A method of launching and recovering a submersible

By using a three-section cargo hold structure and a rotating shaft winch system, the problem of launching and recovering marine submersible transport vessels in sea conditions of level 6 and above has been solved, enabling safe and efficient transportation and operation of marine submersibles and reducing costs.

CN119262193BActive Publication Date: 2026-02-06RES INST 708 OF CHINA STATE SHIPBUILDING CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411666126.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-11-20
Publication Date
2026-02-06
Estimated Expiration
2044-11-20

AI Technical Summary

Technical Problem

Existing ocean-going vehicle transport vessels are unable to safely and efficiently complete deployment and retrieval operations in sea conditions of level 6 or above, resulting in a short operational window.

Method used

It adopts a three-section cargo hold structure for transport ships, and realizes the deployment and retrieval of ocean submersibles through the cooperation of rotating shafts and winches, including adjusting the relative position of the hull and the submersible in deep water areas to ensure safe operation in sea conditions of level 6 and above.

Benefits of technology

It has improved the operational capabilities of ocean submersible transport vessels in sea conditions of level 6 and above, extended the operational window, reduced ship production and operating costs, and ensured the safe and efficient deployment and retrieval of ocean submersibles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119262193B_ABST
    Figure CN119262193B_ABST
Patent Text Reader

Abstract

The present application relates to a kind of ocean submersible methods for receiving and releasing, belong to the technical field of ship and ocean engineering, including the recovery operation step of recovering ocean submersible from deep sea area to the cargo hold of transport ship and the unloading operation step of unloading ocean submersible from the cargo hold of transport ship to the sea surface under the operation position.The cargo hold of three open body type transport ship is used to release ocean submersible, the top of the cargo hold of transport ship is provided with two rotating shafts, and the two sides of the side of the cargo hold of transport ship are connected with the two rotating shafts respectively;The two sides of the transom of the cargo hold of transport ship are provided with watertight cabin, and winch is arranged in the watertight cabin;The bottom of the cargo hold of transport ship is open body structure, and the two ends thereof are connected with winch through steel cable respectively.The ocean submersible method provided by the present application reduces the influence of sea wind and wave on transport ship during operation, so that the transport ship can operate in sea condition above six levels, prolongs the operation window period, ensures the safe and efficient completion of the receiving and releasing work of ocean submersible, and reduces the production and operation cost of ship.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a method for launching and recovering marine submersibles, belonging to the technical field of ships and marine engineering. Background Technology

[0002] Based on existing wave distribution data, sea states of force 6 or higher are highly probable. However, current ocean submersible transport vessels typically use a hoisting method to deploy the submersibles onto the deck or into the operating area. This method is easily affected by sea conditions, resulting in low deployment and retrieval efficiency and a high risk of collisions between the submersible and the vessel, leading to damage. Alternatively, transport vessels can use a semi-submersible design, deploying and retrieving the submersible through buoyancy adjustments. This semi-submersible method requires precise control over ballast water levels, resulting in a bulky hull and numerous pumps, significantly increasing production and operating costs. Furthermore, both of these methods only allow the submersible to be retrieved onto the deck, and its anchoring and movement are heavily influenced by the marine environment. For these reasons, existing ocean submersible transport vessels struggle to operate in sea states of force 6 or higher, resulting in short operational windows and difficulties in safely and efficiently deploying and retrieving submersibles. Summary of the Invention

[0003] The technical problem to be solved by the present invention is that existing marine submersible transport vessels cannot guarantee operation in sea conditions of level 6 or above, resulting in a short operating window and difficulty in safely and efficiently completing the deployment and retrieval of marine submersibles.

[0004] To achieve the above objectives, the present invention provides a method for deploying and recovering a marine submersible, wherein the recovery operation steps are as follows:

[0005] S1: The ocean submersible transport vessel sails to the ocean submersible recovery area;

[0006] S2: The engine of the transport ship starts and drives the rotating shaft to rotate through the transmission device. At the same time, the winch starts to release the cable, so that the cargo hold of the transport ship opens to both sides.

