A safety early warning platform for chemical parks

By laying multiple data collectors and material dispatchers in the chemical park, a safety warning platform for the chemical park was built, and the problems of early warning control and chemical product allocation in the chemical park when it was affected by harmful flue gas were solved, and safety control and reasonable allocation of resources were achieved.

CN119252009BActive Publication Date: 2025-04-08NANJING CEJUN SAFETY TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411787116.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-06
Publication Date
2025-04-08
Estimated Expiration
2044-12-06

AI Technical Summary

Technical Problem

When chemical parks are affected by harmful flue gas, it is difficult to accurately carry out early warning and control, and the timely allocation of chemical products and reasonable allocation of resources cannot be achieved during the early warning and control process, resulting in resource loss.

Method used

Provide a safety warning platform for chemical parks, including a status monitoring module, a risk determination module and an associated risk control module. The park information is obtained through multiple data collectors, the flue gas risk area is judged, and the transportation path is built through the material dispatching agency to achieve safe distribution of chemical products.

Benefits of technology

The safety control of risk areas in the chemical park is achieved, ensuring timely processing and disposal of chemical products, avoiding resource losses, and achieving reasonable allocation of resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119252009B_ABST
    Figure CN119252009B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of risk early warning, and specifically to a safety early warning platform for a chemical park. It includes a state monitoring module, a risk determination module, and an associated risk control module. The smoke risk area affected by smoke in the current chemical park is predicted by a preset smoke collector or Fick's second law, so that the early warning platform performs safety control on the risk area in the chemical park, and thereby generates a transportation path for the material dispatcher in the chemical park, and the material dispatcher performs safe distribution of the chemical products to be disposed of to the operating equipment according to the transportation path, so as to realize timely early warning of the chemical park, and at the same time ensure uninterrupted production in the chemical park to avoid loss and waste of chemical resources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of risk early warning, and in particular to a chemical park safety early warning platform. Background Art

[0002] In order to conduct safety monitoring of the chemical park, monitoring sensors are currently deployed in the chemical park to monitor the status of the chemical park and display it on the early warning terminal, thereby realizing visual monitoring and early warning of the chemical park.

[0003] Among them, in the process of monitoring the chemical park, if there is harmful smoke invading the chemical park, it can be monitored immediately through the deployed monitoring sensors. However, in the process of invasion, how to immediately determine the area where the harmful smoke will invade the chemical park and accurately carry out early warning control of the chemical park is a problem that needs to be solved;

[0004] Moreover, when controlling in a chemical park, if the affected production or processing equipment is shut down and the corresponding chemical products in the equipment need to be processed immediately within a certain period of time, then how to distribute such chemical products when the above-mentioned chemical park is affected, so that the chemical park can still be processed and disposed of in time during early warning control, avoiding the loss of chemical product resources, and realizing the reasonable allocation of resources in the chemical park is a problem that needs to be solved at present. Summary of the invention

[0005] In view of the above-mentioned shortcomings of the prior art, the present invention provides a chemical park safety early warning platform, which can effectively solve the problem in the prior art that when the chemical park is affected by harmful smoke, it is impossible to accurately carry out early warning control in the chemical park, and to achieve reasonable allocation of resources in the chemical park during the early warning control process.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0007] The present invention provides a chemical park safety early warning platform, which at least includes:

[0008] The status monitoring module is used to deploy multiple data collectors in the park to obtain various information data in the park, and also includes:

[0009] The risk determination module is used to collect various status data in the park, receive the information data collected by the data collector that triggers the warning state, and mark the data collector as the target collector, wherein:

[0010] If the target collector is a smoke collector, the coordinate positions of multiple smoke collectors are obtained, and the risk area is constructed based on the smoke collectors. The smoke collectors outside the risk area that have not triggered the warning state are obtained and marked as edge smoke collectors, and the coordinate positions of the edge smoke collectors are obtained. The risk area is combined with the edge collector to construct the smoke risk area , in order to Execute control over the operating equipment within the facility;

[0011] And, an associated risk control module, which is used to When determining and executing control, obtain the operating equipment, products to be disposed of, and material dispatchers in the park, so that the material dispatcher can combine the coordinate positions of the operating equipment, products to be disposed of, and smoke risk areas The transport path is constructed based on the coordinate position of the product to be disposed of so that the product to be disposed of is safely distributed to the operating equipment.

