Nuclear fusion armored superconducting magnet hoisting and leveling method and supporting system thereof
By using a combination method of laser displacement sensor and electro-hydraulic jack in a nuclear fusion device, the lifting status of superconducting magnets is detected and leveled in real time, and the problem of inaccurate magnet installation is solved, and a stable and balanced magnet lifting is achieved.
Patent Information
- Application Number
- CN202411893719.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-20
- Publication Date
- 2025-02-28
AI Technical Summary
During the lifting of superconducting magnets of nuclear fusion devices, it is difficult to ensure accurate installation of magnets, and there may be an angle deviation in the horizontal direction, which will affect the subsequent operation of the device.
A nuclear fusion armored superconducting magnet lifting and leveling method is adopted to detect the lifting status of the magnet through a laser displacement sensor, and level it according to the detection data using an electro-hydraulic jack to ensure real-time control of the height of the magnet in all directions.
The stable lifting and balanced installation of superconducting magnets is achieved, eliminating height errors during the lifting process, and ensuring the accurate position and balanced state of the magnets.
Smart Images

Figure CN119528017A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of nuclear fusion armored superconducting magnets, and in particular to a nuclear fusion armored superconducting magnet hoisting and leveling method and a supporting system thereof. Background Art
[0002] Fusion energy has the advantages of unlimited resources, green and low-carbon, safe and reliable, and is considered to be an effective way to solve the energy crisis of mankind. The magnetic confinement tokamak is currently considered to be the most promising nuclear fusion device for the research and application of controlled nuclear fusion energy. Its principle is to use a certain strong magnetic field to confine and compress high-temperature plasma so that it meets the Lawson criterion, thereby realizing nuclear fusion reaction. Superconducting magnets are one of the core components of the tokamak device, and are generally hoisted in a suitable position through a certain supporting structure. However, during the hoisting process, it is difficult to ensure that the magnets can be installed accurately and there may be a certain angle deviation in the horizontal direction, which will cause some unnecessary troubles in the subsequent operation of the nuclear fusion device.
[0003] Based on the above-mentioned reality, there is an urgent need for a method that can detect the magnet lifting status in real time and level the magnet according to the detection data feedback. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides a nuclear fusion armored superconducting magnet hoisting and leveling method and its support system, which ensures that the armored superconducting magnet is stably hoisted on the supporting platform, and controls the height of the magnet in all directions in real time to ensure the balance of the hoisted magnet.
[0005] In order to achieve the above object, the present invention adopts the following technical solution:
[0006] A method for hoisting and leveling a nuclear fusion armored superconducting magnet comprises the following steps:
[0007] S1: Use a gantry truck to pre-lift the magnet to the designated location;
[0008] S2: Power on each laser displacement sensor and each electric hydraulic jack to initialize the electric jack control system;
[0009] The first laser displacement sensor, the second laser displacement sensor, the third laser displacement sensor, and the fourth laser displacement sensor are horizontally installed on the sensor mounting plate along the radial direction of the armored superconducting magnet; four electric hydraulic jacks are respectively installed on the top of the supporting frame, distributed in a cross shape, for hoisting the magnet and regulating the height of the magnet in all directions;
[0010] S3: The first laser displacement sensor emits a laser to measure a first height above the loading ground;
[0011] S4: The second laser displacement sensor emits a laser to measure a second height from the loading ground;
[0012] S5: The third laser displacement sensor emits a laser to measure a third height from the loading ground;
[0013] S6: the fourth laser displacement sensor emits a laser to measure a fourth height from the loading ground;
[0014] S7: Determine whether the difference between the first height and the first set height exceeds a threshold value, if yes, proceed to step 11; if no, proceed to step S15;
[0015] S8: Determine whether the difference between the second height and the first set height exceeds a threshold value, if yes, proceed to step 12; if no, proceed to step S15;
[0016] S9: Determine whether the difference between the third height and the second set height exceeds a threshold value, if yes, proceed to step 13; if no, proceed to step S15;
[0017] S10: Determine whether the difference between the fourth height and the second set height exceeds a threshold value, if yes, proceed to step 14; if no, proceed to step S15;
[0018] S11: Operate the No. 1 electric jack to make the boom move in the vertical direction to eliminate the height error;
[0019] S12: operate the No. 2 electric jack to make the boom move in the vertical direction to eliminate the height error;
[0020] S13: Operate the No. 3 electric jack to make the boom move in the vertical direction to eliminate the height error;
[0021] S14: Operate the No. 4 electric jack to make the boom move in the vertical direction to eliminate the height error;
[0022] S15: Leveling is completed.
