Verification method and device of power system and storage medium

Through the multi-work mode test of the power simulation system, verification results are generated, which solves the problem that the existing technology cannot predict the operating status of other working modes of the power system in advance, ensuring that the power system operates normally after switching modes.

CN119323109APending Publication Date: 2025-01-17CHINA UNITED NETWORK COMM GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411338076.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2025-01-17

AI Technical Summary

Technical Problem

The existing power system monitoring technology can only monitor the power system status in the current working mode in real time, and cannot predict the operating status in other working modes in advance, resulting in an abnormality when switching the working mode.

Method used

By obtaining the current data of the power simulation system in the normal working state, testing based on multiple working modes, generating verification results, and determining whether the power system is in a stable state, so as to ensure the normal operation of the system when switching the working mode.

Benefits of technology

Improves the diversity and accuracy of the tests, ensuring that the power system can operate normally after switching the working mode, and avoids abnormalities caused by unreasonable circuit or equipment configuration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119323109A_ABST
    Figure CN119323109A_ABST
Patent Text Reader

Abstract

The invention provides a verification method and device of an electric power system and a storage medium, relates to the field of electric power systems, and is used for solving the problem that when the electric power system is switched to other working modes, if line or equipment configuration is unreasonable, the electric power system is likely to be abnormal. In the method, current data of the electric power simulation system in a normal working state are obtained, the electric power simulation system comprises a plurality of working modes, and the working modes are used for indicating power supply loops of the electric power simulation system in different operation states. And based on the current data, testing the power simulation system in different working modes to obtain a plurality of test results, one test result corresponding to one working mode. And generating a verification result based on the plurality of test results, the verification result being used for indicating whether the power simulation system is in a stable state.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power systems, and in particular to a verification method, device and storage medium for a power system. Background Art

[0002] In the information and communication industry, electricity is the key to ensuring the normal operation of communication networks and equipment. To ensure the normal operation of the power system, real-time monitoring of the power system is required.

[0003] However, the power system has multiple working modes, and real-time monitoring can only monitor and warn the operating status of the power system's current working mode in the current line or equipment configuration. This may lead to limitations in monitoring and warning. As a result, when the power system switches to other working modes, it may cause power system abnormalities. Summary of the invention

[0004] The present application provides a verification method, device and storage medium for an electric power system, which are used to solve the problem that when the electric power system switches to other working modes, if the line or equipment configuration is unreasonable, it may cause the electric power system to be abnormal.

[0005] In order to achieve the above objectives, this application adopts the following technical solutions:

[0006] In a first aspect, the present application provides a method for verifying an electric power system. In the method, current data of an electric power simulation system under normal working conditions is obtained, and the electric power simulation system includes multiple working modes, and the working modes are used to indicate the power supply circuit of the electric power simulation system under different operating conditions. Based on the current data, the electric power simulation system in different working modes is tested to obtain multiple test results, and one test result corresponds to one working mode. Based on the multiple test results, a verification result is generated, and the verification result is used to indicate whether the electric power simulation system is in a stable state.

[0007] Based on the above technical solution, the current data of the electric power simulation system under normal working conditions is obtained. The electric power simulation system includes multiple working modes, and the working modes are used to indicate the power supply circuit of the electric power system under different operating conditions. Afterwards, based on the current data, the electric power simulation system in different working modes is tested, and the test results of the electric power simulation system in different working modes can be obtained. Then, it can be determined whether the electric power simulation system is in a stable state through the test results of the electric power simulation system in different working modes. In this way, by testing the electric power simulation system in different working modes, the diversity of the test is increased, thereby improving the accuracy of the test. Furthermore, since the stable state is obtained based on the test results of different working modes; in this way, the working mode can be switched through the stable state, thereby ensuring that the electric power system can operate normally after switching the working mode.

[0008] In a possible design, for each working mode, a test result corresponding to the working mode is determined by a target operation, and the target operation includes: determining a target mode. The target mode is any one of multiple working modes. Determining a target device corresponding to the target mode, the target device is all devices in a power supply circuit corresponding to the target mode through which current flows. The target device is tested based on the current data to obtain a test result corresponding to the target mode.

[0009] In one possible design, a preset parameter threshold and a target algorithm corresponding to a target device are determined, and the target algorithm is used to determine the parameters of the target device. The parameters of the target device are determined based on the current data and the target algorithm. The preset parameter threshold and the parameters of the target device are compared to obtain a test result.

[0010] In a possible design, the power simulation system includes: a main power system, a backup power system, a low-voltage interconnection bus, a generator set, an AC train head cabinet, and a DC train head cabinet. The low-voltage interconnection bus, the generator set, the AC train head cabinet, and the DC train head cabinet are connected to the main power system and the backup power system, respectively.

[0011] In one possible design, the current data includes: the current flowing through each device in the main power system, the current flowing through each device in the backup power system, the current flowing through the AC train terminal, the current flowing through the DC train terminal, the current flowing through the generator set, the current flowing through the low-voltage interconnecting bus, the rated capacity of the battery pack, the power factor of the main power system, the power factor of the backup power system, and the power factor of the UPS system.

[0012] In one possible design, the initial simulation parameters of the target power system are obtained, and the initial simulation parameters include: the rated capacity of each power device in the main power system, the rated capacity of each power device in the backup power system, the rated capacity of the generator set, the rated capacity of the AC train head cabinet, and the rated capacity of the DC train head cabinet. Simulation is performed based on the initial simulation parameters and the preset connection relationship to build a power simulation system for the target power system.

