CT scanning equipment power failure protection control method, device, equipment and medium

By predicting the probability of power outage of the power supply equipment of the CT scanning device and switching to a backup power supply, the protection problem of the CT scanning device when the power supply equipment of the power supply equipment is outage is solved, and the stable operation of the equipment and the safety of the patient is achieved.

CN119423799BActive Publication Date: 2025-04-25SAINUO WEISHENG SCI & TECH BEIJING
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510032560.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-01-09
Publication Date
2025-04-25
Estimated Expiration
2045-01-09

AI Technical Summary

Technical Problem

Existing CT scanning equipment cannot be effectively protected when the power supply equipment in the power grid is out of power, which may lead to equipment damage, data loss and patient safety risks.

Method used

By combining power consumption equipment data, power grid power supply equipment data, meteorological data and historical power outage protection data, the power outage probability of power supply equipment is predicted, and when the real-time state data is offline or the power outage probability reaches a preset threshold, a control signal is generated to switch the main power of the CT scanning device to the backup power supply, and the scanning module, ball tube and data storage module are controlled to perform target response actions.

Benefits of technology

It effectively avoids the inability to complete the scanning of CT scanning equipment, equipment damage, data loss and patient safety hazards caused by power supply equipment in the power grid, and ensures the stable operation of CT scanning equipment and the safety of patients.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119423799B_ABST
    Figure CN119423799B_ABST
Patent Text Reader

Abstract

The power failure protection control method, device, equipment and medium for CT scanning equipment provided by the embodiments of the present disclosure include: determining power failure probability data of power supply equipment based on power-consuming equipment data, power supply equipment data, meteorological data and a historical power failure protection data group, wherein the historical power failure protection data group includes a plurality of historical power failure protection data, and any one of the historical power failure protection data includes historical power-consuming equipment data, historical power supply equipment data and historical meteorological data; acquiring real-time status data of power supply equipment based on the power supply equipment; generating a first control signal to a first switch module and generating a second control signal to a scanning module, a tube and a data storage module of a CT scanning equipment when the real-time status data is offline and / or the power failure probability data is greater than or equal to a preset threshold, so as to avoid problems such as damage to the CT scanning equipment, data loss and inability of patients to leave safely due to an accidental power failure of the power supply equipment based on the power supply equipment based on the power failure probability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of CT scanning technology and related technical fields, and in particular to a power-off protection control method, device, equipment and medium applicable to CT scanning equipment. Background Art

[0002] CT (Computed Tomography) is a medical imaging technology. It uses X-ray beams to scan the human body and uses computer processing to produce detailed images of the body's internal structures. CT scanning is widely used in the diagnosis of various diseases due to its fast and clear imaging capabilities.

[0003] CT provides a scientific and intuitive basis for the diagnosis of diseases, and has become one of the indispensable medical devices for clinicians to diagnose and treat diseases. In the clinical diagnosis process, CT is widely used in physical examination, screening, diagnosis and identification, efficacy evaluation and prognosis. Since the work of CT is inseparable from the supply of power, the design of power supply and distribution is very important. A power supply system that predicts the power supply situation of CT and protects against power failure is undoubtedly a precautionary measure. Summary of the invention

[0004] The embodiments described herein provide a method, device, equipment and medium for controlling power failure protection of a CT scanning device, which solve the problems existing in the prior art.

[0005] In a first aspect, according to the content of the present disclosure, a power-off protection control method for a CT scanning device is provided, which is applied to a CT scanning system, wherein the CT scanning system at least includes a CT scanning device, a main power supply of the CT scanning device, a first switch module, and a backup power supply, wherein the main power supply of the CT scanning device is electrically connected to a power grid power supply device or a backup power supply through the first switch module, and includes:

[0006] Determine the power outage probability data of the power supply equipment according to the power equipment data, the power supply equipment data, the meteorological data and the historical power outage protection data group, wherein the historical power outage protection data group includes a plurality of historical power outage protection data, and any one of the historical power outage protection data includes the historical power equipment data, the historical power supply equipment data and the historical meteorological data;

[0007] Obtain real-time status data of power grid power supply equipment;

[0008] When the real-time status data is in an offline state, and / or the power outage probability data is greater than or equal to a preset threshold, a first control signal is generated to the first switch module to electrically connect the main power supply of the CT scanning device to the backup power supply through the first switch module, and a second control signal is generated to the scanning module, the tube and the data storage module of the CT scanning device to control the scanning module, the tube and the data storage module to perform a target response action.

[0009] In some embodiments of the present disclosure, the CT scanning system further includes a second switch module, a third switch module, an emergency power supply and a non-emergency power supply, the main power supply of the CT scanning device is electrically connected to the emergency power supply through the second switch module, and the main power supply of the CT scanning device is electrically connected to the non-emergency power supply through the third switch module, and the method further includes:

[0010] Generate a third control signal to the second switch module so that the emergency power supply receives the electrical signal output by the backup power supply, and generate a fourth control signal to the third switch module so that the non-emergency power supply is disconnected from the backup power supply, wherein the emergency power supply supplies power to the scanning module, the tube and the data storage module.

[0011] In some embodiments of the present disclosure, determining the power outage probability data of the power supply equipment of the power grid according to the power consumption equipment data, the power supply equipment data of the power grid, the meteorological data and the historical power outage protection data group includes:

[0012] According to the historical power outage protection data group, a power outage prediction model for power grid power supply equipment is trained to obtain a power outage prediction model for target power grid power supply equipment;

[0013] The power-consuming equipment data, the power grid power supply equipment data and the meteorological data are input into a power outage prediction model for target power grid power supply equipment to determine power outage probability data for the power grid power supply equipment.