[0023] Further, the first laser displacement sensor and the second displacement sensor are horizontally mounted on the sensor mounting plate symmetrically about the magnet along the radial direction of the magnet, and the third laser displacement sensor and the fourth displacement sensor are horizontally mounted on the sensor mounting plate symmetrically about the magnet along the radial direction of the magnet.
[0024] Furthermore, the steps S3-S6 are performed synchronously to collect the heights of the magnet from the loading ground in each direction, and measure the first height, the second height, the third height, and the fourth height.
[0025] Furthermore, the steps S7-S10 are performed synchronously to determine whether the positions of the magnets in each direction need to be adjusted.
[0026] Further, in S7-S10, in S7-S10, the difference between the first height H1 and the first set height hset1 is: |H1-hset1|, the difference between the second height H2 and the first set height hset1 is: |H2-hset1|, the difference between the third height H3 and the second set height is: |H3-hset2|, and the difference between the fourth height H4 and the second set height is: |H4-hset2|. The threshold is determined when the measured offset angle of the magnet does not exceed 0.01°, that is, , D is the horizontal distance between each displacement sensor and the center of the magnet, H is H1, H2, H3, H4, and hset is hset1, hset2.
[0027] The present invention also provides a support system for a nuclear fusion armored superconducting magnet, which is controlled by the above-mentioned method for hoisting and leveling a nuclear fusion armored superconducting magnet, and includes a first laser displacement sensor, a second laser displacement sensor, a third laser displacement sensor, a fourth laser displacement sensor, a No. 1 electric hydraulic jack, a No. 2 electric hydraulic jack, a No. 3 electric hydraulic jack, a No. 4 electric hydraulic jack, a round rod suspension rod assembly, a sensor mounting plate, a support stand, and an armored superconducting magnet; the sensor mounting plate is mounted on the round rod suspension rod assembly, the first laser displacement sensor, the second laser displacement sensor, the third laser displacement sensor, and the fourth laser displacement sensor are respectively mounted horizontally on the sensor mounting plate along the radial direction of the armored superconducting magnet, and the electric hydraulic jacks are respectively mounted on the top of the stand, distributed in a cross, and are used to fix and adjust the round suspension rod to complete the balanced hoisting of the armored superconducting magnet.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] The present invention realizes the stable hoisting of the armored superconducting magnet on the supporting platform, detects the magnet hoisting state by laser displacement sensors in various directions, judges whether the height of the magnet in various directions needs to be corrected according to the detected data, feeds back the information to the electric jack, and the jack performs corresponding leveling work according to the feedback data to eliminate the height error of the magnet in various directions, thereby achieving the purpose of real-time control of the height of the magnet in various directions and ensuring the balance of the hoisted superconducting magnet. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The exemplary implementation of the present invention is described in more detail with reference to the accompanying drawings, which does not constitute an improper limitation of the present invention. In the accompanying drawings:
[0031] Figure 1 The present invention provides a flow chart of a method for hoisting and leveling a nuclear fusion armored superconducting magnet.
[0032] Figure 2It is a structural schematic diagram of a support system for a nuclear fusion armored superconducting magnet provided by the present invention.
[0033] In the figure, the reference numerals are: 1-support stand; 2-electric hydraulic jack No. 1; 3-electric hydraulic jack No. 2; 4-electric hydraulic jack No. 3; 5-electric hydraulic jack No. 4; 6-round rod lifting assembly; 7-first laser displacement sensor; 8-third laser displacement sensor; 9-sensor mounting plate; 10-armored superconducting magnet. DETAILED DESCRIPTION
[0034] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the protection scope of the present invention.
[0035] like Figure 1 As shown, an embodiment of the present invention provides a method for hoisting and leveling a nuclear fusion armored superconducting magnet, which specifically includes the following steps:
[0036] S1: Use a gantry truck to pre-lift the magnet to the designated location;
[0037] S2: Power on the displacement sensor and the electric hydraulic jack to initialize the electric jack control system;
[0038] The first laser displacement sensor 7 , the second laser displacement sensor, the third laser displacement sensor 8 , and the fourth laser displacement sensor are horizontally mounted on the sensor mounting plate 9 along the radial direction of the armored superconducting magnet.
[0039] Four electric jacks are respectively installed on the top of the support frame 1 in a cross distribution, and are used to hoist the magnet and adjust the height of the magnet in various directions.