[0013] In a second aspect, the present application provides a verification device for an electric power system, the device comprising an acquisition module and a processing module.

[0014] The acquisition module is used to obtain the current data of the power simulation system under normal working conditions. The power simulation system includes multiple working modes, and the working modes are used to indicate the power supply circuit of the power simulation system under different operating conditions. The processing module is used to test the power simulation system in different working modes based on the current data to obtain multiple test results, and one test result corresponds to one working mode. The processing module is also used to generate a verification result based on the multiple test results, and the verification result is used to indicate whether the power simulation system is in a stable state.

[0015] In one possible design, the processing module is further used to determine a target mode, which is any one of a plurality of operating modes. The processing module is further used to determine a target device corresponding to the target mode, which is all devices in a power supply circuit through which current flows corresponding to the target mode. The processing module is further used to test the target device based on the current data to obtain a test result corresponding to the target mode.

[0016] In one possible design, the processing module is further used to determine a preset parameter threshold and a target algorithm corresponding to the target device, and the target algorithm is used to determine the parameters of the target device. The processing module is further used to determine the parameters of the target device based on the current data and the target algorithm. The processing module is further used to compare the preset parameter threshold and the parameters of the target device to obtain a test result.

[0017] In a possible design, the power simulation system includes: a main power system, a backup power system, a low-voltage interconnection bus, a generator set, an AC train head cabinet, and a DC train head cabinet. The low-voltage interconnection bus, the generator set, the AC train head cabinet, and the DC train head cabinet are connected to the main power system and the backup power system, respectively.

[0018] In one possible design, the current data includes: the current flowing through each device in the main power system, the current flowing through each device in the backup power system, the current flowing through the AC train terminal, the current flowing through the DC train terminal, the current flowing through the generator set, the current flowing through the low-voltage interconnecting bus, the rated capacity of the battery pack, the power factor of the main power system, the power factor of the backup power system, and the power factor of the UPS system.

[0019] In a possible design, the acquisition module is also used to acquire initial simulation parameters of the target power system, including: the rated capacity of each power device in the main power system, the rated capacity of each power device in the backup power system, the rated capacity of the generator set, the rated capacity of the AC train head cabinet, and the rated capacity of the DC train head cabinet. The processing module is also used to perform simulation based on the initial simulation parameters and the preset connection relationship to construct a power simulation system of the target power system.

[0020] In a third aspect, the present application provides a verification device for an electric power system, the device comprising: a processor and a memory; the processor and the memory are coupled; the memory is used to store one or more programs, the one or more programs comprising computer execution instructions, and when the verification of the electric power system is running, the processor executes the computer execution instructions stored in the memory to implement the method described in any possible implementation of the first aspect.

[0021] In a fourth aspect, the present application provides a computer-readable storage medium, in which instructions are stored. When the instructions are executed on a computer, the computer executes the method described in any possible implementation of the first aspect.

[0022] In a fifth aspect, the present application provides a chip, comprising a processor and a communication interface, wherein the communication interface and the processor are coupled, and the processor is used to run a computer program or instructions to implement the method described in any possible implementation of the first aspect.

[0023] In a sixth aspect, the present application provides a computer program product comprising instructions, which, when executed by a computer, enables the computer to execute the method described in any possible implementation of the first aspect above.

[0024] In the above scheme, the technical problems that can be solved and the technical effects achieved by the verification device, computer equipment, computer storage medium, chip or computer program product of the power system can be referred to the technical problems and technical effects solved by the above-mentioned first aspect, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 A system architecture diagram of a power simulation system provided in an embodiment of the present application;

[0026] Figure 2 A schematic diagram of a flow chart of a power system verification method provided in an embodiment of the present application;

[0027] Figure 3 A schematic diagram of a flow chart of another power system verification method provided in an embodiment of the present application;

[0028] Figure 4 A schematic diagram of the structure of a verification device for a power system provided in an embodiment of the present application;

[0029] Figure 5 A schematic diagram of the structure of another power system verification device provided in an embodiment of the present application;

[0030] Figure 6 A conceptual partial view of a computer program product provided for an embodiment of the present application. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0032] The terms “first” and “second” in the description and claims of the present application are used to distinguish different objects rather than to describe a specific order of the objects.

[0033] In addition, the terms "including" and "having" and any variations thereof mentioned in the description of this application are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or modules is not limited to the listed steps or modules, but may optionally include other steps or modules that are not listed, or may optionally include other steps or modules that are inherent to these processes, methods, products or devices.

[0034] In addition, in the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present concepts in a specific way.

[0035] In the information and communication industry, electricity is the key to ensure the normal operation of communication networks and equipment. In order to ensure the normal operation of the power system, the power system needs to be monitored in real time. The current distribution monitoring system is mainly divided into device-level monitoring and system-level monitoring. Device-level monitoring can realize real-time display of its own operating status and alarms at the device level by entering the equipment of the power system and binding the operating parameters of each device to the device. System-level monitoring establishes the connection routing relationship of each power device in the form of a distribution system diagram. By binding the operating parameters of each device to the device, it can realize real-time display of its own operating status and alarms at the device level, and can also display the connection routing relationship within the distribution system and the architecture relationship between distribution systems. The equipment entered into the power system includes transformers, low-voltage distribution cabinets, uninterruptible power systems (UPS) systems, switching power supplies, and head cabinets. The operating parameters of each device include voltage, current, power, power factor, and electricity.