[0012] Furthermore, when the smoke is in the process of flowing, the smoke risk area is predicted by Fick's second law. , the specific method is:

[0013] Determine the safe threshold of smoke concentration ;

[0014] Solve the diffusion equation analytically:

[0015] according to:

[0016]

[0017] The analytical solution is:

[0018]

[0019] In the formula, For the location x and time t The gas concentration on D is the diffusion coefficient, is the initial concentration;

[0020] Set up the equation:

[0021] The concentration in the analytical solution Set as safety threshold ,get:

[0022]

[0023] Solving for location x: Rearrange equations to solve them x :

[0024]

[0025] Therefore, the time is calculated t The smoke concentration reaches the safety threshold Location x;

[0026] By location x Constructing smoke risk areas .

[0027] Furthermore, the smoke risk area The construction method is:

[0028] Determine whether the smoke is the same and harmful. If it is the same and harmful:

[0029] According to the smoke concentration collected by the smoke collector, the starting point of the smoke is determined, and the risky smoke path is determined. The starting point and its corresponding smoke collector are combined with Fick's second law to determine the farthest position of smoke diffusion;

[0030] Locate the smoke collectors in the park that subsequently generate warning status and mark them as collectors to be affected;

[0031] The risk smoke path constructed Combine multiple affected collectors to regenerate risky smoke paths ,in:

[0032] Risky smoke paths The coordinate positions of multiple different collectors to be affected are connected with the coordinate positions of the risky smoke path, thereby the multiple collectors to be affected at different coordinate positions are combined with the determined risky smoke path. Extend various risky smoke paths , based on the multiple risky smoke paths identified Constructing smoke risk areas .

[0033] Furthermore, the method for determining the operating equipment is:

[0034] Obtain the closed operating equipment containing the chemical products to be processed, and obtain the subsequent corresponding production process steps of the closed operating equipment, including:

[0035] The production process steps include production or processing equipment;

[0036] Mark the closed operating equipment as closed operating equipment, and obtain the same equipment as the closed operating equipment in the park and not in the smoke risk area. Operating equipment within the

[0037] Chemical products corresponding to closed operating equipment are marked as products to be disposed of.

[0038] Furthermore, the method for safely distributing the product to be disposed to the operating equipment is as follows:

[0039] S100, obtaining a material dispatcher whose transportation path passes through the coordinate positions of the products to be processed and the coordinate positions of the operating equipment at the current time, and clarifying whether different coordinate positions of the products to be processed and the coordinate positions of the operating equipment can all be passed by the corresponding material dispatcher;

[0040] S200: If the material dispatching machine can access the coordinate position of the product to be processed and the coordinate position of the operating equipment, obtain the material dispatching machine that accesses the coordinate position of the product to be processed and the operating equipment, and determine the remaining capacity volume in the material dispatching machine. ;

[0041] S300: Obtain the coordinate position of the product to be processed and the operating equipment passed by the material dispatcher, and determine the single volume of the product to be processed corresponding to the coordinate position of the product to be processed ,thus:

[0042] when When Can at least meet the needs of a single product to be disposed of of loading, where:

[0043] Get the total volume of the product to be disposed corresponding to the coordinate position of the product to be disposed ;

[0044] If exists When The corresponding material dispatcher is pre-marked as a replacement material dispatcher;

[0045] If not present When When The corresponding material dispatcher is marked as the successor material dispatcher;

[0046] S400: Determine whether the transport path of the replacement material dispatcher passes through the smoke risk area ,in:

[0047] S410A, if not passing through the smoke risk area hour:

[0048] Mark the coordinate positions of the products to be disposed and the coordinate positions of the operating equipment as execution points, and transmit the execution points to the successor material dispatcher to enable it to perform the transportation operation;

[0049] S410B, if passing through a smoke risk area hour:

[0050] Determine the operation point where the material dispatcher needs to take over the operation, and determine whether the operation point is in the smoke risk area If there is:

[0051] You will be in the smoke risk area The operation points in the system are marked as invalid operation points, and other operation points excluding the invalid operation points are marked as execution operation points, and the smoke risk area is avoided. To regenerate the transportation path to take over the material dispatcher;