[0014] In some embodiments of the present disclosure, determining the power outage probability data of the power supply equipment of the power grid according to the power consumption equipment data, the power supply equipment data of the power grid, the meteorological data and the historical power outage protection data group includes:

[0015] According to the historical power outage protection data group, a power outage prediction model for power grid power supply equipment is trained to obtain a power outage prediction model for target power grid power supply equipment;

[0016] Inputting the power-consuming device data into a target power grid power supply equipment power outage prediction model to determine first sub-power outage probability data of the power grid power supply equipment;

[0017] Inputting the power grid power supply equipment data into a target power grid power supply equipment power outage prediction model to determine second sub-power outage probability data of the power grid power supply equipment;

[0018] Inputting the meteorological data into a power outage prediction model for target power grid power supply equipment to determine third sub-power outage probability data for the power grid power supply equipment;

[0019] Power outage probability data of power supply equipment of the power grid is determined according to the first sub-power outage probability data, the second sub-power outage probability data and the third sub-power outage probability data and weight coefficients corresponding to the sub-power outage probability data.

[0020] In some embodiments of the present disclosure, the method further includes:

[0021] Acquire response status information of the scanning module, the tube and the data storage module;

[0022] According to the response status information of the scanning module, the tube and the data storage module, it is determined whether to generate a fifth control signal to the main power supply of the CT scanning device.

[0023] In some embodiments of the present disclosure, the obtaining of response status information of the scanning module, the tube, and the data storage module includes:

[0024] When the position information of the scanning module meets the preset position information, the status information of the tube is the closed status information, and the response status information of the data storage module is that the data storage is completed, a fifth control signal is generated to the main power supply of the CT scanning device to control the main power supply of the CT scanning device to power off through the fifth control signal.

[0025] In some embodiments of the present disclosure, the scanning module includes a scanning bed and a scanning gantry;

[0026] The step of obtaining the response status information of the scanning module, the tube and the data storage module includes:

[0027] Acquire the position information and angle information of the scanning frame, the status information of the tube and the data status information of the data storage module;

[0028] When the position information of the scanning gantry satisfies the first preset position information and the angle information of the scanning gantry satisfies the first preset angle information, the position information and the angle information of the scanning bed are acquired.

[0029] In a second aspect, according to the content of the present disclosure, a power-off protection control device for a CT scanning device is provided, which is applied to a CT scanning system, wherein the CT scanning system at least includes a CT scanning device, a main power supply of the CT scanning device, a first switch module, and a backup power supply, wherein the main power supply of the CT scanning device is electrically connected to a power grid power supply device or a backup power supply through the first switch module, and includes:

[0030] A power outage probability data determination module, used to determine the power outage probability data of the power supply equipment according to the power equipment data, the power supply equipment data, the meteorological data and the historical power outage protection data group, wherein the historical power outage protection data group includes a plurality of historical power outage protection data, and any one of the historical power outage protection data includes the historical power equipment data, the historical power supply equipment data and the historical meteorological data;

[0031] A real-time status data acquisition module is used to acquire real-time status data of power grid power supply equipment;

[0032] A control signal generating module is used to generate a first control signal to a first switch module when the real-time status data is in an offline state and / or the power failure probability data is greater than or equal to a preset threshold value, so that the main power supply of the CT scanning device is electrically connected to the backup power supply through the first switch module, and to generate a second control signal to a scanning module, a tube and a data storage module of the CT scanning device, so as to control the scanning module, the tube and the data storage module to perform a target response action.

[0033] In a third aspect, according to the present disclosure, a computer device is provided, including:

[0034] one or more processors;

[0035] a storage device for storing one or more programs,

[0036] When the one or more programs are executed by the one or more processors, the one or more processors implement any method as described in the first aspect.

[0037] In a fourth aspect, according to the content of the present disclosure, a computer-readable storage medium is provided, on which a computer program is stored, and when the program is executed by a processor, it implements any method as described in the first aspect.

[0038] The power-off protection control method, device, equipment and medium for CT scanning equipment provided in the embodiments of the present disclosure first determine the power-off probability data of the power grid power supply equipment according to the power-consuming equipment data, the power grid power supply equipment data, the meteorological data and the historical power-off protection data group; then obtain the real-time status data of the power grid power supply equipment; finally, when the real-time status data is offline, and / or the power-off probability data is greater than or equal to a preset threshold, generate a first control signal to the first switch module to electrically connect the main power supply of the CT scanning equipment to the backup power supply through the first switch module, and generate a second control signal to the scanning module, the tube and the data storage module of the CT scanning equipment to control the scanning module, the tube and the data storage module to perform the target response action. On the one hand, by outputting the first control signal, the main power supply of the CT scanning device is electrically connected to the backup power supply through the first switch module, so as to avoid the CT scanning device being unable to complete the current CT scanning work due to power failure of the power supply device of the power grid or power failure of the power supply device of the power grid at an unknown time. On the other hand, by outputting the second control signal to the scanning module, the tube and the data storage module of the CT scanning device, the scanning module, the tube and the data storage module are controlled to perform the target response action, so as to avoid the occurrence of problems such as damage to the CT scanning device, data loss and inability of the patient to leave the scene due to accidental power failure of the power supply device of the power grid. In addition, the present invention combines the predicted power failure probability data of the power supply device of the power grid and the collected real-time status data of the power supply device of the power grid, and then controls the action of the CT scanning system with the corresponding control signal, so as to ensure the accuracy of the determined state of the power supply device of the power grid, and avoid the occurrence of problems such as damage to the CT scanning device, data loss and inability of the patient to leave the scene due to sudden power failure of the power supply device of the power grid.

