Train operation plan adjusting method and system introducing backtracking mechanism
By introducing a backtracking mechanism, the adjustment difficulties in conflict and slowdown scenarios in the adjustment of train operation plan are solved, effective conflict relocation and delay reduction are achieved, and the feasibility and efficiency of train operation plan are ensured.
Patent Information
- Application Number
- CN202411604534.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-12
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2044-11-12
AI Technical Summary
During the process of adjusting the train operation plan, conflicts or delays may be encountered that cannot be resolved, resulting in the inability to meet the constraints and the inability to effectively adjust the train operation plan.
Introduce a backtracking mechanism, including the train operation plan backtracking adjustment method in the interval operation conflict scenario and the train operation plan backtracking adjustment method in the interval operation slowdown scenario. By adjusting the departure time and track of the node, gradually trace and update the node status until Resolve conflict or delay problems.
Effectively alleviate train operation conflicts, reduce train delays, and ensure the feasibility and efficiency of train operation plans.
Smart Images

Figure CN119190143A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method and system for adjusting an operation plan, and in particular to a method and system for adjusting a train operation plan by introducing a backtracking mechanism, and belongs to the field of train dispatching. Background Art
[0002] The intelligent dispatching centralized system is based on the existing dispatching centralized system, using operations research, statistics and artificial intelligence technology to better realize the intelligent adjustment of train operation plans and provide dispatchers with more efficient and practical technical means. The realization of the intelligent adjustment function of train operation plans plays a vital role in promoting the development of intelligent dispatching centralized systems.
[0003] During the operation of trains, it is inevitable that they will be affected by uncertain factors such as the environment, equipment, and human factors, and deviate from the planned operation, resulting in train delays. Intelligent adjustment of train operation plans is to use advanced intelligent algorithms to promptly resolve conflicting train operation plans after an emergency that interferes with the normal operation of trains occurs, so that trains can resume orderly operation as soon as possible, reduce the total delay time of trains, control the spread of delays, reduce or even eliminate train delays, and minimize the negative impact of delays. The scenarios that interfere with the normal operation of trains mainly include regional blockades, regional speed limits, section reversals, train delays, etc. Among them, regional blockades include section blockades, station track blockades, station-wide station blockades, train section faults, train track faults in stations, wind, rain, snow, contact network faults, and station and section blockades in scenarios such as foreign objects intruding the limit. Regional speed limits include section speed limits, station speed limits, train slowdowns, wind, rain, snow, and foreign objects intruding the limit.
[0004] Adjusting the train operation plan is a complex and delicate process. Especially in complex scenarios, some nodes may not be able to effectively resolve train operation conflicts or achieve the expected results of the adjustment plan after one adjustment. In the process of adjusting the train operation plan according to the timing of the running line nodes, it may be encountered that no matter how the arrival and departure times and tracks of the node are adjusted, the constraints cannot be met. In order to meet the constraints, the adjusted running line nodes need to be adjusted again to obtain a feasible train operation plan adjustment result. Summary of the invention
[0005] In order to solve the defects in the prior art, the present invention discloses a train operation plan adjustment method introducing a backtracking mechanism, and the technical solution is as follows:
[0006] A train operation plan adjustment method that introduces a backtracking mechanism solves the technical problem that train operation conflicts cannot be resolved during the process of forward adjustment of the train operation plan according to the timing of the operation line nodes. The method is characterized by introducing a backtracking mechanism in the train operation plan adjustment method, including a train operation plan backtracking adjustment method in a scenario where the interval operation is too slow and a train operation plan backtracking adjustment method in a scenario where the interval operation conflicts.
[0007] Preferably, the method for retrospectively adjusting the train operation plan in the interval operation conflict scenario comprises the following steps:
[0008] Step 1: Enter the access time of the running line node that meets the constraint conditions;
[0009] Step 2: Determine whether there is a zone operation conflict, if yes, go to step 3, if no, go to step 7;
[0010] Step 3: Adjust the departure time of the previous node;
[0011] Step 4: Get the start node of the backtracking adjustment;
[0012] Step 5: Determine the backtracking range and update the node adjustment status;
[0013] Step 6: Adjust the nodes within the backtracking range one by one;
[0014] Step 7: Output the arrival time and track of the node in step 6 and the arrival time, departure time and track of each node in the backtracking range.