[0036] However, device-level monitoring and system-level monitoring can only monitor the operating status of the distribution system in real time. The power system has many working modes. Real-time monitoring can only monitor and warn the operating status of the current working mode of the power system in the current line or equipment configuration. It cannot display other working modes outside of this working mode, nor can it predict in advance the operating status of other working modes under the current line or equipment configuration. Therefore, when the power system switches to other working modes, if the line or equipment configuration is unreasonable, it may cause power system abnormalities.

[0037] In response to the technical problems pointed out in the background technology section of this application, an embodiment of the present application provides a verification method for an electric power system. In this method, the current data of an electric power simulation system under normal working conditions is obtained, and the electric power simulation system includes multiple working modes, and the working modes are used to indicate the power supply circuit of the electric power system under different operating conditions. Afterwards, based on the current data, the electric power simulation system in different working modes is tested, and the test results of the electric power simulation system in different working modes can be obtained. Then, it can be determined whether the electric power simulation system is in a stable state through the test results of the electric power simulation system in different working modes. In this way, by testing the electric power simulation system in different working modes, the diversity of the test is increased, thereby improving the accuracy of the test. Furthermore, since the stable state is obtained based on the test results of different working modes; in this way, the working mode can be switched through the stable state, thereby ensuring that the electric power system can operate normally after switching the working mode.

[0038] The implementation environment of the embodiments of the present application is introduced below.

[0039] like Figure 1 As shown, an electric power simulation system provided by an embodiment of the present application includes: a main power system, a backup power system, an AC train head cabinet, a DC train head cabinet, a generator set, and a low-voltage interconnection bus. Among them, the main power system is connected to the AC train head cabinet, the main power system is connected to the DC train head cabinet, the backup power system is connected to the AC train head cabinet, the backup power system is connected to the DC train head cabinet, the generator set is connected to the main power system, the generator set is connected to the backup power system, the low-voltage interconnection bus is connected to the main power system, and the low-voltage interconnection bus is connected to the backup power system.

[0040] Among them, the main power system is the same as the backup power system. Taking the main power system as an example, the main power system includes a low-voltage distribution system, a UPS system, a switching power supply system, and a battery pack. The low-voltage distribution system includes a transformer, a low-voltage incoming line cabinet, a low-voltage contact cabinet, an electric compensation cabinet, a low-voltage dual power conversion cabinet, and a low-voltage feeder cabinet. The battery pack includes a switching power supply system battery pack and a UPS system battery pack.

[0041] It should be noted that, regarding the system architecture of the backup power system, reference can be made to the system architecture of the main power system, which will not be elaborated here.

[0042] In a possible design, each power device in the power simulation system corresponds to a switch connected to each circuit device, and the simulation of different working states of the simulated power system is achieved by opening and closing the switches of each circuit device.

[0043] In some embodiments, the power simulation system further includes: a controller. The controller is used to control the closure of the switch of the low-voltage interconnection busbar when a main power failure occurs in the main power system, so that the low-voltage interconnection cabinet of the backup power system is connected to the low-voltage interconnection cabinet of the main power system through the low-voltage interconnection busbar, and the backup power system supplies power to the main power system through the low-voltage interconnection cabinet. It should be noted that the operation of the main power failure in the backup power system can refer to the operation of the main power failure in the main power system, which will not be repeated here.

[0044] In a possible design, the operating states of the UPS system include main input mode, bypass input mode, and manual maintenance bypass input mode. In a normal state, the UPS system supplies power to the load through the main circuit. If the main circuit fails, the UPS system supplies power to the load through the bypass. If the bypass fails, the UPS system supplies power to the load through the manual maintenance bypass.

[0045] In one possible implementation, when both the main power system and the backup power system experience a power failure and the generator set has not yet started, the UPS system supplies power to the load via the UPS system battery pack, and the switching power system supplies power to the load via the switching power system battery pack.

[0046] In another possible implementation, both the main power system and the backup power system experience a main power failure, and the generator sets have been started to supply power to the main power system and the backup power system.

[0047] In one possible design, the AC main cabinet distributes power to the load equipment through a dual-circuit incoming line.

[0048] For example, the AC power supply cabinet has two independent power supply inlets, A and B.

[0049] It can be understood that the AC power supply cabinet receives the power output by the UPS system through dual-line input and distributes it to various load devices, which can ensure the stability of the power supply provided by the power simulation system to the load devices.

[0050] It should be noted that the way in which a DC power supply cabinet supplies power to load equipment can refer to the way in which an AC power supply cabinet distributes power to load equipment, which will not be described in detail here.

[0051] The embodiments of the present application are described in detail below in conjunction with the accompanying drawings.

[0052] like Figure 2 As shown, a method for verifying a power system provided in an embodiment of the present application includes:

[0053] S201. Acquire current data of the power simulation system under normal working conditions.

[0054] In a possible implementation, monitoring data is obtained based on a monitoring system of a simulation platform, and current data of a power simulation system in a normal working state is obtained based on the monitoring data.

[0055] In some embodiments, the power simulation system includes: a main power system, a backup power system, a low voltage interconnection bus, a generator set, an AC train head cabinet, and a DC train head cabinet. The low voltage interconnection bus, the generator set, the AC train head cabinet, and the DC train head cabinet are connected to the main power system and the backup power system, respectively.