[0039] The above description is only an overview of the technical solution of the embodiment of the present application. In order to more clearly understand the technical means of the embodiment of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the embodiment of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the technical solutions of the embodiments of the present disclosure, the drawings of the embodiments will be briefly described below. It should be noted that the drawings described below only relate to some embodiments of the present disclosure, but are not intended to limit the present disclosure, wherein:

[0041] Figure 1 It is a flowchart of a power-off protection control method for CT scanning equipment provided by an embodiment of the present disclosure;

[0042] Figure 2A is a structural schematic diagram of a CT scanning system provided by an embodiment of the present disclosure;

[0043] Figure 2Bis a structural schematic diagram of another CT scanning system provided by an embodiment of the present disclosure;

[0044] Figure 3 It is a flowchart of another power-off protection control method for CT scanning equipment provided by an embodiment of the present disclosure;

[0045] Figure 4 It is a flowchart of another power-off protection control method for CT scanning equipment provided by an embodiment of the present disclosure;

[0046] Figure 5 It is a structural schematic diagram of a power-off protection control device for CT scanning equipment provided by an embodiment of the present disclosure;

[0047] Figure 6 It is a structural diagram of a computer device provided in an embodiment of the present disclosure.

[0048] In the drawings, reference numerals with the same last two digits correspond to the same elements. It should be noted that the elements in the drawings are schematic and not drawn to scale. DETAILED DESCRIPTION

[0049] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution of the embodiments of the present disclosure will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present disclosure, rather than all of the embodiments. Based on the described embodiments of the present disclosure, all other embodiments obtained by those skilled in the art without creative work also fall within the scope of protection of the present disclosure.

[0050] Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by a person skilled in the art to which the subject matter of the present disclosure belongs. It will be further understood that terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the specification and the relevant art, and will not be interpreted in an idealized or overly formal form unless otherwise explicitly defined herein. As used herein, a statement that two or more parts are "connected" or "coupled" together shall mean that the parts are joined together directly or through one or more intermediate components.

[0051] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase "embodiments" in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0052] The term "and / or" in this article is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists, A and B exist at the same time, and B exists. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0053] Furthermore, in all embodiments of the present disclosure, terms such as “first” and “second” are used only to distinguish one component (or a part of a component) from another component (or another part of a component).

[0054] In the description of the present application, unless otherwise specified, “plurality” means more than two (including two), and similarly, “plurality groups” means more than two (including two).

[0055] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the accompanying drawings.

[0056] Based on the problems existing in the prior art, the embodiment of the present disclosure provides a power-off protection control method for a CT scanning device, which is applied to a CT scanning system. The CT scanning system at least includes a CT scanning device, a main power supply of the CT scanning device, a first switch module, and a backup power supply. Figure 1 is a flow chart of a power-off protection control method for a CT scanning device provided in an embodiment of the present disclosure, Figure 2A is a structural diagram of a CT scanning system provided by an embodiment of the present disclosure, a structural diagram of a power-off protection control method for a CT scanning device, and Figure 1 and Figure 2A , the power-off protection control method of the CT scanning equipment includes:

[0057] In a specific embodiment, the first switch module is a single-pole double-throw switch. In the default state, the moving contact of the first switch module is electrically connected to the first static contact. At this time, the main power supply of the CT scanning device is electrically connected to the power grid power supply device through the first switch module. When the first switch module receives the first control signal, the moving contact of the first switch module is electrically connected to the second static contact. At this time, the main power supply of the CT scanning device is electrically connected to the backup power supply through the first switch module, and the main power supply of the CT scanning device is used to power each module of the CT scanning device.

[0058] S110, determining power outage probability data of power supply equipment of the power grid according to power consumption equipment data, power supply equipment data of the power grid, meteorological data and a historical power outage protection data group.

[0059] The historical power outage protection data group includes multiple historical power outage protection data, and any historical power outage protection data includes historical power consumption equipment data, historical power grid power supply equipment data and historical meteorological data.

[0060] Specifically, the power equipment data include transformer load, transformer temperature, line aging degree, load change rate, etc.; the power grid power supply equipment data include grid voltage, grid current, frequency and harmonics, etc.; the meteorological data include wind speed, temperature, humidity and meteorological information, etc.

[0061] As a specific implementable method, power outage probability data of power grid power supply equipment is determined based on power-consuming equipment data, power grid power supply equipment data, meteorological data and a historical power outage protection data group, including: training a power outage prediction model for power grid power supply equipment based on the historical power outage protection data group to obtain a target power outage prediction model for power grid power supply equipment; inputting power-consuming equipment data, power grid power supply equipment data and meteorological data into the target power outage prediction model for power grid power supply equipment to determine the power outage probability data for power grid power supply equipment.

[0062] Specifically, the historical power outage protection data group is first divided into a training set and a test set, wherein the data of the training set accounts for 70% of the number of historical power outage protection data included in the historical power outage protection data group, and the data of the test set accounts for 30% of the number of historical power outage protection data included in the historical power outage protection data group. The power outage prediction model for power grid power supply equipment is trained through the training set, and then the power outage prediction model for power grid power supply equipment is verified through the test set to see whether it converges. When the power outage prediction model for power grid power supply equipment converges, the corresponding model is the target power outage prediction model for power grid power supply equipment. Then, the collected power consumption equipment data, power grid power supply equipment data, and meteorological data are input into the target power outage prediction model for power grid power supply equipment to determine the power outage probability data of power grid equipment in the future period.