[0015] Preferably, the method for retrospectively adjusting the train operation plan in the scenario where the interval operation is too slow comprises the following steps:
[0016] Step 1: Enter the access time of the running line node that meets the constraint conditions;
[0017] Step 2: Determine whether there is any interval running too slowly, if yes, go to step 3, otherwise go to step 6;
[0018] Step 3: Get the starting node for backtracking adjustment;
[0019] Step 4: Determine the backtracking range and update the node adjustment status;
[0020] Step 5: Adjust the nodes within the backtracking range one by one;
[0021] Step 6: Output the arrival time and track of the node in step 5 and the arrival time, departure time and track of each node in the backtracking range.
[0022] Beneficial Effects
[0023] It can effectively alleviate train operation conflicts and reduce train delays. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 Flow chart of the method for retrospective adjustment of train operation plan in the scenario of interval operation conflict;
[0025] Figure 2 Flow chart of the method for retrospective adjustment of train operation plan in the scenario of slow operation in the section. DETAILED DESCRIPTION
[0026] A train operation plan adjustment method that introduces a backtracking mechanism, the method solves the problem that train operation conflicts cannot be resolved in the process of forward adjustment of the train operation plan according to the timing of the operation line nodes, and is characterized by: introducing a backtracking mechanism in the train operation plan adjustment method, including a train operation plan backtracking adjustment method in a scenario of slow section operation and a train operation plan backtracking adjustment method in a scenario of section operation conflict.
[0027] 1. The method for retrospective adjustment of the train operation plan under the above-mentioned interval operation conflict scenario is shown in Figure 1 shown.
[0028] (1) Input.
[0029] The access time of the running line node that meets the following constraints.
[0030] A. The interval running time is not less than the minimum interval running time in the corresponding scenario.
[0031] B. The track is idle at the time of access and has the conditions for receiving and dispatching the train.
[0032] C. Meet the minimum pick-up time interval.
[0033] (2) A method for determining whether there is a range operation conflict.
[0034] A. Get the node n i,j The previous node n i,j-1 .
[0035] B. Find node n in the adjusted running line nodes i,j and its previous node n i,j-1 Running line nodes n with the same section, same line type and same running direction i”,j .
[0036] C. If satisfied and If yes, retroactive adjustment is required; otherwise, the process returns without participating in the retroactive adjustment introduced by the access interval conflict.
[0037] (3) Adjust the departure time of the previous node.
[0038] A.
[0039] B. According to the minimum departure time interval between two nodes, node n i,j-1 Departure time Make adjustments.
[0040] (4) Method for obtaining the starting node of the backtracking adjustment
[0041] Using Node n i,j-1 Get the starting node of this retrospective adjustment.
[0042] Step 1: If node n i,j-1 If the station does not belong to the line station type, then this node will be the starting node for this retrospective adjustment.
[0043] Step 2: If node n i,j-1 If the station belongs to the line station type, then press Adjust the arrival time of this node.
[0044] Step 3: Get the node n i,j-1 The previous node n i,j-2 .
[0045] Step 4: Press node n i,j-2 Pre-adjusted arrival time Calculate the interval running time based on the expected arrival adjustment time If satisfied
[0046] Then it is determined that the node n i,j-1 The access interval is running too slowly. Indicates train l i At node n i,j-1 With node n i,j-2 The interval running time is Indicates train l i At node n i,j-2 With node n i,j-1 The running time of the scheduled interval is shown in the figure.
[0047] Step 5: If there is a delay in the interval, readjust the node n according to the maximum interval running time allowed for the delay. i,j-2 Departure time
[0048] Step 6: If node n i,j-2 If the station does not belong to the line station type, then this node will be the starting node for this retrospective adjustment.