[0056] In a possible implementation, a power simulation system is obtained by simulating a target power system.

[0057] In a possible design, initial simulation parameters of the target power system are obtained, simulation is performed based on the initial simulation parameters and the preset connection relationship, and a power simulation system of the target power system is constructed. The initial simulation parameters include: the rated capacity of each power device in the main power system, the rated capacity of each power device in the backup power system, the rated capacity of the generator set, the rated capacity of the AC train head cabinet, and the rated capacity of the DC train head cabinet.

[0058] In a possible implementation, current data of the power simulation system in a normal working state is obtained through real-time acquisition.

[0059] The power simulation system includes multiple working modes, which are used to indicate the power supply circuits of the power system under different operating conditions.

[0060] In an embodiment of the present application, the working mode of the power simulation system includes but is not limited to at least one of the following working modes: normal mode, first fault mode, second fault mode and third fault mode. The normal mode is used to indicate the power supply circuit of the power system when the UPS system, the main power system and the backup power system are normal. The first fault mode is used to indicate the power supply circuit of the power system when the UPS system fails, the second fault mode is used to indicate the power supply circuit when the main power system or the backup power system fails, and the third fault mode is used to indicate the power supply circuit when the main power system and the backup power system fail at the same time.

[0061] In a possible design, when the working mode of the power simulation system is the normal mode, the power supply circuit of the power simulation system includes: an AC power supply circuit and a DC power supply circuit. The AC power supply circuit is a power supply circuit when the load is AC power, and the DC power supply circuit is a power supply circuit when the load is DC power. The AC power supply circuit includes: a low-voltage distribution system of the main power system (which can be called the main low-voltage distribution system) connected to the main line of the UPS system (which can be called the main low-voltage distribution system) of the main power system, and the main line of the main UPS system is connected to the AC power supply cabinet. The DC power supply circuit includes: a switching power supply system (which can be called the main switching power supply system) of the main power system connected to the main low-voltage distribution system of the main power system, and the main switching power supply system is connected to the DC power supply cabinet.

[0062] In another possible design, when the working mode of the power simulation system is the first fault mode, the first fault mode includes a UPS system main fault power supply circuit and a UPS system bypass fault power supply circuit. The UPS system main fault power supply circuit includes: a main low-voltage power distribution system connected to a main UPS system bypass, and a main UPS system bypass connected to an AC power supply cabinet. The UPS system bypass fault power supply circuit includes: a main low-voltage power distribution system connected to a main UPS system manual maintenance bypass, and a main UPS system manual maintenance bypass connected to an AC power supply cabinet.

[0063] In another possible design, when the working mode of the power simulation system is the second fault mode, the second fault mode includes a main power system fault power supply circuit and a backup power system fault power supply circuit. The main power system fault power supply circuit includes a main power system fault AC power supply circuit and a main power system fault DC power supply circuit. The main power system fault AC power supply circuit is a power supply circuit when the load is AC power in the case of a main power system fault. The main power system fault DC power supply circuit is a power supply circuit when the load is DC power in the case of a main power system fault. The main power system fault AC power supply circuit includes: a low-voltage contact cabinet of the backup power system (which can be called a backup low-voltage contact cabinet) is connected to a low-voltage contact cabinet of the main power system (which can be called a main low-voltage contact cabinet) through a low-voltage contact bus, so that the main low-voltage distribution system is connected to the backup low-voltage distribution system. The main low-voltage distribution system is connected to the main road of the main UPS system, and the main road of the main UPS system is connected to the AC head cabinet. The main power system fault DC power supply circuit includes: the backup low-voltage contact cabinet is connected to the main low-voltage contact cabinet through a low-voltage contact bus, so that the main low-voltage distribution system is connected to the backup low-voltage distribution system. The main low-voltage power distribution system is connected to the main switch power system of the main power system, and the main switch power system is connected to the DC train head cabinet.

[0064] In another possible design, when the working mode of the power simulation system is the third fault mode, the third fault mode includes a UPS system battery pack power supply circuit, a switching power supply system battery pack power supply circuit, a generator AC power supply circuit, and a generator DC power supply circuit. The UPS system battery pack power supply circuit is a power supply circuit when the main power system and the backup power system fail at the same time, the generator is not started, and the load is AC power. The switching power supply system battery pack power supply circuit is a power supply circuit when the main power system and the backup power system fail at the same time, the generator is not started, and the load is DC power. The generator AC power supply circuit is a power supply circuit when the main power system and the backup power system fail at the same time, the generator has been started, and the load is AC power. The generator DC power supply circuit is a power supply circuit when the main power system and the backup power system fail at the same time, the generator has been started, and the load is DC power. The UPS system battery pack power supply circuit includes: the main UPS system battery pack is connected to the main UPS system main road, and the main UPS system main road is connected to the AC power supply cabinet. The switching power supply system battery pack power supply circuit includes: the main low-voltage power distribution system is connected to the main switching power supply system, and the main switching power supply system is connected to the DC power supply cabinet. The generator AC power supply circuit includes: the generator set is connected to the main low-voltage power distribution system, the main low-voltage power distribution system is connected to the main UPS system main line, and the main UPS system main line is connected to the AC train head cabinet. The generator DC power supply circuit includes: the generator set is connected to the main low-voltage power distribution system, the main low-voltage power distribution system is connected to the main switch power system, and the main switch power system is connected to the DC train head cabinet.