[0063] As another specific implementable method, power outage probability data of power grid power supply equipment is determined based on power-consuming equipment data, power grid power supply equipment data, meteorological data and a historical power outage protection data group, including: training a power outage prediction model for power grid power supply equipment based on the historical power outage protection data group to obtain a target power grid power supply equipment power outage prediction model; inputting the power-consuming equipment data into the target power grid power supply equipment power outage prediction model to determine first sub-power outage probability data of the power grid power supply equipment; inputting the power grid power supply equipment data into the target power grid power supply equipment power outage prediction model to determine second sub-power outage probability data of the power grid power supply equipment; inputting meteorological data into the target power grid power supply equipment power outage prediction model to determine third sub-power outage probability data of the power grid power supply equipment; and determining the power outage probability data of the power grid power supply equipment based on the first sub-power outage probability data, the second sub-power outage probability data and the third sub-power outage probability data and the weight coefficients corresponding to each sub-power outage probability data.

[0064] Specifically, firstly, the historical power outage protection data group is divided into a training set and a test set, wherein the data of the training set accounts for 70% of the number of historical power outage protection data included in the historical power outage protection data group, and the data of the test set accounts for 30% of the number of historical power outage protection data included in the historical power outage protection data group. The power outage prediction model of the power grid power supply equipment is trained through the training set, and then the power outage prediction model of the power grid power supply equipment is verified through the test set to see whether it converges. When the power grid power supply equipment power outage prediction model converges, the corresponding model is the target power grid power supply equipment power outage prediction model. Then, the collected power consumption equipment data, power grid power supply equipment data and meteorological data are respectively input into the target power grid power supply equipment power outage prediction model to determine the sub-power outage probability data of the power grid equipment in the future period. Finally, the power outage probability data of the power grid power supply equipment is determined according to each sub-power outage probability data and the weight coefficient of each sub-power outage probability data.

[0065] S120: Acquire real-time status data of power supply equipment of the power grid.

[0066] A specific implementation method is to collect real-time status data of the power supply equipment of the power grid through a signal acquisition module on the line network between the power supply equipment of the power grid and the main power supply of the CT scanning equipment.

[0067] The real-time status data of the power supply equipment of the power grid includes online status data and offline status data (offline status includes power failure or short circuit, etc.).

[0068] S130. When the real-time status data is in an offline state, and / or the power-off probability data is greater than or equal to a preset threshold, a first control signal is generated to the first switch module to electrically connect the main power supply of the CT scanning device to the backup power supply through the first switch module, and a second control signal is generated to the scanning module, the tube and the data storage module of the CT scanning device to control the scanning module, the tube and the data storage module to perform a target response action.

[0069] In a specific implementation, step S110 is used to obtain power outage probability data of the power grid power supply equipment that may experience a power outage in a future time period based on the collected power-consuming equipment data, power grid power supply equipment data and meteorological data. In step S120, real-time status data of the power grid power supply equipment is obtained. When the power outage probability data of the power grid power supply equipment that may experience a power outage in a future time period is greater than a preset threshold, and / or the real-time status data of the power grid power supply equipment is in an offline state, a first control signal is generated to the first switch module, so that the main power supply of the CT scanning device is electrically connected to the backup power supply through the first switch module, so as to avoid the CT scanning device being unable to complete the current CT scanning work due to power outage of the power grid power supply equipment or at an unknown time.

[0070] In addition, by generating a second control signal to the scanning module, the tube and the data storage module of the CT scanning device, the scanning module, the tube and the data storage module are controlled to perform a target response action. Among them, the target response action of the scanning module is to move to the initial position and the rotation angle is 0 degrees, the target response action of the tube is to close the tube, and the response action of the data storage module is to perform a data storage operation. By generating a second control signal to the scanning module, the tube and the data storage module of the CT scanning device, the scanning module, the tube and the data storage module are controlled to perform a target response action, so as to avoid the occurrence of problems such as damage to the CT scanning equipment, data loss and the inability of patients to leave safely due to accidental power failure of the power supply equipment of the power grid.

[0071] The power failure protection control method for CT scanning equipment provided by the embodiment of the present disclosure first determines the power failure probability data of the power supply equipment according to the power consumption equipment data, the power supply equipment data of the power grid, the meteorological data and the historical power failure protection data group; then obtains the real-time status data of the power supply equipment; finally, when the real-time status data is offline, and / or the power failure probability data is greater than or equal to the preset threshold, generates a first control signal to the first switch module, so that the main power supply of the CT scanning equipment is electrically connected to the backup power supply through the first switch module, and generates a second control signal to the scanning module, the tube and the data storage module of the CT scanning equipment to control the scanning module, the tube and the data storage module to perform the target response action. On the one hand, by outputting the first control signal, the main power supply of the CT scanning equipment is electrically connected to the backup power supply through the first switch module, so as to avoid the CT scanning equipment being unable to complete the current CT scanning work due to the power failure of the power supply equipment or the power failure of the power supply equipment at an unknown time; on the other hand, by outputting the second control signal to the scanning module, the tube and the data storage module of the CT scanning equipment, the scanning module, the tube and the data storage module are controlled to perform the target response action, so as to avoid the occurrence of problems such as damage to the CT scanning equipment, data loss and inability of the patient to leave safely due to the accidental power failure of the power supply equipment. In addition, the present invention combines the predicted power outage probability data of the grid power supply equipment with the collected real-time status data of the grid power supply equipment, and then controls the action of the CT scanning system with the corresponding control signal to ensure the accuracy of the determined status of the grid power supply equipment, thereby avoiding the sudden power outage of the grid power supply equipment, which may cause damage to the CT scanning equipment, data loss, and the inability of patients to leave safely.