[0049] Step 7: If node n i,j-2 If the station belongs to the line station type, then press Adjust the arrival time of the node. Then go to Step 3 and continue to iterate and search forward until the backtracking starting node is found.
[0050] (5) Determine the backtracking range and update the node adjustment status
[0051] A. Adjust the sequence number in All nodes in range. Indicates the adjustment sequence number of the starting node of the retrospective adjustment. Indicates the adjustment sequence number of the node.
[0052] B. Set the adjustment status of all nodes in the retroactive adjustment range to pending retroactive adjustment.
[0053] (6) A method of adjusting nodes one by one within the backtracking range.
[0054] First, the running line nodes are classified according to the adjustment characteristics, and the adjustment method matching the running line node type is set.
[0055] A. If there is no preceding vehicle at the first departure node, use adjustment method I.
[0056] B. If there is a preceding vehicle at the first departure node, use adjustment method II.
[0057] C. The arrival time of the access first node is adjusted using method III.
[0058] D. The departure time of the access first node is adjusted using method IV.
[0059] E. The arrival time of the intermediate node, using adjustment method III.
[0060] F. The departure time of the intermediate node is adjusted using method IV.
[0061] G. The arrival time of the final node is adjusted using method III.
[0062] H. Hand over the arrival time of the tail node and use adjustment method III.
[0063] I. Hand over the departure time of the tail node and adjust V.
[0064] (7)Output.
[0065] The arrival time and track of the node and the arrival time, departure time and track of each node in the backtracking range.
[0066] 2. For the method of retrospective adjustment of train operation plan in the case of slow operation in the section, see Figure 2 As shown:
[0067] (1) Input.
[0068] The access time of the running line node that meets the following constraints.
[0069] A. The interval running time is not less than the minimum interval running time in the corresponding scenario.
[0070] B. The track is idle at the time of access and has the conditions for receiving and dispatching the train.
[0071] C. Meet the minimum pick-up time interval.
[0072] D. There is no interval operation conflict.
[0073] (2) A method for determining whether any interval is running too slowly.
[0074] A. Get the node n i,j The previous node n i,j-1 .
[0075] B. By node n i,j-1 Pre-adjusted arrival time Calculate the interval running time based on the expected arrival adjustment time If satisfied
[0076] It is determined that the node access interval is running too slowly. Indicates train l i At node n i,j With node n i,j-1 The interval running time is Indicates train l i At node n i,j-1 With node n i,j The running time of the scheduled interval is shown in the figure.
[0077] (3) A method for obtaining the starting node of the backtracking adjustment.
[0078] Step 1: Use the adjusted arrival time of the running line node to determine whether the node access interval is running too slowly.
[0079] Step 2: If there is a delay in the interval, readjust the running line node n according to the maximum interval running time allowed for the delay in the interval i,j-1 Departure time
[0080] Step 3: If the running line node n i,j-1If the station does not belong to the line station type, then the running line node will be the backtracking starting node for this backtracking adjustment.
[0081] Step 4: If the running line node n i,j-1 If the station belongs to the line station type, then press
[0082] Adjust running line node n i,j-1 Then go to Step 1 and continue to iterate and search forward until the backtracking starting node is found.
[0083] (4) Determine the backtracking range and update the node adjustment status.
[0084] A. Adjust the sequence number in All nodes in range. Indicates the adjustment sequence number of the starting node of the retrospective adjustment. Indicates the adjustment sequence number of the node.
[0085] B. Set the adjustment status of all nodes in the retroactive adjustment range to pending retroactive adjustment.
[0086] (5) The nodes within the backtracking range are adjusted one by one.
[0087] First, the running line nodes are classified according to the adjustment characteristics, and the adjustment method matching the running line node type is set.
[0088] A. If there is no preceding vehicle at the first departure node, use adjustment method I.
[0089] B. If there is a preceding vehicle at the first departure node, use adjustment method II.
[0090] C. The arrival time of the access first node is adjusted using method III.
[0091] D. The departure time of the access first node is adjusted using method IV.
[0092] E. The arrival time of the intermediate node, using adjustment method III.
[0093] F. The departure time of the intermediate node is adjusted using method IV.