[0052] S420. Obtain the latest processing time of the product to be processed , to obtain the time it takes for the replacement material dispatcher to arrive at the coordinate position of the operating equipment along the transportation path ,in:

[0053] S420A, When the material dispatcher takes over, it will perform the transportation operation;

[0054] S420B, When the material dispatcher is replaced, the transport operation is performed, including:

[0055] exist hour:

[0056] Obtain other material dispatchers in the park that are not replacing the material dispatcher, so as to generate an avoidance instruction for the replacing material dispatcher and transmit it to other material dispatchers, thereby re-making other material dispatchers build a transportation path according to the transportation path avoiding the replacing material dispatcher, wherein:

[0057] The time for other material dispatchers to execute the avoidance instructions of the replacement material dispatcher is ;

[0058] S420C, When the material dispatching machine that takes over is prohibited from performing the transportation operation, the steps of S100-S400 are re-executed and other material dispatching machines that take over are determined.

[0059] Furthermore, after the replacement material dispatcher reconstructs the transportation route, the estimated operation time of the replacement material dispatcher at the historical operation point is obtained. ,in:

[0060] When the early warning platform is in early warning, according to the smoke risk area The early warning platform generates corresponding treatment plans based on the impact status, and determines the smoke risk area based on the execution of the treatment plan. Purification time when the air is purified ,therefore:

[0061] When , the running path of the succeeding material dispatcher remains unchanged;

[0062] At After Marked as safe time, After that, the material dispatcher that takes over the smoke risk area to reconstruct the transportation path based on the shortest path.

[0063] Compared with the known prior art, the technical solution provided by the present invention has the following beneficial effects:

[0064] Predict the smoke risk area affected by smoke in the current chemical park through the preset smoke collector or Fick's second law So that the early warning platform can perform safety control on the risk areas in the chemical park, and thereby generate transportation routes for the material dispatchers in the chemical park. The material dispatchers can perform safe distribution of the chemical products to be disposed of to the operating equipment based on the transportation routes, so as to achieve timely early warning of the chemical park, and at the same time ensure uninterrupted production in the chemical park and avoid waste of chemical resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0066] Figure 1 It is the overall module block diagram of the present invention. DETAILED DESCRIPTION

[0067] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0068] The present invention will be further described below in conjunction with the embodiments.

[0069] Example 1 (see Figure 1): A chemical park safety early warning platform, comprising at least:

[0070] The status monitoring module is used to deploy multiple data collectors in the park, including but not limited to data collectors set up in the park's operating area. It should be noted that the data collector in this solution is usually a sensor, which collects various information data in the park. The information data includes temperature, pressure, gas concentration, wind speed, etc., and is synchronously displayed on the control terminal corresponding to the early warning platform to form a visual supervision of the park's status safety.

[0071] Referring to the above, various status data in the park can be monitored by deploying data collectors. At the same time, the data collectors have corresponding coordinate positions, and in this solution, each coordinate position includes multiple data collectors, so that the actual status of the park in the corresponding area can be clarified through data collectors at different coordinate positions.

[0072] Furthermore, in this solution, the output end of the status monitoring module is connected to a risk determination module, which is used to receive information data collected by the triggering warning status data collector during the process of the data collector collecting various status data in the park, thereby marking the data collector corresponding to the information data as a target collector, and obtaining the detection type of the target collector, wherein:

[0073] If the target collector is a smoke collector, and there are multiple smoke collectors in the park that have triggered the warning state, it is necessary to clarify whether the smoke is the same and harmful. If it is the same and harmful, it means that it is the same smoke. Considering that it will cause harm to the operating personnel and operating equipment in the park, therefore:

[0074] The coordinate positions of multiple smoke collectors are obtained, and the risk area is constructed by connecting them according to the coordinate positions of the smoke collectors. Considering that there is smoke between other smoke collectors in the risk area, but it is not detected due to low concentration, therefore:

[0075] Obtain the smoke collectors outside the risk area that have not triggered the warning state and mark them as edge smoke collectors, and obtain the coordinate position of the edge smoke collectors. From this, the risk area is combined with the edge collectors to construct the smoke risk area ;

[0076] The early warning platform determines the smoke risk area Execute risk warning to indicate the smoke risk area When the operators leave and the risk warning is executed, the warning platform will simultaneously The corresponding operating equipment should be shut down in time to prevent the interior from being corroded by harmful smoke.