[0072] Based on the above embodiments, Figure 3 Another power-off protection control method for CT scanning equipment provided by the embodiment of the present disclosure is as follows: Figure 3 As shown, the CT scanning equipment power-off protection control method further includes:

[0073] S140, generating a third control signal to the second switch module so that the emergency power supply receives the electrical signal output by the backup power supply, and generating a fourth control signal to the third switch module so that the non-emergency power supply is disconnected from the backup power supply.

[0074] Among them, the emergency electrical equipment power supply provides power for the scanning module, the tube and the data storage module.

[0075] In a specific implementation, when the grid power supply device is online, the main power supply of the CT scanning device receives the electrical signal of the grid power supply device, and then supplies power to the main power supply of the CT scanning device. When the grid power supply device is offline, the main power supply of the CT scanning device receives the electrical signal of the backup power supply, and then supplies power to the main power supply of the CT scanning device.

[0076] Combination Figure 2B , by setting the main power supply of the CT scanning device to be electrically connected to the power supply of the emergency power supply through the second switch module, and the main power supply of the CT scanning device to be electrically connected to the power supply of the non-emergency power supply through the third switch module. When the main power supply of the scanning device is electrically connected to the power supply device of the power grid through the first switch module, the main power supply of the CT scanning device supplies power to each module of the CT scanning device. When the main power supply of the scanning device is electrically connected to the backup power supply through the first switch module, the third control signal is output to the second switch module so that the power supply of the emergency power supply receives the electrical signal output by the main power supply of the CT scanning device, and the fourth control signal is output to the third switch module, so that the power supply of the non-emergency power supply does not receive the electrical signal output by the main power supply of the CT scanning device, and the scanning module, the tube and the data storage module of the CT scanning device are powered by the power supply of the emergency power supply, so that the scanning module, the tube and the data storage module can perform the target response action, thereby avoiding the damage of the CT scanning device, the loss of data and the inability of the patient to leave safely. In addition, the power supply of non-emergency electrical equipment is disconnected from the main power supply of the CT scanning equipment to avoid excessive consumption of the backup power supply, which would cause the backup power supply to be consumed too quickly and unable to supply power to the emergency electrical equipment normally, thereby causing damage to the CT scanning equipment, data loss, and patients being unable to leave safely.

[0077] Based on the above embodiments, Figure 4 Another power-off protection control method for CT scanning equipment provided by the embodiment of the present disclosure is based on the above embodiment. Figure 4 As shown, the CT scanning equipment power-off protection control method further includes:

[0078] S150, obtaining response status information of the scanning module, the tube and the data storage module.

[0079] After step S130 generates the second control signal to the scanning module, the tube and the data storage module of the CT scanning device, the scanning module, the tube and the data storage module of the CT scanning device respond to the second control signal and perform the target response action.

[0080] The scanning module includes a scanning frame and a scanning bed.

[0081] In a specific implementation, obtaining response status information of the scanning module, the tube, and the data storage module includes: obtaining position information and angle information of the scanning gantry, status information of the tube, and data status information of the data storage module; when the position information of the scanning gantry satisfies the first preset position information and the angle information of the scanning gantry satisfies the first preset angle information, obtaining the position information and angle information of the scanning bed.

[0082] First, the position information and angle information of the scanning gantry, the status information of the tube and the data status information of the data storage module are obtained, and then when the position information of the scanning gantry meets the first preset position information and the angle information of the scanning gantry meets the first preset angle information, the position information of the scanning bed is obtained. That is, after the second control signal is output to the scanning module of the CT scanning device, the scanning module first executes the control of the scanning gantry to run to the first preset position information and the first preset angle information, the first preset position information and the first preset angle information are the position information and angle information corresponding to the scanning gantry in the initial state, and then after the scanning gantry runs to the first preset position information and the first preset angle information, the scanning bed is then controlled to run to the second preset position information and the second preset angle information, the second preset position information and the second preset angle information are the position information and angle information corresponding to the scanning bed in the initial state, so that the scanning object can be safely evacuated from the scanning bed, and the influence of the scanning gantry on the scanning object is avoided when the scanning object gets off the scanning bed.

[0083] S160: Determine whether to generate a fifth control signal to a main power supply of the CT scanning device according to the response status information of the scanning gantry, the scanning bed, the tube, and the data storage module.

[0084] When the position information of the scanning module meets the preset position information, the status information of the tube is the closed status information and the response status information of the data storage module is that the data storage is completed, a fifth control signal is generated to the main power supply of the CT scanning device to control the main power supply of the CT scanning device to power off through the fifth control signal.

[0085] When the scanning module of the CT scanning device runs to the preset position information corresponding to the initial state, the tube state information is in the closed state, and the data storage module has completed data storage. At this time, by outputting the fifth control signal to the main power supply of the CT scanning device, the main power supply of the CT scanning device is powered off, and the overall power-off operation of the CT scanning device is completed. On the basis of ensuring the safe power-off of the CT scanning device, the data of the CT scanning device can be stored and the patient can leave safely.