[0094] G. The arrival time of the final node is adjusted using method III.
[0095] H. Hand over the arrival time of the tail node and use adjustment method III.
[0096] I. Hand over the departure time of the tail node and adjust V.
[0097] (6) Output.
[0098] The arrival time and track of the node and the arrival time, departure time and track of each node in the backtracking range.
[0099] 3. Below we explain the specific content of the adjustment method:
[0100] 1. Running line node adjustment method I
[0101] (1) Input
[0102] A. Originating node information.
[0103] B. The departure sequence list of the station to which the first node of origin belongs.
[0104] C. Adjust the operating line information, section blocking information, etc. within the time range.
[0105] (2) Constraints
[0106] A. The departure time must not be less than the minimum departure time interval.
[0107] B. Trains are not allowed to depart to blocked sections, that is, there is no section blockade in the departure section.
[0108] C. The departure time shall not be earlier than the scheduled departure time.
[0109] D. The departure interval must not experience slow operation.
[0110] (3) Adjustment strategy
[0111] The constraints are adjusted one by one. The departure time adjustment of the first node caused by the constraints will return to the first constraint for iterative adjustment until all constraints are met.
[0112] (4) Output
[0113] The departure time of the first node.
[0114] 2. Running line node adjustment method II
[0115] (1) Input
[0116] A. Originating node information.
[0117] B. The departure sequence list of the station to which the first node of origin belongs.
[0118] C. Adjust the operating line information, section blocking information, etc. within the time range.
[0119] D. Train connection information.
[0120] (2) Constraints
[0121] A.Meet the minimum train connection time.
[0122] B. Meet the minimum departure time interval.
[0123] C. Trains are not allowed to depart to blocked sections.
[0124] D. The departure time shall not be earlier than the scheduled departure time.
[0125] E. The interval operation must not be too slow.
[0126] (3) Adjustment strategy
[0127] The constraints are adjusted one by one. The departure time adjustment of the first node caused by the constraints will return to the first constraint for iterative adjustment until all constraints are met.
[0128] (4) Output
[0129] The departure time of the first node.
[0130] 3. Running line node adjustment method III
[0131] (1) Input
[0132] A. Access the first node, the intermediate node, the end node, and the end node.
[0133] B. Linked list of the order in which the station to which the node belongs picks up the train.
[0134] C. Adjust the operating line information, section blocking information, etc. within the time range.
[0135] (2) Constraints
[0136] A. Meet the minimum interval running time.
[0137] B. Meet the access conditions:
[0138] Only one train is allowed to occupy a track at the same time.
[0139] The number of vehicles received by a station shall not exceed its receiving capacity.
[0140] Meet the platform requirements. EMUs carrying passengers need to stop at tracks with high platforms, and ordinary passenger cars carrying passengers need to stop at tracks with platforms.
[0141] Ensure that the changed track is connected to the access port and the handover port.
[0142] Ensure that the changed track matches the type of incoming train.
[0143] C. Meet the minimum pick-up time interval.
[0144] D. There must be no interval conflicts.
[0145] E. The interval operation must not be too slow.
[0146] (3) Adjustment strategy
[0147] The constraints are adjusted one by one. The departure time adjustment of the first node caused by the constraints will return to the first constraint for iterative adjustment until all constraints are met.
[0148] (4) Output
[0149] The pick-up time and track of the intermediate node.
[0150] 4. Running line node adjustment method IV
[0151] (1) Input
[0152] A. Access the first node and intermediate node.
[0153] B. The departure sequence list of the station to which the node belongs.
[0154] C. Adjust the operating line information, section blocking information, etc. within the time range.
[0155] (2) Constraints
[0156] A.Meet the minimum stop time.
[0157] B. Meet the minimum departure time interval.
[0158] C. Satisfy the interval blockade.
[0159] D. The departure time shall not be earlier than the scheduled departure time.
[0160] E. The interval operation must not be too slow.
[0161] (3) Adjustment strategy
[0162] The constraints are adjusted one by one. The departure time adjustment of the first node caused by the constraints will return to the first constraint for iterative adjustment until all constraints are met.