[0007] S3: The winch is started and the cable is continuously laid down to lower the hull of the transport ship to the deep water area;

[0008] S4: The marine submersible sails to the top of the transport ship's hull;

[0009] S5: The winch starts and continuously pulls in the cable to lift the bottom of the transport ship and the submersible from the deep water area into the cargo hold of the transport ship.

[0010] S6: the engine of the transport ship is started, the rotating shaft is rotated through the transmission device, and the winch is started to collect the cable, so that the cargo hold of the transport ship is folded to the middle, and the sea water in the hold is discharged;

[0011] The unloading operation steps are as follows:

[0012] S1: the submersible is transported to the operation sea area;

[0013] S2: the engine of the transport ship is started, the rotating shaft is rotated through the transmission device, and the winch is started to release the cable, so that the cargo hold of the transport ship is opened to both sides;

[0014] S3: the winch is started to continuously release the cable, and the bottom of the transport ship and the submersible are lowered to the deep water area;

[0015] S4: the submersible is started to leave the bottom of the transport ship to the deep water operation area;

[0016] S5: the winch is started to continuously collect the cable, and the bottom of the transport ship is pulled up from the deep water area to the cargo hold of the transport ship;

[0017] S6: the engine is started, the rotating shaft is rotated through the transmission device, and the winch is started to collect the cable, so that the cargo hold of the transport ship is folded to the middle, and the sea water in the hold is discharged.

[0018] The present application provides a submersible collecting and releasing method, which adopts a three-opening body type transport ship cargo hold to collect and release a submersible, the top of the transport ship cargo hold is provided with two rotating shafts, and the two sides of the cargo hold are respectively connected with the two rotating shafts; the two sides of the cargo hold are provided with watertight empty cabins, and the winches are arranged in the watertight empty cabins; the bottom of the cargo hold is provided with the bottom of the transport ship, and the two ends of the bottom of the transport ship are respectively connected with the winches through steel cables.

[0019] Preferably, the engine room and superstructure are arranged outside the tail of the ship body.

[0020] Preferably, the engine is arranged in the engine room, and the engine drives the rotating shaft to rotate through the transmission device.

[0021] Preferably, the cargo hold of the transport ship is a three-opening body type hold structure.

[0022] Preferably, the top of the rotating shaft of the cargo hold of the transport ship is a deck.

[0023] Preferably, the watertight empty cabin is located at the bilge of the cargo hold of the transport ship.

[0024] Preferably, the cargo hold of the transport ship is a full-through structure.

[0025] Preferably, the transport ship cargo hold is loaded with one submersible with a diameter not exceeding the width and height of the transport ship cargo hold and a length not exceeding the length of the transport ship cargo hold.

[0026] Preferably, the method comprises a recovery operation step of recovering the submersible from a deep sea area to the transport ship cargo hold of the transport ship and a discharge operation step of discharging the transport ship cargo hold to a discharge operation site below the sea surface.

[0027] In summary, the present application comprises the following beneficial technical effects:

[0028] Compared with the prior art, the submersible launching and recovery method provided by the present application reduces the influence of sea waves on the transport ship during operation, so that the submersible transport ship can operate in sea conditions of six or more, prolongs the operation window period, ensures safe and efficient completion of the submersible launching and recovery work, and reduces the production and operation cost of the ship. BRIEF DESCRIPTION OF DRAWINGS

[0029] Figure 1 is a general arrangement of the submersible transport ship;

[0030] Figure 2 is a cross-sectional view of the submersible transport ship cargo hold area (along the I-I section); Figure 1

[0031] Figure 3 is a first stage of the recovery operation;

[0032] Figure 4 is a second stage of the recovery operation;

[0033] Figure 5 is a third stage of the recovery operation;

[0034] Figure 6 is a fourth stage of the recovery operation;

[0035] Figure 7 is a fifth stage of the recovery operation;

[0036] Figure 8 is a sixth stage of the recovery operation;

[0037] Figure 9 is a first stage of the discharge operation;

[0038] Figure 10 is a second stage of the discharge operation;

[0039] Figure 11 is a third stage of the discharge operation;

[0040] Figure 12 ​Figure 4 is a schematic view of the fourth stage of the launching operation;

[0041] Figure 13 Figure 5 is a schematic view of the fifth stage of the recovery operation;

[0042] Figure 14 Figure 6 is a schematic view of the sixth stage of the launching operation.

