Power system benefit distribution method, device, equipment and medium
By constructing a cost allocation model based on Shapley's value method in the power system and correcting the allocation results with environmental protection contribution, the problem of unfair cost allocation after new energy is solved, and a more fair and effective benefit distribution is achieved.
Patent Information
- Application Number
- CN202310953457.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-31
- Publication Date
- 2025-02-18
AI Technical Summary
After large-scale new energy is connected to the grid, the uncertainty of new energy output leads to the need to increase additional backup and operation costs in system scheduling. The traditional Shapley value method cannot be considered from the perspective of environmental protection in the cost sharing of various entities of the power system. , resulting in unfair cost sharing.
The first cost allocation model based on Shapley's value method is constructed, and the environmental protection correction coefficient is determined based on the environmental contribution of each stakeholder, and the value allocation results are corrected through environmental protection weight parameters to achieve fairer cost allocation.
On the basis of minimizing the total cost of the system operation, the environmental contribution of each stakeholder is fully considered, the proportion of environmental protection impact on cost sharing is increased, and the fairness and effectiveness of the distribution of interests of each stakeholder within the power system is achieved.
Smart Images

Figure CN119477358A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of electric power engineering technology, and in particular to a method, device, equipment and medium for allocating benefits of an electric power system. Background Art
[0002] At present, all industries have taken certain measures to reduce carbon emissions, and building a new power system has become an important development trend for carbon reduction in the power industry in the future.
[0003] After large-scale renewable energy is connected to the grid, the uncertainty of renewable energy output will lead to additional backup and operating costs for system dispatch. In terms of cost sharing among the various entities in the power system, the traditional Shapley value method mainly shares the costs of the various entities in the power system from the perspective of cost minimization, and does not consider the cost sharing between the various entities from the perspective of environmental protection.
[0004] Therefore, how to fairly and reasonably distribute this cost within the new power system has become one of the important issues that need to be studied for large-scale new energy access and consumption. Summary of the invention
[0005] In view of the above problems, the embodiments of the present application provide a method, device, equipment and medium for distributing benefits in an electric power system to achieve the purpose of fair and reasonable distribution of benefits within a new electric power system.
[0006] In order to achieve the above objectives, the embodiments of the present application provide the following technical solutions:
[0007] A first aspect of an embodiment of the present application provides a method for allocating benefits of a power system, comprising:
[0008] Constructing a first cost allocation model, wherein the first cost allocation model is established based on the Shapley value method, and the first cost allocation model includes multiple stakeholders;
[0009] Determining an environmental protection correction coefficient for each stakeholder based on the environmental protection contribution of each stakeholder, wherein the environmental protection contribution is related to the environmental protection input cost of the stakeholder;
[0010] Obtaining an environmental protection weight parameter of each of the interest entities, wherein the environmental protection weight parameter is related to the environmental protection correction coefficient;
[0011] Based on the environmental weight parameter and the environmental correction coefficient, the value allocation result determined based on the first cost allocation model is corrected to obtain a corrected value allocation result.
[0012] Optionally, the environmental protection contribution is set as the product of the relative environmental protection investment of the stakeholder and the environmental protection contribution coefficient of the stakeholder;
[0013] The relative environmental protection investment is related to the environmental protection investment cost, and the environmental protection contribution coefficient is related to the resource utilization effect of the stakeholder and the stakeholder's own attributes.
[0014] Optionally, based on the environmental protection contribution of each stakeholder, determining the environmental protection correction coefficient of each stakeholder includes:
[0015] Obtaining the sum of environmental protection contributions of the plurality of stakeholders;
[0016] Determine the average value of the environmental protection contribution of each of the stakeholders;
[0017] The product of the difference between the quotient of the environmental protection contribution of the stakeholder and the sum of the contributions and the average value and the environmental value of the new power stakeholder is taken as the environmental protection correction coefficient.
[0018] Optionally, the environmental protection correction coefficient is positively correlated with the corrected value allocation result.