[0040] S3: The first laser displacement sensor emits a laser to measure a first height H1 from the loading ground;
[0041] S4: The second laser displacement sensor emits a laser to measure a second height H2 from the loading ground;
[0042] S5: The third laser displacement sensor emits a laser to measure a third height H3 from the loading ground;
[0043] S6: The fourth laser displacement sensor emits a laser to measure a fourth height H4 from the loading ground;
[0044] S7: Determine whether the difference between the first height H1 and the first set height hset1 exceeds a threshold value, if yes, proceed to S11; if no, proceed to S15;
[0045] S8: Determine whether the difference between the second height H2 and the first set height hset1 exceeds a threshold value. If so, proceed to S12; if not, proceed to S15;
[0046] S9: Determine whether the difference between the third height H3 and the second set height hset2 exceeds a threshold value, if yes, proceed to S13; if no, proceed to S15;
[0047] S10: Determine whether the difference between the fourth height H4 and the second set height hset2 exceeds a threshold value, if yes, proceed to S14; if no, proceed to S15;
[0048] S11: Operate the No. 1 electric jack to make the boom move in the vertical direction to eliminate the height error;
[0049] S12: operate the No. 2 electric jack to make the boom move in the vertical direction to eliminate the height error;
[0050] S13: Operate the No. 3 electric jack to make the boom move in the vertical direction to eliminate the height error;
[0051] S14: Operate the No. 4 electric jack to make the boom move in the vertical direction to eliminate the height error;
[0052] S15: Leveling is completed.
[0053] Preferably, the steps S3-S6 are performed synchronously, mainly to collect the height of the magnet in this direction from the loading ground.
[0054] Preferably, S7-S10 are performed simultaneously to determine whether the position of the magnet in this direction needs to be adjusted.
[0055] Preferably, in S7-S10, the difference between the first height H1 and the first set height hset1 is: |H1-hset1|, the difference between the second height H2 and the first set height hset1 is: |H2-hset1|, the difference between the third height H3 and the second set height is: |H3-hset2|, and the difference between the fourth height H4 and the second set height is: |H4-hset2|. The threshold is determined when the offset angle of the magnet is measured to be no more than 0.01°, that is, , D is the horizontal distance between each displacement sensor and the center of the magnet, H is H1, H2, H3, H4, and hset is hset1, hset2.
[0056] like Figure 2As shown, the present invention also provides a support system for a nuclear fusion armored superconducting magnet, which is controlled by the above method, and includes a support stand 1, a No. 1 electric hydraulic jack 2, a No. 2 electric hydraulic jack 3, a No. 3 electric hydraulic jack 4, a No. 4 electric hydraulic jack 5, a round rod hoisting assembly 6, a first laser displacement sensor 7, a second laser displacement sensor, a third laser displacement sensor 8, a fourth laser displacement sensor, a sensor mounting plate 9, and an armored superconducting magnet 10. The No. 1 electric hydraulic jack 2, the No. 2 electric hydraulic jack 3, the No. 3 electric hydraulic jack 4, and the No. 4 electric hydraulic jack 5 are respectively installed on the top of the support stand 1 in a cross distribution, the round rod hoisting assembly 6 is installed on the stand 1 for hoisting the armored superconducting magnet 10 and the four cross-distributed electric hydraulic jacks, the sensor mounting plate 9 is installed on the round rod hoisting assembly, and the first laser displacement sensor 7, the second laser displacement sensor, the third laser displacement sensor 8, and the fourth laser displacement sensor are installed on the corresponding sensor mounting plate 9.
[0057] Preferably, there are four sensor mounting plates 9, which are respectively mounted on the round rod hanging assembly 6 in four directions of up, down, left and right. The first laser displacement sensor 7 and the third laser displacement sensor 8 are respectively mounted on the sensor mounting plates 9.
[0058] Preferably, the second laser displacement sensor and the first laser displacement sensor 7 are symmetrical about the magnet and are installed on the corresponding sensor mounting plate; the fourth laser displacement sensor and the third laser displacement sensor 8 are symmetrical about the magnet and are installed on the corresponding sensor mounting plate 9. That is, the first laser displacement sensor 7, the second laser displacement sensor, the third laser displacement sensor 8, and the fourth laser displacement sensor are horizontally installed on the sensor mounting plate 9 along the radial direction of the armored superconducting magnet; the No. 1 electric hydraulic jack 2, the No. 2 electric hydraulic jack 3, the No. 3 electric hydraulic jack 4, and the No. 4 electric hydraulic jack 5 are respectively installed on the top of the support stand 1, in a cross distribution.
[0059] The four laser displacement sensors emit lasers to continuously detect the height of the position relative to the loading ground in all directions, and feed back the data to each electric hydraulic jack to adjust the position of the magnet in all directions in the height direction.
[0060] The above description is only a preferred embodiment of the present invention and is not intended to limit the scope of protection of the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of protection of the present invention.