[0065] It should be noted that the power supply circuit of the backup power system in different working modes can refer to the power supply circuit of the main power system in different working modes, which will not be described in detail here.

[0066] S202. Based on the current data, test the power simulation system in different working modes to obtain multiple test results.

[0067] Wherein, one test result corresponds to one working mode, and the test result is used to indicate whether the power simulation system is in a stable state in the corresponding working mode.

[0068] In a possible implementation, for each working mode, a test result corresponding to the working mode is determined by a target operation. The target operation includes: determining a target mode, and determining a target device corresponding to the target mode. The target device is tested based on current data to obtain a test result corresponding to the target mode. The target mode is any one of a plurality of working modes, and the target device is all devices in a power supply circuit corresponding to the target mode through which current flows.

[0069] In a possible design, the target mode is determined by opening and closing the switches of each power device in the power simulation system.

[0070] In some embodiments, when the power simulation system is tested in normal mode, the battery pack is in a charging state.

[0071] It should be noted that when the working mode of the power simulation system is the third fault mode, the battery pack supplies power to the load. Afterwards, when the working mode of the power simulation system is switched to the normal mode, the battery pack needs to be charged.

[0072] S203: Generate a verification result based on multiple test results.

[0073] The verification result is used to indicate whether the power simulation system is in a stable state.

[0074] In a possible implementation, the verification result is a first result or a second result, the first result is used to indicate that the power simulation system is in a stable state, and the second result is used to indicate that the power simulation system is in an abnormal state. If each test result indicates that the power simulation system is in a stable state under the corresponding working mode, the first result is generated. If there is a test result indicating that the power simulation system is in an abnormal state under the corresponding working mode among the multiple test results, the second result is generated.

[0075] In another possible implementation, based on multiple test results, a target number is determined, where the target number is the number of test results indicating that the power simulation system is in a stable state in a corresponding working mode. If the target number is greater than a preset number threshold, a first result is generated. If the target number is less than the first number, a second result is generated.

[0076] It should be noted that the embodiment of the present application does not limit the preset number threshold. For example, the preset number threshold is 5, 6, 7, etc. Alternatively, the preset number threshold is related to the number of multiple test results.

[0077] Based on the above technical solution, the current data of the electric power simulation system under normal working conditions is obtained. The electric power simulation system includes multiple working modes, and the working modes are used to indicate the power supply circuit of the electric power system under different operating conditions. Afterwards, based on the current data, the electric power simulation system in different working modes is tested, and the test results of the electric power simulation system in different working modes can be obtained. Then, it can be determined whether the electric power simulation system is in a stable state through the test results of the electric power simulation system in different working modes. In this way, by testing the electric power simulation system in different working modes, the diversity of the test is increased, thereby improving the accuracy of the test. Furthermore, since the stable state is obtained based on the test results of different working modes; in this way, the working mode can be switched through the stable state, thereby ensuring that the electric power system can operate normally after switching the working mode.

[0078] The following introduces the test results of obtaining the power simulation system when operating in the target mode.

[0079] like Figure 3 As shown, a method for verifying a power system provided by an embodiment of the present application is provided. In the method, S202 may include:

[0080] S301: Determine a preset parameter threshold and a target algorithm corresponding to a target device.

[0081] Among them, the target algorithm is used to determine the parameters of the target device.

[0082] In a possible implementation, a target mode is determined. Then, based on the target mode, a power supply circuit corresponding to the target mode is determined. Then, the rated parameter of each device in the power supply circuit corresponding to the target mode can be used as a preset parameter threshold.

[0083] Exemplarily, the target mode is the second fault mode, the second fault mode includes a main power system fault power supply circuit and a backup power system fault power supply circuit. The rated parameters of each device in the main power system fault power supply circuit and the backup power system fault power supply circuit are used as preset parameter thresholds.

[0084] It should be noted that the rated parameter of the target device may be the rated current of the target device, the rated parameter of the target device may be the long-delay setting current value of the target device, or the rated parameter of the target device may be the rated capacity of the target device.

[0085] Exemplarily, the rated parameters of the target equipment can be the rated current of the low-voltage incoming cabinet, the rated current of the UPS system, the rated current of the low-voltage connecting cabinet, the rated current of the low-voltage dual power supply cabinet switching switch, the rated capacity of the transformer, the rated capacity of the generator set, the rated capacity of the UPS system, and the rated capacity of the switching power supply system.

[0086] S302: Determine parameters of a target device based on current data and a target algorithm.

[0087] In an embodiment of the present application, the current data includes: the current flowing through each device in the main power system, the current flowing through each device in the backup power system, the current flowing through the AC power cabinet, the current flowing through the DC power cabinet, the current flowing through the generator set, the current flowing through the low-voltage interconnecting bus, the rated capacity of the battery pack, the power factor of the main power system, the power factor of the backup power system, and the power factor of the UPS system.

[0088] In one possible design, when the target device is each device in the low voltage power distribution system, the target algorithm can satisfy Formula 1.

[0089] A1=1.2*(I1+(Q1 / 10*564+Q2 / 10*56.4) / 380 / 1.732)Formula 1.