[0043] Reference numerals: 1, rotating shaft; 2, cargo hold of the transport ship; 3, ocean submersible; 4, watertight cabin; 5, winch; 6, steel cable; 7, bottom of the transport ship. DETAILED DESCRIPTION

[0044] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only some of the embodiments of the present application, rather than all the embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work fall within the scope of the present application.

[0045] The present application discloses a method for launching and recovering an ocean submersible.

[0046] Figure 1 and Figure 2 A general arrangement of an ocean submersible transport ship is shown, which includes a cargo hold 2 of the transport ship, the cargo hold 2 of the transport ship is a three-opening body type hold structure, the top of the cargo hold 2 is provided with two rotating shafts 1, the top of the two sides of the cargo hold 2 is connected with the two rotating shafts 1 respectively, and the rotating shafts 1 can be driven to rotate through a transmission device; the bottom of the two sides of the cargo hold 2 is provided with a watertight cabin 4, and the winch 5 is arranged in the watertight cabin 4; the bottom of the cargo hold 2 is provided with the bottom 7 of the transport ship, and the two ends of the bottom 7 of the transport ship are connected with the winches 5 in the watertight cabins 4 on the two sides respectively through the steel cables 6.

[0047] The cargo hold 2 of the transport ship is a full-through structure, the deck is provided with the rotating shaft 1, the bilge of the cargo hold 2 is provided with the watertight cabin 4, the bottom of the cargo hold 2 is provided with a double-opening body type bottom structure, and the engine room and the superstructure are arranged outside the two sides of the tail of the ship body; the cargo hold 2 is loaded with one ocean submersible 3, the diameter of the ocean submersible 3 does not exceed the width and height of the cargo hold 2 of the transport ship, and the length of the ocean submersible 3 does not exceed the length of the cargo hold 2 of the transport ship.

[0048] The rotating shaft 1 is arranged on the deck, and the ship body side can be driven to rotate by the rotating shaft 1; the engine room is arranged outside the tail of the ship, the engine is arranged in the engine room, and the engine drives the rotating shaft 1 to rotate through a transmission device; the winch 5 is arranged in the watertight cabin 4, and the bottom 7 of the transport ship is connected with the winch 5 in the watertight cabin 4 on the two sides of the ship bottom through the steel cable 6; the bottom 7 of the transport ship is an opening body type structure, and the winch 5 in the watertight cabin 4 on the two sides of the bilge is connected with the winch 5 in the watertight cabin 4 on the two sides of the bilge through the steel cable 6.

[0049] The method for loading and unloading the submersible 3 of the submersible transport ship is divided into two parts, the first part is to recover the submersible 3 from the deep sea area to the transport ship cargo hold 2 of the submersible transport ship, that is, the submersible recovery operation; the second part is to unload the submersible 3 from the transport ship cargo hold 2 to the sea surface under the operation position, that is, the submersible unloading operation.

[0050] The present application adopts the open-body loading and unloading method to load and unload the submersible 3, and the submersible 3 is located in the transport ship cargo hold 2 of the ship body during transportation. The submersible loading and unloading operation flow of the submersible transport ship is as shown in Figures 3 to 14

[0051] Figure 3 The first stage of the recovery operation is shown in the figure, at this time, the submersible transport ship sails to the submersible 3 recovery area;

[0052] Figure 4 The second stage of the recovery operation is shown in the figure, at this time, the engine is started, and the rotating shaft 1 is driven to rotate through the transmission device, and the winch 5 is started to release the cable, so that the transport ship cargo hold 2 is opened to both sides;

[0053] Figure 5 The third stage of the recovery operation is shown in the figure, at this time, the winch 5 is started to continuously release the cable, and the transport ship bottom 7 is lowered to the deep water area;