[0077] It is worth noting that when the smoke is in the process of flowing, the smoke risk area can also be predicted by Fick's second law. , the specific method is:

[0078] Determine the safe threshold of smoke concentration ;

[0079] Solve the diffusion equation analytically:

[0080] according to:

[0081]

[0082] The analytical solution is:

[0083]

[0084] In the formula, For the location x and time t The gas concentration on D is the diffusion coefficient, is the initial concentration;

[0085] Set up the equation:

[0086] The concentration in the analytical solution Set as safety threshold ,get:

[0087]

[0088] Solving for location x: Rearrange equations to solve them x :

[0089]

[0090] Therefore, the time is calculated t The smoke concentration reaches the safety threshold Location x;

[0091] By location x Constructing smoke risk areas .

[0092] Associated risk control module, which is used in smoke risk areas When the operating equipment is closed, the closed operating equipment containing the chemical products to be processed is obtained, and the subsequent corresponding production process steps of the closed operating equipment are obtained (the production process steps contain the operating equipment for production or processing), thereby marking the closed operating equipment as closed operating equipment, and obtaining the same closed operating equipment in the park and not in the smoke risk area The operating equipment in the closed operation equipment is marked as the chemical products to be disposed of, and the disposal queue is constructed with the products to be disposed of. , and then, the coordinate position of the corresponding product to be processed is determined according to the coordinate position of the closed operation equipment. Therefore, different products to be processed have different coordinate positions. Therefore, in order to ensure that the products to be processed are processed in time, this solution also includes the following steps:

[0093] S100, obtaining a material dispatcher (AGV transport equipment) whose transport path passes through both the coordinate positions of the products to be processed and the coordinate positions of the operating equipment at the current time, so as to clarify whether different coordinate positions of the products to be processed and the coordinate positions of the operating equipment can all be passed by the corresponding material dispatcher;

[0094] S200: If the material dispatching machine can access the coordinate position of the product to be processed and the coordinate position of the operating equipment, obtain the material dispatching machine that accesses the coordinate position of the product to be processed and the operating equipment, and determine the remaining capacity volume in the material dispatching machine. ;

[0095] S300: Obtain the coordinate position of the product to be processed and the operating equipment passed by the material dispatcher, and determine the single volume of the product to be processed corresponding to the coordinate position of the product to be processed ,thus:

[0096] when When Can at least meet the needs of a single product to be disposed of Loading, in order to improve transportation efficiency:

[0097] Get the total volume of the product to be disposed corresponding to the coordinate position of the product to be disposed (Volume to be processed times the quantity of product to be disposed of);

[0098] If exists When The corresponding material dispatcher is pre-marked as a replacement material dispatcher;

[0099] If not present When When The corresponding material dispatcher is marked as the successor material dispatcher;

[0100] Furthermore, in order to ensure that the replacement material dispatcher can safely perform the transportation operation of chemical products, the following steps need to be performed:

[0101] S400: Determine whether the transport path of the replacement material dispatcher passes through the smoke risk area ,in:

[0102] S410A, if not passing through the smoke risk area hour,:

[0103] Mark the coordinate positions of the products to be disposed and the coordinate positions of the operating equipment as execution points, and transmit the execution points to the successor material dispatcher to enable it to perform the transportation operation;

[0104] S410B, if passing through a smoke risk area hour:

[0105] Determine the operation point where the material dispatcher needs to perform operations (the operation point refers to the coordinate position where the material dispatcher loads and unloads chemical products and performs other handling and loading), and determine whether the operation point is in the smoke risk area If there is:

[0106] You will be in the smoke risk area The operation points in the process are marked as invalid operation points (and transmitted to the replacement material dispatcher, and no operation is performed on the invalid operation points), so as to exclude the other operation points of the invalid operation points from being marked as execution operation points (including the coordinate position of the product to be disposed and the coordinate position of the running operation equipment to load or unload the chemical product and the original historical operation point of the replacement material dispatcher), and avoid the smoke risk area To regenerate the transportation path that takes over the material dispatcher (the transportation path can be determined by using Dijkstra algorithm or Bellman-Ford algorithm, etc., which will not be described in detail here);