[0090] Among them, A1 is used to indicate the parameters of the corresponding equipment in the low-voltage power distribution system, and is also used to indicate the parameters of the AC terminal cabinet or DC terminal cabinet. Q1 is used to indicate the rated capacity of the UPS system battery pack, and Q2 is used to indicate the rated capacity of the switching power supply system battery pack. I1 is used to indicate the current flowing through the corresponding equipment in the low-voltage power distribution system.

[0091] In a possible design, when the target device is a UPS system, the target algorithm may satisfy Formula 2.

[0092] A2=1.2*I1Formula 2.

[0093] Among them, A2 is used to represent the parameters of the UPS system, and I1 is used to represent the current flowing through the UPS system.

[0094] In a possible design, when the target device is the rated capacity of a transformer, the target algorithm may satisfy Formula 3.

[0095] A3=(I1*380*1.732+Q1 / 10*564+Q2 / 10*56.4) / a) Formula 3.

[0096] Among them, A3 is used to represent the parameters of the transformer, I1 is used to represent the current flowing through the low-voltage incoming line cabinet, and a represents the power factor of the main power system or the backup power system.

[0097] In a possible design, when the target device is the rated capacity of the generator set, the target algorithm may satisfy Formula 4.

[0098] A4=I1*380*1.732+Q1 / 10*564+Q2 / 10*56.4)Formula 4.

[0099] Among them, A4 is used to represent the parameters of the generator set, and I1 is used to represent the current flowing through the circuit breaker of the low-voltage dual power conversion cabinet.

[0100] In one possible design, when the target device is the rated capacity of the UPS system, the target algorithm may satisfy Formula 5.

[0101] A5=1.2*(I1*380*1.732+Q1 / 10*564+Q2 / 10*56.4) / 0.9 / aFormula 5.

[0102] Among them, A5 is used to represent the parameters of the UPS system, I1 is used to represent the current flowing through the UPS system, and a represents the power factor of the UPS system.

[0103] In one possible design, when the target device is the rated capacity of the switching power supply system, the target algorithm can satisfy Formula 6.

[0104] A6=(I1+Q2 / 10) / 0.8Formula 6.

[0105] Among them, A6 is used to represent the parameters of the switching power supply system, and I1 is used to represent the current flowing through the switching power supply system.

[0106] It should be noted that the target device includes a circuit breaker, and the dual power switch cabinet includes a dual power switch cabinet transfer switch. The current flowing through the dual power switch cabinet transfer switch is the current flowing through the dual power switch cabinet.

[0107] S303: Compare the preset parameter threshold with the parameter of the target device to obtain a test result.

[0108] In a possible implementation, if the preset parameter threshold is greater than or equal to the parameter of the target device, it is determined that the target device is in a stable state. If the preset parameter threshold is less than the parameter of the target device, it is determined that the target device is in an abnormal state.

[0109] Exemplarily, the rated current of the low-voltage incoming cabinet circuit breaker is compared with the parameters of the low-voltage incoming cabinet circuit breaker. If the rated current of the low-voltage incoming cabinet circuit breaker is greater than or equal to the parameters of the low-voltage incoming cabinet circuit breaker, the low-voltage incoming cabinet is determined to be stable; if the rated current of the low-voltage incoming cabinet circuit breaker is less than the parameters of the low-voltage incoming cabinet circuit breaker, the low-voltage incoming cabinet is determined to be abnormal. The rated capacity of the transformer is compared with the parameters of the transformer. If the rated capacity of the transformer is greater than or equal to the parameters of the transformer, the transformer is determined to be stable; if the rated capacity of the transformer is less than the parameters of the transformer, the transformer is determined to be abnormal. The rated capacity of the generator set is compared with the parameters of the generator set. If the rated capacity of the generator set is greater than or equal to the parameters of the generator set, the generator set is determined to be stable; if the rated capacity of the generator set is less than the parameters of the generator set, the generator set is determined to be abnormal. The rated capacity of the UPS system is compared with the parameters of the UPS system. If the rated capacity of the UPS system is greater than or equal to the parameters of the UPS system, the UPS system is determined to be stable; if the rated capacity of the UPS system is less than the parameters of the UPS system, the UPS system is determined to be abnormal. The rated capacity of the switching power supply system is compared with the parameters of the switching power supply system. If the rated capacity of the switching power supply system is greater than or equal to the parameters of the switching power supply system, it is determined that the switching power supply system is stable; if the rated capacity of the switching power supply system is less than the parameters of the switching power supply system, it is determined that the switching power supply system is abnormal.

[0110] In one possible implementation, if the parameter of the target device is less than or equal to a preset parameter threshold, the test result is determined to indicate that the power simulation system is in a stable state in the corresponding working mode. If the parameter of the target device is greater than the preset parameter threshold, the test result is determined to indicate that the power simulation system is in an abnormal state in the corresponding working mode.

[0111] Exemplarily, when the working mode of the power simulation system is the normal mode, the parameters of each device in the AC power supply circuit and the DC power supply circuit are less than or equal to the preset parameter threshold, then the test results in this mode are used to indicate that the power simulation system is in a stable state in the normal mode. When the working mode of the power simulation system is the first fault mode, the parameters of the UPS system in the main fault power supply circuit of the UPS system are less than or equal to the preset parameter threshold, and the parameters of the low-voltage incoming cabinet are greater than the preset parameter threshold, then the test results in this mode are used to indicate that the power simulation system is in an abnormal state in the normal mode.