[0086] On the basis of the above embodiments, the embodiments of the present disclosure further provide a power-off protection control device for a CT scanning device, which is applied to a CT scanning system. The CT scanning system at least includes a CT scanning device, a main power supply of the CT scanning device, a first switch module, and a backup power supply. The main power supply of the CT scanning device is electrically connected to a power grid power supply device or a backup power supply through the first switch module. Figure 5 is a schematic diagram of a power-off protection control device for CT scanning equipment provided by an embodiment of the present disclosure, combined with Figure 2A and Figure 5 , CT scanning equipment power-off protection control device, including:

[0087] The power outage probability data determination module 501 is used to determine the power outage probability data of the power supply equipment according to the power equipment data, the power supply equipment data, the meteorological data and the historical power outage protection data group, wherein the historical power outage protection data group includes a plurality of historical power outage protection data, and any one of the historical power outage protection data includes the historical power equipment data, the historical power supply equipment data and the historical meteorological data;

[0088] A real-time status data acquisition module 502 is used to acquire real-time status data of power grid power supply equipment;

[0089] The control signal generating module 503 is used to generate a first control signal to the first switch module when the real-time status data is in an offline state and / or the power failure probability data is greater than or equal to a preset threshold value, so that the main power supply of the CT scanning device is electrically connected to the backup power supply through the first switch module, and to generate a second control signal to the scanning module, the tube and the data storage module of the CT scanning device to control the scanning module, the tube and the data storage module to perform a target response action.

[0090] The power failure protection control device for CT scanning equipment provided by the embodiment of the present disclosure first determines the power failure probability data of the power supply equipment according to the power consumption equipment data, the power supply equipment data of the power grid, the meteorological data and the historical power failure protection data group; then obtains the real-time status data of the power supply equipment; finally, when the real-time status data is offline, and / or the power failure probability data is greater than or equal to the preset threshold, generates a first control signal to the first switch module, so that the main power supply of the CT scanning equipment is electrically connected to the backup power supply through the first switch module, and generates a second control signal to the scanning module, the tube and the data storage module of the CT scanning equipment to control the scanning module, the tube and the data storage module to perform the target response action. On the one hand, by outputting the first control signal, the main power supply of the CT scanning equipment is electrically connected to the backup power supply through the first switch module, so as to avoid the CT scanning equipment being unable to complete the current CT scanning work due to the power failure of the power supply equipment of the power grid or the power failure of the power supply equipment of the power grid at an unknown time; on the other hand, by outputting the second control signal to the scanning module, the tube and the data storage module of the CT scanning equipment, so as to control the scanning module, the tube and the data storage module to perform the target response action, so as to avoid the occurrence of problems such as damage to the CT scanning equipment, data loss and inability of the patient to leave safely due to the accidental power failure of the power supply equipment of the power grid. In addition, the present invention combines the predicted power outage probability data of the grid power supply equipment with the collected real-time status data of the grid power supply equipment, and then controls the action of the CT scanning system with the corresponding control signal to ensure the accuracy of the determined status of the grid power supply equipment, thereby avoiding the sudden power outage of the grid power supply equipment, which may cause damage to the CT scanning equipment, data loss, and the inability of patients to leave safely.

[0091] In a specific embodiment, the main power supply of the CT scanning device is electrically connected to the power supply of the emergency power device through the second switch module, and the main power supply of the CT scanning device is electrically connected to the power supply of the non-emergency power device through the third switch module. The method further includes:

[0092] Generate a third control signal to the second switch module so that the emergency power supply receives the electrical signal output by the backup power supply, and generate a fourth control signal to the third switch module so that the non-emergency power supply is disconnected from the backup power supply, wherein the emergency power supply supplies power to the scanning module, the tube and the data storage module.

[0093] In a specific implementation manner, determining the power outage probability data of the power supply equipment of the power grid according to the power consumption equipment data, the power supply equipment data of the power grid, the meteorological data and the historical power outage protection data group includes:

[0094] According to the historical power outage protection data group, a power outage prediction model for power grid power supply equipment is trained to obtain a power outage prediction model for target power grid power supply equipment;

[0095] The power-consuming equipment data, the power grid power supply equipment data and the meteorological data are input into a power outage prediction model for target power grid power supply equipment to determine power outage probability data for the power grid power supply equipment.

[0096] In a specific implementation manner, determining the power outage probability data of the power supply equipment of the power grid according to the power consumption equipment data, the power supply equipment data of the power grid, the meteorological data and the historical power outage protection data group includes:

[0097] According to the historical power outage protection data group, a power outage prediction model for power grid power supply equipment is trained to obtain a power outage prediction model for target power grid power supply equipment;

[0098] Inputting the power-consuming device data into a target power grid power supply equipment power outage prediction model to determine first sub-power outage probability data of the power grid power supply equipment;

[0099] Inputting the power grid power supply equipment data into a target power grid power supply equipment power outage prediction model to determine second sub-power outage probability data of the power grid power supply equipment;

[0100] Inputting the meteorological data into a power outage prediction model for target power grid power supply equipment to determine third sub-power outage probability data for the power grid power supply equipment;

[0101] Power outage probability data of power supply equipment of the power grid is determined according to the first sub-power outage probability data, the second sub-power outage probability data and the third sub-power outage probability data and weight coefficients corresponding to the sub-power outage probability data.

[0102] In a specific embodiment, the method further comprises:

[0103] Acquire response status information of the scanning module, the tube and the data storage module;

[0104] According to the response status information of the scanning module, the tube and the data storage module, it is determined whether to generate a fifth control signal to the main power supply of the CT scanning device.

[0105] In a specific implementation, the obtaining of the response status information of the scanning module, the tube, and the data storage module includes:

[0106] When the position information of the scanning module meets the preset position information, the status information of the tube is the closed status information, and the response status information of the data storage module is that the data storage is completed, a fifth control signal is generated to the main power supply of the CT scanning device to control the main power supply of the CT scanning device to power off through the fifth control signal.

