameters of the air source heat pump unit include heat supply parameters; The target operation scheduling model is constructed based on the influence relationship between the distance between each device and the difference in ambient temperature, the electric-heat conversion relationship of the air source heat pump unit, and the relationship between the operating state of each device and the output thermal power, using the operating state parameters of each device, the maximum output power parameters of each device, the energy parameters of the air source heat pump unit, the electric-heat conversion efficiency parameters, the distance parameters between each device, the power consumption parameters of each device, and the temperature parameters in the output pipe of each device, including: Determine the actual ambient temperature parameter of each device based on the influence relationship between the distance between the devices and the ambient temperature difference, the distance parameter between the devices, the operating state parameter of each device and the predetermined ambient temperature parameter; Based on the electric-to-heat conversion relationship of the air source heat pump unit, the electric-to-heat conversion constraint is constructed using the real ambient temperature parameters of each device, the power consumption parameters of each device, the temperature parameters in the output pipe of each device, the electric-to-heat conversion efficiency parameters and the heat supply parameters of each device; Based on the relationship between the operating state of each device and the output thermal power, the power output constraint is constructed using the operating state parameters of each device, the maximum output power parameters of each device and the heat supply parameters of each device.
5. The method according to claim 2, characterized in that: The energy parameters of the building complex include heat demand parameters; The target thermodynamic model is constructed based on the thermal balance relationship between the enclosure structures of the building complex and the thermal balance relationship of the indoor area of the building complex, using the thermodynamic parameters of the enclosure structures of the building complex, the orientation parameters of the enclosure structures, the parameters of the windows installed on the enclosure structures and the heat capacity parameters of the indoor gas, including: Based on the thermal balance relationship between the enclosure structures of the building complex, the thermal balance constraints of the wall and the roof are constructed by using the thermodynamic parameters of the enclosure structures of the building complex, the orientation parameters of the enclosure structures and the predetermined solar radiation intensity parameters; Based on the thermal balance relationship of the indoor area of the building complex, the thermal balance constraints of the indoor area are constructed using the thermodynamic parameters of the building complex's envelope structure, the orientation parameters of the envelope structure, the window parameters installed on the envelope structure, the heat demand parameters and the indoor gas heat capacity parameters.
6. The method according to any one of claims 1 to 5, characterized in that: The target operating state parameters of each device are calculated based on the air source heat pump unit information of the target scenic spot, the information of the building complex, the environmental information of the target scenic spot and the output power information using the target energy center model, the target operation scheduling model and the target thermodynamic model, including: Input the air source heat pump unit information of the target scenic spot, the information of the building complex, the environmental information of the target scenic spot and the output power information into the target calculation engine accordingly, and output the target operating state parameters; Among them, the target calculation engine is loaded with the target energy center model, the target operation scheduling model and the target thermodynamic model.
7. An operation scheduling device for air source heat pump units for scenic area buildings, characterized in that: include: An acquisition module is used to acquire information about the air source heat pump unit of the target scenic spot, information about the building complex, and environmental information of the target scenic spot; wherein the target scenic spot is equipped with a photovoltaic power generation system; the environmental information includes solar radiation intensity; the information about the building complex includes structural information and energy consumption information; A generating module, used for generating output electric energy information of the photovoltaic power generation system according to the solar radiation intensity and a predetermined photoelectric conversion coefficient; a calculation module, for calculating the target operating state parameters of each device using a target energy center model, a target operation scheduling model and a target thermodynamic model based on the air source heat pump unit information of the target scenic area, the information of the building complex, the environmental information of the target scenic area and the output power information; and A scheduling module, used for scheduling each of the devices to operate with each of the target operating state parameters, so that the power demand of the target scenic spot to the distribution network is minimized while suppressing the cold island effect between the devices; Wherein, the target energy center model includes: Objective function: (1) in, is the amount of electricity purchased from the distribution network at time t; is the electricity price at time t; T is the time period; Power balance constraints: (2) in, is the amount of electricity purchased from the distribution network at time t; is the total power consumption of the air source heat pump unit at time t; is the power consumption of the scenic area buildings at time t; is the output power of the distributed photovoltaic system in the scenic area at time t; Thermal power balance constraints: (3) in, The heat generated by the air source heat pump unit; Provides heat for buildings in the scenic area; is the heat generated by the air source heat pump numbered n1 at time t; is the heat required by the building numbered n2 at time t; N1 and N2 are the total number of heat pumps and the total number of buildings; Electricity demand constraints: (4) in, is the maximum power consumption; The target operation scheduling model includes: Electric heat conversion constraints: (5) in, is the heat generated by the air source heat pump numbered n1 at time t; is the power consumption of the air source heat pump numbered n1 at time t; is the efficiency of the n1th air source heat pump at time t; Power output constraints: (6) in, is the maximum thermal power of the air source heat pump; is the operating status of the air source heat pump numbered n1 at time t; The target thermodynamic model includes: Thermal balance constraints between walls and roofs: (7) in, Contains all directions of scenic area buildings; , are the thermal capacity and thermal resistance of the wall; is the wall temperature; is the temperature inside the scenic area building; Indicates whether the wall is exposed to sunlight in direction d; , denote the heat absorption rate and surface area of the wall in direction d, respectively. is the expected solar radiation intensity; T out is the first external environment temperature; Thermal balance constraints for indoor areas: (8) in, is the indoor gas heat capacity of the building in the scenic area numbered n2; , is the thermal resistance in the d direction and the window area; is the window transmittance; T out is the second external environment temperature; The heat required for building numbered n2.
8. An electronic device comprising: one or more processors; a memory for storing one or more computer programs, It is characterized in that the one or more processors execute the one or more computer programs to implement the steps of the method according to any one of claims 1 to 6.
9. A computer-readable storage medium having a computer program or instruction stored thereon, characterized in that: When the computer program or instruction is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
10. A computer program product comprising a computer program or instructions, characterized in that When the computer program or instruction is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
Citation Information
Patent Citations
Optimized scheduling method for hybrid energy central heating system based on air source heat pump
CN118066588A
Control method and apparatus for air source heat pump unit, and electronic device
WO2023065755A1