[0054] Figure 6 The fourth stage of the recovery operation is shown in the figure, at this time, the submersible 3 sails above the transport ship bottom 7;

[0055] Figure 7 The fifth stage of the recovery operation is shown in the figure, the winch 5 is started to continuously release the cable, and the transport ship bottom 7 and the submersible 3 are pulled up from the deep water area to the transport ship cargo hold 2;

[0056] Figure 8 The sixth stage of the recovery operation is shown in the figure, the engine is started, and the rotating shaft 1 is driven to rotate through the transmission device, and the winch 5 is started to release the cable, so that the transport ship cargo hold 2 is folded to the middle and the water in the hold is discharged, at this time, the recovery operation of the submersible 3 is completed;

[0057] Figure 9 The first stage of the unloading operation is shown in the figure, at this time, the transport ship transports the submersible 3 to the operation sea area;

[0058] Figure 10 The second stage of the unloading operation is shown in the figure, at this time, the engine is started, and the rotating shaft 1 is driven to rotate through the transmission device, and the winch 5 is started to release the cable, so that the transport ship cargo hold 2 is opened to both sides;

[0059] Figure 11 ​The diagram shows the third stage of the unloading operation. At this time, the winch 5 starts to continuously release the cable, lowering the bottom of the transport ship 7 and the submersible 3 to the deep water area.

[0060] Figure 12 The diagram shown is the fourth stage of the recovery operation. At this point, the submersible 3 is activated and leaves the bottom 7 of the transport ship to the deep-water operation area.

[0061] Figure 13 The diagram shown is the fifth stage of the recovery operation. At this time, the winch 5 starts to continuously pull up the cable, raising the bottom 7 of the transport ship from the deep water area to the cargo hold 2 of the transport ship.

[0062] Figure 14 The diagram shown is the sixth stage of the recovery operation. At this time, the engine starts and drives the rotating shaft 1 to rotate through the transmission device. At the same time, the winch 5 starts to pull up the cable, so that the sides of the cargo hold 2 of the transport ship close to the middle and the seawater in the hold is discharged. At this time, the unloading operation of the submersible 3 is completed.

[0063] The specific steps for recovering the Ocean Submersible 3 are as follows:

[0064] S1: The ocean submersible transport ship sails to the recovery area of ​​Ocean Submersible 3;

[0065] S2: The engine starts and drives the rotating shaft 1 to rotate through the transmission device. At the same time, the winch 5 starts to release the cable, so that the cargo hold 2 of the transport ship opens to both sides.

[0066] S3: Winch 5 starts and continuously lays out the cable, lowering the bottom 7 of the transport ship to the deep water area;

[0067] S4: The ocean submersible 3 sails to the top of the transport ship's hull 7;

[0068] S5: Winch 5 starts and continuously pulls in the cable, raising the bottom of the transport ship 7 and the submersible 3 from the deep water area into the cargo hold 2 of the transport ship.

[0069] S6: The engine starts and drives the rotating shaft 1 to rotate through the transmission device. At the same time, the winch 5 starts to pull up the cable, so that the sides of the cargo hold 2 of the transport ship close to the middle and the seawater in the hold is discharged.

[0070] The specific steps for the unloading of the ocean submersible 3 are as follows:

[0071] S1: Transport the ocean submersible 3 to the operational area;

[0072] S2: The engine starts and drives the rotating shaft 1 to rotate through the transmission device. At the same time, the winch 5 starts to release the cable, so that the cargo hold 2 of the transport ship opens to both sides.

[0073] S3: Winch 5 starts to continuously lay the cable, lowering the hull 7 of the transport ship and the submersible 3 to the deep water area;

[0074] S4: the submarine 3 is started and leaves the bottom 7 of the transport ship to the deep water working area;

[0075] S5: the winch 5 is started to continuously collect the cable, and the bottom 7 of the transport ship is pulled up from the deep water area to the cargo hold 2 of the transport ship;

[0076] S6: the engine is started, the rotating shaft 1 is rotated through the transmission device, the winch 5 is started to collect the cable, the cargo hold 2 of the transport ship is folded to the middle, and the sea water in the hold is discharged;

[0077] Finally, it should be noted that the above only describes the preferred embodiments of the present application and is not intended to limit the present application. Although the present application has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent replacements to some technical features, and any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.