[0019] Optionally, the environmental protection correction coefficient is positively correlated with the corrected value allocation result, including:
[0020] When the environmental protection correction coefficient is positive, the interest subject obtains additional benefit distribution value due to the environmental protection contribution;
[0021] When the environmental protection correction coefficient is negative, the additional benefit distribution value of the stakeholder is reduced due to the environmental protection contribution.
[0022] Optionally, based on the environmental weight parameter and the environmental correction coefficient, the value allocation result determined based on the first cost allocation model is corrected to obtain a corrected value allocation result, including:
[0023] Determining an initial value allocation result based on the first cost allocation model;
[0024] Determine the product of the environmental protection weight parameter and the environmental protection correction coefficient;
[0025] The sum of the initial value allocation result and the product of the environmental weight parameter and the environmental correction coefficient is used as the corrected value allocation result.
[0026] Optionally, the plurality of interest entities include a power supply side, a grid side, a load side and an energy storage side.
[0027] A second aspect of an embodiment of the present application provides a benefit distribution device for a power system, comprising:
[0028] A construction module, used to construct a first cost allocation model, wherein the first cost allocation model is established based on the Shapley value method, and the first cost allocation model includes multiple stakeholders;
[0029] A determination module, configured to determine an environmental protection correction coefficient of each stakeholder based on the environmental protection contribution of each stakeholder, wherein the environmental protection contribution is related to the environmental protection input cost of the stakeholder;
[0030] An acquisition module, used for acquiring an environmental protection weight parameter of each of the interest subjects, wherein the environmental protection weight parameter is related to the environmental protection correction coefficient;
[0031] A correction module is used to correct the value allocation result determined based on the first cost allocation model based on the environmental weight parameter and the environmental correction coefficient to obtain a corrected value allocation result.
[0032] A third aspect of an embodiment of the present application provides a computer device, comprising:
[0033] processor;
[0034] a memory for storing processor-executable instructions;
[0035] Wherein, the processor is configured to:
[0036] Constructing a first cost allocation model, wherein the first cost allocation model is established based on the Shapley value method, and the first cost allocation model includes multiple stakeholders;
[0037] Determining an environmental protection correction coefficient for each stakeholder based on the environmental protection contribution of each stakeholder, wherein the environmental protection contribution is related to the environmental protection input cost of the stakeholder;
[0038] Obtaining an environmental protection weight parameter of each of the interest entities, wherein the environmental protection weight parameter is related to the environmental protection correction coefficient;
[0039] Based on the environmental weight parameter and the environmental correction coefficient, the value allocation result determined based on the first cost allocation model is corrected to obtain a corrected value allocation result.
[0040] A fourth aspect of an embodiment of the present application provides a non-transitory computer-readable storage medium. When instructions in the storage medium are executed by a processor, a method for allocating benefits of a power system is executed. The method includes:
[0041] Constructing a first cost allocation model, wherein the first cost allocation model is established based on the Shapley value method, and the first cost allocation model includes multiple stakeholders;
[0042] Determining an environmental protection correction coefficient for each stakeholder based on the environmental protection contribution of each stakeholder, wherein the environmental protection contribution is related to the environmental protection input cost of the stakeholder;
[0043] Obtaining an environmental protection weight parameter of each of the interest entities, wherein the environmental protection weight parameter is related to the environmental protection correction coefficient;
[0044] Based on the environmental weight parameter and the environmental correction coefficient, the value allocation result determined based on the first cost allocation model is corrected to obtain a corrected value allocation result.
[0045] Beneficial effects:
[0046] The present invention, on the basis of minimizing the total cost of system operation, fully considers the environmental protection contribution of various stakeholders in the power system, follows the principle of economical and efficient cost allocation among various stakeholders in the new power system, comprehensively considers the cost of the power system and the environmental protection of various stakeholders, and while minimizing the cost of the power system, increases the proportion of the impact of environmental protection on the cost sharing of the subjects, realizes fair and effective distribution of interests among various stakeholders in the power system, and can promote the investment and development of various subjects in environmental protection during the construction of future new power systems. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0048] Figure 1 A specific example flow chart of the method for allocating benefits of a power system in an embodiment of the present invention;
[0049] Figure 2 It is a principle block diagram of a specific example of a benefit distribution device for a power system in an embodiment of the present invention;
[0050] Figure 3 FIG. 4 is a specific example diagram of a computer device in an embodiment of the present invention. DETAILED DESCRIPTION
[0051] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention. It should be noted that the embodiments in this application and the features in the embodiments can be combined with each other arbitrarily without conflict.