[0107] In a specific embodiment, the scanning module includes a scanning bed and a scanning gantry;

[0108] The step of obtaining the response status information of the scanning module, the tube and the data storage module includes:

[0109] Acquire the position information and angle information of the scanning frame, the status information of the tube and the data status information of the data storage module;

[0110] When the position information of the scanning gantry satisfies the first preset position information and the angle information of the scanning gantry satisfies the first preset angle information, the position information and the angle information of the scanning bed are acquired.

[0111] The present application also provides a computer device. Figure 6 , Figure 6 This is a basic structural block diagram of the computer device in this embodiment.

[0112] The computer device includes a memory 510 and a processor 520 that are connected to each other through a system bus. It should be noted that the figure only shows a computer device with components 510-520, but it should be understood that it is not required to implement all the components shown, and more or fewer components can be implemented instead. Among them, those skilled in the art can understand that the computer device here is a device that can automatically perform numerical calculations and / or information processing according to pre-set or stored instructions, and its hardware includes but is not limited to microprocessors, application specific integrated circuits (Application Specific Integrated Circuit, ASIC), field-programmable gate arrays (Field-Programmable Gate Array, FPGA), digital processors (Digital Signal Processor, DSP), embedded devices, etc.

[0113] Computer devices can be computing devices such as desktop computers, notebooks, PDAs, and cloud servers. Computer devices can interact with users through keyboards, mice, remote controls, touch pads, or voice control devices.

[0114] The memory 510 includes at least one type of readable storage medium, and the readable storage medium includes a non-volatile memory or a volatile memory, such as a flash memory, a hard disk, a multimedia card, a card-type memory (such as an SD or DX memory, etc.), a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a programmable read-only memory (PROM), a magnetic memory, a magnetic disk, an optical disk, etc., and the RAM may include a static RAM or a dynamic RAM. In some embodiments, the memory 510 may be an internal storage unit of a computer device, such as a hard disk or a memory of the computer device. In other embodiments, the memory 510 may also be an external storage device of a computer device, such as a plug-in hard disk, a smart memory card (SMC), a secure digital (SD) card, or a flash card (Flash Card), etc., equipped on the computer device. Of course, the memory 510 may also include both an internal storage unit of the computer device and an external storage device thereof. In this embodiment, the memory 510 is generally used to store an operating system and various application software installed on the computer device, such as the program code of the above method, etc. In addition, the memory 510 may also be used to temporarily store various data that have been output or are to be output.

[0115] The processor 520 is generally used to perform the overall operation of the computer device. In this embodiment, the memory 510 is used to store program codes or instructions, the program code includes computer operation instructions, and the processor 520 is used to execute the program codes or instructions stored in the memory 510 or process data, such as running the program code of the above method.

[0116] In this article, the bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus, etc. The bus system can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, only one thick line is used in the figure, but it does not mean that there is only one bus or one type of bus.

[0117] Another embodiment of the present application also provides a computer-readable medium, which may be a computer-readable signal medium or a computer-readable medium. A processor in a computer reads a computer-readable program code stored in the computer-readable medium, so that the processor can execute the functional actions specified in each step or a combination of steps in the above method; and generate a device for implementing the functional actions specified in each block or a combination of blocks in the block diagram.

[0118] Computer-readable media include but are not limited to electronic, magnetic, optical, electromagnetic, infrared memory or semiconductor systems, devices or apparatuses, or any appropriate combination of the foregoing, the memory is used to store program codes or instructions, the program codes include computer operating instructions, and the processor is used to execute the program codes or instructions of the above methods stored in the memory.

[0119] For the definitions of memory and processor, please refer to the description of the aforementioned computer device embodiment and will not be repeated here.

[0120] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of modules or units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0121] Each functional unit or module in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0122] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) or a processor (processor) to execute all or part of the steps of the various embodiments of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk, etc., and other media that can store program codes.

[0123] Unless the context clearly indicates otherwise, the singular form of the words used herein and in the appended claims includes the plural and vice versa. Thus, when referring to the singular, the plural form of the corresponding term is generally included. Similarly, the words "comprise" and "include" are to be interpreted as inclusive rather than exclusive. Likewise, the terms "include" and "or" should be interpreted as inclusive unless such interpretation is expressly prohibited herein. Where the term "example" is used herein, particularly when it is located after a group of terms, the "example" is merely exemplary and illustrative and should not be considered exclusive or comprehensive.

[0124] Further aspects and scopes of adaptability become apparent from the description provided herein. It should be understood that various aspects of the present application can be implemented individually or in combination with one or more other aspects. It should also be understood that the description and specific embodiments herein are intended for purposes of illustration only and are not intended to limit the scope of the present application.

[0125] Several embodiments of the present disclosure are described in detail above, but it is obvious that those skilled in the art can make various modifications and variations to the embodiments of the present disclosure without departing from the spirit and scope of the present disclosure. The protection scope of the present disclosure is defined by the attached claims.