[0163] (4) Output
[0164] The departure time of the node.
[0165] 5. Running line node adjustment method V
[0166] (1) Input
[0167] A. Hand over the tail node.
[0168] B. The departure sequence list of the station to which the node belongs.
[0169] C. Adjust the operating line information, section blocking information, etc. within the time range.
[0170] (2) Constraints
[0171] A.Meet the minimum stop time.
[0172] B. Meet the minimum departure time interval.
[0173] C. The departure time shall not be earlier than the scheduled departure time.
[0174] (3) Adjustment strategy
[0175] The constraints are adjusted one by one. The departure time adjustment of the first node caused by the constraints will return to the first constraint for iterative adjustment until all constraints are met.
[0176] (4) Output
[0177] The departure time of the node.
[0178] The present invention solves the technical problem that train operation conflicts cannot be resolved in the process of forward adjustment of the train operation plan according to the timing of the running line nodes, introduces a backtracking mechanism into the train operation plan adjustment method, and proposes a train operation plan backtracking adjustment method in the interval operation conflict scenario and a train operation plan backtracking adjustment method in the interval operation slowness scenario.
[0179] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.
Claims
1. A train operation plan adjustment method that introduces a backtracking mechanism, which solves the problem that the train operation conflict cannot be resolved during the process of forward adjustment of the train operation plan according to the time sequence of the operation line nodes, and is characterized by: A backtracking mechanism is introduced into the train operation plan adjustment method, including a train operation plan backtracking adjustment method in a scenario where the interval operation is too slow and a train operation plan backtracking adjustment method in a scenario where the interval operation conflicts.
2. The train operation plan adjustment method introducing a backtracking mechanism according to claim 1 is characterized by: The train operation plan retrospective adjustment method under the interval operation conflict scenario comprises the following steps: Step 1: Enter the access time of the running line node that meets the constraint conditions; Step 2: Determine whether there is a zone operation conflict. If yes, execute step 3. If no, output the arrival time and track of the node. Step 3: Adjust the departure time of the previous node; Step 4: Get the starting node for backtracking adjustment; Step 5: Determine the backtracking range and update the node adjustment status; Step 6: Adjust the nodes within the backtracking range one by one; Step 7: Output the arrival time and track of the node in step 6 and the arrival time, departure time and track of each node in the backtracking range.
3. The train operation plan adjustment method introducing a backtracking mechanism according to claim 1 is characterized by: The method for retrospectively adjusting the train operation plan in the scenario of slow operation in the section comprises the following steps: Step 1: Enter the access time of the running line node that meets the constraint conditions; Step 2: Determine whether there is any interval running too slowly. If so, execute step 3. Otherwise, output the arrival time and track of the node. Step 3: Get the starting node for backtracking adjustment; Step 4: Determine the backtracking range and update the node adjustment status; Step 5: Adjust the nodes within the backtracking range one by one; Step 6: Output the arrival time and track of the node in step 5 and the arrival time, departure time and track of each node in the backtracking range.
4. The train operation plan adjustment method introducing a backtracking mechanism according to claim 2 is characterized in that: The constraints include: (1) The interval operation time is not less than the minimum interval operation time in the corresponding scenario; (2) The track is idle at the time of access and has the conditions for receiving and dispatching the train; (3) Meet the minimum pick-up time interval.
5. The train operation plan adjustment method introducing a backtracking mechanism according to claim 2, characterized in that step 2 further comprises the following contents: (1) Get the node n i,j The previous node n i,j-1 ; (2) Find the node n in the adjusted running line nodes i,j and its previous node n i,j-1 Running line nodes n with the same section, same line type and same running direction i”,j ; (3) If satisfied and If so, retroactive adjustment is required; otherwise, the system returns without participating in the retroactive adjustment introduced by the access interval conflict; in: Represents node n i”,j-1 The departure time, Represents node n i,j-1 Departure, Represents node n i”,j The arrival time of the train; i represents the train line, n i,j represents the jth node of train line i.