[0112] It should be noted that S301-S303 are for determining the test results when the power simulation system is running in the target mode. For each of the multiple working modes, the test results of each working mode can be determined by executing S301-S303 to obtain multiple test results.

[0113] Based on the above technical solution, the preset parameter threshold and target algorithm corresponding to the target device are determined, and the target algorithm is used to determine the parameters of the target device. After that, the current data is calculated by the target algorithm to obtain the parameters of the target device. Then, the preset parameter threshold and the parameters of the target device are compared to obtain the test results of the power system in the target mode. In this way, the stability of the target device can be determined by the test results, thereby determining the stable state of the power supply circuit of the power system in the target mode.

[0114] The above mainly introduces the solution provided by the embodiment of the present application from the perspective of the method. It can be understood that in order to realize the above functions, the verification device of the power system includes hardware structures and / or software modules corresponding to the execution of each function. Those skilled in the art should easily realize that, in combination with the verification method steps of the power system of each example described in the embodiment disclosed in this application, the present application can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0115] The embodiment of the present application also provides a verification device for a power system. The verification device for the power system can be an electronic device (server or terminal), or a CPU in the above electronic device, or a verification module in the above electronic device for verifying the power system, or a client in the above electronic device for verifying the power system.

[0116] The embodiment of the present application can divide the verification device of the power system into functional modules or functional units according to the above method example. For example, each functional module or functional unit can be divided according to each function, or two or more functions can be integrated into one processing module. The above integrated module can be implemented in the form of hardware or in the form of software functional modules or functional units. Among them, the division of modules or units in the embodiment of the present application is schematic, which is only a logical functional division. There may be other division methods in actual implementation.

[0117] The present application embodiment provides a verification device for a power system. Figure 4 As shown, the verification device of the power system may include: an acquisition module 401 and a processing module 402 .

[0118] The acquisition module 401 is used to obtain the current data of the power simulation system under normal working conditions. The power simulation system includes multiple working modes, and the working modes are used to indicate the power supply circuit of the power simulation system under different operating conditions. The processing module 402 is used to test the power simulation system in different working modes based on the current data to obtain multiple test results, and one test result corresponds to one working mode. The processing module 402 is also used to generate a verification result based on the multiple test results, and the verification result is used to indicate whether the power simulation system is in a stable state.

[0119] Figure 5 1 is a schematic diagram showing a structure of a verification device for a power system according to an exemplary embodiment. The verification device for a power system may include a processor 502, and the processor 502 is used to execute application code to implement the verification method for a power system in the present application.

[0120] The processor 502 may be a central processing unit (CPU), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits for controlling the execution of the program of the present application.

[0121] like Figure 5As shown, the verification device of the power system may further include a memory 503. The memory 503 is used to store application program codes for executing the solution of the present application, and the execution is controlled by the processor 502.

[0122] The memory 503 may be a read-only memory (ROM) or other types of static storage devices that can store static information and instructions, a random access memory (RAM) or other types of dynamic storage devices that can store information and instructions, or an electrically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, optical disc storage (including compressed optical disc, laser disc, optical disc, digital versatile disc, Blu-ray disc, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of an instruction or data structure and can be accessed by a computer, but is not limited thereto. The memory 503 may exist independently and be connected to the processor 502 via a bus 504. The memory 503 may also be integrated with the processor 502.

[0123] like Figure 5 As shown, the verification device of the power system may further include a communication interface 501, wherein the communication interface 501, the processor 502, and the memory 503 may be coupled to each other, for example, via a bus 504. The communication interface 501 is used to exchange information with other devices, for example, to support information exchange between the verification device of the power system and other devices.

[0124] It should be pointed out that Figure 5 The equipment structure shown in the figure does not constitute a limitation on the verification device of the power system, except Figure 5 In addition to the components shown, the verification device of the power system may include more or fewer components than shown, or combine certain components, or have a different arrangement of components.

[0125] In actual implementation, the functions implemented by the processing unit can be Figure 5 The processor 502 shown calls the program code in the memory 503 to implement.

[0126] The present application also provides a computer-readable storage medium, on which instructions are stored, and when the instructions in the computer-readable storage medium are executed by a processor of a computer device, the computer can execute the verification method of the power system provided by the above-mentioned embodiment. For example, the computer-readable storage medium may be a memory 503 including instructions, and the above instructions may be executed by a processor 502 of a computer device to complete the above method. Optionally, the computer-readable storage medium may be a non-temporary computer-readable storage medium, for example, the non-temporary computer-readable storage medium may be a ROM, RAM, CD-ROM, magnetic tape, floppy disk, optical data storage device, etc.

[0127] Figure 6 A conceptual partial view of a computer program product provided by an embodiment of the present application is schematically shown, where the computer program product includes a computer program for executing a computer process on a computing device.

[0128] In one embodiment, the computer program product is provided using a signal bearing medium 600. The signal bearing medium 600 may include one or more program instructions that, when executed by one or more processors, may provide the above-described Figure 2 , Figure 3 Thus, for example, reference to Figure 2 In the embodiment shown in , one or more features of S201 to S203 may be undertaken by one or more instructions associated with the signal bearing medium 600. In addition, Figure 6 The program instructions in also describe example instructions.

[0129] In some examples, the signal bearing medium 600 may include a computer readable medium 601, such as, but not limited to, a hard drive, a compact disk (CD), a digital video disk (DVD), a digital tape, a memory, a read-only memory (ROM) or a random access memory (RAM), and the like.