[0052] As the proportion of renewable energy (such as wind power and photovoltaic power) connected to the power system continues to increase, the costs on the power supply side, grid side, load side and energy storage side will also change to varying degrees. The uncertainty of renewable energy output will lead to the need for additional backup and operating costs in system scheduling. How to fairly and reasonably share this cost within the new power system has become one of the important issues that need to be studied for large-scale renewable energy access and consumption.
[0053] Therefore, in response to the uncertainty of wind power and photovoltaic power generation in the power system, the increased standby costs can be reasonably shared among the wind farms. On the basis of minimizing the total cost of system operation, the interests of the source, network, load and storage parties should be fully considered. It is necessary to redistribute the interests of all parties within the power system fairly and effectively in accordance with the principle of how to achieve economical and efficient cost allocation among the various entities in the new power system.
[0054] An embodiment of the present invention discloses a method for distributing benefits in an electric power system. The method in this embodiment requires the use of the Shapley value method during implementation. In order to better illustrate the method in the present invention, the Shapley value method is firstly described.
[0055] The Shapley value method is a common method for solving multi-person cooperative game problems and is widely used in the problem of profit distribution among multiple enterprises. In cooperation, different interest individuals may be affected by different external factors. If the profit distribution is carried out according to the average sharing, it is obviously unreasonable for the subject with the largest influencing factors. The alliance after distribution may be unstable and each subject may withdraw from the alliance. In view of this, the present invention proposes a profit distribution method for power system. The improved Shapley value method considering environmental protection factors is used to redistribute the benefits of cooperative games, so that each cooperative alliance remains stable.
[0056] like Figure 1 As shown, the method in this embodiment includes the following steps:
[0057] S101, constructing a first cost allocation model, the first cost allocation model is established based on the Shapley value method, and the first cost allocation model includes multiple stakeholders;
[0058] The first cost sharing model is established based on the traditional Shapley value method. The Shapley value method is a method used to solve individual cooperative game problems. It can be directly used to solve the problem of cost sharing among various entities. The benefits are distributed according to the size of each stakeholder's marginal contribution to the alliance, so that each entity can obtain more benefits than when it does not join the alliance. However, the traditional Shapley value method is an equal distribution plan.
[0059] The traditional Shapley value method does not take into account the external factors that the relevant entities that distribute benefits bear in the actual game process of forming an alliance. Therefore, in the process of constructing a new power system cost sharing model, the impact of external factors should be comprehensively weighed, and environmental protection should be included in the cost sharing of the new power system to ensure the healthy and sustainable development of the new power system.
[0060] The first cost-sharing model includes multiple stakeholders, including the power supply side, grid side, load side and energy storage side, namely power generation companies, grid companies, demand-side aggregators and energy storage companies.
[0061] The corresponding first cost allocation model is constructed from four aspects: power generation enterprises, power grid enterprises, demand-side aggregators, and energy storage enterprises. The Shapleya value allocation method is constructed as follows:
[0062] The stakeholders of the new power system involved in cost sharing are regarded as the basic elements of the cooperative game problem, including decision makers and characteristic functions, which are mathematically expressed as (N, v), where N = {1, 2, 3...n} represents the decision maker set, that is, the number of stakeholders involved in cost sharing in the new power system, and N is a positive integer, n is the number of decision makers involved in decision-making, and v represents the characteristic function of this alliance. S represents the alliance between decision makers, that is, S is a cooperative alliance of N, s is the number of decision makers in coalition S.
[0063] Assume that a coalition A is formed by any decision makers in the set N, satisfying The decision makers in Alliance A work together to maximize the benefits of the alliance, and v represents the value benefit obtained by Alliance A. At this time, the characteristic function is defined as the function that represents the common benefits of the alliance, that is, v s is the characteristic function of the alliance S, and when A=S, v is equal to v s .