[0107] S420. Obtain the latest processing time of the product to be processed , to obtain the time it takes for the replacement material dispatcher to arrive at the coordinate position of the operating equipment along the transportation path ,in:

[0108] S420A, , it means that The replacement material dispatcher is sufficient to transport the product to be processed to the coordinate position of the operating equipment, so as to facilitate the processing of the product to be processed, so that the replacement material dispatcher can perform the transportation operation;

[0109] S420B, , it means that The material dispatcher can transport the product to be processed to the coordinate position of the operating equipment to facilitate the processing of the product to be processed, so that the material dispatcher can perform the transportation operation;

[0110] Among them, but because , which may cause delays. In order to ensure that the replacement material dispatcher can transport the products to be disposed to the coordinate position of the operating equipment, other material dispatchers other than the replacement material dispatchers in the park are obtained to generate avoidance instructions for the replacement material dispatcher and transmit them to other material dispatchers. Thus, other material dispatchers are rebuilt with the transportation path avoided according to the transportation path of the replacement material dispatcher, thereby ensuring that the replacement material dispatcher in this case can complete the transportation of the products to be disposed;

[0111] Among them, the time for other material dispatchers to execute the avoidance instructions of the replacement material dispatcher is , so in After that, there is no need to execute it, so as to form an accurate and reasonable execution of the avoidance instruction of the material dispatcher;

[0112] S420C, , it means that The successor material dispatcher cannot transport the product to be processed to the coordinate position of the operating equipment, which is inconvenient for processing the product to be processed. The successor material dispatcher is prohibited from performing the transportation operation, so steps S100-S400 are re-executed and other successor material dispatchers are determined.

[0113] In this way, the products to be disposed in the closed operation equipment can be distributed and processed continuously, ensuring the uninterrupted production and processing of chemical products, while avoiding the situation where chemical products cannot be processed and cause material damage, resulting in resource cost loss;

[0114] It is worth mentioning that, here, the replacement material dispatcher determined by limiting method can realize the reasonable utilization of the material dispatcher to the greatest extent, while reducing the utilization loss of resources.

[0115] In the above, the replacement material dispatcher relies on the smoke risk area After reconstructing the transportation route, obtain the estimated operation time of the replacement material dispatcher at the historical operation point (Time spent initially operating on the transport path), where:

[0116] When the early warning platform is in early warning, according to the smoke risk area The early warning platform generates corresponding disposal plans (such as spraying purifiers, etc.) for the affected state. The disposal plan refers to the treatment of the smoke risk area. The response plan for internal smoke elimination and purification is matched according to different smoke presets, and the smoke risk area is judged according to the execution of the disposal plan. Purification time when the air is purified (According to the time of executing the disposal plan, go to the smoke risk area time when the indoor air reaches the safety standard), according to the smoke risk area The time required for purification in the area with the highest smoke concentration is determined to ensure sufficient safety in the park. Therefore:

[0117] When , the running path of the succeeding material dispatcher remains unchanged;

[0118] At After Marked as safe time, After that, the material dispatcher that takes over the smoke risk area The transportation route is rebuilt based on the shortest path. It should be noted that in the smoke risk area After the release, it is also necessary to The equipment in the internal working area is monitored for status. Therefore, the original invalid coordinate points of the successor material dispatcher continue to be marked and not released. The release is executed when the early warning platform confirms that it is correct, and then the successor material dispatcher re-determines the transportation route.

[0119] Finally, the estimated operation time of the replacement material dispatcher at the historical operation point When confirmed:

[0120] Obtained under the reconstructed transport path:

[0121] The execution operation point includes the time to reach the coordinate position of the operating equipment (determined according to the constructed transportation path and calculated according to the preset driving speed of the successor material dispatcher) and the time to operate at the coordinate position of the operating equipment (determined according to the time of unloading of the successor material dispatcher, usually the preset unloading time), the time to reach the effective operation point and the preset operation time at the effective operation point (preset operation time). The sum of multiple time lengths is the actual estimated operation time. ,in:

[0122] When, according to and Make a difference to get continuous allocation time xt (It should be noted that by Applied to the current world time, we can determine The corresponding actual world time, thus obtaining the continuous distribution time xt corresponding world time) to continuously distribute time xtAllow this replacement material dispatcher to perform other transportation operations, so that the coordinate position of the replacement material dispatcher completing the operation under the transportation path can be used to obtain the products to be disposed of that are not currently being transported, in combination with the continuous allocation time. xt and Latest processing time of products to be disposed of Determine whether to perform transportation (continuous allocation time) xt Once the world time is determined, you can perform comparison and continuously distribute time xt Indicates the current replacement material dispatcher can continue to perform the transportation operation to reach the world time), if the continuous allocation time xt Latest processing time , it will take over the material dispatching machine to execute the transportation operation, otherwise it will not execute it. This will form a reasonable scheduling and utilization of the material dispatching machine that takes over, save resources and the early warning platform from the tediousness of frequently allocating operations to the material dispatching machine, and improve the immediate efficiency of the operation.

[0123] When this occurs, the taking-over material dispatcher is not allowed to perform other transportation operations.

[0124] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the protection scope of the technical solutions of the embodiments of the present invention.

Claims

1. A chemical park safety early warning platform, including a status monitoring module, which is used to deploy multiple data collectors in the park to obtain various information data in the park, characterized in that: Also includes: The risk determination module is used to collect various status data in the park, receive the information data collected by the data collector that triggers the warning state, and mark the data collector as the target collector, wherein: If the target collector is a smoke collector, the coordinate positions of multiple smoke collectors are obtained, and the risk area is constructed based on the smoke collectors. The smoke collectors outside the risk area that have not triggered the warning state are obtained and marked as edge smoke collectors, and the coordinate positions of the edge smoke collectors are obtained. The risk area is combined with the edge collector to construct the smoke risk area , in order to Execute control over the operating equipment within the facility; And, an associated risk control module, which is used to When determining and executing control, obtain the operating equipment, products to be disposed of, and material dispatchers in the park, so that the material dispatcher can combine the coordinate positions of the operating equipment, products to be disposed of, and smoke risk areas The transport path is constructed based on the coordinate position of the product to be disposed of so as to ensure safe distribution of the product to the operating equipment; The method for determining the operating equipment is: Obtain the closed operating equipment containing the chemical products to be processed, and obtain the subsequent corresponding production process steps of the closed operating equipment, including: The production process steps include production or processing equipment; Mark the closed operating equipment as closed operating equipment, and obtain the same equipment as the closed operating equipment in the park and not in the smoke risk area. Operating equipment within the Chemical products corresponding to closed operation equipment are marked as products to be disposed of; The method for safely distributing the product to be disposed of to the operating equipment is: S100, obtaining a material dispatcher whose transportation path passes through the coordinate positions of the products to be processed and the coordinate positions of the operating equipment at the current time, and clarifying whether different coordinate positions of the products to be processed and the coordinate positions of the operating equipment can all be passed by the corresponding material dispatcher; S200: If the material dispatching machine can access the coordinate position of the product to be processed and the coordinate position of the operating equipment, obtain the material dispatching machine that accesses the coordinate position of the product to be processed and the operating equipment, and determine the remaining capacity volume in the material dispatching machine. ; S300: Obtain the coordinate position of the product to be processed and the operating equipment passed by the material dispatcher, and determine the single volume of the product to be processed corresponding to the coordinate position of the product to be processed ,thus: when When Can at least meet the needs of a single product to be disposed of of loading, where: Get the total volume of the product to be disposed corresponding to the coordinate position of the product to be disposed ; If exists When The corresponding material dispatcher is pre-marked as a replacement material dispatcher; If not present When When The corresponding material dispatcher is marked as the successor material dispatcher; S400: Determine whether the transport path of the replacement material dispatcher passes through the smoke risk area ,in: S410A, if not passing through the smoke risk area hour: Mark the coordinate position of the product to be disposed and the coordinate position of the operating equipment as the execution operation point, and transmit the execution operation point to the successor material dispatcher to enable it to perform the transportation operation; S410B, if passing through a smoke risk area hour: Determine the operation point where the material dispatcher needs to take over the operation, and determine whether the operation point is in the smoke risk area If there is: You will be in the smoke risk area The operation points in the system are marked as invalid operation points, and other operation points excluding the invalid operation points are marked as execution operation points, and the smoke risk area is avoided. To regenerate the transportation path to take over the material dispatcher; S420. Obtain the latest processing time of the product to be processed , to obtain the time it takes for the replacement material dispatcher to arrive at the coordinate position of the operating equipment along the transportation path ,in: S420A, When the material dispatcher takes over, it will perform the transportation operation; S420B, When the material dispatcher takes over, it will perform the transportation operation; S420C, When the material dispatching machine that takes over is prohibited from performing the transportation operation, the steps of S100-S400 are re-executed and other material dispatching machines that take over are determined.