Claims

1. A power-off protection control method for a CT scanning device, applied to a CT scanning system, wherein the CT scanning system comprises at least a CT scanning device, a main power supply of the CT scanning device, a first switch module and a backup power supply, wherein the main power supply of the CT scanning device is electrically connected to a power grid power supply device or a backup power supply through the first switch module, characterized in that: include: Determine the power outage probability data of the power supply equipment according to the power equipment data, the power supply equipment data, the meteorological data and the historical power outage protection data group, wherein the historical power outage protection data group includes a plurality of historical power outage protection data, and any one of the historical power outage protection data includes the historical power equipment data, the historical power supply equipment data and the historical meteorological data; Obtain real-time status data of power grid power supply equipment; When the real-time status data is in an offline state, and / or the power failure probability data is greater than or equal to a preset threshold, a first control signal is generated to a first switch module, so that a main power supply of the CT scanning device is electrically connected to a backup power supply through the first switch module, and a second control signal is generated to a scanning module, a tube, and a data storage module of the CT scanning device, so as to control the scanning module, the tube, and the data storage module to perform a target response action; The target response action of the scanning module is to move to the initial position and rotate at an angle of 0 degrees, the target response action of the tube is to close the tube, and the response action of the data storage module is to execute a data storage action.

2. The method according to claim 1, characterized in that The CT scanning system further includes a second switch module, a third switch module, an emergency power supply and a non-emergency power supply, the main power supply of the CT scanning device is electrically connected to the emergency power supply through the second switch module, and the main power supply of the CT scanning device is electrically connected to the non-emergency power supply through the third switch module, and the method further includes: Generate a third control signal to the second switch module so that the emergency power supply receives the electrical signal output by the backup power supply, and generate a fourth control signal to the third switch module so that the non-emergency power supply is disconnected from the backup power supply, wherein the emergency power supply supplies power to the scanning module, the tube and the data storage module.

3. The method according to claim 1, characterized in that Determining the power outage probability data of the power supply equipment of the power grid according to the power consumption equipment data, the power supply equipment data of the power grid, the meteorological data and the historical power outage protection data group includes: According to the historical power outage protection data group, a power outage prediction model for power grid power supply equipment is trained to obtain a power outage prediction model for target power grid power supply equipment; The power-consuming equipment data, the power grid power supply equipment data and the meteorological data are input into a power outage prediction model for target power grid power supply equipment to determine power outage probability data for the power grid power supply equipment.

4. The method according to claim 1, characterized in that: Determining the power outage probability data of the power supply equipment of the power grid according to the power consumption equipment data, the power supply equipment data of the power grid, the meteorological data and the historical power outage protection data group includes: According to the historical power outage protection data group, a power outage prediction model for power grid power supply equipment is trained to obtain a power outage prediction model for target power grid power supply equipment; Inputting the power-consuming device data into a target power grid power supply equipment power outage prediction model to determine first sub-power outage probability data of the power grid power supply equipment; Inputting the power grid power supply equipment data into a target power grid power supply equipment power outage prediction model to determine second sub-power outage probability data of the power grid power supply equipment; Inputting the meteorological data into a power outage prediction model for target power grid power supply equipment to determine third sub-power outage probability data for the power grid power supply equipment; Power outage probability data of power supply equipment of the power grid is determined according to the first sub-power outage probability data, the second sub-power outage probability data and the third sub-power outage probability data and weight coefficients corresponding to the sub-power outage probability data.

5. The method according to claim 1, characterized in that The method further comprises: Acquire response status information of the scanning module, the tube and the data storage module; According to the response status information of the scanning module, the tube and the data storage module, it is determined whether to generate a fifth control signal to the main power supply of the CT scanning device.

6. The method according to claim 5, characterized in that The step of obtaining the response status information of the scanning module, the tube and the data storage module includes: When the position information of the scanning module meets the preset position information, the status information of the tube is the closed status information, and the response status information of the data storage module is that the data storage is completed, a fifth control signal is generated to the main power supply of the CT scanning device to control the main power supply of the CT scanning device to power off through the fifth control signal.

7. The method according to claim 5, characterized in that The scanning module includes a scanning bed and a scanning frame; The step of obtaining the response status information of the scanning module, the tube and the data storage module includes: Acquire the position information and angle information of the scanning frame, the status information of the tube and the data status information of the data storage module; When the position information of the scanning gantry satisfies the first preset position information and the angle information of the scanning gantry satisfies the first preset angle information, the position information and the angle information of the scanning bed are acquired.

8. A power-off protection control device for CT scanning equipment, applied to a CT scanning system, wherein the CT scanning system comprises at least a CT scanning device, a main power supply of the CT scanning device, a first switch module and a backup power supply, wherein the main power supply of the CT scanning device is electrically connected to a power grid power supply device or a backup power supply through the first switch module, characterized in that: include: A power outage probability data determination module, used to determine the power outage probability data of the power supply equipment according to the power equipment data, the power supply equipment data, the meteorological data and the historical power outage protection data group, wherein the historical power outage protection data group includes a plurality of historical power outage protection data, and any one of the historical power outage protection data includes the historical power equipment data, the historical power supply equipment data and the historical meteorological data; A real-time status data acquisition module is used to acquire real-time status data of power grid power supply equipment; a control signal generating module, configured to generate a first control signal to a first switch module when the real-time status data is in an offline state and / or the power failure probability data is greater than or equal to a preset threshold value, so that a main power supply of the CT scanning device is electrically connected to a backup power supply through the first switch module, and to generate a second control signal to a scanning module, a tube and a data storage module of the CT scanning device, so as to control the scanning module, the tube and the data storage module to perform a target response action; The target response action of the scanning module is to move to the initial position and rotate at an angle of 0 degrees, the target response action of the tube is to close the tube, and the response action of the data storage module is to execute a data storage action.

9. A computer device, characterized in that: include: one or more processors; a storage device for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Power-off release type compression mechanism and mammary gland detection device

    CN110974268A

  • Systems, methods, and apparatus for bi-directional DC short circuit protection

    CN116941155A