Claims

1. A method of launching and recovering a submersible, characterized by: The marine submersible (3) is located in the three-open-body transport ship cargo hold (2) during transportation, the top deck of the transport ship cargo hold (2) is provided with two rotating shafts (1), the top sides of the two sides of the transport ship cargo hold (2) are respectively connected with the two rotating shafts (1); the bottom sides of the two sides of the transport ship cargo hold (2) are provided with watertight empty cabins (4), the watertight empty cabins (4) are provided with winches (5) inside; the bottom of the transport ship cargo hold (2) is provided with a transport ship bottom (7), the transport ship bottom (7) is of an open-body structure, the two ends of the transport ship bottom (7) are respectively connected with the winches (5) through steel cables (6); The marine submersible (3) is loaded and unloaded by adopting a three-open-body loading and unloading method, including a recovery operation step of recovering the marine submersible (3) from a deep sea area to the transport ship cargo hold (2) and an unloading operation step of unloading the marine submersible (3) from the transport ship cargo hold (2) to a working position under the sea surface, the recovery operation step is as follows: S1: the marine submersible transport ship sails to a recovery area of the marine submersible (3); S2: the engine of the transport ship is started, the rotating shaft (1) is rotated through a transmission device, and the winch (5) is started to release a cable, so that the side of the transport ship cargo hold (2) is opened to the two sides; S3: the winch (5) is started to continuously release the cable, and the transport ship bottom (7) is lowered to a deep water area; S4: the marine submersible (3) sails above the transport ship bottom (7); S5: the winch (5) is started to continuously collect the cable, and the transport ship bottom (7) and the marine submersible (3) are pulled up from the deep water area to the transport ship cargo hold (2); S6: the engine is started, the rotating shaft (1) is rotated through the transmission device, and the winch (5) is started to collect the cable, so that the side of the transport ship cargo hold (2) is folded to the middle, and sea water in the hold is discharged; The unloading operation step is as follows: S1: the marine submersible (3) is transported to a working sea area; S2: the engine is started, the rotating shaft (1) is rotated through the transmission device, and the winch (5) is started to release the cable, so that the side of the transport ship cargo hold (2) is opened to the two sides; S3: the winch (5) is started to continuously release the cable, and the transport ship bottom (7) and the marine submersible (3) are lowered to a deep water area; S4: the marine submersible (3) is started to leave the transport ship bottom (7) to a deep water working area; S5: the winch (5) is started to continuously collect the cable, and the transport ship bottom (7) is pulled up from the deep water area to the transport ship cargo hold (2); S6: the engine is started, the rotating shaft (1) is rotated through the transmission device, and the winch (5) is started to collect the cable, so that the side of the transport ship cargo hold (2) is folded to the middle, and sea water in the hold is discharged.

2. A method of launching and recovering a submersible according to claim 1 wherein, The engine is arranged in the engine room, and the engine rotates the rotating shaft (1) through the transmission device.

3. A method of launching and recovering a submersible according to claim 2, wherein, The transport ship cargo hold (2) is of a three-open-body hold structure.

4. A method of launching and recovering a submersible according to claim 1 wherein, The watertight empty cabin (4) is located at the bilge of the transport ship cargo hold (2).

5. A method of launching and recovering a submersible according to claim 3 wherein, ​ 6. A method of deploying and retrieving a submersible according to claim 4, wherein, The transport ship cargo hold (2) is a full-penetration structure.

7. A method of launching and recovering a submersible according to claim 6, wherein, The transport ship cargo hold (2) is loaded with one submarine (3) having a diameter not exceeding the width and height of the transport ship cargo hold (2) and a length not exceeding the length of the transport ship cargo hold (2).

Citation Information

Patent Citations

  • Apparatus for handling submersibles at sea

    US4312287A