6. The train operation plan adjustment method with a backtracking mechanism according to claim 2, characterized in that step 4 further comprises the following contents: using node n i,j-1 Get the starting node of this retrospective adjustment; Step 1: If node n i,j-1 If the station does not belong to the line station type, then this node is the backtracking start node for this backtracking adjustment; Step 2: If node n i,j-1 If the station belongs to the line station type, then press Adjust the arrival time of the node, where Represents node n i,j-1 The arrival time, Represents node n i,j-1 departure time; Step 3: Get the node n i,j-1 The previous node n i,j-2 ; Step 4: Press node n i,j-2 Pre-adjusted arrival time Calculate the interval running time based on the expected arrival adjustment time If satisfied Then it is determined that the node n i,j-1 The access interval is running too slowly; Indicates train l i At node n i,j-1 With node n i,j-2 The interval running time is Represents node n i,j-1 The arrival time, Represents node n i,j-2 The departure time, Indicates train l i At node n i,j-2 With node n i,j-1 The running time of the specified interval between the two, Δt maxsec It indicates the maximum additional time for train operation delay in the section; Step 5: If there is a delay in the interval, readjust the node n according to the maximum interval running time allowed for the delay. i,j-2 Departure time Step 6: If node n i,j-2 If the station does not belong to the line station type, then this node is the backtracking start node for this backtracking adjustment; Step 7: If node n i,j-2 If the station belongs to the line station type, then press Adjust the arrival time of the node; then go to Step 3 and continue to iterate and search forward until the backtracking starting node is found; in: Δt maxsec Indicates the maximum additional delay time for the train in the section.
7. The train operation plan adjustment method with retrospective mechanism according to claim 3 is characterized in that: said step 2 further comprises the following contents: (1) Get the node n i,j The previous node n i,j-1 ; (2) By node n i,j-1 Pre-adjusted arrival time Calculate the interval running time based on the expected arrival adjustment time If satisfied It is determined that the node access interval is running too slowly; Indicates train l i At node n i,j With node n i,j-1 The interval running time is Indicates train l i At node n i,j-1 With node n i,j The running time of the scheduled interval between the two; in, i represents the train running line, n i,j represents the jth node of train line i, Represents node n i,j The arrival time, Represents node n i,j-1 The departure time, Δt maxsec Indicates the maximum additional delay time for the train in the section.
8. The train operation plan adjustment method with retrospective mechanism according to claim 3 is characterized in that: said step 3 further comprises the following contents: Step 1: Use the adjusted arrival time of the running line node to determine whether the node access interval has slow operation; Step 2: If there is a delay in the interval, readjust the running line node n according to the maximum interval running time allowed for the delay in the interval i,j-1 Departure time Step 3: If the running line node n i,j-1 If the station does not belong to the line station type, the running line node is the backtracking start node of this backtracking adjustment; Step 4: If the running line node n i,j-1 If the station belongs to the line station type, then press Adjust running line node n i,j-1 Arrival time; then go to Step 1 and continue to iterate forward until the backtracking starting node is found; in: Δt maxsec It indicates the maximum additional delay time of the train in the section. Represents node n i,j-1 The arrival time, Represents node n i,j-1 The departure time.
9. A non-volatile storage medium, characterized in that: The non-volatile storage medium includes a stored program, wherein when the program is executed, the device where the non-volatile storage medium is located is controlled to execute the method according to any one of claims 1 to 8.
10. A train operation plan adjustment system introducing a backtracking mechanism, characterized in that: It comprises a processor and a memory; the memory stores computer-readable instructions, and the processor is used to execute the computer-readable instructions, wherein the computer-readable instructions execute the method described in any one of claims 1 to 8 when executed.
Citation Information
Patent Citations
Train conflict predicting and solving method based on time colored Petri network
CN104268634A
Interurban railway train operation optimization method based on multi-beat combination
CN105678425A
Capability analysis method suitable for high-speed railway
CN111915221A
Distributed multi-vehicle cooperative behavior decision-making method and system
CN114187781A
Automatic adjustment method of urban rail transit train working diagram
CN115959179A