[0064] Assume that N is the set of decision makers participating in the decision-making under the cooperative game; S represents a cooperative alliance of N; s represents the number of decision makers under alliance S. Assume that all decision makers form alliances in a random order, and the probability of forming each alliance is p, and the calculation formula of p is as follows:
[0065]
[0066] Among them, p is the probability of each alliance, and n is the total number of decision makers involved in the alliance.
[0067] Decision maker i and other (s-1) decision makers form a coalition S. There are (s-1)! (ns)! combinations. Then, the probability of coalition S containing decision maker i is set to The calculation formula is as follows:
[0068]
[0069] in, is the probability of the coalition S containing decision maker i appearing, s is the number of decision makers in the coalition S, and n is the total number of decision makers participating in the coalition.
[0070] In the coalition S, the marginal contribution of decision maker i is r i , and its calculation formula is as follows:
[0071] r i =v s -v s / i
[0072] Among them, r i is the marginal contribution value of decision maker i in alliance S, v s is the value benefit obtained by the decision makers in the alliance S, v s / i is the value benefit when the remaining (s-1) decision makers excluding decision maker i form an alliance.
[0073] The Shapley value allocation method is the expected value of the contribution made by the decision makers participating in the cooperative game in the alliance. The calculation formula is as follows:
[0074]
[0075] Among them, π i (N,v) is the benefit value allocated to decision maker i, s is the number of decision makers in the alliance S, n is the total number of decision makers participating in the alliance, and v s is the value benefit obtained by the decision makers in the alliance S, v s / i is the profit when the remaining (s-1) decision makers excluding decision maker i form an alliance.
[0076] In the payment transfer cooperative game (N, v) scenario, when allocating the benefit value, under this alliance, the distribution strategy of the benefit value of the relevant decision makers can be used to allocate the payment to (x1,…,x i ,…,x n ) to indicate that x i is the benefit value allocated to decision maker i.
[0077] The decision maker's benefit value distribution strategy must meet certain constraints, which are individual rationality and overall rationality.
[0078] Individual rationality means that the benefit value distributed to each decision maker participating in the alliance is not less than the benefit value of independent decision making. Its mathematical expression is as follows:
[0079] x i ≥v i
[0080] Among them, x i is the benefit value of decision maker i participating in the alliance, v i is the benefit value of decision maker i’s independent decision.
[0081] Overall rationality means that the total benefit value of the decision makers participating in the alliance is equal to the total benefit value of the alliance. Its mathematical expression is as follows:
[0082]
[0083] Among them, x i is the benefit value of decision maker i participating in the alliance, n is the number of decision makers participating in the alliance, v N is the total revenue value of alliance N.
[0084] S102, determining an environmental protection correction coefficient of each stakeholder based on the environmental protection contribution of each stakeholder, wherein the environmental protection contribution is related to the environmental protection input cost of the stakeholder.
[0085] In the cost allocation of various entities in the power system, the traditional Shapley value method mainly allocates the costs of various entities in the power system from the perspective of cost minimization, and does not consider the cost allocation between various entities from the perspective of environmental protection. However, with the development of new power systems, it is possible to truly reflect the impact of environmental protection on the cost allocation of various entities in the new power system under the premise of cost minimization.
[0086] Environmental protection is incorporated into the consideration of benefit distribution of new power systems. The main measurement indicator for measuring the contribution of different stakeholders to environmental protection factors is the environmental protection investment cost of the relevant stakeholders. However, the specific environmental protection effect is also related to the resource utilization effect and the interests of the stakeholders themselves. For example, the environmental protection effect of thermal power units is not only related to the investment cost of their environmental protection equipment, but also to other factors such as their fuel quality and operating status. Therefore, the environmental protection contribution needs to be calculated according to the actual situation of different stakeholders, and the environmental protection correction coefficient of each stakeholder is determined according to the calculated environmental protection contribution.
[0087] S103, obtaining an environmental protection weight parameter of each stakeholder, wherein the environmental protection weight parameter is related to the environmental protection correction coefficient.
[0088] Exemplarily, the environmental weight parameter corresponding to the environmental correction coefficient is obtained according to the evaluation results of the relevant experts on the compensation factors of the environmental protection factors of each stakeholder.