[0130] In some implementations, signal bearing medium 600 may include computer recordable medium 602 such as, but not limited to, memory, read / write (R / W) CD, R / W DVD, and the like.

[0131] In some implementations, signal bearing medium 600 may include communication medium 603 such as, but not limited to, digital and / or analog communication media (eg, fiber optic cables, waveguides, wired communication links, wireless communication links, etc.).

[0132] The signal bearing medium 600 may be communicated by a wireless form of communication medium 603. The one or more program instructions may be, for example, computer executable instructions or logic implemented instructions.

[0133] In some examples, the verification device of the power system may be configured to provide various operations, functions, or actions in response to one or more program instructions via computer-readable medium 601 , computer-recordable medium 602 , and / or communication medium 603 .

[0134] Through the description of the above implementation methods, technical personnel in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional modules is used as an example. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the device can be divided into different functional modules to complete all or part of the functions described above.

[0135] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of modules or units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another device, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0136] The units described as separate components may or may not be physically separated, and the components shown as units may be one physical unit or multiple physical units, that is, they may be located in one place or distributed in multiple different places. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0137] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0138] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a readable storage medium. Based on this understanding, the technical solution of the embodiment of the present application is essentially or the part that contributes to the prior art or the full classification part or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium, including a number of instructions to enable a device (which can be a single-chip microcomputer, chip, etc.) or a processor (processor) to execute the full classification part or part of the steps of each embodiment method of the present application. The aforementioned storage medium includes various media that can store program codes, such as-U disk, mobile hard disk, ROM, RAM, disk or CD.

[0139] The above are only specific implementations of the present application, but the protection scope of the present application is not limited thereto, and any changes or substitutions within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A method for verifying a power system, characterized in that: The method comprises: Acquire current data of the power simulation system in a normal working state, wherein the power simulation system includes a plurality of working modes, and the working modes are used to indicate a power supply circuit of the power simulation system in different operating states; Based on the current data, the power simulation system in different working modes is tested to obtain multiple test results, where one test result corresponds to one working mode; Based on the multiple test results, a verification result is generated, where the verification result is used to indicate whether the power simulation system is in a stable state.

2. The method according to claim 1, characterized in that The power simulation system in different working modes is tested based on the current data to obtain multiple test results, including: For each working mode, the test result corresponding to the working mode is determined by the target operation, and the target operation includes: Determine a target mode, wherein the target mode is any one of the multiple working modes; Determine a target device corresponding to the target mode, wherein the target device is all devices through which current flows through a power supply circuit corresponding to the target mode; The target device is tested based on the current data to obtain a test result corresponding to the target mode.

3. The method according to claim 2, characterized in that The testing the target device based on the current data to obtain a test result corresponding to the target mode includes: Determine a preset parameter threshold and a target algorithm corresponding to the target device, wherein the target algorithm is used to determine the parameters of the target device; Determining parameters of the target device based on the current data and the target algorithm; The preset parameter threshold is compared with the parameter of the target device to obtain a test result.

4. The method according to any one of claims 1 to 3, characterized in that The power simulation system includes: a main power system, a backup power system, a low-voltage interconnection bus, a generator set, an AC train head cabinet and a DC train head cabinet; Among them, the low-voltage interconnecting bus, the generator set, the AC train head cabinet and the DC train head cabinet are respectively connected to the main power system and the backup power system.

5. The method according to claim 4, characterized in that The current data includes: the current flowing through each device in the main power system, the current flowing through each device in the backup power system, the current flowing through the AC power cabinet, the current flowing through the DC power cabinet, the current flowing through the generator set, the current flowing through the low-voltage interconnecting bus, the rated capacity of the battery pack, the power factor of the main power system, the power factor of the backup power system, and the power factor of the UPS system.

6. The method according to claim 4, characterized in that The method further comprises: Acquire initial simulation parameters of the target power system, the initial simulation parameters including: the rated capacity of each power device in the main power system, the rated capacity of each power device in the backup power system, the rated capacity of the generator set, the rated capacity of the AC train head cabinet, and the rated capacity of the DC train head cabinet; The simulation is performed based on the initial simulation parameters and the preset connection relationship to construct the power simulation system of the target power system.

7. A verification device for an electric power system, characterized in that: include: An acquisition module, used for acquiring current data of the power simulation system in a normal working state, wherein the power simulation system includes a plurality of working modes, and the working modes are used for indicating a power supply circuit of the power simulation system in different operating states; A processing module, configured to test the power simulation system in different working modes based on the current data to obtain a plurality of test results, wherein one test result corresponds to one working mode; The processing module is further used to generate a verification result based on the multiple test results, and the verification result is used to indicate whether the power simulation system is in a stable state.

8. A verification device for an electric power system, characterized in that: include: Processor and memory; The processor is coupled to the memory; The memory is used to store one or more programs, and one or more of the programs include computer-executable instructions. When the verification device of the power system is running, the processor executes the computer-executable instructions stored in the memory to enable the verification device of the power system to perform the method described in any one of claims 1-6.

9. A computer-readable storage medium, wherein instructions are stored in the computer-readable storage medium, characterized in that: When a computer executes the instruction, the computer performs the method according to any one of claims 1 to 6.

10. A computer program product comprising instructions, characterized in that When the instructions are executed by a computing device, the computing device is caused to perform the method according to any one of claims 1 to 6.