Claims
1. A method for hoisting and leveling a nuclear fusion armored superconducting magnet, characterized in that: The following steps are involved: S1: Use a gantry truck to pre-lift the magnet to the designated location; S2: Power on each laser displacement sensor and each electric hydraulic jack to initialize the electric jack control system; The first laser displacement sensor, the second laser displacement sensor, the third laser displacement sensor, and the fourth laser displacement sensor are horizontally installed on the sensor mounting plate along the radial direction of the armored superconducting magnet; four electric hydraulic jacks are respectively installed on the top of the supporting frame, distributed in a cross shape, for hoisting the magnet and regulating the height of the magnet in all directions; S3: The first laser displacement sensor emits a laser to measure a first height above the loading ground; S4: The second laser displacement sensor emits a laser to measure a second height from the loading ground; S5: The third laser displacement sensor emits a laser to measure a third height from the loading ground; S6: the fourth laser displacement sensor emits a laser to measure a fourth height from the loading ground; S7: Determine whether the difference between the first height and the first set height exceeds a threshold value, if yes, proceed to step 11; if no, proceed to step S15; S8: Determine whether the difference between the second height and the first set height exceeds a threshold value, if yes, proceed to step 12; if no, proceed to step S15; S9: Determine whether the difference between the third height and the second set height exceeds a threshold value, if yes, proceed to step 13; if no, proceed to step S15; S10: Determine whether the difference between the fourth height and the second set height exceeds a threshold value, if yes, proceed to step 14; if no, proceed to step S15; S11: Operate the No. 1 electric jack to make the boom move in the vertical direction to eliminate the height error; S12: operate the No. 2 electric jack to make the boom move in the vertical direction to eliminate the height error; S13: Operate the No. 3 electric jack to make the boom move in the vertical direction to eliminate the height error; S14: Operate the No. 4 electric jack to make the boom move in the vertical direction to eliminate the height error; S15: Leveling is completed.
2. A method for hoisting and leveling a nuclear fusion armored superconducting magnet according to claim 1, characterized in that: The first laser displacement sensor and the second displacement sensor are horizontally mounted on the sensor mounting plate symmetrically about the magnet along the radial direction of the magnet, and the third laser displacement sensor and the fourth displacement sensor are horizontally mounted on the sensor mounting plate symmetrically about the magnet along the radial direction of the magnet.
3. A method for hoisting and leveling a nuclear fusion armored superconducting magnet according to claim 1, characterized in that: The steps S3-S6 are performed synchronously to collect the heights of the magnet from the loading ground in each direction, and measure the first height, the second height, the third height, and the fourth height.
4. A method for hoisting and leveling a nuclear fusion armored superconducting magnet according to claim 1, characterized in that: The steps S7-S10 are performed synchronously to determine whether the positions of the magnets in each direction need to be adjusted.
5. A method for hoisting and leveling a nuclear fusion armored superconducting magnet according to claim 1, characterized in that: In S7-S10, in S7-S10, the difference between the first height H1 and the first set height hset1 is: |H1-hset1|, the difference between the second height H2 and the first set height hset1 is: |H2-hset1|, the difference between the third height H3 and the second set height is: |H3-hset2|, the difference between the fourth height H4 and the second set height is: |H4-hset2|, and the threshold is determined when the measured offset angle of the magnet does not exceed 0.01°, that is, , D is the horizontal distance between each displacement sensor and the center of the magnet, H is H1, H2, H3, H4, and hset is hset1, hset2.
6. A support system for a nuclear fusion armored superconducting magnet, using a method for hoisting and leveling a nuclear fusion armored superconducting magnet as claimed in any one of claims 1 to 5, characterized in that: It includes a support stand, an electric hydraulic jack, a No. 2 electric hydraulic jack, a No. 3 electric hydraulic jack, a No. 4 electric hydraulic jack, a round rod hoisting assembly, a first laser displacement sensor, a third laser displacement sensor, a sensor mounting plate, and an armored magnet; the sensor mounting plate is mounted on the round rod hoisting assembly; The first laser displacement sensor, the second laser displacement sensor, the third laser displacement sensor, and the fourth laser displacement sensor are respectively installed horizontally on the sensor mounting plate along the radial direction of the armored superconducting magnet; the four electric hydraulic jacks are respectively installed on the top of the platform and are distributed in a cross shape.
7. A support system for a nuclear fusion armored superconducting magnet according to claim 6, characterized in that: The laser displacement sensor emits laser to continuously detect the height of the magnet relative to the loading ground in all directions, and feeds back the data to the electric hydraulic jack to adjust the height position of the magnet in all directions.