[0089] S104, based on the environmental weight parameter and the environmental correction coefficient, correct the value allocation result determined based on the first cost allocation model to obtain a corrected value allocation result.
[0090] Exemplarily, the value distribution result determined by the first cost allocation model is corrected based on the calculated environmental protection correction coefficient and the judged environmental protection correction coefficient to obtain the corrected value distribution result of each stakeholder.
[0091] The benefit distribution method of the power system provided by the present invention fully considers the interests of the power supply side, the power grid side, the load side, and the energy storage side on the basis of minimizing the total cost of system operation, follows the principle of realizing economical and efficient cost allocation among various interest subjects of the new power system, and uses the modified Shapley value to realize fair and effective cost sharing among various parties within the power system from the aspect of environmental protection.
[0092] As an optional implementation of the present invention, the environmental protection contribution is set as the product of the relative environmental protection investment of the stakeholder and the environmental protection contribution coefficient of the stakeholder; wherein the relative environmental protection investment is related to the environmental protection investment cost, and the environmental protection contribution coefficient is related to the resource utilization effect of the stakeholder and the stakeholder's own attributes, specifically including:
[0093] Assume that there are n stakeholders in the new power system, and the environmental protection contribution of stakeholder i is The main indicator for measuring the contribution of different stakeholders to environmental protection is the environmental protection input cost of the relevant subjects. However, the specific environmental protection effect is also related to the resource utilization effect and the attributes of the stakeholders themselves. For example, the environmental protection effect of thermal power units is not only related to the investment cost of their environmental protection equipment, but also to other factors such as their fuel quality and operating status. Therefore, the environmental protection contribution needs to be calculated according to the actual situation of different subjects. The calculation formula is as follows:
[0094]
[0095] in, is the environmental protection contribution of stakeholder i, p i is the relative environmental protection investment of stakeholder i, e i is the environmental protection contribution coefficient of stakeholder i.
[0096] As an optional implementation mode of the present invention, based on the environmental protection contribution of each stakeholder, the environmental protection correction coefficient of each stakeholder is determined, specifically including:
[0097] Obtain the sum of the environmental protection contributions of multiple stakeholders;
[0098] Determine the average value of the environmental protection contribution of each stakeholder;
[0099] The difference between the quotient of the environmental protection contribution of the stakeholder and the total contribution and the average value and the product of the environmental value of the new power stakeholder are taken as the environmental protection correction coefficient.
[0100] For example, the sum of the environmental protection contributions of multiple stakeholders is The quotient of the environmental protection contribution of interest subject i and the total contribution is The average value of the environmental protection contribution of each stakeholder is The environmental protection correction coefficient can compare the environmental protection contribution of each stakeholder i with the average level. The calculation formula is as follows:
[0101]
[0102] Among them, β i is the environmental protection correction coefficient of interest subject i, π env The environmental value of the new power interest entity, p i is the relative environmental protection investment of stakeholder i, e i is the environmental protection contribution coefficient of stakeholder i, and n is the total number of stakeholders participating in the alliance.
[0103] As an optional implementation manner of the present invention, the environmental protection correction coefficient is positively correlated with the corrected value allocation result.
[0104] As an optional implementation mode of the present invention, the environmental protection correction coefficient is positively correlated with the corrected value allocation result, including:
[0105] When the environmental protection correction coefficient is positive, the interest subject obtains additional benefit distribution value due to its environmental protection contribution;
[0106] When the environmental protection correction coefficient is negative, the stakeholder's additional benefit distribution value is reduced due to the reduction of environmental protection contribution.
[0107] For example, it can be seen from the calculation formula of the environmental protection correction coefficient that when When , the environmental protection correction coefficient is positive, and the interest subject i will obtain additional benefit distribution value due to its good environmental protection contribution; when When , the environmental protection correction coefficient is negative, and the interest subject i will reduce the additional benefit distribution value due to its unprominent environmental protection contribution.