2. A chemical park safety early warning platform according to claim 1, characterized in that: The smoke is in the process of flowing, and the smoke risk area is predicted by Fick's second law. , the specific method is: Determine the safe threshold of smoke concentration ; Solve the diffusion equation analytically: according to: The analytical solution is: In the formula, For the location x and time t The gas concentration on D is the diffusion coefficient, is the initial concentration; Set up the equation: The concentration in the analytical solution Set as safety threshold ,get: Solving for location x: Rearrange equations to solve them x : Therefore, the time is calculated t The smoke concentration reaches the safety threshold Location x; By location x Constructing smoke risk areas .

3. A chemical park safety early warning platform according to claim 2, characterized in that: The smoke risk area The construction method is: Determine whether the smoke is the same and harmful. If it is the same and harmful: According to the smoke concentration collected by the smoke collector, the starting point of the smoke is determined, and the risky smoke path is determined. The starting point and its corresponding smoke collector are combined with Fick's second law to determine the farthest position of smoke diffusion; Locate the smoke collectors in the park that subsequently generate warning status and mark them as collectors to be affected; The risk smoke path constructed Combine multiple affected collectors to regenerate risky smoke paths ,in: Risky smoke paths The coordinate positions of multiple different collectors to be affected are connected with the coordinate positions of the risky smoke path, thereby the multiple collectors to be affected at different coordinate positions are combined with the determined risky smoke path. Extend various risky smoke paths , based on the multiple risky smoke paths identified Constructing smoke risk areas .

4. A chemical park safety early warning platform according to claim 1, characterized in that: exist hour: Obtain other material dispatchers in the park that are not replacing the material dispatcher, so as to generate an avoidance instruction for the replacing material dispatcher and transmit it to other material dispatchers, thereby re-making other material dispatchers build a transportation path according to the transportation path avoiding the replacing material dispatcher, wherein: The time for other material dispatchers to execute the avoidance instructions of the replacement material dispatcher is .

5. A chemical park safety early warning platform according to claim 1, characterized in that: After the replacement material dispatcher reconstructs the transportation route, the estimated operation time of the replacement material dispatcher at the historical operation point is obtained ,in: When the early warning platform is in early warning, according to the smoke risk area The early warning platform generates corresponding treatment plans based on the impact status, and determines the smoke risk area based on the execution of the treatment plan. Purification time when the air is purified ,therefore: When , the running path of the succeeding material dispatcher remains unchanged; At the time, After Marked as safe time, After that, the material dispatcher that takes over the smoke risk area to reconstruct the transportation path based on the shortest path.

6. A chemical park safety early warning platform according to claim 5, characterized in that: The estimated operation time of the replacement material dispatcher at the historical operation point When confirmed: Obtained under the reconstructed transport path: The execution operation point includes the time to reach the coordinate position of the operating equipment and the time to operate at the coordinate position of the operating equipment, the time to reach the effective operation point and the preset operation time at the effective operation point. The sum of multiple time periods is the actual estimated operation time. ,in: When, according to and Make a difference to get continuous allocation time xt , to continuously allocate time xt Allow this replacement material dispatcher to perform other transportation operations, so that the coordinate position of the replacement material dispatcher completing the operation under the transportation path can be used to obtain the products to be disposed of that are not currently being transported, in combination with the continuous allocation time. xt and Latest processing time of products to be processed Determine whether to transport it, if it continues to allocate time xt Latest processing time , it will take over the material dispatcher to perform the transportation operation, otherwise it will not execute; When this occurs, the taking-over material dispatcher is not allowed to perform other transportation operations.