[0108] As an optional implementation of the present invention, based on the environmental weight parameter and the environmental correction coefficient, the value allocation result determined based on the first cost allocation model is corrected to obtain the corrected value allocation result, including:
[0109] Determining an initial value allocation result based on a first cost allocation model;
[0110] Determine the product of the environmental protection weight parameter and the environmental protection correction coefficient;
[0111] The sum of the initial value allocation result and the product of the environmental protection weight parameter and the environmental protection correction coefficient is taken as the revised value allocation result.
[0112] For example, in the first cost allocation model of the new power system, environmental protection is incorporated into the Shapley value method, and a value compensation mechanism based on the improved Shapley value is designed. The calculation steps are as follows:
[0113] The initial distribution value π of each stakeholder is obtained through the traditional Shapley value method of the first cost allocation model i According to the evaluation results of relevant experts on the compensation factors of the environmental protection factors of the stakeholders, the weight α corresponding to the environmental protection correction coefficient β is obtained, so that the product αβ of the environmental protection weight parameter and the environmental protection correction coefficient of each stakeholder can be determined. i , based on the environmental weight parameter and the environmental correction coefficient, the traditional Shapley value distribution benefits are corrected. The sum of the initial value distribution result and the product of the environmental weight parameter and the environmental correction coefficient is taken as the corrected value distribution result. The corrected distribution value of each interest subject is obtained. The calculation formula is as follows:
[0114]
[0115] in, is the revised interest value of interest subject i, π i is the initial allocation value of stakeholder i, β i is the environmental protection correction coefficient of interest subject i, and α is the correction weight corresponding to the environmental protection correction coefficient β.
[0116] Among them, the revised interest distribution method still needs to meet overall rationality, that is, to ensure that the total value allocated to each stakeholder according to the revised distribution method is equal to the total value allocated to each stakeholder before the revision.
[0117] As an optional implementation manner of the present invention, the multiple stakeholders include a power supply side, a grid side, a load side and an energy storage side.
[0118] As the proportion of renewable energy connected to the power system continues to increase, the costs on the power supply side, grid side, load side and energy storage side will also change to varying degrees. The uncertainty of renewable energy output will require system dispatch to increase additional backup and operating costs.
[0119] The cost allocation method using the Shapley value method takes into account the impact of large-scale access of renewable energy on the cost of the new power system. After the cost generated after the access of new energy is allocated to the power supply side, grid side, load side, and energy storage side, the cost paid by each entity is still lower than the cost of non-cooperation, which verifies the rationality of the Shapley value correction allocation method. By considering the impact of environmental protection on the cost sharing of each entity, it better mobilizes the attention of each entity to the national environmental protection policy in the process of building a new power system. Each entity can further reduce the operating cost of the new power system by regulating environmental protection technologies, etc., and realizes the fairness and effectiveness of cost sharing among various stakeholders within the power system, which can promote the investment and development of various entities in environmental protection in the future construction of new power systems.
[0120] On the basis of the traditional Shapley value method of the first cost allocation model, the quantitative analysis is further considered from the perspective of environmental protection, and is applied to the benefits distributed to various stakeholders in the power system. The logic is coherent and clear, and the plasticity is strong. It can be combined with computer technology to realize the benefit distribution through computers. At the same time, the cost allocation value can be collected and improved, and it has strong scalability. It can be linked with other algorithms in the future, laying a good foundation for jointly studying reasonable benefit distribution methods for power systems.
[0121] The embodiment of the present invention also discloses a benefit distribution device for an electric power system, such as Figure 2 As shown, the device comprises:
[0122] A construction module 201 is used to construct a first cost allocation model, the first cost allocation model is established based on the Shapley value method, and the first cost allocation model includes multiple stakeholders;
[0123] A determination module 202 is used to determine the environmental protection correction coefficient of each stakeholder based on the environmental protection contribution of each stakeholder, wherein the environmental protection contribution is related to the environmental protection input cost of the stakeholder;
[0124] An acquisition module 203 is used to acquire an environmental protection weight parameter of each stakeholder, wherein the environmental protection weight parameter is related to an environmental protection correction coefficient;
[0125] The correction module 204 is used to correct the value allocation result determined based on the first cost allocation model based on the environmental weight parameter and the environmental correction coefficient to obtain a corrected value allocation result.
[0126] The benefit distribution device of the power system provided by the present invention fully considers the interests of the power supply side, the power grid side, the load side, and the energy storage side on the basis of minimizing the total cost of system operation, follows the principle of realizing economical and efficient cost allocation among the various stakeholders of the new power system, comprehensively considers the cost of the power system and the environmental protection of each stakeholder, and while minimizing the cost of the power system, increases the proportion of the impact of environmental protection on the cost sharing of the subject, so that each subject bears the cost increase brought by environmental protection to the new power system as a whole to varying degrees. By quantifying the impact of environmental protection on the cost of the new power system into the cost sharing process, the factors for the cost sharing of the new power system are considered more comprehensively, and the sharing results are more objective and fair, which can promote the investment and development of various subjects in environmental protection during the construction of the future new power system.
[0127] The embodiment of the present invention also provides a computer device, such as Figure 3 As shown, the computer device may include a processor 301 and a memory 302, wherein the processor 301 and the memory 302 may be connected via a bus or other means. Figure 3 The example of connecting through bus is taken in the following.
[0128] The processor 301 may be a central processing unit (CPU). The processor 301 may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or a combination of the above chips.
[0129] The memory 302 is a non-transient computer-readable storage medium that can be used to store non-transient software programs, non-transient computer executable programs and modules, such as program instructions / modules corresponding to the profit distribution method of the power system in the embodiment of the present invention. The processor 301 executes various functional applications and data processing of the processor by running the non-transient software programs, instructions and modules stored in the memory 302, that is, realizing the profit distribution method of the power system in the above method embodiment.
[0130] The memory 302 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required by at least one function; the data storage area may store data created by the processor 301, etc. In addition, the memory 302 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the memory 302 may optionally include a memory remotely arranged relative to the processor 301, and these remote memories may be connected to the processor 301 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0131] One or more modules are stored in the memory 302, and when executed by the processor 301, the execution is as follows: Figure 1 The benefit distribution method of the power system in the illustrated embodiment.
[0132] For details of the above computer equipment, please refer to Figure 1 The corresponding related descriptions and effects in the illustrated embodiments can be understood and will not be repeated here.
[0133] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, the storage medium can be a disk, an optical disk, a read-only memory (ROM), a random access memory (RAM), a flash memory, a hard disk drive (HDD) or a solid-state drive (SSD), etc.; the storage medium can also include a combination of the above-mentioned types of memory.
[0134] It should be noted that the embodiments represented by "one embodiment", "an embodiment", "an exemplary embodiment", "some embodiments", etc. mentioned in the specification may include specific features, structures or characteristics, but not every embodiment may include the specific features, structures or characteristics. In addition, such phrases do not necessarily refer to the same embodiment. In addition, when describing specific features, structures or characteristics in conjunction with an embodiment, it is within the knowledge of those skilled in the art to implement such features, structures or characteristics in conjunction with other embodiments that are explicitly or not explicitly described.
[0135] In general, terms should be understood, at least in part, by the context in which they are used. For example, the term "one or more" as used herein may be used to describe any feature, structure, or characteristic in a singular sense, or may be used to describe a combination of features, structures, or characteristics in a plural sense, depending, at least in part, on the context. Similarly, terms such as "a," "an," or "the" may also be understood to convey singular usage or to convey plural usage, depending, at least in part, on the context.
[0136] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.
Claims
1. A method for allocating benefits of a power system, characterized in that: The method comprises: Constructing a first cost allocation model, wherein the first cost allocation model is established based on the Shapley value method, and the first cost allocation model includes multiple stakeholders; Determining an environmental protection correction coefficient for each stakeholder based on the environmental protection contribution of each stakeholder, wherein the environmental protection contribution is related to the environmental protection input cost of the stakeholder; Obtaining an environmental protection weight parameter of each of the interest entities, wherein the environmental protection weight parameter is related to the environmental protection correction coefficient; Based on the environmental weight parameter and the environmental correction coefficient, the value allocation result determined based on the first cost allocation model is corrected to obtain a corrected value allocation result.
2. The profit distribution method of the power system according to claim 1, characterized in that: The environmental protection contribution is set as the product of the relative environmental protection investment of the stakeholder and the environmental protection contribution coefficient of the stakeholder; The relative environmental protection investment is related to the environmental protection investment cost, and the environmental protection contribution coefficient is related to the resource utilization effect of the stakeholder and the stakeholder's own attributes.
3. The profit distribution method of the power system according to claim 1, characterized in that: Based on the environmental protection contribution of each stakeholder, the environmental protection correction coefficient of each stakeholder is determined, including: Obtaining the sum of environmental protection contributions of the plurality of stakeholders; Determine the average value of the environmental protection contribution of each of the stakeholders; The product of the difference between the quotient of the environmental protection contribution of the stakeholder and the sum of the contributions and the average value and the environmental value of the new power stakeholder is taken as the environmental protection correction coefficient.
4. The profit distribution method of the power system according to claim 3, characterized in that: The environmental protection correction coefficient is positively correlated with the corrected value distribution result.
5. The profit distribution method of the power system according to claim 4, characterized in that: The environmental protection correction coefficient is positively correlated with the corrected value allocation result, including: When the environmental protection correction coefficient is positive, the interest subject obtains additional benefit distribution value due to the environmental protection contribution; When the environmental protection correction coefficient is negative, the additional benefit distribution value of the stakeholder is reduced due to the environmental protection contribution.
6. The profit distribution method of the power system according to claim 1, characterized in that: Based on the environmental weight parameter and the environmental correction coefficient, the value allocation result determined based on the first cost allocation model is corrected to obtain a corrected value allocation result, including: Determining an initial value allocation result based on the first cost allocation model; Determine the product of the environmental protection weight parameter and the environmental protection correction coefficient; The sum of the initial value allocation result and the product of the environmental weight parameter and the environmental correction coefficient is used as the corrected value allocation result.
7. The profit distribution method of the power system according to claim 1, characterized in that: The multiple stakeholders include the power supply side, the grid side, the load side and the energy storage side.
8. A benefit distribution device for an electric power system, characterized in that: include: A construction module, used to construct a first cost allocation model, wherein the first cost allocation model is established based on the Shapley value method, and the first cost allocation model includes multiple stakeholders; A determination module, configured to determine an environmental protection correction coefficient of each stakeholder based on the environmental protection contribution of each stakeholder, wherein the environmental protection contribution is related to the environmental protection input cost of the stakeholder; An acquisition module, used for acquiring an environmental protection weight parameter of each of the interest subjects, wherein the environmental protection weight parameter is related to the environmental protection correction coefficient; A correction module is used to correct the value allocation result determined based on the first cost allocation model based on the environmental weight parameter and the environmental correction coefficient to obtain a corrected value allocation result.
9. A computer device, characterized in that: include: processor; a memory for storing processor-executable instructions; Wherein, the processor is configured to: Constructing a first cost allocation model, wherein the first cost allocation model is established based on the Shapley value method, and the first cost allocation model includes multiple stakeholders; Determining an environmental protection correction coefficient for each stakeholder based on the environmental protection contribution of each stakeholder, wherein the environmental protection contribution is related to the environmental protection input cost of the stakeholder; Obtaining an environmental protection weight parameter of each of the interest entities, wherein the environmental protection weight parameter is related to the environmental protection correction coefficient; Based on the environmental weight parameter and the environmental correction coefficient, the value allocation result determined based on the first cost allocation model is corrected to obtain a corrected value allocation result.
10. A non-transitory computer-readable storage medium, when the instructions in the storage medium are executed by a processor, enables execution of a profit distribution method for a power system, the method comprising: Constructing a first cost allocation model, wherein the first cost allocation model is established based on the Shapley value method, and the first cost allocation model includes multiple stakeholders; Determining an environmental protection correction coefficient for each stakeholder based on the environmental protection contribution of each stakeholder, wherein the environmental protection contribution is related to the environmental protection input cost of the stakeholder; Obtaining an environmental protection weight parameter of each of the interest entities, wherein the environmental protection weight parameter is related to the environmental protection correction coefficient; Based on the environmental weight parameter and the environmental correction coefficient, the value allocation result determined based on the first cost allocation model is corrected to obtain a corrected value allocation result.